Method and device for managing high / low voltage of power grid based on PID (Proportion Integration Differentiation) algorithm

Through PID algorithm and intelligent control of energy storage equipment, the grid voltage is adjusted, and the problems of low voltage or high voltage in the power grid are solved, ensuring that users use normal electricity, reducing the cost of transformer replacement and the impact on residents' electricity use.

CN118889433APending Publication Date: 2024-11-01SHAANXI GREEN ENERGY ELECTRONIC TECH CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411007248.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-25
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

There is a situation in the power grid where the low voltage or voltage is higher than the user's electricity voltage, which causes the user to be unable to use electricity normally and affects electrical equipment.

Method used

Using the PID algorithm-based governance method, the power grid voltage and three-phase power are obtained through the collector, the governance power is calculated, the upper and lower limit voltages are set according to the capacity and governance capacity of the power grid, the corresponding governance method is selected, and the power grid voltage is adjusted to maintain Within the preset range.

Benefits of technology

It effectively solves the user's terminal voltage problem, reduces the cost of transformer replacement and power line replacement, and reduces the impact on residents' electricity use.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118889433A_ABST
    Figure CN118889433A_ABST
Patent Text Reader

Abstract

The invention discloses a method and a device for managing high / low voltage of a power grid based on a PID (Proportion Integration Differentiation) algorithm. The method comprises the following steps: acquiring voltage of a current power grid section and three-phase power of power grid increasing equipment by using a collector; calculating an upper limit voltage, a lower limit voltage, a preset voltage and a voltage control proportion lambda of high / low voltage governed by equipment added to the power grid; comparing the voltage, obtained by the collector, of the current power grid section with the preset voltage of the power grid adding equipment, judging whether the voltage is the first high / low voltage treatment or the second high / low voltage treatment or above, and if the voltage is the first high / low voltage treatment, reducing or increasing the voltage of the power grid through the first treatment power; comparing the difference value between the current voltage and the preset voltage with the difference value between the voltage at the previous moment and the preset voltage if the high / low voltage treatment is carried out for the second time or above, and maintaining the current treatment if the difference values are equal; if the difference value is larger than 0, the power grid voltage is increased through second treatment power; and if the difference value is less than 0, reducing the power grid voltage through the third treatment power.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of electric power systems, and in particular relates to a method and device for controlling high / low voltage of a power grid based on a PID algorithm. Background Art

[0002] With the progress of mankind and the development of society, residents' lives are becoming more and more intelligent and electrified, and the amount of electricity consumed by the power grid is also increasing. When the user's infrastructure cannot keep up with the pace of residents' electricity consumption, it will cause low voltage problems at the end of the electricity consumption, and residents at the end of the electricity consumption will not be able to use electricity normally. In addition, in recent years, rural users have used the surplus electricity generated by photovoltaic systems to access the Internet. There is a situation where the grid voltage is higher than the user's electricity voltage, which will affect the user's electricity consumption and damage electrical equipment. Summary of the invention

[0003] In view of the shortcomings of the prior art, the purpose of the present invention is to provide a method and device for managing high / low voltage in the power grid based on the PID algorithm, which solves the technical problem that users cannot use electricity normally when low voltage in the power grid occurs at the end of the power consumption or the power grid voltage is higher than the user's power voltage through the PID algorithm and intelligent control of energy storage equipment.

[0004] In order to achieve the above object, the present invention adopts the following technical solution:

[0005] The present invention provides a method and device for controlling high / low voltage of a power grid based on a PID algorithm, comprising using a collector to obtain the voltage of a current power grid segment and the three-phase power of a power grid-added device; calculating the upper limit voltage, lower limit voltage, preset voltage and voltage control ratio λ of the power grid-added device for controlling high / low voltage according to the capacity and control capability of the power grid-added device; comparing the voltage of the current power grid segment obtained by the collector with the preset voltage of the power grid-added device, judging the number of current controls, and selecting a corresponding control method according to the number of current controls.

[0006] Furthermore, the number of times of determining the current management includes the first high / low voltage management and the second and subsequent high / low voltage management.

