Automatic verification method and system for relay protection of million-kilowatt nuclear power unit
By establishing test project folders and building offline test programs in the relay protection system of million-kilowatt nuclear power units, systematic testing is achieved, which solves the difficult problem of protection and testing of relay devices in high-power power stations and ensures electrical Safety.
Patent Information
- Application Number
- CN202410933424.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-12
- Publication Date
- 2024-10-29
AI Technical Summary
It is difficult to protect and detect relay devices in million-kilowatt power stations and related power equipment. The lack of systematic protection and detection methods puts the safe operation of the power system at risk.
Design an automatic verification method and system for relay protection of million-kilowatt nuclear power units. By establishing multiple test project folders, building offline test programs and connection test programs, realizing a universal equipment data model and test project sequence, the system can be carried out Professional detection and report generation ensure fault prevention and electrical safety of relay equipment.
It realizes systematic protection and detection of relay devices in high-power power stations, effectively prevents faults, ensures electrical safety, and solves the lack of systematic defects of traditional methods.
Smart Images

Figure CN118858809A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of relay protection, and in particular to a method and system for automatic verification of relay protection of a million-kilowatt nuclear power unit. Background Art
[0002] Million-kilowatt nuclear power unit generator, transformer and booster station, that is, million-kilowatt power power station, substation and booster station, when the power components (such as generators, lines, etc.) in the power system or the power system itself fail and endanger the safe operation of the power system, the relay device can promptly send a warning signal to the operating duty personnel, or directly send a tripping command to the controlled circuit breaker to terminate the development of these events. An automated measure and equipment.
[0003] In the face of million-kilowatt-hour power stations and related power equipment, the protection and detection of relay devices is difficult. The protection and detection of relay devices is a complicated system work. At present, the power industry lacks systematic protection and detection methods. Therefore, it is necessary to propose a million-kilowatt nuclear power unit relay protection automatic verification method and system in view of the lack of systematic defects in the protection and detection methods of traditional relay devices. Summary of the invention
[0004] Based on this, it is necessary to propose an automatic verification method and system for relay protection of million-kilowatt nuclear power units in view of the lack of systematic defects in the protection and detection methods of traditional relay devices.
[0005] The present application provides a method for automatic verification of relay protection of a million-kilowatt nuclear power unit, comprising:
[0006] Create multiple test project folders;
[0007] Select a test project folder;
[0008] Receive test item data definition;
[0009] Describe the test process based on the test item data definition;
[0010] Return to the step of selecting a test project folder until all test project folders are selected;
[0011] Build offline test programs and connected test programs based on each test project folder;
[0012] Start the test procedure according to the test instructions;
[0013] Receive test results and calculate the result of the test process corresponding to each test result;
[0014] Generate a test report.
[0015] The present application provides a relay protection automatic verification system for a million-kilowatt nuclear power unit, comprising:
[0016] A host computer, used to execute the above-mentioned million-level power station relay device inspection method;
[0017] A relay protection tester is used to execute the million-level power station relay device inspection method, or / and communicate with the host computer.
[0018] The present application relates to a method and system for automatic verification of relay protection of a million-kilowatt nuclear power unit. By establishing multiple test project folders, a test process defined by corresponding test project data is input into each test project folder, thereby realizing the construction of a general equipment data model and a test project sequence. The general equipment data model describes the equipment data used by the detection items contained in the corresponding device under test according to the type of the device under test, such as protection device setting, pressure plate and telemetry, etc., and has certain universality. The test project sequence includes test items arranged in sequence, and the test items themselves include control parameters and result processing scripts required for the detection process, etc. Offline test programs and connection test programs are constructed to realize two operation modes: offline operation and external host computer control. The offline test program does not need external host computer control and can be independently operated on a relay protection tester device. The connection test program is based on a host computer and is connected to the host computer through a standard test interface, so that the relay protection tester device performs the test task. The entire test link is systematic, which solves the lack of systematic defects in the protection and detection methods of traditional relay devices, effectively prevents the failure of relay equipment, and ensures the electrical safety of high-power power stations. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 A method flow chart of an automatic verification method for relay protection of a million-kilowatt nuclear power unit provided in one embodiment of the present application.
