Cluster type intelligent suspension cable road building machine and method
Through a clustered intelligent suspension road builder, the efficient storage and exchange of road-building equipment and materials is achieved using suspension cables and internal and external rail systems, solving the low efficiency and difficult quality to ensure due to the intimate construction process during the existing road building process. The problem has achieved the integration of road construction equipment and the improvement of construction efficiency.
Patent Information
- Application Number
- CN202411150538.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-21
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2044-08-21
AI Technical Summary
The construction processes in the existing road construction process are not tight enough, resulting in low construction efficiency and difficult to guarantee quality. They rely on manual operations and frequent monitoring and adjustments, which affects the construction quality.
Design a cluster intelligent suspension road construction machine to realize multi-functional circular road construction construction through suspension cables and construction units. The internal and external tracks and lifting and transfer mechanisms improve the storage, transportation and switching efficiency of equipment materials, so that the road construction equipment is integrated. Process integration.
Significantly save manpower and material costs, improve construction efficiency and quality, realize efficient storage and exchange of equipment and materials, and ensure construction efficiency and endurance.
Smart Images

Figure CN118895697A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of construction engineering, and in particular to a cluster-type intelligent cable-suspended road-building machine, and also to a cluster-type intelligent cable-suspended road-building method. Background Art
[0002] The existing road construction process usually includes survey and design, earth excavation, roadbed leveling, material laying, road surface construction, maintenance and inspection, which will use excavators, bulldozers, rollers, graders, pavers, sprinklers and other equipment. Each device is constructed in sequence, usually first digging, bulldozing, and leveling the ground, then rolling, leveling, paving, maintenance, etc. The construction intervals of each machine are large, the construction is not tight enough, and the efficiency is low. The entire road construction process is divided into separate parts for construction, which greatly prolongs the construction time. In addition, the construction effect is difficult to guarantee due to the lack of tightness of each process. The traditional road construction process relies on manual operation, which is inefficient. Workers need to monitor and adjust frequently, resulting in inaccurate processes and affecting construction quality.
[0003] Therefore, there is a need for a cluster-type intelligent cable-suspended road-building machine and method that can integrate the entire road-building process and closely combine various construction steps so that a whole set of road-building construction can be completed with only one pass of the equipment, without the need for workers to repeatedly drive different equipment back and forth for construction. Summary of the invention
[0004] Based on the deficiencies in the above-mentioned prior art, the technical problem to be solved by the present invention is to provide a cluster-type intelligent suspension road construction machine, which can carry out multifunctional cyclic road construction through the suspension of several road construction machines and the coordination of construction units, and can also carry out internal and external fast transportation, storage, and switching of construction equipment and materials through the suspension support unit, winch unit, internal and external transfer rails, lifting rails, and lifting transfer units inside a single road construction machine, thereby realizing the integration of road construction equipment and the integration of road construction processes, greatly saving manpower and material costs, and improving efficiency and construction quality.
[0005] The present invention also provides a cluster-type intelligent suspension road construction method, which can be directly applied to existing road construction, greatly improving the efficiency of equipment and material storage, transportation, and switching, so that the entire cluster-type intelligent suspension road construction machine can store more construction equipment and materials, thereby ensuring construction efficiency and endurance.
