A concrete boiling box
By designing a connected concrete boiling box, the heat and water vapor of the boiling chamber are used for sample maintenance, and manual operations are reduced through an automated transfer mechanism, the problem of cumbersome sample transfer and energy waste in traditional boiling boxes is solved, and the experimental efficiency and accuracy are improved sex.
Patent Information
- Application Number
- CN202411320680.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-23
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2044-09-23
AI Technical Summary
Traditional concrete boiling boxes have problems such as cumbersome sample transfer, waste of energy and inaccurate experimental results in multiple batches and multi-sample experiments, especially during multiple movements.
A connected concrete boiling box is designed, including a boiling chamber and a curing chamber, which uses the heat and water vapor of the boiling chamber for sample maintenance, and automatically transfer and measurement of samples through material collection, pushing and feeding mechanisms to reduce manual operation. Improve experimental efficiency and reduce the risk of sample damage.
The rapid completion of multi-batch and multi-sample boiling tests has been achieved, energy and water resources have been saved, the risk of collision during sample movement has been reduced, and the accuracy and efficiency of the experiment has been improved.
Smart Images

Figure CN118858353B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of building detection equipment, and in particular relates to a concrete boiling box. Background Art
[0002] The boiling test utilizes the property that free calcium oxide will slowly mature and generate ettringite during the hydration process. This process is very slow at room temperature, but it will be accelerated at high temperatures. When the free calcium oxide in the concrete reacts with water to generate ettringite, since its volume is larger than that of the original material, it will generate internal stress in the hardened concrete, causing micro cracks or volume expansion. The boiling test is to detect the volume stability of concrete by accelerating this process.
[0003] Usually, the concrete boiling test requires making concrete samples according to the specified size, usually in the shape of a cube or cylinder, and then curing them to the specified age. The cured samples are placed in boiling water in a boiling box, and the boiling time is usually 18 hours. The boiling box should maintain the water temperature at around 100°C. After the boiling is over, the samples are taken out of the boiling water and naturally cooled to room temperature. After cooling, check the appearance of the samples and look for any visible cracks or deformations. At the same time, use a ruler to measure the size of the sample to see if there is any significant bending or expansion.
[0004] Traditional concrete boiling boxes are usually continuous boiling insulated boxes that only have the function of boiling concrete, and the curing of concrete samples also requires special curing equipment. Usually, concrete boiling experiments require multiple batches and multiple samples, and concrete samples are heavy. Traditional concrete boiling experiments require multiple samples to be transferred multiple times, which is time-consuming and labor-intensive. In addition, collisions of samples during the transfer process will directly affect the experimental results, which is particularly unfavorable for experiments with multiple batches and multiple samples. Summary of the invention
[0005] The technical problem to be solved by the present invention is to overcome the disadvantages of the above-mentioned prior art and provide a concrete boiling box. The curing chamber of the present invention is connected with the boiling chamber, so that when the concrete sample in the curing chamber is cured, the heat and water vapor generated when the concrete sample is boiled in the boiling chamber can be utilized, thereby effectively reducing the waste of energy. The concrete sample after curing can be directly pushed into the boiling chamber for boiling test, thereby reducing the workload of operators in transferring concrete samples and improving the experimental efficiency. The concrete sample after boiling can be taken out of the boiling chamber by a material taking mechanism, thereby further reducing the workload of operators in transferring concrete samples and avoiding clamping of concrete samples by clamps, thereby reducing the probability of concrete samples being injured and improving the accuracy of the boiling test.
[0006] The technical solution adopted to solve the above technical problems is: a concrete boiling box, comprising a boiling chamber, a curing chamber, a material taking mechanism, a material pushing mechanism, a material feeding mechanism and a material receiving mechanism, wherein the curing chamber is fixedly connected to one side of the boiling chamber, the curing chamber is communicated with the boiling chamber, the material taking mechanism is fixedly arranged on the boiling chamber, the material pushing mechanism is fixedly arranged on the front side of the boiling chamber, the material feeding mechanism is horizontally slidably connected in the curing chamber, and the material receiving mechanism is arranged above the material feeding mechanism in the curing chamber;
[0007] The top of the boiling chamber is provided with a discharge port, and the top of the curing chamber is provided with a feed port;
[0008] The material taking mechanism is arranged above the material discharging port, and the material taking mechanism can take out the boiled sample;
[0009] The material holding mechanism is arranged below the feed inlet, and the material holding mechanism can hold the sample placed in the curing room;
[0010] The feeding mechanism can push the sample from the curing chamber into the boiling chamber.
[0011] Through the above technical solution, the boiling chamber is provided with a water inlet and a water-draining device and a heating device for maintaining the water boiling state, and the curing chamber is provided with a device for maintaining the temperature and humidity in the curing chamber. The concrete sample enters the curing chamber through the feed inlet. After the concrete sample is cured in the curing chamber, the feeding mechanism can be driven by the pushing mechanism to be sent to the boiling chamber, and the next batch of concrete samples enters the material receiving mechanism in the curing chamber through the feed inlet. While the concrete sample in the boiling chamber is boiling, the concrete sample on the material receiving mechanism in the curing chamber can be cured at the same time. When the boiling is finished, the material taking mechanism will complete the boiling. The concrete sample is lifted to the top of the boiling chamber for cooling. After the cooling is completed, the concrete sample can be measured. After the measurement is completed, the pushing mechanism can push the concrete sample out of the top of the boiling chamber, and then the pushing mechanism is reset to drive the feeding mechanism back to the curing chamber. At this time, the concrete sample cured on the receiving mechanism falls onto the feeding mechanism. After the material-taking mechanism is reset, the pushing mechanism can drive the feeding mechanism again to send the cured concrete sample into the boiling chamber. This cycle can quickly complete the boiling test of multiple batches and multiple samples, reduce the operation of experimental operators moving concrete samples multiple times, and effectively improve the experimental efficiency.