[0020] Figure 2 A structural diagram of a universal test template for an automatic verification method for relay protection of a million-kilowatt nuclear power unit provided in one embodiment of the present application.
[0021] Figure 3 A schematic diagram of a method for testing the voltage or current lockout value of a million-kilowatt nuclear power unit relay protection automatic verification method provided in one embodiment of the present application.
[0022] Figure 4 A schematic diagram of a method for testing the action time of an automatic verification method for relay protection of a million-kilowatt nuclear power unit provided in one embodiment of the present application.
[0023] Figure 5A schematic diagram of a method for testing the slip lock value of a method for automatic verification of relay protection for a million-kilowatt nuclear power unit provided in one embodiment of the present application.
[0024] Figure 6 A structural diagram of an automatic verification system for relay protection of a million-kilowatt nuclear power unit provided in one embodiment of the present application.
[0025] Reference numerals:
[0026] 100-host computer; 200-relay protection tester. DETAILED DESCRIPTION
[0027] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0028] The present application provides a method for automatically checking relay protection of a million-kilowatt nuclear power unit.
[0029] like Figure 1 As shown, in one embodiment of the present application, a method for automatic verification of relay protection of a million-kilowatt nuclear power unit includes:
[0030] S100, create multiple test project folders.
[0031] S200, select a test project folder.
[0032] S300, receiving test item data definition.
[0033] Specifically, the data definition of a single test project includes parameter descriptions for calling various hardware devices, such as parameters for using a tester to test a module, descriptions of communication commands for using protection communications, etc. The execution process of the project can be to directly call the function modules provided by the control modules of each hardware device, or to use execution codes written in JavaScript scripts.
[0034] S400, defining and describing the test process according to the test item data.
[0035] Specific, such as:
[0036] Zero-sequence protection stage II 1.05 times fixed value test item, its parameter zero-sequence current is calculated using the following expression:
[0037] 3I0=ref(zero-sequence II current constant)×1.05(Formula 1)
[0038] In formula 1, ref is a template data reference function, and its input parameter is the path of the target data in the template. When the project is running, the parameter containing the expression will calculate its own value through the expression before participating in the fault calculation.
[0039] S500, returning to the step of selecting a test project folder until all test project folders are selected.
[0040] S600, based on each test project folder, builds offline test programs and connected test programs.
[0041] S700: Start the test program according to the test instruction.
[0042] S800, receiving test results, and calculating the result of the test process corresponding to each test result.
[0043] S900: Generate a test report.
[0044] The present application relates to a method for testing a relay device of a million-level power station. By establishing multiple test project folders, a test process corresponding to the test project data definition is input into each test project folder, thereby realizing the construction of a general equipment data model and a test project sequence. The general equipment data model describes the equipment data used by the test items contained in the corresponding device under test according to the type of the device under test, such as the setting value of the protection device, the pressure plate and the telemetry, etc., and has a certain degree of universality. The test project sequence includes test items arranged in order, and the test items themselves include the control parameters and result processing scripts required for the detection process, etc. Offline test programs and connection test programs are constructed to realize two operation modes: offline operation and external host computer control. The offline test program does not need external host computer control and can be independently operated on the relay protection tester device. The connection test program is based on the host computer, and the host computer is connected through a standard test interface, so that the relay protection tester device performs the test task. The entire test link is systematic, which solves the lack of systematic defects in the protection and detection methods of traditional relay devices, effectively prevents the failure of relay equipment, and ensures the electrical safety of high-power power stations.
