Mountain photovoltaic adjustable mobile construction platform

By using an adjustable mobile construction platform in the construction of mountainous photovoltaic power stations, the problems of difficulty in installing spiral piles and insufficient stability of guardrail foundations in traditional construction methods in complex terrain are solved, achieving efficient and safe construction of the platform in mountainous environments. The stability and power generation efficiency of the photovoltaic bracket system are improved.

CN118815367APending Publication Date: 2024-10-22HUADIAN JINSHANGCHANGDU NEW ENERGY CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411203250.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-30
Publication Date
2024-10-22

AI Technical Summary

Technical Problem

In the construction of mountain photovoltaic power stations, the traditional construction method of photovoltaic support systems due to complex terrain and unstable soil makes it difficult to install spiral piles, ensure the safety of workers, and ensure the stability of guardrail foundations, which affects the safety and efficiency of the entire photovoltaic support system. .

Method used

A mountainous photovoltaic adjustable mobile construction platform is designed, using components such as universal wheels, winches, telescopic tables, rope anchors, angle adjustment rods, fixed components and detachable guardrails. Through the collaborative work of these components, The stability and safety of the platform in complex terrain are adjusted to ensure the flexibility and safety of the construction platform.

Benefits of technology

The platform can quickly adapt to different terrains, improve drilling accuracy and efficiency, enhance construction safety and stability, reduce construction costs, and improve the stability and power generation of photovoltaic support systems through precise positioning and depth control. efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118815367A_ABST
    Figure CN118815367A_ABST
Patent Text Reader

Abstract

The mountain photovoltaic adjustable movable construction platform comprises a bottom plate with universal wheels, a winch installed on the bottom plate and a telescopic table hinged to the bottom plate through a support, the other end of a rope wound around the winch is connected with a pull rope anchoring part, and a supporting frame is hinged to the middle of the upper end of the telescopic table; a pile pit drilling machine is fixed to the lower end of the top plate through a telescopic rod, an angle adjusting rod is connected to the middle of one end of the telescopic table in a threaded mode, a pull rope anchoring part is installed at the other end of the telescopic table, the telescopic table comprises an outer sleeve plate on the outer side and a stretching plate stretching out of the outer sleeve plate in a sliding mode, and a push block is arranged at the front end of the stretching plate. Through the adjustable movable design, the construction platform can quickly adapt to different mountain terrains, construction delay caused by terrain changes is reduced, the position and height of the pile pit drilling machine can be accurately adjusted through the combined design of the telescopic table and the lifting sleeve, and therefore the drilling accuracy and efficiency are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of photovoltaic construction platforms, and in particular to a mountain photovoltaic adjustable mobile construction platform. Background Art

[0002] like Figure 1 As shown in the figure, there are many challenges in the construction of existing photovoltaic support systems, especially in the construction of mountain photovoltaic power stations. The traditional photovoltaic support system is mainly composed of photovoltaic support a, and photovoltaic panels e are installed on the upper end of photovoltaic support a to receive solar energy and convert it into electrical energy. The lower end of photovoltaic support a is firmly fixed to the mountain through spiral piles f to ensure the stability and safety of the entire photovoltaic system. At the same time, in order to optimize the power output, the middle part of photovoltaic support a is often equipped with inverter d through a cross bar, and the side of inverter d is equipped with inverter guardrail b to protect the inverter from external damage. The lower end of inverter guardrail b is fixed on the guardrail foundation c to enhance the stability of the overall structure.

[0003] In the actual construction process, especially in the complex and changeable mountain environment, this traditional construction method has exposed some significant limitations. First of all, the installation process of the spiral pile is particularly critical and difficult. Due to the inclination and unevenness of the mountain slope, it is extremely difficult to drive the spiral pile. The traditional manual construction method is not only inefficient, but also difficult to ensure the safety of workers, facing the risk of landslides and falls.

[0004] In addition, the construction of the guardrail foundation c also faces many challenges. In mountainous environments, due to the complex terrain and unstable soil structure, traditional construction methods often cannot ensure the stability and reliability of the guardrail foundation, which in turn affects the safety of the entire photovoltaic support system. Summary of the invention

[0005] The purpose of the present invention is to provide a mountain photovoltaic adjustable mobile construction platform to solve the defects mentioned in the above background technology.

