A temperature control system and method for concrete pouring of gate piers
By setting up a cooling pipeline network and temperature matrix monitoring system in the gate pier, the temperature unevenness and hollowness in the cooling pipe during the concrete pouring of the gate pier are solved, and uniform cooling and strength improvement of the gate pier are achieved, avoiding temperature cracking and cooling The negative impact of pipeline network on strength.
Patent Information
- Application Number
- CN202411320690.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-23
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2044-09-23
AI Technical Summary
During the pouring process, the temperature rise caused by cement hydration heat, tensile stress is generated, and cracks are prone to occur. The existing cooling methods cannot effectively solve the problem that the cooling water pipe solidifies in the gate pier and the hollowness in the cooling pipe affects the strength.
Design a temperature control system for concrete pouring of gate piers, including water inlet pipe, return pipe and multiple cooling branches, and coolant circulation and cooling, use the temperature matrix to monitor temperature differences, adjust the flow rate, temperature and direction of coolant to form a uniform Cool the pipe network and pour the concrete into the cooling branch pipe after cooling to enhance the bonding strength.
The uniformity and strength of cooling and cooling are improved, the temperature cracking phenomenon is avoided, the integrity and strength of the gate pier are enhanced, and the impact of the cooling pipeline on the gate pier strength is reduced.
Smart Images

Figure CN118878347B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of water conservancy engineering, and in particular to a pier concrete pouring temperature control system and method. Background Art
[0002] As a more important part of water conservancy projects, the stability and strength of gate piers are of paramount importance. Gate piers are pier-type components in the gate chamber used to support gates, separate gate holes, and connect both sides. Gate pier concrete is a large-volume concrete, which is generally cast on site. In the actual engineering concrete pouring, cement releases a large amount of hydration heat during the hardening of concrete, and the internal temperature continues to rise, generating tensile stress on the surface, which cannot stretch freely, and generating tensile stress inside the concrete. As a brittle material, concrete has a low tensile strength. When the tensile stress generated is greater than its tensile strength, cracks will appear. Temperature cracks in sluice piers are very common. Cracks in pier concrete not only destroy the integrity of the pier structure, but also affect the durability and safety of water conservancy projects.
[0003] In the prior art, the gate pier is generally cooled by setting a cooling structure on the periphery of the gate pier. This cooling method can only cool the periphery, and the gate pier is huge in size. The peripheral cooling has no effect on the interior, which will cause a large temperature difference between the inside and the outside, and will cause new problems; or cooling water pipes are arranged inside the gate pier for cooling. This method is more reliable, but after cooling, the cooling water pipes will solidify inside the gate pier, and the hollow state of the cooling water pipes will affect the strength of the gate pier, or concrete is poured into the cooling water pipes to fill the cooling water pipes, but the concrete in the cooling water pipes cannot be combined with the concrete of the gate pier body, and the strength improvement is relatively limited.
[0004] Based on this, the present invention designs a gate pier concrete pouring temperature control system and method to solve the above problems. Summary of the invention
[0005] The purpose of the present invention is to provide a temperature control system and method for pouring gate pier concrete, so as to solve the problem proposed in the above background technology that after cooling, the cooling water pipe will solidify in the gate pier, and the hollow state of the cooling water pipe will affect the strength of the gate pier, and the cooling water pipe poured into the concrete filling cannot be combined with the gate pier body concrete, resulting in limited strength improvement.
