Heat treatment framing method and heat treatment tool for universal joint cross shaft
Through the combination of lifting components and anti-falling rods, the problems of inconvenience and collapse of universal joint cross shaft frame mounting are solved, and a stable and efficient frame mounting process is achieved, improving frame mounting convenience and heat treatment effect.
Patent Information
- Application Number
- CN202411401787.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-09
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2044-10-09
AI Technical Summary
The universal cross shaft is inconvenient to be loaded into the frame during the heat treatment and is prone to collapse, resulting in low frame loading efficiency and unstable accumulation.
The combination method of lifting and lowering assembly and anti-falling rod is adopted. Through the lifting and rotating operation of the lifting and lowering assembly, the stable stacking of the universal joint cross shaft is achieved and the collapse prevention is prevented, thereby improving the convenience and neatness of frame loading.
It improves the convenience of frame loading and stacking stability of the universal joint cross shaft, reduces the risks during frame loading, and enhances the heat treatment effect and the service life of the lifting components.
Smart Images

Figure CN118895418A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of vehicle parts processing, and in particular to a heat treatment framing method for a universal joint cross shaft and a heat treatment tool. Background Art
[0002] Universal joints are components that enable variable-angle power transmission and can be used in situations where the direction of a drive axis needs to be changed. There are many types of universal joints, the most common being the cross-axis universal joint, a type of unequal velocity universal joint. They are commonly used in automotive power transmission systems, military equipment, tools, and other applications. A cross-axis universal joint consists of two U-shaped yokes and a cross-axis bearing outer ring. The two U-shaped yokes are connected by a cross-axis. Rotation of the shaft at either end drives the other shaft. Furthermore, the bearing allows the cross-axis universal joint to swing around the center of the cross-axis at a specific angle, thus achieving variable-angle power transmission. Cross-axis universal joints offer a wide transmission angle, accommodating large variations in transmission angles. They also feature a simple structure, easy manufacturing, low cost, and a long service life. The cross-axis of the universal joint plays a crucial role, providing not only transmission but also positioning and support. Therefore, the production quality of the cross-axis is crucial. In current production, multiple cross-axis universal joints are typically stacked vertically within a frame and then heat-treated.
[0003] However, when placing the cross shafts that require heat treatment into the frame, the frame's depth makes it difficult to install the universal joint cross shafts. Furthermore, the cross shafts in the frame are stacked vertically, forming a group of cross shafts. Multiple groups of universal joint cross shafts are stacked within the frame. Highly stacked universal joint cross shafts are prone to collapse. Summary of the Invention
[0004] In order to solve the problem that the universal joint cross shaft is inconvenient to frame and easily collapses, the present invention provides a universal joint cross shaft heat treatment framing method and heat treatment tooling.
[0005] In a first aspect, the present invention provides a method for heat treating and framing a universal joint cross shaft, comprising: Step S10: Based on the positioning of the material frame assembly and the lifting assembly, controlling the lifting assembly to rise to a first position; the lifting assembly includes a first lifting plate and a second lifting plate; the first lifting plate and the second lifting plate are located in the material frame assembly; Step S20: Based on the lifting assembly being located at the first position, a universal joint cross shaft is placed into the material frame assembly, and the number of universal joint cross shafts placed is accumulated; wherein the universal joint cross shafts in the material frame assembly are accumulated above the first lifting plate and the second lifting plate; Step S30, based on the number of the universal joint cross shafts being delivered reaching a preset number, controlling the lifting assembly to descend to a preset height; Step S40, based on the descending height of the lifting assembly reaching a preset height, re-accumulating the number of the universal joint cross shafts delivered; Step S50, looping the steps S30 to S40 until the lifting assembly descends to the second position; Step S60: Based on the lifting assembly being in the second position, controlling the first lifting plate and the second lifting plate to rotate to a preset angle around the vertical axis, and controlling the upper surface of the first lifting plate to partially contact the lower surface of the second lifting plate; wherein, during the rotation of the first lifting plate and the second lifting plate, the anti-fall rod remains stationary, and the anti-fall rod is provided in a plurality and distributed in an array in the material frame assembly; the vertically stacked universal joint cross shafts form a group, and the anti-fall rod is inserted between two adjacent groups of the universal joint cross shafts; In step S70 , based on the first lifting plate and the second lifting plate rotating to a preset angle, the steps S30 to S40 are looped until the lifting assembly descends to a third position.