[0006] To achieve the above-mentioned purpose, a mountain photovoltaic adjustable mobile construction platform is provided, comprising a base plate with universal wheels, a winch installed on the base plate, and a telescopic platform connected to the base plate through a support, the other end of the rope wound on the winch is connected to a pull rope anchor, a support frame is hinged at the middle of the upper end of the telescopic platform, and a lifting sleeve for adjusting the length is installed at one end of the support frame, and a top plate is installed on the top of the support frame, a pile pit drilling rig is fixed to the lower end of the top plate through a telescopic rod, and the drill rod of the pile pit drilling rig passes through the telescopic platform and the base plate, an angle adjustment rod is screwed at the middle of one end of the telescopic platform, and a slider hinged at the lower end of the angle adjustment rod is installed on a slide rail on the base plate, a pull rope anchor is installed on the other end of the telescopic platform, the telescopic platform comprises an outer outer jacket plate and a stretching plate sliding out from the inner part of the outer jacket plate, and a push block is provided at the front end of the stretching plate.

[0007] Furthermore, a through slot is provided in the middle of the telescopic platform, and the drill rod at the lower end of the pile pit drilling rig passes through the through slot, and a track mounting slot is provided on the outer casing plate at the rear side of the through slot, a slide rail is fixed inside the track mounting slot, and a slider of an articulated support frame is slidably installed on the slide rail.

[0008] Furthermore, the telescopic rod includes an external sleeve and an internal telescopic rod, and a spring is sleeved on the telescopic rod, one end of the spring is fixed on the sleeve, and the other end of the spring is fixed to the lower end of the telescopic rod, and the two groups of telescopic rods are fixed to the support frame through brackets.

[0009] Furthermore, a base plate for fixing the rope and an anchor rod fixed at the bottom of the base plate are arranged above the pull rope anchor, and the height of the base plate of the pull rope anchor is higher than the height of the bottom plate and lower than the height of the telescopic platform.

[0010] Furthermore, both ends of the base plate are connected to fixed components via rotating shafts, and both sides of the fixed components are connected to the base plate via return springs, and the fixed components are of an I-shaped structure.

[0011] Furthermore, the fixing assembly includes a soil pressing plate in the middle, side positioning plates connected on both sides of the soil pressing plate, and a slide groove is opened on the soil pressing plate, and a foot pedal is slidably installed inside the slide groove, an insertion rod is fixed at the lower end of the foot pedal, and the foot pedal pushes the insertion rod downward inside the slide groove.

[0012] Furthermore, a detachable guardrail is installed on the side of the telescopic platform, and the pile pit drilling rig installed on the telescopic platform is detachable, and the concrete bin is detachable on the telescopic platform, and a feed pump is installed inside the concrete bin, and the feed pump, the pile pit drilling rig and the winch are connected to the power supply system and the controller, and the controller is installed on the telescopic platform.

[0013] Furthermore, the angle adjustment rod rotates to push the telescopic platform to rotate around the support, and the angle formed by the telescopic platform and the bottom plate is the same as the inclination of the slope of the mountain.

[0014] Further, the method of using the construction platform: Preparation stage: Ensure that all parts of the construction platform are intact and correctly installed in the designated location; check whether the power supply system and controller are connected properly, and ensure that all electrical equipment has been connected to the power supply system; confirm that the fixing components and guardrails are complete and effective; Movement and positioning: Use the universal wheels on the bottom plate and the winch to move the construction platform to the designated construction site; By adjusting the soil pressing plate and side positioning plate of the fixed assembly, ensure that the construction platform is stable and does not shake on the mountain slope; use the foot pedal to push the insertion rod into the soil to increase the stability of the platform; Adjust the telescopic table: According to actual needs, adjust the stretching plate on the telescopic table to make its length meet the construction needs; use the push block to adjust the position of the stretching plate; adjust the angle of the telescopic table, and by turning the angle adjustment rod, make the angle formed by the telescopic table and the bottom plate match the inclination angle of the mountain slope to ensure the stability of the construction platform; Install and adjust the support frame: Install the support frame on the middle of the upper end of the telescopic platform, and adjust the height of one side of the support frame through the lifting sleeve, install the top plate on the support frame, and fix the pile pit drilling rig through the telescopic rod; adjust the length of the telescopic rod by pressing down the pile pit drilling rig, and use the spring to maintain its stability; Startup and Operation: Start the power supply system through the controller and ensure that all electrical equipment is in standby mode; start the pile pit drilling machine and use the drill rod to pass through the telescopic table and the bottom plate to perform drilling operations; adjust the depth and angle of the drilling machine as needed; if concrete operations are required, install the concrete silo on the telescopic table and use the feed pump to transport concrete; Safety and Maintenance: During construction, always ensure that the guardrails are installed in place to prevent people from falling; regularly check the connection and wear of each component, and replace damaged components in time; after the construction is completed, clean the construction platform, put all components back in place, and prepare for the next use; Through the above steps, the safe and efficient use of the mountain photovoltaic adjustable mobile construction platform can be ensured to meet the needs of mountain photovoltaic construction.

