Heating equipment for green building new material production

By designing a motor-driven stirring and brushing mechanism, as well as an electromagnet-controlled sealing plate, into the heating equipment for new green building materials, the problem of rapid saturation of activated carbon caused by dust adhesion was solved, achieving efficient adsorption and filtration effects of activated carbon.

CN118892699APending Publication Date: 2024-11-05THE THIRD CONSTR OF CHINA CONSTR EIGHTH ENG BUREAU
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202410922401.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-10
Publication Date
2024-11-05

AI Technical Summary

Technical Problem

In existing technologies, the smoke and fine particulate matter generated during the heating process of new green building materials easily adhere to the surface of activated carbon, causing the activated carbon to become saturated quickly, requiring frequent replacement of the filter box and affecting the adsorption effect.

Method used

A heating device including a purification unit and a filtration mechanism was designed. The motor drives the rotating rod to move the stirring rod and the brush plate to prevent smoke and dust from adhering. At the same time, an electromagnet controls the sealing plate to block the air vents, preventing the activated carbon from contacting the external airflow.

Benefits of technology

It effectively prevents smoke and dust from adhering, extends the service life of the filter box, improves the adsorption effect of activated carbon, reduces the replacement frequency, and ensures efficient filtration of harmful gases.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118892699A_ABST
    Figure CN118892699A_ABST
Patent Text Reader

Abstract

The invention discloses heating equipment for green building new material production, and belongs to the technical field of new material processing, the heating equipment comprises a heating box, a feeding opening is formed in the top wall of the heating box, a plug plate is detachably mounted in the feeding opening, heating rods are uniformly and fixedly mounted on the inner side wall of the heating box, and the heating rods are fixedly mounted on the inner side wall of the heating box. A discharge valve is inserted into the bottom wall of the heating box; and the purification device comprises a ventilation opening formed in the side wall of the heating box. According to the scheme, the filter screen is arranged, impurities in smoke can be filtered in the process that the smoke passes through the filter screen, then the impurities in the smoke are prevented from being attached to the surface of activated carbon, a filter box does not need to be frequently replaced, a motor drives a rotating rod to rotate, and then the rotating rod can drive a stirring rod to rotate and stir the activated carbon; therefore, the unsaturated activated carbon is in full contact with harmful gas in the flue gas, and the effect of improving the adsorption effect of the activated carbon is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of new material processing, and more specifically, to a heating device for producing new green building materials. Background Art

[0002] Green building new materials refer to building materials with lower environmental impact, higher sustainability and better performance during the construction and construction process.

[0003] Toxic substances are often produced in the process of heating new green building materials. In order to prevent harmful gases from polluting the air, most of the existing technologies use filter boxes filled with activated carbon to absorb harmful gases in the gas. However, smoke and dust are often produced in the process of heating new building materials, that is, fine particles are also produced. Then the fine particles will adhere to the surface of the activated carbon, causing the activated carbon to be quickly saturated, and the filter box needs to be replaced frequently.

[0004] In view of the above problems, in the prior art, for example, CN218774463U is a heating device for producing new green building materials. By setting up an installation mechanism, the filter box can be taken out from the inside of the exhaust port, which makes it easy to disassemble the filter box. However, the user still needs to spend time to frequently replace the filter box, and the fine particles attached to the surface of the activated carbon will also affect the adsorption effect of the activated carbon on harmful gases. Summary of the invention

[0005] In view of the problems existing in the prior art, the purpose of the present invention is to provide a heating device for the production of new green building materials, which can achieve the purpose of improving the adsorption effect of activated carbon.

[0006] To solve the above problems, the present invention adopts the following technical solutions.

