Hydraulic engineering construction sludge treatment device
By using covers and impact pumps in sludge treatment equipment to increase sludge cleaning efficiency, and combining expansion and retraction components to control equipment disturbance, the problems of low sludge treatment efficiency and water pollution in existing equipment are solved, and efficient sludge treatment and cleaning are achieved Effect.
Patent Information
- Application Number
- CN202411280980.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-13
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2044-09-13
AI Technical Summary
Existing sludge treatment equipment can easily cause silt to rise and make the water turbid during the dredging process. The extraction efficiency is low and it is difficult to clean quickly, resulting in water pollution and poor dredging efficiency.
A water conservancy project construction sludge treatment device is designed, including a cover, an impact pump and an impact pipe. The cover separates the silt and the water body. The impact pump and impact pipe increase the silt cleaning efficiency, and the expansion and retraction components are used to control the expansion of the cover. and storage to reduce the disturbance of the equipment to the water body.
It effectively reduces the diffusion and pollution of silt in water bodies, improves the rapid extraction efficiency of silt, enhances the silt treatment effect, and reduces disturbance and pollution of water bodies.
Smart Images

Figure CN118855031A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of sludge treatment equipment, in particular to a sludge treatment device for water conservancy project construction. Background Art
[0002] During the long-term use of wetland ecosystems, controlling the silt content in wetland ecosystems is one of the necessary measures to maintain the purification efficiency and effect of wetland ecosystems.
[0003] When underwater dredging is carried out in wetland ecosystems, dredging equipment is usually carried on a clearing ship to clean the underwater silt on the water surface. In conventional technology, underwater cleaning equipment is usually divided into grab dredging, pump suction dredging, and ordinary suction dredging. Among them, grab dredging directly grabs the underwater silt in actual application, while pump suction dredging and ordinary suction dredging require stirring the silt, and then the silt is pumped out under the suction of the sludge pump. In the actual dredging process, these three dredging methods all have the defect of disturbing the water body and silt. During the dredging process, it is not only easy to cause silt to rise and water turbidity, but also due to the interference of the water body, the silt extraction efficiency is reduced and the dredging efficiency is poor.
[0004] In order to reduce the disturbance to the water body during the dredging process, the related technology discloses an underwater dredging device for treating sludge in water conservancy projects, with the publication number CN112962703A. In this scheme, the dredging device is installed on the upper end of the lifting equipment of the ship through a lifting ring, and the dredging device is inserted into the river body. The bottom sounding box is in the shape of a triangular prism, which is convenient for stable insertion into the river body and not easy to tip over. The spiral conveying rod is driven by the forward and reverse motors to rotate, so that the sludge on both sides can be piled to the periphery of the dredging device, which is convenient for sludge cleaning. However, when this scheme is used, it will still cause the sludge to spread outward, causing secondary pollution to the water body, and in the absence of disturbance to the sludge, the sludge cleaning is difficult, which is not conducive to the rapid dredging work.
[0005] In view of this, the present invention proposes a sludge treatment device for water conservancy project construction to solve the above technical problems. Summary of the invention
[0006] In order to make up for the deficiencies of the prior art and solve the above-mentioned technical problems, the present invention proposes a sludge treatment device for water conservancy project construction.
[0007] The technical solution adopted by the present invention to solve the technical problem is as follows: a sludge treatment device for water conservancy project construction according to the present invention comprises a dredging ship, a sludge pump and a suction pipe;
[0008] It also includes a closed dredging component, which is installed at the end of the suction pipe, and the closed dredging component reduces the diffusion of silt in the water body by closing the dredging range;
[0009] The closed desilting assembly includes a cover, an impact pump and an impact pipe;
[0010] The cover is installed at the end of the suction pipe, the cover is a sheet-like structure, the cover covers the sludge, and the suction pipe is located at the center of the cover;
[0011] The impact pump is fixedly installed on the dredging vessel, and an impact pipe is installed at the output end of the impact pump. The impact pipe extends to the bottom of the cover, and the opening direction of the impact pipe faces the suction pipe.
