Engineering processing method, system, equipment and medium
By automatically evaluating and generating change plans, it solves the timeliness and accuracy problems of introducing changes into production in traditional engineering change management, and achieves an efficient change management process.
Patent Information
- Application Number
- CN202410872792.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-01
- Publication Date
- 2024-10-29
AI Technical Summary
Traditional engineering change management solutions cannot ensure that changes are introduced into production in a timely and efficient manner, and the accuracy of manual assessment is low, which affects the accuracy and efficiency of engineering changes.
By obtaining shipment data, vulnerability level and inventory data, it can automatically assess the customer level, vulnerability level and emergency level of engineering changes, generate and review change plans, reduce manual participation, and improve the standardization and efficiency of change plans.
It realizes the rapid issuance and introduction of engineering changes into production, reduces human leakage, and improves the review timeliness and the efficiency of changes from evaluation to execution.
Smart Images

Figure CN118863784A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of information processing technology, and in particular to an engineering processing method, system and equipment. Background Art
[0002] As the server market continues to grow explosively, the demand for servers from Internet vendors is also increasing significantly. Therefore, in order to improve competitiveness, how to increase the depth of server customization has become an issue that server vendors need to consider.
[0003] With deep customization as a prerequisite, in order to reduce server costs, engineering changes are usually made to server boards to meet the demand for new hardware. Traditional engineering change management solutions require evaluating change plans, evaluating import plans, and monitoring the time and effect of import. In addition to being unable to guarantee that engineering changes can be introduced into production in a timely and efficient manner, there is also the problem of low accuracy in manual evaluation, which affects the correct changes to the project.
[0004] Therefore, a standard automated engineering change processing method is urgently needed to solve the above technical problems. Summary of the invention
[0005] Based on this, it is necessary to provide an engineering treatment method to solve the above technical problems.
[0006] In a first aspect, the present application provides an engineering treatment method, the method comprising:
[0007] In response to input of engineering change information of the engineering change, obtaining shipment data in the shipment control database, vulnerability levels in the vulnerability control database, and inventory data in the warehouse control database;
[0008] Determine a customer level matching the engineering change based on the shipment volume data in the shipment control database and the changed board part number in the engineering change information;
[0009] Determine the vulnerability level matching the engineering change according to the vulnerability data in the warehouse management and control database and the vulnerability number in the engineering change information;
[0010] Determine the change urgency level that matches the engineering change according to the inventory data in the warehouse control database and the changed board part number in the engineering change information;
[0011] Determine the customer level, vulnerability level, change urgency level and preset level assessment rules that match the engineering change, and determine the change level corresponding to the engineering change;
[0012] Generate an engineering change plan according to the change level corresponding to the engineering change and the engineering change information;
[0013] The engineering change plan is reviewed according to the change level corresponding to the engineering change, and the engineering change plan that has passed the review is imported for execution.
[0014] In some embodiments, determining the customer level matching the project according to the shipment volume data in the shipment control database and the changed board part number in the project change information includes:
[0015] According to the changed board part number in the input engineering change information, searching the product shipment control database for a target board model that matches the changed board part number;
[0016] Query the target customers matching the target board model, and determine the customer grade of the target customers according to the shipment data corresponding to the target board model and the preset customer grade evaluation rules.
[0017] In some embodiments, determining the change urgency level matching the engineering change according to the inventory data in the warehouse control database and the changed board part number in the engineering change information includes:
[0018] According to the changed board part number in the input engineering change information, searching the warehouse control database for inventory data corresponding to the changed board part number, the inventory data including monthly average consumption and inventory;
[0019] The change urgency level of the engineering change is determined based on the found monthly average consumption and inventory corresponding to the changed board part number and a preset change urgency level assessment rule.
[0020] In some embodiments, determining the customer level of the target customer according to the shipment data corresponding to the target board model and a preset customer level evaluation rule includes:
[0021] Counting the product shipments within a first preset period and the first average shipments in the shipment data corresponding to the target board model, and sorting the long-term customers of shipments according to the product shipments to obtain the first key customers;
[0022] If there is a new customer whose shipment is less than the first preset period, the second average shipment volume of the new customer in the second preset period is counted;
[0023] According to the first average shipment volume and the second average shipment volume, long-term customers and new customers are sorted to obtain second key customers;
[0024] Counting the total shipment volumes of long-term customers and new customers in the product shipment control database within the third preset period within the third preset period, and sorting the long-term customers and new customers according to the total shipment volumes to obtain third key customers;
[0025] assigning scores to the key customers according to the ranking of each key user among the first key customer, the second key customer, and the third key customer, wherein the assigned scores decrease in descending order according to the ranking of the key users;
[0026] The sum of scores corresponding to the key users included in the first key customer, the second key customer, and the third key customer are calculated respectively, and the key customers whose sum of scores among the key users is ranked within the preset ranking are selected as target key customers.
[0027] In some embodiments, determining the change urgency level of the engineering change according to the found monthly average consumption and inventory corresponding to the changed board part number and a preset change urgency level assessment rule includes:
[0028] Obtaining the monthly average consumption and inventory of boards matching the changed board part number;
[0029] Calculate the remaining days according to the current date of submitting the engineering change and the change plan import date in the input engineering change information;
[0030] Calculate the available consumption based on the remaining days and the average monthly consumption;
[0031] The consumable quantity is compared with the inventory quantity to determine the change urgency level of the engineering change, where the change urgency level includes an emergency level and a general level.
[0032] In some embodiments, the change level includes major changes and general changes, and determining the change level corresponding to the engineering change according to the acquired level assessment attributes and preset level assessment rules includes:
[0033] In response to the target customer being a target key customer, determining that the change level corresponding to the engineering change is a major change;
[0034] In response to the change urgency level of the engineering change being an emergency level, determining that the change level corresponding to the engineering change is a major change;
[0035] In response to the vulnerability level being level 4 or level 3, determining that the change level corresponding to the engineering change is a major change.
[0036] In some embodiments, determining the change level corresponding to the engineering change further includes:
[0037] In response to the input of the engineering change information, the root cause of the change is the first specific cause, determining whether the remaining days are less than or equal to a preset threshold;
[0038] If the remaining number of days is less than or equal to the preset threshold, determining that the change level corresponding to the engineering change is a major change;
[0039] If the remaining number of days is greater than the preset threshold and the first specific reason is a material quality issue, obtaining the usability of the board before the change;
[0040] If the usability of the board before the change is that the board needs to be scrapped before the change or the material needs to be reworked before use, then the change level corresponding to the engineering change is determined to be a major change;
[0041] If the remaining number of days is greater than the preset threshold and the first specific reason is not a material quality issue, the change level corresponding to the engineering change is determined to be a general change.