[0006] In some embodiments, in step S80 , based on the lifting assembly being located at the third position, the first lifting plate and the second lifting plate are controlled to move horizontally until the first lifting plate and the second lifting plate are separated from the material frame assembly.
[0007] In some embodiments, in step S81, based on the lifting assembly being located at the third position, controlling the first lifting plate to move horizontally until the first lifting plate is separated from the material frame assembly; Step S82: Based on the separation of the first lifting plate from the material frame assembly, the second lifting plate is controlled to move horizontally until the second lifting plate is separated from the material frame assembly.
[0008] In some embodiments, the first lifting plate has a first side and a second side facing each other; the second lifting plate has a third side and a fourth side facing each other; the second side and the third side are disposed adjacent to each other; when the first side and the fourth side are parallel to each other, an angle is formed between the second side and the third side; In the step S60, during the process of controlling the first lifting plate and the second lifting plate to rotate respectively around the vertical axis, the angle between the second side and the third side gradually decreases.
[0009] In a second aspect, the present invention further provides a heat treatment tool for a universal joint cross shaft, comprising: A material frame assembly, comprising a bottom plate, a cover plate, a plurality of vertical poles and a plurality of anti-falling poles; the vertical poles are detachably connected to the bottom plate; the vertical poles are detachably connected to the cover plate; the anti-falling poles are detachably connected to the bottom plate; the vertical poles are parallel to the anti-falling poles; A lifting assembly, the lifting assembly comprising a first lifting plate, a second lifting plate and a driving unit, the first lifting plate and the second lifting plate being parallel to each other and arranged in sequence along a first horizontal direction; the ends of the first lifting plate and the second lifting plate that are close to each other are both suspended; the ends of the first lifting plate and the second lifting plate that are away from each other are respectively connected to the driving assembly; a plurality of first paving grooves are formed on the first lifting plate; the first paving grooves extend to the end of the first lifting plate close to the second lifting plate; a plurality of second paving grooves are formed on the second lifting plate, the second paving grooves extend to the end of the second lifting plate close to the first lifting plate; Wherein, the heat treatment fixture of the universal joint cross shaft includes a first state and a second state; The first state includes: the first lifting plate and the second lifting plate are located in the material frame assembly; part of the anti-falling rod is located in the first clearance groove, and the other part of the anti-falling rod is located in the second clearance groove; The second state includes: the first lifting plate and the second lifting plate are located outside the material frame assembly.
[0010] In some embodiments, a length of the first lifting plate along the first horizontal direction is less than a length of the second lifting plate along the first horizontal direction.
[0011] In some embodiments, the first lifting plate has a first side and a second side facing each other; the second lifting plate has a third side and a fourth side facing each other; the second side and the third side are arranged close to each other; when the first side and the fourth side are parallel to each other, an angle is formed between the second side and the third side.
[0012] In some embodiments, the first side and the second side are parallel to each other; and the third side and the fourth side have an included angle.
[0013] In some embodiments, the anti-fall rod includes a rod body and a limit block; the rod body and the limit block are detachably connected; a slot corresponding to the rod body is opened on the base plate; when the rod body is inserted into the corresponding slot, the limit block abuts against the upper surface of the base plate under the action of gravity.
[0014] In some embodiments, the bottom plate and the cover plate both have a mesh hollow structure.
[0015] To solve the problem that the universal joint cross shaft is inconvenient to frame and easily collapses, the present invention has the following advantages: A lifting assembly allows for raising and lowering according to the progress of framing. By raising the height of the first and second lifting plates in the material frame assembly, the universal joint cross is placed onto the first and second lifting plates. This allows for a shallower placement depth of the universal joint cross, thereby improving framing convenience. The lifting assembly is controlled to descend based on the progress of the universal joint cross installation. The lifting assembly reaches its second position. At this point, the first and second lifting plates carry a significant amount of the universal joint cross. There is a risk of the first and second lifting plates bending when they penetrate into the suspended portion of the material frame assembly. To mitigate this risk, the first and second lifting plates are controlled to rotate about their vertical axes to a predetermined angle. This allows the adjacent ends of the first and second lifting plates to overlap vertically, thereby increasing their resistance to bending and preventing damage to the intermediate portion due to excessive load. This in turn increases the service life of the lifting assembly.