[0006] To achieve the above-mentioned purpose, the present invention provides the following technical solution: comprising a water inlet main pipe, a return main pipe and a plurality of cooling branches, wherein the cooling branches comprise a water inlet pipe, a return pipe and a plurality of transverse pipes, wherein the two ends of the transverse pipes are respectively connected to the water inlet pipe and the return pipe, wherein the water inlet main pipe is connected to the water inlet pipes of all cooling branches, wherein the return main pipe is connected to the return pipes of all cooling branches, wherein the outer pipe of the transverse pipe is provided with a plurality of strengthening windows, wherein the inner side of the transverse pipe is rotatably connected to a plurality of sealing strips, wherein the sealing strips are located inside the strengthening windows and used to seal the strengthening windows , the sealing strip has synchronous rings fixedly connected at both ends, an inward-retracted tooth piece fixedly connected at the outer end of the synchronous ring, a plurality of connecting windows are provided on the outer tube walls of the water inlet pipe and the water return pipe, a plurality of sealing pieces are rotatably connected on the inner sides of the water inlet pipe and the water return pipe, the sealing pieces are located on the inner sides of the connecting windows and are used to close the sealing pieces, a positioning ring is fixedly connected at both ends of the sealing pieces, a plurality of driving rings are fixedly connected between the sealing pieces, a driving insert is fixedly connected to the bottom of the driving ring, the driving insert is located above the inward-retracted tooth piece and the two are meshed.
[0007] As a further solution of the present invention, a separation sheet is fixedly connected to the inner side of the reinforced window and the connecting window, one end of the separation sheet is fixedly connected to one side of the sealing strip and the blocking sheet, and the separation sheet is located between the reinforced window and the sealing strip.
[0008] As a further solution of the present invention, a plurality of reinforcing tubes are fixedly connected to the outer tube wall of the transverse tube, and the reinforcing tubes are hollow tubes.
[0009] As a further solution of the present invention, an external receiver is also included, and a reinforcing rib is fixedly connected between the water inlet pipe and the water return pipe. The reinforcing rib is in a broken line shape and temperature sensors are installed at the corners. The temperature sensor is electrically connected to the external receiver.
[0010] As a further solution of the present invention, one end of the transverse pipe close to the return pipe is fixedly connected with a limiting disk and slidably connected with an open disk, the open disk is located on the outside of the limiting disk, the disk surface of the limiting disk is provided with an offset window, the disk surface of the open disk is provided with a hollow window, the open disk is used to fit tightly with the limiting disk and close the offset window, and the driving ring is used to pull the open disk open.
[0011] As a further solution of the present invention, an extension handle is fixedly connected to the outer side of the open disk, a lower edge piece is fixedly connected to the bottom of the drive ring, an eccentric ring hook is fixedly connected to the bottom end of the lower edge piece, and the end of the eccentric ring hook passes through the extension handle, and the extension handle is pulled outward through the eccentric ring hook by the rotation of the drive ring.
[0012] As a further solution of the present invention, the top of the blocking piece is fixedly connected with an operating drum, which is located inside the water inlet pipe and the water return pipe and has a top lower than or flush with the top of the water inlet pipe and the water return pipe.
[0013] As a further solution of the present invention, a plurality of branch pipes are connected below the water inlet main pipe and the return main pipe, the branch pipes of the water inlet main pipe correspond one-to-one with the water inlet pipe and are connected, the branch pipes of the return main pipe correspond one-to-one with the return pipe and are connected, the bottom ends of the branch pipes are fixedly connected with mounting rings, the top ends of the water inlet pipe and the return pipe are fixedly connected with tower-type pipes, and the outer wall of the tower-type pipe is fixedly connected with a fixing ring.
[0014] As a further solution of the present invention, a plurality of mounting grooves are provided on the side wall of the mounting ring, a connecting hook is rotatably connected in the mounting groove, a fixing cylinder is threadedly connected to the outer wall of the branch pipe, a clamping ring which is open upward is fixedly connected to the bottom end of the fixing cylinder, the clamping ring is located on the inner side of the upper end of the connecting hook, and an anti-slip block is fixedly connected to the bottom end of the connecting hook and is used to hook the fixing ring.