[0007] A heating device for producing new green building materials, comprising a heating box, a top wall of the heating box is provided with a delivery port, a plug plate is detachably installed in the delivery port, heating rods are evenly fixedly installed on the inner side wall of the heating box, and a discharge valve is inserted on the bottom wall of the heating box; A purification device, the purification device comprising an air vent opened on the side wall of the heating box, a filter box matched with the air vent fixedly mounted on the side wall of the heating box, activated carbon contained in the filter box, first air holes evenly opened on the side wall of the filter box close to the heating box, and air vents evenly opened on the top wall of the filter box; The filtering mechanism includes a motor fixedly mounted on the side wall of the filter box, a rotating rod extending into the heating box is fixedly mounted on the output end of the motor, and a stirring rod is evenly fixedly mounted on the rotating rod, a filter screen is provided on the side wall of the filter box, and the filter screen is slidably matched with the rotating rod, and a brush plate that rotates with the filter screen is fixedly mounted on the rotating rod.

[0008] Furthermore, an elastic pad is fixedly installed on the side wall of the filter box, and the elastic pad is fixedly connected to the filter screen, a sliding groove is provided on the rotating rod, a push rod is slidably installed in the sliding groove, a connecting groove is provided on the filter screen, and the push rod is rotatably matched with the connecting groove, an inclined block matching with the push rod is fixedly installed on the side wall of the filter box, and the side wall of the inclined block close to the push rod is an inclined surface.

[0009] Furthermore, an air groove is provided on the push rod, a first air pipe is inserted on the side wall of the air groove, an annular groove is provided on the rotating rod, and one end of the first air pipe away from the air groove is connected to the annular groove, and an air supply mechanism cooperating with the annular groove is provided on the elastic pad.

[0010] Furthermore, the air supply mechanism includes a cavity opened on the elastic pad, a first air inlet valve connected to the outside is inserted in the cavity, an exhaust valve connected to the outside is also inserted on the side wall of the cavity, and a second air pipe connected to the rotating groove is fixedly installed on the output end of the exhaust valve.

[0011] Furthermore, a linkage plate is fixedly mounted on the side wall of the filter screen close to the brush plate, and a cleaning groove is provided on the linkage plate.

[0012] Furthermore, a slide groove is symmetrically opened on the top wall of the filter box, a sealing plate is slidably installed in the slide groove, a vertical plate is fixedly installed on the top wall of the heating box, an elastic airbag is symmetrically fixedly installed between the side wall of the vertical plate and the sealing plate, and the heating box is provided with a driving mechanism that cooperates with the sealing plate.

[0013] Furthermore, the driving mechanism includes an electromagnet embedded in the heating box, a magnet block cooperating with the electromagnet is embedded in the sealing plate, and a sealing gasket cooperating with the sealing plate is embedded in the top wall of the filter box.

[0014] Furthermore, a sealing cavity is provided on the sealing gasket, a first connecting tube is inserted into the cavity, a horizontal groove is provided on the sealing plate, a sealing rod is slidably installed in the horizontal groove, and a spring is fixedly installed between the sealing rod and the sliding groove, a first connecting hole matching with the first connecting tube is provided on the sealing rod, and a second connecting tube matching with the first connecting hole is inserted into the elastic airbag.

[0015] Furthermore, a second air intake valve is inserted into the elastic airbag, and an air intake pipe communicating with the sealing cavity is fixedly mounted on the input end of the second air intake valve.

[0016] Furthermore, two groups of push rods and inclined blocks are correspondingly arranged.