[0006] In order to achieve the above-mentioned purpose, the present invention adopts the following technical measures:
[0007] The cluster-type intelligent suspension road-building machine of the present invention comprises a road-building construction array formed by connecting a plurality of road-building units through a suspension cable portion, wherein the road-building units comprise a body portion, an internal transfer portion, and a suspension cable frame portion connected in sequence from bottom to top; the suspension cable frame portion is composed of four main pillars installed at the four corners of the body base of the body portion to form a main body, a main top plate is provided on the top of the main pillar, four suspension cable main brackets are provided between the body base and the main top plate, inside the body, and near the four main pillars, and each suspension cable main bracket is provided with an installation area for two suspension cable support units; the internal transfer portion comprises an outer transfer track installed as a main body on the upper surface of the body base, and an inner transfer track installed inside the outer transfer track; a plurality of construction equipment transfer seats are provided on the outer transfer track, and a plurality of construction equipment transfer seats are provided on the inner transfer track A number of construction material storage boxes; the construction equipment transfer seat is connected from bottom to top by an electric trolley, a circular baffle, a transfer seat electric push rod, and a transfer seat support plate. In the storage area formed by the circular baffle, the transfer seat electric push rod pushes the transfer seat support plate on its output shaft to rise and fall, so that the equipment can be raised and lowered in the construction equipment transfer seat for easy access; the suspension cable part includes a suspension cable that serves as a main body connecting the interior of a road-building unit and each road-building unit, and also includes a number of construction units installed on the suspension cable through an electric trolley; the construction unit is mainly composed of a construction electric trolley installed on the suspension cable, on which a rotating motor is provided, and the output shaft of the rotating motor is connected to a construction electric push rod mounting seat, on which four vertically downward construction electric push rods are arranged around, and the output shaft of the construction electric push rod is connected to a construction electric clamp.
[0008] Preferably, the cable support unit is connected from top to bottom in sequence by a saddle rotating motor mounting seat, a saddle rotating motor, a saddle mounting seat, and a cable saddle; a winch circular track is provided on the upper surface of the body base near the lower part of the cable main bracket, and four winch units are installed on it, and the winch units are connected from bottom to top in sequence by an electric trolley installed on the winch circular track, a rotating motor on the electric trolley, a winch mounting seat on the output shaft of the rotating motor, and a winch on the winch mounting seat; each winch unit is connected to the cable support unit on the nearest cable main bracket, and the four winch units correspond to the cable support units in pairs. The cable passes through the cable saddle of the cable support unit through the winch, and after passing through, it can pass through other suspension saddles and then be connected to other winches. After the winches at both ends are tightened, the cable can be straightened for construction.
[0009] Furthermore, an internal lifting and transfer mechanism is provided above the transfer outer track and the transfer inner track. The internal lifting and transfer mechanism is mainly composed of four sub-pillars installed on the periphery of the transfer outer track and on the body base, and a sub-top plate is provided on the top. Four rectangular transfer openings are provided at the four corners of the sub-top plate above the corners of the transfer outer track, and a rectangular transfer opening is provided in the middle of the sub-top plate above the overlapping part in the middle of the transfer inner track, and the equipment is passed through the transfer opening and accessed by the construction unit on the upper suspension cable; a first lifting track is provided on the outside of the four rectangular transfer openings at the four corners of the sub-top plate and on the lower surface of the sub-top plate, a second lifting track is provided on the inside of the four rectangular transfer openings and on the lower surface of the sub-top plate, and a circle of third lifting track is provided on the periphery of the transfer opening located in the middle of the sub-top plate, and a number of lifting and transfer units are provided on the first lifting track, the second lifting track and the third lifting track.
[0010] Furthermore, the lifting and transfer unit is connected from top to bottom in sequence by an electric trolley, a rotating motor, a lifting electric push rod mounting seat, and a lifting vertical electric push rod. A clamping mechanism is connected to the output shaft of the lifting vertical electric push rod. The clamping mechanism consists of a lifting vertical electric clamp and a horizontal lifting horizontal electric push rod nearby. The output shaft of the lifting horizontal electric push rod is also connected to a lifting horizontal electric clamp.
[0011] Preferably, the suspension cable part also includes an excavation module and a road rolling module; the excavation module is mainly composed of an excavation bucket, and a first clamping seat and a second clamping seat of the excavation bucket are respectively provided on both sides of the excavation module. When excavating, one electric clamp clamps the first clamping seat, and the other clamps the second clamping seat. The electric push rods on the two electric clamps are extended to different lengths to complete the rotary excavation action of the excavation bucket to shovel the soil; the road rolling module is mainly composed of a rolling wheel, and road rolling clamping seats are connected on both sides of the road rolling module through rotating shafts. It only needs the electric clamp to clamp the clamping seat and then push out the electric push rod to press the rolling wheel to the ground, and move the electric trolley or the entire road making machine cluster to roll and roll to complete the road rolling.
