Steel box girder installation construction method

Through precise pre-embedded column foot anchor bolts, supporting steel column installation and plate rubber support setting, and pre-assembly of steel box girders on the ground, the low accuracy, low efficiency and safety risks in traditional steel box girder installation methods are solved. The problem is that efficient and safe installation of steel box girders has been achieved, improving the overall performance and structural stability of the bridge.

CN118880738AInactive Publication Date: 2024-11-01CHINA CONSTR SECOND ENG BUREAU LTD +1
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202410918914.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-10
Publication Date
2024-11-01
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Traditional steel box girder installation methods have problems of low accuracy, low efficiency, waste of materials and safety risks. Especially when the bridge span is large and the structure is complex, it affects the construction progress and quality and may lead to hidden dangers of structural stability and safety. .

Method used

Accurate anchor positioning of pre-embedded column foot bolts, efficient support steel column installation, stable plate rubber support setting, and pre-assembly of steel box girders on the ground, combining total station site stake, car crane lifting and four-sided circumference The installation method of fillet welds for welding, optimize the construction process to improve accuracy and efficiency, and reduce material waste and safety risks.

Benefits of technology

It significantly improves the accuracy and construction efficiency of steel box girder installation, reduces material waste and safety risks, improves the overall performance and structural stability of the bridge, and ensures construction safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118880738A_ABST
    Figure CN118880738A_ABST
Patent Text Reader

Abstract

The invention discloses a steel box girder installation and construction method which ensures the installation and construction quality and the service life of a steel box girder through the steps of accurate paying-off, stable anchor bolt pre-embedding, accurate steel column installation, stable support installation, accurate steel box girder splicing and installation and effective anti-corrosion coating. And the mounting precision and the construction efficiency of the steel box girder are obviously improved. The novel method is beneficial to reducing material waste, and the safety risk caused by high-altitude operation and heavy equipment operation can be greatly reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of bridge construction, and in particular relates to a steel box girder installation construction method. Background Art

[0002] In the field of bridge construction, the installation of steel box girders is a key step. However, traditional installation methods have many problems, such as low precision, low efficiency, material waste and safety risks. These problems not only affect the construction progress and quality, but also may lead to hidden dangers of bridge structure stability and safety. In order to solve these problems, the present invention proposes a new steel box girder installation construction method, which aims to improve construction accuracy and efficiency, reduce material waste, and ensure construction safety.

[0003] The traditional method of installing steel box girders mainly relies on manual measurement and positioning, which makes it difficult to ensure accuracy. Especially when the bridge span is large and the structure is complex, even a small deviation may have a significant impact on the overall performance of the bridge. At the same time, the traditional method requires a lot of manual operation and on-site welding, which is inefficient and easily affected by external factors such as weather and traffic. Summary of the invention

[0004] To solve the above problems, the present invention discloses a steel box girder installation construction method, which significantly improves the installation accuracy and construction efficiency of the steel box girder through precise positioning of embedded column foot anchor bolts, efficient installation of supporting steel columns, stable plate rubber bearing settings, and pre-assembly of the steel box girder on the ground. This new method not only helps to reduce material waste, but also greatly reduces the safety risks brought by high-altitude operations and heavy equipment operations, and has strong practicality.

[0005] To achieve the above object, the technical solution of the present invention is as follows:

[0006] A steel box girder installation construction method, the specific steps are:

[0007] S1. Embedded column foot anchor bolts:

[0008] S11. At the construction site, according to the coordinate values ​​of the control points, use the total station to conduct on-site layout and determine the positioning axis of the steel column foot positioning anchor bolts;

[0009] S12. Mark the exact position of the positioning axis on the concrete foundation;

[0010] S13. Align the positioning axis on the positioning frame of the column foot anchor bolt with the positioning axis on the concrete surface to achieve accurate positioning of the column foot anchor bolt, and determine the elevation and fix it with the steel bar;