[0012] Furthermore, the material picking mechanism includes a material picking component and an electric lifting rod, the electric lifting rod is fixedly connected to one side of the material discharge port at the top of the boiling chamber, the bottom of the electric lifting rod is fixed to the top of the material picking component, the material picking component includes a bottom plate, a pressure plate, a top plate and a vertical plate, one side of the vertical plate is fixedly connected with the bottom plate, the pressure plate and the top plate, the pressure plate is arranged above the bottom plate, the top plate is arranged above the pressure plate, the bottom of the electric lifting rod is fixedly connected to the top of the top plate, and the top plate can block the material discharge port.
[0013] Through the above technical scheme, since the material taking component includes a bottom plate, a pressure plate, a top plate and a vertical plate, the bottom plate, the pressure plate and the top plate are fixedly connected to one side of the vertical plate, the pressure plate is arranged above the bottom plate, the top plate is arranged above the pressure plate, the bottom of the electric lifting rod is fixedly connected to the top of the top plate, and the top plate can block the discharge port, so that the electric lifting rod can drive the material taking component to rise and fall, and the electric lifting rod descends to allow the top plate to block the discharge port, thereby realizing the sealing of the boiling chamber, reducing the escape of water vapor when the boiling chamber is conducting a boiling test, and reducing the waste of water resources and energy. After the boiling test is completed, the electric lifting rod can drive the material taking component to rise, and lift the boiled concrete sample on the material taking component to the top of the boiling chamber, thereby reducing the probability of collision during the movement of concrete, eliminating the need to use a clamp to clamp the boiled concrete sample, avoiding damage to the concrete sample by the clamp, and improving the accuracy of the concrete boiling test.
[0014] Furthermore, the feeding mechanism includes a feeding plate, a receiving plate, a receiving spring, a threaded rod and a first rack, the top of the feeding plate is symmetrically fixedly connected with a spring bin, the receiving plate is vertically slidably connected to the feeding plate, the spring bin can accommodate a receiving spring, the top of the receiving spring is fixedly connected to the top of the spring bin, the bottom of the receiving spring is fixedly connected to the receiving plate, the threaded rod is fixedly connected to one side of the feeding plate, and the front and rear sides of the feeding plate are symmetrically fixedly connected with the first rack.
[0015] Through the above technical solution, since the top of the feeding plate is symmetrically fixedly connected with the spring bin, the receiving plate is vertically slidably connected to the feeding plate, the receiving spring can be accommodated in the spring bin, the top of the receiving spring is fixedly connected to the top of the spring bin, and the bottom of the receiving spring is fixedly connected to the receiving plate. The cured concrete sample can be placed on the receiving plate, and the receiving plate can be lowered to the bottom of the boiling chamber. The boiling chamber does not need a high water level to cover the concrete sample, and the bottom of the curing chamber is higher than the bottom of the boiling chamber, so that the boiling water in the boiling chamber will not flow into the curing chamber.
[0016] Furthermore, a through slot is provided in the middle of the material receiving plate, the bottom plate can pass through the through slot, and the pressure plate can limit the rising of the material receiving plate.
[0017] Through the above technical scheme, since a through groove is provided in the middle of the material receiving plate, the bottom plate can pass through the through groove, and the pressing plate can limit the rise of the material receiving plate, so that when the feeding plate enters the boiling chamber, the material taking component can be lowered, allowing the feeding plate to pass through between the bottom plate and the pressing plate into the boiling chamber, and the bottom plate can hold up the material receiving plate, and the material receiving plate will not suddenly drop after entering the boiling chamber due to the gravity of the concrete sample, causing the concrete sample to tip over due to instability. After the feeding plate moves into place, the bottom plate is in the through groove, and the pressing plate is above the concrete sample. At this time, the material taking component continues to drop, and the bottom plate drops to the bottom of the boiling chamber, and the pressing plate drops accordingly, causing the concrete sample to sink into the water in the boiling chamber, and the pressing plate fills the gap left when the material receiving plate drops, and the position of the feeding plate is fixed, and then the concrete boiling experiment can be carried out;
[0018] After the boiling test, the material taking part rises, and the bottom plate supports the concrete sample. When the bottom plate rises higher than the top of the boiling chamber, the concrete sample is taken out of the boiling chamber, eliminating the need for the clamp to clamp the boiled concrete sample. At this time, there is no concrete sample on the material receiving plate, and the material receiving spring can drive the material receiving plate to reset, and the feeding plate is released, and the feeding plate can be returned to the curing room later.
[0019] Furthermore, the material receiving mechanism includes a first material receiving roller, a second material receiving roller, a fixed side plate and a transmission gear component, the first material receiving roller and the second material receiving roller are arranged in the same horizontal plane, the first material receiving roller is symmetrically fixedly connected with a first transmission rack at both ends, the second material receiving roller is symmetrically fixedly connected with a second transmission rack at both ends, the fixed side plates are divided into two groups, the fixed side plates are symmetrically arranged at both ends of the first material receiving roller and the second material receiving roller, the top of the fixed side plate is fixedly connected to the top of the curing room, the center of the fixed side plate is rotatably connected with a transmission gear component, the first transmission rack is slidably connected to the inner side of the fixed side plate, and the second transmission rack is slidably connected to the outer side of the fixed side plate.
