Power station boiler water cooling wall state monitoring and failure early warning system and method

By arranging measurement devices on the boiler water-cooled wall, combined with finite element calculations and transfer learning models, a digital twin model is established to realize real-time monitoring and safety assessment of the boiler water-cooled wall, solving the problem that the existing technology cannot detect the safety of the boiler water-cooled wall in advance. hidden dangers and improve the accuracy of early warning.

CN118865640APending Publication Date: 2024-10-29XIAN THERMAL POWER RES INST CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202410986882.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-23
Publication Date
2024-10-29

AI Technical Summary

Technical Problem

The existing technology lacks online monitoring and intelligent early warning capabilities for boiler water-cooled walls. As a result, frequent starts and stops and low-load operation caused by deep peak shaving pose a threat to the safety of the water-cooled walls, making it impossible to detect safety hazards in advance.

Method used

A power plant boiler water-cooled wall condition monitoring and failure early warning system based on data-physics integration is adopted. By arranging a variety of measurement devices on the boiler water-cooled wall, combined with finite element calculation and transfer learning model, a digital twin model of the temperature field and stress field is established. Conduct real-time monitoring and safety assessment to achieve over-limit alarms and predictive alarms.

Benefits of technology

The early warning accuracy of the boiler water wall is greatly improved, its safety can be evaluated online, potential hazards can be discovered in advance, and the risk of accidents can be reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118865640A_ABST
    Figure CN118865640A_ABST
Patent Text Reader

Abstract

The utility boiler water cooling wall state monitoring and failure early warning system comprises an on-site acquisition system, an upper computer system and a network communication system, the field acquisition system comprises a plurality of measuring devices and a data acquisition device which are arranged on the water wall of the boiler; the data acquisition device is connected with the upper computer system through the network communication system; the upper computer system comprises a computer simulation system and a failure early warning system; calculating a simulation system to obtain a digital twinborn model comprising temperature field distribution and stress field distribution of the whole boiler water wall; the failure early warning system calculates simulation data based on field measurement point data to execute safety evaluation, and performs prediction and alarm; and on-line evaluation and intelligent failure early warning are carried out on the safety of the boiler water wall, so that the early warning accuracy is greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of status monitoring and safety assessment of in-service power station equipment, and relates to a system and method for status monitoring and failure early warning of a water-cooled wall of a power station boiler. Background Art

[0002] In recent years, with the need for the construction of new power systems, the role of thermal power units in power supply has also changed. From the perspective of national policy, thermal power units are encouraged to carry out flexibility transformation and participate in deep peak regulation. However, the frequent start and stop of units, long-term low-load operation, and rapid load increase and decrease brought about by deep peak regulation will have a great impact on the safe operation of important equipment of the unit, especially the boiler water-cooled wall, resulting in frequent accidents such as boiler water-cooled wall bursts, cracking, and deformation in recent years, which also pose a great threat to the safety of operators. At present, the treatment plan for boiler water-cooled wall accidents is mainly focused on increasing personnel inspections during operation, strengthening metal supervision and repair maintenance during maintenance, etc., but lacks online monitoring of the health status of boiler water-cooled walls, and cannot detect the existing safety hazards in advance and conduct assessments and real-time intelligent warnings. Based on this, it is very necessary to develop a system that measures the basic operating status data of boiler water-cooled walls and realizes the status monitoring and failure warning system of power station boiler water-cooled walls based on data-physical fusion. Summary of the invention

[0003] The purpose of the present invention is to overcome the shortcomings of the above-mentioned prior art and to provide a system and method for monitoring the state of the water-cooled wall of a power plant boiler based on data-physical fusion drive. The system and method can monitor the state of the water-cooled wall of a deep peak-shaving power plant boiler in real time, and perform online evaluation of its safety and intelligent failure warning.

[0004] A power station boiler water wall status monitoring and failure warning system, including a field acquisition system, a host computer system, and a network communication system; characterized in that:

[0005] The field acquisition system includes a variety of measuring devices and data acquisition devices arranged on the boiler water-cooled wall;

[0006] The multiple measuring devices include: a plurality of temperature measuring devices (21, 22-2n), a plurality of strain measuring devices (31, 32-3n), a plurality of displacement measuring devices (41, 42-4n); and a plurality of vibration measuring devices (51, 52-5n).

[0007] The data acquisition device is connected to the host computer system through a network communication system;

[0008] The host computer system includes a computer simulation system and a failure warning system.