[0017] Compared with the prior art, the present invention has the following beneficial effects: (1) This solution can filter impurities in the flue gas when the flue gas passes through the filter screen, thereby preventing impurities in the flue gas from adhering to the surface of the activated carbon, thereby eliminating the need to frequently replace the filter box, and the motor drives the rotating rod to rotate, and then the rotating rod can drive the stirring rod to rotate and stir the activated carbon, so that the unsaturated activated carbon is fully in contact with the harmful gases in the flue gas, which plays a role in improving the adsorption effect of the activated carbon; (2) In this scheme, a brush plate is provided, and the brush plate is driven to rotate during the rotation of the rotating rod. Then, during the rotation of the brush plate, the brush plate gradually contacts the impurities on the surface of the filter and drives the impurities to rotate. Under the combined action of centrifugal force and gravity, the impurities gradually break away from the filter, thereby ensuring normal filtration of harmful gases in the flue gas; (3) This scheme sets a sealing plate. Under the action of the magnetic field of the electromagnet, the magnet block drives the sealing plate to gradually approach the electromagnet and break away from the air vent, thereby ensuring that the smoke passes through the filter, the first air vent, the filter box, and the air vent to the outside normally. Then, when the production of the new green building material is completed, the motor gradually stops working. At this time, the electromagnet is powered off and the magnetic field disappears. Then the elastic airbag contracts and drives the sealing plate to reset. During the resetting process of the sealing plate, the sealing plate gradually contacts with the air vent and blocks the air vent, thereby effectively preventing the outside airflow from contacting the activated carbon through the air vent when the heating equipment is not in use and causing the activated carbon to be quickly saturated, further improving the adsorption effect of harmful gases in the smoke. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a structural schematic diagram of the present invention; Figure 2 For the present invention Figure 1 Enlarged view of point A in the middle; Figure 3 is a cross-sectional view of the present invention; Figure 4 For the present invention Figure 3 Enlarged view of point B in the middle; Figure 5 For the present invention Figure 4 Enlarged view of point C in the middle; Figure 6 For the present invention Figure 4 Enlarged view of point D in the middle; Figure 7It is a combined diagram of the sealing rod, the first communicating hole, the first communicating tube, and the second communicating tube of the present invention; Figure 8 It is a cross-sectional view of the elastic airbag of the present invention.

[0019] Description of the numbers in the figure: 1. Heating box; 2. plug plate; 3. heating rod; 4. discharge valve; 5. filter box; 6. air vent; 7. motor; 8. rotating rod; 10. stirring rod; 11. filter screen; 12. brush plate; 13. elastic pad; 14. annular groove; 15. push rod; 16. inclined block; 17. air groove; 18. first air pipe; 19. cavity; 20. first air inlet valve; 21. exhaust valve; 22. second air pipe; 23. interlocking plate; 24. cleaning groove; 25. sealing plate; 26. vertical plate; 27. elastic air bag; 28. electromagnet; 29. ​​magnet block; 30. sealing pad; 31. sealing cavity; 32. first connecting pipe; 33. sealing rod; 34. spring; 35. first connecting hole; 36. second connecting pipe; 37. second air inlet valve; 38. air inlet pipe; 39. sliding groove; 40. connecting groove. DETAILED DESCRIPTION

[0020] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention; it is obvious that the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments, and all other embodiments obtained by ordinary technicians in this field based on the embodiments of the present invention without making creative work are within the scope of protection of the present invention.

[0021] See also Figures 1 to 8 A heating device for producing new green building materials comprises a heating box 1, a feeding port is provided on the top wall of the heating box 1, a plug plate 2 is detachably installed in the feeding port, heating rods 3 are evenly fixedly installed on the inner wall of the heating box 1, and a discharge valve 4 is inserted on the bottom wall of the heating box 1; A purification device, the purification device comprising an air vent opened on the side wall of the heating box 1, a filter box 5 matched with the air vent fixedly mounted on the side wall of the heating box 1, the filter box 5 containing activated carbon, a first air hole evenly opened on the side wall of the filter box 5 close to the heating box 1, and air vents 6 evenly opened on the top wall of the filter box 5; The filtering mechanism includes a motor 7 fixedly mounted on the side wall of the filter box 5, a rotating rod 8 extending into the heating box 1 is fixedly mounted on the output end of the motor 7, and a stirring rod 10 is evenly fixedly mounted on the rotating rod 8, a filter screen 11 is provided on the side wall of the filter box 5, and the filter screen 11 is slidably matched with the rotating rod 8, and a brush plate 12 is fixedly mounted on the rotating rod 8 and rotatably matched with the filter screen 11.

[0022] An elastic pad 13 is fixedly installed on the side wall of the filter box 5, and the elastic pad 13 is fixedly connected to the filter screen 11. A sliding groove 39 is provided on the rotating rod 8, and a push rod 15 is slidably installed in the sliding groove 39. A connecting groove 40 is provided on the filter screen 11, and the push rod 15 is rotatably matched with the connecting groove 40. An inclined block 16 that cooperates with the push rod 15 is fixedly installed on the side wall of the filter box 5, and the side wall of the inclined block 16 close to the push rod 15 is an inclined surface.

