Disassembling and dismantling method and disassembling and dismantling system for ultrahigh large-span pole tower

By dismantling the bottom and wellbore of the large span tower, and using double flat arm holders and cranes to remove the tower body one by one, the problems of large land occupation and great influence in the existing technology are solved, and efficient and environmentally friendly demolition effect is achieved .

CN118881237APending Publication Date: 2024-11-01ANHUI ELECTRIC POWER TRANSMISSION & TRANSFORMATION ENG CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410760402.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-13
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

The existing large-span tower removal methods have problems such as large area, large impact and low efficiency, especially the mechanical demolition method and blasting demolition method have a great impact on the environment and components, while the manual demolition method is more efficient and costly.

Method used

A decomposition and dismantling method and system are adopted to first remove the bottom and internal wellbore of the large span tower, set up a double flat arm hinge and unfold it on the top of the tower, cooperate with the construction personnel to remove the tower body one by one, and finally use a crane to remove the remaining tower body. , achieve efficient demolition and reduce the impact on the environment and site.

Benefits of technology

The efficient removal of the large-span tower is achieved, with a small area, high efficiency, and will not affect the surrounding environment and components, solving the problem that the bottom tower body exceeds the hoisting range and improving the reliability of the demolition.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118881237A_ABST
    Figure CN118881237A_ABST
Patent Text Reader

Abstract

The embodiment of the invention provides a disassembling and disassembling method and system for an ultrahigh large-span pole tower, and belongs to the technical field of large-span pole tower disassembling. The disassembling and dismantling method comprises the steps that ground auxiliary facilities at the bottom of the large-span tower are dismantled; a shaft in the middle of the interior of the large-span pole tower is dismantled; according to the method, the double-flat-arm derrick is assembled at the position of the original shaft, the double arms are unfolded at the top of the large-span tower, a constructor is matched with the double-flat-arm derrick to dismantle the tower body of the large-span tower from top to bottom, and finally the double-flat-arm derrick and the residual tower body of the large-span tower are dismantled, so that dismantling of the large-span tower is completed. When the dismantling method is used, a large area is not needed to be occupied, the dismantling efficiency is high, and the surrounding environment and components cannot be affected; in addition, the mode that the last two sections of the tower body are dismantled through a crane is adopted, and the problem that the tower body at the bottom end of a large-span tower exceeds the hoisting range of the double-flat-arm derrick can be effectively solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of long-span pole tower dismantling, and in particular to a disassembly and dismantling method and a disassembly and dismantling system for super-high long-span pole towers. Background Art

[0002] Long-span towers are a special type of transmission towers, mainly used to cross rivers, straits, lakes or other obstacles to ensure that power lines can be smoothly transmitted from one place to another. The design and construction of such towers usually need to consider a variety of factors, such as terrain, climate, soil conditions, line tension and safety standards.

[0003] At present, there are roughly three methods for dismantling pole towers. One is mechanical dismantling, which mainly uses mechanical equipment to dismantle pole towers. However, the mechanical dismantling method requires the use of more large-scale mechanical equipment, has high requirements for the site, and occupies a large area of ​​the site; the other is blasting demolition, which is a method of dismantling pole towers using explosives; however, the blasting demolition method requires the use of a large amount of explosives, which has a greater impact on the surrounding environment, and is prone to damage to pole tower components during the dismantling process; the third is manual dismantling, which is a method of dismantling pole towers using manual labor; however, the manual dismantling method has low demolition efficiency and high cost.

[0004] The inventors of the present application discovered during the process of realizing the present invention that the above-mentioned solutions in the prior art have the defects of large demolition area, large demolition impact and low demolition efficiency. Summary of the invention

[0005] The purpose of the embodiments of the present invention is to provide a disassembly method and disassembly system for super-high and long-span pole towers, which can realize efficient disassembly of long-span pole towers with little impact on the surroundings and occupy a small area during disassembly.

[0006] In order to achieve the above-mentioned object, an embodiment of the present invention provides a method for disassembling and removing a super-high and long-span pole tower, comprising:

[0007] Dismantle the ground auxiliary facilities at the bottom of the long-span tower;

[0008] Dismantling the shaft in the middle of the long-span tower;

[0009] A double-arm holding pole is assembled in the middle of the large-span pole tower, and the double arms of the double-arm holding pole are unfolded at the top of the large-span pole tower;

[0010] The double horizontal arm holding rod is driven to dismantle the tower body of the large span tower section by section from top to bottom;

[0011] Determining whether the number of remaining tower sections of the current long-span tower is less than or equal to two;

[0012] When it is determined that the number of remaining tower body sections of the current long-span tower is less than or equal to two, the double horizontal arm bracket is removed;

[0013] The remaining tower body of the large-span tower is dismantled using a crane.

[0014] Optionally, driving the double horizontal arm holding rod to dismantle the tower body of the long-span tower from top to bottom section by section comprises:

[0015] Driving the double horizontal arm holding rod to rotate;

[0016] Determine whether the two hooks of the double horizontal arm bracket have reached two of the main pipes diagonally distributed in the tower body respectively;

[0017] When it is determined that the two hooks of the double horizontal arm bracket have respectively reached two of the diagonally distributed main pipes in the tower body, the main pipes and / or the cross materials connected to the main pipes are tied;

[0018] Dismantling the main pipe and / or the cross material;

[0019] The double horizontal arm holding rod is driven to lift the main pipe and / or the cross material to the ground.

[0020] Optionally, driving the double horizontal arm holding rod to dismantle the tower body of the long-span tower from top to bottom section by section further includes:

[0021] Driving the double horizontal arm holding rod to rotate;

[0022] Determine whether the two hooks of the double horizontal arm bracket have reached the other two main pipes diagonally distributed in the tower body respectively;

[0023] When it is determined that the two hooks of the double horizontal arm bracket reach the other two main pipes diagonally distributed in the tower body respectively, the main pipes and / or the cross materials connected to the main pipes are tied;

[0024] Dismantling the main pipe and / or the cross material;

[0025] The double horizontal arm holding rod is driven to lift the main pipe and / or the cross material to the ground.

[0026] Optionally, driving the double horizontal arm holding rod to dismantle the tower body of the long-span tower from top to bottom section by section further includes:

[0027] Driving the double horizontal arm holding rod to rotate;

[0028] Binding the two hooks of the double horizontal arm holding rod to symmetrical auxiliary materials;

[0029] Disassembling the auxiliary materials;

[0030] The double horizontal arm holding rod is driven to lift the auxiliary material to the ground.

[0031] Optionally, binding the main pipe and / or the cross material connected to the main pipe comprises:

[0032] Hanging the first steel wire rope on the hook;

[0033] Determining whether the number of tower sections of the current long-span tower is less than or equal to six;

[0034] When it is determined that the number of tower sections of the current long-span tower is less than or equal to six, determining whether the side wall of the main pipe has a cross material;

[0035] In the case where it is determined that there is a cross material on the side wall of the main pipe, it is determined whether there is a horizontal pipe on the top of the main pipe;

[0036] When it is determined that there is a transverse pipe on the top of the main pipe, one end of the first steel wire rope is connected to the vicinity of an end of the transverse pipe away from the main pipe;

[0037] Connecting the other end of the first steel wire rope to the top of the main pipe;

[0038] A second steel wire rope is used to connect the end of the cross pipe away from the main pipe and the lower end of the cross member away from the main pipe;

[0039] When it is determined that there is no cross pipe on the top of the main pipe, one end of the first steel wire rope is connected to the center position of the cross material;

[0040] Connecting the other end of the first steel wire rope to the top of the main pipe;

[0041] When it is determined that there is no cross material on the side wall of the main pipe, the two ends of the first steel wire rope are respectively connected to the top symmetrical positions of the main pipe.

