Anti-wave repairing method for wharf road

By erecting a modular construction platform on the dock road and using crawler cranes to alternately turnover, the rapid restoration of the breakwater is achieved, solving the problems of long construction time and high cost in traditional restoration technology, and ensuring the continuity of dock operation.

CN118880798APending Publication Date: 2024-11-01CCCC THIRD HARBOR ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411114076.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-14
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

Traditional breakwater repair technology has problems such as long construction time, high cost and affecting the normal operation of the wharf. In particular, the construction of crane ships requires cumbersome offshore construction procedures and dock closure, resulting in a long repair cycle.

Method used

Using a combination of detachable modular construction platform and crawler crane, the vehicle passes by mounting a facility construction platform on the dock road, and the crawler crane alternates to turn over the construction platform to achieve rapid repair of the breakwater and reduce the impact on the dock operation. .

Benefits of technology

It improves the construction efficiency of breakwater restoration, reduces construction costs, avoids closure of dock roads, and ensures the continuity of dock operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118880798A_ABST
    Figure CN118880798A_ABST
Patent Text Reader

Abstract

The invention relates to a breakwater repairing method for a wharf road, which relates to a breakwater repairing technology and comprises the following steps: S1, detecting a damaged section of a breakwater, and determining the passing height limit and the passing width limit of the wharf road; s2, two construction platforms are manufactured in a factory according to the parameters obtained in the step S1; s3, transporting the construction platform and the crawler crane into a site; s4, all assemblies of the crawler crane are hoisted to the construction platform to be assembled; s5, the crawler crane is controlled to dismantle the damaged part of the breakwater according to the set technology, and new repairing materials are refilled; s6, the construction platforms are automatically and alternately transferred through a crawler crane, so that the two construction platforms can be alternately used; and S7, the step S5 and the step S6 are repeated till the repair work of the anti-slope embankment is completed, and then the crawler crane and the construction platform are transported away from the factory. The construction method has the advantages that on the premise that the influence on normal operation of the wharf is reduced, the construction efficiency of anti-slope embankment repairing is improved, and the construction cost is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to breakwater repair technology, and in particular to a breakwater repair method for dock roads. Background Art

[0002] A breakwater will be built on the sea side of the dock to prevent wave invasion. The breakwater prevents siltation of the harbor and erosion of the coastline by waves. It is an important component of artificially protected coastal ports and is used as a hydraulic structure required to shelter the waters. When in use, the breakwater is the first line of defense of the dock and is most vulnerable to the impact of waves.

[0003] Specifically, when the waves wash in front of the dike axis, short-peak waves will be generated. Short-peak waves can cause complex movement of water particles in a certain place, produce the effect of mass transfer, and thus cause impact on the seabed. When the seabed is subjected to the huge impact of the waves, it will cause the seabed effect, and the seabed effect will cause damage to the breakwater.

[0004] In addition, reasons such as typhoon weather, freezing, collision of foreign objects in sea water, etc. may also cause damage to the breakwater.

[0005] When the breakwater is damaged, the damaged section of the breakwater needs to be repaired in time to ensure that it can effectively resist the impact of waves and protect the safety of the dock.

[0006] In traditional technology, breakwater repair projects usually use crane ships for water construction. However, the use of crane ships will be affected by offshore construction procedures, and crane ships have high construction requirements, long construction time, and high use costs. In related technologies, there are also crawler cranes used directly on the dock for repair construction, but crawler cranes will occupy the roads on the dock, resulting in the need for temporary closure of the dock during the breakwater repair period. The breakwater repair process takes a long time, which seriously affects the normal operation of the dock. Summary of the invention The purpose of the present application is to provide a breakwater repair method for a wharf road, which has the effect of improving the efficiency of breakwater repair construction and reducing construction costs while reducing the impact on the normal operation of the wharf.