[0016] Vertically stacked universal joint crosses are grouped together, with anti-fall bars inserted between adjacent groups. These bars prevent the stacked crosses from collapsing. By controlling the rotation of the first and second lifting plates, irregularly stacked crosses can collide with the anti-fall bars to achieve a certain degree of vertical alignment, improving the uniformity of the vertical stacking of the universal joint crosses. This creates a vertical gap between adjacent groups, enhancing the flow of hot air during heat treatment and ultimately improving the heat treatment effect on the universal joint crosses. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 A schematic flow chart of a heat treatment and framing method for a universal joint cross shaft according to an embodiment is shown; Figure 2 A top view of a heat treatment tooling according to an embodiment is shown; Figure 3 A front view of a heat treatment tooling according to an embodiment is shown; Figure 4 A top view of a lifting assembly according to one embodiment is shown; Figure 5 A top view of a rotating lifting assembly according to an embodiment is shown; Figure 6 A top view of a base plate of one embodiment is shown; Figure 7 A top view of a cover plate according to an embodiment is shown; Figure 8 A top view of a Cardan cross is shown according to one embodiment.
[0018] Figure numerals: material frame assembly 10; bottom plate 11; cover plate 12; vertical pole 13; anti-fall rod 14; rod body 141; limit block 142; lifting assembly 20; first lifting plate 21; second lifting plate 22; first make way groove 23; second make way groove 24; first make way opening 25; second make way opening 26; universal joint cross shaft 30. DETAILED DESCRIPTION
[0019] The present disclosure will now be discussed with reference to several exemplary embodiments. It should be understood that these embodiments are discussed only to enable those skilled in the art to better understand and implement the present disclosure, rather than to imply any limitation on the scope of the present disclosure.
[0020] As used herein, the term "including" and its variations are to be interpreted as open-ended terms meaning "including, but not limited to." The term "based on" is to be interpreted as "based, at least in part, on." The terms "one embodiment" and "an embodiment" are to be interpreted as "at least one embodiment." The term "another embodiment" is to be interpreted as "at least one other embodiment." Terms such as "upper," "lower," "left," "right," "front," "back," "top," "bottom," "inner," "outer," "vertical," "horizontal," "transverse," and "longitudinal" indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings. These terms are primarily intended to better describe the present application and its embodiments and are not intended to limit the devices, elements, or components indicated to having a specific orientation, or to being constructed and operated in a specific orientation. Furthermore, some of the above terms may be used to indicate other meanings besides orientation or positional relationships. For example, the term "on" may, in certain circumstances, be used to indicate a dependency or connection relationship. Those skilled in the art will understand the specific meanings of these terms in this application based on the specific circumstances. Furthermore, the terms "installed," "disposed," "provided with," "connected," and "connected" are to be interpreted broadly. For example, it can be a fixed connection, a detachable connection, or an integral structure; it can be a mechanical connection or an electrical connection; it can be a direct connection, an indirect connection through an intermediate medium, or an internal connection between two devices, elements, or components. For those of ordinary skill in the art, the specific meanings of the above terms in this application can be understood according to the specific circumstances. In addition, the terms "first", "second", etc. are mainly used to distinguish different devices, elements, or components (the specific types and structures may be the same or different), and are not used to indicate or imply the relative importance or quantity of the indicated devices, elements, or components. Unless otherwise specified, "plurality" means two or more.