[0007] Furthermore, the current governance is the first high / low voltage governance, and the first governance power is calculated using the PID algorithm, and the grid voltage is reduced or increased through the first governance power; the first governance power = the grid increases the active power of the equipment + the voltage control ratio λ × the voltage difference of the current grid segment.

[0008] Furthermore, the current management is the second or more high / low voltage management, and the difference between the current voltage and the preset voltage is compared with the difference between the voltage and the preset voltage at the previous moment; if the difference between the voltage at the current moment and the preset voltage is greater than / less than the difference between the voltage at the previous moment and the preset voltage, the deviation coefficient k is calculated; if the difference between the voltage at the current moment and the preset voltage is equal to the difference between the voltage at the previous moment and the preset voltage, the current management is maintained.

[0009] Furthermore, when the difference between the voltage at the current moment and the preset voltage is greater than / less than the difference between the voltage at the previous moment and the preset voltage, including: when the difference between the voltage at the current moment and the preset voltage minus the difference between the voltage at the previous moment and the preset voltage is greater than 0, the voltage of the current power grid segment is in a low voltage state, and the power grid voltage is increased by the second governance power, the second governance power = the active power of the equipment added to the current power grid + the voltage control ratio λ × the voltage difference of the current power grid segment + the deviation coefficient k.

[0010] Furthermore, when the difference between the voltage at the current moment and the preset voltage is greater than / less than the difference between the voltage at the previous moment and the preset voltage, it also includes: when the difference between the voltage at the current moment and the preset voltage minus the difference between the voltage at the previous moment and the preset voltage is less than 0, the voltage of the current power grid segment is in a high voltage state, and the power grid voltage is reduced by a third governance power, the third governance power = active power of the current power grid increased equipment + voltage control ratio λ × voltage difference of the current power grid segment - deviation coefficient k.

[0011] Furthermore, the first high / low voltage management and the second and subsequent high / low voltage management first use grid energy and then use the grid to increase the energy of the equipment.

[0012] The present invention also provides a device for controlling high / low voltage of a power grid based on a PID algorithm, comprising: a collection module: used to use a collector to obtain the voltage of a current power grid segment and the three-phase power of a power grid-added device; a calculation module: used to calculate the upper limit voltage, lower limit voltage, preset voltage and voltage control ratio λ of the power grid-added device for controlling high / low voltage according to the capacity and control capability of the power grid-added device; an execution module: used to compare the voltage of the current power grid segment obtained by the collector with the preset voltage of the power grid-added device, determine the number of current controls, and select a corresponding control method according to the number of current controls.

[0013] The present invention also provides a computer device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the device is special in that when the processor executes the computer program, the device implements the steps of any one of the above-mentioned methods for controlling high / low voltage in a power grid based on a PID algorithm.

[0014] The present invention also provides a computer-readable storage medium, which stores a computer program. The special feature of the computer program is that when the computer program is executed by a processor, the steps of any of the above-mentioned methods for controlling high / low voltage in a power grid based on a PID algorithm are implemented.

[0015] Compared with the prior art, the present invention has the following beneficial technical effects:

[0016] The present invention discloses a method for controlling high / low voltage of a power grid based on a PID algorithm. First, the installation position of a collector is determined. The collector is used to obtain the voltage of the current power grid segment and the three-phase power of a power grid increase device. The power grid increase device calculates the upper limit voltage, lower limit voltage, preset voltage and voltage control ratio of the high / low voltage of the power grid increase device according to the capacity and control capability. The voltage of the current power grid segment obtained by the collector is compared with the preset voltage of the voltage increase device to determine whether the current control number is the first high / low voltage control or the second or more high / low voltage control. If it is the first high / low voltage control, the PID algorithm is used to calculate the first high / low voltage control. One control power; if it is the second or more high / low voltage control, compare the difference between the current voltage and the preset voltage with the difference between the voltage and the preset voltage at the previous moment. If the difference between the current voltage and the preset voltage is equal to the difference between the voltage and the preset voltage at the previous moment, maintain the current control; if the difference between the current voltage and the preset voltage is greater than or less than the difference between the voltage and the preset voltage at the previous moment, calculate the deviation coefficient, subtract the difference between the current voltage and the preset voltage from the difference between the previous moment and the preset voltage, and if it is greater than zero, use the second control power to increase the grid device; if it is less than zero, use the third control power to increase the grid voltage. This solution can solve the problem of high / low voltage at the end of the user and the inability to use electricity normally, and can reduce the replacement of transformers, reduce the additional cost of replacing power lines, and reduce the impact of transformer replacement on residential electricity use. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 A flow chart of a method for controlling high / low voltage in a power grid based on a PID algorithm according to the present invention;