[0015] A method for controlling the temperature of pier concrete pouring, comprising the following steps:
[0016] The cooling branches are evenly distributed in the gate pier, and adjacent cooling branches are arranged in a staggered manner. The water inlet pipes of all cooling branches are connected through the water inlet main pipe, and the water return pipes of all cooling branches are connected through the return main pipe to form a cooling pipe network;
[0017] When forming the cooling pipe network, a temperature matrix is formed. The water inlet pipe is connected to an external water pump, and the return pipe is connected to an external pump. The coolant is sent into the water inlet pipe through the external water pump and enters each cooling branch pipe. The coolant in each cooling branch pipe is extracted by the pump and collected in the return pipe for recycling, so that the coolant is circulated and cooled during concrete pouring.
[0018] When the coolant is circulating and cooling, the temperature at various locations is monitored through the temperature matrix, which serves as the basis for changing the flow rate, temperature and direction of the coolant. The difference between the coolant temperature and the temperature inside the gate pier is 20-25 degrees. When the temperature difference is greater than 20-25 degrees, the water flow rate is reduced or the water temperature is increased, or both are performed simultaneously. When the difference between the internal temperature of the gate pier and the external temperature of the gate pier is less than 15 degrees, the cooling water is stopped. When the temperature drop is greater than 4 degrees per day, the water flow rate is reduced or the water temperature is increased, or both are performed simultaneously. When the temperature difference between the cooling branches at both ends is greater than 4 degrees, the water direction is changed.
[0019] When the concrete is solidified and no longer needs cooling, extract the coolant from all cooling branches, remove the pump body, and blow air into all cooling branches through the water inlet pipe or return pipe to remove the remaining coolant as much as possible;
[0020] Remove the water inlet pipe and the return pipe, rotate the operating drum to drive all the sealing pieces to rotate and open the connecting window, and drive all the sealing strips to rotate through the drive ring and the meshing of the drive spline and the inward-adducting tooth piece to open the reinforced window;
[0021] Pour concrete into all cooling branches. The concrete fills the cooling branches and solidifies into one with the pier body concrete through the connecting windows and the reinforcing windows.
[0022] Compared with the prior art, the present invention has the following beneficial effects:
[0023] When the device is used, the cooling branches are evenly distributed in the gate pier to form a cooling network, which is evenly distributed in the gate pier in three dimensions, and the cooling network is distributed both vertically and horizontally, so that the cooling is more uniform and easy to control; when the coolant is circulating and cooling, the temperature of each place is monitored by the temperature sensor of the temperature matrix, and the water flow rate, water temperature and water direction of the coolant are controlled, so that the pouring temperature of the gate pier drops smoothly and evenly, avoiding temperature cracking in the solidification process, enhancing the integrity of the gate pier pouring and ensuring the strength of the gate pier.
[0024] The water inlet pipe and the water return pipe can become hollow pipe bodies whose side walls are connected to the outside world. The transverse pipe can also become a hollow pipe body whose side walls are connected to the outside world. Concrete is poured into all cooling branch pipes. The concrete fills the cooling branch pipes and solidifies into one with the concrete of the gate pier body through the connecting windows and the reinforcing windows, thereby enhancing the combination effect of the cooling pipe network and the gate pier, minimizing the influence of the cooling pipe network on the strength of the gate pier while reducing the temperature. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a schematic diagram of the overall arrangement of the present invention from a side view;
[0026] Figure 2 It is a schematic diagram of the overall arrangement of the present invention from a top view;
[0027] Figure 3 This is a schematic diagram of the structure of the cooling branch pipe of the present invention from the front side perspective;
[0028] Figure 4 This is a schematic diagram of a half-section structure of a cooling branch pipe from the front perspective of the present invention;
[0029] Figure 5 The cooling branch pipe of the present invention Figure 4 A schematic diagram of the enlarged structure of the middle part A;
[0030] Figure 6 The cooling branch pipe of the present invention Figure 4 The schematic diagram of the enlarged structure of the middle B part;
[0031] Figure 7 It is a schematic diagram of the side half-section structure of the cooling branch return pipe of the present invention;
[0032] Figure 8 The cooling branch return pipe of the present invention Figure 7 The enlarged structural diagram of the middle C part;
[0033] Fig. 9 The cooling branch return pipe of the present invention Figure 7 The enlarged structural diagram of the middle D part;
[0034] Fig.10 This is a schematic diagram of a half-section structure of a cooling branch pipe according to the present invention from a top view;
[0035] Fig.11 The cooling branch pipe of the present invention Fig.10 The enlarged structural diagram of the middle E part;
[0036] Fig.12 This is a schematic diagram of the cooling branch pipe structure from the front perspective of the present invention;
[0037] Fig.13 It is a schematic diagram of the temperature matrix of the present invention.