[0012] Furthermore, the machine body is connected from bottom to top in sequence by a crawler chassis, a hydraulic turntable mounting seat, a hydraulic turntable, and a machine body base; the crawler chassis provides power for the road-making machine to travel on wasteland, and the hydraulic turntable thereon can drive the machine body base to rotate relative to the crawler chassis.
[0013] Correspondingly, the present invention also provides a cluster-type intelligent cable suspension road construction method, the steps of which are:
[0014] S1. Cable connection: When connecting the cables, first determine the cable support units and hoist units that need to be connected in pairs according to the actual situation, including the cables connected inside the road-building unit and the cables connected between the road-building units, including the cables used for internal transportation and the cables used for construction. The connection method of the cables here can be a square connection or an X-shaped connection. After confirming the cables to be connected, first fix one end of the cables to the hoist on one side, and the other end of the cables passes through the cable saddle and is connected to the hoist on the other side. Before the connection process, the electric trolley in the hoist unit is moved on the hoist circular track to adjust the relative position, and at the same time, the rotating motor is controlled to rotate and adjust the direction of the hoist, and then the saddle rotating motor in the cable support unit is used to rotate and adjust the direction of the cable saddle to ensure the stability of the cable connection;
[0015] S2. Installation of construction units: After one side of the suspension cable is fixed to the hoist at one end and the other end passes through the suspension cable saddle, it is necessary to equip the suspension cable with several construction units according to the actual situation. After the equipment is completed, the suspension cable is passed through the suspension cable saddle at the other end and connected to the hoist. After the hoists at both ends straighten the suspension cable, the electric trolley can move on it, and the construction unit performs mobile construction on the suspension cable. The construction unit can be installed between road construction units for construction, or installed inside a single road construction unit for transportation;
[0016] S3. Transfer of equipment and materials between tracks: When transferring equipment and materials, a number of construction equipment transfer seats and construction material storage boxes are respectively provided on the transfer outer track and the transfer inner track, and the construction equipment is stored in the construction equipment transfer seat, and the transfer seat electric push rod is lowered for storage, and the construction materials are stored in the construction material storage box; if the equipment in the transfer outer track is transported to the transfer inner track, the corresponding construction equipment transfer seat is controlled to come to the overlap of the first lifting track, the second lifting track and the transfer outer track, and the transfer seat electric push rod is raised to push out the equipment, and a number of lifting and transfer units on the first and second lifting tracks are controlled to come nearby, and the clamping mechanism is brought close to the equipment by lowering its lifting vertical electric push rod, and the lifting vertical electric clamp is controlled to directly clamp the equipment vertically, or the lifting horizontal electric push rods of a number of lifting and transfer mechanisms push out the lifting horizontal electric clamp to clamp the equipment horizontally, and after clamping is completed, the electric trolley is controlled to transport it to the overlap of the first and second lifting tracks and the transfer inner track, and a construction equipment transfer seat or a construction material storage box is controlled to come below it, and the equipment is stored in the opposite way;
[0017] S4. Handover of equipment between track cables: if the equipment in the outer transfer track is transported to the construction unit on the cable, if the height of the cable to be transported is low, raise the electric push rod of the transfer seat outside the coverage of the cross-shaped and lifting transfer mechanism of the outer construction track, and cooperate with the construction electric push rod and construction electric clamp of the construction unit to clamp it. It is usually the transfer inside the road construction unit. When the equipment is transported to the construction unit on the lower cable, it is controlled to move to the overlapping area with the higher cable above, and then the upper construction unit clamps the equipment to complete the handover. Although the upper and lower cables overlap, there is still a certain distance The upper and lower construction units can be staggered and handed over, and this method can also be used for the handover of equipment on the internal and external cables of the machine body; if the equipment on the outer transfer track and the inner transfer track is transported to the construction unit on the cable, and the height of the transport cable is relatively high, the equipment can be first transported to the lifting and transfer units on the first, second or third lifting tracks, and then these lifting and transfer units will bring it to the transfer opening, align the equipment with the transfer opening, and the construction unit on the upper cable will come to the upper part of the transfer opening, lower its construction electric push rod to pass through the transfer opening to clamp the equipment, and release the clamp on the lifting and transfer unit to complete the equipment handover;
[0018] S5. Road-building machine cluster combination: several road-building machines are connected to each other through suspension cables. The specific connection method is adjusted according to the actual situation.
