A multi-level support method for the junction of forward and reverse foundation pits
By adopting a multi-stage support method at the junction of the foundation pit, using components such as the first support plate, the second support plate and the support frame for multi-stage support of the template, the low-level template construction efficiency in the prior art is solved and The problem of low strength improves the casting stability and construction efficiency of the crown beam.
Patent Information
- Application Number
- CN202411351068.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-26
- Publication Date
- 2024-12-06
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The formwork at the junction of existing foundation pits is low efficiency and has low strength, which affects the stability during concrete pouring.
Using the multi-stage support method of the first support plate, the second support plate and the support frame, the steps of measuring the lines, the chiseling of wall heads, the cushion layer construction, the steel bar installation, the formwork installation, concrete pouring and the mold removal and maintenance , use components such as fixed steel film, support frame and screw for multi-stage support to ensure the stability and strength of the template.
It improves the strength and stability of the formwork, enhances the stability during the casting process of crown beams, simplifies the installation process, and improves the construction efficiency and structural integrity.
Smart Images

Figure CN118854941B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of foundation pit support, and in particular to a multi-level support method at the junction of a forward and reverse foundation pit. Background Art
[0002] The support at the junction of foundation pits is an important part of the foundation pit project. It is directly related to the stability of the foundation pit and the safety of the surrounding environment. Setting up crown beam support at the edge of the foundation pit can provide additional support for the foundation pit, enhance the overall stability of the edge of the foundation pit, and thus provide better stability for the junction of the foundation pit.
[0003] When the crown beam support method is used for construction, the concrete pouring process is usually adopted to prepare the crown beam structure on site. Before pouring the concrete, a template needs to be built at a specified position. The stability of the template construction directly determines the strength of the crown beam structure. However, when building the template at this stage, the efficiency is low because the plates are spliced. Secondly, the strength of the connection points between the plates is low, which affects the strength of the template structure during the concrete pouring process. Therefore, the present invention provides a multi-level support method at the junction of forward and reverse foundation pits to meet the needs. Summary of the invention
[0004] The technical problem to be solved by the present invention is to provide a multi-level support method for the junction of forward and reverse foundation pits. By setting a first support plate, a second support plate and a support frame, the three can systematically perform multi-level support on both sides of the template, while improving the strength of the template and making the crown beam more stable during the later pouring process. The above settings can solve the problem of low efficiency and low strength during the template installation process.
[0005] In order to solve the above technical problems, the present invention provides the following technical solutions:
[0006] A multi-level support method for the junction of a forward and reverse foundation pit comprises the following steps:
[0007] Step 1: Survey and lay out: Use a total station to measure the structural contour and axis according to the drawings, and drive in wooden stakes or steel bars as the basis for excavation and steel bar tying;
[0008] Step 2: Chisel off the wall head: Chisel off the wall manually with a pneumatic pick, and use a steel bar straightening machine to straighten the bent steel bars so that the length of the steel bars meets the anchoring requirements. After the straightening is completed, remove the rust and stains on the steel bars and the dust and other impurities on the top of the wall or pile;
[0009] Step 3: Construction of cushion layer: pour a 5cm thick and 1.6cm wide concrete cushion layer at the axis position. After pouring the cushion layer, use a total station to lay out the crown beam and concrete support control line, divide the edge line according to the control line and use the ink fountain to position it, and lay a 12mm thick bamboo plywood as the base membrane at the bottom of the concrete support and the suspended position of the crown beam;
[0010] Step 4: Steel bar installation: The steel bar threads processed on site are ground with a grinding wheel cutter before threading. After threading, they are inspected with a go / no-go gauge. The qualified steel bar wire heads are protected with sleeves. The skeleton bars and frame bars are installed in sequence, and finally the stirrups are tied. The steel bar wire heads are connected with straight thread sleeves. Two protective layer concrete pads are arranged at the points where the beam height is divided into three equal parts. The concrete pads are arranged at intervals of 1m in the length direction. After the steel bars are tied, the axial force gauge is embedded in the support according to the design drawings;
[0011] Step 5: Formwork installation: The first support plate of the crown beam and concrete adopts a shaped steel membrane, and the second support plate is arranged outside the first support plate with a spacing of no more than 1m. After the second support plate is arranged, it is reinforced with a support frame diagonal brace. One end of the support frame is fixed to the second support plate, and the other end is fixed to the wooden pile driven into the soil. After the first support plate is installed, its verticality is checked with a hanging hammer;
[0012] Step 6, concrete pouring: Use a car pump to transport concrete, chisel the construction joints before pouring, remove garbage and loose sand and gravel on the surface of the construction joints, clean with water and fully moisten, use an inserted vibrator to vibrate, pour in layers, each layer is 300-400mm thick, use oblique vibration at the dense intersection of steel bars, and use vertical vibration at other locations. The distance between the vibration points is 300-400mm, and the insertion point is no more than 200mm from the first support plate;
[0013] Step 7: Formwork removal and maintenance: Cover the concrete with a water-saving and moisturizing film within 12 hours after the concrete is completed, and use an automatic sprinkler system for 24-hour moisturizing maintenance. After the concrete reaches the specified strength, the formwork is removed. For concrete edges and corners damaged during excavation, angle steel is used to protect them.