[0045] like Figure 1 As shown, in one embodiment of the present application, in S100, the test items include one or more of voltage and current test, harmonic test, state sequence test, whole group test, cable distance protection test, zero-sequence protection test, power frequency variation impedance test, overcurrent protection test, negative sequence overcurrent test, automatic reclosing and post-acceleration test, voltage protection test, current protection test, inverse time characteristic test, impedance characteristic test, differential protection test and time measurement test.
[0046] Specifically, the voltage and current test can be used to simulate multi-channel AC / DC voltage and current output, and various manual tests can be completed. The harmonic test can be used to simultaneously superimpose DC and 1--20th harmonics on each channel to complete various harmonic-related tests. The state sequence test can simulate the sequential output of several test states, and the voltage and current amplitude, phase, frequency, and amplitude and frequency change rate of each state can be customized, and the state output quantity change can be customized. The whole group test can simulate various instantaneous / permanent and conversion faults, and the whole group transmission test of various line protections can be completed. The cable distance protection test can realize the distance protection fixed value verification and action time detection. The zero-sequence protection test can realize the zero-sequence protection fixed value verification and action time detection. The power frequency variable impedance test can realize the power frequency variable impedance relay fixed value verification. The overcurrent protection test can realize the overcurrent protection fixed value verification and action time test. The negative sequence overcurrent test can realize the negative sequence overcurrent protection fixed value verification and action time test. The automatic reclosing and post-acceleration tests include reclosing delay, post-acceleration, no-voltage check, synchronization check, etc. The voltage protection test can be used to test the action value, return value, return coefficient, action time, and return time of positive sequence, negative sequence, AC and DC overvoltage and undervoltage relays. The current protection test can be used to test the action value, return value, return coefficient, action time, and return time of positive sequence, negative sequence, zero sequence, AC and DC current relays and microcomputer-based overcurrent protection. The inverse time characteristic test can be used to test the current inverse time IT, voltage inverse time UT, frequency inverse time fT, and overexcitation U* / f*-T characteristics. The impedance characteristic test can be used to determine the action boundary characteristics. The differential protection test and time measurement test can be used to test the differential protection ratio braking characteristics and harmonic braking characteristics. The test items are divided into boundary search and fixed-point test.
[0047] like Figure 2 As shown, in one embodiment of the present application, before S400, the following steps are included:
[0048] S411, receiving tester parameters for each test item.
[0049] S412, constructing a general device data model.
[0050] S413, select a tester parameter.
[0051] S414, constructing a function that forms a mapping with the tester parameters.
[0052] Specifically, the zero-sequence compensation coefficient of the short-circuit impedance Zf, the program provides three settings:
[0053] The first type: KL = (Z0-Z1) / (3*Z1): Polar coordinate form: amplitude, angle.
[0054]
[0055] The power system assumes that the impedance angles of the zero-sequence impedance Z0 and the positive-sequence impedance Z1 are equal.
[0056] The second type: KR = (R0-R1) / (3*R1), KX = (X0-X1) / (3*X1)
[0057]
[0058] The third type: KL=Z0 / Z1.
[0059] S415, incorporating the function into the general device data model.
[0060] S416, returning to the step of selecting a tester parameter until all tester parameters are selected.
[0061] Specifically, the template universal device data model acts as a proxy for the actual device data model, providing data services for the test items. For automatic testing based on test templates, this method effectively isolates the test item parameters from the actual device data. When the test item accesses or operates device-related data, it only operates on the template local device data, and during actual execution, the actual device data is operated through the data proxy service. In this mode, the test items in the template have good versatility for different models of equipment.
[0062] This embodiment relates to a general device data model. The relay protection test system adopts a modular design, and under the overall system framework, loose coupling design is adopted between modules. For the modules that provide device control interfaces, different device control modules can be replaced according to the interchangeability characteristics of modular design, so that the system can achieve the effect of using different devices while keeping the basic framework unchanged, thereby reflecting better compatibility and flexibility.
[0063] In one embodiment of the present application, S400 includes:
[0064] S421, output test voltage and test current.
