Construction method of high-pressure jet grouting powerful mixing pile suitable for floating pebble stratum

By using the construction method of high-pressure jet spraying and strong stirring piles in the pebble stratum, the problems of long construction period, high cost and difficulty in anti-seepage and water-proof design are solved, and efficient and safe construction results are achieved, which is suitable for a variety of foundations. treatment and foundation construction.

CN118835596AInactive Publication Date: 2024-10-25ZHEJIANG GEOTECHNICAL FOUNDATION CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411321738.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-23
Publication Date
2024-10-25
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing anti-seepage and water-proof design has the problems of long construction period, high construction cost and high construction difficulty in the pebble formation. In particular, the interlocking piles and ground connection walls have poor wall protection effect during the hole and groove formation processes, making it difficult to meet the construction period. Tight project needs.

Method used

The construction method of high-pressure rotary spraying and strong stirring piles is adopted. A double pipe pile machine is used to drill holes in the pebble layer and spray cement slurry and high-pressure air. The mixing fins are used to rotate and stir to form cement-soil piles. The ground voids are fully mixed and filled to ensure that the piles are body quality and improve construction efficiency through improved drill pipe design and mixing processes.

Benefits of technology

It significantly improves construction efficiency, reduces construction cost and construction period, enhances construction safety, avoids hole collapse, adapts to complex geological conditions, and is suitable for the construction of anti-seepage walls, composite foundation treatments and composite pile foundations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118835596A_ABST
    Figure CN118835596A_ABST
Patent Text Reader

Abstract

The invention relates to the field of civil engineering, in particular to a construction method of a high-pressure jet grouting intense stirring pile suitable for a floating pebble stratum. Comprising the following steps: staking out and fixing a pile position in survey, placing a double tubular pile machine in place and preparing cement grout, sinking, stirring and spraying to a pile end, stirring and lifting the sprayed grout to a pile top, re-stirring and spraying to sink to the pile end, re-stirring and lifting the sprayed grout to the pile top, and shifting the double tubular pile machine. According to the floating pebble bed high-pressure jet grouting powerful mixing pile, the characteristics of a high-pressure jet grouting pile and a cement mixing pile are fully combined, and meanwhile, the equipment and technical defects that a traditional high-pressure jet grouting pile cannot be effectively cut into a pile in a floating pebble bed and a traditional cement mixing pile cannot be mixed and formed in the floating pebble bed are overcome. The method can be used for anti-seepage wall construction, a traditional occlusion cast-in-place pile and diaphragm wall technology is replaced, and due to the fact that cement grout is adopted for construction, the construction cost can be greatly reduced, and the construction period can be greatly shortened.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of civil engineering, and in particular to a construction method of high-pressure rotary jet strong mixing piles suitable for floating pebble strata. Background Art

[0002] In the fields of civil engineering, building structure reinforcement, and geological engineering, anti-seepage and water-stopping design is an important task. Especially in the pebble stratum, due to the slow construction speed, long construction period, high construction cost, and great construction difficulty of the pebble layer, anti-seepage and water-stopping design has become a technical problem. At present, the existing solutions mainly use two reinforced concrete structures: interlocking piles or ground-connected walls.

[0003] The existing anti-seepage and water-stopping design schemes mainly use two reinforced concrete structures, namely, interlocking piles or ground-connected walls. Interlocking piles are mainly constructed by impact hammer or rotary drilling, and the reinforced concrete piles and plain piles are interlocked to form a wall; ground-connected walls are connected to form a wall piece by piece by a groove forming machine. Among them, the impact hammer construction or rotary drilling interlocking pile technology is widely used in floating pebble layers. It is difficult to form a groove for ground-connected walls in floating pebble layers, and it is difficult to form a wall.

[0004] However, there are some problems with the existing anti-seepage and water-stopping design schemes. First, the construction period is long, and the construction speed of the pebble layer is slow, with the time efficiency generally being around 0.2-0.5 meters, which greatly affects the progress of the project. Secondly, the construction cost is high, the hole-making and grooving speeds are slow, and the mechanical construction fee is high. Due to the low efficiency of conventional methods, the construction cost increases accordingly, making its overall cost also relatively high. Finally, the construction difficulty is high, and the wall protection effect is poor during the hole-making (grooving) process of the floating pebble layer of the bite pile and ground-connected wall construction, and the hole collapse is very likely to occur. When the rotary drilling bite adopts the follow-up pipe hole-making method, it is also necessary to continuously replace the drilling tool to use the bucket drilling method for small pebbles and the cutting and crushing method for floating stones to achieve the advance. For projects with tight construction periods, the use of the above processes is far from meeting the construction requirements.