[0042] In a second aspect, the present application provides an engineering change processing system, the system comprising:
[0043] An engineering data preparation module, for obtaining, in response to input of engineering change information of an engineering change, shipment data in a shipment control database, vulnerability levels in a vulnerability control database, and inventory data in a storage control database;
[0044] A change level assessment module, used to determine the customer level matching the engineering change according to the shipment volume data in the shipment control database and the changed board part number in the engineering change information;
[0045] The change level assessment module is further used to determine the vulnerability level matching the engineering change according to the vulnerability data in the warehouse management and control database and the vulnerability number in the engineering change information;
[0046] The change level assessment module is further used to determine the change urgency level matching the engineering change based on the inventory data in the warehouse control database and the changed board part number in the engineering change information;
[0047] The change level assessment module is further used to determine the change level corresponding to the engineering change according to the customer level, vulnerability level, change urgency level and preset level assessment rules matched by the engineering change;
[0048] A change plan generating module, used for generating an engineering change plan according to the change level corresponding to the engineering change and the engineering change information;
[0049] The change plan review module is used to review the engineering change plan according to the change level corresponding to the engineering change and import the engineering change plan that has passed the review for execution.
[0050] In a third aspect, the present application provides a computer program product, including a computer program, which implements the steps of the following method when executed by a processor:
[0051] In response to input of engineering change information of the engineering change, obtaining shipment data in the shipment control database, vulnerability levels in the vulnerability control database, and inventory data in the warehouse control database;
[0052] Determine a customer level matching the engineering change based on the shipment volume data in the shipment control database and the changed board part number in the engineering change information;
[0053] Determine the vulnerability level matching the engineering change according to the vulnerability data in the warehouse management and control database and the vulnerability number in the engineering change information;
[0054] Determine the change urgency level that matches the engineering change according to the inventory data in the warehouse control database and the changed board part number in the engineering change information;
[0055] Determine the change level corresponding to the engineering change according to the customer level, vulnerability level, change urgency level and preset level assessment rules matched by the engineering change;
[0056] Generate an engineering change plan according to the change level corresponding to the engineering change and the engineering change information;
[0057] The engineering change plan is reviewed according to the change level corresponding to the engineering change, and the engineering change plan that has passed the review is imported for execution.
[0058] In a fourth aspect, the present application provides an electronic device, the electronic device comprising:
[0059] one or more processors;
[0060] and a memory associated with the one or more processors, the memory being used to store program instructions, wherein when the program instructions are read and executed by the one or more processors, the program instructions perform the following operations:
[0061] In response to input of engineering change information of the engineering change, obtaining shipment data in the shipment control database, vulnerability levels in the vulnerability control database, and inventory data in the warehouse control database;
[0062] Determine a customer level matching the engineering change based on the shipment volume data in the shipment control database and the changed board part number in the engineering change information;
[0063] Determine the vulnerability level matching the engineering change according to the vulnerability data in the warehouse management and control database and the vulnerability number in the engineering change information;
[0064] Determine the change urgency level that matches the engineering change according to the inventory data in the warehouse control database and the changed board part number in the engineering change information;
[0065] Determine the change level corresponding to the engineering change according to the customer level, vulnerability level, change urgency level and preset level assessment rules matched by the engineering change;
[0066] Generate an engineering change plan according to the change level corresponding to the engineering change and the engineering change information;
[0067] The engineering change plan is reviewed according to the change level corresponding to the engineering change, and the engineering change plan that has passed the review is imported for execution.
[0068] In a fifth aspect, the present application further provides a computer-readable storage medium, on which a computer program is stored, and the computer program enables a computer to perform the following operations:
[0069] In response to input of engineering change information of the engineering change, obtaining shipment data in the shipment control database, vulnerability levels in the vulnerability control database, and inventory data in the warehouse control database;
[0070] Determine a customer level matching the engineering change based on the shipment volume data in the shipment control database and the changed board part number in the engineering change information;
[0071] Determine the vulnerability level matching the engineering change according to the vulnerability data in the warehouse management and control database and the vulnerability number in the engineering change information;
[0072] Determine the change urgency level that matches the engineering change according to the inventory data in the warehouse control database and the changed board part number in the engineering change information;
[0073] Determine the change level corresponding to the engineering change according to the customer level, vulnerability level, change urgency level and preset level assessment rules matched by the engineering change;
[0074] Generate an engineering change plan according to the change level corresponding to the engineering change and the engineering change information;
[0075] The engineering change plan is reviewed according to the change level corresponding to the engineering change, and the engineering change plan that has passed the review is imported for execution.
[0076] The beneficial effects achieved by this application are:
[0077] The present application provides a method for processing engineering changes, including obtaining, in response to input of engineering change information of an engineering change, shipment data in a shipment control database, vulnerability levels in a vulnerability control database, and inventory data in a warehouse control database; determining a customer level matching the engineering change according to the shipment data in the shipment control database and the changed board part number in the engineering change information; determining a vulnerability level matching the engineering change according to the vulnerability data in the warehouse control database and the vulnerability number in the engineering change information; determining a change urgency level matching the engineering change according to the inventory data in the warehouse control database and the changed board part number in the engineering change information; determining a change level corresponding to the engineering change according to the customer level, vulnerability level, change urgency level matching the engineering change, and a preset level evaluation rule; generating an engineering change plan according to the change level corresponding to the engineering change and the engineering change information; reviewing the engineering change plan according to the change level corresponding to the engineering change and importing the reviewed and approved engineering change plan for execution. Reduce human-induced change levels and change plan evaluations, greatly improve review timeliness and reduce human omissions in engineering change reviews, improve the standardization of engineering audits, and greatly improve the efficiency of engineering changes from evaluation to execution. BRIEF DESCRIPTION OF THE DRAWINGS
[0078] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For those of ordinary skill in the art, other drawings can be obtained based on these drawings without creative work, among which:
[0079] Figure 1 It is a schematic diagram of an engineering change processing method provided in an embodiment of the present application;
[0080] Figure 2 This is a schematic diagram of an engineering change plan review provided in an embodiment of the present application;
[0081] Figure 3 It is a schematic diagram of the system architecture of an engineering change solution provided in an embodiment of the present application;
[0082] Figure 4 It is a structural diagram of an electronic device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0083] In order to make the purpose, technical solutions and advantages of this application clearer, the technical solutions in the embodiments of this application will be clearly and completely described below in conjunction with the drawings in the embodiments of this application. Obviously, the described embodiments are only part of the embodiments of this application, not all of them. Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0084] It should be understood that in the description of the present application, unless the context clearly requires otherwise, words such as "include", "comprises", and the like in the entire specification and claims should be interpreted as inclusive rather than exclusive or exhaustive; that is, the meaning of "including but not limited to".
[0085] It should also be understood that the terms "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance. In addition, in the description of this application, unless otherwise specified, "plurality" means two or more.
[0086] It should be noted that the terms "S1", "S2", etc. are only used for the purpose of describing the steps, and do not specifically refer to the order or sequence, nor are they used to limit the present application. They are only for the convenience of describing the method of the present application, and cannot be understood as indicating the order of the steps. In addition, the technical solutions between the various embodiments can be combined with each other, but they must be based on the ability of ordinary technicians in this field to implement them. When the combination of technical solutions is contradictory or cannot be implemented, it should be considered that such a combination of technical solutions does not exist and is not within the scope of protection required by the present application.