[0065] S422, detecting the output accuracy, zero drift parameter and phase parameter of the test voltage and the test current.
[0066] S423, receiving the action and / or return value of the test device.
[0067] S424, receiving test data of the action and / or return time of the test device.
[0068] S425, determining a test result based on the function of the test item of the general device data model.
[0069] Specifically, voltage and current are universal test modules. Through flexible output settings, a variety of test items can be completed, including protection sampling accuracy, zero drift, phase inspection, various conventional relay action / return value tests, action / return time tests (using the output lock function). The test module can provide up to 24 channels (12U+12I) of analog signal output at the same time, and the amplitude, angle and frequency of each channel are independent of each other, and AC and DC can be set arbitrarily and adjusted in real time. The parameters of each voltage and current channel include: amplitude, angle, frequency, and whether it is DC. During the test, the channel parameters of each voltage and current can be modified and adjusted in real time as needed.
[0070] In one embodiment of the present application, S400 further includes:
[0071] S431, based on the device type data of the relay, determine whether the tested device is an AC relay.
[0072] S432, if the device under test is an AC type relay, determine the specification parameters of the voltage relay, current relay or power direction relay, and perform an AC test.
[0073] S433, if the tested device is not an AC relay, determine that the tested device is a DC voltage relay, a DC current relay, or a DC relay of an intermediate relay.
[0074] S434, perform DC test.
[0075] Specifically, the step-by-step change module is mainly used for step-by-step change tests that require high time accuracy for each step. During the test, the variable changes stepwise according to the set step length and time per step △ parameter / △t. It can complete automatic tests of various relay actions / return values, including:
[0076] AC relays: action value, return value, sensitivity angle and action time test of voltage relays, current relays, power direction relays, etc.
[0077] DC type relay: action value, return value and action time test of DC voltage relay, DC current relay, intermediate relay, etc.
[0078] In one embodiment of the present application, S432 includes:
[0079] S43201, select test parameters.
[0080] S43202, using the test item data definition of the test parameter, determine the test parameter change method.
[0081] S43203, using the step size and step time of the test parameter, determine the variation range of the test parameter.
[0082] S43204, receive test results.
[0083] S43205, determining a test result based on the function of the test item of the general device data model.
[0084] Specifically, select the variables in the test process, which can be phase voltage, phase current, frequency and line voltage. Set the starting point and end point of the variable change. The starting point can be greater than or less than the end point. Generally, the setting of the change range should cover the action / return value range of the relay. Set the step size of each step change of the variable. Generally, select an appropriate step size according to the test requirements. The smaller the step size, the higher the test accuracy. When the variable changes according to the set step size, the holding time of each step size. Generally, the setting of each step time should be greater than the action (or return) time of the relay.
[0085] Set the changing mode of the change amount. "Start" is the starting point of the change range, "End" is the end point, "Start to End" is a one-way change, which can only measure the action value, and "Start to End to Start" is a two-way change, which can measure the action value and return value at the same time, and automatically calculate the return coefficient / or sensitivity angle.
[0086] When the variable changes from the starting point to the end point, once the relay is detected, it will automatically determine whether to continue the test according to the change mode. If the change mode is "from beginning to end": end the test. If the change mode is "from beginning to end to beginning": change the change direction of the variable and return to the starting point. During the test, regardless of whether the relay is activated or not, the variable will continue to change according to the set change range until it reaches the end point or returns to the starting point.
[0087] Is it necessary to output a reset state before each step change (before simulating a fault, to reset the protection). Conventional relays generally do not need to reset before each step. During the test, the variable changes continuously. Some microcomputer protections may need to reset before each step. During the test, the variable changes in a pulsed manner, that is, a reset state is output before each step change output.
[0088] In one embodiment of the present application, S434 includes:
[0089] S43401, determine the action contact.
[0090] S43402, output test voltage and / or test current to the action contact.
[0091] S43403, based on the action logic, determine whether the device under test performs an action that complies with the action logic.