[0014] Optionally, a support assembly is used to reinforce the strength of the formwork, and the support assembly is respectively connected to the first support plate, the second support plate and the support frame.
[0015] Optionally, the support assembly includes a smooth portion fixedly connected to one side of the second support plate, a protrusion fixedly connected to the other side of the second support plate, the number of the support frames is three, the support frames match the contour of the second support plate, screws are inserted on the first support plate and the second support plate, the screw outer sleeve is provided with a tension plate, and a clamping plate is screwed on the screw.
[0016] Optionally, a connecting rod is fixedly connected to one side of the supporting frame, and an inclined plate, a triangular plate and a straight plate are fixedly connected to the connecting rods of the three supporting frames in sequence from top to bottom.
[0017] Optionally, one end of the inclined plate and the straight plate are both fixedly connected to a U-shaped frame, the bottom of the U-shaped frame is fixedly connected to a C-shaped frame, and bolts are inserted into the C-shaped frame.
[0018] Optionally, the triangular plate is a triangular structure, and lightweight grooves are provided on the inclined plate, the triangular plate and the straight plate, and the inclined plate, the triangular plate and the straight plate are an integrally manufactured structure.
[0019] Optionally, both ends of the support frame are fixedly connected with positioning blocks, and positioning grooves that match the shape of the positioning blocks are symmetrically formed on both sides of the second support plate.
[0020] Optionally, a positioning tube is fixedly connected to the middle position of the support frame, and slots matching the size of the positioning tube are formed on the first supporting plate and the second supporting plate.
[0021] Optionally, an insertion portion is fixedly connected to the middle position of the tension plate, an insertion tube is fixedly connected inside the insertion portion, locking grooves are provided on both sides of the tension plate, and the insertion portion matches the contour of the support frame.
[0022] Optionally, the screw outer shell is provided with a sleeve, and the sleeve is made of PVC plastic material.
[0023] Compared with the prior art, the present invention has at least the following beneficial effects:
[0024] In the above scheme, by setting the first supporting plate, the second supporting plate and the supporting frame, the three can systematically perform multi-level support on both sides of the formwork, thereby improving the strength of the formwork and making the crown beam more stable during the later pouring process. The first supporting plate is a smooth plate structure, and the entire plate is in contact with both sides of the formwork, supporting and limiting both sides of the formwork to form a primary support; the second supporting plate is a vertical plate distributed at intervals, and the second supporting plate mainly supports the first supporting plate for a secondary support, ensuring that the first supporting plate is in a vertical state and improving the strength of the first supporting plate structure; the three supporting frames are arranged from top to bottom on the top, In the middle and bottom positions, the second support plate is braced and reinforced with three supporting points to form a three-level support. The setting of the three-point support structure maximizes the stability of the second support plate structure; after the support frame is installed, the screw rods are inserted into the first support plate, the second support plate and the support frame, and the clamping plate is locked on the tension plate under the driving action of the thread to form a four-level support. This setting allows the first support plate, the second support plate and the support frame to be installed and fixed at the same time with the help of screw rods and tension plates, thereby greatly reducing the operating burden of the three during the installation process, improving the installation efficiency while ensuring the integrity of the direct structure of the three.
[0025] By arranging a smooth portion and a raised portion on the second supporting plate, the second supporting plate is adapted to the contours of the first supporting plate and the supporting frame at the same time, so that the structures of the three can cooperate with each other during installation, thereby improving the installation efficiency while ensuring the firmness and stability of the cooperation between the structures.
