Automatic laying device for power pipeline construction

By using a motor-driven sprocket system and track mechanism, the automated and uniform laying of power pipelines and their smooth movement on irregular terrain are achieved, solving the fatigue problem caused by manual handling and improving construction efficiency and quality.

CN224068217UActive Publication Date: 2026-03-31GUANGDONG ZHUXING CONSTR ENG CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-04-23
Publication Date
2026-03-31

AI Technical Summary

Technical Problem

In existing power pipeline construction, manual handling leads to prolonged worker fatigue, affecting the laying speed and efficiency.

Method used

The system employs a motor-driven drive sprocket and driven sprocket to drive the rotating rod and transmission belt, combined with tracks and a multi-terrain moving mechanism, to achieve automated and uniform pipeline laying and maintain stable movement on irregular road sections.

Benefits of technology

It improves the automation and efficiency of pipeline laying, enhances laying quality, and maintains the stability of the equipment in complex terrain.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224068217U_ABST
    Figure CN224068217U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of pipeline laying, and discloses an automatic laying device for power pipeline construction, which comprises a machine body, a motor is fixedly connected to the rear end of the right side of the top of the machine body, rotating rods are rotatably connected to the upper and lower ends of the front and rear sides of the inner wall of the machine body, and a driving chain wheel is fixedly connected to the right end of the rotating rod at the lower end of the rear side; a driven chain wheel is fixedly connected to the right end of the rotating rod at the lower end of the front side, the driven chain wheel is in transmission connection with the driving chain wheel through a chain, transmission belts are rotationally connected to the outer walls of the multiple rotating rods, and a plurality of fixing buckles are fixedly connected to the outer walls of the two transmission belts at equal intervals; the left side and the right side of the machine body are each provided with a multi-terrain moving mechanism. According to the pipeline laying device, the motor drives the transmission belt and the fixing buckle to limit the pipeline through the driving chain wheel, the chain, the driven chain wheel and the rotating rod, so that the pipeline is uniformly conveyed downwards to be laid, and the effect of automatically and uniformly laying the pipeline is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to pipeline laying technical field especially relates to an automatic laying device for electric power pipeline construction. BACKGROUND

[0002] The electric power pipeline construction laying device is a professional equipment for electric power pipeline installation and laying, aiming at improving construction efficiency, guaranteeing laying quality and ensuring construction safety, and the common electric power pipeline construction laying device includes a tractor, which lays the electric power pipeline along the pre-planned path through strong traction, and can adapt to pipelines of different lengths and diameters.

[0003] Through retrieval, the patent publication number CN113690799B discloses a pipeline laying auxiliary device for electric power construction, which comprises a moving mechanism, a support frame is installed on the top of the moving mechanism, a lifting and overturning mechanism is installed on the side of the support frame, a groove is opened in the middle of the support frame, a support plate and a support mechanism are installed in the groove, one end of the support plate is rotatably installed on the side wall of the groove, the support mechanism is installed on the bottom plate of the groove and cooperates with the other end of the support plate, the moving mechanism can drive the movement of the whole device, reducing the labor intensity of the workers and improving the work efficiency, the lifting and overturning mechanism can lift the pipeline from the ground and lay it in the pre-dug pit under the cooperation of the support plate and the support mechanism, this process can be completed by one person, greatly reducing the labor intensity of the workers and improving the work efficiency, while the existing laying device for electric power pipeline construction lays the pipeline by manually carrying it to the designated position, and this pipeline laying method can cause the workers to be tired during long-time work, affecting the pipeline laying speed and work efficiency in the later period. UTILITY MODEL CONTENTS

[0004] In order to make up for the above shortcomings, the utility model provides an automatic laying device for electric power pipeline construction, aiming at improving the problem that the workers are tired during long-time work in the pipeline laying method in the prior art, affecting the pipeline laying speed and work efficiency in the later period.