[0087] As described in the background technology, unlike traditional cognition, the current Internet customer "the larger the scale, the more standardized and universal the product" is based on deep customization. In order to squeeze every bit of system performance and reduce every possible cost, top-level and ultra-large-scale Internet customers tend to develop customized products for themselves based on their different application characteristics and business needs. This is a product customization that far exceeds the server product customization concept that emerged ten years ago, and has essentially become the definition of the product.
[0088] With deep customization as the premise, in order to squeeze every bit of system performance and reduce every possible cost, customization is diversified. For example, once there is new hardware that needs to be adapted and new demands that need to be met in the market, the corresponding boards will have many engineering changes, and the engineering changes of the boards will also be required to be imported efficiently and quickly. Traditional engineering change management solutions require manual evaluation of change plans, evaluation of import plans, and monitoring of the import time and effect, which will require a lot of manpower and material resources. However, the disadvantage caused by limited human energy is that the process of engineering changes is slow and requires multiple people to monitor and communicate. In this way, it cannot be guaranteed that engineering changes can be imported into production in a timely and efficient manner and quickly meet customer needs, and the efficiency is very low.
[0089] Therefore, this application proposes a method for processing engineering changes, which standardizes, streamlines and automates engineering changes, greatly reduces manual participation in change plan review, and enables engineering changes to be quickly issued and introduced into production.
[0090] Embodiment 1
[0091] The embodiment of the present application provides a method for processing engineering changes, which is applied to an engineering system. The system includes a product shipment control database, a warehouse control database, and a vulnerability level control database. Specifically, Figure 1 As shown, the method disclosed in the embodiment of the present application is used to realize automatic evaluation of engineering changes and import and execute change plans, including the following contents:
[0092] S1. In response to input of engineering change information of an engineering change, a grade assessment attribute matching the engineering change is determined according to shipment volume data in a shipment control database, vulnerability levels in a vulnerability control database, and inventory data in a warehouse control database.
[0093] In a specific implementation scenario, the embodiment of the present application proposes a more convenient and quick way to input engineering change information. The embodiment of the present application provides an interface for workers to fill in relevant engineering change information, such as a visual window or page. Among them, the input engineering change information includes a change information input field and a change information secondary input field; among them, the relevant information of the change information input field, the corresponding relationship with the internal name, the field input method, the field drop-down options and the remarks information are shown in Table 1 below:
[0094]
[0095]
[0096] Table 1
[0097] It is understandable that the above Table 1 is only for illustration purposes. The fields input in other embodiments are not limited to the above content. This application does not restrict the specific form format and input fields; among them, the above internal name is not a field that must be input, and can be set according to actual needs. The settings of the internal names in all the following tables are also not fields that must be input, and this application embodiment does not restrict this. The purpose of setting the internal name is to set the internal name directly when setting other rules in the engineering change processing process. For example, after the property is modified or adjusted, it will not affect the relevant rules set in the process or the operation of the process; and it is easy for the computer to recognize, so as to further speed up the speed of engineering changes.
[0098] In addition, regarding the setting of the drop-down items, as an example, the embodiment of the present application provides a setting provision:
[0099] (1) When the root cause of the change = material quality issues, the change type cannot be selected as "Firmware change" and the board usability before change cannot be selected as "Board needs to be refreshed before use before change";
[0100] (2) When the change type = "Firmware change", the board usability before change cannot be selected as "Rework materials before use before change";
[0101] (3) When the root cause of the change = "process improvement" or "function optimization" or "company policy change", the usability of the board before the change can only be selected as "the board can continue to be used before the change", and the planned import date of the change can only be selected as "no import requirement";
[0102] (4) When the change type = "Firmware change" and the card usability before the change is selected as "The card can continue to be used before the change", the firmware refresh method can only be selected as "No refresh required"
[0103] (5) When the change type = "Firmware change" and the board usability before change is selected as "Board before change needs to be scrapped", the firmware refresh method can only be selected as "Offline refresh".
[0104] In addition, it is worth noting that only when a specific option is selected when entering certain attributes in the change information input field, the embodiment of the present application will pull the secondary input field containing the change information, and the change information secondary input field will not be entered every time an engineering change is made; for details, please refer to Table 2, which is a change information secondary input table:
[0105] Table 2
[0106] It is worth noting that the above Table 2 is for illustration only. In other embodiments, the input fields are not limited to the above content. This application does not impose any restrictions on the specific table format and input fields.
[0107] Among them, Table 3 is as follows. When filling in the board change material list, Table 3 will automatically pop up for staff to input; Table 3 is also only an exemplary table. In specific implementation scenarios, the format of the table can be changed according to actual needs, and this application does not limit this.
[0108]
[0109]
[0110] Table 3
[0111] Among them, the newly added materials in Table 3 refer to the materials that need to be added to the changed board material list, the material number refers to the material coding in the system, the quantity refers to the number of materials that need to be added in the change, and the position refers to the position where the material is welded on the board. The number of corresponding pins must be filled in if the quantity is written here. Multiple positions can be separated by commas for system recognition. If more than one material is added or deleted in this change, you can click "Add a row" to add the content of the corresponding row; when changing the substitute material, you need to fill in the corresponding main material number first and then fill in the substitute material that can replace the main material. When filling in the main material, the system needs to check whether this material exists in the board material list and is the main material: if there is no such material in the material list, it is not allowed to add it. If this material already exists in the material list and is a substitute material, it is not allowed to add it; after the substitute material number is added, the system needs to verify whether this material already exists in the board material list: if the substitute material already exists in the material list, whether it exists as a main material or a substitute material, it is not allowed to add this material again.
[0112] After the person in charge of the engineering change inputs the relevant information of the engineering change, the system will automatically review the change level, automatically output the change plan and the change plan review process, so as to avoid logical errors in human selection of information on the input end and avoid human participation in the change level and change plan evaluation, so as to greatly improve the efficiency of change plan review, quickly take effect and be quickly introduced into production execution, and avoid defects such as insufficient human review.
[0113] After the engineering change information of this engineering change is input, the information related to the level assessment attributes in the input engineering change information (ie, the information contained in Table 1 and Table 2) is read, wherein the level assessment attributes include the customer level, the vulnerability level, and the change urgency level.
[0114] In a specific implementation scenario, the above-mentioned level assessment attributes that match the engineering change are determined, and the level assessment attributes that match the engineering change include at least customer level, vulnerability level and change urgency level, and the determination method includes: determining the customer level that matches the engineering change based on the shipment volume data in the shipment control database and the changed board part number in the engineering change information; determining the vulnerability level that matches the engineering change based on the vulnerability data in the warehouse control database and the vulnerability number in the engineering change information; determining the change urgency level that matches the engineering change based on the inventory data in the warehouse control database and the changed board part number in the engineering change information.