[0038] In the accompanying drawings, the components represented by the reference numerals are listed as follows:
[0039] 1. Inlet pipe; 2. Return pipe; 3. Cooling branch pipe; 4. Inlet pipe; 5. Return pipe; 6. Horizontal pipe; 7. Reinforced window; 8. Sealing strip; 9. Synchronous ring; 10. Inward-retracted tooth piece; 11. Connecting window; 12. Blocking piece; 13. Positioning ring; 14. Drive ring; 15. Drive spline; 16. Separation piece; 17. Reinforced cylinder; 18. Reinforced rib; 19. Temperature sensor; 20. Restriction disk; 21. Open disk; 22. Offset window; 23. Hollow window; 24. Extended handle; 25. Lower edge piece; 26. Eccentric ring hook; 27. Operating drum; 28. Branch pipe; 29. Installation ring; 30. Tower-type pipe; 31. Fixing ring; 32. Installation groove; 33. Connecting hook; 34. Fixing cylinder; 35. Clamping ring; 36. Anti-slip block. DETAILED DESCRIPTION
[0040] See also Figure 1-13 The working principle of the technical solution provided by the present invention is as follows:
[0041] See also Figure 1-2In this device, the cooling branch pipe 3, the return main pipe 2 and the water inlet main pipe 1 are separately arranged. When cooling is completed, the return main pipe 2 and the water inlet main pipe 1 can be dismantled and recycled, which can save materials and reduce costs. When used specifically, the cooling branch pipes 3 are evenly distributed in the gate pier, and the adjacent cooling branch pipes 3 are staggered up and down. The water inlet pipes 4 of all cooling branch pipes 3 are connected through the water inlet main pipe 1, and the return pipes 5 of all cooling branch pipes 3 are connected through the return main pipe 2 to form a cooling pipe network, which is three-dimensionally and evenly distributed in the gate pier. The cooling pipe network is distributed vertically and horizontally through the arrangement of the water inlet pipe 4, the return pipe 5 and the transverse pipe 6, so that the cooling is more uniform and easy to control. Different from the prior art that only has vertical distribution, the arrangement spacing of the cooling branch pipes 3 can be determined according to the cooling radiation range of the cooling branch pipes 3, thereby reducing the temperature difference between the cooling branch pipes 3, so that the gate pier pouring cooling is more uniform and the solidification effect is good.
[0042] See also Figure 1-2 , 13, forming a cooling network and a temperature matrix at the same time, connecting the water inlet main pipe 1 with an external water pump, connecting the return main pipe 2 with an external water pump, sending cooling liquid into the water inlet main pipe 1 through the external water pump and entering each cooling branch pipe 3, extracting the cooling liquid in each cooling branch pipe 3 through the water pump and collecting it in the return main pipe 2 for recovery, and then circulating the cooling liquid during concrete pouring; more conveniently, the water from the river where the gate pier is located can be directly used for cooling, and it is more convenient to use local materials; in order to control more conveniently and accurately, a range can be enclosed or a circulation pool can be built separately, the water at the location of the gate pier can be enclosed or introduced into the pool, and a heating structure can be provided to facilitate the subsequent water temperature control, or the water that has been used for cooling can be discharged into the enclosed range or the pool for mixing to increase the cooling water temperature. The specific setting method can be adapted to local conditions, so as to achieve the purpose of convenience, energy saving and control.