[0005] In order to achieve the above object, the utility model discloses the following technical scheme: a kind of automatic laying device for electric power pipeline construction, including machine body, the top right side rear end of the machine body is fixedly connected with motor, the inner wall front and back side upper end and lower end of the machine body are rotatably connected with rotating rod, the right end of the rotating rod in rear side lower end is fixedly connected with driving sprocket, the right end of the rotating rod in front side lower end is fixedly connected with driven sprocket, the driven sprocket is connected with the driving sprocket by chain, the outer wall of multiple rotating rods is rotatably connected with transmission belt, the outer wall of two transmission belts is fixedly connected with multiple fixed buckles at equal intervals, the left and right sides of the machine body are all installed with multiple terrain moving mechanism, and the multiple terrain moving mechanism is used for the automatic laying device for electric power pipeline construction moves in different terrain.

[0006] Through the above technical scheme: the power provided by motor drives driving sprocket to rotate, while driving sprocket rotates, driven sprocket fixed on the rotating rod on the other side is driven to rotate synchronously by chain, the rotation of driving sprocket and driven sprocket drives the two rotating rods on the lower side to rotate, at this time, the two rotating rods on the lower side drive the two rotating rods on the upper side to rotate synchronously by transmission belt fixed on the outside, so as to drive the two transmission belts to rotate, at this time, the two transmission belts limit the pipeline by multiple fixed buckles fixed on the outside, so as to uniformly transport the pipeline downward for laying.

[0007] As a further description of the above technical scheme:

[0008] The multiple terrain moving mechanism includes fixed plate, the adjacent side of two fixed plates is fixedly connected on the left and right sides of machine body, the bottom of two fixed plates is fixedly connected with multiple springs at equal intervals, the middle part of multiple springs is slidably connected with connecting rod, the bottom of multiple connecting rods is fixedly connected with roller, the front and back ends of the left and right sides of machine body are rotatably connected with power wheel, and the outer wall of multiple power wheels is meshingly connected with track.

[0009] Through the above technical scheme: the machine body drives the power wheel fixed on the front and back of its two sides to rotate, when multiple power wheels rotate, meshing with the track sleeved on the outside, so as to drive the corresponding track to rotate, so as to drive the machine body to move forward, when encountering irregular section, multiple rollers installed in the track will be sequentially lifted up by the protruding part on the section, at this time, the corresponding spring fixed under the fixed plate will be extruded, so as to provide space for the lifting of the roller, so as to avoid the influence of irregular section on the machine body, at this time, the connecting rod fixed on the roller can avoid the corresponding spring bending to side.

[0010] As a further description of the above technical scheme:

[0011] The bottom of the motor is fixedly connected with stabilizing frame, and the front and back sides and left and right ends of the stabilizing frame are threadedly connected with screw one.

[0012] Through the technical scheme, the stable frame fixed by the screw one can improve the stability of the motor.

[0013] Further description of the technical scheme is as follows:

[0014] The top rear side of the body is provided with a laying groove, and the inner side of the laying groove is provided with a conveying belt.

[0015] Through the technical scheme, the conveying belt installed in the laying groove facilitates the laying of the pipeline.

[0016] Further description of the technical scheme is as follows:

[0017] The top of each connecting rod is threadedly connected with a screw two, and the outer wall of each screw two is threadedly connected with a limiting piece.

[0018] Through the technical scheme, the limiting piece fixed by the screw two can limit the movement range of the connecting rod.

[0019] Further description of the technical scheme is as follows:

[0020] The top of the body is fixedly connected with a pipe storage box, and the bottom right side of the pipe storage box is fixedly connected with supporting rods.

[0021] Through the technical scheme, the pipe storage box supported by the supporting rods can place the pipeline for laying.

[0022] Further description of the technical scheme is as follows:

[0023] The top right side of the body is fixedly connected with a protection box, and the right side of the protection box is provided with a box door.

[0024] Through the technical scheme, the box door installed on the protection box can quickly maintain and repair the interior of the body.

[0025] Further description of the technical scheme is as follows:

[0026] The right side of the box door is fixedly connected with a plug buckle, and the inner side of the plug buckle is slidably connected with a bolt.

[0027] Through the technical scheme, the box door is fixed with the protection box through the plug buckle and the bolt.

[0028] The utility model has the advantages of:

[0029] 1. In the utility model, the motor drives the rotating rod to rotate through the driving sprocket, chain and driven sprocket, the rotating rod restricts the pipeline through the transmission belt installed outside and multiple fixing buckles fixed outside the transmission belt, so that the pipeline is uniformly transported downward for laying, which realizes the effect of automatic and uniform laying of the pipeline, and improves work efficiency and work quality.