[0020] Through the above technical scheme, since the first material receiving roller and the second material receiving roller are arranged in the same horizontal plane, the first material receiving roller is symmetrically fixedly connected at both ends with the first transmission rack, and the second material receiving roller is symmetrically fixedly connected at both ends with the second transmission rack, there are two groups of fixed side plates, and the fixed side plates are symmetrically arranged at both ends of the first material receiving roller and the second material receiving roller, the top of the fixed side plate is fixedly connected to the top of the curing chamber, and the center of the fixed side plate is rotatably connected with a transmission gear component, the first transmission rack is slidably connected to the inner side of the fixed side plate, and the second transmission rack is slidably connected to the outer side of the fixed side plate, so that the first material receiving roller and the second material receiving roller can slide horizontally in the same horizontal plane, when the distance between the first material receiving roller and the second material receiving roller is smaller than the width of the concrete sample, the concrete sample entering the curing chamber from the feed port will be on the first material receiving roller and the second material receiving roller, and when the distance between the first material receiving roller and the second material receiving roller is larger than the width of the concrete sample, the concrete sample will fall onto the feeding plate.
[0021] Furthermore, a first transmission gear, a second transmission gear and a third transmission gear are fixedly connected to the transmission gear component rotating shaft, the bottom of the first transmission gear is meshed with the first transmission rack, and the top of the second transmission gear is meshed with the second transmission rack.
[0022] Through the above technical scheme, since the first transmission gear, the second transmission gear and the third transmission gear are fixedly connected to the rotating shaft of the transmission gear component, the bottom of the first transmission gear is meshed with the first transmission rack, and the top of the second transmission gear is meshed with the second transmission rack, when the transmission gear component rotates, the first material receiving roller and the second material receiving roller will slide horizontally in the same horizontal plane. When the transmission gear component rotates forward, the distance between the first material receiving roller and the second material receiving roller decreases. When the transmission gear component rotates reversely, the distance between the first material receiving roller and the second material receiving roller increases.
[0023] Furthermore, the first rack is meshed with the third transmission gear.
[0024] Through the above technical solution, since the first rack is meshed with the third transmission gear, when the feeding plate slides horizontally, the transmission gear component rotates, when the feeding plate slides horizontally toward the boiling chamber, the transmission gear component rotates forward, and when the feeding plate slides horizontally toward the curing chamber, the transmission gear component rotates reversely;
[0025] That is, the feeding plate slides toward the boiling chamber, and when the cured concrete sample is fed into the boiling chamber, the distance between the first receiving roller and the second receiving roller is reduced. At this time, the next batch of uncured concrete samples to be tested can be placed on the first receiving roller and the second receiving roller through the feed port. When the boiling test is completed and the feeding plate is reset back to the curing chamber, the distance between the first receiving roller and the second receiving roller gradually increases. When the receiving plate is below the first receiving roller and the second receiving roller, the concrete sample can just fall down and fall onto the receiving plate.
[0026] Furthermore, the pushing mechanism includes a pushing rod, a connecting frame and a second rack. A hydraulic pushing rod is fixedly arranged on the pushing mechanism. The rear end of the hydraulic pushing rod is fixedly connected to the pushing rod. The connecting frame is sleeved on the rear end of the pushing rod. One side of the connecting frame is fixedly connected to the second rack. An avoidance groove is arranged on the vertical plate, and the pushing rod can pass through the avoidance groove.
[0027] Through the above technical scheme, since a hydraulic push rod is fixedly arranged on the pushing mechanism, a push rod is fixedly connected to the rear end of the hydraulic push rod, and an avoidance groove is arranged on the vertical plate, the push rod can pass through the avoidance groove, so that after the material taking component is raised to take out the concrete sample from the boiling chamber, after the concrete sample is tested above the boiling chamber, the hydraulic push rod can drive the push rod to push the concrete sample out from the bottom plate, and the experimental operator does not need to manually move the tested concrete sample, thereby reducing the workload of the experimental operator. Then the push rod retreats, and the material taking component can be lowered to continue the next material taking operation.
[0028] Furthermore, an elastic ball is arranged on the rear end of the push rod, and a ball groove is arranged in the connecting frame, and the ball groove can accommodate the elastic ball.
[0029] According to the above technical solution, since an elastic ball is arranged on the rear end of the push rod, a ball groove is arranged in the connecting frame, and the ball groove can accommodate the elastic ball, after the rear end of the push rod enters the connecting frame, the push rod can be locked with the connecting frame, so that the horizontal displacement of the push rod can drive the displacement of the second rack;
[0030] When the rear end of the push rod reaches the vertical plate position, the connecting frame is blocked, the push rod and the connecting frame are unlocked, and the push rod passes through the avoidance groove. When the push rod retreats, the rear end of the push rod passes through the connecting frame and is locked with the connecting frame again.
[0031] Furthermore, a driving gear ring is rotatably connected to the side wall of the curing chamber, the threaded rod passes through the driving gear ring, the threaded rod is threadedly connected to the driving gear ring, the second rack is slidably connected to the side wall of the curing chamber, and the second rack is meshed with the driving gear ring.