[0043] See also Fig.13, when the coolant is circulating and cooling, the temperature sensors 19 of the temperature matrix monitor the temperature at various locations, and the data of the temperature sensors 19 at various locations are received through the external receiver and the temperature at various temperature sensors 19 is displayed according to the temperature matrix. The external receiver is also equipped with a display screen to view the data of the temperature sensor 19 at any time; the difference between the coolant temperature and the temperature inside the gate pier is controlled within a range of 20-25 degrees. When the temperature difference is greater than 20-25 degrees, the water flow rate is reduced or the water temperature is increased, or both are performed at the same time. When the difference between the internal temperature of the gate pier and the external temperature of the gate pier is less than 15 degrees, the cooling water is stopped. When the temperature drop of the gate pier is greater than 4 degrees per day, the water flow rate is reduced or the water temperature is increased, or both are performed at the same time. When the temperature difference of the cooling branch pipes 3 at both ends is greater than 4 degrees, the water flow direction is changed, so that the pouring temperature of the gate pier drops smoothly and evenly, avoiding the temperature cracking phenomenon in the solidification process, enhancing the integrity of the gate pier pouring and ensuring the strength of the gate pier. While the temperature sensor 19 is supported and installed by the reinforcing rib 18, the reinforcing rib 18 enters the gate pier together during pouring, thereby enhancing the connection strength.
[0044] See also Figure 3-4 7-8. When the concrete is solidified and no longer needs to be cooled, the coolant in all cooling branches 3 is extracted, the pump body is removed, and air is blown into all cooling branches 3 through the water inlet pipe 1 or the return pipe 2 to remove the remaining coolant; the water inlet pipe 1 and the return pipe 2 are removed, and the operating drum 27 is operated to leak out. At this time, the operating drum 27 can be rotated to drive all the blocking pieces 12 to rotate and then open the connecting window 11, so that the water inlet pipe 4 and the return pipe 5 become hollow pipes with side walls communicating with the outside world. When the blocking piece 12 rotates, it also drives all the driving rings 14 to rotate. The driving ring 14 The driving insert 15 at the bottom is rotated to rotate the inward-retracted tooth piece 10, and then the sealing strips 8 in all the transverse tubes 6 are driven to rotate through the synchronous ring 9, and the reinforcement windows 7 of all the transverse tubes 6 are opened, so that the transverse tubes 6 also become hollow tube bodies whose side walls are connected to the outside. At this time, concrete is poured into all the cooling branch pipes 3. The concrete fills the cooling branch pipes 3 and solidifies into one with the concrete of the gate pier body through the connecting windows 11 and the reinforcement windows 7, thereby enhancing the combination effect of the cooling pipe network and the gate pier, and minimizing the influence of the cooling pipe network on the strength of the gate pier while cooling.
[0045] At the same time, a reinforcement tube 17 is provided on the outer wall of the transverse tube 6. When the gate pier is poured, concrete is poured into the reinforcement tube 17, thereby enhancing the bonding strength between the outer tube body of the cooling branch pipe 3 and the gate pier body. After the concrete is poured inside the tube body, the bonding strength between the inner sealing strip 8 and the sealing piece 12 and the gate pier body is enhanced through the connecting window 11 and the reinforcement window 7. At the same time, the entire cooling branch pipe 3 is integrated into the gate pier in a mutually penetrating and embedded manner, thereby maximizing the bonding strength between the cooling pipe network and the gate pier.