[0007] The present application provides a method for repairing a breakwater for a wharf road, which adopts the following technical solution: A method for repairing a breakwater for a wharf road comprises the following steps: S1. Inspect the damaged sections of the breakwater, evaluate the breakwater repair materials and construction techniques based on the damaged sections, and determine the height and width limits for the wharf roads; S2. Manufacturing two construction platforms in the factory according to the parameters obtained in step S1, wherein the bottoms of the two construction platforms are provided with passages for vehicles to pass through; S3, transport the construction platform and crawler crane to the site, splice the two construction platforms together, and make the passages under the two construction platforms communicate with the wharf road; S4, hoisting the crawler crane components onto the construction platform for assembly; S5. Control the crawler crane to dismantle the damaged part of the breakwater according to the set process and refill it with new repair materials; S6, using the crawler crane to alternately rotate the construction platforms so that the two construction platforms can be used alternately, and supporting the crawler crane to adjust a new construction position; S7, repeating step S5 and step S6 until the slope breakwater repair work is completed, and transporting the crawler crane and the construction platform out of the factory; Among them, each of the construction platforms has a turnover state and a use state. When the construction platform is in the use state, the construction platform is placed on the dock road. When the construction platform is in the turnover state, the construction platform is lifted by the crawler crane and transferred to the next construction location.

[0008] By adopting the above technical solution, during construction, two construction platforms are erected on the wharf road and placed close together. The crawler crane removes and hoists the repair materials such as twist blocks on the construction platform, and the wharf operating vehicles can pass through the passage below the construction platform to ensure that the wharf road is unobstructed. During the construction process, the crawler crane can move forward to change the construction position by rotating the construction platform by itself, so that the crawler crane can normally complete the breakwater repair project under the premise of reducing the normal operation of the wharf.

[0009] Optionally, in step S2, each of the construction platforms includes a modular support frame and a support table, the support frame is provided with two pieces, and the two long sides of the support table are respectively detachably connected to the upper sides of the two support frames, and the channel is formed by the support table and the two support frames. In step S3, the modules of the construction platform are assembled on site after entering the site.

[0010] By adopting the above technical solution, the construction platform can be modularly disassembled into a support frame and a support platform, which can not only reduce the daily space occupied by the construction platform, but also avoid the entry restrictions of the dock road height and width when the construction platform is transported to the site, thereby ensuring the safety of the construction module entering the site.

[0011] Optionally, when assembling the construction platform in step S3, the following steps are included: a1. Support fences on both sides of the wharf road; a2. Install the two support frames on the opposite sides of the two fences and adjust the positions of the support frames; a3. Use a crane to hoist the support platform to the upper ends of the two support frames, and ensure that the connection positions of the support platform and the support frames are accurately aligned; a4. Fix the connection between the support platform and the support frame; Wherein, the guardrail is removed after the construction platform is assembled.

[0012] By adopting the above technical solution, the fence can play a protective role, avoiding the impact on normal passing vehicles when assembling the construction platform, and at the same time avoiding the impact of dust raised by passing vehicles on construction workers, thereby ensuring the safety of the assembly of the construction platform.

[0013] Optionally, the support platform includes two modularly arranged two-layer platform bodies, the sides of the two two-layer platform bodies facing each other are detachably connected, and the bottom surfaces of the opposite sides of the two two-layer platform bodies are detachably connected to the upper ends of the two support frames respectively.

[0014] By adopting the above technical solution, the support platform is split into two two-layer platform bodies, which facilitates the transportation of the support platform to the site.

[0015] Optionally, in step S6, when the construction platforms are alternately rotated, the following steps are included: b1. Control the crawler crane to move above the construction platform in use, and connect the hook of the crawler crane to the construction platform that needs to be moved; b2. Control the crawler crane to vertically lift the construction platform that needs to be turned around, and the lifting height of the construction platform is higher than its own height; b3, using the crawler crane to drive the construction platform in the turnover state to move horizontally to the top of the next construction position; b4. Lower the construction platform in the turnover state vertically. During the lowering process of the construction platform, straighten the two long sides of the construction platform until the construction platform lands, and then release the connection between the crawler crane hook and the construction platform.

[0016] By adopting the above technical solution, by vertically lifting or lowering the construction platform and making the rising height of the construction platform higher than the height of the construction platform itself, it is possible to avoid large shaking of the construction platform during the lifting process, prevent collision with passing vehicles, and ensure the safety of vehicle passage and turnover of the construction platform.

[0017] Optionally, a hook device is provided in the middle of each of the construction platforms, and the hook device is used for connection with a hook of a crawler crane, and the hook device includes a V-shaped rod and a driving telescopic cylinder, both ends of the V-shaped rod are rotatably connected to the support platform, and at least one end of the V-shaped rod is provided with a rocker penetrating through the bottom surface of the support platform, and the driving telescopic cylinder is arranged in the bottom surface of the support platform, and when the piston rod of the driving telescopic cylinder is extended and retracted, the V-shaped rod can be driven to adjust between a horizontal or vertical state; When the step b1 is performed, the piston rod of the driving telescopic cylinder is pushed out, and the V-shaped rod is in a vertical state, so that the hook of the crawler crane can hook the V-shaped rod.