[0011] S14. During the concrete pouring process, monitor and adjust the position of the column foot anchor bolts in real time to ensure their accurate position;

[0012] S15. After pouring concrete, check the position of the column foot anchor bolts and record the offset;

[0013] S2. Install supporting steel columns:

[0014] S21. Based on the plane control network and the drawing dimensions, use the rectangular coordinate method to lay out the vertical and horizontal axes of each steel column foundation;

[0015] S22. Use a mobile crane to hoist the steel column using a single-machine rotation method, and level the column bottom elevation by fine-tuning the adjusting nuts of the column foot anchor bolts;

[0016] S23. A circular hole with a diameter of 800 mm is opened at the top of the steel column, and concrete is poured into the steel column;

[0017] S3. Install the plate rubber bearing: After the steel column is installed, measure and mark, install the bearing in place, and weld the bearing bottom plate to the surrounding of the steel column;

[0018] S4. Assembly of steel box girders: several roadbed boxes are laid on the ground to form an assembly site. Support structures are set at both ends of the roadbed boxes at the assembly site. Assembly frames are set on the assembly site. All components of the steel box girders are assembled on the assembly frames. During the cantilever assembly stage, the bottom plate butt weld groove is outward, and a manhole is opened at the top plate of the steel box girder at every web spacing, and the groove direction of the partitions on both sides faces the manhole opening side;

[0019] S5. Steel box girder installation:

[0020] S51. Tie up the steel box girder components;

[0021] S52. Use a crane to lift the steel box girder component and slowly lower the steel box girder;

[0022] S53. Welding of steel box girder bottom plate, four-sided corner welds are used between the steel box girder bottom plate and the support steel pad.

[0023] As an improvement of the present invention, the column base anchor bolt is composed of an anchor plate, a round steel anchor rod, an adjusting nut, a fastening nut and a gasket, wherein the adjusting nut and the fastening nut are both exposed from the concrete, and the column base anchor bolt is made of Q235B and has a diameter of 36 mm.

[0024] As an improvement of the present invention, the threaded portion of the column foot anchor bolt is protected with a plastic film or oilcloth for rust prevention.

[0025] As an improvement of the present invention, the material of the steel column is Q235C, and a pier is provided on the top of the steel column, and the material of the pier is Q345qD.

[0026] As an improvement of the present invention, the size of the assembly site is 6m*20m, the roadbed box is fully laid on the assembly site, and the size of the roadbed box is 2000*6000*200mm.

[0027] As an improvement of the present invention, the construction method also includes an anti-corrosion coating step, which is specifically as follows: first, thoroughly remove grease, oxide scale and particles from the steel surface, then perform surface sandblasting, then treat the steel surface for rust removal, apply anti-rust primer and intermediate paint, and finally apply topcoat.

[0028] As an improvement of the present invention, the anti-rust primer is an epoxy zinc-rich primer, the intermediate paint is an epoxy micaceous iron paint, and the topcoat is a fluorocarbon topcoat or an epoxy high build paint.

[0029] As an improvement of the present invention, the number of spray coats of the antirust primer is 2, the number of spray coats of the intermediate paint is 3, the number of spray coats of the topcoat is 1 to 3, and the total dry film thickness of the antirust primer, intermediate paint and topcoat is 160 to 310 μm.

[0030] The beneficial effects of the present invention are:

[0031] (1) The present invention can ensure the precise positioning of steel columns and steel box girders by using a total station to perform on-site layout to determine the positioning axis of the column foot anchor bolts, and monitor and adjust the position of the column foot anchor bolts in real time, thereby greatly improving the installation accuracy. This not only helps to improve the overall performance of the bridge, but also avoids potential safety hazards caused by installation deviations. Pre-assembling the steel box girder on the ground reduces the time and difficulty of high-altitude operations, thereby speeding up the construction progress. In addition, by optimizing the construction process, such as using a truck crane to hoist the steel columns and install the steel box girders, the construction efficiency is further improved.