[0026] By arranging inclined plates, triangular plates and straight plates on the support frame, these three plates cooperate to form a stable triangular structure. The arrangement of the triangular structure further improves the stability of the support frame structure. The other ends of the inclined plates, triangular plates and straight plates converge into the same plate and are connected to the wooden piles driven into the soil. A U-shaped frame is installed on the plate structure formed by the convergence of the three plates, and a C-shaped frame is installed at the bottom of the U-shaped frame. The U-shaped frame and the C-shaped frame utilize the structure of the existing wooden piles, a specific installation structure, a top-down insertion positioning method, and a structure tightened with bolts, which can greatly improve the efficiency of installing the support frame on the wooden piles, and can ensure the stability and safety of the support frame during use. Such an installation method can be used repeatedly, and will not cause damage to the wooden piles and the structure of the support frame during disassembly.
[0027] By setting the tension plates and clamping plates, a good spacing can be maintained between the two first support plates. When looseness occurs between the two first support plates, the first support plates can be tightened by screwing the nuts on the clamping plates. This setting can ensure that the formwork will not become loose or displaced during the pouring process. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] The accompanying drawings, which are incorporated herein and constitute a part of the specification, illustrate embodiments of the invention and, together with the description, further serve to explain the principles of the invention and to enable those skilled in the relevant art to make and use the invention.
[0029] Figure 1 This is a first-view structural diagram of the multi-level support method at the junction of the forward and reverse foundation pits;
[0030] Figure 2 It is a second-angle structural diagram of the multi-level support method at the junction of the forward and reverse foundation pits;
[0031] Figure 3 A schematic diagram of the enlarged three-dimensional structure for the support assembly;
[0032] Figure 4 It is a schematic diagram of the top view structure of the support assembly;
[0033] Figure 5 It is a schematic diagram of the three-dimensional structure of the support frame;
[0034] Figure 6 It is an enlarged three-dimensional structural diagram of the second supporting plate, supporting frame, tension plate and clamping plate;
[0035] Figure 7 It is a schematic diagram of the structure of the support assembly in a cutaway first-person perspective;
[0036] Figure 8 It is a structural schematic diagram of the support assembly cutaway from the second viewing angle;
[0037] Fig. 9 This is a schematic diagram of the exploded three-dimensional structure of the screw, sleeve, tension plate and clamping plate.
[0038] Reference numerals:
[0039] 1. First supporting plate; 2. Second supporting plate; 201. Smooth part; 202. Raised part; 203. Positioning groove; 3. Support frame; 301. Positioning block; 302. Positioning cylinder; 303. Connecting rod; 304. Inclined plate; 305. Triangular plate; 306. Straight plate; 307. U-shaped frame; 308. C-shaped frame; 4. Screw; 5. Sleeve; 6. Tension plate; 601. Locking groove; 602. Insertion part; 603. Insertion cylinder; 7. Clamping piece.
[0040] As shown in the figure, in order to clearly implement the structure of the embodiment of the present invention, specific structures and devices are marked in the figure, but this is only for illustrative purposes and is not intended to limit the present invention to the specific structure, device and environment. According to specific needs, ordinary technicians in this field can adjust or modify these devices and environments. DETAILED DESCRIPTION
[0041] The following is a detailed description of a multi-level support method for the junction of a foundation pit provided by the present invention in conjunction with the accompanying drawings and specific embodiments. At the same time, it is explained here that in order to make the embodiments more detailed, the following embodiments are the best and preferred embodiments, and those skilled in the art may also adopt other alternative methods to implement some known technologies; and the accompanying drawings are only for a more specific description of the embodiments, and are not intended to specifically limit the present invention.
[0042] It should be noted that the references to "one embodiment", "embodiment", "exemplary embodiments", "some embodiments" and the like in the specification indicate that the embodiments described may include specific features, structures or characteristics, but not every embodiment may include the specific features, structures or characteristics. In addition, when a specific feature, structure or characteristic is described in conjunction with an embodiment, it should be within the knowledge of a person skilled in the art to implement such feature, structure or characteristic in conjunction with other embodiments (whether or not explicitly described).
[0043] In general, a term can be understood, at least in part, from its use in context. For example, depending, at least in part, on the context, the term "one or more" as used herein can be used to describe any feature, structure, or characteristic in the singular sense, or can be used to describe a combination of features, structures, or characteristics in the plural sense. Additionally, the term "based on" can be understood as not necessarily intended to convey an exclusive set of factors, but can instead, depending, at least in part, on the context, allow for the presence of other factors that are not necessarily explicitly described.
[0044] It will be understood that the meanings of “on,” “over,” and “above” in the present invention should be interpreted in the broadest manner, so that “on” means not only “directly on” something, but also includes the meaning of being “on” something with intervening features or layers therebetween, and “on” or “over” means not only “on” or “above” something, but also includes the meaning of being “on” or “above” something with no intervening features or layers therebetween.