[0018] By adopting the above technical solution, when the construction platform needs to be hoisted, the telescopic cylinder is used to drive the V-shaped rod to rotate to a vertical state, so that the bent part of the V-shaped rod is vertically facing upward. At this time, the hook of the crawler crane can directly hook the bent position of the V-shaped rod, so that the crawler crane can directly lift the construction platform without human intervention.

[0019] Optionally, positioning components are provided at both ends of each of the construction platforms. When steps b2 and b4 are performed, the positioning components on the construction platform in use are fitted with the two long sides of the construction platform in turnover, and the construction platform in turnover can be lifted or lowered close to the positioning components provided on the construction platform in use.

[0020] By adopting the above technical solution, by utilizing the ability to fit together with the two long sides of the lifted or lowered construction platform, it is possible to straighten the construction platform during the lifting process, reduce manual involvement, and effectively ensure the safe turnover of the construction platform. It also has the effect of guiding the construction platform to fall to a fixed point.

[0021] Optionally, each of the support frames includes a plurality of columns, each of the columns is arranged along the length direction of the support frame, and an X-shaped scissor rod is provided between any two adjacent columns, and each of the positioning components includes two adjustment mechanisms respectively provided on the two long sides of the construction platform; Wherein, when the steps b2 and b4 are performed, the two columns of the construction platform which are in the lifting state and close to the use state are clamped by two adjusting mechanisms at corresponding positions respectively.

[0022] By adopting the above technical solution, the columns can play a major supporting role, and any two adjacent columns can be fixedly connected together using the X-shaped scissors rod to ensure the overall strength of the support frame. By clamping the corresponding columns using the adjustment mechanism, the landing point of the lowered construction platform can be controlled, thereby realizing the positioning turnover of the construction platform in the turnover state.

[0023] Optionally, the adjusting mechanism includes a swing rod, a clamp rod, a first telescopic cylinder and a second telescopic cylinder. The swing rod is rotatably installed at the bottom of the support platform. A limit rod perpendicular to the length direction of the swing rod is horizontally arranged on one side of the swing rod. The clamp rod is slidably installed on the swing rod. The swing rod passes through the clamp rod. The first telescopic cylinder is installed on the construction platform to drive the swing rod to rotate, and the second telescopic cylinder is installed on the swing rod to drive the clamp rod to translate along the length direction of the swing rod.

[0024] By adopting the above technical solution, the two long sides of the construction platform in the lifting state can be limited by the swing rod, and at the same time, the cooperation between the limit rod and the clamping rod can be used to clamp the columns of the above construction platform to prevent the construction platform from shaking, thereby achieving the effect of limiting the lifting and lowering position of the construction platform.

[0025] In summary, the present application includes at least one of the following beneficial technical effects: 1. When the crawler crane is repairing the breakwater, it will not affect the normal use of the dock road, and does not require cumbersome construction procedures, effectively promoting the efficiency of breakwater repair construction; 2. The construction platform can be reused and disassembled into multiple modules for storage to avoid taking up too much space; 3. It can reduce manual labor to reduce costs, and the cost of crawler cranes is much lower than that of crane ships, effectively controlling construction costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 is a schematic diagram of the repair method flow of Example 1 of the present application; Figure 2 is a schematic diagram of the repair method of Example 1 of the present application; Figure 3 It is a structural schematic diagram of the construction platform of Example 1 of the present application; Figure 4 is a schematic diagram of a support frame according to Example 1 of the present application; Figure 5 is a schematic diagram of a support platform of Example 1 of the present application; Figure 6 is a flow chart of step S3 of Example 1 of the present application; Figure 7 is a flow chart of step S6 of Example 1 of the present application; Figure 8 is a schematic top view of a support platform of Example 2 of the present application; Fig. 9 is a schematic diagram of the separation of the support platform of Example 2 of the present application; Fig.10is a cross-sectional schematic diagram of a hook device according to Embodiment 2 of the present application; Fig.11 is a schematic structural diagram of a positioning assembly according to Embodiment 3 of the present application; Fig.12 It is a schematic diagram of the structure of the adjustment mechanism of Example 3 of the present application.