[0092] S43404: If the device under test performs an action that complies with the action logic, the test is determined to be successful.
[0093] S43405: If the device under test does not perform an action that complies with the action logic, it is determined that the test is unsuccessful.
[0094] Specifically, during the test, the program will determine whether the protection is activated or returned based on the setting of the action contact.
[0095] “Logical AND”: When all the selected inputs meet the conditions, the action is established.
[0096] "Logical OR": If any of the selected inputs meets the conditions, the action is successful.
[0097] If only one binary input is selected, "Logical AND" and "Logical OR" have the same effect.
[0098] In order to avoid the vibration of the relay contacts, the state of the open contact is maintained for a period of time (confirmation time) before the tester recognizes it. Generally, it is 10 to 20ms.
[0099] like Figures 3 to 5 As shown, in one embodiment of the present application, S400 further includes:
[0100] S441, select slip test parameters. The slip test parameters include slip action value test, action time test, slip blocking value test, current blocking value test and voltage blocking value test.
[0101] S442, starting point based on slip variable.
[0102] S443, determining the return time by using the output time of the starting point and the received action completion time point.
[0103] S444, determining the slip speed based on the ratio of the slip test parameter to the reset time.
[0104] S445, calling the function of the test item of the general equipment data model to determine whether the slip speed meets the safety requirements.
[0105] S446: If the slip speed meets the safety requirements, the test is determined to be successful.
[0106] S447, if the slip speed does not meet the safety requirements, it is determined that the test is unsuccessful.
[0107] S448, returning to the process of selecting the slip test parameters until all the slip test parameters are selected.
[0108] Specifically, slip test (linear change): the specified variable changes point by point according to the given slip d parameter / dt. It can complete the action value, action time and slip locking characteristic test of various frequency relays, low-frequency / low-voltage load reduction devices, etc.
[0109] Slip action value test:
[0110] According to the search settings (search starting point, end point, step length), gradually modify the slip end point to complete each step of the test. Each step of the test is a complete linear change process. The change in the protection response during each step of the linear change process determines whether to act.
[0111] Select the slip variable as needed, including phase voltage, phase current, frequency, line voltage, etc. At each step, the sliding starting point of the slip variable is generally to ensure reliable reset of the protection. The output time of the slip starting point is generally greater than the reset time of the protection to ensure reliable reset of the protection. The search starting point and end point of the action value. The search range should cover the action value, and generally search from the non-action area to the action area. The search step of the action value. Generally, a suitable step size is selected according to the test requirements. The smaller the step size, the higher the test accuracy. At each step, the variable changes from the reset point according to the slip d parameter / dt to the current search value. If the protection action is not detected during this period, the tester stays at the slip end point and maintains a "waiting time" to wait for the protection action.
[0112] like Figure 4 As shown, the action time test:
[0113] Select the slip variable as needed, including phase voltage, phase current, frequency, line voltage, etc. The sliding starting point of the slip variable is generally to ensure reliable reset of the protection. The output time of the slip starting point is generally taken to be greater than the reset time of the protection to ensure reliable reset of the protection. The variable changes from the reset point to the end point according to the slip d parameter / dt. If the protection action is not detected during this period, the tester stays at the slip end point and maintains a "waiting time" to wait for the protection action. During the test, after the variable changes to the "timing start value" according to the set slip d parameter / dt, the timer is triggered to start timing, and the timing is stopped when the protection action is detected. To ensure the accuracy of the test results, it is recommended that the timing start value be the action value of the protection.
[0114] like Figure 5 As shown, slip lock value test:
[0115] According to the search settings (search starting point, end point, step length), gradually modify the slip d / dt to complete each step of the test. Each step of the test is a complete linear change process. The action is determined based on the change in the protection response during each step of the linear change process. Select variables as needed, including phase voltage, phase current, frequency, line voltage, etc. At each step of change, the sliding starting point of the slip variable is generally to ensure reliable reset of the protection. The variable changes from the reset point to the end point according to the current slip d / dt. If the protection action is not detected during this period, the tester stays at the slip end point and maintains a "waiting time" to wait for the protection action. The search starting point and end point of the slip lock value d / dt. The search range should cover the lock value, and generally search from the non-locking area to the locking area. The search step length of the slip lock value d / dt. Generally, select a suitable step length according to the test requirements. The smaller the step length, the higher the test accuracy.