[0018] Figure 2 An exemplary installation location diagram of a power grid adding device according to an embodiment of the present invention;

[0019] Figure 3 This is a diagram of the installation position of the collector in an embodiment of the present invention. DETAILED DESCRIPTION

[0020] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0021] like Figure 2 As shown, it is an example installation diagram of the grid adding equipment in the method for controlling high / low voltage of the grid based on PID algorithm of the present invention, G is the grid that supplies power to residents, A1, A2...An are residential users, the grid adding equipment is installed at the rear end of the residential users, overload operation of the rooftop photovoltaic power generation grid, loss of transmission circuit, insufficient transformer capacity and insufficient reactive power will cause high / low problems at the power consumption end, H is used to detect and calculate the specific reasons for the high / low voltage of the current grid according to the detection algorithm, and control it; C is a device for controlling the high / low voltage of the grid.

[0022] like Figure 3 As shown, this is the installation position of the collector in the method for controlling high / low voltage in a power grid based on PID algorithm of the present invention, wherein collector 1 and collector 2 have the same structural dimensions and are installed in two situations to collect three-phase voltage, three-phase current, three-phase active power and total active power of the power grid. After receiving the data collected by the collector, H analyzes and judges the data, and uses the PID algorithm to control the power grid to increase the energy that the equipment should output to control the high / low voltage problem.

[0023] like Figure 1 As shown, the present invention provides a method for controlling high / low voltage in a power grid based on a PID algorithm, comprising: using a collector to obtain the voltage of a current power grid segment and the three-phase power of a power grid-added device; calculating the upper limit voltage, lower limit voltage, preset voltage and voltage control ratio λ of the power grid-added device for controlling high / low voltage according to the capacity and control capability of the power grid-added device; comparing the voltage of the current power grid segment obtained by the collector with the preset voltage of the power grid-added device, judging the number of current controls, and selecting a corresponding control method according to the number of current controls.

[0024] Use the collector to obtain the voltage of the current grid segment and the three-phase power of the grid-added equipment. Specifically, first determine the installation location of the collector, and use the collector to obtain the voltage of the current grid segment and the three-phase power of the grid-added equipment. The three-phase power includes three-phase active power and three-phase reactive power according to the different management directions. Analyze the grid voltage and power data collected by the collector. If the grid voltage is low / high due to lack / surplus of active power, use the PID algorithm to calculate the active power that needs to be supplemented. If the grid voltage is low due to reactive power, use the PID algorithm to calculate the reactive power that needs to be compensated.

[0025] The voltage of the current grid segment obtained by the collector is compared with the preset voltage of the grid-added equipment to determine the number of current management times. According to the number of current management times, the corresponding management method is selected, specifically: the voltage of the current grid segment obtained by the collector is compared with the preset voltage of the grid-added equipment. If the voltage of the current grid segment is equal to the preset voltage of the grid-added equipment, the current grid voltage management is maintained; if the voltage of the current grid segment is less than or greater than the preset voltage of the grid-added equipment, grid voltage management is performed. First, ensure that the grid high / low voltage management device C is installed in the grid-added equipment, and then determine the number of current management times. The current number of management times is specifically the first high / low voltage management or the second and above high / low voltage management.

[0026] If it is the first high / low voltage control, use the PID algorithm to calculate the first control power, the first control power = the active power of the grid-added equipment + the voltage control ratio λ × the voltage difference of the current grid segment. If the current grid voltage is high, the grid high / low voltage device C will be used to control the grid voltage with the value of the first control power; if the current grid voltage is low, the grid high / low voltage device C will be used to control the grid voltage with the value of the first control power.