[0115] Specifically, according to the changed board part number in the input engineering change information, the target board model matching the changed board part number is searched in the product shipment control database; the target customer matching the target board model is queried, and the customer level of the target customer is determined according to the shipment data corresponding to the target board model and the preset customer level evaluation rules; according to the vulnerability number in the input engineering change information and the preset mapping relationship table, the vulnerability level matching the vulnerability number is searched in the vulnerability control database, wherein the vulnerability level is divided into one to four levels according to the severity, wherein the highest severity level is four; according to the changed board part number in the input engineering change information, the inventory data corresponding to the changed board part number is searched in the warehouse control database, the inventory data is the monthly consumption, monthly average consumption and inventory of all boards stored in the warehouse control database and other inventory-related data, and the above-searched inventory data at least includes the monthly average consumption and inventory; according to the found monthly average consumption and inventory corresponding to the changed board part number and the preset change emergency level evaluation rules, the change urgency level of the engineering change is determined. This application analyzes the important attributes that affect the change level assessment of engineering changes by analyzing the customer level, vulnerability level, and change urgency level, thereby further improving the accuracy of the change level assessment.
[0116] Among them, the above-mentioned shipment data is the shipment volume, shipment time, customer and other data corresponding to all boards and cards recorded in the shipment control data and data related to shipment. According to the shipment data corresponding to the target board and card model and the preset customer level evaluation rules, the customer level of the target customer is analyzed, specifically including: counting the product shipment volume and the first average shipment volume in the first preset period in the shipment data corresponding to the target board and card model, and sorting the long-term customers who have shipped according to the product shipment volume to obtain the first key customer; if there is a new customer whose shipment is less than the first preset period, then counting the second average shipment volume of the new customer in the second preset period; according to the first average shipment volume and the second average shipment volume, sorting the long-term customers and new customers to obtain the second key customer; counting the product shipment control data According to the total shipments of long-term customers and new customers in the third preset period in the database, the long-term customers and new customers are sorted according to the total shipments to obtain the third key customers; the key customers are assigned scores according to the rankings of each key user in the first key customer, the second key customer, and the third key customer, respectively, wherein the assigned scores decrease in sequence according to the ranking of the key users; the sum of the scores corresponding to the key users included in the first key customer, the second key customer, and the third key customer are calculated respectively, and the key customers whose sum of scores among the key users is ranked within the preset ranking are selected as the target key customers. Among them, the preset ranking can be set according to actual needs, preferably can be set to 5, and this application does not restrict the specific ranking.
[0117] Preferably, the first preset period can be set to one year, and the second preset period can be set to the time period between the second month when the new user starts shipping and the month before the date of importing the change plan. It can be understood that the second preset period is strongly related to the time when the new customer starts shipping, and the second preset periods corresponding to different new customers are not necessarily the same. New customers are new customers whose shipments in the product shipment control database do not meet the first preset period; the present application does not impose any restrictions on the specific first preset period; the third preset period is preferably set to three months before the date of importing the change plan, and can also be set according to actual needs, and the present application does not impose any restrictions on this; the first average shipments and the second average shipments are preferably monthly average shipments, and weekly average shipments can also be set according to actual needs.
[0118] Take a preferred example for illustration, wherein the first preset period is set to 1 year, the above-mentioned third preset period is set to three months before the date of importing the change plan, and the preset ranking is set to 5: the embodiment of the present application can count the product shipments in the first preset period in the product shipment control database, and define the long-term customers ranked in the top five in product shipments as the first key customers, recorded as ZTOP1=customer A1, ZTOP2=customer A2, ZTOP3=customer A3, ZTOP4=customer A4, ZTOP5=customer A5, and record the average shipments of long-term customers in the first month of the year; the embodiment of the present application also counts the shipments of each new customer and the shipments of long-term customers in the second preset period in the product shipment control database, and records the average shipments of new customers in the second month of the second preset period. The average shipments of the first month and the average shipments of the second month are ranked together, and the customers ranked in the top five by average shipments (including long-term customers and new customers) are defined as the second key customers, and are recorded as JTOP1=customer B1, JTOP2=customer B2, JTOP3=customer B3, JTOP4=customer B4, and JTOP5=customer B5. The embodiment of the present application also queries the total shipments of each of the new customers in the product shipment monitoring system within three months (i.e., the third preset period) within these three months, and defines the customers ranked in the top five by total shipments as the third key customers, and are recorded as STOP1=customer C1, STOP2=customer C2, STOP3=customer C3, STOP4=customer C4, and STOP5=customer C5.
[0119] The above respectively calculates the sum of the scores corresponding to the key users included in the first key customer, the second key customer, and the third key customer, and selects the key customers whose total scores are ranked within the preset ranking as the target key customers. Specifically, each TOP1 of the first key customer, the second key customer, and the third key customer above can be scored 5 points, TOP2 4 points, TOP3 3 points, TOP4 2 points, TOP5 1 point 5, and the others are 0 points; the scores of all customers are counted, and finally the TOP5 customers with the highest total scores are recorded, and these TOP5 customers are marked as target key customers, that is, Customer 1 = key customer, Customer 2 = key customer, Customer 3 = key customer, Customer 4 = key customer, Customer 5 = key customer. This application selects multiple cycles and combines different evaluation criteria to achieve the screening of key customers, thereby improving the accuracy of the target key customers finally screened, and further improving the accuracy of the subsequent engineering change level assessment.
[0120] The specific process of determining the vulnerability level is determined by querying the pre-set mapping relationship table stored in the vulnerability level control database. The data in the vulnerability level control database are problems found by testers, R&D personnel, technical personnel, quality personnel, customer service personnel, and engineering personnel in testing, production, and customer sites. After submitting to the vulnerability level control database, analysis and resolution, solution verification, and vulnerability closure activities are carried out. In the database, the vulnerability level is divided into four levels: level one, level two, level three, and level four, according to the impact of the vulnerability on product functions and performance, the impact on customers, and the obstruction of subsequent board activities (including production, testing, etc.). The severity increases in turn, and can be divided according to the following rules:
[0121] Level 1: Minor problems that cause inconvenience to customers but do not affect usage or important functions.
[0122] Level 2: The system functions properly but the performance or response time is slow; erroneous intermediate results may appear but will not affect the final result; or the impact is limited; low-risk vulnerabilities may occur.
[0123] Level 3: Hardware may be lost or lost probabilistically; data may be lost or damaged due to software errors, resulting in system errors and system data corruption; some functions may be unavailable; medium-risk security vulnerabilities may occur.
[0124] Level 4: The entire system may crash or freeze, rendering it unusable; there may be serious problems such as irreparable data loss, damage, or memory leakage; or there may be high-risk security vulnerabilities.
[0125] The above mapping relationship table is shown in Table 4. It can be queried in this database according to the vulnerability number in the change. Different vulnerability numbers correspond to specific vulnerabilities. The above mapping relationship table specifically shows the relationship between the specific vulnerability description and the vulnerability level, which corresponds to confirming the level of the vulnerability. The system records the changed vulnerability level and returns the value to the vulnerability level field.