[0021] The cross-axis universal joint is a type of unequal velocity universal joint. It can be composed of a cross shaft connecting two universal joint forks, and the variable angle transmission of power is achieved through the cross shaft. The cross-axis universal joint can be widely used in fields such as automotive transmission systems, especially in some devices where the direction of the transmission axis needs to be changed. The cross-axis universal joint is one of the key components of the universal transmission device and can be used in combination with the drive shaft to achieve flexible power transmission. The cross shaft is one of the key parts of the cross-axis universal joint. In the current production process, the universal joint cross shaft that needs to be heat treated is placed in the frame. However, when the cross shaft that needs to be heat treated is placed in the frame, it is inconvenient to frame the universal joint cross shaft because the frame has a certain depth. The cross shafts in the frame are stacked vertically, and the vertically arranged cross shafts are a group. There are multiple groups of universal joint cross shafts stacked in the frame. Universal joint cross shafts with higher stacks are prone to collapse. In order to solve the above problems, such as Figure 1 As shown, the present invention provides a method for heat treatment and framing of a universal joint cross shaft.
[0022] In this embodiment, in step S10, before heat treatment is required for multiple universal joint cross shafts 30, the lifting assembly 20 can be controlled to rise to a first position based on the positioning of the material frame assembly 10 and the lifting assembly 20. The first position is the upper position from the top to the bottom of the material frame assembly 10, which means that the depth of the universal joint cross shaft 30 to be placed is shallow. The material frame assembly 10 can accommodate multiple universal joint cross shafts 30 that need to be heat treated, and the lifting assembly 20 can improve the convenience of framing the universal joint cross shaft 30. The lifting assembly 20 may include a first lifting plate 21 and a second lifting plate 22. The first lifting plate 21 and the second lifting plate 22 can be located in the material frame assembly 10. The lifting assembly 20 can be raised and lowered in the material frame assembly 10, and the first lifting plate 21 and the second lifting plate 22 can be conveniently used to remove the material frame assembly 10 after the universal joint cross shaft 30 is placed.
[0023] In step S20, based on the lifting assembly 20 being in the first position, the universal joint cross 30 is introduced into the material frame assembly 10, and the number of universal joint crosses 30 introduced is accumulated to determine the stacking height of the universal joint crosses 30 and prevent overflow of the accumulated universal joint crosses 30. The universal joint crosses 30 in the material frame assembly 10 are accumulated above the first lifting plate 21 and the second lifting plate 22. The first lifting plate 21 and the second lifting plate 22 can lift the introduced universal joint crosses 30 to prevent the accumulated universal joint crosses 30 from falling directly to the bottom. Thus, the first lifting plate 21 and the second lifting plate 22 facilitate the introduction of the universal joint crosses 30.
[0024] In step S30, when the number of gimbal crosses 30 delivered reaches a predetermined number and the stacked gimbal crosses 30 have reached a predetermined height, the lifting assembly 20 can be controlled to descend to the predetermined height. This ensures that the delivery position of the gimbal crosses 30 is always located above the material frame assembly 10, thereby facilitating delivery of the gimbal crosses 30.
[0025] In step S40, when the lifting assembly 20 reaches a predetermined height, the accumulated number of universal joint crosses 30 is cleared and the accumulated number of universal joint crosses 30 is reset. This allows the height of the lifting assembly 20 within the material frame assembly 10 to be adjusted based on the accumulated number of universal joint crosses 30, thereby preventing the accumulation of universal joint crosses 30.
[0026] In step S50 , the steps S30 to S40 are looped until the lifting assembly 20 descends to the second position.