[0023] When in use, first open the plug plate 2 and put the green building new material into the heating box 1 through the delivery port, then cover the plug plate 2 and turn on the heating rod 3. At this time, the temperature of the green building new material gradually increases, and then as the temperature of the green building new material increases, smoke with impurities will be generated, and then the smoke will flow to the outside through the filter 11, the first air hole, the filter box 5, and the air hole 6. In the process of the smoke passing through the filter box 5, the activated carbon in the filter box 5 can adsorb harmful gases in the smoke, and in the process of the smoke passing through the filter 11, the filter 11 can filter the fine particles of impurities in the smoke, thereby effectively preventing fine particles from entering the filter box 5 and adhering to the surface of the activated carbon, causing the activated carbon to be quickly saturated, thereby improving the adsorption effect of the activated carbon on harmful gases.

[0024] After the heating rod 3 is energized, the user can start the motor 7, and then the motor 7 drives the stirring rod 10 to rotate through the rotating rod 8 and stir the activated carbon, so that the unsaturated activated carbon is fully in contact with the harmful gases in the flue gas, which plays a role in improving the adsorption effect of the activated carbon. In the process of rotation of the rotating rod 8, the brush plate 12 is also driven to rotate, and then in the process of rotation of the brush plate 12, it gradually contacts with impurities on the surface of the filter screen 11 and drives the impurities to rotate. Under the combined action of centrifugal force and gravity, the impurities gradually break away from the filter screen 11, thereby ensuring that the flue gas passes through the filter screen 11 normally and enters the filter box 5.

[0025] During the rotation of the rotating rod 8, the rotating rod 8 will drive the push rod 15 to rotate, and then during the rotation of the push rod 15, it will gradually contact the inclined surface of the inclined block 16 and apply a thrust to the inclined surface, and then under the action of the thrust reaction force, the push rod 15 will slide along the sliding groove 39 and drive the filter 11 to move away from the filter box 5. At this time, the elastic pad 13 is stretched and has a tendency to recover. When the push rod 15 is out of contact with the inclined block 16, the elastic pad 13 contracts and drives the filter 11 to reset. During the shaking of the filter 11, the impurities on the surface of the filter 11 can be driven to shake and make the impurities on the surface of the filter 11 loose, thereby facilitating the subsequent brush plate 12 to clean the filter 11.

[0026] like Figure 4 , Figure 5As shown, an air groove 17 is provided on the push rod 15, and a first air pipe 18 is inserted on the side wall of the air groove 17. The first air pipe 18 is a retractable hose. An annular groove 14 is provided on the rotating rod 8, and one end of the first air pipe 18 away from the air groove 17 is connected to the annular groove 14. The elastic pad 13 is provided with an air supply mechanism that cooperates with the annular groove 14.

[0027] The air supply mechanism includes a cavity 19 opened on the elastic pad 13, a first air inlet valve 20 connected to the outside is inserted in the cavity 19, an exhaust valve 21 connected to the outside is also inserted on the side wall of the cavity 19, and a second air pipe 22 connected to the rotating groove is fixedly installed on the output end of the exhaust valve 21.

[0028] A linkage plate 23 is fixedly mounted on the side wall of the filter screen 11 close to the brush plate 12 , and a cleaning groove 24 is formed on the linkage plate 23 .

[0029] By adopting the above technical solution, during the extension of the elastic pad 13, the cavity 19 inhales air from the outside through the first air inlet valve 20, and then during the contraction of the elastic pad 13, the gas in the cavity 19 flows into the annular groove 14 through the exhaust valve 21 and the second air pipe 22. Since the push rod 15 is rotatably connected to the filter screen 11 through the connecting groove 40, the push rod 15 is always in contact with the filter screen 11, and then the airflow flows into the air groove 17 through the annular groove 14 and the first air pipe 18, and then the airflow passes through the air groove 17 and blows the filter screen 11 into the heating box 1. At the same time, the air groove 17 is driven to rotate during the rotation of the rotating rod 8, and then the rotating air groove 17 drives the airflow to blow evenly toward the filter screen 11, so that impurities in the gap of the filter screen 11 can be cleaned, thereby ensuring that the smoke passes through the filter screen 11 normally and contacts the activated carbon in the filter box 5.