[0015] Compared with the prior art, the present invention has the following beneficial effects: Through the adjustable mobile design, the construction platform can quickly adapt to different mountain terrains, reducing construction delays caused by terrain changes. The combined design of the telescopic table and lifting casing allows the pile pit drilling rig to accurately adjust the position and height, thereby improving the accuracy and efficiency of drilling.

[0016] The design of the angle adjustment rod allows the construction platform to be adjusted according to the inclination angle of the mountain slope, ensuring that the construction platform remains stable with the ground, improving the safety and stability of construction; the I-shaped structure and plug-in rod design of the fixed component enable the construction platform to be firmly fixed in complex terrain and not easy to slip.

[0017] The guardrails installed on the telescopic platform provide the necessary safety barrier to prevent workers from accidentally falling during construction; the stabilization system composed of the winch and rope anchors ensures that the construction platform will not get out of control due to external forces during operation, further improving the safety of construction.

[0018] The detachable design allows the various components of the construction platform to be flexibly combined and used, which not only facilitates transportation and installation, but also reduces the cost of replacing the entire machine due to component damage; the integrated design of the power supply system and controller enables the construction platform to be autonomously powered and controlled, reducing dependence on external power supplies and manual control, thereby reducing construction costs.

[0019] The precise positioning and depth control of the pile pit drilling rig ensure the installation accuracy of the spiral piles, thereby improving the stability and power generation efficiency of the entire photovoltaic support system; the precise construction of the inverter guardrail and guardrail foundation also ensures the safe and stable operation of the inverter and reduces the failure rate caused by construction errors. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 This is a schematic diagram of the installation of the existing mountain photovoltaic bracket; Figure 2 This is a schematic diagram of the structural construction platform of the present invention; Figure 3 It is a schematic diagram of the box of the present invention; Figure 4 It is a schematic diagram of the beam slide rail of the present invention.

[0021] Numbers in the figure: a, photovoltaic bracket; b, inverter guardrail; c, guardrail foundation; d, inverter; e, photovoltaic panel; f, screw pile; 1, bottom plate; 2, winch; 3, telescopic table; 31, through slot; 32, outer plate; 33, stretching plate; 34, push block; 35, track mounting slot; 4, slide rail; 5, fixing assembly; 51, soil pressure plate; 52, slide slot; 53, foot pedal; 54, insertion rod; 55, side positioning plate; 56, reset spring; 6, angle adjustment rod; 7, support frame; 8, telescopic rod; 9, top plate; 10, pile pit drilling rig; 11, lifting casing; 12, concrete bin; 13, pull rope anchor. DETAILED DESCRIPTION

[0022] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention. Example

[0023] See also Figure 2-4 The present invention provides a technical solution: a mountain photovoltaic adjustable mobile construction platform, mainly composed of a bottom plate 1, a winch 2, a telescopic platform 3, a support frame 7, a top plate 9, a pile hole drill 10, a telescopic rod 8, a pull rope anchor 13 and a fixing assembly 5. The coordinated work between the various parts enables the construction platform to efficiently and flexibly complete the installation of photovoltaic brackets in complex and changeable mountain environments.

