Testing method for short-term conductivity of fractures in simulated natural gas hydrate reservoirs

By preparing simulated natural gas hydrate reservoir slabs and calculating the appropriate closed pressure range, the problem of inaccuracy of existing test methods in natural gas hydrate reservoirs in the sea area is solved, and short-term diversion of natural gas hydrate reservoir fracturing fractures is achieved Accurate testing of capabilities has promoted efficient development of reservoirs.

CN118835975BActive Publication Date: 2024-11-26CHINA UNIV OF PETROLEUM (EAST CHINA)
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411049544.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-01
Publication Date
2024-11-26
Estimated Expiration
2044-08-01

AI Technical Summary

Technical Problem

The existing short-term diversion capacity testing method for fracturing fractures of natural gas hydrate reservoirs is not suitable for natural gas hydrate reservoirs in sea areas. Conventional experimental methods provide inaccurate data in the state of destruction and cannot meet the needs of commercial mining.

Method used

By preparing simulated natural gas hydrate reservoir slabs, the appropriate closed pressure range was calculated based on their mechanical properties, a short-term diversion capability test was conducted for the simulated natural gas hydrate reservoir fracturing fractures, and the experimental conditions were adjusted to ensure data accuracy.

Benefits of technology

A short-term flow diversion capacity testing method for fracturing fractures suitable for natural gas hydrate reservoirs is provided, which ensures the accuracy and reference value of experimental data, and promotes the efficient development and utilization of natural gas hydrate reservoirs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118835975B_ABST
    Figure CN118835975B_ABST
Patent Text Reader

Abstract

The present invention belongs to the field of petroleum and natural gas engineering technology, and relates to a test method for the short-term conductivity of a simulated natural gas hydrate reservoir fracturing crack, including: preparing a simulated natural gas hydrate reservoir rock plate and calculating the maximum closing pressure value in the simulated natural gas hydrate reservoir rock plate conductivity test experiment according to the Mohr-Coulomb failure criterion, designing the closing pressure point required to be loaded in the simulated natural gas hydrate reservoir fracturing crack short-term conductivity test experiment in combination with the test results and the calculation results, and carrying out the simulated natural gas hydrate reservoir fracturing crack short-term conductivity test experiment under the set closing pressure point. In view of the particularity of the natural gas hydrate reservoir, the present invention solves the problem that the conventional test pressure conditions in the fracturing proppant conductivity test standard are not suitable for the natural gas hydrate reservoir conductivity test experiment, and provides certain experimental data references for the hydraulic fracturing construction design of the natural gas hydrate reservoir.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of offshore natural gas hydrate reservoir development, and relates to a testing method for simulating the short-term conductivity of a natural gas hydrate reservoir fracturing crack. Background Art

[0002] As a new type of unconventional energy, natural gas hydrate has the characteristics of large reserves, high energy density, clean and low carbon, and is expected to become a substitute for traditional energy in the future. Therefore, the successful development of natural gas hydrate resources is of great significance to alleviate the severe energy situation in my country, optimize the energy structure, and ensure energy security. However, the exploration and development of natural gas hydrate reservoirs in my country's sea areas has always faced huge challenges. Its low permeability marine environment restricts the mining effect. It is difficult to obtain a high daily gas production per well using conventional mining methods. The existing pilot projects still have problems such as low single well production, small mining range and short mining time, and have not yet been able to meet the purpose of commercial mining.

[0003] Hydraulic fracturing is a production-increasing technique widely used in the exploitation of unconventional oil and gas resources such as shale gas and coalbed methane. Applying hydraulic fracturing transformation technology to natural gas hydrate reservoirs is currently one of the potential technical means to achieve its efficient development and utilization, and is an important exploration direction to improve the efficiency of natural gas hydrate exploitation and achieve increased production. In the process of hydraulic fracturing, fracture conductivity becomes one of the important parameters for evaluating the effect of fracturing production increase. Whether fractures with higher fracture conductivity can be formed is the key to hydraulic fracturing operations.

[0004] Fracture conductivity is a parameter that describes the ability of proppant-filled fractures to allow formation fluids (such as oil and natural gas) to pass through under reservoir conditions. Obviously, exploring the laws of fracture conductivity in natural gas hydrate reservoirs plays a decisive role in increasing natural gas production. The particularity of natural gas hydrate reservoirs determines that its fracture conductivity is different from that of other reservoirs. As a special medium, the mechanical properties, failure laws, and the laws of fracture initiation and expansion of hydrates have not yet been clearly revealed. There are still few experimental studies on the fracture conductivity of hydrate reservoirs after fracturing. There is still a lack of research on the effects of various influencing factors such as formation stress after fracturing, proppant embedding, and residual fracturing fluid on conductivity.