[0032] Through the above technical solution, since a driving gear ring is rotatably connected to the side wall of the curing chamber, the threaded rod penetrates the driving gear ring, the threaded rod is threadedly connected to the driving gear ring, the second rack is slidably connected to the side wall of the curing chamber, the second rack is meshed with the driving gear ring, the threaded rod is fixedly connected to a protrusion fixedly arranged at the bottom of one side of the feeding plate, a limiting groove is arranged at the bottom of the curing chamber, the protrusion slides horizontally with the limiting groove, so that the second rack can drive the driving gear ring to rotate when sliding horizontally back and forth, and the rotation of the driving gear ring can drive the feeding plate to slide horizontally in the curing chamber;
[0033] That is, when the second rack slides horizontally backward, the driving gear ring rotates forward to drive the feeding plate to slide horizontally toward the boiling chamber, and when the second rack slides horizontally forward, the driving gear ring rotates reversely to drive the feeding plate to slide horizontally toward the curing chamber.
[0034] The beneficial effects of the present invention are as follows:
[0035] (1) In the present invention, the concrete sample enters the curing chamber through the feed port. After the concrete sample is cured in the curing chamber, the feed mechanism can be driven by the push mechanism to be sent to the boiling chamber, and the next batch of concrete samples enters the receiving mechanism in the curing chamber through the feed port. While the concrete sample in the boiling chamber is boiling, the concrete sample on the receiving mechanism in the curing chamber can be cured at the same time. When the boiling is finished, the material taking mechanism lifts the boiled concrete sample to the top of the boiling chamber for cooling. After the cooling is finished, the concrete sample can be measured. After the measurement is finished, the push mechanism can push the concrete sample out of the top of the boiling chamber, and then the push mechanism is reset to drive the feed mechanism back to the curing chamber. At this time, the concrete sample on the receiving mechanism that has been cured falls onto the feed mechanism. After the material taking mechanism is reset, the push mechanism can drive the feed mechanism again to send the cured concrete sample into the boiling chamber. In this way, the boiling test of multiple batches and multiple samples can be completed quickly, reducing the operation of the experimental operator to move the concrete sample multiple times, and effectively improving the experimental efficiency.
[0036] (2) In the present invention, the feeding plate slides toward the boiling chamber, and while the cured concrete samples are fed into the boiling chamber, the distance between the first receiving roller and the second receiving roller is reduced. At this time, the next batch of uncured concrete samples to be tested can be placed on the first receiving roller and the second receiving roller through the feeding port. The water vapor generated by the boiling test in the boiling chamber can help the next batch of uncured concrete samples to be tested in the curing chamber to be cured, effectively saving energy and water resources.
[0037] (3) After the boiling test in the present invention is completed, the material taking component rises, and the bottom plate supports the concrete sample. When the bottom plate rises higher than the top of the boiling chamber, the concrete sample is taken out of the boiling chamber, thereby reducing the probability of collision during concrete movement, eliminating the need to use a clamp to clamp the boiled concrete sample, avoiding damage to the concrete sample caused by the clamp, and improving the accuracy of the concrete boiling test. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] Figure 1 It is a structural schematic diagram of a concrete boiling box of the present invention;
[0039] Figure 2 It is a structural schematic diagram of a concrete boiling box of the present invention when the top is open;
[0040] Figure 3 It is a schematic diagram of the internal structure of a concrete boiling box of the present invention;
[0041] Figure 4 It is a structural schematic diagram of a material taking component of a concrete boiling box of the present invention;
[0042] Figure 5It is a structural schematic diagram of a feeding mechanism of a concrete boiling box of the present invention;
[0043] Figure 6 It is a structural schematic diagram of the cooperation between a feeding mechanism and a material taking component of a concrete boiling box of the present invention;
[0044] Figure 7 It is a structural schematic diagram of the cooperation between a feeding mechanism and a receiving mechanism of a concrete boiling box of the present invention;
[0045] Figure 8 The invention discloses a concrete boiling box. Figure 7 A partial enlarged view of point B in the middle;
[0046] Fig. 9 It is a schematic diagram of the exploded structure of a material receiving mechanism of a concrete boiling box of the present invention;
[0047] Fig.10 It is a schematic diagram of the structure of a transmission gear component of a concrete boiling box of the present invention;
[0048] Fig.11 The invention discloses a concrete boiling box. Figure 1 A partial enlarged view of the middle A;
[0049] Fig.12 It is a schematic diagram of the exploded structure of a material pushing mechanism of a concrete boiling box of the present invention;
[0050] Fig.13 The invention discloses a concrete boiling box. Fig.12 A partial enlarged view of point C in the middle.
[0051] 1. Boiling chamber; 2. Curing chamber; 3. Material taking mechanism; 4. Material pushing mechanism; 5. Material feeding mechanism; 6. Material receiving mechanism; 11. Material discharging port; 21. Material feeding port; 31. Material taking component; 311. Bottom plate; 312. Pressing plate; 313. Top plate; 314. Vertical plate; 41. Material pushing rod; 42. Connecting frame; 43. Second rack; 51. Material feeding plate; 52. Material receiving plate; 53. Material receiving spring; 54. Threaded rod; 55. First rack; 511. Spring bin; 541. Driving gear ring; 61. First material receiving roller; 62. Second material receiving roller; 63. Fixed side plate; 64. Transmission gear component; 611. First transmission rack; 621. Second transmission rack; 641. First transmission gear; 642. Second transmission gear; 643. Third transmission gear. DETAILED DESCRIPTION
[0052] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0053] In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "top / bottom" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific position, be constructed and operated in a specific position, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.