[0030] During the rotation of the brush plate 12, it will pass through the interlocking plate 23 and drive the bristles on the brush plate 12 to hit the interlocking plate 23. Then, under the action of inertia, the impurities adhered to the bristles will enter the cleaning groove 24, thereby effectively preventing the impurities on the brush plate 12 from adhering to the surface of the filter screen 11 again, affecting the normal entry of smoke into the filter box 5, thereby further improving the cleaning effect of the filter screen 11.

[0031] like Figure 4 , Figure 5 , Figure 6 , Figure 7 , Figure 8 As shown, a slide groove is symmetrically opened on the top wall of the filter box 5, a sealing plate 25 is slidably installed in the slide groove, a vertical plate 26 is fixedly installed on the top wall of the heating box, and an elastic airbag 27 is symmetrically fixedly installed between the side wall of the vertical plate 26 and the sealing plate 25, and the heating box 1 is provided with a driving mechanism that cooperates with the sealing plate 25.

[0032] The driving mechanism comprises an electromagnet 28 embedded in the heating box 1 , a magnet block 29 matched with the electromagnet 28 is embedded in the sealing plate 25 , and a sealing gasket 30 matched with the sealing plate 25 is embedded in the top wall of the filter box 5 .

[0033] The sealing gasket 30 is provided with a sealing cavity 31, the cavity 19 is inserted with a first connecting tube 32, the sealing plate 25 is provided with a horizontal groove, a sealing rod 33 is slidably installed in the horizontal groove, and a spring 34 is fixedly installed between the sealing rod 33 and the sliding groove, the sealing rod 33 is provided with a first connecting hole 35 that cooperates with the first connecting tube 32, and the elastic airbag 27 is inserted with a second connecting tube 36 that cooperates with the first connecting hole 35.

[0034] The elastic airbag 27 is provided with a second air inlet valve 37 , and an air inlet pipe 38 communicating with the sealing cavity 31 is fixedly mounted on the input end of the second air inlet valve 37 .

[0035] By adopting the above technical solution, after the motor 7 is started, the electromagnet 28 is energized and generates a magnetic field, and then the magnet block 29 gradually approaches the electromagnet 28 under the action of the magnetic field. During the movement of the magnet block 29, the sealing plate 25 is driven to move along the slide groove and disengage from the air vent 6. At this time, the elastic airbag 27 is stretched and has a tendency to recover, thereby ensuring that the smoke can normally pass through the filter 11, the first air vent, the filter box 5, and the air vent 6 to the outside. Then, when the production of the new green building material is completed, the motor 7 gradually stops working. At this time, the electromagnet 28 is powered off and the magnetic field disappears. Then the elastic airbag 27 contracts and drives the sealing plate 25 to reset. During the resetting process of the sealing plate 25, the sealing plate 25 gradually contacts and blocks the air vent 6, thereby effectively preventing the external airflow from contacting the activated carbon through the air vent 6 when the heating equipment is not in use, causing the activated carbon to be quickly saturated, thereby affecting the activated carbon's adsorption effect on harmful gases in the smoke.

[0036] During the contraction of the elastic airbag 27, the gas in the elastic airbag 27 is compressed and tends to flow outward, and then gradually contacts the sealing rod 33 and applies a thrust to the sealing rod 33 during the movement and reset of the sealing plate 25. Then, under the action of the thrust, the sealing rod 33 moves and drives the first connecting hole 35 to contact the first connecting tube 32. At this time, the first spring 34 is compressed and tends to recover. When the first connecting tube 32 is connected to the first connecting hole 35, the airflow in the elastic airbag 27 flows into the sealing cavity 31 through the second connecting tube 36, the first connecting hole 35, and the first connecting tube 32, and causes the sealing pad 30 to expand. Then, the expanded sealing pad 30 fits tightly with the sealing plate 25, thereby improving the sealing of the air permeable hole 6, and further preventing the activated carbon from absorbing impurities in the outside air and affecting the absorption effect of the activated carbon on harmful gases.