[0012] Preferably, it also includes an unfolding and retracting assembly, and the unfolding and retracting assembly is used to control the cover to unfold and fold;
[0013] The stowage assembly comprises a mounting frame, an extension frame, a deflection rod and a telescopic rod;
[0014] The cover is made of a flexible material, the mounting frame is fixedly mounted in the middle of the cover, the extension frames are symmetrically distributed on both sides of the mounting frame, and both ends of the cover are fixedly connected to the extension frames respectively;
[0015] Telescopic rods are fixedly mounted on both sides of the mounting frame, a deflection rod is hingedly mounted on the output end of the telescopic rod, and one end of the deflection rod away from the telescopic rod is hingedly mounted on the extension frame.
[0016] Preferably, the deflection rod is symmetrically mounted at both ends of the telescopic rod, and the telescopic rod is a bidirectional output rod.
[0017] Preferably, the stowage assembly further comprises a reel and a coil spring;
[0018] The extension frame is provided with a winding cavity, which is designed to be open toward one side of the mounting frame. The reel is rotatably mounted in the winding cavity, the coil spring is fixedly mounted on the reel, and one end of the coil spring away from the reel is fixedly connected to the extension frame.
[0019] Preferably, a transmission belt is fixedly mounted on the reel, and one end of the transmission belt away from the reel is fixedly mounted on a mounting frame, and the length of the transmission belt is less than the length of the cover.
[0020] Preferably, a scraper is fixedly mounted on each of the extension frames. The scraper is located at the opening of the winding chamber and is used to scrape the surface of the cover.
[0021] Preferably, the telescopic rod consists of a fixed end, a telescopic end and a connecting spring, the fixed end is open at both ends, the telescopic end sliding seals are installed at both ends of the telescopic end, the impact tube is designed in three sections, and the three sections of impact tubes are all fixedly installed on the fixed end, one section of the impact tube is connected to the impact pump, and the other two sections of the impact tube extend to both ends of the cover respectively, and a pressure valve is installed inside the impact tube extending to the bottom of the cover, and the opening pressure of the pressure valve is greater than the elastic force of the connecting spring.
[0022] Preferably, a symmetrically designed gravity bar is fixedly mounted on the cover, the gravity bar is designed to be perpendicular to the extension frame, and the gravity bar is made of a flexible rubber material with a built-in lead block.
[0023] Preferably, the impact tube extends to the interior of the gravity bar, and the impact tube is provided with a plurality of openings below the cover, and the plurality of openings are evenly arranged along the length direction of the gravity bar.
[0024] The beneficial effects of the present invention are as follows:
[0025] 1. The silt treatment device for water conservancy project construction described in the present invention is provided with a covering part. During the dredging process, the covering part separates the silt from the water body. When the silt is disturbed, the covering part blocks the diffused silt, and cooperates with the continuous negative pressure extraction of the suction pipe, so that the stirred silt is quickly extracted, thereby reducing the pollution of the water body during the dredging process. At the same time, it cooperates with the impact pump and the impact pipe to increase the cleaning efficiency of the silt, thereby effectively enhancing the silt treatment effect.
[0026] 2. The silt treatment device for water conservancy project construction described in the present invention, by setting up an expansion and retraction component, can expand and retract the cover. On the one hand, the volume of the cover is reduced during movement, thereby reducing the movement resistance of the equipment. On the other hand, the degree of disturbance of the cover and other structures to the water body and silt is reduced. During the dredging process, the degree of diffusion of silt into the water body is effectively reduced, thereby reducing the degree of pollution to the water body. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] The present invention will be further described below in conjunction with the accompanying drawings.
[0028] Figure 1 is a stereogram of the present invention;
[0029] Figure 2 is a three-dimensional diagram of the cover member in the present invention in a retracted state;
[0030] Figure 3 yes Figure 2 A partial enlarged view of the middle part;
[0031] Figure 4 is a three-dimensional diagram of the cover member in the present invention in an unfolded state;
[0032] Figure 5 It is a stereoscopic diagram of the assembly of the impact tube and the telescopic rod;
[0033] Figure 6 is a cross-sectional view of the extension frame;
[0034] Figure 7 is a cross-sectional view of the telescopic rod;
[0035] Figure 8 It is a stereogram of the assembly of the impact tube and the gravity bar;
[0036] In the figure: 1. dredging boat; 11. sludge pump; 12. suction pipe; 2. cover; 21. impact pump; 22. impact pipe; 23. mounting frame; 24. extension frame; 25. deflection rod; 3. telescopic rod; 31. fixed end; 32. telescopic end; 33. connecting spring; 34. pressure valve; 4. winding chamber; 41. reel; 42. coil spring; 43. transmission belt; 44. scraper; 5. gravity bar. DETAILED DESCRIPTION
[0037] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.