[0019] S6. Road construction: The crawler chassis provides the power for the road construction machine to travel on wasteland. The hydraulic turntable on it can drive the base of the machine to rotate relative to the crawler chassis, similar to the rotating turret structure of a tank, so that the machine can control the rotation of the upper mechanism without the crawler chassis moving. Several construction units move on the straightened cables, and the construction equipment is contacted with the ground to carry out construction by lowering the construction electric push rod. Several groups of construction units move back and forth on the cables to carry out construction synchronously or sequentially, and carry out tight process construction on the road surface. At this point, the entire cluster intelligent suspension road construction is completed.
[0020] From the above, the beneficial effects of the cluster-type intelligent cable suspension road-building machine and method of the present invention are as follows:
[0021] 1. The cable frame designed by the present invention is composed of four groups of cable main brackets at four corners and cable support units in the upper and lower installation areas, forming a cable installation frame that can flexibly adjust the direction. It can be used not only for cable connection between road construction units, but also for cable connection inside road construction units. Because it has a multi-group and multi-layer structure, the cable connection method is more diverse. The internal connection alone can be a U-shaped connection or an X-shaped connection, and the internal height difference connection can also be performed, so that the actuation trajectory of the construction unit thereon is more adaptable, has great variability, and has a wide range of applications.
[0022] 2. The inner and outer transfer tracks designed in the present invention cooperate with the lifting track of the lifting and transfer mechanism to make good use of the space inside the machine body. The upper cables can be used for weaving nets, the two cross-shaped inner and outer tracks at the bottom are used for equipment and material storage, and the three U-shaped tracks are used for equipment transfer of the inner and outer tracks and track cables, which greatly improves the efficiency of equipment and material storage, transportation, and switching, so that the entire cluster-type intelligent suspension road construction machine can store more construction equipment and materials, so that construction efficiency and endurance are guaranteed.
[0023] 3. The cable-suspended structure designed in the present invention cooperates with the structure of the cluster road-building unit, so that the different tracks formed by the arrangement and combination of several units can realize extremely flexible construction with the construction units thereon, whether it is the construction of winding back and forth roads or the one-time construction of a flat large area, it can cope with it well, and the construction equipment used thereon can be put into use after simple modification of the existing equipment, the connection method is simple, and the application prospect is good.
[0024] 4. The cluster-type intelligent cable-suspended road-building machine designed by the present invention supports the combined construction of various connection modes. Several road-building machines are connected to each other through cables. For example: rectangular standard four-way mobile construction, which can well cope with the construction of standard bifurcated roads; straight-line two-way mobile construction, which can well cope with the construction of large-scale single roads; special-shaped multi-faceted multi-directional mobile construction, which can well cope with the construction of winding non-standard roads; triangular three-way construction, which can well cope with the construction of bifurcated intersections with certain angles; various connection modes make the road-building machine cluster more intelligent and efficient. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] The drawings described herein are used to provide further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute improper limitations on the present application.
[0026] Figure 1 This is a schematic diagram of a cluster operation of a single machine for road construction according to the present invention;
[0027] Figure 2 It is a schematic diagram of the connection of the suspension cable part between two road-making units of the present invention;
[0028] Figure 3 It is a structural schematic diagram of a single road-making machine of the present invention;
[0029] Figure 4 It is a structural schematic diagram of the body part of the present invention;
[0030] Figure 5 It is a structural schematic diagram of the suspension frame part of the present invention;
[0031] Figure 6 A schematic diagram of a horizontal transport structure of an internal transport portion of the present invention;
[0032] Figure 7 It is a schematic diagram of the lifting and transporting structure of the internal transporting part of the present invention;
[0033] Figure 8 It is a structural schematic diagram of a construction unit of the present invention;
[0034] Fig. 9 It is a structural schematic diagram of the mining module of the present invention;
[0035] Fig.10 It is a structural schematic diagram of the road pressing module of the present invention;
[0036] Fig.11 The present invention shows a schematic diagram of several road construction single machine multiple cluster operation modes, wherein (a) is a rectangular standard four-way mobile construction, (b) is a straight-line two-way mobile construction, (c) is a special-shaped multi-faceted multi-directional mobile construction, and (d) is a triangular three-way construction.