[0054] like Figure 1 - Figure 3 As shown, a concrete boiling box comprises a boiling chamber 1, a curing chamber 2, a material taking mechanism 3, a material pushing mechanism 4, a material feeding mechanism 5 and a material receiving mechanism 6, wherein the curing chamber 2 is fixedly connected to one side of the boiling chamber 1, the curing chamber 2 is communicated with the boiling chamber 1, the material taking mechanism 3 is fixedly arranged on the boiling chamber 1, the material pushing mechanism 4 is fixedly arranged on the front side of the boiling chamber 1, the material feeding mechanism 5 is horizontally slidably connected in the curing chamber 2, and the material receiving mechanism 6 is arranged above the material feeding mechanism 5 in the curing chamber 2;
[0055] A discharge port 11 is provided at the top of the boiling chamber 1, and a feed port 21 is provided at the top of the curing chamber 2;
[0056] The material taking mechanism 3 is arranged above the material discharging port 11, and the material taking mechanism 3 can take out the boiled sample;
[0057] The material holding mechanism 6 is arranged below the feed port 21, and the material holding mechanism 6 can hold the sample placed in the curing chamber 2;
[0058] The feeding mechanism 5 can push the sample from the curing chamber 2 into the boiling chamber 1 .
[0059] In this embodiment, the boiling chamber 1 is provided with a water inlet and outlet and a heating device for maintaining the water boiling state, and the curing chamber 2 is provided with a device for maintaining the temperature and humidity in the curing chamber 2. The concrete sample enters the curing chamber 2 through the feed inlet 21. After the concrete sample is cured in the curing chamber 2, it can be sent to the boiling chamber 1 by driving the feeding mechanism 5 through the pushing mechanism 4, and the next batch of concrete samples enters the receiving mechanism 6 in the curing chamber 2 through the feed inlet 21. While the concrete sample in the boiling chamber 1 is boiling, the concrete sample on the receiving mechanism 6 in the curing chamber 2 can be cured at the same time. When the boiling is finished, the taking mechanism 3 takes the boiled concrete sample. The prepared concrete sample is lifted to the top of the boiling chamber 1 for cooling. After the cooling is completed, the concrete sample can be measured. After the measurement is completed, the pushing mechanism 4 can push the concrete sample out of the top of the boiling chamber 1, and then the pushing mechanism 4 is reset to drive the feeding mechanism 5 back to the curing chamber 2. At this time, the concrete sample cured on the receiving mechanism 6 falls onto the feeding mechanism 5. After the material taking mechanism 3 is reset, the pushing mechanism 4 can drive the feeding mechanism 5 again to send the cured concrete sample into the boiling chamber 1. This cycle can quickly complete the boiling test of multiple batches and multiple samples, reduce the operation of the experimental operator to move the concrete samples multiple times, and effectively improve the experimental efficiency.
[0060] like Figure 4 - Figure 6 As shown, the material taking mechanism 3 includes a material taking component 31 and an electric lifting rod, the electric lifting rod is fixedly connected to one side of the material discharge port 11 at the top of the boiling chamber 1, the bottom of the electric lifting rod is fixed to the top of the material taking component 31, the material taking component 31 includes a bottom plate 311, a pressing plate 312, a top plate 313 and a vertical plate 314, one side of the vertical plate 314 is fixedly connected with the bottom plate 311, the pressing plate 312 and the top plate 313, the pressing plate 312 is arranged above the bottom plate 311, the top plate 313 is arranged above the pressing plate 312, the bottom of the electric lifting rod is fixedly connected to the top of the top plate 313, and the top plate 313 can block the material discharge port 11;
[0061] The feeding mechanism 5 includes a feeding plate 51, a receiving plate 52, a receiving spring 53, a threaded rod 54 and a first rack 55. The top of the feeding plate 51 is symmetrically fixedly connected with a spring bin 511. The receiving plate 52 is vertically slidably connected to the feeding plate 51. The spring bin 511 can accommodate the receiving spring 53. The top of the receiving spring 53 is fixedly connected to the top of the spring bin 511. The bottom of the receiving spring 53 is fixedly connected to the receiving plate 52. The threaded rod 54 is fixedly connected to one side of the feeding plate 51. The front and rear sides of the feeding plate 51 are symmetrically fixedly connected with the first rack 55.
[0062] A through slot is provided in the middle of the receiving plate 52 , and the bottom plate 311 can pass through the through slot. The pressing plate 312 can limit the rising of the receiving plate 52 .