[0038] like Figures 1 to 8 As shown, a silt treatment device for water conservancy project construction described in the present invention includes a dredging vessel 1, a silt pump 11 and a suction pipe 12, and also includes a closed dredging component, which is installed at the end of the suction pipe 12. The closed dredging component reduces the diffusion of silt in the water body by closing the dredging range. The closed dredging component includes a covering 2, an impact pump 21 and an impact pipe 22. The covering 2 is installed at the end of the suction pipe 12. The covering 2 is a sheet-like structure. The covering 2 covers the silt. The suction pipe 12 is located at the center of the covering 2. During the dredging process, the covering 2 will cover the silt to be treated. The covering 2 is used to separate the silt from the water body. When the silt is extracted and disturbed, the covering 2 can block the movement and diffusion of the silt.
[0039] The impact pump 21 is fixedly installed on the dredging vessel 1, and an impact pipe 22 is installed at the output end of the impact pump 21. The impact pipe 22 extends to the bottom of the cover 2, and the opening direction of the impact pipe 22 is toward the suction pipe 12. In the present invention, the impact pump 21 is preferably an air compressor pump, which is used to extract and pump air, cooperate with the impact pipe 22 to guide the air, and then use the flow of airflow to disturb the silt.
[0040] During the actual dredging operation, in order to enhance the suction effect of the sludge and reduce the degree of diffusion of the sludge into the water body, the present invention arranges a closed dredging component on the suction pipe 12. During actual operation, the suction pipe 12 and the closed dredging component sink underwater until the end of the suction pipe 12 and the closed dredging component contact the underwater sludge layer. At this time, under the resistance of the sludge layer, the covering layer fits with the sludge layer, and the staff starts the sludge pump 11 and the impact pump 21. After the sludge pump 11 is started, it cooperates with the suction pipe 12 to continuously form a negative pressure under the covering layer. In the initial stage of extraction, the sludge with low density and strong fluidity on the surface of the sludge layer is quickly extracted, and the impact pump 21 extracts the external air and pumps it into the impact pipe 22. The compressed air rushes out from the end of the impact pipe 22 and flows toward the suction pipe 12. The compressed air impacts the flow During the process, the silt is impacted and the impact force is used to stir the silt, causing the silt layer to loosen, thereby increasing the silt extraction rate. During the silt extraction process, the water outside the covered area flows along the edge of the cover 2 to the center of the cover 2. As the extraction operation continues, the loose silt content gradually decreases. When the silt in the covered area is extracted to a certain extent, the water content in the mud output by the silt pump 11 increases significantly. The staff can shut down the silt pump 11 and the impact pump 21 by themselves, and with the help of the dredging vessel 1, drive the suction pipe 12 and the cover 2 to move their positions, thereby performing underwater dredging operations for the wetland. It should be noted that a hoisting device is also installed on the dredging vessel 1 in the present invention, and the hoisting device is connected to the end of the suction pipe 12, which is used to control the up and down lifting of the suction pipe 12 to facilitate the recovery of the suction pipe 12 and the closed dredging component.
[0041] The present invention provides a covering member 2. During the dredging process, the covering member 2 separates the silt from the water body. When the silt is disturbed, the covering member 2 blocks the diffused silt, and cooperates with the continuous negative pressure extraction of the suction pipe 12, so that the stirred silt is quickly extracted, thereby reducing the pollution of the water body during the dredging process. At the same time, in cooperation with the impact pump 21 and the impact pipe 22, the cleaning efficiency of the silt is increased, thereby effectively enhancing the silt treatment effect.
[0042] As a preferred embodiment of the present invention, it further comprises an unfolding and retracting assembly, which is used to control the cover 2 to be unfolded and folded and stored. The unfolding and retracting assembly comprises a mounting frame 23 , an extension frame 24 , a deflection rod 25 and a telescopic rod 3 .