[0005] The research on the test experiment of conductivity of conventional reservoir fractures has been relatively comprehensive and mature. The petroleum and natural gas industry standard "test method of conductivity of fracturing proppant" is widely used in the test experiment of conductivity of conventional reservoir fractures. However, the offshore natural gas hydrate reservoir is generally a loose muddy siltstone formation with a low degree of compaction. The reservoir has the characteristics of low strength, large porosity, and weak cementation. The prepared simulated reservoir rock plate will be damaged within the closing pressure range (6.9MPa-69MPa) in the conventional conductivity test standard. The data obtained from the conductivity test under the damaged state is inaccurate and has lost its reference value. Therefore, the conventional conductivity test conditions in the petroleum and natural gas industry standards are no longer applicable to natural gas hydrate reservoirs. The test method of short-term conductivity of fractures in natural gas hydrate reservoirs still needs further exploration and verification. Therefore, it is crucial to find a test method suitable for short-term conductivity of fractures in natural gas hydrate reservoirs. Summary of the invention

[0006] The present invention aims to provide a method for testing the short-term conductivity of a simulated natural gas hydrate reservoir fracture. According to the mechanical properties of the natural gas hydrate reservoir, a simulated natural gas hydrate reservoir rock plate required for the experiment is prepared. By calculating the maximum closure pressure value of the simulated natural gas hydrate reservoir rock plate in the conductivity test experiment, the closure pressure range required for the short-term conductivity test of the simulated natural gas hydrate reservoir fracture is obtained, and the short-term conductivity test experiment of the simulated natural gas hydrate reservoir fracture is carried out within the closure pressure range. It provides a reference for the test method of the short-term conductivity of the fracture of the natural gas hydrate reservoir, solves the problem that the conventional experimental method in the test standard of the conductivity of the fracturing proppant is not applicable to the test experiment of the conductivity of the natural gas hydrate reservoir, and provides a certain reference value for further exploring the conductivity of the fracture of the natural gas hydrate reservoir.

[0007] In one aspect, the present invention provides a method for testing the short-term conductivity of a simulated natural gas hydrate reservoir fracture, comprising the following steps:

[0008] (1) Prepare simulated natural gas hydrate reservoir rock slabs based on the target reservoir mineral composition data and reservoir-related mechanical properties;

[0009] According to the target reservoir mineral composition data and the reservoir-related mechanical properties, the preparation formula of the simulated natural gas hydrate reservoir rock plate is determined, the required materials are weighed according to the proportion in the formula, the weighed materials are evenly mixed with water, and a slurry mixture of the simulated natural gas hydrate reservoir rock plate material is prepared. The target reservoir described in the present invention is a natural gas hydrate reservoir in the South China Sea. According to the requirements of the reservoir-related mechanical properties, the preferred proportions of various materials are calculated, in parts by weight, namely 50-55 parts of heavy calcium powder, 45-50 parts of quartz sand, 40-45 parts of illite powder, 18-20 parts of cement, 50-55 parts of water, and 2-7 parts of additive materials; the additive is fiber filaments.

[0010] The present invention uses a multiple-layer filling method to fill the slurry mixture into the mold, and presses and shakes the slurry during each filling process to eliminate bubbles in the slurry mixture. Additive materials such as fiber filaments are added to the slurry mixture to increase the tensile strength of the rock plate to avoid the rock plate from breaking during the drying process. The slurry mixture in the mold is left to stand for forming, removed from the mold, and cured in a constant temperature water bath, and ventilated and dried under normal temperature and pressure conditions, and finally a simulated natural gas hydrate reservoir rock plate is prepared.

[0011] (2) The internal friction angle and cohesion of the simulated natural gas hydrate reservoir are calculated according to the Mohr-Coulomb failure criterion, and the failure criterion curve is drawn.

[0012] (3) Based on the in situ stress calculation formula, the horizontal in situ stress of the simulated natural gas hydrate reservoir slab under different overlying rock pressures is calculated without considering the tectonic stress condition.

[0013] (4) Based on the calculation results of step (3), a stress Mohr circle of the simulated natural gas hydrate reservoir rock plate is made. By observing the relationship between the Mohr circle and the failure criterion curve, it is determined whether the rock plate is damaged, and the maximum critical closure pressure value when the rock plate is damaged is calculated.