[0126]
[0127]
[0128] Table 4
[0129] Among them, according to the monthly average consumption and inventory corresponding to the changed board part number found and the preset change emergency level assessment rules, the change emergency level of the engineering change is determined, including: obtaining the monthly average consumption and inventory of the board matching the changed board part number, wherein the inventory is the inventory data obtained by querying the changed board part number; calculating the remaining days according to the current date of submitting the engineering change and the change plan import date according to the input engineering change information; calculating the consumable amount according to the remaining days and the monthly average consumption; comparing the consumable amount with the inventory to determine the change emergency level of the engineering change, and the change emergency level includes the emergency level and the general level. Specifically, if the consumable amount is greater than the inventory, the change emergency level of the engineering change is determined to be the general level; if the consumable amount is less than or equal to the inventory, the change emergency level of the engineering change is determined to be the emergency level; if the monthly average consumption quantity and the inventory are both zero, or the inventory is also zero, the change emergency level of the engineering change is determined to be the general level. This application determines whether the current project is urgent by comparing consumption and inventory, and provides a simple and quick method for judging the urgency level of changes, which speeds up the judgment of the urgency level of project changes and further speeds up the entire project change processing process.
[0130] Among them, the specific method for calculating the consumable quantity is to query the board material consumption in the warehouse management and control database according to the changed board part number in the engineering change process, query the monthly consumption quantity of the board according to the month of the natural year, and record the monthly average consumption quantity, recorded as Y; compare the "change plan import date" in the change input information with the current date of submitting the engineering change, calculate the specific number of days, recorded as T, and the consumable quantity is recorded as X, then X=T / 30 (a month is calculated as 30 days)*Y.
[0131] S2. Determine the change level corresponding to the engineering change based on the acquired level assessment attributes and preset level assessment rules.
[0132] Specifically, the above-mentioned change levels include major changes and general changes. According to the obtained level assessment attributes and the preset level assessment rules, the change level corresponding to the engineering change is determined, including: in response to the target customer being a key target customer, the change level corresponding to the engineering change is determined to be a major change; in response to the change emergency level of the engineering change being an emergency level, the change level corresponding to the engineering change is determined to be a major change; in response to the vulnerability level being level four or level three, the change level corresponding to the engineering change is determined to be a major change. This application evaluates the change level of engineering changes from multiple dimensions based on the level assessment attributes, which increases the accuracy and comprehensiveness of the judgment of the engineering change level.
[0133] Specifically, the change level corresponding to the engineering change determined above also includes a supplementary judgment rule: in response to the input engineering change information, the root cause of the change is the first specific reason, determining whether the remaining days are less than or equal to the preset threshold; if the remaining days are less than or equal to the preset threshold, the change level corresponding to the engineering change is determined to be a major change; if the remaining days are greater than the preset threshold and the first specific reason is a material quality problem, the usability of the board before the change is obtained; if the usability of the board before the change is that the board before the change needs to be scrapped or the material needs to be reworked before the change, the change level corresponding to the engineering change is determined to be a major change; if the remaining days are greater than the preset threshold and the first specific reason is not a material quality problem, the change level corresponding to the engineering change is determined to be a general change. It can be understood that in addition to the above-disclosed supplementary judgment rules, with the development of technology, those skilled in the art can also set other supplementary judgment rules according to actual scenarios, and this application does not restrict this. The above preset threshold can preferably be set to 10 days, and can also be set by those skilled in the art according to actual scenarios, and this application does not restrict this. In addition to evaluating the change level corresponding to the engineering change through the level evaluation attribute, some special rules are added to further improve the accuracy of the engineering change level evaluation.
[0134] S3. Generate an engineering change plan according to the change level corresponding to the engineering change and the engineering change information.
[0135] Specifically, the generation of the above engineering change plan may include the following rules:
[0136] (1) When the change level = major change, and the board usability before change is selected as "Boards before change need to be scrapped", the engineering change plan is: the inventory whole machine processing method is "rework", the online whole machine processing method is "rework", the inventory board processing method is "scrap", the customer service board library processing method is "scrap", the production board processing method is "scrap", and the return material review processing method must be filled in "scrap".
[0137] (2) When the change level = major change, the vulnerability level is "Level 3" or "Level 4", and the change type is not "Firmware Change", the engineering change plan is: the processing method for inventory complete machines is "Rework", the processing method for online complete machines is "Rework", the processing method for inventory boards is "Rework", the processing method for customer service board library is "Rework", the processing method for production boards is "Import immediately", and the processing method for returned material review is "Import all boards".
[0138] (3) When the change level = major change, the vulnerability level is "Level 3" or "Level 4", the change type is "Firmware Change", and the firmware refresh method is "Offline Refresh", the engineering change plan is: the inventory whole machine processing method is "Rework", the online whole machine processing method is "Rework", the inventory board processing method is "Rework", the customer service board library processing method is "Rework", the production board processing method is "Import Now", and the return material review processing method is "Import All Boards".
[0139] (4) When the change level = major change, the vulnerability level is "Level 3" or "Level 4", and the change type is "Firmware Change", and the firmware refresh method is "Online Refresh", the engineering change plan is: the inventory whole machine processing method is "Rework", the online whole machine processing method is "Online Refresh", the inventory board processing method is "Online Refresh", the customer service board library processing method is "Online Refresh", the production board processing method is "New Work Order Import", and the returned material review processing method is "All Boards Import".
[0140] (5) When the change level = major change, the change type is "firmware change", the vulnerability level is "level 1" or "level 2", and the firmware refresh method is "offline refresh", the engineering change plan is: the inventory whole machine processing method is "no processing required", the online whole machine processing method is "no processing required", the inventory board processing method is "rework", the customer service board library processing method is "rework", the production board processing method is "import immediately", and the return material review processing method is "import all boards".
[0141] (6)) When the change level = major change, the change type is "firmware change", the vulnerability level is "level 1" or "level 2", and the firmware refresh method is "online refresh", the engineering change plan is: the inventory whole machine processing method is "no processing required", the online whole machine processing method is "no processing required", the inventory board processing method is "online refresh", the customer service board library processing method is "online refresh", the production board processing method is "new work order import", and the return material review processing method is "all boards import".
[0142] (7) When the change level = major change, the change type is "firmware change", the vulnerability level is "level 1" or "level 2", and the firmware refresh method is "no refresh required", the engineering change plan is: the inventory whole machine processing method is "no processing required", the online whole machine processing method is "no processing required", the inventory board processing method is "rework", the customer service board library processing method is "rework", the production board processing method is "import immediately", and the return material review processing method is "import all boards".
[0143] (8) When the change level = major change, the change type is not "firmware change", and the vulnerability level is "level 1" or "level 2", the engineering change plan is: the inventory whole machine processing method is "no processing required", the online whole machine processing method is "no processing required", the inventory board processing method is "rework", the customer service board library processing method is "rework", the production board processing method is "import immediately", and the return material review processing method is "import all boards".
[0144] (9) When the change level = general change, and the change type is not "substitute material change", the engineering change plan is: the inventory whole machine processing method is "no processing required", the online whole machine processing method is "no processing required", the inventory board card processing method is "no processing required", the customer service board card library processing method is "no processing required", the production board card processing method is "new work order import", and the returned material review processing method is "no processing required".