[0009] A computational simulation system (9) is used to establish a boiler water wall physical model based on the original input data and perform temperature field and stress field simulation calculations to obtain preliminary temperature field distribution and stress field distribution, and then use a transfer learning model to fuse the collected temperature, displacement, vibration, stress and other data to obtain a digital twin model including the temperature field distribution and stress field distribution of the entire boiler water wall;

[0010] The failure warning system is used to issue over-limit alarms based on on-site measurement point data and real-time calculation and simulation data; in addition, it can also perform safety assessments and issue predictive alarms based on on-site measurement point data and real-time calculation and simulation data.

[0011] A method for monitoring the status of a water wall of a power station boiler and for early warning of failure, characterized in that:

[0012] The steps include:

[0013] Step 1, inputting the original design parameters of the boiler water-cooled wall (1) into the calculation simulation system (9) for establishing the finite element stress calculation model of the boiler water-cooled wall (1) in step 3;

[0014] Step 2, analyzing and determining the temperature sensitive area, deformation sensitive area and vibration sensitive area of ​​the boiler water-cooled wall;

[0015] According to a set rule, a plurality of temperature measuring devices (21, 22-2n) are arranged on a boiler water-cooled wall (1) including a temperature sensitive area, a plurality of displacement measuring devices (41, 42-4n) are arranged on a boiler water-cooled wall (1) including a deformation sensitive area, and a plurality of vibration measuring devices (51, 52-5n) are arranged on a boiler water-cooled wall (1) including a vibration sensitive area;

[0016] Step 3: Based on finite element calculation and transfer learning model, a digital twin model of the temperature field distribution and stress field distribution of the entire boiler water wall is obtained;

[0017] Step 4: Perform over-limit alarm and prediction alarm based on on-site measurement point data and calculation simulation data.

[0018] The beneficial effects of the present invention are:

[0019] Compared with the prior art, the present invention designs a power plant boiler water-cooled wall state monitoring and failure warning system and method driven by data-physics fusion, wherein a digital twin model of the temperature field distribution and stress field distribution of the entire boiler water-cooled wall is obtained based on finite element calculation and transfer learning model; and further over-limit alarm and safety assessment and prediction are performed based on on-site measurement point data and digital twin model simulation data; online assessment and intelligent failure warning of the boiler water-cooled wall safety are performed, which greatly improves the accuracy of the warning. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a structural schematic diagram of the present invention;

[0021] Figure 2 It is the schematic diagram of the water-cooled wall in the AA direction;

[0022] Figure 3 It is a diagram of the method steps of the present invention;

[0023] Figure 4 is a process flow chart of the present invention;

[0024] In the figure: boiler water-cooled wall (1), temperature measuring device (21, 22-2n), strain measuring device (31, 32-3n), displacement measuring device (41, 42-4n), vibration measuring device (51, 52-5n), data acquisition device (61, 62-6n), switch system (7), control operation system (8), computer simulation system (9), failure warning system (10), water-cooled wall tube (11), fin (12), power supply system (13), power line (14). DETAILED DESCRIPTION

[0025] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0026] like Figure 1 As shown, a power station boiler water wall status monitoring and failure warning system includes a field acquisition system, a host computer system, and a network communication system.

[0027] The on-site data collection system includes a variety of measuring devices and data acquisition devices arranged on the boiler water-cooled wall.

[0028] A boiler water-cooled wall (1) to be monitored, which is composed of a water-cooled wall tube (11) and fins (12);

[0029] The multiple measuring devices include: a plurality of temperature measuring devices (21, 22-2n), a plurality of strain measuring devices (31, 32-3n), a plurality of displacement measuring devices (41, 42-4n); and a plurality of vibration measuring devices (51, 52-5n).

[0030] Several data acquisition devices (61, 62-6n) can be connected with a variety of measuring devices via data lines.

[0031] In order to facilitate signal detection on the entire structural surface of the water-cooled wall, a plurality of data acquisition devices (61, 62-6n) can be arranged in a distributed manner, wherein each data acquisition device can be connected to one or more of a temperature measuring device, a strain measuring device, a displacement measuring device, and a vibration measuring device through a data line, that is, the entire structural surface of the water-cooled wall is first divided into a plurality of array monitoring areas, and a data acquisition device is correspondingly arranged in each monitoring area. The data acquisition device can be connected to one or more of the temperature measuring device, the strain measuring device, the displacement measuring device, and the vibration measuring device according to the arrangement of the measuring points, and the connected measuring device can collect temperature, strain, displacement, and vibration data in the corresponding monitoring area in real time. The data acquired by each data acquisition device is transmitted to the network communication system through the network, wherein a wired or wireless network communication method can be adopted. A switch is arranged in the network communication system.