[0014] (5) Multiple closing pressure points are set within the range of the maximum critical closing pressure value, and a short-term conductivity test experiment of the simulated natural gas hydrate reservoir fracturing fracture is carried out under this condition. During the test, the selection of the closing pressure point is designed and adjusted again according to the changes in the pressure differential table and the final experimental results.

[0015] According to the experimental data and the variation law of the fracture conductivity curve, when the numerical interval between two adjacent closing pressure points is small, the measured conductivity value may be inaccurate, resulting in a small fluctuation in the measured conductivity curve. Therefore, the specific value of the closing pressure point is adjusted and the number of closing pressure points is reduced so that the selected closing pressure point can better present the variation law of the short-term conductivity of the simulated natural gas hydrate reservoir.

[0016] Optionally, in step (1), the materials constituting the simulated natural gas hydrate reservoir rock plate are determined to be quartz sand powder, heavy calcium powder, illite powder and cement according to the mineral composition data of the target reservoir. The cement is composite silicate cement with a cement particle size of 600-800 mesh; the particle size of the quartz sand powder is 600-800 mesh, the heavy calcium powder is 600-800 mesh, and the illite powder is 600-800 mesh.

[0017] Optionally, the size of the rock plate used in the short-term conductivity test experiment of the simulated natural gas hydrate reservoir fracturing crack prepared in the step (1) meets the requirements of the API test standard, wherein the length of the rock plate is 177.7~177.8mm, the width is 37.1mm~38.1mm, and the thickness is 10~12mm.

[0018] Optionally, in the preparation process of step (1), a preparation formula that meets the properties of the target reservoir is selected according to the mechanical properties of the target reservoir, the required materials are weighed according to the proportion in the formula, and the weighed materials are evenly mixed with water to prepare a slurry mixture of the slab material simulating the natural gas hydrate reservoir. The slurry mixture is filled into a self-made slab mold in small amounts and multiple times, and is flattened and compacted. The slurry mixture in the mold is fully shaken to eliminate bubbles inside the slurry; after each filling is completed, special materials such as fiber filaments are laid on top of the slurry to prevent the slab from breaking during the drying process.

[0019] Optionally, in the preparation process of step (1), the fiber filament length can be 5 mm to 6 mm, the waiting time for static molding is 36 to 48 hours, the water bath curing time is 20 to 24 hours, and the drying time at room temperature and pressure is 24 to 36 hours.

[0020] Optionally, in step (2), the internal friction angle and cohesion of the simulated natural gas hydrate reservoir are calculated according to the Mohr-Coulomb criterion calculation formula by using the simulated natural gas hydrate reservoir core triaxial experimental data to fit, and a failure criterion curve is drawn based on the calculated internal friction angle and cohesion.

[0021] Optionally, the Mohr-Coulomb criterion calculation formula in step (2) is:

[0022] ;

[0023] Where: Represents the maximum principal stress, in MPa; Represents the minimum principal stress, in MPa; It represents the cohesive force, in MPa; Represents the internal friction angle in degrees.

[0024] Optionally, in step (3), according to the in situ stress calculation formula, without considering the tectonic stress condition, the relationship between the maximum and minimum horizontal geostress and the overburden pressure is only related to the Poisson's ratio. The closing pressure of the simulated gas hydrate reservoir rock plate conductivity experiment is the overburden pressure of the reservoir, and the rock plate side wall bearing pressure (confining pressure) is the horizontal geostress of the reservoir. Set different overburden pressure values ​​and calculate the magnitude of the horizontal geostress under different overburden pressures.

[0025] The formula for calculating the in-situ stress in step (3) is as follows:

[0026] ;

[0027] Where: It represents the maximum horizontal ground stress in MPa; It represents the minimum horizontal ground stress in MPa; Indicates the overburden pressure in MPa; μ Represents Poisson's ratio and has no units.

[0028] Optionally, the maximum critical closing pressure value calculated in step (4) is 10-20 MPa. According to the above calculation results, different closing pressure points required for the flow conductivity test are designed within the critical closing pressure point range, and the closing pressure points can be initially designed to be 1, 3, 5, 7, 10, 12, and 15 MPa.

[0029] Optionally, in step (5), a simulated natural gas hydrate reservoir fracture conductivity evaluation system is used to conduct a short-term conductivity test experiment of a simulated natural gas hydrate reservoir fracture.