[0032] (2) The present invention ensures accurate installation of steel components through precise measurement and positioning technology, reducing material waste caused by installation errors. At the same time, pre-assembly on the ground helps to promptly discover and solve potential problems, avoiding the waste of materials and time caused by discovering problems during high-altitude operations. By reducing high-altitude operations and heavy equipment operations, safety risks during the construction process are reduced. In addition, precise measurement and stable installation methods also help to improve the stability and safety of bridge structures. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 It is a flow chart of the present invention.

[0034] Figure 2 It is a schematic diagram of the installation of the present invention, wherein Figure (a) is a schematic diagram of the embedded column foot anchor bolts, Figure (b) is a schematic diagram of the installation of the supporting steel column, and Figure (c) is a schematic diagram of the installation of the steel box girder.

[0035] Figure 3 It is a schematic diagram of the column foot anchor structure of the present invention.

[0036] Figure 4 It is a schematic diagram of the supporting steel column structure of the present invention.

[0037] Figure 5 It is a welding process flow chart of the present invention. DETAILED DESCRIPTION

[0038] The present invention will be further explained below in conjunction with specific embodiments. It should be understood that the following specific embodiments are only used to illustrate the present invention and are not used to limit the scope of the present invention. It should be noted that the words "front", "rear", "left", "right", "upper" and "lower" used in the following description refer to directions in the accompanying drawings, and the words "inner" and "outer" refer to directions toward or away from the geometric center of a specific component, respectively.

[0039] The present invention is implemented by taking a certain activity center project in Deyang City as an example. The total land area of ​​the project is 71.45 mu and the total construction area is 29800m 2 The main bridge of the Lian Bridge is 162.98m long, the upper structure adopts fish-belly steel box girder, and the total width of the main bridge is 6.0m.

[0040] Example 1 Pre-embedded column foot anchor bolt

[0041] The column foot of the steel column in this project is fixed with anchor bolts. The adjusting nuts and fastening nuts of the anchor bolts are exposed from the concrete. When installing the steel column, the adjusting nuts can be fine-tuned to ensure the elevation and verticality of the steel column. The column foot anchor bolt is made of Q235B with a diameter of Φ36 and consists of an anchor plate, round steel anchor rod, adjusting nut, fastening nut and gasket.

[0042] (1) At the construction site, according to the coordinate values ​​of the control points, a total station is used to perform field surveying to determine the positioning axis of the steel column foot positioning anchor bolts;

[0043] (2) Mark the exact position of the positioning axis on the concrete foundation;

[0044] (3) Align the positioning axis on the positioning frame of the column foot anchor bolt with the positioning axis on the concrete surface to achieve accurate positioning of the column foot anchor bolt, and determine the elevation and fix it with the steel bar;

[0045] (4) Concrete pouring: During the concrete pouring process, the position of the column foot anchor bolts is monitored and adjusted in real time to ensure their accurate position;

[0046] (5) After concrete pouring, check the position of the column base anchor bolts and record the offset.

[0047] The threaded part of the column foot anchor bolt is protected with plastic film or oilcloth for rust prevention, which is crucial for the smooth tightening of the nut and the smooth installation of the steel column. The threaded part should be coated with butter before leaving the factory to prevent rust. And it should be tightly wrapped with plastic cloth to prevent the intrusion of moisture during concrete pouring.

[0048] The installation of anchor bolts must not cause damage to the anchor bolt components. The anchor bolts that collide with the secondary steel bars should adjust the steel bar position to ensure smooth installation of the anchor bolts. The anchor bolts that collide with the main steel bars should promptly notify the civil engineering technicians and issue a feasible plan. It is strictly forbidden to cut the civil engineering steel bars. Before pouring concrete, the threaded part of the embedded bolts should be inspected. If damaged, they should be repaired and re-wrapped. The condition of the column foot anchor bolts should be monitored in real time during the concrete pouring process. If the positioning of the column foot anchor bolts is affected, they should be adjusted back in time.