[0005] In view of this, the present invention provides a construction method of high-pressure rotary jet strong mixing piles suitable for floating pebble strata. Summary of the invention

[0006] The purpose of the present invention is to provide a construction method of high-pressure rotary jet strong mixing piles suitable for floating pebble strata in view of the shortcomings of the prior art.

[0007] In order to solve the above technical problems, the following technical solutions are adopted: A construction method for high-pressure rotary jet strong mixing piles suitable for floating pebble strata comprises the following steps: S1. Measurement and positioning: First, according to the design drawings, measurement and positioning work is carried out on the foundation, and the position coordinates and mileage data of the center point of each pile position are determined based on the ruler; S2. The double pile driver is positioned and cement slurry is prepared; the double pile driver is moved to the predetermined pile position, the stability and verticality of the driver are ensured, and the drilling operation is prepared; at the same time, the cement slurry material is configured and kept ready according to the design requirements; S3 sinking mixing spraying to the pile end: start the double pipe pile machine, the double pipe pile machine drill pipe sinking to the designed depth, while the drill pipe inside the high-pressure pipe to spray cement slurry and high-pressure air into the ground, and through the drill pipe on the stirring wing rotation stirring; S4. Shotcrete mixing and lifting to the pile top: While the drill rod is being lifted, the stirring wings on the drill rod are rotating and stirring, and the cement slurry and the soil are fully mixed by high-pressure air to fill the gaps in the pebble layer formed by stirring to form a cement soil pile; S5. Compound mixing and spraying sinking to the pile end: in accordance with step S3, after the cement soil pile reaches the designed depth, compound mixing is performed again, and cement slurry is continued to be sprayed to ensure the quality of the pile body; S6. Shotcrete re-mixing and lifting to the top of the pile: According to the method of step S4, after the cement soil pile reaches the designed depth, re-mixing and lifting are carried out again, and at the same time, high-pressure air is continued to drive the cement slurry to mix with the soil to fully fill the gaps in the pebble layer formed by mixing, so as to form a cement soil pile to ensure the quality of the pile body.

[0008] S7. Shifting of the double pile driver: After completing the construction of one pile, the double pile driver is moved to the next pile position, and steps 2 to 6 are repeated to carry out the construction of the next pile until the entire project is completed.

[0009] A further improvement based on the technical solution is that the specific process of step S2 is as follows: the installed double pipe pile machine is erected as a whole at a determined position, and a hydraulic lifter is used to adjust the height of the hydraulic legs so that the drill rod of the double pipe pile machine remains vertical to the ground; then a mixing background operation is performed, and the cement material ratio is fully mixed using a mixing CNC background equipment to obtain a cement slurry material, and after the cement slurry material is mixed, it is stored in a slurry storage barrel in the background, and the mixing efficiency of the mixing barrel and the storage capacity of the slurry storage barrel must meet the construction spraying speed requirements.

[0010] A further improvement based on the technical solution is that step S3 also includes: sinking, stirring and spraying of the drill rod, the first sinking and stirring is the process of cutting and disturbing the pebble formation, the pick alloy on the drill bit of the double pipe pile driver plays the role of cutting and crushing the boulders with larger diameters, and the small pebbles are stirred by the blades of the drill bit; at the same time, during the stirring process, the cement slurry is driven by high-pressure air to quickly fill the gaps in the pebble layer of the formation; the cement slurry is transported to the drill bit nozzle of the double pipe pile driver through a high-pressure grouting pump, and the flow rate of the cement slurry is controlled by adjusting the speed through a frequency converter cabinet to achieve voltage conversion; during the sinking process, the flow rate of the cement slurry is aimed at preventing the air nozzle and the spray nozzle from being blocked.

[0011] A further improvement based on the technical solution is that step S4 also includes that during the shotcrete mixing and lifting process, the cutting and crushing function of the drill bit is transformed into the same as the mixing wings of the drill rod, and rotary spraying mixing is mainly used. The upper porosity of the pebble stratum is large. Through the stirring of the drill bit blade and the stirring wings of the drill rod, the cement slurry displacement drives a part of the sand and gravel fine particles along the mixing channel of the pile to the upper part of the cement soil pile, which can better improve the quality of the pile.

[0012] A further improvement based on the technical solution is that in step S4, geological conditions are created for reducing resistance for the second sinking and lifting, and the speed is controlled at 0.8-1.0 m / min. In step S6, for the last shotcrete lifting, it is necessary to ensure that the pile body is fully filled with cement slurry, and the speed is controlled at 0.6-0.8 m / min.