[0116] like Figure 3 As shown, current blocking value test:
[0117] Select the current phase to be searched. You can select single-phase, two-phase, three-phase and six-phase simultaneous search as needed. The search start and end points of the current blocking value. The search range should cover the blocking value, and generally search from the non-blocking area to the blocking area. The search step of the current blocking value. Generally, select the appropriate step size according to the test requirements. The smaller the step size, the higher the test accuracy.
[0118] like Figure 3 As shown, voltage lock value test:
[0119] Select the voltage to be searched, which can be set as phase voltage or line voltage, and select the corresponding phase as needed. The search start and end points of the voltage blocking value. The search range should cover the blocking value, and generally search from the non-blocking area to the blocking area. The search step of the voltage blocking value. Generally, select a suitable step size according to the test requirements. The smaller the step size, the higher the test accuracy. For this test item, the slip variable is fixed to the system frequency, that is, the frequency of all AC voltage and current phases. At each step change, the sliding starting point of the slip variable is generally to ensure reliable protection reset.
[0120] In one embodiment of the present application, S400 further includes:
[0121] S451, select a current definition, wherein the current definition includes a fault current definition, a negative sequence current definition, a zero sequence current definition and a single current definition.
[0122] S452, output the voltage and current frequency corresponding to the current definition.
[0123] S453, determining a phase angle difference between voltage and current based on the line impedance angle parameter.
[0124] S454, using the phase angle difference between the voltage and the current, determine the fault phase voltage and current.
[0125] Specifically, the I(t) action characteristic test of the inverse time overcurrent relay includes directional overcurrent or non-directional overcurrent relay, negative sequence overcurrent, and zero sequence overcurrent.
[0126] Fault current If: used for directional overcurrent and non-directional overcurrent It characteristic tests.
[0127] Negative sequence current I2 (or 3I2): used for negative sequence overcurrent It characteristic test.
[0128] Zero-sequence current 3I0: used for zero-sequence overcurrent It characteristic test.
[0129] Single current: used for single current It characteristic test.
[0130] Select the fault type, that is, the output mode of the current during the test. The phase voltage value before the fault is generally the rated voltage to ensure reliable reset of the protection. The fault phase voltage value during the fault to provide a reliable directional judgment. The line impedance angle determines the phase angle difference between the voltage and the current. The current before the fault. Generally, it is 0. The output time of the pre-fault state. Before entering the next current test point, in order to ensure the reliable reset of the protection (or the reliable return of the relay), it is necessary to output the pre-fault state for a certain time.
[0131] In one embodiment of the present application, the state sequence test includes:
[0132] The state sequence test unit can provide up to 24 channels (12U+12I) of analog signal output simultaneously. The amplitude, angle and frequency of each channel are independent of each other, and the AC and DC can be set arbitrarily.
[0133] Set the number of cyclic repetition outputs of the entire state sequence, with a maximum of 3000 cycles. The states are interrelated (the angle changes continuously). When the state is switched, the angle between the states keeps changing continuously. The states are independent of each other. When the state is switched, the phase between the states is independent, that is, the angle is discontinuous. Select whether to superimpose a decaying non-periodic DC component on the voltage and current during the state switching process. The decay time constant of the non-periodic DC component. The action (flip) of all open-in contacts starts with the open-in position at the end of the state characteristic value 1. The action (flip) of all open-in contacts starts with the open-in position at the end of the previous state.