[0030] 2. In the utility model, the body drives the track to rotate through the power wheel, which drives the body to move forward, when encountering irregular road sections, multiple rollers installed in the track are sequentially lifted upward by the protruding parts on the road sections, at this time, the spring fixed under the fixed plate is extruded, so as to provide space for the lifting of the roller, which avoids the influence of irregular road sections on the body, at this time, the connecting rod fixed on the roller can avoid the corresponding spring bending to the side, which realizes the effect that the automatic laying device for power pipeline construction stably advances on irregular road sections. BRIEF DESCRIPTION OF DRAWINGS

[0031] Figure 1 It is a perspective view of an automatic laying device for power pipeline construction provided by the utility model;

[0032] Figure 2 It is an enlarged view of A in Figure 1

[0033] Figure 3 It is a partial structure schematic view of an automatic laying device for power pipeline construction provided by the utility model;

[0034] Figure 4 It is an enlarged view of B in Figure 3

[0035] Figure 5 It is an explosion view of the structure of an automatic laying device for power pipeline construction provided by the utility model.

[0036] LEGEND:

[0037] 1, body; 2, multiple terrain moving mechanism; 201, fixed plate; 202, spring; 203, connecting rod; 204, roller; 205, power wheel; 206, track; 3, motor; 4, rotating rod; 5, driving sprocket; 6, driven sprocket; 7, chain; 8, transmission belt; 9, fixing buckle; 10, stabilizing frame; 11, screw one; 12, laying groove; 13, conveying belt; 14, screw two; 15, limiting piece; 16, pipe storage box; 17, supporting rod; 18, protection box; 19, box door; 20, plug buckle; 21, bolt. DETAILED DESCRIPTION

[0038] ​​The technical solutions in the embodiments of the utility model will be clearly and completely described below with reference to the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by those skilled in the art without creative labor fall within the scope of the utility model.

[0039] With reference to Figure 3 And Figure 4 The utility model provides an embodiment: a kind of automatic laying device for electric power pipeline construction, including body 1, the top right side rear end of body 1 is fixedly connected with motor 3, the inner wall front and back side upper and lower end of body 1 is rotatably connected with rotating rod 4, the right end of rear side lower end rotating rod 4 is fixedly connected with driving sprocket 5, motor 3 drives driving sprocket 5 rotation, the right end of front side lower end rotating rod 4 is fixedly connected with driven sprocket 6, driven sprocket 6 is connected with driving sprocket 5 by chain 7, driving sprocket 5 drives driven sprocket 6 rotation by chain 7, the outer wall of multiple rotating rods 4 is rotatably connected with transmission belt 8, the outer wall of two transmission belts 8 is fixedly connected with multiple fixed buckles 9 at equal intervals, rotating rod 4 drives fixed buckle 9 to turn round by transmission belt 8, the left and right sides of body 1 are all installed with multi-terrain moving mechanism 2, and multi-terrain moving mechanism 2 is used for the automatic laying device for electric power pipeline construction to move in different terrain, the bottom of motor 3 is fixedly connected with stabilizing frame 10, the front and back side left and right ends of stabilizing frame 10 are all screw-connected with screw one 11, and screw one 11 is used to fix stabilizing frame 10, the top rear side of body 1 is provided with laying groove 12, and the inner side of laying groove 12 is installed with conveying belt 13, and conveying belt 13 is installed in laying groove 12;

[0040] Specifically, the power provided by motor 3 drives driving sprocket 5 to rotate, and driving sprocket 5 rotates simultaneously to drive driven sprocket 6 fixed on the rotating rod 4 on the other side to rotate synchronously through chain 7, and the rotation of driving sprocket 5 and driven sprocket 6 drives the two rotating rods 4 on the lower side to rotate, at this time, the two rotating rods 4 on the lower side drive the two rotating rods 4 on the upper side to rotate synchronously through the transmission belt 8 fixed outside, so as to drive the two transmission belts 8 to rotate, at this time, the multiple fixed buckles 9 fixed outside limit the pipeline, so that the pipeline is evenly transported downward for laying, and the stabilizing frame 10 fixed by screw one 11 can improve the stability of motor 3, and the conveying belt 13 installed in laying groove 12 facilitates the laying of the pipeline.