[0027] If it is the second high / low voltage management, the difference between the current voltage and the preset voltage is compared with the difference between the voltage and the preset voltage at the previous moment. If the difference between the current voltage and the preset voltage is greater / less than the difference between the voltage and the preset voltage at the previous moment, calculate the deviation coefficient k; if the difference between the current voltage and the preset voltage is equal to the difference between the voltage and the preset voltage at the previous moment, maintain the current management.

[0028] If the difference between the current voltage and the preset voltage is greater than / less than the difference between the previous voltage and the preset voltage, the deviation coefficient k is calculated, including: when the difference between the current voltage and the preset voltage minus the difference between the previous voltage and the preset voltage is greater than 0, the voltage of the current grid segment is in a low voltage state, and the grid voltage is increased by the second governance power, the second governance power = the active power of the equipment added to the current grid + the voltage control ratio λ × the voltage difference of the current grid segment + the deviation coefficient k; when the difference between the current voltage and the preset voltage minus the difference between the previous voltage and the preset voltage is less than 0, the voltage of the current grid segment is in a high voltage state, and the grid voltage is reduced by the third governance power, the third governance power = the active power of the equipment added to the current grid + the voltage control ratio λ × the voltage difference of the current grid segment - the deviation coefficient k.

[0029] During the first high / low voltage control and the second and subsequent high / low voltage controls, grid energy is used preferentially for control during the control process. When the grid energy cannot meet the high / low voltage control, the energy of the grid high / low voltage device C is consumed. When the grid high voltage and low voltage of the grid high / low voltage device C exist at the same time, the grid high voltage energy is used preferentially to control the grid low voltage. If the low voltage control meets the current preset voltage and there is surplus energy, the surplus energy is stored in the grid high / low voltage device. If the grid energy cannot meet the high / low voltage control, the grid high / low voltage device C is used for control first, and then the grid high / low voltage device is recharged during the low peak period.

[0030] Taking active power as an example, the calculation process of high / low voltage management of the power grid using the PID algorithm is as follows:

[0031] The upper limit voltage of the high / low voltage management equipment added to the power grid is 240V, the lower limit voltage is 210V, the preset voltage is 220V and the voltage control ratio λ is 10%.

[0032] Take the grid A phase voltage as an example

[0033] Assume that the current voltage of phase A is 190V. Since the current voltage does not meet the preset voltage, low voltage management is required. The current voltage difference of phase A = preset voltage - current voltage of phase A = 220V - 190V = 30V. The last voltage difference of phase A is equal to 0. Therefore, it is the first high / low voltage management. The first management power is used to increase the grid voltage. The first management power = the active power of the grid-added equipment + the voltage control ratio λ × the voltage difference of the current grid segment. Specifically, the first management power = 0 + 10% × 30V = 3kW. The 3kW discharge power is sent to the high / low voltage device.

[0034] At this time, the voltage is managed to 220V. If the grid load increases after this management, causing the grid voltage to drop to 200V, and a second management is performed, then the current voltage difference of phase A = preset voltage - phase A voltage = 220V - 200V = 20V, and the last voltage difference of phase A is equal to 30V. Since it is not the first high / low voltage management, the current voltage difference of phase A is greater than 0, which proves that the grid voltage is low at this time. Since the last voltage difference is greater than the current voltage difference, and the current voltage difference is greater than 0, the second management power = the active power of the current grid-added equipment + voltage control ratio λ × the voltage difference of the current grid segment + deviation coefficient k, specifically: deviation coefficient k = (current voltage difference - last voltage difference) * voltage control ratio = (30V-20V) × 10% = 1kW, the second management power = 3kW + 10% × 20V + 1kW = 6kW, and the 3kW discharge power is sent to the high / low voltage device.

[0035] If during operation, the grid voltage rises due to unloading and other reasons, and the grid voltage rises to 280V, which is higher than the preset voltage of 220V, the third treatment is carried out, then the current voltage difference of phase A = preset voltage - phase A voltage = 220V - 280V = -60V, the previous voltage difference of phase A is equal to 20V, because it is not the first high / low voltage treatment, the current voltage difference of phase A is less than 0, which proves that the grid voltage is too high at this time, because the previous voltage difference is less than the current voltage difference, and the current voltage difference is less than 0, then the third treatment power = the current grid voltage. Increase the active power of the equipment + voltage control ratio λ × the voltage difference of the current grid segment - the deviation coefficient k, specifically: deviation coefficient k = (current voltage difference - last voltage difference) * voltage control ratio = (60V-20V) × 10% = 4kW, the third control power = 6kW + 10% × -60V-4kW = -4kW, and send the -4kW discharge power to the high / low voltage device. When only the single-phase voltage is too high or too low, it is necessary to input energy to the high / low voltage control device or output energy from the high / low voltage control device.