[0145] (10) When the change level = general change, and the change type is selected as "substitute material change", the engineering change plan is: the inventory whole machine processing method is "no processing required", the online whole machine processing method is "no processing required", the inventory board card processing method is "no processing required", the customer service board card library processing method is "no processing required", the production board card processing method is "no processing required", and the returned material review processing method is "no processing required".
[0146] (11) When the root cause of the change is not "Material quality issue", the engineering change plan is: Material handling method is "No handling required"
[0147] (12) When the root cause of the change is selected as "Material Quality Issue" and the change type is not selected as "PCB Change", the engineering change plan is: the material handling method is "Return".
[0148] (13) When the root cause of the change is selected as "Material Quality Issue" and the change type is selected as "PCB Change", the engineering change plan is: the material handling method is "Scrap".
[0149] The above rules are all the rules that can be listed currently. It is not ruled out that new rules will be added with the development of technology, and this application does not limit this.
[0150] S4. Review the engineering change plan according to the change level corresponding to the engineering change and import the approved engineering change plan for execution.
[0151] Specifically, select an appropriate review plan based on the change level of the engineering change. For engineering changes assessed as general changes, no review is required and they will take effect upon submission; Figure 2As shown, for major changes, in order to reduce the serious consequences of problems that may exist in major changes, this application proposes to establish an approval process after the engineering change plan assessed as a major change is submitted. The specific logic includes:
[0152] A project management and control team is established based on the project members when the project or product is established. The review roles set in the team must include: R&D, quality representative, procurement representative, engineering representative, product manager, and production representative, and at least one staff member is added to each of the above roles. If the corresponding personnel need to sign off after the change is submitted, it is only necessary to grab the corresponding personnel from the corresponding role in the team to review the change, and there is no need to manually add sign-off personnel.
[0153] This application also provides a preferred audit scheme, including:
[0154] Calculate the audit score for each auditor based on the type, quantity, speed, accuracy, years of experience, and other factors of the engineering assessment plans that the auditor corresponding to each role has reviewed in the past. The specific calculation process of the audit score can be achieved by training a deep model, which is not limited in this application.
[0155] For each audit role, the audit scores of multiple auditors corresponding to the audit role are obtained, and the audit levels of the auditors are divided according to the audit scores of each auditor, and the audit levels are associated with the degree of major changes in the engineering change. For the engineering change that has been defined as a major change, the degree of major change can be further refined according to the difficulty of the engineering change plan;
[0156] When reviewing an engineering change plan, after determining the review role required at the current node, find a staff member with a review level that matches the even-numbered engineering change degree based on the degree of major change in the engineering change plan;
[0157] If the staff at the currently determined audit level are unable to conduct the audit, the audit will be postponed to the staff at the next audit level.
[0158] By dividing the levels of auditors, it is possible to select auditors for detailed engineering change plans for major changes, improve the adaptability of auditors and engineering change plans, and further improve audit efficiency and accuracy.
[0159] This application automatically evaluates the engineering change level and automatically outputs the change plan rules so that when the engineering change is a "general change", the change submission and effectiveness can be quickly imported into production for execution. At the same time, engineering changes with a change level of "major changes" are screened out, so that engineering change engineers are only responsible for the approval of major changes and the back-end execution of major changes. The entire engineering change reduces the manual change level and change plan evaluation, greatly improves the review timeliness and reduces human omissions in the engineering change review, thereby improving product competitiveness and customer satisfaction.
[0160] Embodiment 2
[0161] Corresponding to the above-mentioned embodiment 1, as Figure 3 As shown, the embodiment of the present application also provides an engineering change processing system, including:
[0162] The engineering data preparation module 310 is used to obtain the shipment data in the shipment control database, the vulnerability level in the vulnerability control database, and the inventory data in the storage control database in response to the input of the engineering change information of the engineering change;
[0163] A change level assessment module 320, for determining a customer level matching the engineering change according to the shipment volume data in the shipment control database and the changed board part number in the engineering change information;
[0164] The change level assessment module 320 is further used to determine the vulnerability level matching the engineering change according to the vulnerability data in the warehouse management and control database and the vulnerability number in the engineering change information;
[0165] The change level assessment module 320 is further used to determine the change urgency level matching the engineering change according to the inventory data in the warehouse control database and the changed board part number in the engineering change information;
[0166] The change level assessment module 320 is further used to determine the change level corresponding to the engineering change according to the customer level, vulnerability level, change urgency level and preset level assessment rules matched by the engineering change;
[0167] A change plan generating module 330, configured to generate an engineering change plan according to the change level corresponding to the engineering change and the engineering change information;
[0168] The change plan review module 340 is used to review the engineering change plan according to the change level corresponding to the engineering change and import the engineering change plan that has passed the review for execution.
[0169] In some implementation scenarios, the change level assessment module 320 is also used to search for a target board model that matches the changed board part number in the input engineering change information in the product shipment control database; query target customers that match the target board model, and determine the customer level of the target customer based on the shipment data corresponding to the target board model and preset customer level assessment rules.
[0170] In some implementation scenarios, the change level assessment module 320 is also used to search for inventory data corresponding to the changed board part number in the input engineering change information in the warehouse management and control database, the inventory data including monthly average consumption and inventory; determine the change urgency level of the engineering change based on the found monthly average consumption and inventory corresponding to the changed board part number and preset change urgency level assessment rules.
[0171] In some implementation scenarios, the change level assessment module 320 is further used to count the product shipments and the first average shipments in the first preset period of the shipment data corresponding to the target board model, and sort the long-term customers of shipments according to the product shipments to obtain the first key customers; if there are new customers whose shipments are less than the first preset period, count the second average shipments of the new customers in the second preset period; sort the long-term customers and new customers according to the first average shipments and the second average shipments to obtain the second key customers; count the products in the third preset period in the product shipment control database; The total shipment volume of long-term customers and new customers within the third preset period is respectively calculated, and the long-term customers and new customers are sorted according to the total shipment volume to obtain the third key customers; the key customers are assigned scores according to the ranking of each key user among the first key customers, the second key customers and the third key customers, wherein the assigned scores decrease in descending order according to the ranking of the key users; the sum of the scores corresponding to the key users included in the first key customers, the second key customers and the third key customers are calculated respectively, and the key customers whose sum of scores ranks within the preset ranking among the key users are selected as the target key customers.
[0172] In some implementation scenarios, the change level assessment module 320 is also used to obtain the average monthly consumption and inventory of boards that match the changed board part number; calculate the remaining days based on the current date of submitting the engineering change and the change plan import date in the input engineering change information; calculate the consumable amount based on the remaining days and the average monthly consumption; compare the consumable amount with the inventory to determine the change urgency level of the engineering change, and the change urgency level includes an emergency level and a general level.