[0027] In the figure, 1, breakwater; 2, wharf road; 3, construction platform; 31, support frame; 311, column; 312, X-shaped scissors rod; 313, reinforcement rod; 32, support platform; 321, second-layer platform; 322, upper metal frame; 323, lower metal frame; 324, support column; 325, connecting column; 326, reinforcement rib; 327, connecting ring; 328, connecting plate; 33, guardrail; 34, passage; 35, hook device; 351, mounting seat; 352, V-shaped rod; 353, rocker; 354, driving telescopic cylinder; 36, positioning assembly; 361, adjustment mechanism; 362, swing rod; 363, clamping rod; 364, first telescopic cylinder; 365, second telescopic cylinder; 366, limit rod; 4, crawler crane. DETAILED DESCRIPTION

[0028] The following is combined with Figure 1 -Attached Fig.12 , further details of this application are given.

[0029] Embodiment 1: A method for repairing breakwaters for dock roads, referring to Figure 1 and Figure 2 , including the following steps: S1. Inspect the damaged section of breakwater 1, evaluate the repair materials and construction technology of breakwater 1 according to the damaged section, and determine the height and width limits of the wharf road; S2. Two construction platforms 3 are manufactured in the factory according to the parameters obtained in step S1. The two construction platforms 3 have passages 34 for vehicles to pass through underneath. S3, transport the construction platform 3 and crawler crane 4 to the site, splice the two construction platforms 3 together, and make the passage 34 under the two construction platforms 3 communicate with the wharf road 2; S4, hoisting the components of the crawler crane 4 onto the construction platform 3 for assembly; S5, controlling the crawler crane to remove the damaged part of the breakwater 1 according to the set process, and refilling it with new repair materials; S6, using the crawler crane to alternately rotate the construction platforms 3, so that the two construction platforms 3 can be used alternately, and supporting the crawler crane 4 to adjust a new construction position; S7, repeating step S5 and step S6 until the slope breakwater repair work is completed, and then transporting the crawler crane and the construction platform 3 out of the factory; Among them, each construction platform 3 has a turnover state and a use state. When the construction platform 3 is in the use state, the construction platform 3 is placed on the dock road 2. When the construction platform 3 is in the turnover state, the construction platform 3 is lifted by the crawler crane 4 and transferred to the next construction position.

[0030] Reference Figure 3 The construction platforms 3 include a modular support frame 31 and a support platform 32; wherein, the support frame 31 is symmetrically arranged in two pieces, and the two long sides of the support platform 32 are detachably connected to the upper sides of the two support frames 31, and guardrails 33 are arranged on the two long sides of the support platform 32; wherein, the passage 34 is formed by the support platform 32 and the two support frames 31.

[0031] Reference Figure 3 and Figure 4 The support frame 31 includes a column 311, an X-shaped scissor rod 312 and a reinforcing rod 313; wherein, a plurality of columns 311 are provided, and each column 311 is arranged along the length direction of the support frame 31, a plurality of X-shaped scissor rods 312 are provided, and each X-shaped scissor rod 312 is respectively arranged between any two adjacent columns 311, a plurality of reinforcing rods 313 are provided, and each reinforcing rod 313 is respectively located directly below each X-shaped scissor rod 312, and both ends of each X-shaped scissor rod 312 and reinforcing rod 313 are respectively fixedly connected to any two adjacent columns 311.

[0032] Furthermore, a reinforcing column is provided between any two adjacent supporting columns 324 or between any adjacent supporting columns 324 and connecting columns 325, and each reinforcing rib 326 is inclined, and the upper and lower ends of each reinforcing rib 326 are respectively welded to the upper metal frame 322 and the lower metal frame 323.

[0033] Reference Figure 3 and Figure 5 The support platform 32 includes two modularly arranged two-layer platform bodies 321, the two sides of the two-layer platform bodies 321 facing each other are detachably connected, and the bottom surfaces of the opposite sides of the two-layer platform bodies 321 are detachably connected to the upper ends of the two support frames 31; wherein, a metal plate (not shown in the figure) is provided on the upper surface of the support platform 32, and the two sides of the metal plate are respectively fixed to the two two-layer platform bodies 321 by bolt locking, and the surface of the metal plate is provided with anti-slip texture.