[0049] 10% of the embedded parts will be randomly inspected according to the number of column bases, and actual measurements will be made using a level, total station, spirit level and steel ruler.

[0050] Table 1 Permissible deviation (mm) requirements for anchor bolts (anchor bolts)

[0051]

[0052] Example 2 Installing the Support Steel Column

[0053] This project has a total of 9 steel circular tubular columns, some of which have piers on top. The steel columns are made of Q235C with a diameter of 800*12mm, and the pier part is Q345qD with a size of 2600*1600*710mm.

[0054] The steel column and pier are transported to the construction site as a whole. The maximum weight of the steel column is 2.3t. The steel box girder is hoisted by a 200t truck crane. Before hoisting the steel column, the steel climbing body should be hung on the top of the column, and the bottom of the ladder should be fixed to the bottom of the steel column with a rope. The binding method is two-point binding, and the binding position is connected to the ear plate through a clamp. The two short heads used for hoisting the steel column should be hung on two ears that are basically in the horizontal plane to prevent the column body from rolling due to the force of one sling during the lifting process. During hoisting, the single-machine rotation method is used for lifting. Before lifting, the steel column should be placed horizontally on the sleepers. The steel column should not be dragged on the ground during lifting. The steel column must be hoisted more than 2 meters above the ground before it can be rotated.

[0055] (1) Based on the plane control network and the drawing dimensions, the vertical and horizontal axes of each steel column foundation are laid out using the rectangular coordinate method;

[0056] (2) Use a truck crane to hoist the steel column using the single-machine rotation method, and level the column bottom elevation by fine-tuning the adjusting nuts of the column foot anchor bolts;

[0057] (3) A circular hole with a diameter of 800 mm is opened at the top of the steel column and concrete is poured into the steel column.

[0058] Example 3 Installing plate-type rubber bearing

[0059] After the steel column is installed, measurements and markings are carried out, the support is installed in place, and the support base plate is welded around the steel column to fix it.

[0060] Example 4: Steel Box Girder Assembly

[0061] A number of roadbed boxes are laid on the ground to form an assembly site. Support structures are set at both ends of the roadbed boxes in the assembly site. An assembly frame is set on the assembly site. Various components of the steel box girder are assembled as a whole on the assembly frame. During the cantilever assembly stage, the groove of the bottom plate butt weld faces outward, and a manhole is opened at the top plate of the steel box girder at every web spacing, and the groove direction of the partitions on both sides faces the manhole opening.

[0062] The size of the assembly site is 6m*20m, and the roadbed box is fully laid on the assembly site. The size of the roadbed box is 2000*6000*200mm.

[0063] Example 5 Steel Box Girder Installation

[0064] (1) Tie the steel box girder components;

[0065] (2) Use a crane to lift the steel box girder component and slowly lower it. After the box girder is in place, calibrate the component according to the positioning axis. The elevation correction is adjusted by setting up two jacks on the top of the bracket, and the axis correction is corrected by a crane in combination with a jack.

[0066] (3) Welding of the bottom plate of the steel box girder. Four-sided fillet welds are used between the bottom plate of the steel box girder and the supporting steel pad.

[0067] According to the relevant provisions of "Carbon Steel and Low Alloy Steel Welding Wire for Gas Shielded Arc Welding" GB / T8110-2008, "Carbon Steel Flux-Cored Welding Wire" GB / T10045-2001, and "Heat-Resistant Steel Welding Rod" GB / T 5118-2012, the welding materials suitable for this project are selected as follows:

[0068] Serial number Welding material name Brand Specification Implementation Standards Remark 1 Gas shielded solid welding wire ER50-6 Φ1.2(20kg) GB / T8110-2008 Golden Bridge 2 Gas shielded flux cored wire E501T-1 Φ1.2(15kg) GB / T10045-2001 Golden Bridge 3 welding rod J507 / GB / T5118-2012 /

[0069] Example 6 Anticorrosive coating steps

[0070] First, thoroughly remove grease, scale and particles from the steel surface, then perform surface sandblasting, then remove rust from the steel surface, apply anti-rust primer and intermediate paint, and finally apply topcoat.