[0037] Description of reference numerals:
[0038] 1-Road construction stand-alone machine;
[0039] 1000-Body Part:
[0040] 1001- crawler chassis; 1002- hydraulic turntable mounting seat; 1003- hydraulic turntable; 1004- machine body base;
[0041] 2000-Suspension frame part:
[0042] 2001-main pillar; 2002-main top plate; 2003-main suspension cable support; 2003a-suspension cable auxiliary support; 2004-suspension cable support unit; 2004a-cable saddle rotating motor mounting seat; 2004b-cable saddle rotating motor; 2004c-cable saddle mounting seat; 2004d-cable saddle; 2005-winch circular track; 2006-winch unit;
[0043] 3000-Internal transfer part:
[0044] 3001-transport outer track; 3002-construction equipment transfer seat; 3002a-circular baffle; 3002b-transport seat electric push rod; 3002c-transport seat support plate; 3003-transport inner track; 3004-construction material storage box; 3005a-secondary support; 3005b-secondary top plate; 3005c-transport opening; 3006a-lifting first track; 3006b-lifting second track; 3006c-lifting third track; 3007a-lifting electric push rod mounting seat; 3007b-lifting vertical electric push rod; 3007c-lifting vertical electric clamp; 3007d-lifting horizontal electric push rod; 3007e-lifting horizontal electric clamp;
[0045] 4000-Suspension cable part:
[0046] 4001-suspension cable; 4002-construction unit; 4002a-construction electric trolley; 4002b-construction electric push rod mounting seat; 4002c-construction electric push rod; 4002d-construction electric clamp; 4003-excavation module; 4003a-first clamping seat of excavation bucket; 4003b-second clamping seat of excavation bucket; 4004-rolling module; 4004a-rolling wheel; 4004b-rolling clamping seat. DETAILED DESCRIPTION
[0047] Next, combine Figures 1 to 11 A cluster-type intelligent cable-suspended road-building machine and method provided by the present invention are introduced in detail.
[0048] Depend on Figure 1-3 As shown, the cluster-type intelligent suspension road-building machine of the present invention includes a road-building unit 1 as a main body. The entire cluster-type intelligent suspension road-building machine is a road-building construction array formed by connecting a plurality of road-building units 1 through a suspension part 4000. The road-building unit 1 is connected from bottom to top in sequence by a body part 1000, an internal transport part 3000, and a suspension frame part 2000.
[0049] Depend on Figure 4 As shown, the machine body 1000 is connected from bottom to top in sequence by a crawler chassis 1001, a hydraulic turntable mounting seat 1002, a hydraulic turntable 1003, and a machine body base 1004; the purpose of setting up this structure is that the crawler chassis 1001 provides power for the road-building machine 1 to travel on wasteland, and the hydraulic turntable 1003 thereon can drive the machine body base 1004 to rotate relative to the crawler chassis 1001, similar to the rotating turret structure of a tank, so that the machine body can control the rotation of the upper mechanism when the crawler chassis 1001 is stationary, making the suspension cable connection between each road-building machine 1 smoother, more convenient, more stable and more flexible.
[0050] Depend on Figure 5As shown, the cable frame part 2000 is mainly composed of four main pillars 2001 installed at the four corners of the body base 1004, a main top plate 2002 is provided on the top of the main pillar 2001, and four cable main brackets 2003 are provided between the body base 1004 and the main top plate 2002, inside the body, and near the four main pillars 2001. Each cable main bracket 2003 is provided with an installation area for two cable support units 2004. The cable main bracket 2003 in the installation area is thinned, leaving only a small-diameter cable sub-bracket 2003a in the middle for vertical support; The support unit 2004 is installed on the upper surface of the installation area, and each installation area is provided with a symmetrical pair of suspension support units 2004. The installation positions of the suspension support units 2004 in the upper installation area and the lower installation area are perpendicular to each other, with the purpose of minimizing the possibility of suspension space collision. The installation direction can also be adjusted here according to actual conditions. The suspension support units 2004 in the upper installation area are mainly used for suspension connection between each road-making unit 1, while the suspension support units 2004 in the lower installation area are mainly used for suspension connection inside a single road-making unit 1.