[0134] In one embodiment of the present application, the entire set of tests includes:
[0135] Taking a single machine to an infinite system as a model, it provides a simple fault simulation function for the power system to test the overall transmission characteristics of the protection. It can simulate instantaneous, permanent, conversion faults, and multiple reclosing, etc.
[0136] The whole group transmission test of distance, zero sequence, overcurrent protection, etc. Reclosing action characteristics. GPS swap of double-terminal line protection. The calculation model includes constant source impedance, constant short-circuit current, and constant short-circuit voltage. Provides a variety of fault triggering methods, including key triggering, time triggering, PPM pulse triggering, and open contact triggering.
[0137] Ten fault types are provided, including: A, B, C grounding, AB, BC, CA phase-to-phase, AB, BC, CA two-phase grounding, and three-phase short circuit. The program automatically calculates the voltage and current of the three phases A, B, and C according to the settings of the calculation model and the corresponding fault parameters.
[0138] Fault type and closing angle correspondence table:
[0139]
[0140] At the moment of fault triggering, is there an attenuated non-periodic DC component superimposed on the fault current? The magnitude of this DC component is:
[0141]
[0142] Where:
[0143] Ipm0 is the maximum current before the fault.
[0144] Ipm is the maximum value of the steady-state short-circuit current after a fault.
[0145] is the loop impedance angle before the fault.
[0146] is the loop impedance angle after the fault.
[0147] τ is the decay time constant of the loop after a fault.
[0148] The present application provides a relay protection automatic verification system for a million-kilowatt nuclear power unit.
[0149] like Figure 6 As shown, in one embodiment of the present application, a relay protection automatic verification system for a million-kilowatt nuclear power unit includes a host computer 100 and a relay protection tester 200 .
[0150] The host computer 100 is used to execute the automatic verification method of relay protection of a million-kilowatt nuclear power unit.
[0151] The relay protection tester 200 is used for the million-level power station relay device inspection method, or / and is connected to the host computer 100 for communication.
[0152] The present application relates to a relay protection automatic verification system for a million-kilowatt nuclear power unit. The host computer 100 or the relay protection tester 200 establishes multiple test project folders, and inputs the test process defined by the corresponding test project data into each test project folder, thereby realizing the construction of a general equipment data model and a test project sequence. The general equipment data model describes the equipment data used for the detection items contained in the corresponding device under test according to the type of the device under test, such as the setting value of the protection device, the pressure plate and the telemetry, etc., and has certain universality. The test project sequence includes test items arranged in sequence, and the test items themselves include the control parameters and result processing scripts required for the detection process, etc. Offline test programs and connection test programs are constructed to realize two operation modes: offline operation and external host computer 100 control. The offline test program does not need to be controlled by the external host computer 100, and can be independently operated on the relay protection tester 200 device. The connection test program is based on the host computer 100, and is connected to the host computer 100 through a standard test interface, so that the relay protection tester 200 device performs the test task. The entire testing process is systematic, which solves the lack of systematic defects in the protection and detection methods of traditional relay devices, effectively prevents the failure of relay equipment, and ensures the electrical safety of high-power power stations.
[0153] The technical features of the above-described embodiments may be arbitrarily combined, and the execution order of the method steps is not limited. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0154] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.
Claims
1. A method for automatic verification of relay protection of a million-kilowatt nuclear power unit, characterized in that: include: Create multiple test project folders; Select a test project folder; Receive test item data definition; Describe the test process based on the test item data definition; Return to the step of selecting a test project folder until all test project folders are selected; Build offline test programs and connected test programs based on each test project folder; Start the test procedure according to the test instructions; Receive test results and calculate the result of the test process corresponding to each test result; Generate a test report.
2. The method for automatic verification of relay protection of a million-kilowatt nuclear power unit according to claim 1 is characterized in that: In the multiple test item folders established, the test items include one or more of voltage and current test, harmonic test, state sequence test, whole group test, cable distance protection test, zero sequence protection test, power frequency variation impedance test, overcurrent protection test, negative sequence overcurrent test, automatic reclosing and post-acceleration test, voltage protection test, current protection test, inverse time characteristic test, impedance characteristic test, differential protection test and time measurement test.