[0173] In some implementation scenarios, the change plan generation module 330 is also used to determine that the change level corresponding to the engineering change is a major change in response to the target customer being a target key customer; in response to the change urgency level of the engineering change being an emergency level, determine that the change level corresponding to the engineering change is a major change; in response to the vulnerability level being level four or level three, determine that the change level corresponding to the engineering change is a major change.
[0174] In some implementation scenarios, the change plan generation module 330 is also used to determine whether the remaining days are less than or equal to a preset threshold in response to the input engineering change information having a first specific reason as the root cause of the change; if the remaining days are less than or equal to the preset threshold, the change level corresponding to the engineering change is determined to be a major change; if the remaining days are greater than the preset threshold and the first specific reason is a material quality problem, the usability of the board before the change is obtained; if the usability of the board before the change is that the board needs to be scrapped before the change or the material needs to be reworked before use, the change level corresponding to the engineering change is determined to be a major change; if the remaining days are greater than the preset threshold and the first specific reason is not a material quality problem, the change level corresponding to the engineering change is determined to be a general change.
[0175] Embodiment 3
[0176] Corresponding to the above-mentioned Embodiment 1 and Embodiment 2, when the computer program is executed by the processor, the steps of the method described below are implemented:
[0177] In response to input of engineering change information of the engineering change, obtaining shipment data in the shipment control database, vulnerability levels in the vulnerability control database, and inventory data in the warehouse control database;
[0178] Determine a customer level matching the engineering change based on the shipment volume data in the shipment control database and the changed board part number in the engineering change information;
[0179] Determine the vulnerability level matching the engineering change according to the vulnerability data in the warehouse management and control database and the vulnerability number in the engineering change information;
[0180] Determine the change urgency level that matches the engineering change according to the inventory data in the warehouse control database and the changed board part number in the engineering change information;
[0181] Determine the change level corresponding to the engineering change according to the customer level, vulnerability level, change urgency level and preset level assessment rules matched by the engineering change;
[0182] Generate an engineering change plan according to the change level corresponding to the engineering change and the engineering change information;
[0183] The engineering change plan is reviewed according to the change level corresponding to the engineering change, and the engineering change plan that has passed the review is imported for execution.
[0184] Embodiment 4
[0185] Corresponding to all the above embodiments, an embodiment of the present application provides an electronic device, including: one or more processors; and a memory associated with the one or more processors, the memory is used to store program instructions, and when the program instructions are read and executed by the one or more processors, the following operations are performed:
[0186] In response to input of engineering change information of the engineering change, obtaining shipment data in the shipment control database, vulnerability levels in the vulnerability control database, and inventory data in the warehouse control database;
[0187] Determine a customer level matching the engineering change based on the shipment volume data in the shipment control database and the changed board part number in the engineering change information;
[0188] Determine the vulnerability level matching the engineering change according to the vulnerability data in the warehouse management and control database and the vulnerability number in the engineering change information;
[0189] Determine the change urgency level that matches the engineering change according to the inventory data in the warehouse control database and the changed board part number in the engineering change information;
[0190] Determine the change level corresponding to the engineering change according to the customer level, vulnerability level, change urgency level and preset level assessment rules matched by the engineering change;
[0191] Generate an engineering change plan according to the change level corresponding to the engineering change and the engineering change information;
[0192] The engineering change plan is reviewed according to the change level corresponding to the engineering change, and the engineering change plan that has passed the review is imported for execution.
[0193] in, Figure 4 The architecture of the electronic device is exemplarily shown, which may include a processor 410, a video display adapter 411, a disk drive 412, an input / output interface 413, a network interface 414, and a memory 420. The processor 410, the video display adapter 411, the disk drive 412, the input / output interface 413, the network interface 414, and the memory 420 may be communicatively connected via a bus 430.
[0194] Among them, the processor 410 can be implemented by a general-purpose CPU (Central Processing Unit), a microprocessor, an application-specific integrated circuit (Application Specific Integrated Circuit, ASIC), or one or more integrated circuits, and is used to execute relevant programs to implement the technical solution provided in this application.
[0195] The memory 420 can be implemented in the form of ROM (Read Only Memory), RAM (Random Access Memory), static storage device, dynamic storage device, etc. The memory 420 can store an operating system 521 for controlling the execution of the electronic device 400, and a basic input and output system (BIOS) 422 for controlling the low-level operations of the electronic device 400. In addition, a web browser 423, a data storage management system 424, and an icon font processing system 425, etc. can also be stored. The above-mentioned icon font processing system 425 can be an application program that specifically implements the operations of the aforementioned steps in the embodiment of the present application. In short, when the technical solution provided in the present application is implemented by software or firmware, the relevant program code is stored in the memory 420 and is called and executed by the processor 410.
[0196] The input / output interface 413 is used to connect the input / output module to realize information input and output. The input / output module can be configured in the device as a component (not shown in the figure), or it can be externally connected to the device to provide corresponding functions. The input device may include a keyboard, a mouse, a touch screen, a microphone, various sensors, etc., and the output device may include a display, a speaker, a vibrator, an indicator light, etc.
[0197] The network interface 414 is used to connect to a communication module (not shown) to realize communication interaction between the device and other devices. The communication module can realize communication through a wired mode (such as USB, network cable, etc.) or a wireless mode (such as mobile network, WIFI, Bluetooth, etc.).
[0198] The bus 430 comprises a pathway for transmitting information between the various components of the device (eg, the processor 410, the video display adapter 411, the disk drive 412, the input / output interface 413, the network interface 414, and the memory 420).
[0199] In addition, the electronic device 400 can also obtain information on specific collection conditions from the virtual resource object collection condition information database for use in condition judgment, etc.
[0200] It should be noted that, although the above device only shows a processor 410, a video display adapter 411, a disk drive 412, an input / output interface 413, a network interface 414, a memory 420, a bus 430, etc., in the specific implementation process, the device may also include other components necessary for normal execution. In addition, it can be understood by those skilled in the art that the above device may also only include components necessary for implementing the solution of the present application, and does not necessarily include all the components shown in the figure.
[0201] It can be seen from the description of the above implementation methods that those skilled in the art can clearly understand that the present application can be implemented by means of software plus a necessary general hardware platform. Based on this understanding, the technical solution of the present application can essentially or in other words, the part that contributes to the prior art can be embodied in the form of a software product, which can be stored in a storage medium such as ROM / RAM, a disk, an optical disk, etc., including several instructions for a computer device (which can be a personal computer, a cloud service end, or a network device, etc.) to execute the methods of various embodiments of the present application or certain parts of the embodiments.