[0071] The anti-rust primer is an epoxy zinc-rich primer, the intermediate paint is an epoxy micaceous iron paint, and the topcoat is a fluorocarbon topcoat or an epoxy high build paint.

[0072] The number of spraying coats of the antirust primer is 2, the number of spraying coats of the intermediate paint is 3, the number of spraying coats of the topcoat is 1 to 3, and the total dry film thickness of the antirust primer, the intermediate paint and the topcoat is 160 to 310 μm.

[0073] According to the specific situation of steel structure, the long-term surface coating system requirement number S04 and the closed environment inner surface coating system S14 in the "Technical Code for Anti-corrosion Coating Engineering of Urban Bridge Steel Structures" (CJJ / T235-2015) shall be implemented. The steel structure coating is shown in the table below.

[0074] Table 2 Coating scheme for the outer surface of steel structure

[0075]

[0076] Table 3 Inner surface coating scheme of steel structure (closed environment)

[0077]

[0078] Table 4 Inner surface coating scheme of steel box girder (non-enclosed environment)

[0079]

[0080] Table 5 Steel bridge deck coating scheme

[0081]

[0082] The steel box girder installation construction method provided by the present invention has the following working principle:

[0083] First, the column foot anchor bolts are embedded. This stage is the basis of the overall construction. The precise position of the anchor bolts is determined by field surveying, and then the position of the anchor bolts is monitored and adjusted in real time during the concrete pouring process to ensure its accuracy. This stage ensures the stability of the steel column installation. Next, the supporting steel column is installed. Through precise laying out and hoisting, the steel column is installed in the predetermined position, and then the column bottom elevation is accurately leveled by fine-tuning the adjusting nut of the column foot anchor bolt. A circular hole is opened at the top of the steel column and concrete is poured to further enhance the stability of the steel column.

[0084] Installing the plate rubber bearing is a key step in connecting the steel column and the steel box girder. After the bearing is installed, it is fixed to prepare for the subsequent installation of the steel box girder. The roadbed box is laid on the ground to form an assembly site, and an assembly frame is set up. The components of the steel box girder are assembled as a whole on the assembly frame. This step ensures the structural integrity and installation accuracy of the steel box girder.

[0085] Finally, the steel box girder is installed. Through the tying, hoisting and welding of the steel box girder components, the steel box girder is firmly installed on the support. In particular, the four-sided fillet welds between the bottom plate of the steel box girder and the steel pad of the support further enhance the stability of the structure.

[0086] In addition, the present invention also includes an anti-corrosion coating step. By thoroughly cleaning the steel surface, sandblasting and coating the steel surface with anti-rust primer, intermediate paint and topcoat, the anti-corrosion performance and service life of the steel structure are effectively improved.

[0087] Through the above embodiment steps, the present invention ensures the installation construction quality and service life of the steel box girder through accurate layout, stable anchor pre-embedding, accurate steel column installation, stable support installation, accurate steel box girder assembly and installation, and effective anti-corrosion coating steps.

[0088] It should be noted that, for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present invention, and these improvements and modifications all fall within the scope of protection of the claims of the present invention.