[0034] Reference Figure 5The second-layer platform 321 mainly includes an upper metal frame 322, a lower metal frame 323, support columns 324 and connecting columns 325; the upper metal frame 322 and the lower metal frame 323 are in an upper and lower position relationship, and a plurality of support columns 324 are arranged in a rectangular array relationship, and the upper and lower ends of each support column 324 are welded to the upper metal frame 322 and the lower metal frame 323 respectively, and the number of connecting columns 325 is corresponding to the number and position of the columns 311 on the support frame 31, and the upper end of each connecting column 325 is fixedly connected to the upper metal frame 322, and the lower end of each connecting column 325 passes through the lower metal frame 323.

[0035] Among them, there are several I-beams arranged along the length direction on the opposite sides of the two upper metal frames 322. When the two second-layer platforms 321 are connected to each other, the positions of the I-beams on the two upper metal frames 322 correspond one to one, and the two I-beams corresponding to the above positions are fixedly connected by a steel clamping plate structure.

[0036] Among them, the two lower metal frames 323 are formed by welding crisscross steel pipes. When the two second-layer platforms 321 are connected to each other, the steel pipes arranged along the length direction of the two lower metal frames 323 are connected one by one, and any two steel pipes that are connected to each other are fixedly connected by a flange structure.

[0037] Reference Figure 6 When assembling the construction platform 3 in step S3, the following steps are included: a1. Support fences on both sides of the wharf road 2; a2. Install the two support frames 31 on opposite sides of the two fences, and adjust the positions of the support frames 31; a3. Use a crane to hoist the assembled support platform 32 to the upper ends of the two support frames 31, and ensure that the connection positions of the support platform 32 and the support frames 31 are accurately aligned; a4. Fix the connection between the support platform 32 and the support frame 31; When the support platform 32 is connected to the support frame 31 , each connecting column 325 is located above each column 311 , and the connecting column 325 is connected to the column 311 by a flange structure. After the construction platform 3 is assembled, the guardrail 33 is removed.

[0038] Reference Figure 7 In step S6, when the construction platform 3 is alternately rotated, the following steps are included: b1, control the crawler crane 4 to move above the construction platform 3 in use, and connect the hook of the crawler crane 4 to the construction platform 3 that needs to be turned around; b2. Control the crawler crane 4 to vertically lift the construction platform 3 that needs to be turned around, and the lifting height of the construction platform 3 is higher than its own height; b3, using the crawler crane 4 to drive the construction platform 3 in the turnover state to move horizontally to the top of the next construction position; b4. Lower the construction platform 3 in the turnover state vertically. During the lowering process of the construction platform 3, straighten the two long sides of the construction platform 3 until the construction platform 3 lands, and then release the connection between the hook of the crawler crane 4 and the construction platform 3.

[0039] The implementation principle of the embodiment of the present application is: During construction, two construction platforms 3 are erected on the wharf road 2 and placed close together. The crawler crane 4 removes and hoists the repair materials such as twist blocks on the construction platform 3. The wharf operating vehicles can pass through the passage 34 under the construction platform 3 to ensure the wharf road 2 is unobstructed. During the construction process, the crawler crane 4 can move forward to change the construction position by rotating the construction platform 3 by itself, so that the crawler crane 4 can normally complete the repair project of the breakwater 1 under the premise of reducing the normal operation of the wharf.

[0040] The crawler crane 4 can adjust its position by alternately rotating the crawler crane 4 without occupying the dock road 2 . Vehicles traveling on the dock road 2 can pass through the passage under the construction platform 3 .

[0041] Embodiment 2: Reference Figure 8 and Fig. 9 The difference from Example 1 is that the construction platform 3 also includes a hook device installed on the support platform 32, and the two sides of the two-layer platform bodies 321 facing each other are provided with a semi-circular ring-shaped connecting ring 327. When the two-layer platform bodies 321 are connected as a whole, the two connecting rings 327 can enclose and form an installation area for installing the clearance component, and the hook device is used to realize automatic connection with the hook of the crawler crane 4.

[0042] Among them, connecting plates 328 that can fit with the hook device are arranged on the upper and lower surfaces of each connecting ring 327, and fastening bolts that can be threadedly connected with the hook device are inserted on each connecting plate 328.

[0043] Reference Fig. 9 and Fig.10The hook device includes a mounting seat 351, a V-shaped rod 352 and a driving telescopic cylinder 354. Both ends of the V-shaped rod 352 are rotatably connected to the mounting seat 351, and at least one end of the V-shaped rod 352 is provided with a rocker 353 passing through the bottom surface of the support platform 32. The driving telescopic cylinder 354 is arranged in the bottom surface of the support platform 32, and both ends of the driving telescopic cylinder 354 are rotatably connected to the mounting seat 351 and the rocker 353 respectively. When the piston rod of the driving telescopic cylinder 354 is extended and retracted, the V-shaped rod 352 can be driven to adjust between a horizontal or vertical state.