[0042] Optionally, tying the main pipe and / or the cross material connected to the main pipe further comprises:

[0043] When it is determined that the number of tower sections of the current long-span tower is greater than six, determining whether the tower material to be dismantled is a main pipe;

[0044] When it is determined that the tower material to be dismantled is a main pipe, two ends of the first steel wire rope are symmetrically connected to the top of the main pipe respectively;

[0045] When it is determined that the tower material to be dismantled is not a main pipe, the two ends of the first steel wire rope are respectively connected to the two ends of the top side of the cross material;

[0046] The ends of the other sides of the cross material are sequentially connected using a third steel wire rope to form a U shape.

[0047] Optionally, hand winches are provided on both opposite sides and the bottom edge of the third steel wire rope.

[0048] Optionally, dismantling the remaining tower body of the long-span tower by using a crane includes:

[0049] Driving the crane to move to the center of the remaining tower body;

[0050] Binding the crane to the tower material to be dismantled;

[0051] Dismantle the tower materials to be dismantled;

[0052] The crane is driven to lift the tower materials to be dismantled to the ground.

[0053] Optionally, dismantling the tower material to be dismantled includes:

[0054] Dismantle the horizontal material of the last section of the tower body of the long-span tower;

[0055] Dismantle the main pipe of the second to last section of the long-span tower;

[0056] The cross materials and auxiliary materials of the last section of the tower body of the large-span tower are removed.

[0057] On the other hand, the present invention also provides a disassembly and dismantling system using the disassembly and dismantling method as described above, comprising:

[0058] A double horizontal arm holding rod is used to extend out of the top of the long-span pole tower to dismantle the tower body of the long-span pole tower;

[0059] The crane is used to assemble or dismantle the double-arm bracket and dismantle the last two sections of the long-span tower.

[0060] Through the above technical scheme, the disassembly and dismantling method and disassembly and dismantling system for super-high and long-span pole towers provided by the present invention first dismantle the bottom ground auxiliary facilities at the bottom of the long-span pole tower, and then dismantle the shaft in the middle of the large-span pole tower. After the dismantling is completed, a double horizontal arm holding rod is assembled at the original shaft position, and the double arms are unfolded at the top of the large-span tower. The construction personnel cooperate with the double horizontal arm holding rod to dismantle the tower body of the large-span pole tower from top to bottom, and finally dismantle the double horizontal arm holding rod and the remaining tower body of the large-span pole tower to complete the dismantling of the large-span pole tower. This dismantling method does not need to occupy a large area when used, has high dismantling efficiency, and will not affect the surrounding environment and components; in addition, the method of using a crane to dismantle the last two sections of the tower body can effectively solve the problem that the tower body at the bottom of the large-span pole tower exceeds the lifting range of the double horizontal arm holding rod, thereby improving the reliability of the dismantling of the large-span pole tower.

[0061] Other features and advantages of the embodiments of the present invention will be described in detail in the subsequent detailed description. BRIEF DESCRIPTION OF THE DRAWINGS

[0062] The accompanying drawings are used to provide a further understanding of the embodiments of the present invention and constitute a part of the specification. Together with the following specific implementations, they are used to explain the embodiments of the present invention, but do not constitute a limitation on the embodiments of the present invention. In the accompanying drawings:

[0063] Figure 1 This is a flow chart of a method for disassembling and removing a super-high and long-span pole tower according to one embodiment of the present invention;

[0064] Figure 2 It is a flow chart of dismantling a power distribution room in a method for disassembling an ultra-high voltage long-span pole tower according to an embodiment of the present invention;

[0065] Figure 3 It is a flow chart of dismantling a shaft in a method for disassembling an ultra-high voltage long-span tower according to one embodiment of the present invention;

[0066] Figure 4 It is a flow chart of removing an elevator in a shaft in a method for disassembling an ultra-high voltage long-span tower according to an embodiment of the present invention;

[0067] Figure 5 It is a flow chart of dismantling multiple shaft sections in a method for disassembling an ultra-high voltage long-span tower according to one embodiment of the present invention;

[0068] Figure 6 This is a flow chart of assembling a double-horizontal arm bracket in a method for disassembling an ultra-high voltage long-span pole tower according to an embodiment of the present invention;

[0069] Figure 7It is a flow chart of dismantling a tower body in a method for dismantling an ultra-high voltage long-span pole tower according to one embodiment of the present invention;

[0070] Figure 8 This is a flow chart of tying tower materials in a method for disassembling and removing an ultra-high voltage long-span tower according to an embodiment of the present invention;

[0071] Fig. 9 This is a flow chart of crane dismantling in a method for disassembling an ultra-high voltage long-span pole tower according to an embodiment of the present invention;

[0072] Fig.10 It is a flow chart of dismantling the last two sections of the tower body in the disassembly and dismantling method for an ultra-high voltage long-span tower according to one embodiment of the present invention;

[0073] Fig.11 It is a schematic diagram of dismantling a tower body by holding a pole with double horizontal arms in a method for dismantling an ultra-high voltage long-span pole tower according to an embodiment of the present invention;

[0074] Fig.12 It is a schematic diagram of hoisting the main pipe, the cross pipe and the cross material assembly components in the method for disassembling and removing the ultra-high voltage long-span pole tower according to one embodiment of the present invention;

[0075] Fig.13 It is a schematic diagram of hoisting a main pipe and a cross material assembly component in a method for disassembling and removing an ultra-high voltage long-span pole tower according to an embodiment of the present invention;

[0076] Fig.14 It is a schematic diagram of hoisting the main pipe in the method for disassembling and removing the ultra-high voltage long-span tower according to one embodiment of the present invention;

[0077] Fig.15 It is a schematic diagram of hoisting cross materials in a method for disassembling and removing an ultra-high voltage long-span tower according to an embodiment of the present invention;

[0078] Fig.16 It is a schematic diagram of hoisting auxiliary materials in a method for disassembling and removing an ultra-high voltage long-span tower according to an embodiment of the present invention;

[0079] Fig.17 It is a schematic diagram of on-site hoisting of components in a method for disassembling and removing an ultra-high voltage long-span tower according to an embodiment of the present invention;

[0080] Fig.18 It is a schematic diagram of on-site hoisting of the main pipe in the method for disassembling and removing an ultra-high voltage long-span pole tower according to one embodiment of the present invention;

[0081] Fig.19It is a schematic diagram of on-site hoisting by a crane in a method for disassembling and removing an ultra-high voltage long-span pole tower according to an embodiment of the present invention.

[0082] Description of Reference Numerals

[0083] 1. Double horizontal arm pole 2. Large span pole tower

[0084] 3. Hook 4. First wire rope

[0085] 5. Hand chain hoist 6. Supervisor

[0086] 7. Cross material 8. Second wire rope

[0087] 9. Horizontal tube 10. Third wire rope

[0088] 11. Auxiliary materials DETAILED DESCRIPTION

[0089] The specific implementation of the embodiment of the present invention is described in detail below in conjunction with the accompanying drawings. It should be understood that the specific implementation described here is only used to illustrate and explain the embodiment of the present invention, and is not used to limit the embodiment of the present invention.