[0051] The cable support unit 2004 is connected from top to bottom in sequence by a cable saddle rotating motor mounting seat 2004a, a cable saddle rotating motor 2004b, a cable saddle mounting seat 2004c, and a cable saddle 2004d; the cable saddle 2004d is a universal part, on which the cable can be mounted and slid, and it can support the cable; a hoist circular track 2005 is provided on the upper surface of the body base 1004 near the lower part of the cable main bracket 2003, which is a circular track, on which four hoist units 2006 are installed, and the hoist units 2006 are installed in sequence from bottom to top on the hoist circular track 200 5, a rotating motor on the electric trolley, a winch mounting seat on the output shaft of the rotating motor, and a winch on the winch mounting seat are connected; each winch unit 2006 is connected to a suspension cable support unit 2004 on the nearest suspension cable main bracket 2003, and the four winch units 2006 correspond to the suspension cable support units 2004 in pairs. The suspension cable passes through the suspension cable saddle 2004d of the suspension cable support unit 2004 through the winch, and after passing through, it can pass through other suspension cable saddles 2004d and then be connected to other winches. After the winches at both ends are tightened, the suspension cable can be straightened for construction.
[0052] The purpose of setting up this structure is that when the suspension cable connection is carried out, the suspension cable support units 2004 and the winch units 2006 that need to be connected in pairs are first determined according to the actual situation. The suspension cables include the suspension cables connected inside the road-building unit 1 and the suspension cables connected between the road-building units 1, which include the suspension cables for internal transportation and the suspension cables for construction. The connection method of the suspension cables can be a square connection or an X-type connection. At the same time, according to the usage, it can also be a suspension connection between the internal lower installation area and the upper installation area with a certain height difference, ensuring that the suspension cables connected inside and the suspension cables connected outside overlap in the vertical direction, so that the construction equipment It can quickly move and switch between the body, internal cables and external cables; after confirming the cables that need to be connected, first fix one end of the cables on the winch on one side, and the other end of the cables passes through the cable saddle 2004d and is connected to the winch on the other side. Before connecting, first use the electric trolley in the winch unit 2006 to move and adjust the relative position on the winch circular track 2005, and at the same time control its rotating motor to rotate and adjust the direction of the winch, and then cooperate with the saddle rotating motor 2004b in the cable support unit 2004 to rotate and adjust the direction of the cable saddle 2004d to ensure the stability of the cable connection.
[0053] Compared with the prior art, the suspension frame part 2000 designed in the present invention is composed of four groups of suspension main brackets 2003 at the four corners and the suspension support units 2004 in the upper and lower installation areas, forming a suspension installation frame that can flexibly adjust the direction. It can be used not only for the suspension connection between road-building units 1, but also for the suspension connection inside the road-building unit 1. Because it has a multi-group and multi-layer structure, the suspension connection method is more diverse. The internal connection alone has a U-shaped connection and an X-shaped connection, and the internal height difference connection can also be performed, so that the actuation trajectory of the construction unit 4002 thereon is more adaptable, has great variability, and has a wide range of applications.
[0054] Depend on Figure 6-7As shown, the internal transfer part 3000 includes an outer transfer track 3001 installed on the upper surface of the body base 1004 as a main body, and an inner transfer track 3003 installed inside the outer transfer track 3001; the outer transfer track 3001 is a large cross shape, which is a closed loop, and the inner transfer track 3003 is a small cross shape, which is a track with a central overlap; a number of construction equipment transfer seats 3002 are arranged on the outer transfer track 3001, and a number of construction material transfer seats 3002 are arranged on the inner transfer track 3003. Material storage box 3004; it should be noted that, a large number of construction equipment transfer seats 3002 are mainly arranged on the transfer outer track 3001, and a large number of large construction material storage boxes 3004 are mainly arranged on the transfer inner track 3003. However, after being transferred through the internal lifting and transfer mechanism above the transfer outer track 3001 and the transfer inner track 3003, the equipment on the construction equipment transfer seat 3002 can also be stored in the construction material storage box 3004, so the construction equipment transfer seat 3002 can also be arranged in the transfer inner track 3003.