[0046] See also Figure 8In order to make the rotation of the sealing strip 8 and the plugging piece 12 smoother, the sealing strip 8 and the plugging piece 12 are separated from the concrete of the gate pier body during pouring by the provided separation piece 16, so as to avoid adhesion, making the sealing strip 8 and the plugging piece 12 easier to rotate. During the rotation, the separation piece 16 can be peeled off from one side, so that the separation piece 16 is gradually folded and retracted in the reinforcement window 7 or the connecting window 11 during the rotation process, which not only ensures the reliable rotation of the sealing strip 8 and the plugging piece 12, but also can open the reinforcement window 7 or the connecting window 11 to form a hollow tube body. At the same time, when used as a sealed tube body during cooling, the separation piece 16 strengthens the sealing degree between the sealing strip 8 and the plugging piece 12 and the reinforcement window 7 or the connecting window 11, so as to ensure the sealing of the tube body during cooling and avoid leakage. When pouring concrete and passing cooling water, the separation piece 16 is arranged in the middle, and is supported both inside and outside, so as to avoid casting deformation and make the cooling pipe network unobstructed.
[0047] See also Figure 4-5 9-11. When cooling water is introduced for cooling, the water outlet cross-section of the transverse tube 6 is reduced by adding a limiting disk 20 and an open disk 21 at the water outlet end of the transverse tube 6, so that the transverse tube 6 has a thicker tube body that can cool a larger radiation range while limiting the water outlet flow of each transverse tube 6. During cooling, the limiting disk 20 and the open disk 21 are close to each other, which is conducive to the cooling water to flow back and forth in parallel along multiple transverse tubes 6 at the same time, and the return water is guided and diverted. When the flow rate is constant, if the return water volume is one hundred, each transverse tube 6 can only discharge ten due to the limitation of the water outlet cross-section, and then the water outlet is dispersed to each transverse tube 6, so that the water in each transverse tube 6 can also be effectively circulated and cooled, avoiding the incoming cooling water from directly flowing back from the bottom transverse tube 6, thereby improving the uniformity of cooling.
[0048] See also Figure 5 , 9 , 11, after cooling is completed, while the operating drum 27 is rotated, the lower edge piece 25 and the eccentric ring hook 26 below it are driven to rotate together through each driving ring 14, and the eccentric ring hook 26 rotates to pull the extension handle 24 toward the center direction of the return pipe 5, thereby making the open disk 21 away from the limiting disk 20. At this time, the offset window 22 and the hollow window 23 can communicate with each other. When pouring concrete inside the pipe body, the transverse pipe 6 is opened to the maximum extent, which is beneficial to the flow of concrete in the pipe body, and a gap between the open disk 21 and the limiting disk 20 can be filled with concrete, thereby improving the pouring mixing strength.
[0049] See also Figure 4 , 6, 12. When the branch pipes 28 of the water inlet main pipe 1 and the return main pipe 2 are connected with the water inlet pipe 4 and the return pipe 5, the tower-type pipe 30 is used to facilitate the connection of the branch pipe 28. At the same time, the inner end of the branch pipe 28 is provided with a downwardly open slope ring surface to facilitate the contact with the tower-type pipe 30 to form a surface contact, thereby enhancing the seal; when the branch pipe 28 is connected, the connecting hook 33 is in a free state. When connecting, the lower end can be freely opened and thus sleeved on the outside of the fixing ring 31. After the connection is completed, the fixing cylinder 34 is screwed downward, thereby driving the clamping ring 35 to move downward, thereby gradually pushing the upper end of the connecting hook 33 outward, and the bottom end of the connecting hook 33 is gradually retracted and lifted inward, thereby gradually tightening the fixing ring 31 upward, pressing the tower-type pipe 30 and the branch pipe 28, so that the connection between the two is more tightly connected and the sealing effect is better. It is more reliable and convenient to tighten and fix through the fixing cylinder 34, and the disassembly and connection are relatively simple, which is convenient for use and operation.