[0030] Optionally, the closing pressure point preliminarily designed in the above step (5) is set as the closing pressure collection point in the test experiment, and the flow rate of the liquid is set to 1-2.5 ml / min. When the closing pressure reaches the set value and stabilizes for a period of time, the conductivity value at the closing pressure point is recorded. The change in the reading of the pressure difference gauge is used to determine whether the diversion chamber has reached a stable state at this time. Finally, the appropriate closing pressure point is adjusted and selected according to the experimental data and the change trend of the fracture conductivity curve.

[0031] Alternatively, according to the experimental data obtained in step (5) and the variation law of the conductivity curve, it can be known that when the numerical interval between two adjacent closing pressure points is small, the conductivity value measured at a certain closing pressure point may be inaccurate, resulting in a small fluctuation in the measured conductivity curve within a small range. Therefore, the specific value of the closing pressure point is adjusted and the number of closing pressure points is reduced so that the selected closing pressure point can better present the variation law of the conductivity of the simulated natural gas hydrate reservoir. The final selected closing pressure points are 1, 5, 10, 13, and 15 MPa.

[0032] Optionally, the simulated natural gas hydrate reservoir fracture conductivity evaluation system in step (5) includes the simulated natural gas hydrate reservoir fracture conductivity evaluation system including an API diversion chamber, the API diversion chamber is covered with an insulation layer outside and is arranged on a hydraulic press platform, and a pressure difference sensor and a displacement sensor are arranged on the hydraulic press platform; the diversion chamber is connected to a data acquisition system, a circulating refrigeration device, and a constant flow pump through pipeline I, pipeline II, and pipeline III respectively; a balance and a vacuum system are arranged on pipeline I; a constant pressure pump and an air compressor are arranged on pipeline III; the data acquisition system is controlled and connected with the balance, the pressure difference sensor, and the displacement sensor to realize real-time monitoring and collection of data.

[0033] Compared with the prior art, the present invention has the following beneficial effects:

[0034] (1) The present invention prepares a simulated natural gas hydrate reservoir rock plate that meets the requirements of the API fracturing proppant conductivity test standard according to the optimal preparation formula. During the preparation process, the preparation process of the simulated natural gas hydrate reservoir rock plate is continuously adjusted and optimized, thereby solving the problems of rock plate drying, fracture, bending and deformation that occur during the preparation process, ensuring that the prepared rock plate can be used for the short-term conductivity test of the simulated natural gas hydrate reservoir fracturing crack, thereby ensuring the smooth implementation of the simulated natural gas hydrate reservoir fracturing crack conductivity test experiment.

[0035] (2) Taking into account the particularity of the mechanical properties of natural gas hydrate reservoirs, the present invention relates to a method for testing the short-term conductivity of fractures in simulated natural gas hydrate reservoirs, and designs a key parameter value (closing pressure) suitable for the short-term conductivity test experiment of fractures in simulated natural gas hydrate reservoirs, thereby solving the problem that the closing pressure point is not applicable in the conventional experimental method in the test standard for the conductivity of fracturing proppants, so that experiments related to the fracture conductivity of natural gas hydrate reservoirs can be further carried out. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] The above and other objects and / or features of the present invention will become more apparent through the following description in conjunction with the accompanying drawings, in which:

[0037] Figure 1 An experimental system for evaluating the conductivity of fractures in simulated natural gas hydrate reservoirs;

[0038] Figure 2 To simulate the uniaxial compressive strength test curve of natural gas hydrate reservoir rock plate;

[0039] Figure 3 This is the relationship diagram between the Mohr circle and the failure criterion curve of the simulated natural gas hydrate reservoir rock plate;

[0040] Figure 4 This is the fracture conductivity change curve of Example 3;

[0041] Figure 5 This is the fracture conductivity change curve of Example 4;

[0042] Figure 6 This is the fracture conductivity change curve of Example 5. DETAILED DESCRIPTION

[0043] Hereinafter, an experimental test method for simulating the short-term conductivity of a natural gas hydrate reservoir fracture will be described in detail in conjunction with exemplary embodiments.

[0044] Example 1

[0045] (1) Determine the materials required to prepare the simulated natural gas hydrate reservoir rock plate and the proportion of each material component based on the target reservoir mineral composition data and reservoir-related mechanical properties.