[0055] The construction equipment transfer seat 3002 is connected from bottom to top by an electric trolley, a circular baffle 3002a, a transfer seat electric push rod 3002b, and a transfer seat support plate 3002c. In the storage area formed by the circular baffle 3002a, the transfer seat electric push rod 3002b pushes the transfer seat support plate 3002c on its output shaft to rise and fall, so that the equipment can be raised and lowered in the construction equipment transfer seat 3002 for easy access; the construction material storage box 3004 is composed of a large storage box on an electric trolley installed on a track, which can be moved on the track driven by the electric trolley and is used to store equipment and materials required for construction, and waste produced by construction.
[0056] The internal lifting and transfer mechanism is mainly composed of four auxiliary pillars 3005a installed on the periphery of the transfer outer track 3001 and the body base 1004, and a secondary top plate 3005b is provided on the top. The four corners of the auxiliary top plate 3005b are provided with four rectangular transfer openings 3005c above the corners of the transfer outer track 3001, and a rectangular transfer opening 3005c is provided in the middle of the auxiliary top plate 3005b above the middle overlapping part of the transfer inner track 3003, and the area of the transfer opening 3005c is slightly larger than the area of the largest construction equipment required, so that the equipment can pass through the transfer opening 3005c and be taken by the construction unit 4002 on the upper suspension cable; the first lifting track 3006a is provided on the outside of the four rectangular transfer openings 3005c at the four corners of the auxiliary top plate 3005b and on the lower surface of the auxiliary top plate 3005b, and the inner side of the four rectangular transfer openings 3005c A second lifting track 3006b is provided on the lower surface of the sub-top plate 3005b, and a circle of third lifting track 3006c is provided on the periphery of the transfer opening 3005c located in the middle of the sub-top plate 3005b. A number of lifting and transferring units are provided on the above three tracks, and the lifting and transferring units are connected from top to bottom by an electric trolley, a rotating motor, a lifting electric push rod mounting seat 3007a, and a lifting vertical electric push rod 3007b. A clamping mechanism is connected to the output shaft of the lifting vertical electric push rod 3007b, and the clamping mechanism consists of a lifting vertical electric clamp 3007c and a horizontal lifting horizontal electric push rod 3007d nearby. The output shaft of the lifting horizontal electric push rod 3007d is also connected to a lifting horizontal electric clamp 3007e; it should be noted that the above-mentioned electric clamps, electric push rods, and rotating motors are all common parts, and their prefixes are distinguishing expressions.