[0041] With reference to Figure 5The multi-terrain moving mechanism 2 comprises a fixed plate 201, the adjacent sides of the two fixed plates 201 are fixedly connected to the left and right sides of the body 1, the bottoms of the two fixed plates 201 are fixedly connected with a plurality of springs 202 at equal intervals, the fixed plate 201 is used for fixing the springs 202, the middle parts of the plurality of springs 202 are slidingly connected with connecting rods 203, the bottoms of the plurality of connecting rods 203 are fixedly connected with rollers 204, the connecting rod 203 is used for fixing the roller 204, the left and right sides of the body 1 are rotatably connected with power wheels 205, the outer walls of the plurality of power wheels 205 are meshingly connected with tracks 206, the power wheel 205 is used for driving the track 206 to rotate, the tops of the plurality of connecting rods 203 are threadedly connected with screws two 14, the outer walls of the plurality of screws two 14 are threadedly connected with limiting sheets 15, and the screw two 14 is used for fixing the limiting sheet 15.

[0042] Specifically, the body 1 drives the power wheels 205 fixed on the front and rear sides thereof to rotate, when the plurality of power wheels 205 rotate, the tracks 206 sleeved on the outer walls thereof are meshingly connected, so that the corresponding tracks 206 are driven to rotate, thereby driving the body 1 to move forward, when an irregular road section is encountered, the plurality of rollers 204 installed in the tracks 206 are sequentially lifted upward by the protruding parts on the road section, at this time, the corresponding springs 202 fixed under the fixed plate 201 are extruded, thereby providing space for the rollers 204 to lift upward, thereby avoiding the influence of the irregular road section on the body 1, the connecting rod 203 fixed on the roller 204 can avoid the corresponding spring 202 from being bent to the side, and the limiting sheet 15 fixed by the screw two 14 can limit the movement range of the connecting rod 203.

[0043] Referring to Figure 1 and Figure 2 , the top of the body 1 is fixedly connected with a storage pipe box 16, the bottoms of the right sides of the storage pipe box 16 are fixedly connected with support rods 17, the support rod 17 is used for supporting the storage pipe box 16, the top of the right side of the body 1 is fixedly connected with a protection box 18, the right side of the protection box 18 is provided with a box door 19, the box door 19 facilitates the maintenance in the protection box 18, the right side of the front end of the box door 19 is fixedly connected with a plug buckle 20, the inner side of the plug buckle 20 is slidingly connected with a latch 21, and the plug buckle 20 and the latch 21 are used for fixing the box door 19.

[0044] Specifically, the storage pipe box 16 supported by the support rod 17 can place the pipeline used for laying, the box door 19 installed on the protection box 18 is used for quickly maintaining and repairing the inside of the body 1, and the box door 19 is fixed with the protection box 18 through the plug buckle 20 and the latch 21.

[0045] Working principle: when using the automatic laying device for power pipeline construction to lay pipeline, first start the motor 3 fixed on the machine body 1, drive the driving sprocket 5 to rotate through the power provided by the motor 3, drive the driven sprocket 6 fixed on the other side of the rotating rod 4 to rotate synchronously through the chain 7 while the driving sprocket 5 rotates, drive the two rotating rods 4 on the lower side to rotate through the driving sprocket 5 and the driven sprocket 6, at this time, the two rotating rods 4 on the lower side drive the two rotating rods 4 on the upper side to rotate synchronously through the transmission belt 8 fixed outside, thereby driving the two transmission belts 8 to rotate, at this time, the two transmission belts 8 limit the pipeline through the plurality of fixed buckles 9 fixed outside, thereby uniformly conveying the pipeline downward for laying, so as to realize the effect of automatic and uniform laying of the pipeline, thereby improving the work efficiency and work quality.