[0013] A further improvement based on the technical solution is that the double-pipe pile driver adopts LGZ-40 full-hydraulic multifunctional pile driver, and the output torque of the pile driver power head is 468000N*M; The drill rod adopts a double-layer drill rod with a diameter of 325 mm and an outer wall thickness of 25 mm. The head of the drill rod is provided with a drill bit, and the drill bit includes a plurality of planar blades, the thickness of the planar blades is 60 mm, the material of the planar blades is 16 manganese, and the planar blades are welded with pick alloy; The drill rod is provided with a stirring wing, the thickness of the stirring wing is 60 mm, the material of the stirring wing is Q235b, and the stirring wing is welded with a tooth alloy.

[0014] A further improvement based on the technical solution is that two high-pressure pipes are arranged inside the drill pipe, and the two high-pressure pipes form a dual channel, one of which is an air pipe for passing high-pressure air, and the other is a slurry pipe for passing cement slurry.

[0015] A further improvement based on the technical solution is that the inner hole diameter of the slurry pipe is 38 mm, the inner hole diameter of the air pipe is 32 mm, the cement slurry and air are cut and mixed with the soil through a drill bit device to form a high-strength cement soil pile, thereby improving the bearing capacity of the foundation.

[0016] A further improvement based on the technical solution is that the air pressure is 25 kPa, the pressure of the cement slurry is 20 MPa, the flow rate is 40 L / min, the water-cement ratio of the cement slurry is 1:2, and the cement strength is 42.5 MPa.

[0017] A further improvement based on the technical solution is that, according to the design drawings, the pile positions are marked as Z1, Z2, Z3...Zn according to the spacing, and the construction sequence is Z1→Z5→Z9→Z13→...→Z3→Z7→Z11→...→Z2→Z6→Z10→Z14→...→Z4→Z8→Z12→... Through steps S3-S6, a whole section is constructed in four batches in four days, with one day between each batch. The first two batches are not overlapped, and the original soil is drilled for construction, which avoids the problem of uneven hardness and softness; the in-situ re-mixing of the last two batches realizes the overlap of the cement piles.

[0018] A further improvement based on the above technical solution is: The above technical solution has the following beneficial effects: The present invention provides a construction method for high-pressure rotary jet strong mixing piles suitable for floating pebble strata. The floating pebble layer high-pressure rotary jet strong mixing piles of the present invention fully combine the characteristics of high-pressure rotary jet piles and cement mixing piles, and overcome the equipment and technical defects that traditional high-pressure rotary jet piles cannot be effectively cut into piles in floating pebble layers and traditional cement mixing piles cannot be mixed and formed in floating pebble layers. The present invention can be used for anti-seepage wall construction, replacing the traditional process of interlocking cast-in-place piles, and because it adopts cement slurry construction, its construction cost and construction period can be greatly reduced.

[0019] Compared with the existing technology, the beneficial effects of this technical solution are as follows: 1. Improve construction efficiency: The present invention adopts high-pressure rotary jet strong mixing piles, which can significantly improve construction efficiency and reduce construction period compared with traditional bite piles or ground-connected wall construction. Experimental data show that the construction speed of the present invention can reach 16-20 meters / day, which is more than 50% higher than the traditional method.

[0020] 2. Reduce construction costs: Since the present invention adopts cement slurry construction, compared with the traditional reinforced concrete structure, the material cost and construction cost are greatly reduced. At the same time, due to the improvement of construction efficiency, the construction cost is further reduced.

[0021] 3. Improve construction safety: The high-pressure rotary jet strong mixing pile of the present invention can effectively prevent the occurrence of hole collapse during the construction process, thereby improving construction safety. Compared with traditional interlocking piles or ground-connected wall construction, the wall protection effect of the present invention is better and can better adapt to complex geological conditions.

[0022] 4. Wide application: The present invention can be used not only for the construction of anti-seepage walls, but also for the construction of composite foundation treatment, composite pile foundation and composite assembled ground-connected walls, and has broad application prospects. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] The present invention will be further described below in conjunction with the accompanying drawings: Figure 1 The present invention is a flowchart of a construction method of high-pressure rotary jet strong mixing piles suitable for floating pebble formations according to an embodiment of the present invention.

[0024] Figure 2 It is a construction sequence diagram between the pile positions of the embodiment of the present invention.

[0025] Figure 3 It is a schematic structural diagram of a drill rod according to an embodiment of the present invention.

[0026] Figure 4 It is a schematic diagram of the cross-sectional structure of a drill bit according to an embodiment of the present invention.

[0027] Figure 5 Schematic diagram of the structure of a drill bit according to an embodiment of the present invention.