[0024] The base plate 1 is the foundation of the entire construction platform, and universal wheels are installed on it to ensure that the platform can move freely on the mountain, which is convenient for adjusting the position and carrying out multi-point construction. The design of the universal wheels takes into account the complexity of the terrain, and can maintain stability on inclined and rugged ground, reducing the difficulty of operation.

[0025] The winch 2 is fixed on the base plate 1, with one end of its rope wound on the winch, and the other end connected to the rope anchor 13 at one end of the telescopic platform 3 through a pulley or a guide device. The rope anchor 13 is designed with a fixed base plate and an anchor rod, and its height design ensures that the rope can be firmly connected without generating excessive friction resistance during movement. This design enables the construction platform to adjust the position and height of the telescopic platform 3 through the operation of the winch as needed.

[0026] The telescopic platform 3 is the core part of the construction platform. It adopts a combination structure of an outer plate 32 and a stretch plate 33, so that the entire platform can be adjusted in length to adapt to construction areas of different widths. A through slot 31 is provided on the outer plate 32 for the drill rod of the pile pit drilling machine 10 to pass through, and a track installation slot 35 is used to install the slide rail 4. The slider of the support frame 7 slides in the track installation slot 35 through the slide rail 4, thereby realizing the support and adjustment function of the telescopic platform 3.

[0027] The support frame 7 is hinged at the middle of the upper end of the telescopic platform 3, and the angle is adjusted by the angle adjustment rod 6 to adapt to the inclination angle of the mountain slope. A top plate 9 is installed on the top of the support frame 7, and the lower end of the top plate 9 is fixed to the pile pit drilling machine 10 through the telescopic rod 8. The telescopic rod 8 is designed as a combination of a sleeve and a telescopic rod, and a spring is built in to provide a buffering effect, thereby enhancing the stability of the operation of the pile pit drilling machine 10.

[0028] First, the construction workers use the universal wheels on the base plate 1 to move the construction platform to the specified position. During the movement, the platform's travel direction can be adjusted according to the terrain to ensure that it reaches the construction site smoothly. After arriving at the construction site, the winch 2 is operated and the pull rope anchor 13 is used to stably fix the telescopic platform 3 on the ground to prevent movement during the operation.

[0029] According to construction needs, the length and angle of the telescopic platform 3 are adjusted. The length of the telescopic platform 3 is adjusted by adjusting the extended length of the stretching plate 33 in the outer sleeve plate 32. At the same time, the telescopic platform 3 is rotated around the support by rotating the angle adjustment rod 6 until it matches the inclination angle of the mountain slope. During this process, the slider of the support frame 7 slides on the slide rail 4 to ensure the stability of the telescopic platform 3.

[0030] After adjusting the telescopic platform 3, the pile pit drilling rig 10 is started to install the spiral pile. The drill rod of the pile pit drilling rig 10 passes through the through slot 31 and drills downward until it reaches a predetermined depth. During this process, the telescopic rod 8 and its built-in spring provide necessary support and buffering effects to ensure the stable operation of the drilling rig.

[0031] In order to further enhance the stability of the construction platform, a fixing assembly 5 can be used during the construction process. The fixing assembly 5 includes a soil pressing plate 51, a side positioning plate 55, a slide 52, a foot pedal 53 and an insertion rod 54. When the construction platform needs to be fixed, the construction personnel can step on the foot pedal 53 to push the insertion rod 54 into the soil, thereby fixing the platform. The fixing assembly 5 of the I-shaped structure increases the contact area with the ground and improves the firmness of the fixation.

[0032] The controller is used to centrally control various functions of the entire construction platform, including the start, stop, speed adjustment of the pile pit drilling rig, and the material feeding control of the concrete silo.

[0033] Through the display screen on the controller or the remote monitoring system, the operating status and various parameters of the construction platform can be monitored in real time to ensure construction safety and efficiency.