[0027] In step S60, based on the lifting assembly 20 being in the second position, the second position can be located midway between the top and bottom of the material frame assembly 10. This means that the number of universal joint crosses 30 deployed is greater than half of the total number of universal joint crosses 30 required. At this point, the lifting assembly 20 is subject to a greater load, and the first and second lifting plates 21, 22 can be controlled to rotate about the vertical axis to a predetermined angle, with the first and second lifting plates 21, 22 rotating in opposite directions. The upper surface of the first lifting plate 21 and the lower surface of the second lifting plate 22 are controlled to partially align. This allows the vertical projections of the first and second lifting plates 21, 22 to overlap to a certain extent, thereby increasing the strength of the overlapping portion of the lifting assembly 20. This improves the compressive bending resistance of the adjacent ends of the first and second lifting plates 21, 22, thereby increasing their service life. During the rotation of the first and second lifting plates 21, 22, the anti-fall bars 14 remain stationary. Multiple anti-fall bars 14 are provided and arranged in an array within the material frame assembly 10. The universal joint cross shafts 30 stacked vertically can be a group, and the anti-fall rod 14 can be inserted between two adjacent groups of universal joint cross shafts 30. The anti-fall rod 14 can make the stack of universal joint cross shafts 30 less likely to collapse. The rotation of the first lifting plate 21 and the second lifting plate 22 can also allow the universal joint cross shafts 30 of the same group that are not aligned neatly to touch the anti-fall rod 14 to achieve alignment, thereby reducing the possibility of collapse. And after the uniformity of the universal joint cross shafts 30 is improved, the universal joint cross shafts 30 of the same group can have a certain gap. Therefore, when the multiple universal joint cross shafts 30 are subjected to heat treatment, the airflow can be more orderly and smooth, thereby improving the heat treatment effect of the universal joint cross shaft 30.
[0028] In step S70, after the first and second lifting plates 21 and 22 have rotated to a predetermined angle, steps S30 to S40 are repeated until the lifting assembly 20 descends to the third position. This completes the assembly of the universal joint cross 30, allowing subsequent operations on the lifting assembly 20 to proceed.
[0029] In this embodiment, in step S80, based on the lifting assembly 20 being in the third position and the universal joint cross 30 being assembled, the first lifting plate 21 and the second lifting plate 22 are controlled to move horizontally until the first lifting plate 21 and the second lifting plate 22 are separated from the material frame assembly 10. Due to the weight limit of the heat treatment furnace, removing the lifting assembly 20 from the material frame assembly 10 can reduce the weight of the material frame assembly 10, thereby increasing the furnace loading capacity of the universal joint cross 30.
[0030] In this embodiment, step S80 of the heat treatment framing method of the universal joint cross shaft 30 may include step S81 and step S82.
[0031] In step S81 , based on the lifting assembly 20 being located at the third position, the first lifting plate 21 may be controlled to move horizontally until the first lifting plate 21 is separated from the material frame assembly 10 .
[0032] In step S82, based on the separation of the first lifting plate 21 from the material frame assembly 10, the second lifting plate 22 is controlled to move horizontally until the second lifting plate 22 separates from the material frame assembly 10. This is done so that once the first lifting plate 21 has separated, the first lifting plate 21 will not resist the separation of the second lifting plate 22, thereby making it easier for the second lifting plate 22 to separate.
[0033] In this embodiment, if Figure 4 As shown, the first lifting plate 21 has a first side L1 and a second side L2 that are opposed to each other. The second lifting plate 22 has a third side L3 and a fourth side L4 that are opposed to each other. The second side L2 and the third side L3 can be positioned close to each other. When the first side L1 and the fourth side L4 are parallel to each other, an angle is formed between the second side L2 and the third side L3. This allows the first and second lifting plates 21, 22 to rotate, thereby increasing the strength of the first and second lifting plates 21, 22.
[0034] In step S60, Figure 4 、 Figure 5 As shown, during the process of controlling the first and second lifting plates 21, 22 to rotate about their respective vertical axes, the angle between the second side L2 and the third side L3 gradually decreases, eventually approaching parallelism. This results in a more uniform overlap between the first and second lifting plates 21, 22, and thus greater stability when the first and second lifting plates 21, 22 are heavily loaded.
[0035] In this embodiment, the present invention discloses a heat treatment tool for a universal joint cross shaft 30 that can be used in any embodiment of the heat treatment framing method for the universal joint cross shaft 30, such as Figure 2 As shown, the heat treatment tooling for the universal joint cross shaft 30 may include a material frame assembly 10 and a lifting assembly 20 .