[0046] When the automatic laying device for power pipeline construction lays pipeline, the machine body 1 drives the power wheels 205 fixed on both sides to rotate, when the plurality of power wheels 205 rotate, the crawler belts 206 sleeved outside are engaged, thereby driving the corresponding crawler belts 206 to rotate, so as to drive the machine body 1 to move forward, when encountering irregular road sections, the plurality of rollers 204 installed in the crawler belts 206 are sequentially lifted upward by the protruding parts on the road sections, at this time, the corresponding springs 202 fixed under the fixed plate 201 are extruded, thereby providing space for the rollers 204 to lift, thereby avoiding the influence of the irregular road sections on the machine body 1, at this time, the connecting rods 203 fixed on the rollers 204 can avoid the corresponding springs 202 to bend to the side, so as to realize the effect that the automatic laying device for power pipeline construction stably travels on the irregular road sections.

[0047] Finally, it should be pointed out that: the above only for the preferred embodiments of the present application, and not for limiting the present application, although the present application has been described in detail with reference to the foregoing embodiments, for those skilled in the art, it still can modify the technical solutions recorded in the foregoing embodiments, or make equivalent replacement for part of the technical features, any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present application, should be included in the protection scope of the present application.

Claims

1. An automatic laying device for power pipeline construction, comprising a machine body (1), characterized in that: The top right side of the body (1) is fixedly connected with a motor (3), the inner wall of the body (1) is rotatably connected with a rotating rod (4) at the upper end and the lower end of the front side and the rear side, the right end of the rotating rod (4) at the lower end of the rear side is fixedly connected with a driving sprocket (5), the right end of the rotating rod (4) at the lower end of the front side is fixedly connected with a driven sprocket (6), the driven sprocket (6) is drivingly connected with the driving sprocket (5) through a chain (7), the outer wall of a plurality of rotating rods (4) is rotatably connected with a transmission belt (8), the outer wall of two transmission belts (8) is fixedly connected with a plurality of fixed buckles (9) at equal intervals, the left and right sides of the body (1) are provided with a plurality of terrain moving mechanisms (2), and the terrain moving mechanism (2) is used to move the automatic laying device for power pipeline construction on different terrains.

2. The automatic laying device for power pipeline construction according to claim 1, characterized in that: The terrain moving mechanism (2) comprises a fixed plate (201), the adjacent sides of two fixed plates (201) are fixedly connected to the left and right sides of the body (1), the bottoms of two fixed plates (201) are fixedly connected with a plurality of springs (202) at equal intervals, the middle portions of a plurality of springs (202) are slidingly connected with a connecting rod (203), the bottoms of a plurality of connecting rods (203) are fixedly connected with a roller (204), the left and right sides of the body (1) are rotatably connected with a power wheel (205) at the front end and the rear end, and the outer wall of a plurality of power wheels (205) is meshingly connected with a track (206).

3. The automatic laying device for power pipeline construction according to claim 1, characterized in that: The bottom of the motor (3) is fixedly connected with a stabilizing frame (10), and the front side and the rear side of the stabilizing frame (10) are threadedly connected with a screw (11).

4. The automatic laying device for power pipeline construction according to claim 1, characterized in that: The top rear side of the body (1) is provided with a laying groove (12), and the inner side of the laying groove (12) is provided with a conveyor belt (13).

5. The automatic laying device for power pipeline construction according to claim 2, characterized in that: The top of a plurality of connecting rods (203) is threadedly connected with a screw (14), and the outer wall of a plurality of screws (14) is threadedly connected with a limiting piece (15).

6. The automatic laying device for power pipeline construction according to claim 1, characterized in that: The top of the body (1) is fixedly connected with a pipe storage box (16), and the bottom right side of the pipe storage box (16) is fixedly connected with a supporting rod (17) at the front end and the rear end.

7. The automatic laying device for power pipeline construction according to claim 1, characterized in that: The top right side of the body (1) is fixedly connected with a protection box (18), and the right side of the protection box (18) is provided with a box door (19).

8. The automatic laying device for power pipeline construction according to claim 7, characterized in that: The right side of the front end of the box door (19) is fixedly connected with a plug buckle (20), and the inner side of the plug buckle (20) is slidingly connected with a latch (21).

Citation Information

Patent Citations

  • A pipeline laying auxiliary device for power construction

    CN113690799B