[0037] In the process that the magnetic field of the electromagnet 28 drives the sealing plate 25 to move through the magnet block 29, the elastic airbag 27 is stretched, and then the elastic airbag 27 inhales air from the sealing cavity 31 through the second air inlet valve 37, and then the sealing gasket 30 contracts and resets, playing a role in preparing for work again.

[0038] like Figure 4 As shown, two groups of push rods 15 and inclined blocks 16 are correspondingly arranged.

[0039] By adopting the above technical solution, in the process of the push rod 15 driving the filter screen 11 to move through the inclined block 16, the force on the filter screen 11 can be balanced by correspondingly setting two groups of push rods 15 and inclined blocks 16, thereby effectively preventing the filter screen 11 from tilting and getting stuck due to uneven force, thereby ensuring the normal movement of the filter screen 11.

[0040] Instructions for use: When in use, first open the plug plate 2 and put the green building new material into the heating box 1 through the delivery port, then cover the plug plate 2 and energize the heating rod 3. At this time, the temperature of the green building new material gradually rises, and then as the temperature of the green building new material rises, smoke with impurities will be generated, and then the smoke will pass through the filter 11, the first air hole, the filter box 5, and the air vent 6 to flow to the outside. In the process of the smoke passing through the filter box 5, the activated carbon in the filter box 5 can adsorb harmful gases in the smoke, and in the process of the smoke passing through the filter 11, the filter 11 can filter fine particles of impurities in the smoke; the rotating rod 8 drives the stirring rod 10 to rotate and stir the activated carbon, so that the unsaturated activated carbon is fully in contact with the harmful gases in the smoke, that is, it plays a role in improving the adsorption effect of the activated carbon, and in the process of the rotating rod 8 rotating, it will also drive the brush plate 12 to rotate, and then gradually contact with the filter during the rotation of the brush plate 12. The impurities on the surface of the net 11 contact and drive the impurities to rotate. Under the combined action of centrifugal force and gravity, the impurities gradually break away from contact with the filter screen 11; during the extension of the elastic pad 13, the cavity 19 inhales air from the outside through the first air inlet valve 20, and then during the contraction of the elastic pad 13, the gas in the cavity 19 flows into the annular groove 14 through the exhaust valve 21 and the second air pipe 22, and flows into the air groove 17 through the annular groove 14 and the first air pipe 18, and then the air flow passes through the air groove 17 to blow the filter screen 11 into the heating box 1. At the same time, during the rotation of the rotating rod 8, the air groove 17 is driven to rotate, and then the rotating air groove 17 drives the air flow to blow evenly toward the filter screen 11, so that the impurities in the gap of the filter screen 11 can be cleaned; the electromagnet 28 is powered off and the magnetic field disappears, and then the elastic air bag 27 contracts and drives the sealing plate 25 to reset. During the resetting of the sealing plate 25, the sealing plate 25 gradually contacts with the air vent 6 and blocks the air vent 6.

[0041] The above is only a preferred specific implementation of the present invention; however, the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical solution and its improved conception within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A heating device for producing new green building materials, characterized in that: include: A heating box (1), wherein a delivery port is provided on the top wall of the heating box (1), a plug plate (2) is detachably installed in the delivery port, heating rods (3) are evenly fixedly installed on the inner wall of the heating box (1), and a discharge valve (4) is inserted on the bottom wall of the heating box (1); A purification device, the purification device comprising an air vent provided on a side wall of a heating box (1), a filter box (5) matched with the air vent being fixedly mounted on the side wall of the heating box (1), the filter box (5) containing activated carbon, first air holes being uniformly provided on the side wall of the filter box (5) close to the heating box (1), and air vents (6) being uniformly provided on the top wall of the filter box (5); A filtering mechanism, the filtering mechanism comprising a motor (7) fixedly mounted on a side wall of a filter box (5), a rotating rod (8) extending into a heating box (1) fixedly mounted on an output end of the motor (7), and a stirring rod (10) evenly fixedly mounted on the rotating rod (8), a filter screen (11) being provided on the side wall of the filter box (5), and the filter screen (11) being slidably engaged with the rotating rod (8), and a brush plate (12) being rotatably engaged with the filter screen (11) fixedly mounted on the rotating rod (8).