[0032] When a wired network is used, several data acquisition devices can be connected to the field bus to exchange data with the switch connected to the field bus; when a wireless network is used, several data acquisition devices can be connected to the ZigBee or WIFI network to communicate with the switch via the wireless network.

[0033] The switch is further connected to the host computer system.

[0034] In addition, it also has a power supply system that can provide power supply for the field acquisition system, host computer system, and network communication system.

[0035] When arranging the system,

[0036] A plurality of temperature measuring devices (21, 22-2n), a plurality of strain measuring devices (31, 32-3n), a plurality of displacement measuring devices (41, 42-4n), and a plurality of vibration measuring devices (51, 52-5n) are directly fixed or connected to the water-cooled wall tube (11) or fin (12) to be monitored through a positioning device;

[0037] A plurality of temperature measuring devices (21, 22-2n) are arranged in a temperature sensitive area of ​​a water-cooled wall tube (11) or a fin (12) of a boiler water-cooled wall (1);

[0038] A plurality of strain measuring devices (31, 32-3n) are arranged in a stress failure sensitive area of ​​a water-cooled wall tube (11) or a fin (12) of a boiler water-cooled wall (1);

[0039] A plurality of displacement measuring devices (41, 42-4n) are arranged in deformation sensitive areas of water-cooled wall tubes (11) or fins (12) of a boiler water-cooled wall (1);

[0040] A plurality of vibration measuring devices (51, 52-5n) are arranged in a vibration sensitive area of ​​a water-cooled wall tube (11) or a fin (12) of a boiler water-cooled wall (1);

[0041] The temperature measuring point devices (21, 22-2n), the strain measuring devices (31, 32-3n), the displacement measuring devices (41, 42-4n); and the vibration measuring devices (51, 52-5n) are arranged on the water-cooled wall tubes (11) or fins (12) to be monitored according to a set rule, and the other ends are connected to a plurality of distributed data acquisition devices (61, 62-6n) through data lines according to the set rule, and then connected to the host computer system through a switch system (7);

[0042] The host computer system includes a control operating system, a computer simulation system, and a failure warning system.

[0043] The control operating system (8) is used to provide functions such as human-computer interaction, data collection, data storage, statistical analysis, and system settings.

[0044] A computational simulation system (9) is used to establish a boiler water wall physical model based on the original input data and perform temperature field and stress field simulation calculations to obtain preliminary temperature field distribution and stress field distribution, and then use a transfer learning model to fuse the collected temperature, displacement, vibration, stress and other data to obtain a digital twin model including the temperature field distribution and stress field distribution of the entire boiler water wall;

[0045] The failure warning system is used to issue over-limit alarms based on on-site measurement point data and real-time calculation and simulation data; in addition, it can also perform safety assessments and issue predictive alarms based on on-site measurement point data and real-time calculation and simulation data.

[0046] like Figure 1 , Figure 2 As shown, a method for monitoring the status and early warning of failure of a power plant boiler water wall is provided, wherein the corresponding digital twin model of the boiler water wall is first calculated, and the steps are as follows:

[0047] Step 1, inputting the original design parameters of the boiler water-cooled wall (1) into the calculation simulation system (9) for establishing the finite element stress calculation model of the boiler water-cooled wall (1) in step 3;

[0048] Step 2, analyzing and determining the temperature sensitive area, deformation sensitive area and vibration sensitive area of ​​the boiler water-cooled wall;

[0049] According to a set rule, a plurality of temperature measuring devices (21, 22-2n) are arranged on a boiler water-cooled wall (1) including a temperature sensitive area, a plurality of displacement measuring devices (41, 42-4n) are arranged on a boiler water-cooled wall (1) including a deformation sensitive area, and a plurality of vibration measuring devices (51, 52-5n) are arranged on a boiler water-cooled wall (1) including a vibration sensitive area;

[0050] Step 3, obtaining a digital twin model of the temperature field distribution and stress field distribution of the entire boiler water-cooled wall;

[0051] 3-1, establish the finite element stress calculation model of the boiler water wall (1);

[0052] 3-2. Based on the finite element stress calculation model of the water-cooled wall (1), the temperature field calculation under the combustion-structure-fluid multi-field coupling is carried out to obtain the simulated temperature field distribution data, and the data is integrated with the collected real-time temperature measurement data through the transfer learning model to obtain the real-time temperature field distribution of the boiler water-cooled wall (1) based on the digital twin technology;