Claims
1. A temperature control system for pouring concrete of a pier, comprising a water inlet main pipe (1), a return main pipe (2) and a plurality of cooling branches (3), characterized in that: The cooling branch pipe (3) comprises an inlet pipe (4), a return pipe (5) and a plurality of transverse pipes (6); the two ends of the transverse pipe (6) are respectively connected to the inlet pipe (4) and the return pipe (5); the inlet main pipe (1) is connected to the inlet pipes (4) of all the cooling branch pipes (3); the return main pipe (2) is connected to the return pipes (5) of all the cooling branch pipes (3); the outer pipe of the transverse pipe (6) is provided with a plurality of reinforcement windows (7); the inner side of the transverse pipe (6) is rotatably connected to a plurality of sealing strips (8); the sealing strips (8) are located inside the reinforcement windows (7) and are used to seal the reinforcement windows (7); the two ends of the sealing strips (8) are fixedly connected to synchronization rings (9); the outer end of the synchronization ring (9) is fixedly connected to an inward-retracting tooth piece (10); the outer pipe wall of the inlet pipe (4) and the return pipe (5) A plurality of connection windows (11) are provided, and a plurality of blocking pieces (12) are rotatably connected to the inner sides of the water inlet pipe (4) and the water return pipe (5). The blocking pieces (12) are located inside the connection windows (11) and are used to seal the blocking pieces (12). Positioning rings (13) are fixedly connected to both ends of the blocking pieces (12). A plurality of driving rings (14) are fixedly connected between the blocking pieces (12). A driving insert (15) is fixedly connected to the bottom of the driving ring (14). The driving insert (15) is located above the inward-retracted tooth piece (10) and the two are meshed. An operating rotary drum (27) is fixedly connected to the top of the blocking piece (12). The operating rotary drum (27) is located inside the water inlet pipe (4) and the water return pipe (5) and the top of the operating rotary drum is lower than or flush with the top of the water inlet pipe (4) and the water return pipe (5).
2. A pier concrete pouring temperature control system according to claim 1, characterized in that: A separation sheet (16) is fixedly connected to the inner sides of the reinforcing window (7) and the connecting window (11); one end of the separation sheet (16) is fixedly connected to the sealing strip (8) and one side of the blocking sheet (12); and the separation sheet (16) is located between the reinforcing window (7) and the sealing strip (8).
3. A pier concrete pouring temperature control system according to claim 1, characterized in that: A plurality of reinforcing tubes (17) are fixedly connected to the outer tube wall of the transverse tube (6), and the reinforcing tubes (17) are hollow tubes.
4. A pier concrete pouring temperature control system according to claim 1, characterized in that: It also includes an external receiver, wherein a reinforcing rib (18) is fixedly connected between the water inlet pipe (4) and the water return pipe (5), the reinforcing rib (18) is in a broken line shape and temperature sensors (19) are installed at the corners, and the temperature sensors (19) are connected to the external receiver by telecommunication.
5. A pier concrete pouring temperature control system according to claim 1, characterized in that: An end of the transverse pipe (6) close to the return pipe (5) is fixedly connected to a limiting disk (20) and slidably connected to an open disk (21); the open disk (21) is located outside the limiting disk (20); a dislocation window (22) is provided on the disk surface of the limiting disk (20); a hollow window (23) is provided on the disk surface of the open disk (21); the open disk (21) is used to fit tightly against the limiting disk (20) and close the dislocation window (22); and the drive ring (14) is used to pull the open disk (21) open.
6. A pier concrete pouring temperature control system according to claim 5, characterized in that: An extension handle (24) is fixedly connected to the outside of the open disk (21), a lower edge piece (25) is fixedly connected to the bottom of the drive ring (14), an eccentric ring hook (26) is fixedly connected to the bottom end of the lower edge piece (25), an end of the eccentric ring hook (26) passes through the extension handle (24), and the extension handle (24) is pulled outwards through the eccentric ring hook (26) by the rotation of the drive ring (14).