[0045] Additionally, spatially relative terms such as "under," "beneath," "lower," "above," "upper," and the like may be used herein for descriptive convenience to describe the relationship of one element or feature to another element or features, as shown in the accompanying drawings. Spatially relative terms are intended to encompass different orientations of the device in use or operation in addition to the orientation depicted in the accompanying drawings. The device may be oriented in other ways, and the spatially relative descriptors used herein may be similarly interpreted accordingly.
[0046] like Figures 1 to 3 As shown, an embodiment of the present invention provides a multi-level support method at the junction of a foundation pit with forward and reverse working, comprising the following steps:
[0047] Step 1: Survey and lay out: Use a total station to measure the structural contour and axis according to the drawings, and drive in wooden stakes or steel bars as the basis for excavation and steel bar tying;
[0048] Step 2: Chisel off the wall head: Chisel off the wall manually with a pneumatic pick, and use a steel bar straightening machine to straighten the bent steel bars so that the length of the steel bars meets the anchoring requirements. After the straightening is completed, remove the rust and stains on the steel bars and the dust and other impurities on the top of the wall or pile;
[0049] Step 3: Construction of cushion layer: pour a 5cm thick and 1.6cm wide concrete cushion layer at the axis position. After pouring the cushion layer, use a total station to lay out the crown beam and concrete support control line, divide the edge line according to the control line and use the ink fountain to position it, and lay a 12mm thick bamboo plywood as the base membrane at the bottom of the concrete support and the suspended position of the crown beam;
[0050] Step 4: Steel bar installation: The steel bar threads processed on site are ground with a grinding wheel cutter before threading. After threading, they are inspected with a go / no-go gauge. The qualified steel bar wire heads are protected with sleeves. The skeleton bars and frame bars are installed in sequence, and finally the stirrups are tied. The steel bar wire heads are connected with straight thread sleeves. Two protective layer concrete pads are arranged at the points where the beam height is divided into three equal parts. The concrete pads are arranged at intervals of 1m in the length direction. After the steel bars are tied, the axial force gauge is embedded in the support according to the design drawings;
[0051] Step 5, formwork installation: The first support plate 1 of the crown beam and concrete adopts a shaped steel film, and the second support plate 2 is arranged outside the first support plate 1, with a spacing of no more than 1m. After the second support plate 2 is arranged, a support frame 3 is used for diagonal reinforcement. One end of the support frame 3 is fixed to the second support plate 2, and the other end is fixed to the wooden pile driven into the soil. After the first support plate 1 is installed, a hanging hammer is used to check its verticality;
[0052] Step 6, concrete pouring: Use a car pump to transport concrete, chisel the construction joints before pouring, remove garbage and loose sand and gravel on the surface of the construction joints, clean with water and fully moisten, use an inserted vibrator to vibrate, pour in layers, each layer is 300-400mm thick, use oblique vibration at the dense intersection of steel bars, and use vertical vibration at other locations. The distance between the vibration points is 300-400mm, and the insertion point is no more than 200mm from the first support plate 1;
[0053] Step 7: Formwork removal and maintenance: Cover the concrete with a water-saving and moisturizing film within 12 hours after the concrete is completed, and use an automatic sprinkler system for 24-hour moisturizing maintenance. After the concrete reaches the specified strength, the formwork is removed. For concrete edges and corners damaged during excavation, angle steel is used to protect them.
[0054] As an implementation method in this embodiment, Figures 1 to 8As shown, the support assembly is used to strengthen the strength of the template. The support assembly is connected to the first support plate 1, the second support plate 2 and the support frame 3 respectively. The support assembly includes a smooth portion 201 fixedly connected to one side of the second support plate 2, and the other side of the second support plate 2 is fixedly connected to a raised portion 202. The number of the support frames 3 is three, and the support frame 3 coincides with the contour of the second support plate 2. A connecting rod 303 is fixedly connected to one side of the support frame 3. The connecting rods 303 of the three support frames 3 are fixedly connected with an inclined plate 304, a triangular plate 305 and a straight plate 306 in sequence from top to bottom. 6. The triangular plate 305 is a triangular structure. The inclined plate 304, the triangular plate 305 and the straight plate 306 are all provided with lightweight grooves. The inclined plate 304, the triangular plate 305 and the straight plate 306 are an integrated manufacturing structure. The support assembly system provided in the present application provides multi-level support for both sides of the template, which improves the strength of the template and makes the crown beam more stable during the later pouring process. The support assembly mainly includes a first support plate 1 located on both sides of the template and a second support plate 2 arranged on the outside of the first support plate 1. The first support plate 1 is a smooth plate structure, and the entire plate is against the template. On both sides of the template, the two sides of the template are supported and limited. The second supporting plate 2 is a vertical plate distributed at intervals. The second supporting plate 2 mainly supports the first supporting plate 1 to ensure that the first supporting plate 1 is in a vertical state and improves the strength of the first supporting plate 1 structure. In order to make the first supporting plate 1 and the second supporting plate 2 firmly contact the outside of the template, a supporting frame 3 is installed on one side of the second supporting plate 2. The number of supporting frames 3 is three. The three supporting frames 3 are arranged from top to bottom at the top, middle and bottom positions of the second supporting plate 2, and the second supporting plate 2 is inclined with three supporting points. The three-point support structure is reinforced, and the setting of the three-point support structure maximizes the stability of the second support plate 2 structure. The three support frames 3 are installed on one side in sequence from top to bottom with an inclined plate 304, a triangular plate 305 and a straight plate 306. These three plates cooperate to form a stable triangular structure. The setting of the triangular structure further improves the stability of the support frame 3 structure. One end of the inclined plate 304, the triangular plate 305 and the straight plate 306 are connected to the second support plate 2, and the other ends of the inclined plate 304, the triangular plate 305 and the straight plate 306 converge into the same plate and are connected to the wooden piles driven into the soil.