[0090] Figure 1 The flowchart of the method for disassembling and removing a super-high long-span pole tower according to one embodiment of the present invention is shown in FIG. Figure 1 In the present invention, the decomposition and removal method may include:

[0091] In step S10, the auxiliary facilities at the bottom of the long-span tower 2 are removed. The auxiliary facilities at the bottom of the long-span tower 2 may include its auxiliary power distribution room, temporary buildings and walls.

[0092] In step S11, the middle shaft inside the long-span tower 2 is dismantled, wherein the dismantling of the shaft includes the dismantling of the elevator, ladder, rest platform, etc. inside the shaft.

[0093] In step S12, a double-arm holding pole 1 is assembled in the middle of the long-span pole tower 2, and the double arms of the double-arm holding pole 1 are deployed at the top of the long-span pole tower 2. After the shaft is removed, the double-arm holding pole 1 is assembled at the position of the original shaft, and the suspension height of the double-arm holding pole 1 is made greater than the height of the top of the long-span pole tower, so that the disassembled tower materials can be easily suspended and transported.

[0094] In step S13, the double horizontal arm holding rod 1 is driven to dismantle the tower body of the long span pole tower 2 from top to bottom section by section. When the long span pole tower 2 is dismantled from top to bottom, the double horizontal arm holding rod 1 needs to cooperate with the construction personnel, and the construction personnel dismantle the connecting pipes and supporting pipes (i.e., tower materials) of the long span pole tower 2, and the double horizontal arm holding rod 1 hoists the dismantled connecting pipes and supporting pipes to the ground.

[0095] In step S14, it is determined whether the remaining tower bodies of the current long-span tower 2 are less than or equal to two.

[0096] In step S15, when it is determined that the number of remaining tower sections of the current long-span pole tower 2 is less than or equal to two, the double horizontal arm bracket 1 is removed. If the number of remaining tower sections of the current long-span pole tower 2 is less than or equal to two, it means that the current long-span pole tower 2 has been dismantled to only two tower sections. At this time, considering the disassembly height and related requirements, a crane can be used to dismantle the remaining tower. Specifically, before dismantling the remaining two tower sections, the double horizontal arm bracket 1 needs to be dismantled to facilitate the entry of the crane.

[0097] In step S16, a crane is used to dismantle the remaining tower body of the long-span tower 2.

[0098] In step S10 to step S16, when it is necessary to dismantle the long-span pole tower 2, the ground facilities at the bottom thereof are first dismantled, and the corresponding lines are disconnected to ensure the safety of the dismantling process. Secondly, the shaft part in the middle of the long-span pole tower 2 is dismantled to facilitate the subsequent assembly of the double horizontal arm holding rod 1. After the double horizontal arm holding rod 1 is assembled, the double arms of the double horizontal arm holding rod 1 are unfolded at the top of the long-span pole tower 2 so that the suspension height of the double horizontal arm holding rod 1 is higher than the top of the long-span pole tower 2. Therefore, the construction personnel can cooperate with the double horizontal arm holding rod 1 to lift the corresponding tower materials to the bottom of the long-span pole tower 2 after dismantling them. In this way, the long-span pole tower 2 is disassembled and dismantled layer by layer from top to bottom until the bottom tower body of the long-span pole tower 2 is dismantled. When dismantling the bottom tower body of the long-span pole tower 2, that is, the last two sections of the tower body at the bottom, the double horizontal arm holding rod 1 is first dismantled, and then the bottom tower body of the long-span pole tower 2 is dismantled.

[0099] There are three main methods for dismantling traditional long-span pole towers. The first is to use mechanical equipment to dismantle the pole tower, but it requires the use of more large equipment and occupies a large area. The second is to use explosives to demolish the pole tower, but it has a great impact on the surrounding environment and is easy to damage the pole tower components. The third is manual demolition, but the cost is high and the efficiency is low. In this embodiment of the present invention, the method of assembling a double horizontal arm holding rod 1 at the original shaft position of the long-span pole tower 2 is adopted, which does not require a large construction area and will not affect the surrounding environment and tower material components. At the same time, the method of driving the double horizontal arm holding rod 1 to cooperate with the construction personnel to dismantle layer by layer is simple to operate, has high dismantling efficiency, and effectively reduces the dismantling cost. In addition, since the bottom end of the large-span tower in the prior art, that is, the weight of part of the tower material in the last two sections of the tower body exceeds the lifting range of the double horizontal arm holding rod 1, it cannot be lifted and dismantled, thereby affecting the efficiency and reliability of the dismantling of the large-span pole tower 2. In this embodiment of the present invention, a crane is used to dismantle the remaining two sections of the tower body, which can be used in conjunction with the double horizontal arm bracket 1 to reliably and effectively dismantle the entire long-span tower 2, ensuring the stability and efficiency of the dismantling of the long-span tower 2.

[0100] In this embodiment of the present invention, when it is necessary to remove the ground auxiliary facilities at the bottom of the long-span tower 2, it is also necessary to disconnect the power supply of the relevant lines. The specific removal steps can be as follows: Figure 2 Specifically, Figure 2 In the above, the decomposition and removal method may further include:

[0101] In step S100, the power supply is cut off for the lines connected to the power distribution room at the bottom of the long-span tower 2. In order to ensure the safety of the long-span tower 2 during dismantling, it is necessary to cut off the power supply of the relevant lines involved in the power distribution room. Specifically, the power distribution room is an important component of the power system. If the power is not cut off first, it may cause interference or danger to the power system during the dismantling process, affect the normal operation of other equipment, and also affect the life safety of construction workers.

[0102] In step S101, the lines inside the power distribution room are removed. Since the long-span pole tower 2 is removed by using a double-arm bracket 1, and is located at the inner center of the long-span pole tower 2, its four legs need to be tied with guy wires, which will inevitably damage the bottom power distribution room, so the power distribution room needs to be removed as a whole. When the power distribution room is removed, the lines inside it need to be removed first.

[0103] In step S102, an excavator is used to demolish the power distribution room, temporary buildings and walls. After the internal lines are removed, the power distribution room can be demolished by small excavation, and the temporary buildings and walls can also be demolished. Specifically, it is necessary to pay attention to whether there is a steel bar connection at the location where the roof of the power distribution room is connected to the shaft. If there is, it needs to be cut off in advance to avoid affecting the shaft when dismantling the power distribution room.

[0104] In step S100 to step S102, when dismantling the ground auxiliary facilities at the bottom of the large span tower 2, it is necessary to shut down the power supply of the power distribution room related lines, and then dismantle the lines inside it. Finally, use an excavator to dismantle the power distribution room, temporary buildings, and walls. Specifically, for the dismantling of the power distribution room, first disconnect the power supply of the electrical equipment in the power distribution room, and after confirming the power outage, manually move all small objects in the power distribution room. Remove the distribution cabinet and the pipelines (gas and water lines) and wires and cables, transformers and other equipment inside the power distribution room and transport them to the warehouse. The demolition method for brick walls is to dismantle from top to bottom, and if necessary, the method of pushing or pulling can be used. The specific demolition sequence can include roof waterproofing and insulation layer → roof concrete and prefabricated floor slabs → roof beams → top brick walls → floor slabs → beams under the floor slabs → lower brick walls.

[0105] In this embodiment of the present invention, since an elevator is also provided inside the shaft of the long-span tower 2, when the shaft is dismantled, the elevator inside the shaft also needs to be dismantled. The specific dismantling steps can be as follows: Figure 3 shown.