[0046] In this embodiment, the materials for composing the simulated natural gas hydrate reservoir rock plate in the basic formula are selected according to the reservoir mineral composition data of the target area, which are 51 parts of heavy calcium powder, 46 parts of quartz sand, 41 parts of illite powder, 12 parts of cement, 33 parts of water, and 5 parts of fiber.

[0047] (2) According to the preparation formula obtained in step (1), the required materials are weighed in proportion, and the weighed heavy calcium powder, quartz sand, illite powder, and cement are first uniformly mixed and stirred for 5 to 10 minutes, and the weighed water is added thereto. The mixture is uniformly mixed and stirred again for 5 to 10 minutes to prepare a slurry mixture of the desired simulated natural gas hydrate reservoir rock plate material.

[0048] In this embodiment, a small amount of slurry mixture is filled into the mold, and the slurry mixture in the mold is fully pressed by a compacting tool to flatten and compact it, and then the slurry mixture in the mold is fully shaken to eliminate bubbles inside the slurry. After the shaking is completed, the fiber filaments prepared in advance are laid on the top of the slurry to prevent the rock slab from breaking during the drying process. After the laying is completed, the slurry mixture is filled again, and the above steps are repeated until the slurry mixture is completely filled into the entire mold. The slurry above the mold is scraped flat by a scraping device, and the excess slurry on the mold is removed and the upper surface of the slurry is kept flat. After filling, a glass plate is covered on the mold to prevent the rock slab from breaking due to excessive evaporation of water. Wait for the slurry mixture in the mold to stand and fix to form under normal temperature and pressure conditions, and the standing forming time can be 36 hours; after demolding, take out the rock slab and put it into a constant temperature water tank for water bath curing, and the curing time can be 24 hours; after completing the water bath curing, the rock slab is placed under normal temperature and pressure conditions for ventilation and drying, and the drying time can be 24 hours. The mold is designed according to the standard API rock plate size.

[0049] Example 2

[0050] The simulated natural gas hydrate reservoir fracture conductivity evaluation system includes an API diversion chamber, which is covered with an insulation layer outside and arranged on a hydraulic press platform. A differential pressure sensor and a displacement sensor are arranged on the hydraulic press platform; the diversion chamber is connected with a data acquisition system, a circulating refrigeration device and a constant flow pump through pipelines I, II and III respectively; a balance and a vacuum system are arranged on pipeline I; a constant pressure pump and an air compressor are arranged on pipeline III; the data acquisition system is controlled and connected with the balance, the differential pressure sensor and the displacement sensor to realize real-time monitoring and collection of data.

[0051] Example 3

[0052] In this embodiment, the internal friction angle and cohesion of the simulated natural gas hydrate reservoir are calculated based on the Mohr-Coulomb failure criterion and the triaxial test experimental data of the simulated natural gas hydrate reservoir core, and the failure criterion curve is made using the calculated internal friction angle and cohesion. The Mohr-Coulomb criterion calculation formula is as follows:

[0053] ;

[0054] Where: Represents the maximum principal stress, in MPa; Represents the minimum principal stress, in MPa; It represents the cohesive force, the unit is MPa; Represents the internal friction angle in degrees.

[0055] The triaxial experimental data of the simulated natural gas hydrate reservoir core were selected, and the peak stress data were tested under confining pressures of 0, 1, and 2 MPa. The specific data are shown in Table 1:

[0056] ;

[0057] Substituting the data in the above table into the above calculation formula, the internal friction angle and cohesion of the hydrate reservoir are fitted and calculated. The specific calculated values ​​are: internal friction angle 31.4811°, cohesion 0.8501MPa.

[0058] (2) In this embodiment, the horizontal principal stress under different overburden pressures is calculated according to the in situ stress calculation formula:

[0059] ;

[0060] Among them, the closing pressure in the reservoir rock plate conductivity experiment is the overlying rock pressure of the reservoir , the bearing pressure (confining pressure) of the rock plate sidewall is the horizontal ground stress of the reservoir , The relationship between the overburden pressure and the horizontal ground stress is only related to the Poisson's ratio of the reservoir. According to the core triaxial test experimental data and the core sonic test experimental data, the reservoir Poisson's ratio is determined to be 0.23.

[0061] Setting different overburden pressures (closing pressures) The value of will set the overburden pressure value (closing pressure) Substitute into the calculation formula to find the horizontal ground stress (confining pressure) under different overburden rock pressures , According to the above calculation process, different overburden pressures (closing pressures) are set. The values ​​of are 1, 5, 10, 15, 20, 25, 30 MPa, and the solved horizontal ground stress (confining pressure) is , They are 0.23, 1.17, 2.35, 3.52, 4.69, 5.86 and 7.04MPa.