[0044] When step b1 is performed, when the piston rod of the telescopic cylinder 354 is driven to push out, the V-shaped rod 352 is in a vertical state, so that the hook of the crawler crane 4 can hook the V-shaped rod 352 .

[0045] Embodiment 3: Reference Fig.11 The difference from Example 1 is that positioning components 36 are provided at both ends of the construction platform 3, and the positioning components 36 include two adjusting mechanisms 361 respectively provided on the bottom surfaces of both sides of the support platform 32, and the adjusting mechanisms 361 are used to straighten the construction platform 3 in the lifting state to reduce the effect of the shaking degree of the construction platform 3 during the lifting process.

[0046] Reference Fig.11 and Fig.12 The adjusting mechanism 361 includes a swing rod 362, a clamp rod 363, a first telescopic cylinder 364 and a second telescopic cylinder 365. The swing rod 362 is rotatably installed on the bottom surface of the lower metal frame 323. A limit rod 366 perpendicular to the length direction of the swing rod 362 is horizontally arranged on one side of the swing rod 362. The clamp rod 363 is slidably installed on the swing rod 362 through a slide rail, and the length direction of the clamp rod 363 is parallel to the length direction of the limit rod 366. The swing rod 362 passes through the clamp rod 363. The first telescopic cylinder 364 is installed on the construction platform 3 to drive the swing rod 362 to rotate. The second telescopic cylinder 365 is installed on the swing rod 362 to drive the clamp rod 363 to translate along the length direction of the swing rod 362.

[0047] Specifically, when steps b2 and b4 are performed, the two columns 311 in the lifting state and close to the construction platform 3 in the use state are respectively clamped by two adjusting mechanisms 361 in corresponding positions, and the construction platform 3 in the turnover state can be lifted or lowered close to the positioning assembly 36 set on the construction platform 3 in the use state.

[0048] The embodiments of this specific implementation are all preferred embodiments of the present application, and are not intended to limit the protection scope of the present application. The same components are represented by the same figure marks. Therefore, any equivalent changes made based on the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A method for repairing a breakwater for a wharf road, characterized in that: The following steps are involved: S1. Inspect the damaged section of the breakwater (1), evaluate the repair materials and construction process of the breakwater (1) based on the damaged section, and determine the height and width limits of the wharf road (2); S2. Manufacturing two construction platforms (3) in a factory according to the parameters obtained in step S1, wherein the bottom of each of the two construction platforms (3) has a passage (34) for vehicles to pass through; S3, transporting the construction platform (3) and the crawler crane (4) to the site, splicing the two construction platforms (3) together, and making the passage (34) under the two construction platforms (3) communicate with the wharf road (2); S4, hoisting the various components of the crawler crane (4) onto the construction platform (3) for assembly; S5, controlling the crawler crane (4) to remove the damaged part of the breakwater (1) according to the set process, and refilling it with new repair materials; S6, using the crawler crane (4) to automatically and alternately rotate the construction platforms (3), so that the two construction platforms (3) can be used alternately, and supporting the crawler crane (4) to adjust a new construction position; S7, repeating step S5 and step S6 until the slope breakwater repair work is completed, and then transporting the crawler crane (4) and the construction platform (3) out of the factory; Each of the construction platforms (3) has a turnover state and a use state. When the construction platform (3) is in the use state, the construction platform (3) is placed on the dock road (2). When the construction platform (3) is in the turnover state, the construction platform (3) is lifted by the crawler crane (4) and transferred to the next construction location.

2. A method for repairing a breakwater for a wharf road according to claim 1, characterized in that: In step S2, each of the construction platforms (3) comprises a modular support frame (31) and a support platform (32), wherein the support frame (31) is provided with two pieces, and the two long sides of the support platform (32) are respectively detachably connected to the upper sides of the two support frames (31), and the passage (34) is formed by enclosing the support platform (32) and the two support frames (31). In step S3, the modules of the construction platform (3) are assembled on site after entering the site.