[0028] Figure 6 For the embodiment of the present invention Figure 4 Schematic diagram of the structure in the A direction.

[0029] Figure 7 For the embodiment of the present invention Figure 4 Schematic diagram of the structure in the B direction.

[0030] 1-drill rod; 2-drill bit; 3-flat blade; 4-cutting tooth alloy; 5-stirring wing; 6-air pipe; 7-slurry pipe. DETAILED DESCRIPTION

[0031] In order to make the purpose, technical scheme and advantages of the present invention clearer, the present invention is further described in detail below through the accompanying drawings and embodiments. However, it should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the scope of the present invention. In addition, in the following description, the description of known structures and technologies is omitted to avoid unnecessary confusion of the concept of the present invention.

[0032] See also Figure 1-Figure 2A construction method for high-pressure rotary jet strong mixing piles suitable for pebble strata comprises the following steps: S1. Measurement, layout and stake positioning: First, according to the design drawings, measurement and positioning work is carried out on the foundation, and the position coordinates and mileage data of the center point of each pile position are determined based on the measuring rope scale.

[0033] Specifically in this embodiment, the trench is opened on the anti-seepage wall as a reference, the trench depth is 0.8m-1.0m, and a measuring rope ruler is pulled on one side of the cofferdam parallel to the anti-seepage wall for positioning.

[0034] S2. The double-tube pile driver is in place and cement slurry is prepared; the double-tube pile driver is moved to the predetermined pile position, the stability and verticality of the pile driver are ensured, and preparation is made for drilling operations; at the same time, cement slurry materials are configured and kept ready according to design requirements.

[0035] The specific process is as follows: First, hoist the double pile machine and the CNC mixing platform to the cofferdam platform and put them in a standby state, then prepare the required materials in advance as required, such as cement, steel plates and other materials, and then assemble the required accessories to ensure that they can operate normally before they can be put into use. The installed double pile machine is erected as a whole at the determined position, and the hydraulic lifter is used to open and adjust the bottom of the hydraulic support leg to keep the drill rod 1 of the double pile machine vertical to the ground, and the positioning line hammer of the pile machine drill rod 1 is set on the measuring rope scale to control the pile position positioning of the double pile machine.

[0036] Then the mixing background operation is carried out, and the cement material ratio is fully mixed using the mixing CNC background equipment to obtain cement slurry material. The water-cement ratio of the cement slurry is 1:2, and the cement strength is 42.5MPa.

[0037] Before step S3, the method further includes: storing the cement slurry material after mixing in a slurry storage barrel, and the mixing efficiency of the mixing barrel and the storage capacity of the slurry storage barrel must meet the requirements of the construction spraying speed.

[0038] S3. Sinking, stirring and spraying to the pile end: Start the double-tube pile driver, sink the drill rod 1 of the double-tube pile driver to the designed depth, and at the same time spray cement slurry and high-pressure air into the ground through the high-pressure pipe inside the drill rod 1, and rotate and stir through the stirring wings on the drill rod 1.

[0039] The specific process is as follows: the drill rod 1 sinks and stirs the grouting. The first sinking and stirring is actually the process of cutting and disturbing the pebble stratum. The pick alloy on the drill bit 2 of the double-tube pile driver cuts and crushes the larger diameter boulders, and the small pebbles are stirred by the blade of the drill bit 2. At the same time, during the stirring process, the cement slurry is driven by high-pressure air to quickly fill the gaps in the pebble layer of the stratum. The cement slurry is transported to the drill bit 2 nozzle of the pile driver through a high-pressure grouting pump, wherein the pressure of the cement slurry transported by the high-pressure grouting pump is 2.5-3Mpa, and the high-pressure air is exhausted by the air compressor. The exhaust pressure of the air compressor is 0.8MPa and the air volume is 10m³ / min. The diameter of the drill bit 2 nozzle is 3mm, the number is 4, and the flow rate of the drill bit 2 nozzle is generally 50L / min (subject to on-site commissioning). The flow rate of the cement slurry is controlled by adjusting the speed through the frequency conversion cabinet to achieve voltage conversion. During the sinking process, the flow rate of the cement slurry is aimed at preventing the air nozzle and the spray nozzle from being blocked, and the pumping flow rate of the high-pressure grouting pump is half of that in the lifting stage.

[0040] S4. Shotcrete mixing and lifting to the pile top: while the drill rod 1 sinks, the mixing wings on the drill rod 1 rotate and mix, and the cement slurry and soil are driven by high-pressure air to fully mix and fill the gaps in the pebble layer formed by mixing, forming a cement soil pile.