[0036] Take the grid A phase voltage and grid B phase voltage as an example

[0037] Assuming that the current voltage of phase A is 190V and the voltage of phase B is 250V, then the current voltage difference of phase A = preset voltage - current voltage of phase A = 220V - 190V = 30V, and the last voltage difference of phase A is equal to 0, then the current voltage difference of phase B = preset voltage - current voltage of phase B = 220V - 250V = -30V, and the last voltage difference of phase B is equal to 0. Since it is the first high / low voltage management, the first management power of phase A = active power of the equipment added to the power grid + voltage control ratio λ × voltage difference of the current power grid segment, specifically: the first management power of phase A = 0 + 10% × 30V = 3kW, and the 3kW discharge power is sent to the high / low voltage device, the first management power of phase B = active power of the equipment added to the power grid + voltage control ratio λ × voltage difference of the current power grid segment, specifically: the first management power of phase B = 0 + 10% × -30V = -3kW, and the -3kW discharge power is sent to the high / low voltage device.

[0038] For the high / low voltage device, the absolute values ​​of the first control power of phase A and the first control power of phase B are equal. Since the power directions are opposite during control, the power of phase B of the high / low voltage device can fully provide the power required by phase A. Therefore, for the high / low voltage device, the high voltage and low voltage of the power grid are controlled at the same time, and the power of the high / low voltage control device is not consumed.

[0039] The present invention also provides a device for controlling high / low voltage of a power grid based on a PID algorithm, comprising a collection module: used to use a collector to obtain the voltage of a current power grid segment and the three-phase power of a power grid-added device; a calculation module: used to calculate the upper limit voltage, lower limit voltage, preset voltage and voltage control ratio λ of the power grid-added device for controlling high / low voltage according to the capacity and control capability of the power grid-added device; an execution module: used to compare the voltage of the current power grid segment obtained by the collector with the preset voltage of the power grid-added device, determine the number of current controls, and select a corresponding control method according to the number of current controls.

[0040] The present invention also provides a computer device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the device is special in that when the processor executes the computer program, the device implements the steps of a method for controlling high / low voltage in a power grid based on a PID algorithm as described in any one of the above-mentioned embodiments.

[0041] In another embodiment of the present invention, a terminal device is provided, the terminal device includes a processor and a memory, the memory is used to store a computer program, the computer program includes program instructions, and the processor is used to execute the program instructions stored in the computer storage medium. The processor may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components, etc., which are the computing core and control core of the terminal, which are suitable for implementing one or more instructions, and are specifically suitable for loading and executing one or more instructions to implement the corresponding method flow or corresponding functions; the processor described in the embodiment of the present invention can be based on the operation of the high / low voltage method of the PID algorithm.

[0042] The present invention also provides a computer-readable storage medium, which stores a computer program, characterized in that when the computer program is executed by a processor, the steps of the method for controlling high / low voltage in a power grid based on a PID algorithm as described in any one of the above embodiments are implemented.

[0043] In another embodiment of the present invention, the present invention also provides a storage medium, specifically a computer-readable storage medium (Memory), which is a memory device in a terminal device for storing programs and data. It is understandable that the computer-readable storage medium here can include both the built-in storage medium in the terminal device and the extended storage medium supported by the terminal device. The computer-readable storage medium provides a storage space, which stores the operating system of the terminal. In addition, one or more instructions suitable for being loaded and executed by the processor are also stored in the storage space, and these instructions can be one or more computer programs (including program codes). It should be noted that the computer-readable storage medium here can be a high-speed RAM memory or a non-volatile memory, such as at least one disk memory. The processor can load and execute one or more instructions stored in the computer-readable storage medium to implement the corresponding steps of the congestion control method based on variable speed limit in the above embodiment.