[0036] like Figure 3 、 Figure 8 As shown, the material frame assembly 10 may include a base plate 11, a cover plate 12, a plurality of vertical rods 13 and a plurality of anti-fall rods 14. The vertical rods 13 are detachably connected to the base plate 11, the vertical rods 13 are detachably connected to the cover plate 12, the anti-fall rods 14 are detachably connected to the base plate 11, and the vertical rods 13 are parallel to the anti-fall rods 14. The base plate 11 can support the universal joint cross shaft 30 that has been put in to prevent leakage of the universal joint cross shaft 30. The base plate 11 is subjected to a large bearing force, so the strength of the base plate 11 is also relatively high. The cover plate 12 can be used to seal the universal joint cross shafts 30 after they are loaded. It can also make the structure more stable when the universal joint cross shaft 30 is heat treated. The vertical rods 13 are evenly distributed around the base plate 11, and the vertical rods 13 are perpendicular to the base. For example, assuming that the base is rectangular, there are four vertical rods 13, which are respectively set up around the base. There are multiple anti-fall bars 14 distributed in an array in the material frame assembly 10. The vertically stacked universal joint cross shafts 30 are a group, and the anti-fall bars 14 are inserted between two adjacent groups of universal joint cross shafts 30 to prevent the stacked universal joint cross shafts 30 from collapsing.
[0037] like Figure 3 As shown, the lifting assembly 20 may include a first lifting plate 21, a second lifting plate 22, and a drive unit. The first lifting plate 21 may be parallel to the second lifting plate 22, and the first and second lifting plates 21, 22 are arranged sequentially along a first horizontal direction. The ends of the first and second lifting plates 21, 22 that are adjacent to each other are suspended, allowing them sufficient space for rotation and allowing them to easily separate from the material frame assembly 10 when the load is high. The ends of the first and second lifting plates 21, 22 that are distal to each other are respectively connected to the drive unit. The first lifting plate 21 has a plurality of first clearance slots 23 extending from the end of the first lifting plate 21 adjacent to the second lifting plate 22. The second lifting plate 22 has a plurality of second clearance slots 24 extending from the end of the second lifting plate 22 adjacent to the first lifting plate 21. The first and second clearance slots 23, 24 are used to avoid the anti-fall bar 14, thereby allowing the first and second lifting plates 21, 22 to be installed in the material frame assembly 10.
[0038] The heat treatment tooling for the universal joint cross shaft 30 may include a first state and a second state.
[0039] The first state can include: the first and second lifting plates 21, 22 are located in the material frame assembly 10, a portion of the anti-fall rod 14 is located in the first clearance groove 23, and the remaining portion of the anti-fall rod 14 is located in the second clearance groove 24. In other words, the first and second lifting plates 21, 22 are located inside the material frame assembly 10 and have been positioned relative to the material frame assembly 10. This allows the universal joint cross shaft 30 to be placed.
[0040] The second state may include: the first lifting plate 21 and the second lifting plate 22 are located outside the material frame assembly 10. That is, the plurality of universal joint cross shafts 30 have been placed, and the first lifting plate 21 and the second lifting plate 22 have been separated from the material frame assembly 10.
[0041] In this embodiment, the first clearance groove 23 may be provided with a plurality of first clearance openings 25, and the second clearance groove 24 may be provided with a plurality of second clearance openings 26. The plurality of first clearance openings 25 are evenly distributed among the plurality of first clearance grooves 23. The plurality of second clearance openings 25 are evenly distributed among the plurality of second clearance grooves 24. The diameters of the first clearance openings 25 and the second clearance openings 26 are respectively larger than the diameters of the first clearance groove 23 and the second clearance groove 24. The anti-fall rod 14 may correspond one-to-one with the first clearance openings 25. The anti-fall rod 14 may correspond one-to-one with the second clearance openings 26, thereby making it easier for the first lifting plate 21 and the second lifting plate 22 to rotate.
[0042] In this embodiment, if Figure 4 As shown, the length of the first lifting plate 21 along the first horizontal direction is shorter than the length of the second lifting plate 22 along the first horizontal direction. The horizontal length of the second lifting plate 22 is twice the horizontal length of the first lifting plate 21. The first lifting plate 21 is located below the second lifting plate 22, subject to greater loads and thus more susceptible to damage. Therefore, reducing the horizontal length of the first lifting plate 21 makes it less susceptible to damage, thereby increasing its service life.