[0043] The cover 2 is made of a flexible material, the mounting frame 23 is fixedly mounted in the middle of the cover 2, the extension frames 24 are symmetrically distributed on both sides of the mounting frame 23, both ends of the cover 2 are fixedly connected to the extension frames 24, telescopic rods 3 are fixedly mounted on both sides of the mounting frame 23, a deflection rod 25 is hingedly mounted on the output end of the telescopic rod 3, and the deflection rod 25 is hinged to the extension frame 24 at one end away from the telescopic rod 3.
[0044] The deflection rod 25 is symmetrically mounted at both ends of the telescopic rod 3, and the telescopic rod 3 is a bidirectional output rod.
[0045] In order to enhance the convenience of underwater installation of the cover 2 and reduce the disturbance of underwater silt during assembly of the cover 2 during dredging, the present invention adopts a flexible material to make the cover 2, and sets an unfolding and retracting assembly to cooperate with the cover 2, so as to enhance the convenience of dredging. Specifically, in the initial state, that is, when the dredging boat 1 moves, the cover 2 is rolled up and stored by the unfolding and retracting assembly. When the dredging boat 1 moves to the water area to be cleaned, the staff lowers the suction pipe 12 with the assistance of the lifting equipment. Under the action of gravity, the suction pipe 12 and the cover 2 at the end thereof gradually move downward. At this time, the cover 2 is stored by the unfolding and retracting assembly, and the overall surface area is small, thereby effectively reducing the water resistance when the equipment is lowered, and reducing the disturbance effect on the water. After the end of the suction tube 12 contacts the silt layer, the staff starts the telescopic rod 3 through the external control device, and the telescopic rod 3 slowly extends from the contracted state in the initial state. Since the deflection rods 25 are hingedly installed at both ends of the telescopic rod 3, and the other end of the deflection rod 25 is hinged to the extension frame 24, as the length of the telescopic rod 3 gradually increases, under the transmission effect of the deflection rod 25, the extension frame 24 gradually moves away from the telescopic rod 3, and the cover 2 installed between the mounting frame 23 and the extension frame 24 is gradually unfolded under the pulling action, thereby shielding the area to be cleaned. When transferring the cleaning position, the telescopic rod 3 is controlled to shrink, so that the gap between the extension frame 24 and the telescopic rod 3 is reduced, resulting in a reduction in the size of the equipment and reducing the disturbance to the water body.
[0046] The present invention provides an expansion and retraction assembly to expand and retract the cover 2. On the one hand, the volume of the cover 2 is reduced during movement, thereby reducing the movement resistance of the equipment. On the other hand, the disturbance degree of the cover 2 and other structures to the water body and silt is reduced. During the dredging process, the degree of diffusion of silt into the water body is effectively reduced, thereby reducing the degree of pollution to the water body.
[0047] The unfolding and retracting assembly also includes a reel 41 and a coil spring 42. A coiling cavity 4 is provided on the extension frame 24. The coiling cavity 4 is designed to be open toward one side of the mounting frame 23. The reel 41 is rotatably installed in the coiling cavity 4. The coil spring 42 is fixedly installed on the reel 41, and the end of the coil spring 42 away from the reel 41 is fixedly connected to the extension frame 24.
[0048] A transmission belt 43 is fixedly mounted on the reel 41 . One end of the transmission belt 43 away from the reel 41 is fixedly mounted on the mounting frame 23 . The length of the transmission belt 43 is less than the length of the cover 2 .
[0049] When the stowage assembly is extended and retracted, in order to enhance the volume change effect of the cover 2, a winding chamber 4 is provided on the extension frame 24, and the end of the cover 2 is fixed on the reel 41. In the initial state, the cover 2 and the transmission belt 43 are wound on the reel 41, and the coil spring 42 is in a retracted state. When the extension frame 24 moves away from the mounting frame 23 and the telescopic rod 3, the transmission belt 43, which is shorter than the cover 2, is straightened first, and as the movement distance increases, the transmission belt 43 pulls the reel 41 to rotate, thereby gradually unfolding the cover 2, so that the cover 2 blocks the area to be dredged. When the dredging is completed, the extension frame 24 gradually approaches the mounting frame 23, and the coil spring 42 loses its pulling force, driving the reel 41 The reverse rotating reel 41 winds up the transmission belt 43 and the cover 2. By winding up the cover 2, the cover 2 can be expanded and contracted more flexibly and orderly when it is expanded and contracted. At the same time, the arrangement of the transmission belt 43 makes the cover 2 less stressed during the winding and storage process. On the one hand, the cover 2 is always in a relaxed state. When the cover 2 covers the mud area, it can better fit the uneven mud under the action of gravity. The relaxed state can reduce the probability of damage of the cover 2 during movement. On the other hand, it can also reduce the stress level of the cover 2 during expansion and contraction, thereby reducing the probability of damage to the cover 2 when used for a long time.