[0041] The specific process is as follows: the cutting and crushing function of the drill bit 2 is transformed into the same as the stirring wing of the drill rod 1, and rotary jet stirring is mainly used. The pebble formation generally has a large porosity in the upper part. Through the stirring of the drill bit 2 blade and the stirring wing of the drill rod 1, the cement slurry displacement drives a part of the sand and gravel fine particles along the mixing channel of the pile to the upper part of the pile body, which can better improve the quality of the pile.

[0042] S5. Re-mixing and spraying to the pile end: After the cement soil pile reaches the designed depth, re-mixing is performed again according to the method of step S3, and cement slurry is continuously sprayed to ensure the quality of the pile body.

[0043] In the above steps 4 and 5, the change in the interlayer porosity of the pebble layer is determined according to the change in the slurry volume of the first sinking shotcrete, and the stratum below 3 meters is stirred for the second time to achieve the purpose of slurry filling.

[0044] S6. Shotcrete re-mixing and lifting to the pile top: According to the method of step S4, after the cement soil pile reaches the designed depth, re-mixing is performed again, and cement slurry is continued to be sprayed to ensure the quality of the pile body.

[0045] Wherein, the step S5 and step S6 are different from the step S3 and step S4 of the first pass: the sinking of step S5 occurs when the step S3 sinks, at which time the cutting and crushing of large boulders and rocks has been completed, and the sinking drilling speed is relatively smooth, without the need for pause resistance. The lifting speed of step S6 is different from that of step S4. Step S4 mainly completes the stirring and filling of cement slurry in the disturbed stratum on the basis of the cutting and crushing completed in step S3, and creates geological conditions for reducing resistance for the second sinking and lifting. The speed-up is controlled at 0.8-1.0m / min. In step S6, for the last shotcrete lifting, it is necessary to ensure that the cement slurry of the pile body is fully filled, and the speed-up is controlled at 0.6-0.8m / min. Wherein, generally in actual operation, the second time due to the reduction of resistance, so the second time speed-up is greater than the first time speed-up. Wherein, the rotation speed of drill rod 1 is generally controlled to 6r / min.

[0046] S7. Shifting of the double pile driver: After completing the construction of one pile, the double pile driver is moved to the next pile position, and steps 2 to 6 are repeated to carry out the construction of the next pile until the entire project is completed.

[0047] As a further illustration of this embodiment, the double-pipe pile driver adopts the LGZ-40 full hydraulic multifunctional pile driver, and the pile driver power head outputs a torque of 468000N*M. The full hydraulic pile driver with high pressure rotary jetting and strong mixing is the LGZ40 full hydraulic pile driver, which has high efficiency and stable performance and can meet the construction requirements of high strength and large depth.

[0048] The strength of the drill rod 1 of the above-mentioned LGZ40 full-hydraulic pile driver matches the maximum torque of the pile driver of 468000N*M, which meets the needs of mixing in pebbles (drifting) stones and rock. At the same time, the mixing wings are thickened to avoid deformation during drilling and mixing in pebbles (drifting) stones. The mixing wings of the drill bit 2 are welded with pick alloys, which not only meet the needs of drilling into the rock, but also can perform alloy grinding and crushing when encountering large-diameter pebbles (drifting) stones in pebbles (drifting) stones.

[0049] refer to Figure 3 The drill pipe 1 of the double-tube pile driver adopts a double-layer drill pipe 1 with a diameter of 325 mm and an outer wall thickness of 25 mm.

[0050] See also Figure 4-Figure 7The double pile driver includes a drill rod 1 and a drill bit 2. The head of the drill rod 1 is provided with a drill bit 2. The drill bit 2 includes a plurality of planar blades 3. In this embodiment, the number of the planar blades 3 is four. The clockwise inclination angle of the planar blades 3 is 25°. The thickness of the planar blades 3 is 60 mm. The material of the planar blades 3 is 16 manganese. The planar blades 3 are welded with a pick alloy 4. The outer cutting exposed surface of the drill bit 2 of the double pile driver is welded with a wear-resistant welding rod to improve the wear resistance.

[0051] As a further explanation of this embodiment, see Figure 4 The drill rod 1 is provided with a stirring wing 5, the thickness of the stirring wing 5 is 60 mm, the effective diameter is equal to the pile diameter, and the material of the stirring wing 5 of the double pipe pile driver is Q235b. This design makes the drill rod 1 and the drill bit 2 have sufficient strength and wear resistance, and can drill efficiently in the pebble layer.

[0052] As a further illustration of this embodiment, the stirring wings 5 ​​of the double pile driver are welded with tooth alloy. This design enables the drill bit 2 to effectively cut pebbles during rotation, thereby improving drilling efficiency.