[0044] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.

[0045] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

Claims

1. A method for controlling high / low voltage in a power grid based on a PID algorithm, characterized in that: include: Use the collector to obtain the voltage of the current grid segment and the three-phase power of the equipment added to the grid; According to the capacity and governance capacity of the grid-added equipment, the upper limit voltage, lower limit voltage, preset voltage and voltage control ratio λ of the grid-added equipment for high / low voltage governance are calculated respectively; Compare the voltage of the current grid segment obtained by the collector with the preset voltage of the grid-added equipment to determine the current number of governances, and select the corresponding governance method based on the current number of governances.

2. A method for controlling high / low voltage in a power grid based on a PID algorithm according to claim 1, characterized in that: The number of times of determining the current management includes the first high / low voltage management and the second and subsequent high / low voltage management.

3. A method for controlling high / low voltage in a power grid based on a PID algorithm according to claim 2, characterized in that: The current control is the first high / low voltage control, and the first control power is calculated using the PID algorithm, and the grid voltage is reduced or increased by the first control power; The first control power=the active power of the equipment added to the power grid+the voltage control ratio λ×the voltage difference of the current power grid segment.

4. A method for controlling high / low voltage in a power grid based on a PID algorithm according to claim 2, characterized in that: The current management is the second or more high / low voltage management, and the difference between the current voltage and the preset voltage is compared with the difference between the voltage at the previous moment and the preset voltage; If the difference between the current voltage and the preset voltage is greater than / less than the difference between the previous voltage and the preset voltage, calculate the deviation coefficient k; If the difference between the current voltage and the preset voltage is equal to the difference between the previous voltage and the preset voltage, the current control is maintained.

5. A method for controlling high / low voltage in a power grid based on a PID algorithm according to claim 4, characterized in that: When the difference between the voltage at the current moment and the preset voltage is greater than / less than the difference between the voltage at the previous moment and the preset voltage, the method includes: When the difference between the current voltage and the preset voltage minus the difference between the previous voltage and the preset voltage is greater than 0, the voltage of the current grid segment is in a low voltage state, and the grid voltage is increased by the second governance power. The second governance power = the active power of the equipment added to the current grid + the voltage control ratio λ × the voltage difference of the current grid segment + the deviation coefficient k.

6. A method for controlling high / low voltage in a power grid based on a PID algorithm according to claim 5, characterized in that: When the difference between the voltage at the current moment and the preset voltage is greater than / less than the difference between the voltage at the previous moment and the preset voltage, the method further includes: When the difference between the current voltage and the preset voltage minus the difference between the previous voltage and the preset voltage is less than 0, the voltage of the current grid segment is in a high voltage state, and the grid voltage is reduced by the third governance power. The third governance power = the active power of the current grid-added equipment + the voltage control ratio λ × the voltage difference of the current grid segment - the deviation coefficient k.

7. The method for controlling high / low voltage of a power grid based on a PID algorithm according to claim 2, characterized in that: The first high / low voltage management and the second and subsequent high / low voltage management first use grid energy and then use the grid to increase the energy of the equipment.

8. A device for managing high / low voltage in a power grid based on a PID algorithm, characterized in that: include: Collection module: used to use the collector to obtain the voltage of the current grid segment and the three-phase power of the grid-added equipment; Calculation module: used to calculate the upper limit voltage, lower limit voltage, preset voltage and voltage control ratio λ of the high / low voltage of the grid-added equipment according to the capacity and management capacity of the grid-added equipment; Execution module: used to compare the voltage of the current power grid segment obtained by the collector with the preset voltage of the power grid added equipment, determine the current number of governance, and select the corresponding governance method according to the current number of governance.

9. A computer device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the steps of a method for managing high / low voltage in a power grid based on a PID algorithm as described in any one of claims 1 to 7 are implemented.

10. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the steps of a method for managing high / low voltage in a power grid based on a PID algorithm as described in any one of claims 1 to 7 are implemented.

Citation Information

Cited By

  • Control method and system of dynamic voltage regulation device based on overcurrent risk pre-judgment

    CN121813427A

  • A control method and system of a dynamic voltage regulating device based on overcurrent risk prediction

    CN121813427B