[0053] 3-3, based on the finite element stress calculation model of the water-cooled wall (1), the real-time temperature field distribution data of the boiler water-cooled wall (1) obtained in the above step 3-2 is applied to carry out stress field calculation under the action of thermal-solid coupling and obtain simulated stress field distribution data;

[0054] 3-4, according to the collected displacement and vibration measurement data of the deformation sensitive area and the vibration sensitive area, and combined with the simulated stress field distribution data in the above step 3-3, determine the stress failure sensitive area, and then arrange a number of strain measurement devices (31, 32~3n) in time to carry out real-time strain data collection;

[0055] 3-5, the simulated stress field distribution data in the above step 3-2 is integrated with the collected real-time stress measurement data through a transfer learning model, and the real-time stress field distribution of the entire boiler water-cooled wall (1) is obtained based on the digital twin technology; a digital twin model including the real-time temperature field distribution and the real-time stress field distribution of the entire boiler water-cooled wall is obtained;

[0056] Step 4: Perform over-limit alarm and prediction alarm based on on-site measurement point data and calculation simulation data;

[0057] 4-1, when the temperature, vibration and displacement values ​​of each measuring point of the boiler water-cooled wall (1) collected in real time are greater than the set thresholds a, b and c respectively, the power station boiler water-cooled wall state monitoring and failure early warning system (10) will generate a corresponding alarm signal;

[0058] 4-2, when the temperature value of any point on the real temperature field calculated by the calculation simulation system (9) exceeds the set temperature threshold d, the power station boiler water wall state monitoring and failure warning system (10) will generate a corresponding alarm signal.

[0059] 4-3, the calculation simulation system (9) combines the calculated real-time distribution data of the real stress field, the real-time displacement data collected by the displacement measuring device (41, 42~4n) and the real-time vibration data collected by the vibration measuring device (51, 52~5n) to predict and evaluate the safety of the boiler water-cooled wall (1). When the evaluation shows that there is a safety risk, the power station boiler water-cooled wall status monitoring and failure warning system (10) will generate a corresponding alarm signal.

[0060] Finally, it should be noted that the above description is only an explanation of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail, those skilled in the art can still modify the technical solutions described above or replace some of the technical features with equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A power station boiler water wall status monitoring and failure warning system, including a field acquisition system, a host computer system, and a network communication system; It is characterized in that The field acquisition system includes a variety of measuring devices and data acquisition devices arranged on the boiler water-cooled wall; The multiple measuring devices include: a plurality of temperature measuring devices (21, 22-2n), a plurality of strain measuring devices (31, 32-3n), a plurality of displacement measuring devices (41, 42-4n); and a plurality of vibration measuring devices (51, 52-5n). The data acquisition device is connected to the host computer system through a network communication system; The host computer system includes computer simulation system and failure warning system; A computational simulation system (9) is used to establish a boiler water wall physical model based on the original input data and perform temperature field and stress field simulation calculations to obtain preliminary temperature field distribution and stress field distribution, and then use a transfer learning model to fuse the collected temperature, displacement, vibration, stress and other data to obtain a digital twin model including the temperature field distribution and stress field distribution of the entire boiler water wall; The failure warning system is used to issue over-limit alarms based on on-site measurement point data and real-time calculation and simulation data; in addition, it can also perform safety assessments and issue predictive alarms based on on-site measurement point data and real-time calculation and simulation data.

2. According to the power plant boiler water wall status monitoring and failure warning system of claim 1, It is characterized in that A plurality of data acquisition devices (61, 62-6n) are connected to a plurality of measuring devices via data lines; the plurality of data acquisition devices (61, 62-6n) are arranged in a distributed manner, wherein each data acquisition device is connected to one or more of a temperature measuring device, a strain measuring device, a displacement measuring device, and a vibration measuring device via a data line.

3. According to the power plant boiler water wall status monitoring and failure warning system according to claim 2, It is characterized in that The entire structural surface of the water-cooled wall is divided into multiple array monitoring areas, and a data acquisition device is correspondingly set up in each monitoring area.

4. According to the power plant boiler water wall status monitoring and failure warning system according to claim 2, It is characterized in that The network communication system adopts wired or wireless network communication; when using a wired network, several data acquisition devices can be connected to the field bus to exchange data with the switch connected to the field bus; when using a wireless network, several data acquisition devices can be connected to the ZigBee or WIFI network to communicate with the switch through a wireless network.