[0043] In this embodiment, if Figure 4As shown, the first lifting plate 21 has a first side L1 and a second side L2 that are opposed to each other. The second lifting plate 22 has a third side L3 and a fourth side L4 that are opposed to each other. The second side L2 and the third side L3 are arranged adjacent to each other. When the first side L1 and the fourth side L4 are parallel to each other, an angle is formed between the second side L2 and the third side L3. Because the first lifting plate 21 is relatively short in the horizontal direction, the second side L2 is difficult to process. Therefore, the first side L1 and the second side L2 can be parallel. The second lifting plate 22 is relatively long in the horizontal direction, making the third side L3 easier to process. As a result, the first and second lifting plates 21, 22 have a certain rotatable angle, allowing them to partially overlap. This increases the stability of the first and second lifting plates 21, 22 when loaded with heavy loads.
[0044] In this embodiment, if Figure 4 As shown, the first side L1 and the second side L2 are parallel to each other. The third side L3 and the fourth side L4 form an angle. Because the first lifting plate 21 is relatively short in the horizontal direction, which is not conducive to processing, the first lifting plate 21 is rectangular. The second lifting plate 22 is longer in the horizontal direction, which is more convenient for processing. Therefore, the third side L3 of the second lifting plate 22 is angled. This only requires processing the second lifting plate 22, thereby reducing production costs.
[0045] In this embodiment, if Figure 3 As shown, the anti-fall bar 14 can include a rod body 141 and a stopper 142. The rod body 141 and the stopper 142 are detachably connected. A slot corresponding to each rod body 141 is defined on the base plate 11. When the rod body 141 is inserted into the corresponding slot, the stopper 142 abuts against the upper surface of the base plate 11 due to gravity. The stopper 142 can position the rod body 141 and provide greater stability to the anti-fall bar 14.
[0046] In this embodiment, if Figure 6 、 Figure 7 As shown, the bottom plate 11 and the cover plate 12 are both in a mesh hollow structure. This can increase the contact area with the hot air flow after the universal joint cross shaft 30 is framed, thereby improving the quality of the heat treatment.
[0047] Those skilled in the art will appreciate that the above-mentioned embodiments are specific examples for implementing the present disclosure, and that in actual applications, various changes may be made thereto in form and detail without departing from the scope of the present disclosure.
Claims
1. A method for heat treatment and framing of a universal joint cross shaft, characterized in that: The heat treatment framing method of the universal joint cross shaft comprises: Step S10, based on the completion of positioning of the material frame assembly and the lifting assembly, controlling the lifting assembly to rise to a first position; the lifting assembly comprises a first lifting plate and a second lifting plate; the first lifting plate and the second lifting plate are located in the material frame assembly; Step S20, based on the lifting assembly being located at the first position, placing a universal joint cross shaft into the material frame assembly, and accumulating the number of the universal joint cross shafts placed; wherein the universal joint cross shafts in the material frame assembly are accumulated above the first lifting plate and the second lifting plate; Step S30, based on the number of the universal joint cross shafts being delivered reaching a preset number, controlling the lifting assembly to descend to a preset height; Step S40, based on the descending height of the lifting assembly reaching a preset height, re-accumulating the number of drops of the universal joint cross axis; Step S50, looping the steps S30 to S40 until the lifting assembly descends to the second position; Step S60, based on the lifting assembly being located at the second position, controlling the first lifting plate and the second lifting plate to rotate to a preset angle around the vertical axis respectively, and controlling the upper surface of the first lifting plate to partially fit with the lower surface of the second lifting plate; wherein, during the rotation of the first lifting plate and the second lifting plate, the anti-falling rod remains stationary, and the anti-falling rod has a plurality of anti-falling rods and is distributed in an array in the material frame assembly; the universal joint cross shafts stacked vertically form a group, and the anti-falling rod is inserted between two adjacent groups of the universal joint cross shafts; Step S70, based on the first lifting plate and the second lifting plate rotating to a preset angle, looping the steps S30 to S40 until the lifting assembly descends to a third position.
2. A method for heat treatment and framing of a universal joint cross shaft according to claim 1, characterized in that: The universal joint cross shaft heat treatment framing method also includes: Step S80: Based on the lifting assembly being located at the third position, the first lifting plate and the second lifting plate are controlled to move horizontally until the first lifting plate and the second lifting plate are separated from the material frame assembly.