[0106] Specifically, in Figure 3 In the above, the decomposition and removal method may further include:

[0107] In step S110, the elevator inside the shaft is dismantled, wherein the elevator includes an elevator car, an elevator running track, a hoisting device, etc.

[0108] In step S111, it is determined whether the elevator has been dismantled.

[0109] In step S112, when it is determined that the elevator is dismantled, the shaft is dismantled, wherein the shaft includes multiple shaft sections, walkways, platforms, and the like.

[0110] In this embodiment of the present invention, in order to dismantle the elevator running track and the elevator car inside the shaft, it is also necessary to arrange the construction personnel on the top of the elevator car to facilitate the dismantling section by section. The specific dismantling steps can be as follows: Figure 4 Specifically, Figure 4 In the above, the decomposition and removal method may further include:

[0111] In step S1100, the elevator car in the shaft is driven to move to the top of the shaft, wherein the construction personnel are located at the top of the elevator car.

[0112] In step S1101, the elevator car is driven to move from top to bottom to cooperate with the construction personnel to remove the elevator running rails inside the shaft section by section. When the elevator car moves section by section from top to bottom, the construction personnel can remove the elevator running rails section by section.

[0113] In step S1102, it is determined whether the elevator running guide rails have been removed.

[0114] In step S1103, when it is determined that the removal of the elevator running rail is completed, the counterweight of the elevator car is fixed to the top of the shaft. After the elevator running rail is removed, the elevator car needs to be removed. Specifically, the elevator car is at the bottom at this time, and the elevator counterweight needs to be fixed to the elevator main load-bearing steel beam at the top of the shaft to facilitate the removal of the elevator car. Specifically, the fixing of the counterweight can include a wire rope fixing method.

[0115] In step S1104, the elevator car is dismantled.

[0116] In step S1105, a steering pulley is arranged at the top of the shaft, and a steel wire rope is wound around the steering pulley. The steering pulley is a 5T steering pulley, and the 5T steering pulley is arranged on the elevator mainframe load-bearing steel beam at the top of the shaft.

[0117] In step S1106, one end of the steel wire rope is connected to the balancing weight, and the other end of the steel wire rope is connected to the tractor capstan. The steel wire rope includes a φ12.5 steel wire rope.

[0118] In step S1107, the tractor capstan is driven to start, so as to lift the balancing weight to the ground.

[0119] In step S1108, the hoisting equipment and the elevator wire rope are removed. When the hoisting equipment needs to be removed, a separately designed and processed lifting beam is set at the top of the elevator shaft, and the elevator wire rope is temporarily fixed on the lifting beam, and then the hoisting equipment is removed. Specifically, a 5T steering pulley is set on the lifting beam, and the hoisting equipment can be lifted to the ground with a φ12.5 wire rope and a tractor capstan. After the hoisting equipment is removed, a φ12.5 wire rope and a tractor capstan are used to lift the elevator wire rope to the ground. In addition, the cable elevator control unit, the elevator main machine load-bearing steel beam, etc. can also be removed and lifted to the ground using a φ12.5 wire rope and a tractor capstan.

[0120] In step S1100 to step S1108, the elevator car in the shaft is first driven to move to the top of the shaft, and the construction personnel are located on the top of the elevator car. The elevator car is driven to move from top to bottom, and the construction personnel are cooperated to remove the elevator running rails section by section. After the elevator running rails are removed, the balance weight of the elevator car is fixed to the top of the shaft by a wire rope, and the elevator car is removed. A steering pulley is set at the top of the shaft, and the wire rope is wound along the steering pulley. The other end of the wire rope is connected to the tractor capstan. The tractor capstan cooperates with the wire rope to dismantle other elevator devices such as the balance weight, hoisting equipment, and elevator wire rope. The operation is simple and convenient. In addition, the dismantling of the power distribution room and the elevator dismantling construction can be carried out simultaneously to improve the dismantling efficiency.

[0121] In this embodiment of the present invention, after the elevator inside the shaft is dismantled, its body and the external walkway, platform, etc. need to be dismantled. The specific dismantling steps can be as follows: Figure 5 Specifically, Figure 5 In the above, the decomposition and removal method may further include:

[0122] In step S1120, a lifting point is set at the top of the long-span tower 2. Multiple groups of φ21.5 steel wire ropes are used to form the lifting point. The φ21.5×4.5 / 6m steel wire rope head is tied to the top of the steel pipe of the ground wire support, connected with an 8-ton shackle, and a 10-ton lifting pulley is used to form a V-sleeve. A 4.5m long steel wire rope is connected in series with a 9-ton hand lever hoist for tension adjustment. Adjust the hand lever hoist to tighten the rope length of the steel wire rope until the top surface of the tower body is 1m high. A 10-ton ring high-speed pulley is installed on the φ21.5 steel wire rope, and the lifting pulley is connected to the eccentric steel wire rope through a 5-ton shackle and DB-25. The eccentric steel wire rope is adjusted by connecting a φ12.5 steel wire rope to a 6-ton hand lever hoist. A φ12.5×10m steel wire rope is used to tie the V-shaped rope loop set at the intersection of the main pipes to ensure that the eccentric steel wire rope is located in the center. The lifting wire rope is carried out in a single end, and the lifting wire rope is connected to the hook 3.

[0123] In step S1121, the two sections at the top of the shaft are dismantled using the lifting points. Considering that the space at the top of the long-span tower 2 is small, there is not enough space for the shaft to fall after it is lifted, so the two sections at the top of the shaft are dismantled first. Specifically, before dismantling the two sections at the top of the shaft, the external walkway, platform, cross auxiliary materials inside the tower body, and the connecting components between the tower body and the shaft are first dismantled, and the above components are all dismantled through the lifting points.

[0124] In step S1122, an electric crane is set up at the connection between the third section of the tower body and the cross arm of the long-span tower 2. After the two sections at the top of the shaft are removed, the upper plane of the steel pipe at the connection between the third section of the tower body and the cross arm of the long-span tower 2 is cut and smoothed by electric welding, and the electric crane is set up using the auxiliary lifting point of the ground wire cross arm, and then the electric crane is installed on the steel pipe at the connection between the third section of the tower body and the cross arm of the long-span tower 2.

[0125] In step S1123, the electric crane is used to dismantle the other sections of the shaft in sequence and hoist them to the ground. The electric crane is connected to the single section of the shaft by the lifting wire rope, and can dismantle the shaft from top to bottom in sequence and hoist it to the ground. Specifically, before dismantling the shaft, the walkway, platform, and connecting components with the tower body on the outside are first dismantled.

[0126] In step S1120 to step S1123, a plurality of sets of steel wire ropes are first used to set a lifting point on the top of the long-span pole tower 2, and the two sections at the top of the shaft are removed by using the lifting point. After the removal is completed, there is enough space on the top of the long-span pole tower 2, and an electric crane is set up at the connection between the third section of the tower body and the cross arm of the long-span pole tower 2, and the other sections of the shaft are removed section by section and hoisted to the ground by using the electric crane.

[0127] In this embodiment of the present invention, after the shaft and the elevator in the middle of the large span tower 2 are removed, it is necessary to set up a tower crane track at the original shaft position to facilitate the subsequent lifting and deployment of the double horizontal arm holding rod 1. The specific steps can be as follows: Figure 6 Specifically, Figure 6 In the above, the decomposition and removal method may further include:

[0128] In step S120, a tower crane track is set up in the middle of the long-span tower 2. The tower crane track can be assembled and lifted by a crane and an electric crane.