[0053] The present invention redesigns the drill rod, specifically including designing a flat blade, the thickness of which is 60 mm, the material of which is 16 manganese, and a pick alloy is welded on the flat blade; the drill rod is provided with a stirring wing, the thickness of which is 60 mm, the material of which is Q235b, and a tooth alloy is welded on the stirring wing. This ensures that the pile is drilled into a complete pile shape in the pebble layer, solves the problem that the traditional high-pressure jet grouting pile cannot be drilled into a complete pile shape in the pebble layer, and realizes the function of cutting, crushing and drilling during the drilling process.

[0054] As a further explanation of this embodiment, see Figure 4 Two high-pressure pipes are arranged inside the drill rod 1, and the two high-pressure pipes form a double channel, one of which is an air pipe 6, and the air pipe 6 is used to pass high-pressure air, and the other is a slurry pipe 7, and the slurry pipe 7 is used to pass cement slurry. This design enables the slurry and gas to be cut and mixed with the soil under high pressure through the drill bit 2 device, thereby realizing the formation of the pile.

[0055] As a further illustration of this embodiment, the inner diameter of the slurry pipe 7 is 38 mm, the inner diameter of the air pipe 6 is 32 mm, and the cement slurry and air are cut and mixed with the soil through the drill bit 2 device to form a high-strength cement soil pile, thereby improving the bearing capacity of the foundation. Compared with traditional reinforced concrete structures, the construction cost and construction period of cement slurry can be greatly reduced by using cement slurry for construction. By using a variety of methods such as composite foundation treatment, composite pile foundation and composite assembled ground-connected wall, different construction methods can be selected according to actual needs, thereby improving the flexibility and efficiency of construction.

[0056] As a further illustration of this embodiment, the pressure of the cement slurry is 20 MPa, the flow rate is 40 L / min, the water-cement ratio of the cement slurry is 1:2, the cement strength is 42.5 MPa, and the cement blending amount is 25%.

[0057] As a further explanation of this embodiment, according to the design drawings, the pile positions are marked as Z1, Z2, Z3...Zn according to the spacing, and the construction sequence is Z1→Z5→Z9→Z13→...→Z3→Z7→Z11→...→Z2→Z6→Z10→Z14→...→Z4→Z8→Z12→... Through steps S3-S6, a whole section is constructed in four batches in four days, with one day between each batch. The first two batches are not overlapped, and the original soil is drilled for construction, avoiding the problem of uneven hardness and softness; the in-situ re-mixing of the last two batches realizes the overlap of cement piles. Figure 2 , this embodiment draws 4 pile positions Z1, Z2, Z3 ... Z1. The piles need to be overlapped, and the overlap is mainly to ensure the continuity, stability and bearing capacity of the pile body. The specific reasons are as follows: 1. Extend the pile length to meet the design requirements: During the pile foundation construction process, due to complex geological conditions or long pile length, the length of a single pile often cannot meet the design requirements. Therefore, it is necessary to connect multiple pile sections into one by overlapping to achieve the required depth.

[0058] 2. Enhance structural stability: Overlapping can ensure the integrity of the pile body in the vertical direction, so that the bearing capacity of the pile can be transmitted to the required depth, enhance the stability of the overall structure, and avoid instability or insufficient bearing capacity caused by discontinuity of the pile body.

[0059] 3. Dealing with transportation and construction restrictions: Due to transportation and construction site restrictions, the length of piles is usually limited. Multiple short piles can be connected into longer piles by overlapping to meet construction needs while avoiding the difficulties of long pile transportation and installation.

[0060] 4. Improve the compression and tensile capacity of the piles: The overlap joints are usually reinforced, such as welded steel bars, sleeve connections, etc., which can effectively improve the compression, tensile and shear resistance of the piles, ensuring that under complex geological conditions, the piles can stably bear the load of the superstructure.

[0061] 5. Ensure construction quality: Through the correct overlap process, the verticality and axis alignment of the pile body can be ensured, thereby ensuring the construction quality of the pile foundation and the overall stress performance of the pile body.

[0062] 6. It has a good anti-seepage effect.

[0063] In short, overlap is an important measure in pile foundation construction to achieve the designed pile length, enhance the integrity and bearing capacity of the pile, and adapt to the actual situation of the construction site. Therefore, the use of a special construction sequence can ensure the construction quality and efficiency, which is very suitable for pebble (floating) stone layers with large porosity and less filling.

[0064] This embodiment adopts a four-spray four-stirring method, two sinking and two lifting stirring, fully stirring the bottom fine particles of soil and turning them up to form a pile shape. The second sinking, stirring and lifting completes the refilling of the porosity and reduces the sinking amount of cement slurry.