[0034] Cleaning and tidying up after construction is completed: turn off all electrical equipment and disconnect the power supply system; dismantle and clean the pile pit drilling rig, concrete bin and other detachable parts, and put them back to their original places or store them properly; check and clean all parts of the construction platform to ensure there are no residues or damage; use the winch and rope anchors to move the construction platform to the next construction site or storage location. Example

[0035] The difference between the embodiment 1 and the embodiment 1 is that: on the basis of the original, a slope sensor and an automatic leveling system are added; the slope sensor monitors the inclination angle between the construction platform and the mountain slope in real time, and automatically controls the angle adjustment rod, so that the telescopic platform is automatically adjusted to the optimal angle parallel to the slope, ensuring construction stability and efficiency; The pile drilling rig and concrete silo construction equipment are designed as modular components that can be quickly replaced; according to construction needs, they can be easily replaced with other types of construction tools (such as small cranes, material handling devices, etc.), improving the versatility and flexibility of the construction platform; On the basis of the fixing components, a hydraulic drive device is added to enable the insertion rod to automatically insert into the soil and reach the predetermined depth, thereby improving the fixing efficiency and stability; at the same time, anti-slip pads and anchor bolts are added to further enhance the stability of the construction platform on soft or inclined ground; Add retractable safety fences and protective nets around the telescopic platform to ensure the safety of construction workers during operation; at the same time, install emergency brakes and anti-slip mats on the platform to prevent accidents; A touch screen or remote control is installed on the telescopic table as a control terminal, integrating the control functions of all construction equipment; construction personnel can start, stop, adjust and other actions of the equipment through simple operations, thus improving construction efficiency and convenience; Connect the construction platform to the remote monitoring system to transmit the images and data of the construction site to the monitoring center in real time; monitoring personnel can remotely monitor the construction progress and platform status, discover and solve problems in a timely manner, and ensure construction safety and quality; Add wastewater recovery systems and dust suppression devices on the construction platform to reduce the impact on the environment during construction; at the same time, use low-noise, low-emission construction equipment to reduce construction noise and exhaust emissions; Optimize the power supply system and use renewable energy such as solar panels to power the construction platform; when there is sufficient sunlight, the excess electricity can be stored in the battery pack for use at night or in rainy weather, reducing dependence on external power sources.

Claims

1. A mountain photovoltaic adjustable mobile construction platform, comprising a base plate (1) with universal wheels, a winch (2) mounted on the base plate (1), and a telescopic platform (3) connected to the base plate (1) via a support, characterized in that: The other end of the rope wound on the hoist (2) is connected to a pull rope anchor (13); a support frame (7) is hingedly connected to the middle of the upper end of the telescopic platform (3); a lifting sleeve (11) for adjusting the length is installed at one end of the support frame (7); a top plate (9) is installed on the top of the support frame (7); a pile drilling machine (10) is fixed to the lower end of the top plate (9) through a telescopic rod (8); and the drill rod of the pile drilling machine (10) passes through the telescopic platform (3) and the bottom plate (1); an angle adjustment rod (6) is screwed to the middle of one end of the telescopic platform (3); and a slider hinged at the lower end of the angle adjustment rod (6) is installed on a slide rail on the bottom plate (1); a pull rope anchor (13) is installed on the other end of the telescopic platform (3); the telescopic platform (3) comprises an outer outer plate (32) and a stretching plate (33) slidingly extending from the inner side of the outer plate (32); and a push block (34) is provided at the front end of the stretching plate (33).

2. The mountain photovoltaic adjustable mobile construction platform according to claim 1 is characterized by: A through slot (31) is provided in the middle of the telescopic platform (3), and a drill rod at the lower end of the pile pit drilling machine (10) passes through the through slot (31). A track mounting slot (35) is provided on the outer sleeve plate (32) at the rear side of the through slot (31), and a slide rail (4) is fixed inside the track mounting slot (35), and a slider of a hinged support frame (7) is slidably mounted on the slide rail (4).

3. The mountain photovoltaic adjustable mobile construction platform according to claim 2 is characterized by: The telescopic rod (8) comprises an external sleeve and an internal telescopic rod, and a spring is sleeved on the telescopic rod, one end of the spring is fixed to the sleeve, and the other end of the spring is fixed to the lower end of the telescopic rod, and the two sets of telescopic rods (8) are fixed to the support frame (7) through brackets.

4. The mountain photovoltaic adjustable mobile construction platform according to claim 3 is characterized by: A base plate for fixing the rope and an anchor rod fixed at the bottom of the base plate are arranged above the pull rope anchor (13), and the height of the base plate of the pull rope anchor (13) is higher than the height of the bottom plate (1) but lower than the height of the telescopic platform (3).