[0129] In step S121, the tower crane track is built to the top of the long-span tower 2. In order to maximize the efficiency of pole assembly and facilitate debugging, a 150-meter-high standard section is hoisted by a crane. After the waist ring is set, the slewing body, mast, and vertical hoisting arm are hoisted in sequence and fixed on the tower body. The electric crane is removed by the top ground wire cross arm sling and dropped to the ground to free up the top space.

[0130] In step S122, the double-arm holding rod 1 is driven to move along the tower crane track to the top of the long-span pole tower 2. The remaining 80-meter standard sections are lifted in sequence using the hydraulic lifting system, the double-arm holding rod 1 is extended out of the tower top, the double arms are unfolded, the arm and the trolley wire rope are passed through, and a pre-lifting test is carried out. After completion, the dismantling operation can begin.

[0131] In step S120 to step S122, a tower crane track is first set up in the middle of the long-span tower 2 until it reaches the top of the long-span tower 2. Then the double-arm holding rod 1 is driven to move along the tower crane track to the top of the long-span tower 2, and the double arms are unfolded.

[0132] In this embodiment of the present invention, after the double horizontal arm bracket 1 is unfolded, the tower body of the long span tower 2 needs to be dismantled from top to bottom, and before dismantling the tower body, the ground wire bracket and the conductor cross arm on the tower body need to be dismantled. Specifically, the disassembly and dismantling method may also include:

[0133] Connect the lifting rope of the double horizontal arm holding rod 1 to the ground wire bracket, and drive the double horizontal arm holding rod 1 to remove and lift the ground wire bracket. Among them, the ground wire bracket is located at the top, so the ground wire bracket is removed first. When removing the ground wire bracket, first use the lifting rope to tie the ground wire bracket, then the construction personnel remove the ground wire bracket, and finally drive the double horizontal arm holding rod 1 to lift the ground wire bracket to the ground. Specifically, when the ground wire bracket is placed at the bottom of the tower body, as the width of the tower body increases, the horizontal arm walking trolley needs to be gradually moved outward until 22 meters. At this time, the lifting weight of the holding rod is 4840kg, which does not meet the safe lifting of the removed components. Therefore, the walkway in the ground wire bracket needs to be removed in advance, and the plane auxiliary materials on the ground wire bracket are removed before removing the walkway. The auxiliary materials are removed and tied to the walkway, and then the walkway is removed together to the ground. Hang a chain hoist on the lifting point rope of the ground wire bracket close to the hanging point to adjust the lifting point rope. Then connect the hand hoist and wire rope between the upper and lower planes, and adjust the hand hoist to make the upper and lower hanging point ropes evenly stressed.

[0134] Furthermore, the lifting rope of the double horizontal arm holding rod 1 is connected to the guide cross arm, and the double horizontal arm holding rod 1 is driven to remove and lift the guide cross arm. After the ground wire bracket is removed, the lifting rope is tied to the conductor cross arm, and then the conductor cross arm is removed by the construction personnel, and finally the double horizontal arm holding rod 1 is driven to lift the conductor to the ground. Specifically, when the ground wire bracket is placed at the bottom of the tower body, as the width of the tower body increases, the horizontal arm walking trolley needs to be gradually moved outward until 21 meters. At this time, the lifting weight of the holding rod is 5160kg, which does not meet the safe lifting of the removed components. Therefore, the walkway in the conductor cross arm needs to be removed in advance, and the plane auxiliary materials on the conductor cross arm need to be removed before the walkway is removed. The auxiliary materials are removed and placed on the walkway for removal together. For the lifting point rope of the conductor cross arm close to the hanging point side, a chain hoist is hung to adjust the lifting point rope. Then, a hand winch and a wire rope are connected between the upper and lower planes, and the hand winch is adjusted to make the upper and lower lifting point ropes evenly stressed.

[0135] In this embodiment of the present invention, after the conductor cross arm is removed, the tower materials of the tower body need to be removed. The specific removal steps can be as follows: Figure 7 Specifically, in the figure, the decomposition and removal method may also include:

[0136] In step S130, the double horizontal arm holding pole 1 is driven to rotate. When the double horizontal arm holding pole 1 rotates, the hooks 3 on the two holding poles rotate along with the corresponding holding poles. Specifically, the schematic diagram of the double horizontal arm holding pole 1 in dismantling the tower body can be as follows: Fig.11 shown.

[0137] In step S131, it is determined whether the two hooks 3 of the double horizontal arm holding rod 1 have reached two of the diagonally distributed main pipes 6 in the tower body. For the tower body of the long-span pole tower 2, the ground wire support section and the conductor cross arm section are generally used as the first section and the second section, respectively, so the remaining tower body is disassembled from the third section. In addition, after the conductor cross arm is removed, the waist ring of the wellhead section needs to be removed to facilitate the installation of the third section main pipe 6 and auxiliary materials 11, so the holding rod needs to drop 4 standard sections.

[0138] In step S132, when it is determined that the two hooks 3 of the double horizontal arm holding rod 1 have respectively reached two of the main pipes 6 that are diagonally distributed in the tower body, the main pipes 6 and / or the cross materials 7 connected to the main pipes 6 are tied. Among them, the two hooks 3 are moved to the two diagonal main pipes 6 to meet the basic requirements of demolition. Specifically, the basic requirements for demolition include: in order to ensure the lifting balance and stability of the two ends of the double horizontal arm holding rod 1, it is necessary to carry out symmetrical demolition on both sides, the maximum lifting weight on one side does not exceed 8t, and the weight of the hanging parts on both sides is basically equal, the amplitude of the trolleys on both sides is basically the same, and the hanging parts on both sides leave the tower body and fall to the ground at the same time. In addition, during demolition, the tower material components should be demolished as far as possible in the horizontal and along-line directions, and close to the tower body, so as to facilitate the landing of the tower materials. The placement position of the hanging parts is symmetrically arranged opposite to the center of the holding rod, and the hook 3 should be directly opposite to the center of gravity of the hanging parts. At this time, the displacement of the center of gravity of the hanging parts causes the force on the trolley variable-length wire rope to be less than 500kg.

[0139] Specifically, each section of the tower body includes a main pipe 6, a cross material 7 and other auxiliary materials 11. When each section of the tower body is dismantled, two diagonal main pipes 6 are generally dismantled first, and then the other two diagonal main pipes 6 are dismantled. At the same time, considering that the tower body materials of the upper layer are smaller in volume and lighter in weight, the main pipes 6 and cross materials 7 are generally dismantled as a whole for the dismantling of the upper layer of the tower body; while the tower body of the lower layer is larger in volume and heavier in weight, the main pipes 6 and cross materials 7 can only be dismantled separately. Therefore, the steps for binding the main pipes 6 and / or cross materials 7 can be as follows: Figure 8 Specifically, Figure 8 In the above, the decomposition and removal method may further include:

[0140] In step S1320, the first steel wire rope 4 is hung on the hook 3. The first steel wire rope 4 may include a φ21.5 steel wire rope and a φ17.5 steel wire rope. Specifically, the first steel wire rope 4 may also include two steel wire ropes respectively connected to the hook 3.

[0141] In step S1321, it is determined whether the number of tower sections of the current long-span tower 2 is less than or equal to six.