[0065] In the overlap construction of this embodiment, one section is constructed in four batches in four days, each batch is separated by one day, and the first two batches are not overlapped. In this embodiment, one section is constructed in four batches in four days with four pile positions at a jump interval, and the construction of the last two batches is actually equivalent to re-mixing the original pile body, which solves the overlap cold joint problem of the first solution.

[0066] The construction of the last two batches made up for the problem of large boulders and rocks at the bottom, and the pile body was damaged due to the squeezing of rocks by each other in the first three batches. It is very suitable for gravel and pebble layers, and sand and gravel layers containing a small amount of boulders.

[0067] Compared with the existing technology, this technical solution mainly solves the following technical problems: 1. Long construction period and slow construction speed of pebble layer; 2. High construction cost, slow hole and groove forming speed, and high mechanical construction cost; 3. High construction difficulty, poor wall protection effect during hole (groove) forming of floating pebble layer by interlocking piles and ground-connected wall construction, and easy occurrence of hole collapse; 4. How to quickly drill through the floating pebble layer and other technical problems.

[0068] Due to the advanced nature of the technical solution, it can be widely used in civil engineering, building structure reinforcement, geological engineering and other application fields. In particular, in terms of anti-seepage and water-stopping design, the pebble layer high-pressure rotary jet strong mixing pile of the present invention can effectively solve the problems in traditional processes, such as long construction period, high construction cost, and great construction difficulty. In addition, the present invention can also be used for composite foundation treatment, composite pile foundation and composite assembled ground-connected wall construction, further expanding its scope of application.

[0069] The above are only specific embodiments of the present invention, but the technical features of the present invention are not limited thereto. Any simple changes, equivalent replacements or modifications made based on the present invention to solve basically the same technical problems and achieve basically the same technical effects are all included in the protection scope of the present invention.

Claims

1. A construction method for high-pressure rotary jet strong mixing piles suitable for pebble strata, characterized in that The following steps are involved: S1. Measurement and positioning: First, according to the design drawings, measurement and positioning work is carried out on the foundation, and the position coordinates and mileage data of the center point of each pile position are determined based on the ruler; S2. The double pile driver is positioned and cement slurry is prepared; the double pile driver is moved to the predetermined pile position, the stability and verticality of the driver are ensured, and the drilling operation is prepared; at the same time, the cement slurry material is configured and kept ready according to the design requirements; S3 sinking mixing spraying to the pile end: start the double pipe pile machine, the double pipe pile machine drill pipe sinking to the designed depth, while the drill pipe inside the high-pressure pipe to spray cement slurry and high-pressure air into the ground, and through the drill pipe on the stirring wing rotation stirring; S4. Shotcrete mixing and lifting to the pile top: While the drill rod is being lifted, the stirring wings on the drill rod are rotating and stirring, and the cement slurry and the soil are fully mixed by high-pressure air to fill the gaps in the pebble layer formed by stirring to form a cement soil pile; S5. Compound mixing and spraying sinking to the pile end: in accordance with step S3, after the cement soil pile reaches the designed depth, compound mixing is performed again, and cement slurry is continued to be sprayed to ensure the quality of the pile body; S6. Shotcrete remixing and lifting to the pile top: According to step S4, after the cement soil pile reaches the designed depth, remixing and lifting are performed again, and high-pressure air is continued to drive the cement slurry and the soil to mix thoroughly and fill the gaps in the floating pebble layer formed by mixing to form a cement soil pile to ensure the quality of the pile body; S7. Shifting of the double pile driver: After completing the construction of one pile, the double pile driver is moved to the next pile position, and steps 2 to 6 are repeated to carry out the construction of the next pile until the entire project is completed.

2. The construction method of a high-pressure rotary jet strong mixing pile suitable for pebble strata according to claim 1 is characterized by: The specific process of step S2 is as follows: the installed double pile machine is erected as a whole at the determined position, and the height of the hydraulic legs is adjusted using a hydraulic lifter to keep the drill rod of the double pile machine vertical to the ground; then a mixing backstage operation is performed, and the cement material ratio is fully mixed using a mixing CNC backstage equipment to obtain a cement slurry material. After the cement slurry material is mixed, it is stored in a slurry storage barrel in the backstage. The mixing efficiency of the mixing barrel and the storage capacity of the slurry storage barrel must meet the construction spraying speed requirements.