[0050] As a preferred embodiment of the present invention, a scraper 44 is fixedly installed on the extension frame 24. The scraper 44 is located at the opening of the winding chamber 4. The scraper 44 is used to scrape the surface of the cover 2. During the winding process of the cover 2, the scraper 44 can scrape the surface of the cover 2 and the transmission belt 43, thereby reducing the probability of impurities such as silt entering the winding chamber 4.
[0051] As a preferred embodiment of the present invention, the telescopic rod 3 is composed of a fixed end 31, a telescopic end 32 and a connecting spring 33. The fixed end 31 is open at both ends, and the telescopic end 32 is slidingly sealed and installed at both ends of the telescopic end 32. The impact tube 22 is designed in three sections, and the three sections of the impact tube 22 are fixedly installed on the fixed end 31. One section of the impact tube 22 is connected to the impact pump 21, and the other two sections of the impact tube 22 extend to both ends of the cover 2 respectively. A pressure valve 34 is installed inside the impact tube 22 extending to the bottom of the cover 2. The opening pressure of the pressure valve 34 is greater than the elastic force of the connecting spring 33. In the dredging operation, the telescopic rod 3 is connected to the middle part of the impact tube 22. After the impact pump 21 is started, the impact pump 21 pumps compressed air into the impact tube 22, and the compressed air flows into the impact tube 22 along the impact tube 22. Inside the fixed end 31, under the action of the gradually increasing air pressure, the telescopic end 32 pulls the connecting spring 33 and moves toward the outside of the fixed end 31, thereby causing the cover 2 to gradually unfold. When the telescopic rod 3 is fully extended, the air pressure intensity inside the fixed end 31 gradually exceeds the opening pressure of the pressure valve 34, causing the pressure valve 34 to open, and the airflow flows into the other two sections of the impact tube 22 and is sprayed under the cover 2. The connection between the telescopic rod 3 and the impact tube 22, in conjunction with the pressure valve 34, can avoid disturbing the silt when the cover 2 is not unfolded during the actual dredging process, thereby avoiding misoperation by the staff. It should be noted that when controlling the telescopic rod 3 to retract, the staff separates the impact tube 22 from the impact tube 22. At this time, under the elastic action of the connecting spring 33, the air is discharged in the reverse direction, thereby causing the equipment to retract.
[0052] As a preferred embodiment of the present invention, a symmetrically designed gravity bar 5 is fixedly mounted on the cover 2. The gravity bar 5 is designed to be perpendicular to the extension frame 24. The gravity bar 5 is made of a flexible rubber material with a built-in lead block.
[0053] The impact tube 22 extends to the inside of the gravity bar 5. The impact tube 22 is located below the cover 2 and has multiple openings, and the multiple openings are evenly arranged along the length direction of the gravity bar 5. The setting of the gravity bar 5, combined with the cover 2 in a relaxed state, can enable the cover 2 to hang down perpendicular to both sides of the extension frame 24 after the cover 2 is fully unfolded, thereby enhancing the degree of closure of the area to be cleaned. At the same time, the setting of multiple openings of the impact tube 22 increases the dispersion of compressed air in the area to be cleaned, thereby enhancing the disturbance effect on the sludge.
[0054] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A sludge treatment device for water conservancy project construction, comprising a dredging vessel (1), a sludge pump (11) and a suction pipe (12); Features: It also includes a closed dredging component, which is installed at the end of the suction pipe (12) and reduces the diffusion of silt in the water body by closing the dredging range; The closed dredging assembly comprises a cover (2), an impact pump (21) and an impact pipe (22); The covering member (2) is installed at the end of the suction pipe (12), the covering member (2) is a sheet-like structure, the covering member (2) covers the sludge, and the suction pipe (12) is located at the center of the covering member (2); The impact pump (21) is fixedly installed on the dredging vessel (1), and an impact pipe (22) is installed at the output end of the impact pump (21). The impact pipe (22) extends to the bottom of the cover (2), and the opening direction of the impact pipe (22) faces the suction pipe (12).