[0055] Specifically, a smooth portion 201 is installed on one side of the second supporting plate 2, and a raised portion 202 is installed on the other side. The smooth portion 201 is in conflict with the outer wall of the first supporting plate 1, and the smooth portion 201 is a smooth plate structure. Such a structural setting makes the contact area of the second supporting plate 2 larger and the stability better when it conflicts with the surface of the first supporting plate 1, thereby ensuring that the second supporting plate 2 is not prone to sliding displacement. The contour of the raised portion 202 has two arc-shaped raised structures, and the contour of the raised portion 202 coincides with the contour of the support frame 3. Therefore, the setting of the raised portion 202 structure is to allow the second supporting plate 2 to form a better adaptation effect with the structure of the support frame 3. In summary, the setting of the second supporting plate 2 structure is adapted to the contours of the first supporting plate 1 and the support frame 3 at the same time, so that the structures of the three can cooperate with each other during installation, thereby improving the installation efficiency while ensuring the firmness and stability of the coordination between the structures.
[0056] Lightweight grooves are provided on the inclined plate 304, the triangular plate 305 and the straight plate 306. The lightweight grooves are specifically provided in the middle position of the inclined plate 304, the triangular plate 305 and the straight plate 306. The purpose of providing the lightweight grooves is to reduce the weight of the plate structure, making the plate more labor-saving during installation and transportation.
[0057] In this embodiment, if Figures 3 to 9 As shown, the first supporting plate 1 and the second supporting plate 2 are both plugged with screws 4, and the outer sleeve of the screw 4 is provided with a tension plate 6, and a clamping piece 7 is screwed on the screw 4. The outer sleeve of the screw 4 is provided with a sleeve 5, and the sleeve 5 is made of PVC plastic material. An insertion portion 602 is fixedly connected to the middle position of the tension plate 6, and an insertion tube 603 is fixedly connected to the insertion portion 602. Locking grooves 601 are provided on both sides of the tension plate 6, and the insertion portion 602 coincides with the contour of the support frame 3. The screw 4 passes through the first supporting plate 1 and the second supporting plate 2 at the same time. The tension plates 6 are sleeved on both ends of the screw 4, and the tension plates 6 are against the outer wall of the support frame 3, and the contour coincides with the contour of the support frame 3. Such a structural arrangement makes it possible to use the tension plates 6 to support the The positioning efficiency is higher when the frame 3 is fixed, and the stability is better after fixation. The contour of the clamping piece 7 is adapted to the tension plate 6, and a nut is arranged on the clamping piece 7. When the user needs to fix the support frame 3 with the help of the tension plate 6, firstly, the insertion portion 602 in the middle of the tension plate 6 is inserted into the middle of the support frame 3, and then the nut on the clamping piece 7 is screwed onto the screw 4, so that the clamping piece 7 is locked on the tension plate 6 under the driving action of the thread. The above structural setting enables the first support plate 1, the second support plate 2 and the support frame 3 to be installed and fixed at the same time with the help of the screw 4 and the tension plate 6, thereby greatly reducing the operating burden of the three during the installation process, improving the installation efficiency and ensuring the integrity of the direct structure of the three.