[0202] Embodiment 5
[0203] Corresponding to all the above embodiments, the embodiments of the present application further provide a computer-readable storage medium, characterized in that it stores a computer program, and the computer program enables a computer to perform the following operations:
[0204] In response to input of engineering change information of the engineering change, obtaining shipment data in the shipment control database, vulnerability levels in the vulnerability control database, and inventory data in the warehouse control database;
[0205] Determine a customer level matching the engineering change based on the shipment volume data in the shipment control database and the changed board part number in the engineering change information;
[0206] Determine the vulnerability level matching the engineering change according to the vulnerability data in the warehouse management and control database and the vulnerability number in the engineering change information;
[0207] Determine the change urgency level that matches the engineering change according to the inventory data in the warehouse control database and the changed board part number in the engineering change information;
[0208] Determine the change level corresponding to the engineering change according to the customer level, vulnerability level, change urgency level and preset level assessment rules matched by the engineering change;
[0209] Generate an engineering change plan according to the change level corresponding to the engineering change and the engineering change information;
[0210] The engineering change plan is reviewed according to the change level corresponding to the engineering change, and the engineering change plan that has passed the review is imported for execution.
[0211] Each embodiment in this specification is described in a progressive manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the system or system embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment. The system and system embodiments described above are merely schematic, in which the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules can be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative labor.
[0212] The above are only preferred embodiments of the present application and are not intended to limit the present application. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application should be included in the protection scope of the present application.
Claims
1. A method for handling engineering changes, It is characterized in that The method comprises: In response to input of engineering change information of the engineering change, obtaining shipment data in the shipment control database, vulnerability levels in the vulnerability control database, and inventory data in the warehouse control database; Determine a customer level matching the engineering change based on the shipment volume data in the shipment control database and the changed board part number in the engineering change information; Determine the vulnerability level matching the engineering change according to the vulnerability data in the warehouse management and control database and the vulnerability number in the engineering change information; Determine the change urgency level that matches the engineering change according to the inventory data in the warehouse control database and the changed board part number in the engineering change information; Determine the change level corresponding to the engineering change according to the customer level, vulnerability level, change urgency level and preset level assessment rules matched by the engineering change; Generate an engineering change plan according to the change level corresponding to the engineering change and the engineering change information; The engineering change plan is reviewed according to the change level corresponding to the engineering change, and the engineering change plan that has passed the review is imported for execution.
2. The method according to claim 1, It is characterized in that Determining the customer level matching the project according to the shipment volume data in the shipment control database and the changed board part number in the project change information includes: According to the changed board part number in the input engineering change information, searching the product shipment control database for a target board model that matches the changed board part number; Query the target customers matching the target board model, and determine the customer grade of the target customers according to the shipment data corresponding to the target board model and the preset customer grade evaluation rules.
3. The method according to claim 2 It is characterized in that The determining the change urgency level matching the engineering change according to the inventory data in the warehouse control database and the changed board part number in the engineering change information includes: searching the warehouse control database for inventory data corresponding to the changed board part number according to the input changed board part number in the engineering change information, wherein the inventory data includes monthly average consumption and inventory; The change urgency level of the engineering change is determined based on the found monthly average consumption and inventory corresponding to the changed board part number and a preset change urgency level assessment rule.
4. The method according to claim 2, It is characterized in that Determining the customer level of the target customer according to the shipment data corresponding to the target board model and a preset customer level evaluation rule includes: Counting the product shipments within a first preset period and the first average shipments in the shipment data corresponding to the target board model, and sorting the long-term customers of shipments according to the product shipments to obtain the first key customers; If there is a new customer whose shipment is less than the first preset period, the second average shipment volume of the new customer in the second preset period is counted; According to the first average shipment volume and the second average shipment volume, long-term customers and new customers are sorted to obtain second key customers; Counting the total shipment volumes of long-term customers and new customers in the product shipment control database within the third preset period within the third preset period, and sorting the long-term customers and new customers according to the total shipment volumes to obtain third key customers; assigning scores to the key customers according to the ranking of each key user among the first key customer, the second key customer, and the third key customer, wherein the assigned scores decrease in descending order according to the ranking of the key users; The sum of scores corresponding to the key users included in the first key customer, the second key customer, and the third key customer are calculated respectively, and the key customers whose sum of scores among the key users is ranked within the preset ranking are selected as target key customers.
5. The method according to claim 4, It is characterized in that The step of determining the change urgency level of the engineering change based on the found monthly average consumption and inventory corresponding to the changed board part number and a preset change urgency level assessment rule includes: Obtaining the monthly average consumption and inventory of boards matching the changed board part number; Calculate the remaining days according to the current date of submitting the engineering change and the change plan import date in the input engineering change information; Calculate the available consumption based on the remaining days and the average monthly consumption; The consumable quantity is compared with the inventory quantity to determine the change urgency level of the engineering change, where the change urgency level includes an emergency level and a general level.
6. The method according to claim 5, It is characterized in that The change level includes major changes and general changes. The change level corresponding to the engineering change is determined according to the acquired level assessment attributes and the preset level assessment rules, including: In response to the target customer being a target key customer, determining that the change level corresponding to the engineering change is a major change; In response to the change urgency level of the engineering change being an emergency level, determining that the change level corresponding to the engineering change is a major change; In response to the vulnerability level being level 4 or level 3, determining that the change level corresponding to the engineering change is a major change.
7. The method according to claim 6, It is characterized in that The determining of the change level corresponding to the engineering change also includes: In response to the input of the engineering change information, the root cause of the change is the first specific cause, determining whether the remaining days are less than or equal to a preset threshold; If the remaining number of days is less than or equal to the preset threshold, the change level corresponding to the engineering change is determined to be a major change; if the remaining number of days is greater than the preset threshold and the first specific reason is a material quality problem, the usability of the board before the change is obtained; If the usability of the board before the change is that the board needs to be scrapped before the change or the material needs to be reworked before use, then the change level corresponding to the engineering change is determined to be a major change; If the remaining number of days is greater than the preset threshold and the first specific reason is not a material quality issue, the change level corresponding to the engineering change is determined to be a general change.
8. An engineering change processing system, It is characterized in that The system comprises: An engineering data preparation module, for obtaining, in response to input of engineering change information of an engineering change, shipment data in a shipment control database, vulnerability levels in a vulnerability control database, and inventory data in a storage control database; A change level assessment module, used to determine the customer level matching the engineering change according to the shipment volume data in the shipment control database and the changed board part number in the engineering change information; The change level assessment module is further used to determine the vulnerability level matching the engineering change according to the vulnerability data in the warehouse management and control database and the vulnerability number in the engineering change information; The change level assessment module is further used to determine the change urgency level matching the engineering change based on the inventory data in the warehouse control database and the changed board part number in the engineering change information; The change level assessment module is further used to determine the change level corresponding to the engineering change according to the customer level, vulnerability level, change urgency level and preset level assessment rules matched by the engineering change; A change plan generating module, used for generating an engineering change plan according to the change level corresponding to the engineering change and the engineering change information; The change plan review module is used to review the engineering change plan according to the change level corresponding to the engineering change and import the engineering change plan that has passed the review for execution.
9. An electronic device, It is characterized in that The electronic device comprises: one or more processors; And a memory associated with the one or more processors, the memory is used to store program instructions, and when the program instructions are read and executed by the one or more processors, the method according to any one of claims 1-7 is executed.
10. A computer-readable storage medium, It is characterized in that The computer program stores a computer program, wherein the computer program enables a computer to execute the method according to any one of claims 1 to 7.