[0142] In step S1322, when it is determined that the number of tower sections of the current long-span tower 2 is less than or equal to six, it is determined whether there is a cross material 7 on the side wall of the main pipe 6. Among them, when the number of tower sections currently being dismantled is between three and six, it means that the tower materials currently being dismantled are small in volume and weight, and the main pipe 6 and the cross material 7 can be dismantled together. Specifically, in sections four, five and six, some main pipes 6 need to be dismantled separately, so when dismantling the tower materials of sections three to six, it is also necessary to determine whether the side wall of the main pipe 6 is connected with a cross material 7.

[0143] In step S1323, when it is determined that there is a cross member 7 on the side wall of the main pipe 6, it is determined whether there is a transverse pipe 9 on the top of the main pipe 6. If there is a cross member 7 on the side wall of the main pipe 6, it means that the shape of the component composed of the main pipe 6 and the cross member 7 is irregular, and it is necessary to further determine whether there is a transverse pipe 9 on the side wall of the main pipe 6.

[0144] In step S1324, when it is determined that there is a transverse tube 9 on the top of the main pipe 6, one end of the first steel wire rope 4 is connected to the vicinity of the end of the transverse tube 9 away from the main pipe 6. If there is also a transverse tube 9 on the top of the main pipe 6, the stability of the transverse tube 9 also needs to be considered, so one end of the first steel wire rope 4 is connected to the vicinity of the end of the transverse tube 9 away from the column pipe. Further, considering that the main pipe 6 is generally arranged vertically or tilted, and the transverse tube 9 is arranged horizontally, there is a certain distance between the connection point / hanging point position of one end of the first steel wire rope 4 and the transverse tube 9 and the end of the transverse tube 9 away from the main pipe 6 to further ensure its balance. Specifically, in order to ensure the stability of the component during the process of hoisting to the ground, a 5t hand chain hoist 5 is arranged between the first steel wire rope 4 and the hanging point of the hook 3 and the transverse tube 9. Specifically, both ends of the first steel wire rope 4 are provided with buckles, the hook of the hand chain hoist 5 is hung on one of the buckles, and the other buckle is connected to the hook 3 through a shackle.

[0145] In step S1325, the other end of the first steel wire rope 4 is connected to the top of the main pipe 6. The two ends of the first steel wire rope 4, the top of the main pipe 6 and the cross pipe 9 form a stable triangular structure.

[0146] In step S1326, a second steel wire rope 8 is used to connect the end of the cross tube 9 away from the main tube 6 and the lower end of the cross material 7 away from the main tube 6. Among them, the end of the cross tube 9 away from the main tube 6 is generally not connected to the cross material 7. Therefore, in order to further improve the stability during lifting, the end of the cross tube 9 away from the main tube 6 is connected to the lower end of the cross material 7 away from the main tube 6, that is, the lower right end of the cross material 7. Specifically, in order to ensure the stability of the component during the process of lifting it to the ground, a 1t hand winch 5 is provided on the second steel wire rope 8. Specifically, the second steel wire rope 8 may include a φ12.5 steel wire rope. In addition, the lifting of the component formed by the combination of the main tube 6, the cross tube 9 and the cross material 7 can be as follows Fig.12 As shown, the on-site hoisting diagram of the component formed by the main pipe 6, the cross pipe 9 and the cross material 7 can be as follows Fig.17 shown.

[0147] In step S1327, when it is determined that there is no cross tube 9 on the top of the main pipe 6, one end of the first steel wire rope 4 is connected to the center of the cross member 7. If there is no cross tube 9 on the top of the main pipe 6, that is, the main pipe 6 is only connected to the cross member 7, one end of the first steel wire rope 4 needs to be connected to the center of the cross member 7 to improve the stability of the component.

[0148] In step S1328, the other end of the first steel wire rope 4 is connected to the top of the main pipe 6. The hoisting of the member composed of the main pipe 6 and the cross material 7 can be as follows: Fig.13 shown.

[0149] In step S1329, when it is determined that there is no cross material 7 on the side wall of the main pipe 6, the two ends of the first steel wire rope 4 are connected to the top symmetrical positions of the main pipe 6. If there is no cross material on the side wall of the main pipe 6, it means that the component is only the main pipe 6, and the hanging point can be directly set at the top of the main pipe 6, and it is symmetrical. Specifically, the first steel wire rope 4 can include a φ21.5 steel wire rope, a φ17.5 steel wire rope, and a φ19.5 steel wire rope. In addition, the hanging diagram of the main pipe 6 can be as follows Fig.14 As shown, the on-site hoisting diagram of the main pipe 6 can be as follows Fig.18 shown.

[0150] In step S1330, when it is determined that the number of tower sections of the current long-span tower 2 is greater than six, it is determined whether the tower material to be dismantled is the main pipe 6. If the number of tower sections to be dismantled is greater than six, that is, seven to twenty sections, the tower material is large in volume and heavy in weight, so the main pipe 6 and the cross material 7 are generally dismantled and hoisted separately.

[0151] In step S1331, when it is determined that the tower material to be dismantled is the main pipe 6, the two ends of the first steel wire rope 4 are symmetrically connected to the top of the main pipe 6. If the tower material to be dismantled is the main pipe 6, as described above, symmetrical hanging points are provided on the top of the main pipe 6, and the two ends of the first steel wire rope 4 can be connected to the two hanging points respectively.

[0152] In step S1332, when it is determined that the tower material to be dismantled is not the main pipe 6, the two ends of the first steel wire rope 4 are respectively connected to the two ends of the top side of the cross material 7. Among them, if the tower material to be dismantled is not the main pipe 6, it may be the cross material 7 or the auxiliary material 11. The binding of the auxiliary material 11 is not considered here, so it is the cross material 7. In addition, further judgments on the cross material 7 and the auxiliary material 11 can be added here, which will not be elaborated here. Specifically, the first steel wire rope 4 includes a φ17.5 steel wire rope and a φ19.5 steel wire rope. In addition, the schematic diagram for the hoisting of the cross material 7 can be as follows Fig.15 shown.

[0153] In step S1333, the ends of the other sides of the cross member 7 are sequentially connected by the third steel wire rope 10 to form a U-shape. In particular, due to the shape characteristics of the cross member 7, in order to ensure the stability of the cross member 7 during lifting, the ends of the cross member 7 are sequentially connected to form a U-shape. At the same time, a 3t hand winch 5 is provided on the three sides of the U-shape (the two opposite sides and the bottom side), and the third steel wire rope 10 includes a φ15.5 steel wire rope.

[0154] In step S1320 to step S1333, when the main pipe 6 and / or the cross material 7 are first tied, the first steel wire rope 4 is first hung on the hook 3, and the number of sections of the tower body to be dismantled is judged. If the number of sections of the tower body to be dismantled is less than or equal to six, that is, when the tower material is small and light, it is further determined whether there is a cross material 7 on the side wall of the main pipe 6. If there is a cross material 7 on the side wall of the main pipe 6, it is determined whether there is a cross pipe 9 connected to its top. If a cross pipe 9 is provided on the top of the main pipe 6, it is necessary to set a hanging point at the top of the main pipe 6 and near the end of the cross pipe 9 away from the main pipe 6, and connect the end of the cross pipe 9 away from the main pipe 6 to the lower right end of the cross material 7 to improve the stability during hoisting. If there is no cross pipe 9 on the top of the main pipe 6, the top of the main pipe 6 and the center position of the cross material 7 are used as two hanging points for hoisting. If there is no cross material 7 on the side wall of the main pipe 6, symmetrical hanging points are set on the top of the main pipe 6 for hoisting. In addition, if the number of sections of the tower body to be dismantled is greater than six, that is, the tower materials are large and heavy, the main pipe 6 and the cross material 7 need to be hoisted separately. Specifically, the hoisting of the main pipe 6 is the same as above, and symmetrical hoisting points are set at the top. When hoisting the cross material 7, hoisting points can be set at both ends above the cross material 7, and the ends of the cross material 7 can be tied into a U shape using a third steel wire rope 10, thereby forming a stable hoisting structure. The above-mentioned fixed-point hoisting method can, on the one hand, realize stable and reliable hoisting of the tower body and tower materials, and on the other hand, it can effectively improve the efficiency and convenience of tower body dismantling, that is, efficient dismantling.