[0063] In this embodiment, the electric lifting rod can drive the material taking component 31 to rise and fall, and the electric lifting rod can be lowered to allow the top plate 313 to block the material outlet 11, thereby achieving the sealing of the boiling chamber 1, reducing the escape of water vapor when the boiling chamber 1 is conducting a boiling test, and reducing the waste of water resources and energy;
[0064] The cured concrete sample can be placed on the receiving plate 52. When the feeding plate 51 enters the boiling chamber 1, the material taking component 31 can be lowered to allow the feeding plate 51 to pass between the bottom plate 311 and the pressing plate 312 and enter the boiling chamber 1. The bottom plate 311 can hold up the receiving plate 52. The receiving plate 52 will not suddenly drop after entering the boiling chamber 1 due to the gravity of the concrete sample, causing the concrete sample to fall due to instability. After the feeding plate 51 moves into place, the bottom plate 311 is in the through groove, and the pressing plate 312 The feeding member 31 is above the concrete sample. At this time, the material taking component 31 continues to descend, the bottom plate 311 descends to the bottom of the boiling chamber 1, and the pressing plate 312 descends accordingly, so that the concrete sample sinks into the water in the boiling chamber 1. The pressing plate 312 fills the gap left when the material receiving plate 52 descends. The position of the feeding plate 51 is fixed. The boiling chamber 1 does not need a higher water level to cover the concrete sample, and the bottom of the curing chamber 2 is higher than the bottom of the boiling chamber 1, so that the boiling water in the boiling chamber 1 will not flow into the curing chamber 2, and then the concrete boiling experiment can be carried out;
[0065] After the boiling test is completed, the material taking component 31 rises, and at this time the bottom plate 311 supports the concrete sample. When the bottom plate 311 rises above the top of the boiling chamber 1, the concrete sample is taken out of the boiling chamber 1, reducing the probability of bumping during the movement of the concrete, eliminating the need to use a clamp to clamp the boiled concrete sample, avoiding damage to the concrete sample by the clamp, and improving the accuracy of the concrete boiling test. At this time, there is no concrete sample on the material receiving plate 52, and the material receiving spring 53 can drive the material receiving plate 52 to reset, and the feeding plate 51 is released, and the feeding plate 51 can be returned to the curing chamber 2 later.
[0066] like Figure 7 - Fig.10 As shown, the material receiving mechanism 6 includes a first material receiving roller 61, a second material receiving roller 62, a fixed side plate 63 and a transmission gear component 64. The first material receiving roller 61 and the second material receiving roller 62 are arranged in the same horizontal plane. The first material receiving roller 61 has first transmission racks 611 symmetrically fixedly connected at both ends, and the second material receiving roller 62 has second transmission racks 621 symmetrically fixedly connected at both ends. The fixed side plates 63 are divided into two groups. The fixed side plates 63 are symmetrically arranged at both ends of the first material receiving roller 61 and the second material receiving roller 62. The top of the fixed side plate 63 is fixedly connected to the top of the curing chamber 2. The fixed side plate 63 is rotatably connected to the transmission gear component 64 at the center. The first transmission rack 611 is slidably connected to the inner side of the fixed side plate 63, and the second transmission rack 621 is slidably connected to the outer side of the fixed side plate 63.
[0067] The first transmission gear 641, the second transmission gear 642 and the third transmission gear 643 are fixedly connected to the rotating shaft of the transmission gear component 64. The bottom of the first transmission gear 641 is meshed with the first transmission rack 611, and the top of the second transmission gear 642 is meshed with the second transmission rack 621.
[0068] The first rack gear 55 is meshed with the third transmission gear 643 .
[0069] In this embodiment, when the feeding plate 51 slides horizontally, the transmission gear component 64 rotates. When the feeding plate 51 slides horizontally toward the boiling chamber 1, the transmission gear component 64 rotates forward. When the feeding plate 51 slides horizontally toward the curing chamber 2, the transmission gear component 64 rotates reversely.
[0070] That is, the feeding plate 51 slides toward the boiling chamber 1, and when the cured concrete sample is fed into the boiling chamber 1, the distance between the first receiving roller 61 and the second receiving roller 62 is reduced. At this time, the next batch of uncured concrete samples to be tested can be placed on the first receiving roller 61 and the second receiving roller 62 through the feed port 21. When the boiling test is completed and the feeding plate 51 is reset back to the curing chamber 2, the distance between the first receiving roller 61 and the second receiving roller 62 gradually increases. When the receiving plate 52 is below the first receiving roller 61 and the second receiving roller 62, the concrete sample can just fall and fall onto the receiving plate 52.
[0071] like Fig.11 - Fig.13 As shown, the pushing mechanism 4 includes a pushing rod 41, a connecting frame 42 and a second rack 43. A hydraulic push rod is fixedly arranged on the pushing mechanism 4, and the rear end of the hydraulic push rod is fixedly connected to the pushing rod 41. The connecting frame 42 is sleeved on the rear end of the pushing rod 41, and one side of the connecting frame 42 is fixedly connected to the second rack 43. An avoidance groove is arranged on the vertical plate 314, and the pushing rod 41 can pass through the avoidance groove.
[0072] An elastic ball is disposed at the rear end of the push rod 41, and a ball groove is disposed in the connecting frame 42, and the ball groove can accommodate the elastic ball;
[0073] A driving gear ring 541 is rotatably connected to the side wall of the curing chamber 2 , and the threaded rod 54 passes through the driving gear ring 541 . The threaded rod 54 is threadedly connected to the driving gear ring 541 . The second rack 43 is slidably connected to the side wall of the curing chamber 2 , and the second rack 43 is meshed with the driving gear ring 541 .
[0074] In this embodiment, after the material taking component 31 is raised to take the concrete sample out of the boiling chamber 1, after the concrete sample is tested above the boiling chamber 1, the hydraulic push rod can drive the push rod 41 to push the concrete sample out from the bottom plate 311, and the experimental operator does not need to manually move the tested concrete sample, thereby reducing the workload of the experimental operator. Then, the push rod 41 retreats, and the material taking component 31 can be lowered to continue the next material taking operation.