[0062] (3) According to the overburden pressure (closing pressure) and horizontal ground stress (confining pressure), the stress Mohr circle in the rock plate failure criterion is obtained. The relationship between the Mohr circle and the failure criterion curve in step (2) is observed to determine whether the rock plate will fail. When the failure criterion curve and the Mohr circle are tangent, it means that the rock plate has failed. By combining formulas (1) and (2), , , solve the maximum stress value of the Mohr circle when the rock plate is damaged ,in is the maximum critical closing pressure when the rock plate fails. It is 17.445MPa.

[0063] (4) At the maximum critical closing pressure The different closing pressure points required for the experiment were set within the range, and the closing pressure points for the short-term conductivity experiment of the simulated natural gas hydrate reservoir rock plate fracturing were preliminarily designed to be 1, 3, 5, 7, 10, 12, and 15 MPa, and the flow value was set to 2.5 ml / min.

[0064] (5) In this embodiment, the simulated natural gas hydrate reservoir fracture conductivity experimental evaluation system described in Example 2 is used to conduct a short-term conductivity test experiment of a simulated natural gas hydrate reservoir fracture under the conditions of the closing pressure point and flow value set in the above steps.

[0065] ① 20 / 40 mesh quartz sand and deionized water were selected as the samples in this test experiment. The sand concentration of the proppant in the experiment was 10~15kg / m 2 , the proppant mass is 64.52g.

[0066] ② First, place the rock plate into the assembled diversion chamber, then fill the prepared proppant into the diversion chamber and use the paving equipment to flatten the proppant in the diversion chamber, and then place the steel plate on top of the proppant. After installing the top piston, place the diversion chamber on the platform of the hydraulic press and connect the pipelines at both ends of the diversion chamber (inlet end pipeline and outlet end pipeline).

[0067] ③ After the vacuum system is connected to the flow chamber, the flow chamber and the connecting pipeline are vacuumed for 30 minutes. The flow rate of the constant flow pump is set to 1ml / min, and the constant flow pump is turned on to continuously pass liquid into the flow chamber for 1~2h to soak and compact the originally dry and dispersed proppant to reach the stable state during the test experiment. During this process, the change of the pressure difference indication number can be observed to determine whether the proppant is in a stable compaction state.

[0068] ④ Input the set closing pressure points 1, 3, 5, 7, 10, 12, 15 MPa on the operation software interface, set the flow rate on the constant flow pump to 2.5 ml / min, start the constant pressure pump to apply pressure to the diversion chamber until the closing pressure reaches the preset closing pressure value. At this time, the software acquisition system automatically records and solves the corresponding conductivity value, and makes a curve of the change of the fracture conductivity value with the closing pressure under the condition of 2.5 ml / min flow rate. The experimental conductivity values ​​are shown in Table 2, and the fracture conductivity change curve is shown in Table 2. Figure 4 As shown:

[0069] ;

[0070] According to the experimental data, the conductivity change law is shown. When the interval between two adjacent closing pressure points is small, the measured conductivity value may be inaccurate, resulting in a small fluctuation in the measured conductivity curve. Therefore, it is necessary to adjust the specific value of the closing pressure point and reduce the number of closing pressure points. Finally, the number of closing pressure points is set to 5, and the optimal closing pressure points are 1, 5, 10, 13, and 15 MPa.

[0071] It can be intuitively seen from the variation law of the curve that the variation law of the conductivity curve obtained at the closed pressure point set by the present invention basically conforms to the conventional variation law, which proves the feasibility of the test method of the present invention.

[0072] Example 4

[0073] 1. Under the minimum closing pressure of 6.9MPa given in the industry test standard, a uniaxial compressive strength test experiment was carried out on the simulated natural gas hydrate reservoir rock plate to observe the damage state of the rock plate during the pressure-bearing process, and the data was collected to obtain the displacement-load curve of the uniaxial compressive strength test of the rock plate.

[0074] 2. Carry out coring operations on the simulated natural gas hydrate reservoir rock plates under different pressure conditions, use the taken out simulated natural gas hydrate reservoir cores to conduct pressure test experiments, and analyze the distribution of pores in the simulated natural gas hydrate reservoir rock plates before and after pressure and under different pressure conditions.