[0058] Furthermore, the user can increase the clamping force applied by the pull plate 6 to the support frame 3 by tightening the nut on the clamping plate 7. When the clamping force on the surface of the support frame 3 is increased, the second support plate 2 will also increase the clamping force on the first support plate 1. Such a setting can ensure that a good spacing is always maintained between the two first support plates 1. When looseness occurs between the two first support plates 1, the first support plates 1 can be tightened by screwing the nut on the clamping plate 7, thereby ensuring that the template will not become loose or displaced during the pouring process.
[0059] Furthermore, a sleeve 5 made of PVC plastic material is arranged outside the screw rod 4. The sleeve 5 is wrapped around the screw rod 4 so that the concrete will not be poured directly on the screw rod 4 during the pouring process. When the formwork is disassembled later, the screw rod 4 can be directly pulled out from the sleeve 5, and the sleeve 5 remains in the concrete. The use of PVC plastic material makes the sleeve 5 cheaper. The contour of the locking groove 601 on both sides of the tension plate 6 is consistent with the contour of the connecting rod 303. Such an arrangement allows the user to insert the tension plate 6 on the outside of the support frame 3, and the matching effect of the locking groove 601 and the connecting rod 303 can be used for auxiliary positioning, so that it has a fool-proof effect during the installation process. Secondly, after the tension plate 6 is installed, the locking groove 601 and the connecting rod 303 limit each other, which can further improve the stability of the structural coordination between the tension plate 6 and the support frame 3.
[0060] In this embodiment, if Figures 3 to 5 As shown, one end of the inclined plate 304 and the straight plate 306 are fixedly connected to a U-shaped frame 307, and the bottom of the U-shaped frame 307 is fixedly connected to a C-shaped frame 308, and bolts are inserted into the C-shaped frame 308. As described above, one end of the inclined plate 304, the straight plate 306 and the triangular plate 305 converge into a same plate and are connected to the wooden piles driven into the soil. The specific U-shaped frame 307 is installed at the convergence point of the inclined plate 304, the straight plate 306 and the triangular plate 305. The overall structure of the U-shaped frame 307 is a U-shaped structure, and the setting of the U-shaped structure coincides with the outline of the wooden pile. When the user installs the support frame 3 on the wooden pile, the U-shaped frame 307 can be set on the top of the wooden pile from top to bottom, and the U-shaped frame 307 and the wooden pile can be connected. The adaptation effect of the pile contour can simply play a limiting function. Secondly, a C-frame 308 is installed at the bottom of the U-frame 307. The C-frame 308 is a C-shaped structure. Such a structural setting allows the user to clamp and fix the C-frame 308 with the help of its C-shaped structure and bolts. The setting of the above structure utilizes the structure of the existing wooden piles, sets a specific installation structure, a top-down insertion positioning method, and a bolt-tightened C-structure, which can greatly improve the efficiency of installing the support frame 3 on the wooden piles, and can ensure the stability and safety of the support frame 3 during use. Such an installation method can be used repeatedly, and will not cause damage to the structure of the wooden piles and the support frame 3 during disassembly.
[0061] In this embodiment, if Figures 1 to 4 and Figures 6 to 8 As shown, both ends of the support frame 3 are fixedly connected with positioning blocks 301, and positioning grooves 203 that match the shape of the positioning blocks 301 are symmetrically opened on both sides of the second support plate 2. A positioning cylinder 302 is fixedly connected to the middle position of the support frame 3, and slots that match the size of the positioning cylinder 302 are opened on the first support plate 1 and the second support plate 2. It is described in the previous text that the contours of the support frame 3 and the second support plate 2 are consistent with each other, and the two can be guided to position during the installation process with the help of the structural adaptation effect. Furthermore, positioning blocks 301 are installed at both ends of the support frame 3, and the contours of the positioning blocks 301 are consistent with the contours of the second support plate 2 on both sides. The contours of the positioning grooves 203 match, and the plates on which the positioning blocks 301 are installed at both ends of the support frame 3 are elastic structures that can be deformed under the action of external force. Such a structural setting allows the positioning blocks 301 to be inserted into the positioning grooves 203 during the installation process, and with the help of the elastic structure of the plate body of the support frame 3, an interlocking connection is formed between the positioning blocks 301 and the positioning grooves 203. The above structural setting allows the second support plate 2 and the support frame 3 to limit each other's structures during the installation process, thereby improving the installation efficiency, allowing users to save more effort during actual operation, reducing operational errors during installation, and improving construction accuracy.