5. The mountain photovoltaic adjustable mobile construction platform according to claim 4 is characterized by: The two ends of the base plate (1) are connected to fixed components (5) via rotating shafts, and the two sides of the fixed component (5) are connected to the base plate (1) via return springs (56), and the fixed component (5) is an I-shaped structure.

6. The mountain photovoltaic adjustable mobile construction platform according to claim 5 is characterized by: The fixing assembly (5) comprises a soil pressing plate (51) in the middle, side positioning plates (55) connected to both sides of the soil pressing plate (51), a slide groove (52) is provided on the soil pressing plate (51), a foot pedal (53) is slidably mounted inside the slide groove (52), an insertion rod (54) is fixed at the lower end of the foot pedal (53), and the foot pedal (53) pushes the insertion rod (54) downward inside the slide groove (52).

7. The mountain photovoltaic adjustable mobile construction platform according to claim 6 is characterized by: A detachable guardrail is installed on the side of the telescopic platform (3), and the pile pit drilling machine (10) installed on the telescopic platform (3) is detachable. At the same time, the concrete bin (12) is detachable on the telescopic platform (3), and a feed pump is installed inside the concrete bin (12). The feed pump, the pile pit drilling machine (10) and the winch (2) are connected to a power supply system and a controller, and the controller is installed on the telescopic platform (3).

8. The mountain photovoltaic adjustable mobile construction platform according to claim 7 is characterized by: The angle adjustment rod (6) rotates to push the telescopic platform (3) to rotate around the support, and the angle formed by the telescopic platform (3) and the bottom plate (1) is the same as the inclination of the slope of the mountain.

9. The mountain photovoltaic adjustable mobile construction platform according to claim 8, characterized in that: How to use the construction platform: Preparation stage: Ensure that all parts of the construction platform are intact and correctly installed in the designated location; check whether the power supply system and controller are connected properly, and ensure that all electrical equipment has been connected to the power supply system; confirm that the fixing components and guardrails are complete and effective; Movement and positioning: The construction platform is moved to a designated construction site using the universal wheels on the bottom plate (1) in conjunction with a winch (2); By adjusting the soil pressing plate (51) and the side positioning plate (55) of the fixing assembly (5), the construction platform is ensured to be stable and not shake on the mountain slope; the insertion rod (54) is pushed into the soil by the foot pedal (53) to increase the stability of the platform; Adjust the telescopic table: According to actual needs, the stretching plate (33) on the telescopic platform (3) is adjusted so that its length adapts to the construction needs; the position of the stretching plate (33) is adjusted by using a push block; the angle of the telescopic platform (3) is adjusted by rotating the angle adjustment rod (6) so that the angle formed by the telescopic platform (3) and the bottom plate (1) matches the inclination angle of the mountain slope, thereby ensuring the stability of the construction platform; Install and adjust the support frame: The support frame (7) is installed at the middle of the upper end of the telescopic platform (3), and the height of one side of the support frame (7) is adjusted by means of a lifting sleeve (11), a top plate (9) is installed on the support frame (7), and a pile pit drilling machine (10) is fixed by means of a telescopic rod (8); the length of the telescopic rod (8) is adjusted by pressing down the pile pit drilling machine (10), and its stability is maintained by means of a spring; Startup and Operation: Start the power supply system through the controller to ensure that all electrical equipment is in standby mode; The pile pit drilling machine (10) is started, and a drilling rod is used to pass through the telescopic platform (3) and the bottom plate (1) to perform a drilling operation; the depth and angle of the drilling machine are adjusted as required; if concrete operation is required, a concrete bin is installed on the telescopic platform, and a feed pump is used to transport concrete; Safety and maintenance: During construction, always ensure that the guardrails are installed in place to prevent people from falling; regularly check the connection and wear of each component, and replace damaged components in time; after the construction is completed, clean the construction platform, put all components back in place, and prepare for the next use; Through the above steps, the safe and efficient use of the mountain photovoltaic adjustable mobile construction platform can be ensured to meet the needs of mountain photovoltaic construction.

Citation Information

Cited By

  • Lifting equipment for mounting photovoltaic panel on water and lifting method thereof

    CN121063253A