5. According to the power plant boiler water wall status monitoring and failure warning system of claim 1, It is characterized in that A plurality of temperature measuring devices (21, 22-2n), a plurality of strain measuring devices (31, 32-3n), a plurality of displacement measuring devices (41, 42-4n), and a plurality of vibration measuring devices (51, 52-5n) are directly fixed or connected to the water-cooled wall tube (11) or fin (12) to be monitored through a positioning device.

6. According to the power plant boiler water wall status monitoring and failure warning system of claim 1, It is characterized in that The host computer system includes a control operating system; the control operating system (8) is used to provide human-computer interaction, data collection, data storage, statistical analysis, and system setting functions.

7. A method for monitoring the status and early warning of failure of water-cooled walls of power station boilers. It is characterized in that The steps include: Step 1, inputting the original design parameters of the boiler water-cooled wall (1) into the calculation simulation system (9) for establishing the finite element stress calculation model of the boiler water-cooled wall (1) in step 3; Step 2, analyzing and determining the temperature sensitive area, deformation sensitive area and vibration sensitive area of ​​the boiler water-cooled wall; According to a set rule, a plurality of temperature measuring devices (21, 22-2n) are arranged on a boiler water-cooled wall (1) including a temperature sensitive area, a plurality of displacement measuring devices (41, 42-4n) are arranged on a boiler water-cooled wall (1) including a deformation sensitive area, and a plurality of vibration measuring devices (51, 52-5n) are arranged on a boiler water-cooled wall (1) including a vibration sensitive area; Step 3: Based on finite element calculation and transfer learning model, a digital twin model of the temperature field distribution and stress field distribution of the entire boiler water wall is obtained; Step 4: Perform over-limit alarm and prediction alarm based on on-site measurement point data and calculation simulation data.

8. According to the power plant boiler water wall state monitoring and failure early warning method according to claim 7, It is characterized in that Step 3 includes: 3-1, establish the finite element stress calculation model of the boiler water wall (1); 3-2. Based on the finite element stress calculation model of the water-cooled wall (1), the temperature field calculation under the combustion-structure-fluid multi-field coupling is carried out to obtain the simulated temperature field distribution data, and the data is integrated with the collected real-time temperature measurement data through the transfer learning model to obtain the real-time temperature field distribution of the boiler water-cooled wall (1) based on the digital twin technology.

9. According to the power plant boiler water wall state monitoring and failure early warning method of claim 8, It is characterized in that Step 3 further includes: 3-3, based on the finite element stress calculation model of the water-cooled wall (1), the real-time temperature field distribution data of the boiler water-cooled wall (1) obtained in the above step 3-2 is applied to carry out stress field calculation under the action of thermal-solid coupling and obtain simulated stress field distribution data; 3-4, according to the collected displacement and vibration measurement data of the deformation sensitive area and the vibration sensitive area, and combined with the simulated stress field distribution data in the above step 3-3, determine the stress failure sensitive area, and then arrange a number of strain measurement devices (31, 32~3n) in time to carry out real-time strain data collection; 3-5. The simulated stress field distribution data in the above step 3-2 is integrated with the collected real-time stress measurement data through a transfer learning model, and the real-time stress field distribution of the entire boiler water-cooled wall (1) is obtained based on the digital twin technology; a digital twin model including the real-time temperature field distribution and the real-time stress field distribution of the entire boiler water-cooled wall is obtained.

10. The method for monitoring the status and early warning of failure of a water wall of a power plant boiler according to claim 7, It is characterized in that Step 4 includes: 4-1, when the temperature, vibration and displacement values ​​of each measuring point of the boiler water-cooled wall (1) collected in real time are greater than the set thresholds a, b and c respectively, the power station boiler water-cooled wall state monitoring and failure early warning system (10) will generate a corresponding alarm signal; 4-2, when the temperature value of any point on the real temperature field calculated by the calculation simulation system (9) exceeds the set temperature threshold d, the power station boiler water wall state monitoring and failure warning system (10) will generate a corresponding alarm signal; 4-3, the calculation simulation system (9) combines the calculated real-time distribution data of the real stress field, the real-time displacement data collected by the displacement measuring device (41, 42~4n) and the real-time vibration data collected by the vibration measuring device (51, 52~5n) to predict and evaluate the safety of the boiler water-cooled wall (1). When the evaluation shows that there is a safety risk, the power station boiler water-cooled wall status monitoring and failure warning system (10) will generate a corresponding alarm signal.

Citation Information

Cited By

  • Water-cooled wall high-temperature corrosion online monitoring system

    CN121540615A

  • Condition monitoring and failure early-warning system and method for boiler water-cooled wall of power station

    WO2026020623A1