2. A heating device for producing new green building materials according to claim 1, characterized in that: An elastic pad (13) is fixedly mounted on the side wall of the filter box (5), and the elastic pad (13) is fixedly connected to the filter screen (11); a sliding groove (39) is provided on the rotating rod (8), and a push rod (15) is slidably mounted in the sliding groove (39); a connecting groove (40) is provided on the filter screen (11), and the push rod (15) is rotatably engaged with the connecting groove (40); an inclined block (16) engaged with the push rod (15) is fixedly mounted on the side wall of the filter box (5), and the side wall of the inclined block (16) close to the push rod (15) is an inclined surface.

3. A heating device for producing new green building materials according to claim 2, characterized in that: The push rod (15) is provided with an air groove (17), a first air pipe (18) is inserted into the side wall of the air groove (17), the rotating rod (8) is provided with an annular groove (14), and one end of the first air pipe (18) away from the air groove (17) is connected to the annular groove (14), and the elastic pad (13) is provided with an air supply mechanism that cooperates with the annular groove (14).

4. A heating device for producing new green building materials according to claim 3, characterized in that: The air supply mechanism comprises a cavity (19) formed on the elastic pad (13); a first air inlet valve (20) connected to the outside is inserted into the cavity (19); an exhaust valve (21) connected to the outside is also inserted into the side wall of the cavity (19); a second air pipe (22) connected to the rotating groove is fixedly mounted on the output end of the exhaust valve (21).

5. A heating device for producing new green building materials according to claim 4, characterized in that: A linkage plate (23) is fixedly mounted on the side wall of the filter screen (11) close to the brush plate (12), and a cleaning groove (24) is provided on the linkage plate (23).

6. The heating equipment for producing new green building materials according to claim 5 is characterized by: The top wall of the filter box (5) is symmetrically provided with slide grooves, a sealing plate (25) is slidably mounted in the slide grooves, a vertical plate (26) is fixedly mounted on the top wall of the heating box, an elastic air bag (27) is symmetrically fixedly mounted between the side wall of the vertical plate (26) and the sealing plate (25), and the heating box (1) is provided with a driving mechanism that cooperates with the sealing plate (25).

7. A heating device for producing new green building materials according to claim 6, characterized in that: The driving mechanism comprises an electromagnet (28) embedded in the heating box (1), a magnet block (29) cooperating with the electromagnet (28) is embedded in the sealing plate (25), and a sealing gasket (30) cooperating with the sealing plate (25) is embedded in the top wall of the filter box (5).

8. The heating equipment for producing new green building materials according to claim 7 is characterized by: The sealing pad (30) is provided with a sealing cavity (31), the cavity (19) is provided with a first connecting tube (32), the sealing plate (25) is provided with a horizontal groove, a sealing rod (33) is slidably mounted in the horizontal groove, and a spring (34) is fixedly mounted between the sealing rod (33) and the sliding groove, the sealing rod (33) is provided with a first connecting hole (35) matching with the first connecting tube (32), and the elastic airbag (27) is provided with a second connecting tube (36) matching with the first connecting hole (35).

9. A heating device for producing new green building materials according to claim 8, characterized in that: A second air intake valve (37) is inserted into the elastic airbag (27), and an air intake pipe (38) communicating with the sealing cavity (31) is fixedly mounted on the input end of the second air intake valve (37).

10. The heating equipment for producing new green building materials according to claim 2, characterized in that: The push rods (15) and the inclined blocks (16) are provided in two groups correspondingly.

Citation Information

Patent Citations

  • High-rise building rainwater utilization system

    CN106245709A

  • Ventilation device for cowshed and use method of ventilation device

    CN117598205A

  • Anion melamine impregnated paper processing device

    CN118166578A

  • Closed seam type smoke-blocking fireproof door

    CN218407191U

  • Heating equipment for green building new material production

    CN218774463U