[0075] After the rear end of the push rod 41 enters the connection frame 42, the push rod 41 can be locked with the connection frame 42, so that the horizontal displacement of the push rod 41 can drive the second rack 43 to move;
[0076] When the rear end of the push rod 41 reaches the position of the vertical plate 314, the connecting frame 42 is blocked, the push rod 41 and the connecting frame 42 are unlocked, and the push rod 41 passes through the avoidance groove. When the push rod 41 retreats, the rear end of the push rod 41 passes through the connecting frame 42 and is locked with the connecting frame 42 again.
[0077] When the second rack 43 slides horizontally back and forth, it can drive the driving gear ring 541 to rotate, and the rotation of the driving gear ring 541 can drive the feeding plate 51 to slide horizontally in the curing chamber 2;
[0078] That is, when the second rack 43 slides horizontally backward, the driving gear ring 541 rotates forward to drive the feeding plate 51 to slide horizontally toward the boiling chamber 1, and when the second rack 43 slides horizontally forward, the driving gear ring 541 rotates reversely to drive the feeding plate 51 to slide horizontally toward the curing chamber 2.
[0079] Working principle:
[0080] During operation, the concrete sample enters the curing chamber 2 through the feed port 21. After the concrete sample is cured in the curing chamber 2, the cured concrete sample can be placed on the receiving plate 52.
[0081] The push rod 41 is locked with the connecting frame 42, and the push rod 41 drives the second rack 43 to move backward. When the second rack 43 slides backward horizontally, the driving gear ring 541 rotates forward to drive the feeding plate 51 to slide horizontally toward the boiling chamber 1.
[0082] When the feeding plate 51 enters the boiling chamber 1, the material taking component 31 can be lowered to allow the feeding plate 51 to pass through the bottom plate 311 and the pressing plate 312 to enter the boiling chamber 1. The bottom plate 311 can hold up the material receiving plate 52. The material receiving plate 52 will not suddenly drop after entering the boiling chamber 1 due to the gravity of the concrete sample, causing the concrete sample to tip over due to instability. After the feeding plate 51 moves into place, the bottom plate 311 is in the through groove, and the pressing plate 312 is above the concrete sample. At this time, the material taking component 31 continues to drop, the bottom plate 311 drops to the bottom of the boiling chamber 1, and the pressing plate 312 drops accordingly, so that the concrete sample sinks into the water in the boiling chamber 1. The pressing plate 312 fills the gap left when the material receiving plate 52 drops. The position of the feeding plate 51 is fixed, and the boiling chamber 1 does not need a higher water level to cover the concrete sample, and the bottom of the curing chamber 2 is higher than the bottom of the boiling chamber 1, so that the boiling water in the boiling chamber 1 will not flow into the curing chamber 2, and then the concrete boiling experiment can be carried out;
[0083] The feeding plate 51 slides toward the boiling chamber 1, and while feeding the cured concrete samples into the boiling chamber 1, the distance between the first material receiving roller 61 and the second material receiving roller 62 is reduced. At this time, the next batch of uncured concrete samples to be tested can be placed on the first material receiving roller 61 and the second material receiving roller 62 through the feeding port 21. The water vapor generated by the boiling test in the boiling chamber 1 can help the next batch of uncured concrete samples to be tested in the curing chamber 2 to be cured, effectively saving energy and water resources.
[0084] After the boiling test is finished, the material taking component 31 rises, and the bottom plate 311 supports the concrete sample. When the bottom plate 311 rises higher than the top of the boiling chamber 1, the concrete sample is taken out of the boiling chamber 1, which reduces the probability of collision during concrete movement, eliminates the need to use a clamp to clamp the boiled concrete sample, avoids damage to the concrete sample by the clamp, and improves the accuracy of the concrete boiling test. At this time, there is no concrete sample on the material receiving plate 52, and the material receiving spring 53 can drive the material receiving plate 52 to reset, and the feeding plate 51 is released;
[0085] After the concrete sample taken out of the boiling chamber 1 by the material taking component 31 is cooled and tested, the push rod 41 continues to push backwards. When the rear end of the push rod 41 reaches the position of the vertical plate 314, the connecting frame 42 is blocked, the push rod 41 and the connecting frame 42 are unlocked, and the push rod 41 passes through the avoidance groove. The push rod 41 pushes the concrete sample out of the bottom plate 311, and the experimental operator does not need to manually move the tested concrete sample, thereby reducing the workload of the experimental operator.
[0086] Then the push rod 41 retreats forward, and the rear end of the push rod 41 passes through the connecting frame 42 and is locked with the connecting frame 42. When the push rod 41 continues to move forward and drives the second rack 43 to slide forward horizontally, the driving gear ring 541 reverses and drives the feeding plate 51 to slide horizontally toward the curing chamber 2.
[0087] When the feeding plate 51 is reset back to the curing chamber 2, the distance between the first receiving roller 61 and the second receiving roller 62 gradually increases. When the receiving plate 52 is below the first receiving roller 61 and the second receiving roller 62, the concrete sample can just fall down and fall onto the receiving plate 52. At this time, the concrete sample that has fallen onto the receiving plate 52 has also been cured. Repeating the above steps can carry out a new round of concrete boiling experiment, which effectively improves the experimental efficiency of concrete boiling experiments with multiple batches and multiple samples.
[0088] The above description is only a preferred embodiment of the present invention and is not intended to limit the protection scope of the present invention.