[0062] A positioning tube 302 is installed at the middle position of the support frame 3. During the actual installation process, the positioning tube 302 is simultaneously inserted into the slots on the first supporting plate 1 and the second supporting plate 2 that are adapted to the size of the positioning tube 302. This structural setting is also to allow the second supporting plate 2 and the support frame 3 to be assisted in positioning with the help of the positioning tube 302 during the installation process, thereby improving the installation efficiency and the accuracy of the construction. Furthermore, an insertion tube 603 is provided in the insertion portion 602 on the tension plate 6. When the insertion portion 602 is inserted into the middle position of the support frame 3 plate body, the insertion tube 603 abuts against one end of the positioning tube 302 and matches the contour of the positioning tube 302 (such as Figure 8 As shown), this arrangement is to achieve the sealing of the slot between the support frame 3 and the second support plate 2 to prevent leakage during the concrete pouring process.
[0063] The working principle of the technical solution provided by the present invention is as follows: when in use, the first supporting plate 1 is first arranged on both sides of the template to form a primary support. The first supporting plate 1 is a smooth plate structure, and the entire plate is in contact with both sides of the template to support and limit the two sides of the template. Then, the second supporting plate 2 is arranged on the outside of the first supporting plate 1 to form a secondary support. The second supporting plate 2 is a vertical plate distributed at intervals. The second supporting plate 2 mainly supports the first supporting plate 1 to ensure that the first supporting plate 1 is in a vertical state and improves the strength of the first supporting plate 1 structure. Subsequently, the supporting frame 3 is arranged on one side of the second supporting plate 2 to form a tertiary support. There are three support frames 3, which are arranged in sequence from top to bottom at the top, middle and bottom positions of the second supporting plate 2, and the second supporting plate 2 is diagonally braced and reinforced with three supporting points. The setting of the three-point support structure maximizes the stability of the second supporting plate 2 structure. An inclined plate 304, a triangular plate 305 and a straight plate 306 are installed in sequence from top to bottom on one side of the three support frames 3. These three plates cooperate to form a stable triangular structure. The setting of the triangular structure further improves the stability of the support frame 3 structure. One end of the inclined plate 304, the triangular plate 305 and the straight plate 306 are all connected to the second supporting plate 2, and the inclined plate 304, the triangular plate 305 and the straight plate 306 are connected to the second supporting plate 2. The other ends of the plate 304, the triangular plate and the straight plate 306 are gathered into the same plate and connected to the wooden piles driven into the soil. After the support frame 3 is installed, the screw rod 4 is inserted into the first support plate 1, the second support plate 2 and the support frame 3, and the insertion portion 602 in the middle of the tension plate 6 is inserted into the middle of the support frame 3, and then the nut on the clamping plate 7 is screwed onto the screw rod 4, so that the clamping plate 7 is locked on the tension plate 6 under the driving action of the thread to form a four-level support. The above structural setting allows the first support plate 1, the second support plate 2 and the support frame 3 to be installed and fixed at the same time with the help of the screw rod 4 and the tension plate 6, thereby greatly reducing the three The operating burden during the installation process is improved, the installation efficiency is improved, and the integrity of the direct structure of the three is ensured. At the same time, the user can increase the clamping force applied by the pull plate 6 to the support frame 3 by tightening the nut on the clamping plate 7. When the clamping force on the surface of the support frame 3 is increased, the second support plate 2 will also increase the clamping force on the first support plate 1. This arrangement can ensure that a good spacing is always maintained between the two first support plates 1. When looseness occurs between the two first support plates 1, the first support plate 1 can be tightened by screwing the nut on the clamping plate 7. This arrangement can ensure that the template will not be loose or displaced during the pouring process.
[0064] The present invention covers any substitution, modification, equivalent method and scheme made on the essence and scope of the present invention. In order to make the public have a thorough understanding of the present invention, specific details are described in detail in the following preferred embodiments of the present invention, but those skilled in the art can fully understand the present invention without the description of these details. In addition, in order to avoid unnecessary confusion about the essence of the present invention, well-known methods, processes, procedures, components and circuits are not described in detail.