3. A method for heat treatment and framing of a universal joint cross shaft according to claim 2, characterized in that: The step S80 includes: Step S81, based on the lifting assembly being located at the third position, controlling the first lifting plate to move horizontally until the first lifting plate is separated from the material frame assembly; Step S82, based on the first lifting plate being separated from the material frame assembly, controlling the second lifting plate to move horizontally until the second lifting plate is separated from the material frame assembly.
4. A method for heat treatment and framing of a universal joint cross shaft according to claim 1, characterized in that: The first lifting plate has a first side and a second side facing each other; the second lifting plate has a third side and a fourth side facing each other; the second side and the third side are arranged close to each other; when the first side and the fourth side are parallel to each other, an angle is formed between the second side and the third side; In the step S60, during the process of controlling the first lifting plate and the second lifting plate to rotate around the vertical axis respectively, the angle between the second side and the third side gradually decreases.
5. A heat treatment tool for a universal joint cross shaft, characterized in that: The heat treatment tooling for the universal joint cross shaft comprises: A material frame assembly, the material frame assembly comprising a bottom plate, a cover plate, a plurality of vertical poles and a plurality of anti-falling poles; the vertical poles are detachably connected to the bottom plate; the vertical poles are detachably connected to the cover plate; the anti-falling poles are detachably connected to the bottom plate; the vertical poles are parallel to the anti-falling poles; A lifting assembly, the lifting assembly comprising a first lifting plate, a second lifting plate and a driving unit, the first lifting plate and the second lifting plate are parallel to each other, and the first lifting plate and the second lifting plate are arranged in sequence along a first horizontal direction; the ends of the first lifting plate and the second lifting plate close to each other are both suspended; the ends of the first lifting plate and the second lifting plate far away from each other are respectively connected to the driving assembly; a plurality of first giving way grooves are provided on the first lifting plate; the first giving way grooves penetrate to the end of the first lifting plate close to the second lifting plate; a plurality of second giving way grooves are provided on the second lifting plate, and the second giving way grooves penetrate to the end of the second lifting plate close to the first lifting plate; Wherein, the heat treatment tooling for the universal joint cross shaft includes a first state and a second state; The first state includes: the first lifting plate and the second lifting plate are located in the material frame assembly; part of the anti-falling rod is located in the first giving way groove, and the other part of the anti-falling rod is located in the second giving way groove; The second state includes: the first lifting plate and the second lifting plate are located outside the material frame assembly.
6. A heat treatment tool for a universal joint cross shaft according to claim 5, characterized in that: A length of the first lifting plate along the first horizontal direction is smaller than a length of the second lifting plate along the first horizontal direction.
7. A heat treatment tool for a universal joint cross shaft according to claim 6, characterized in that: The first lifting plate has a first side and a second side that are opposite to each other; the second lifting plate has a third side and a fourth side that are opposite to each other; the second side and the third side are arranged close to each other; when the first side and the fourth side are parallel to each other, an angle is formed between the second side and the third side.
8. A heat treatment tool for a universal joint cross shaft according to claim 7, characterized in that: The first side edge and the second side edge are parallel to each other; the third side edge and the fourth side edge have an included angle.
9. The heat treatment tool for a universal joint cross shaft according to claim 5, characterized in that: The anti-fall rod includes a rod body and a limit block; the rod body and the limit block are detachably connected; slots corresponding to the rod bodies are provided on the bottom plate; when the rod body is inserted into the corresponding slots, the limit block abuts against the upper surface of the bottom plate under the action of gravity.
10. A heat treatment tool for a universal joint cross shaft according to claim 5, characterized in that: The bottom plate and the cover plate both present a mesh hollow structure.
Citation Information
Patent Citations
Multi-station rotary lifting stock bin
CN212292048U
Heat treatment tool for plates
CN214655140U
Carburizing string bar charging basket for heat treatment of cross shaft
CN215560512U
Multifunctional feeding mechanical arm for punching air conditioner motor support
CN215965968U
Feeding device capable of being used for feeding or discharging cups
CN218260865U