[0155] In step S133, the main pipe 6 and / or the cross material 7 are disassembled. When the component cannot be disassembled, it cannot be disassembled blindly. The holding rod continues to keep the component under stress, and oxygen welding is considered to cut the component. At the same time, the double horizontal arm holding rod 1 is driven to lift the main pipe 6 and / or the cross material 7 to the ground. During the lifting process, the rope should be tightened to prevent the tower material components from colliding with the iron tower. When the trolley amplitude is larger than the tower amplitude, the rope of the hanging part does not need to be stressed, and it is only used to prevent the component from rotating.

[0156] In step S134, the double-arm boom 1 is driven to rotate.

[0157] In step S135, it is determined whether the two hooks 3 of the double horizontal arm bracket 1 have reached the other two main pipes 6 diagonally distributed in the tower body. After removing two of the main pipes 6 and cross materials 7 of the tower body, the other two main pipes 6 and cross materials 7 are removed.

[0158] In step S136, when it is determined that the two hooks 3 of the double horizontal arm bracket 1 have reached the other two main pipes 6 diagonally distributed in the tower body, the main pipes 6 and / or the cross materials 7 connected to the main pipes 6 are tied. The tying strategy can refer to the above steps.

[0159] In step S137, the main pipe 6 and / or the cross material 7 are disassembled. After the disassembly, the double horizontal arm holding rod 1 is driven to lift the main pipe 6 and / or the cross material 7 to the ground.

[0160] In step S138, the double-arm boom 1 is driven to rotate.

[0161] In step S139, the two hooks 3 of the double horizontal arm bracket 1 are tied to the symmetrical auxiliary material 11. Among them, since the structure of the auxiliary material 11 is irregular and can include various shapes, the lifting of the auxiliary material 11 only needs to meet the lifting requirements and the lifting point is stable. Specifically, when the beam and the bracket are removed, they are lifted at two or three points depending on their length. When the beam is removed, loosen it with a chisel or a hand pry, and remove as many connecting bolts as possible, but be careful to leave at least one bolt unremoved. When the bolts on both sides of the beam are removed to only one left, the force balance point of the bolt should be found by adjusting the force of the lifting point and slowly moving up and down (tightening and loosening). In order to prevent the beam from rotating, it is necessary to first ensure that the beam is not affected by horizontal lateral forces. The personnel remove the nut, knock the bolt out of the screw hole with a hammer, and put it in the toilet bag. At this time, the force on the last bolt left on the other side must be larger, and the bolt is removed in the same way. Specifically, the binding of the auxiliary material 11 can also be done as follows Fig.16 As shown:

[0162] In step S140, the auxiliary material 11 is disassembled. After the disassembly, the double horizontal arm boom 1 is driven to lift the main pipe 6 and / or the cross material 7 to the ground.

[0163] In step S130 to step S141, considering the balance and stability of the double horizontal arm holding rod 1 during hoisting, symmetrical dismantling is required when using the double horizontal arm holding rod 1 to dismantle tower materials. Therefore, the double horizontal arm holding rod 1 is first rotated to the diagonal main pipe 6 of the tower body, and the main pipe 6 and / or cross material 7 are first dismantled, and then other auxiliary materials 11 are dismantled. This dismantling method can achieve safe and stable dismantling of tower materials on the one hand, and can also ensure dismantling efficiency on the other hand.

[0164] In this embodiment of the present invention, when the workers remove the bolts, they need to tighten the wire rope connected to the suspension point through the double horizontal arm holding rod 1. The wire rope is always in a tightened state to prevent the tower materials from falling rapidly due to their own gravity after the connecting bolts between the tower materials are removed, causing them to fall from the air.

[0165] In this embodiment of the present invention, after the double horizontal arm bracket 1 dismantles the long span tower 2 to the last two sections, since the last two sections of the tower body are close to the ground and the weight of the tower material exceeds the lifting range of the double horizontal arm bracket 1, it is necessary to dismantle the double horizontal arm bracket 1 first, and then dismantle the last two sections using the tower body. The specific steps can be as follows: Fig. 9 Specifically, Fig. 9 In the above, the decomposition and removal method may further include:

[0166] In step S160, the crane is driven to move to the center of the remaining tower. After the double-arm bracket 1 is removed, the crane is driven to the center of the remaining tower, that is, the center of the last two sections of the tower. In addition, when the double-arm bracket 1 is removed, the crane can also be driven synchronously to remove and hoist the periphery of the large-span tower 2 to further improve the removal efficiency. Specifically, the hoisting diagram of the crane on site can be as follows: Fig.19 shown.

[0167] In step S161, the crane is tied to the tower material to be disassembled. Among them, since the travel of the boom trolley is large when hoisting the main pipe 6 in the diagonal direction, the lifting weight is limited. Therefore, when the main pipe 6 of sections 18 and 19 is two sections, the weight of a single section of the main pipe 6 exceeds 5-6 tons, and it cannot be lifted according to the capacity of the (double horizontal arm) boom, so a crane is needed for disassembly. When the main pipe 6 of sections 18 and 19 is 4 sections, the weight of the corresponding main pipe 6 is reduced compared to the original. Therefore, the main pipe 6 of section 18 is dismantled using a boom, and all components except part of the main pipe 6 of section 19 are dismantled using a boom. The part of the main pipe 6 of section 19 and the 20th section of the tower material are dismantled using a 100-ton crane.

[0168] In step S162, the tower material to be disassembled is disassembled. The disassembly steps for the last two sections of the tower material may include: Fig.10 Specifically, Fig.10 In the above, the decomposition and removal method may further include:

[0169] In step S1620, the horizontal material of the last section of the tower body of the long-span tower 2 is removed. The horizontal material is also the auxiliary material 11.

[0170] In step S1621, the main pipe 6 of the second to last section of the long-span tower 2 is dismantled.

[0171] In step S1622 , the cross members 7 and auxiliary members 11 of the last section of the tower body of the long-span tower 2 are removed.

[0172] In step S1620 to step S1622, when the crane is located at the center of the tower to hoist the 19th section of the lower main pipe 6, the 20th section of the horizontal material will block the boom, so the 20th section of the horizontal material is removed first, and then the 19th section of the lower main pipe 6 is removed. Finally, the 20th section of the cross material 7 and other auxiliary materials 11 (such as small horizontal materials, etc.) are removed.

[0173] In step S163, the crane is driven to lift the tower materials to be dismantled to the ground.