[0075] In this embodiment, in order to further verify that the closing pressure point specified in the conventional fracture conductivity test standard is not suitable for the fracture conductivity test experiment of the simulated natural gas hydrate reservoir, the rock plate prepared in Example 1 is subjected to a uniaxial compressive strength test experiment. The maximum pressure value of the uniaxial compressive strength test is set to 6.9MPa, and 6.9MPa is converted into a load value of 44.10KN specified by the test machine according to the size of the rock plate. The length of the rock plate is 176.42mm, the width is 37.98mm, and the height is 12.22mm. When the load value reaches 44.10kN, the test machine is paused, and the state of the rock plate at this time is observed to find that the side wall of the rock plate is severely broken. By analyzing the displacement-load curve, it can be seen that before the pressure reaches 6.9MPa, the curve first shows a small bending change and then shows a linear increase trend. Based on the above analysis, it is believed that the rock plate has reached the maximum compressive strength before the pressure reaches 6.9MPa, and the internal structure of the rock plate has been damaged. If the pressure continues to be applied to the rock plate, it will continue to be in a state of deformation that is constantly compacted. It is analyzed here that the 6.9MPa specified in the industry standard cannot be used as the initial closing pressure point in the test of the conductivity of the simulated natural gas hydrate reservoir rock plate.

[0076] In this implementation, in order to verify the rationality of the closing pressure value calculated by the method involved in this patent, the simulated natural gas hydrate reservoir rock plate was cored after being subjected to a certain closing pressure, and then the simulated natural gas hydrate reservoir core was subjected to a pressure test experiment. The prepared four simulated natural gas hydrate reservoir rock plates were placed in the diversion chamber and a certain closing pressure was applied to the four rock plates respectively, where the applied closing pressures were 0, 5, 10, and 15 MPa respectively; when the pressure reached the specified closing pressure and stabilized for 30 minutes, the rock plate was taken out and a simulated natural gas hydrate reservoir core with a diameter of 25 mm and a height of 10 mm was taken out from the middle part of the rock plate using the coring technology, and four simulated natural gas hydrate reservoir rock plates under different pressure conditions were respectively taken out of four different simulated natural gas hydrate reservoir cores. Subsequently, the four simulated natural gas hydrate reservoir cores taken out were subjected to a pressure test experiment to analyze the pore size distribution of the rock plates under different pressure conditions. According to the experimental results, the cores under different pressure conditions show different pore size distributions. As the closing pressure increases, the distribution ratio of the initial pores with larger diameters in the cores decreases significantly. When the closing pressure is 0MPa, the peak of the core pore size distribution curve corresponds to a pore diameter of 0.2955mm, and the distribution ratio of pores with this diameter is 29.55%; when the closing pressure reaches 15MPa, the distribution ratio of pores with a diameter of about 0.29mm in the core is only 0.03-0.04%.

[0077] As the closing pressure increases, the distribution ratio of initial pores with larger diameters in the rock plate decreases significantly, indicating that the internal pore structure of the rock plate has been damaged. The internal pore structure of the rock plate is constantly changing during the entire pressure-bearing process. Applying a greater closing pressure or using the closing pressure point of the conventional diagenetic formation specified in the industry standard will cause more serious damage to the rock plate. The conductivity value obtained by the conductivity test experiment of the rock plate in a damaged state is obviously not of reference value. The maximum closing pressure value calculated by the method in the patent is 15MPa. By observing the distribution of the pore structure of the rock plate under the closing pressure of 15MPa, it can be seen that the internal structure of the rock plate under the closing pressure of 15MPa has been damaged to a certain extent. At the same time, the reliability of the maximum closing pressure value calculation method involved in the method is verified. It is also reliable to set the closing pressure point within the closing pressure range of 15MPa and conduct a conductivity test experiment of the simulated natural gas hydrate reservoir rock plate.

[0078] Example 5

[0079] In this example, a short-term conductivity test experiment of simulated natural gas hydrate reservoir rock plate fracturing cracks was carried out under the conditions of set closing pressure points (1, 5, 10, 13, 15MPa). This experiment analyzes the change law of the conductivity of simulated natural gas hydrate reservoir rock plate under different proppant particle size conditions, and the conductivity test experiments under three different proppant particle size conditions of 20 / 40 mesh, 30 / 50 mesh, and 40 / 70 mesh were designed.

[0080] The basic experimental parameters are shown in Table 3:

[0081] ;

[0082] The experimental results are shown in Table 4. The fracture conductivity variation curve is shown in Figure 5 shown.