[0065] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. A multi-level support method at the junction of forward and reverse foundation pits, characterized in that: The following steps are involved: Step 1: Survey and lay out: Use a total station to measure the structural contour and axis according to the drawings, and drive in wooden stakes or steel bars as the basis for excavation and steel bar tying; Step 2: Chisel off the wall head: Chisel off the wall manually with a pneumatic pick, and use a steel bar straightening machine to straighten the bent steel bars so that the steel bar length meets the anchoring requirements. After the straightening is completed, remove the rust and stains on the steel bars and the dust and impurities on the top of the wall or pile; Step 3: Construction of cushion layer: pour a 5cm thick and 1.6cm wide concrete cushion layer at the axis position. After pouring the cushion layer, use a total station to lay out the crown beam and concrete support control line, divide the edge line according to the control line and use the ink fountain to position it, and lay a 12mm thick bamboo plywood as the base membrane at the bottom of the concrete support and the suspended position of the crown beam; Step 4: Steel bar installation: The steel bar threads processed on site are ground with a grinding wheel cutter before threading. After threading, they are inspected with a go / no-go gauge. The qualified steel bar wire heads are protected with sleeves. The skeleton bars and frame bars are installed in sequence, and finally the stirrups are tied. The steel bar wire heads are connected with straight thread sleeves. Two protective layer concrete pads are arranged at the points where the beam height is divided into three equal parts. The concrete pads are arranged at intervals of 1m in the length direction. After the steel bars are tied, the axial force gauge is embedded in the support according to the design drawings; Step 5: Formwork installation: The first support plate of the crown beam and concrete adopts a shaped steel membrane, and the second support plate is arranged outside the first support plate with a spacing of no more than 1m. After the second support plate is arranged, it is reinforced with a support frame diagonal brace. One end of the support frame is fixed to the second support plate, and the other end is fixed to the wooden pile driven into the soil. After the first support plate is installed, its verticality is checked with a hanging hammer; Step 6, concrete pouring: Use a car pump to transport concrete, chisel the construction joints before pouring, remove garbage and loose sand and gravel on the surface of the construction joints, clean with water and fully moisten, use an inserted vibrator to vibrate, pour in layers, each layer is 300-400mm thick, use oblique vibration at the dense intersection of steel bars, and use vertical vibration at other locations. The distance between the vibration points is 300-400mm, and the insertion point is no more than 200mm from the first support plate; Step 7: De-moulding and curing: Cover the concrete with a water-saving and moisturizing film within 12 hours after the concrete is completed, and use an automatic spraying system for 24-hour moisturizing curing. After the concrete reaches the specified strength, the formwork is removed. For the concrete edges and corners damaged during excavation, angle steel is used to protect them; It also includes a support assembly, which is used to reinforce the strength of the template, and the support assembly is respectively connected to the first support plate, the second support plate and the support frame; The support assembly includes a smooth portion fixedly connected to one side of the second support plate, a protrusion fixedly connected to the other side of the second support plate, three support frames, the support frames match the contour of the second support plate, screws are inserted on the first support plate and the second support plate, a tension plate is provided on the outer sleeve of the screw, and a clamping sheet is screwed on the screw; An insertion portion is fixedly connected to the middle position of the tension plate, an insertion tube is fixedly connected inside the insertion portion, locking grooves are provided on both sides of the tension plate, and the insertion portion matches the contour of the support frame.
2. The multi-level support method at the junction of the forward and reverse foundation pits according to claim 1 is characterized in that: A connecting rod is fixedly connected to one side of the support frame, and an inclined plate, a triangular plate and a straight plate are fixedly connected to the connecting rods of the three support frames in sequence from top to bottom.
3. The multi-level support method at the junction of the forward and reverse foundation pits according to claim 2 is characterized in that: One end of the inclined plate and the straight plate is fixedly connected to a U-shaped frame, the bottom of the U-shaped frame is fixedly connected to a C-shaped frame, and bolts are inserted into the C-shaped frame.
4. The multi-level support method at the junction of the forward and reverse foundation pits according to claim 2 is characterized in that: The triangular plate is a triangular structure, and lightweight grooves are provided on the inclined plate, the triangular plate and the straight plate. The inclined plate, the triangular plate and the straight plate are an integrated manufacturing structure.
5. The multi-level support method at the junction of the forward and reverse foundation pits according to claim 1 is characterized in that: Both ends of the support frame are fixedly connected with positioning blocks, and both sides of the second support plate are symmetrically provided with positioning grooves that match the shape of the positioning blocks.
6. The multi-level support method at the junction of the forward and reverse foundation pits according to claim 1 is characterized in that: A positioning tube is fixedly connected at the middle position of the support frame, and slots matching the size of the positioning tube are provided on the first supporting plate and the second supporting plate.
7. The multi-level support method at the junction of the forward and reverse foundation pits according to claim 1 is characterized in that: The outer sleeve of the screw rod is provided with a sleeve, and the sleeve is made of PVC plastic material.
Citation Information
Patent Citations
Method for excavating super-deep foundation pit engineering piles in graded mode and graded composite supporting of supporting piles
CN103255771A
Combined double-row cantilever support construction method
CN115652949A
Sectional pouring method for slide-resistant pile
CN118065349A
Construction method for main pier and junction pier bearing platform of continuous rigid frame bridge
CN118127920A