[0174] In step S160 to step S163, when dismantling the last two sections, first dismantle the double horizontal arm holding rod 1, and move the crane to the center of the remaining tower body. Then tie the hook 3 on the crane to the tower material, dismantle the tower material, and finally drive the tower material to the ground by the crane. The method of dismantling the last two sections of the tower body by a crane, on the one hand, effectively reduces the difficulty of lifting the last two sections and improves the lifting efficiency, and on the other hand, it can also effectively reduce the manpower and material resources for dismantling. On the other hand, the present invention also provides a disassembly and dismantling system using the above-mentioned disassembly and dismantling method. Specifically, the disassembly and dismantling system may include a double horizontal arm holding rod 1 and a crane.

[0175] The double horizontal arm holding rod 1 is used to extend out of the top of the long span pole tower 2 to dismantle the tower body of the long span pole tower 2. The crane is used to assemble or dismantle the double horizontal arm holding rod 1 and dismantle the last two sections of the long span pole tower 2.

[0176] Through the above technical scheme, the disassembly and dismantling method and disassembly and dismantling system for the super-high and long-span pole tower 2 provided by the present invention first dismantle the bottom ground auxiliary facilities at the bottom of the long-span pole tower 2, and then dismantle the shaft in the middle of the long-span pole tower 2. After the dismantling is completed, the double-horizontal arm holding rod 1 is assembled at the original shaft position, and the double arms are unfolded at the top of the long-span tower. The construction personnel cooperate with the double-horizontal arm holding rod 1 to dismantle the tower body of the long-span pole tower 2 from top to bottom, and finally dismantle the double-horizontal arm holding rod 1 and the remaining tower body of the long-span pole tower 2 to complete the dismantling of the long-span pole tower 2. This dismantling method does not need to occupy a large area when used, has high dismantling efficiency, and will not affect the surrounding environment and components; in addition, the method of using a crane to dismantle the last two sections of the tower body can effectively solve the problem that the tower body at the bottom of the long-span pole tower 2 exceeds the lifting range of the double-horizontal arm holding rod 1, thereby improving the reliability of the dismantling of the long-span pole tower 2.

[0177] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.

[0178] The above are only embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included within the scope of the claims of the present application.

Claims

1. A method for disassembling and removing a super-high and long-span pole tower, characterized in that: include: Dismantle the ground auxiliary facilities at the bottom of the long-span tower; Dismantling the shaft in the middle of the long-span tower; A double-arm holding pole is assembled in the middle of the large-span pole tower, and the double arms of the double-arm holding pole are unfolded at the top of the large-span pole tower; The double horizontal arm holding rod is driven to dismantle the tower body of the large span tower section by section from top to bottom; Determining whether the number of remaining tower sections of the current long-span tower is less than or equal to two; When it is determined that the number of remaining tower body sections of the current long-span tower is less than or equal to two, the double horizontal arm bracket is removed; The remaining tower body of the large-span tower is dismantled using a crane.

2. The disassembly and removal method according to claim 1, characterized in that: Driving the double horizontal arm holding rod to dismantle the tower body of the large span tower from top to bottom section by section includes: Driving the double horizontal arm holding rod to rotate; Determine whether the two hooks of the double horizontal arm bracket have reached two of the main pipes diagonally distributed in the tower body respectively; When it is determined that the two hooks of the double horizontal arm bracket have respectively reached two of the diagonally distributed main pipes in the tower body, the main pipes and / or the cross materials connected to the main pipes are tied; Dismantling the main pipe and / or the cross material; The double horizontal arm holding rod is driven to lift the main pipe and / or the cross material to the ground.

3. The disassembly and removal method according to claim 2, characterized in that: Driving the double horizontal arm holding rod to dismantle the tower body of the long-span tower from top to bottom section by section also includes: Driving the double horizontal arm holding rod to rotate; Determine whether the two hooks of the double horizontal arm bracket have reached the other two main pipes diagonally distributed in the tower body respectively; When it is determined that the two hooks of the double horizontal arm bracket reach the other two main pipes diagonally distributed in the tower body respectively, the main pipes and / or the cross materials connected to the main pipes are tied; Dismantling the main pipe and / or the cross material; The double horizontal arm holding rod is driven to lift the main pipe and / or the cross material to the ground.

4. The disassembly and removal method according to claim 3, characterized in that: Driving the double horizontal arm holding rod to dismantle the tower body of the long-span tower from top to bottom section by section also includes: Driving the double horizontal arm holding rod to rotate; Binding the two hooks of the double horizontal arm holding rod to symmetrical auxiliary materials; Disassembling the auxiliary materials; The double horizontal arm holding rod is driven to lift the auxiliary material to the ground.

5. The disassembly and removal method according to claim 2 or 3, characterized in that: Binding the main pipe and / or the cross material connected to the main pipe includes: Hanging the first steel wire rope on the hook; Determining whether the number of tower sections of the current long-span tower is less than or equal to six; When it is determined that the number of tower sections of the current long-span tower is less than or equal to six, determining whether the side wall of the main pipe has a cross material; In the case where it is determined that there is a cross material on the side wall of the main pipe, it is determined whether there is a horizontal pipe on the top of the main pipe; When it is determined that there is a transverse pipe on the top of the main pipe, one end of the first steel wire rope is connected to the vicinity of an end of the transverse pipe away from the main pipe; Connecting the other end of the first steel wire rope to the top of the main pipe; A second steel wire rope is used to connect the end of the cross pipe away from the main pipe and the lower end of the cross member away from the main pipe; When it is determined that there is no cross pipe on the top of the main pipe, one end of the first steel wire rope is connected to the center position of the cross material; Connecting the other end of the first steel wire rope to the top of the main pipe; When it is determined that there is no cross material on the side wall of the main pipe, the two ends of the first steel wire rope are respectively connected to the top symmetrical positions of the main pipe.

6. The disassembly and removal method according to claim 5, characterized in that: Binding the main pipe and / or the cross material connected to the main pipe also includes: When it is determined that the number of tower sections of the current long-span tower is greater than six, determining whether the tower material to be dismantled is a main pipe; When it is determined that the tower material to be dismantled is a main pipe, two ends of the first steel wire rope are symmetrically connected to the top of the main pipe respectively; When it is determined that the tower material to be dismantled is not a main pipe, the two ends of the first steel wire rope are respectively connected to the two ends of the top side of the cross material; The ends of the other sides of the cross material are sequentially connected using a third steel wire rope to form a U shape.

7. The disassembly and removal method according to claim 6, characterized in that: Hand winches are arranged on the two opposite sides and the bottom side of the third steel wire rope.

8. The disassembly and removal method according to claim 1, characterized in that: The remaining tower body of the large span tower is dismantled by crane, including: Driving the crane to move to the center of the remaining tower body; Binding the crane to the tower material to be dismantled; Dismantle the tower materials to be dismantled; The crane is driven to lift the tower materials to be dismantled to the ground.

9. The disassembly and removal method according to claim 8, characterized in that: The tower materials to be dismantled include: Dismantle the horizontal material of the last section of the tower body of the long-span tower; Dismantle the main pipe of the second to last section of the long-span tower; The cross materials and auxiliary materials of the last section of the tower body of the large-span tower are removed.

10. A disassembly and dismantling system using the disassembly and dismantling method according to claim 1, characterized in that: include: A double horizontal arm holding rod is used to extend out of the top of the long-span pole tower to dismantle the tower body of the long-span pole tower; The crane is used to assemble or dismantle the double-arm bracket and dismantle the last two sections of the long-span tower.