[0083] ;

[0084] It can be intuitively seen from the variation law of the curve that the variation law of the conductivity curve obtained under the closing pressure point set in the present invention basically conforms to the conventional variation law, which proves that the test method and the selected closing pressure point described in the present invention are suitable for test experiments under different proppant particle size conditions.

[0085] Example 6

[0086] In this example, a short-term conductivity test experiment of simulated natural gas hydrate reservoir rock plate fracturing cracks was carried out. This experiment analyzed the change law of the conductivity of the simulated natural gas hydrate reservoir rock plate under different proppant sand concentration conditions, in which 10kg / m 2 , 20kg / m 2 , 25kg / m 2 Conductivity test experiment under three different proppant sand concentration conditions. The basic parameters of the experiment are shown in Table 5, the experimental results are shown in Table 6, and the fracture conductivity change curve is shown in Figure 6 .

[0087] ;

[0088] ;

[0089] It can be intuitively seen from the variation law of the curve that the variation law of the conductivity curve obtained under the closing pressure point set in the present invention basically conforms to the conventional variation law, which proves that the test method and the selected closing pressure point described in the present invention are suitable for test experiments under different proppant sand concentration conditions.

Claims

1. A method for testing the short-term conductivity of a simulated natural gas hydrate reservoir fracture, characterized in that: The test was conducted using a simulated natural gas hydrate reservoir fracture conductivity evaluation system; the following steps were included: (1) Prepare simulated natural gas hydrate reservoir rock slabs based on the target reservoir mineral composition data and reservoir-related mechanical properties; (2) Calculate the internal friction angle and cohesion of the simulated natural gas hydrate reservoir according to the Mohr-Coulomb failure criterion, and draw a failure criterion curve; (3) Calculating the horizontal geostress of the simulated natural gas hydrate reservoir slab under different overburden pressures according to the in situ stress calculation formula; the overburden pressure is the closing pressure of the simulated natural gas hydrate reservoir slab conductivity experiment, and the horizontal geostress is the bearing pressure of the side wall of the simulated natural gas hydrate reservoir slab; (4) Based on the calculation results of step (3), a stress Mohr circle of the simulated natural gas hydrate reservoir rock plate is obtained, and by observing the relationship between the Mohr circle and the failure criterion curve, whether the rock plate is damaged is determined, and the maximum critical closure pressure value when the rock plate is damaged is calculated; (5) Setting multiple closing pressure points within the maximum critical closing pressure range, and conducting a short-term conductivity test of a simulated natural gas hydrate reservoir fracture under these conditions. During the test, the selection of the closing pressure point is adjusted again according to the changes in the pressure differential gauge and the final experimental results; In the step (1), the raw material composition of the simulated natural gas hydrate reservoir rock plate is, by weight: 50-55 parts of heavy calcium powder, 45-50 parts of quartz sand powder, 40-45 parts of illite powder, 18-20 parts of cement, 50-55 parts of water, and 2-7 parts of additive material; the additive material is fiber filament; The simulated natural gas hydrate reservoir fracture conductivity evaluation system comprises an API diversion chamber, the API diversion chamber is covered with a thermal insulation layer outside and is arranged on a hydraulic press platform, and a pressure difference sensor and a displacement sensor are arranged on the hydraulic press platform; the diversion chamber is connected with a data acquisition system, a circulating refrigeration device and a constant flow pump through pipelines I, II and III respectively; a balance and a vacuum system are arranged on pipeline I; a constant pressure pump and an air compressor are arranged on pipeline III; the data acquisition system is controlled and connected with the balance, the pressure difference sensor and the displacement sensor to realize real-time monitoring and acquisition of data.

2. The method for testing the short-term conductivity of a simulated natural gas hydrate reservoir fracture according to claim 1, characterized in that: The calculation formula of the Mohr-Coulomb criterion in step (2) is: ; Where: Represents the maximum principal stress, in MPa; Represents the minimum principal stress, in MPa; It represents the cohesive force, the unit is MPa; Represents the internal friction angle in degrees.

3. The method for testing the short-term conductivity of a simulated natural gas hydrate reservoir fracture according to claim 1, characterized in that: The formula for calculating the in-situ stress in step (3) is: ; Where: It represents the maximum horizontal ground stress in MPa; It represents the minimum horizontal ground stress in MPa; Indicates the overburden pressure in MPa; μ Represents Poisson's ratio and has no units.