3. A method for repairing a breakwater for a wharf road according to claim 2, characterized in that: When assembling the construction platform (3) in step S3, the following steps are included: a1. Support fences on both sides of the wharf road (2); a2. Install two support frames (31) on opposite sides of the two fences, and adjust the positions of the support frames (31); a3. Use a crane to hoist the support platform (32) to the upper ends of the two support frames (31), and ensure that the connection positions of the support platform (32) and the support frames (31) are accurately aligned; a4. Fixing the connection between the support platform (32) and the support frame (31); Wherein, after the construction platform (3) is assembled, the guardrail (33) is removed.

4. A method for repairing a breakwater for a wharf road according to claim 2, characterized in that: The support platform (32) comprises two modularly arranged two-layer platform bodies (321), the two two-layer platform bodies (321) facing each other on one side being detachably connected, and the bottom surfaces of the two two-layer platform bodies (321) on one side being arranged opposite to each other are detachably connected to the upper ends of the two support frames (31).

5. A method for repairing a breakwater for a wharf road according to claim 2, characterized in that: In the step S6, when the construction platform (3) is alternately rotated, the following steps are included: b1. Controlling the crawler crane (4) to move above the construction platform (3) in use, and connecting the hook of the crawler crane (4) to the construction platform (3) that needs to be moved; b2. Controlling the crawler crane (4) to vertically lift the construction platform (3) that needs to be turned around, wherein the lifting height of the construction platform (3) is higher than the height of the construction platform (3); b3. Using the crawler crane (4) to drive the construction platform (3) in a turnover state to move horizontally to the top of the next construction position; b4. The construction platform (3) in the turnover state is lowered vertically. During the lowering process of the construction platform (3), the two long sides of the construction platform (3) are straightened until the construction platform (3) lands, and then the connection between the hook of the crawler crane (4) and the construction platform (3) is released.

6. A method for repairing a breakwater for a wharf road according to claim 5, characterized in that: A hook device (35) is provided in the middle of each of the construction platforms (3), and the hook device (35) is used for connection with a hook of a crawler crane (4). The hook device comprises a V-shaped rod (352) and a driving telescopic cylinder (354). Both ends of the V-shaped rod (352) are rotatably connected to the support platform (32), and at least one end of the V-shaped rod (352) is provided with a rocker (353) passing through the bottom surface of the support platform (32). The driving telescopic cylinder (354) is arranged in the bottom surface of the support platform (32). When the piston rod of the driving telescopic cylinder (354) is extended and retracted, the V-shaped rod (352) can be driven to adjust between a horizontal state and a vertical state. When the step b1 is performed, the piston rod of the driving telescopic cylinder (354) is pushed out, and the V-shaped rod (352) is in a vertical state, so that the hook of the crawler crane (4) can hook the V-shaped rod (352).

7. A method for repairing a breakwater for a wharf road according to claim 5, characterized in that: Both ends of each of the construction platforms (3) are provided with positioning components (36). When the steps b2 and b4 are performed, the positioning components (36) on the construction platform (3) in use are fitted with two long sides of the construction platform (3) in turnover state, and the construction platform (3) in turnover state can be lifted or lowered by adhering to the positioning components (36) provided on the construction platform (3) in use state.

8. A method for repairing a breakwater for a wharf road according to claim 7, characterized in that: Each of the support frames (31) comprises a plurality of columns (311), each of the columns (311) is arranged along the length direction of the support frame (31), and an X-shaped scissor rod (312) is arranged between any two adjacent columns (311), and each of the positioning components (36) comprises two adjustment mechanisms (361) respectively arranged on two long sides of the construction platform (3); When steps b2 and b4 are performed, two upright posts (311) of the construction platform (3) in a lifting state and close to a use state are respectively clamped by two adjusting mechanisms (361) at corresponding positions.

9. A method for repairing a breakwater for a wharf road according to claim 8, characterized in that: The adjusting mechanism (361) comprises a swing rod (362), a clamp rod (363), a first telescopic cylinder (364) and a second telescopic cylinder (365); the swing rod (362) is rotatably mounted on the bottom of the support platform (32); a limit rod (366) is horizontally arranged on one side of the swing rod (362) and is perpendicular to the length direction of the swing rod (362); the clamp rod (363) is slidably mounted on the swing rod (362); the swing rod (362) passes through the clamp rod (363); the first telescopic cylinder (364) is mounted on the construction platform (3) to drive the swing rod (362) to rotate; and the second telescopic cylinder (365) is mounted on the swing rod (362) to drive the clamp rod (363) to translate along the length direction of the swing rod (362).