3. The automatic verification method for relay protection of a million-kilowatt nuclear power unit according to claim 2 is characterized in that: Before describing the test process according to the test item data definition, the method further includes: Receive tester parameters for each test item; Build a common device data model; Select a tester parameter; Constructing a function that maps to the tester parameters; Incorporate this function into the common device data model; Return to selecting a tester parameter until all tester parameters are selected.
4. The automatic verification method for relay protection of a million-kilowatt nuclear power unit according to claim 3 is characterized in that: Describing the test process according to the test item data definition includes: Output test voltage and test current; Detect the output accuracy, zero drift parameters and phase parameters of the test voltage and test current; Receive the actions and / or return values of the test equipment; Receive test data of the action and / or return time of the test equipment; A test result is determined based on the function of the test item of the general device data model.
5. The method for automatic verification of relay protection of a million-kilowatt nuclear power unit according to claim 4 is characterized in that: Describing the test process according to the test item data definition also includes: Based on the device type data of the relay, determining whether the device under test is an AC type relay; If the device under test is an AC type relay, determining specification parameters of the voltage relay, current relay or power directional relay, and performing an AC test based on the specification parameters of the voltage relay, current relay or power directional relay; If the device under test is not an AC type relay, determine that the device under test is a DC voltage relay, a DC current relay, or a DC type relay of an intermediate relay; Perform DC tests on the device under test.
6. The method for automatic verification of relay protection of a million-kilowatt nuclear power unit according to claim 5 is characterized in that: The performing of the AC test comprises: Select test parameters; Determine the test parameter change mode by using the test item data definition of the test parameter; Determine the variation range of the test parameters by using the step length and step time of the test parameters; Receive test results; A test result is determined based on the function of the test item of the general device data model.
7. The method for automatic verification of relay protection of a million-kilowatt nuclear power unit according to claim 6 is characterized in that: The DC test is performed, comprising: Determine the action contact; Output test voltage and / or test current to the action contact; Based on the action logic, determine whether the device under test performs an action that complies with the action logic; If the device under test performs actions that conform to the action logic, the test is determined to be successful; If the device under test does not perform actions that conform to the action logic, the test is determined to be unsuccessful.
8. The method for automatic verification of relay protection of a million-kilowatt nuclear power unit according to claim 7 is characterized in that: Describing the test process according to the test item data definition also includes: Select slip test parameters; the slip test parameters include one or more of slip action value test parameters, action time test parameters, slip blocking value test parameters, current blocking value test parameters and voltage blocking value test parameters; Determine the starting point of the slip variable; Determine the return time using the output time of the starting point and the completion time of the received action; Determine the slip speed based on the ratio of the slip test parameter to the reset time; Call the function of this test item of the general equipment data model to determine whether the slip speed meets the safety requirements; If the slip speed meets the safety requirements, the test is determined to be successful; If the slip speed does not meet the safety requirements, the test is determined to be unsuccessful; Return to the step of selecting the slip test parameters until all the slip test parameters are selected.
9. The method for automatic verification of relay protection of a million-kilowatt nuclear power unit according to claim 8 is characterized in that: Describing the test process according to the test item data definition also includes: Select a current definition; the current definition includes one or more of a fault current definition, a negative sequence current definition, a zero sequence current definition and a single current definition; Output voltage and current frequency corresponding to the current definition; determining a phase angle difference between voltage and current based on line impedance angle parameters; The phase angle difference between voltage and current is used to determine the fault phase voltage and current.
10. A relay protection automatic verification system for a million-kilowatt nuclear power unit, characterized in that: include: A host computer, used to execute the million-level power station relay device inspection method as described in any one of claims 1 to 9; A relay protection tester is used to execute the million-level power station relay device inspection method as described in any one of claims 1 to 9, or / and to communicate with the host computer.