7. A pier concrete pouring temperature control system according to claim 1, characterized in that: A plurality of branch pipes (28) are connected below the water inlet main pipe (1) and the return main pipe (2). The branch pipes (28) of the water inlet main pipe (1) correspond to and are connected to the water inlet pipe (4) one by one. The branch pipes (28) of the return main pipe (2) correspond to and are connected to the return pipe (5) one by one. The bottom ends of the branch pipes (28) are fixedly connected to mounting rings (29). The top ends of the water inlet pipe (4) and the return pipe (5) are fixedly connected to tower-shaped pipes (30). The outer wall of the tower-shaped pipes (30) is fixedly connected to a fixing ring (31).
8. A pier concrete pouring temperature control system according to claim 7, characterized in that: The side wall of the mounting ring (29) is provided with a plurality of mounting grooves (32), a connecting hook (33) is rotatably connected in the mounting groove (32), a fixing cylinder (34) is threadedly connected to the outer wall of the branch pipe (28), an upwardly open pressing ring (35) is fixedly connected to the bottom end of the fixing cylinder (34), the pressing ring (35) is located on the inner side of the upper end of the connecting hook (33), and an anti-slip block (36) is fixedly connected to the bottom end of the connecting hook (33) and is used to hook the fixing ring (31).
9. A method for controlling the temperature of pier concrete pouring, comprising the control system according to any one of claims 1 to 8, characterized in that The following steps are involved: S1: The cooling branch pipes (3) are evenly distributed in the gate pier, and adjacent cooling branch pipes (3) are arranged in a staggered manner up and down. The water inlet pipes (4) of all cooling branch pipes (3) are connected through the water inlet main pipe (1), and the water return pipes (5) of all cooling branch pipes (3) are connected through the return main pipe (2), so as to form a cooling pipe network; S2: A temperature matrix is formed while forming a cooling pipe network. The water inlet main pipe (1) is connected to an external water pump, and the return main pipe (2) is connected to an external pump. The cooling liquid is fed into the water inlet main pipe (1) and enters each cooling branch pipe (3) through the external water pump. The cooling liquid in each cooling branch pipe (3) is extracted by the pump and collected in the return main pipe (2) for recovery, thereby circulating the cooling liquid during concrete pouring. S3: When the coolant is circulating and cooling, the temperature at each location is monitored through the temperature matrix, which is then used as a basis for changing the flow rate, flow temperature and flow direction of the coolant. The difference between the coolant temperature and the temperature inside the gate pier is 20-25 degrees. When the temperature difference is greater than 20-25 degrees, the flow rate is reduced or the water temperature is increased, or both are performed simultaneously. When the difference between the temperature inside the gate pier and the temperature outside the gate pier is less than 15 degrees, the cooling water is stopped. When the temperature drop is greater than 4 degrees per day, the flow rate is reduced or the water temperature is increased, or both are performed simultaneously. When the temperature difference between the cooling branches (3) at both ends is greater than 4 degrees, the water direction is changed. S4: When the concrete is solidified and no longer needs to be cooled, the coolant in all cooling branch pipes (3) is extracted, the pump body is removed, and air is blown into all cooling branch pipes (3) through the water inlet pipe (1) or the return pipe (2) to remove the remaining coolant; S5: Remove the water inlet pipe (1) and the return pipe (2), rotate the operating drum (27) to drive all the blocking pieces (12) to rotate and open the connecting window (11), and drive all the sealing strips (8) to rotate through the drive ring (14) through the engagement of the drive insert (15) and the inward-retracted tooth piece (10), thereby opening the reinforced window (7); S6: pouring concrete into all cooling branch pipes (3); the concrete fills the cooling branch pipes (3) and solidifies into one with the concrete of the gate pier body through the connecting window (11) and the reinforcing window (7).
Citation Information
Patent Citations
Construction method and device for water cooling of gate pier large volume concrete of tide gate
CN107905232A
Temperature control system and method for concrete gate pier pouring process
CN109797719A
Apparatus for cooling placed concrete of bridge pier of composite steel pipe-concrete structure
JP2011032658A
Anti-cracking method and Anti-cracking structure for pouring ship lock floor in strong constraint area of bedrock
WO2024174551A1