Claims

1. A steel box girder installation construction method, characterized in that: The specific steps are: S1. Pre-buried column foot anchor bolts: S11. At the construction site, according to the coordinate values ​​of the control points, use the total station to conduct on-site layout and determine the positioning axis of the steel column foot positioning anchor bolts; S12. Mark the exact position of the positioning axis on the concrete foundation; S13. Align the positioning axis on the positioning frame of the column foot anchor bolt with the positioning axis on the concrete surface to achieve accurate positioning of the column foot anchor bolt, and determine the elevation and fix it with the steel bar; S14. During the concrete pouring process, monitor and adjust the position of the column foot anchor bolts in real time to ensure their accurate position; S15. After pouring concrete, check the position of the column foot anchor bolts and record the offset; S2. Install supporting steel columns: S21. Based on the plane control network and the drawing dimensions, use the rectangular coordinate method to lay out the vertical and horizontal axes of each steel column foundation; S22. Use a mobile crane to hoist the steel column using a single-machine rotation method, and level the column bottom elevation by fine-tuning the adjusting nuts of the column foot anchor bolts; S23. A circular hole with a diameter of 800 mm is opened at the top of the steel column, and concrete is poured into the steel column; S3. Install the plate rubber bearing: After the steel column is installed, measure and mark, install the bearing in place, and weld the bearing bottom plate to the surrounding of the steel column; S4. Assembly of steel box girders: several roadbed boxes are laid on the ground to form an assembly site. Support structures are set at both ends of the roadbed boxes at the assembly site. Assembly frames are set on the assembly site. All components of the steel box girders are assembled on the assembly frames. During the cantilever assembly stage, the bottom plate butt weld groove is outward, and a manhole is opened at the top plate of the steel box girder at every web spacing, and the groove direction of the partitions on both sides faces the manhole opening side; S5. Steel box girder installation: S51. Tie up the steel box girder components; S52. Use a crane to lift the steel box girder component and slowly lower the steel box girder; S53. Welding of steel box girder bottom plate, four-sided corner welds are used between the steel box girder bottom plate and the support steel pad.

2. The steel box girder installation construction method according to claim 1 is characterized in that: The column foot anchor bolt is composed of an anchor plate, a round steel anchor rod, an adjusting nut, a fastening nut and a gasket, wherein the adjusting nut and the fastening nut are both exposed from the concrete. The column foot anchor bolt is made of Q235B and has a diameter of 36 mm.

3. The steel box girder installation construction method according to claim 2 is characterized in that: The threaded portion of the column foot anchor bolt is protected with a plastic film or oilcloth for rust prevention.

4. The steel box girder installation construction method according to claim 1 is characterized in that: The material of the steel column is Q235C, and a pier is arranged on the top of the steel column, and the material of the pier is Q345qD.

5. The steel box girder installation construction method according to claim 1 is characterized in that: The size of the assembly site is 6m*20m, and the roadbed box is fully laid on the assembly site. The size of the roadbed box is 2000*6000*200mm.

6. The steel box girder installation construction method according to claim 1 is characterized in that: The construction method also includes an anti-corrosion coating step, which specifically includes: firstly, thoroughly removing grease, scale and particles from the steel surface, then performing surface sandblasting, then removing rust from the steel surface, applying anti-rust primer and intermediate paint, and finally applying topcoat.

7. The steel box girder installation construction method according to claim 6 is characterized in that: The anti-rust primer is an epoxy zinc-rich primer, the intermediate paint is an epoxy micaceous iron paint, and the topcoat is a fluorocarbon topcoat or an epoxy high build paint.

8. The steel box girder installation construction method according to claim 7 is characterized in that: The number of spray coats of the anti-rust primer is 2, the number of spray coats of the intermediate paint is 3, the number of spray coats of the topcoat is 1-3, and the total dry film thickness of the anti-rust primer, the intermediate paint and the topcoat is 160-310 μm.

Citation Information

Patent Citations

  • Prefabricated bridge deck steel-concrete composite beam construction method

    CN112267383A

  • Large-span steel structure factory building main body engineering construction method

    CN116201371A

  • Construction method of curve variable cross-section steel box girder crossing high-speed road section

    CN116752451A

  • Municipal steel box girder bridge few-support block rapid assembly construction method

    CN118148018A

  • Steel frame column base part dropping-in construction method

    JP1999222928A