2. A water conservancy project construction sludge treatment device according to claim 1, characterized in that: It also includes an unfolding and retracting assembly, which is used to control the cover (2) to unfold and fold; The stowage assembly comprises a mounting frame (23), an extension frame (24), a deflection rod (25) and a telescopic rod (3); The cover (2) is made of a flexible material, the mounting frame (23) is fixedly mounted in the middle of the cover (2), the extension frames (24) are symmetrically distributed on both sides of the mounting frame (23), and the two ends of the cover (2) are respectively fixedly connected to the extension frames (24); Telescopic rods (3) are fixedly mounted on both sides of the mounting frame (23); a deflection rod (25) is hingedly mounted on the output end of the telescopic rod (3); and the end of the deflection rod (25) away from the telescopic rod (3) is hingedly connected to the extension frame (24).
3. A water conservancy project construction sludge treatment device according to claim 2, characterized in that: The deflection rod (25) is symmetrically mounted at both ends of the telescopic rod (3), and the telescopic rod (3) is a bidirectional output rod.
4. A water conservancy project construction sludge treatment device according to claim 3, characterized in that: The unfolding and retracting assembly further comprises a reel (41) and a coil spring (42); The extension frame (24) is provided with a winding cavity (4), the winding cavity (4) is designed to be open toward one side of the mounting frame (23), the winding shaft (41) is rotatably mounted in the winding cavity (4), the winding spring (42) is fixedly mounted on the winding shaft (41), and one end of the winding spring (42) away from the winding shaft (41) is fixedly connected to the extension frame (24).
5. A water conservancy project construction sludge treatment device according to claim 4, characterized in that: A transmission belt (43) is fixedly mounted on the reel (41); one end of the transmission belt (43) away from the reel (41) is fixedly mounted on the mounting frame (23); and the length of the transmission belt (43) is less than the length of the cover (2).
6. A water conservancy project construction sludge treatment device according to claim 5, characterized in that: A scraper (44) is fixedly mounted on each of the extension frames (24); the scraper (44) is located at the opening of the winding chamber (4); and the scraper (44) is used to scrape the surface of the cover (2).
7. A water conservancy project construction sludge treatment device according to claim 6, characterized in that: The telescopic rod (3) is composed of a fixed end (31), a telescopic end (32) and a connecting spring (33). The fixed end (31) is open at both ends. The telescopic end (32) is slidingly sealed and mounted at both ends of the telescopic end (32). The impact tube (22) is designed in three sections, and the three sections of the impact tube (22) are all fixedly mounted on the fixed end (31). One section of the impact tube (22) is connected to the impact pump (21), and the other two sections of the impact tube (22) extend to both ends of the cover (2) respectively. A pressure valve (34) is installed inside the impact tube (22) extending to the bottom of the cover (2). The opening pressure of the pressure valve (34) is greater than the elastic force of the connecting spring (33).
8. A water conservancy project construction sludge treatment device according to claim 7, characterized in that: A symmetrically designed gravity bar (5) is fixedly mounted on the cover (2). The gravity bar (5) is designed to be perpendicular to the extension frame (24). The gravity bar (5) is made of a flexible rubber material with a built-in lead block.
9. A water conservancy project construction sludge treatment device according to claim 8, characterized in that: The impact tube (22) extends into the interior of the gravity bar (5); the impact tube (22) is located below the cover (2) and has a plurality of openings, and the plurality of openings are evenly arranged along the length direction of the gravity bar (5).
Citation Information
Patent Citations
Environmental-protection desilting device and application method thereof
CN107916689A
High-pressure flow-jet-type underwater desilting device and desilting ship
CN107956231A
Trap type flexible desilting system
CN115262683A
Hydraulic engineering desilting device
CN215801884U
Dredging device of underwater sludge sedimented on bottom of reservoir, river or the like
JP2000257108A