Claims
1. A concrete boiling box, comprising a boiling chamber (1) and a curing chamber (2), It is characterized in that It also comprises a material taking mechanism (3), a material pushing mechanism (4), a material feeding mechanism (5) and a material receiving mechanism (6), wherein the curing chamber (2) is fixedly connected to one side of the boiling chamber (1), the curing chamber (2) is communicated with the boiling chamber (1), the material taking mechanism (3) is fixedly arranged on the boiling chamber (1), the material pushing mechanism (4) is fixedly arranged on the front side of the boiling chamber (1), the material feeding mechanism (5) is horizontally slidably connected in the curing chamber (2), and the material receiving mechanism (6) is arranged above the material feeding mechanism (5) in the curing chamber (2); The boiling chamber (1) is provided with a discharge port (11) at the top, and the curing chamber (2) is provided with a feed port (21) at the top; The material taking mechanism (3) is arranged above the material discharge port (11), and the material taking mechanism (3) is capable of taking out the boiled sample; The material receiving mechanism (6) is arranged below the material inlet (21), and the material receiving mechanism (6) is capable of supporting a sample placed in the curing chamber (2); The feeding mechanism (5) is capable of pushing the sample from the curing chamber (2) into the boiling chamber (1); The material taking mechanism (3) comprises a material taking component (31) and an electric lifting rod, wherein the electric lifting rod is fixedly connected to one side of a material discharge port (11) at the top of the boiling chamber (1), and the bottom of the electric lifting rod is fixed to the top of the material taking component (31). The material taking component (31) comprises a bottom plate (311), a pressing plate (312), a top plate (313) and a vertical plate (314), and one side of the vertical plate (314) is fixedly connected to the bottom plate (311), the pressing plate (312) and the top plate (313), the pressing plate (312) is arranged above the bottom plate (311), and the top plate (313) is arranged above the pressing plate (312). The bottom of the electric lifting rod is fixedly connected to the top of the top plate (313), and the top plate (313) can block the material discharge port (11). The feeding mechanism (5) comprises a feeding plate (51), a receiving plate (52), a receiving spring (53), a threaded rod (54) and a first rack (55); the top of the feeding plate (51) is symmetrically fixedly connected to a spring bin (511); the receiving plate (52) is vertically slidably connected to the feeding plate (51); the spring bin (511) can accommodate the receiving spring (53); the top of the receiving spring (53) is fixedly connected to the top of the spring bin (511); the bottom of the receiving spring (53) is fixedly connected to the receiving plate (52); the threaded rod (54) is fixedly connected to one side of the feeding plate (51); and the front and rear sides of the feeding plate (51) are symmetrically fixedly connected to the first rack (55).
2. A concrete boiling box according to claim 1, It is characterized in that A through slot is provided in the middle of the material receiving plate (52), the bottom plate (311) can pass through the through slot, and the pressing plate (312) can limit the rise of the material receiving plate (52).
3. A concrete boiling box according to claim 1, It is characterized in that The material receiving mechanism (6) comprises a first material receiving roller (61), a second material receiving roller (62), a fixed side plate (63) and a transmission gear component (64). The first material receiving roller (61) and the second material receiving roller (62) are arranged in the same horizontal plane. The first material receiving roller (61) is symmetrically fixedly connected to the two ends of the first material receiving roller (61), and the second material receiving roller (62) is symmetrically fixedly connected to the two ends of the second material receiving roller (62). The fixed side plates (63) are divided into two groups. The fixed side plates (63) are symmetrically arranged at the two ends of the first material receiving roller (61) and the second material receiving roller (62). The top of the fixed side plate (63) is fixedly connected to the top of the curing chamber (2). The center of the fixed side plate (63) is rotatably connected to the transmission gear component (64). The first transmission rack (611) is slidably connected to the inner side of the fixed side plate (63), and the second transmission rack (621) is slidably connected to the outer side of the fixed side plate (63).
4. A concrete boiling box according to claim 3, It is characterized in that A first transmission gear (641), a second transmission gear (642) and a third transmission gear (643) are fixedly connected to the rotating shaft of the transmission gear component (64); the bottom of the first transmission gear (641) is meshed with the first transmission rack (611), and the top of the second transmission gear (642) is meshed with the second transmission rack (621).
5. A concrete boiling box according to claim 4, It is characterized in that The first rack (55) is meshed with the third transmission gear (643).
6. A concrete boiling box according to claim 1, It is characterized in that The pushing mechanism (4) comprises a pushing rod (41), a connecting frame (42) and a second rack (43); a hydraulic pushing rod is fixedly arranged on the pushing mechanism (4); the rear end of the hydraulic pushing rod is fixedly connected to the pushing rod (41); the connecting frame (42) is sleeved on the rear end of the pushing rod (41); one side of the connecting frame (42) is fixedly connected to the second rack (43); an avoidance groove is arranged on the vertical plate (314); and the pushing rod (41) can pass through the avoidance groove.
7. A concrete boiling box according to claim 6, It is characterized in that An elastic ball is arranged on the rear end of the push rod (41), and a ball groove is arranged in the connection frame (42), wherein the ball groove can accommodate the elastic ball.
8. A concrete boiling box according to claim 7, It is characterized in that A driving gear ring (541) is rotatably connected to the side wall of the curing chamber (2); the threaded rod (54) passes through the driving gear ring (541); the threaded rod (54) is threadedly connected to the driving gear ring (541); the second rack (43) is slidably connected to the side wall of the curing chamber (2); the second rack (43) is meshed with the driving gear ring (541).
Citation Information
Patent Citations
Cement boils and boils device
CN205139057U
Boil and boil case protection casing
CN205950986U
Lei shi boiling box
CN206497118U
Cement boiling box
CN207351934U
Cement fog room
CN208215622U