3. The construction method of a high-pressure rotary jet strong mixing pile suitable for pebble strata according to claim 1 is characterized in that: The step S3 also includes: sinking, stirring and spraying of the drill rod. The first sinking and stirring is the process of cutting and disturbing the pebble stratum. The pick alloy on the drill bit of the double pipe pile driver plays the role of cutting and crushing the boulders with larger diameters, and the small pebbles are stirred by the blades of the drill bit. At the same time, during the stirring process, the cement slurry is driven by high-pressure air to quickly fill the gaps in the pebble layer of the stratum. The cement slurry is transported to the drill bit nozzle of the double pipe pile driver through a high-pressure grouting pump. The flow rate of the cement slurry is controlled by adjusting the speed through a frequency conversion cabinet to achieve voltage conversion. During the sinking process, the flow rate of the cement slurry is aimed at preventing the air nozzle and the spray nozzle from being blocked.

4. The construction method of high-pressure rotary jet strong mixing piles suitable for pebble strata according to claim 1 is characterized by: The step S4 also includes that during the shotcrete mixing and lifting process, the cutting and crushing function of the drill bit is transformed into the same as the mixing wings of the drill rod, and rotary spray mixing is mainly used. The upper porosity of the pebble stratum is large. Through the mixing of the drill bit blade and the mixing wings of the drill rod, the cement slurry displacement drives a part of the sand and gravel fine particles along the mixing channel of the pile to the upper part of the cement soil pile, which can better improve the quality of the pile.

5. The construction method of high-pressure rotary jet strong mixing piles suitable for pebble strata according to claim 1 is characterized by: In step S4, geological conditions are created for the second sinking and lifting to reduce resistance, and the speed is controlled at 0.8-1.0 m / min. In step S6, for the last shotcrete lifting, it is necessary to ensure that the pile body is fully filled with cement slurry, and the speed is controlled at 0.6-0.8 m / min.

6. The construction method of high-pressure rotary jet strong mixing piles suitable for pebble strata according to claim 1 is characterized by: The double pile driver adopts LGZ-40 full hydraulic multifunctional pile driver, and the output torque of the pile driver power head is 468000N*M; The drill rod adopts a double-layer drill rod with a diameter of 325 mm and an outer wall thickness of 25 mm. The head of the drill rod is provided with a drill bit, and the drill bit includes a plurality of planar blades, the thickness of the planar blades is 60 mm, the material of the planar blades is 16 manganese, and the planar blades are welded with pick alloy; The drill rod is provided with a stirring wing, the thickness of the stirring wing is 60 mm, the material of the stirring wing is Q235b, and the stirring wing is welded with a tooth alloy.

7. The construction method of high-pressure rotary jet strong mixing piles suitable for pebble strata according to claim 5 is characterized by: Two high-pressure pipes are arranged inside the drill pipe, and the two high-pressure pipes form a double channel, one of which is an air pipe for passing high-pressure air, and the other is a slurry pipe for passing cement slurry.

8. The construction method of high-pressure rotary jet strong mixing piles suitable for pebble strata according to claim 7 is characterized by: The inner hole diameter of the slurry pipe is 38 mm, and the inner hole diameter of the air pipe is 32 mm. The cement slurry and air are cut and mixed with the soil through the drill bit device to form a high-strength cement soil pile, thereby improving the bearing capacity of the foundation.

9. The construction method of high-pressure rotary jet strong mixing piles suitable for pebble strata according to claim 1 is characterized by: The air pressure is 25 kPa, the pressure of the cement slurry is 20 MPa, the flow rate is 40 L / min, the water-cement ratio of the cement slurry is 1:2, and the cement strength is 42.5 MPa.

10. The construction method of high-pressure rotary jet strong mixing piles suitable for pebble strata according to claim 1 is characterized by: According to the design drawings, the pile positions are marked as Z1, Z2, Z3...Zn according to the spacing, and the construction sequence is Z1→Z5→Z9→Z13→...→Z3→Z7→Z11→...→Z2→Z6→Z10→Z14→...→Z4→Z8→Z12→... Through steps S3-S6, one section is constructed in four batches in four days, with one day between each batch. The first two batches are not overlapped, and the original soil is drilled for construction to avoid the problem of uneven hardness and softness; the in-situ re-mixing of the last two batches realizes the overlap of the cement piles.

Citation Information

Patent Citations

  • Construction method of self-drilling type mixing jet-grouting pile for long-auger high-pressure and low-pressure multi-tube

    CN101886387A

  • Long spiral double-pipe high-pressure stir-jet grouting pile construction method and device

    CN101962949A

  • Drill rod with ream bit

    CN102953684A

  • Dynamic water environment three-pipe jet grouting pile in-pit construction method

    CN113089655A

  • High-strength drill tooth for rotary excavating cutter tooth alloy coring bit

    CN217206318U