[0057] The purpose of setting up this structure is that when equipment and materials are transferred, a number of construction equipment transfer seats 3002 and construction material storage boxes 3004 are respectively provided on the transfer outer track 3001 and the transfer inner track 3003, the construction equipment is stored in the construction equipment transfer seat 3002, the transfer seat electric push rod 3002b is lowered for storage, and the construction materials are stored in the construction material storage box 3004; if the equipment in the transfer outer track 3001 is transported to the transfer inner track 3003, the corresponding construction equipment transfer seat 3002 is controlled to come to the overlap of the first lifting track 3006a, the second lifting track 3006b and the transfer outer track 3001, and the transfer seat electric push rod 3002b is raised to store the equipment. The push rod 3002b pushes out the equipment, controls several lifting and transfer units on the first and second lifting tracks to come nearby, and lowers its lifting vertical electric push rod 3007b to make its clamping mechanism close to the equipment, controls the lifting vertical electric clamp 3007c to directly clamp the equipment vertically, or the lifting horizontal electric push rod 3007d of several lifting and transfer mechanisms pushes out the lifting horizontal electric clamp 3007e to clamp the equipment horizontally, and after clamping, controls the electric trolley to transport it to the overlap of the first and second lifting tracks and the transfer inner track 3003, and controls a construction equipment transfer seat 3002 or a construction material storage box 3004 to come below it, and stores the equipment in the opposite way; in this way, the transfer outer track 3006 is moved to the upper and lower sides of the transfer platform 3007, and the upper and lower sides of the transfer platform 3007 are moved to the lower sides of the transfer platform 3007. The equipment in 001 is transported to the construction unit 4002 on the suspension cable. If the height of the suspension cable to be transported is relatively low, its transfer seat electric push rod 3002b can be raised outside the coverage of the cross-shaped lifting and transfer mechanism of the construction outer track, and the construction electric push rod 4002c and the construction electric clamp 4002d of the construction unit 4002 are cooperated to clamp it. It is usually the internal transportation of the road construction unit. After the equipment is transported to the construction unit 4002 on the lower suspension cable, it is controlled to move to the overlapping area with the higher suspension cable above, and then the upper construction unit 4002 clamps the equipment to complete the handover. Although the upper and lower suspension cables overlap, there is still a certain distance between them, so the upper and lower construction units 4002 can The staggered handover can also be used for the handover of equipment on the cables inside and outside the machine body; if the equipment on the outer transfer track 3001 and the inner transfer track 3003 is transported to the construction unit 4002 on the cable, and the height of the transport cable is relatively high, the equipment can be first transported to the lifting transfer unit on the first, second or third lifting track, and then brought to the transfer opening 3005c by these lifting transfer units, and the equipment is aligned with the transfer opening 3005c. The construction unit 4002 on the upper cable comes to the upper part of the transfer opening 3005c, lowers its construction electric push rod 4002c to pass through the transfer opening 3005c to clamp the equipment, and releases the clamp on the lifting transfer unit to complete the equipment handover.
[0058] Compared with the prior art, the inner and outer transfer tracks designed in the present invention cooperate with the first, second and third lifting tracks of the lifting and transfer mechanism to make good use of the space inside the machine body. The upper cables can be used for weaving nets, the two cross-shaped inner and outer tracks at the bottom are used for equipment and material storage, and the three U-shaped tracks are used for equipment transfer of the inner and outer tracks and track cables, which greatly improves the efficiency of equipment and material storage, transportation and switching, so that the entire cluster-type intelligent suspension road construction machine can store more construction equipment and materials, so that construction efficiency and endurance are guaranteed.
[0059] Depend on Figure 2 , Figure 8 , Fig. 9 , Fig.10 As shown, the cable part 4000 includes a cable 4001 as a main body connecting the interior of the road-building unit 1 and each road-building unit 1, and also includes a plurality of construction units 4002 installed on the cable 4001 through an electric trolley; the construction unit 4002 is mainly composed of a construction electric trolley 4002a installed on the cable 4001, on which a rotating motor is provided, and the output shaft of the rotating motor is connected to a construction electric push rod mounting seat 4002b, on which four vertically downward construction electric push rods 4002c are arranged around, and the output shaft of the construction electric push rod 4002c is connected to a construction electric clamp 4002d; the cable part 4000 also includes an excavation module 4003 and a road compaction module 4004. It should be noted that only two of the most classic equipment examples are cited here, and the rest of the construction equipment such as harvesting buckets only need It can be put into use after making simple similar modifications on it, which is to add clamping seats around it and improve the size to make it easier to clamp; the excavation module 4003 is composed of an excavation bucket as the main body, and a first clamping seat 4003a of the excavation bucket and a second clamping seat 4003b of the excavation bucket are respectively provided on both sides of it. When excavating, one electric clamp clamps the first clamping seat and the other clamps the second clamping seat. The electric push rods on the two electric clamps are extended to different lengths to complete the rotary excavation action of the excavation bucket to shovel the soil; the road rolling module 4004 is composed of a rolling wheel 4004a as the main body, and road rolling clamping seats 4004b are connected on both sides of it through rotating shafts. It only needs the electric clamp to clamp the clamping seat and then push out the electric push rod to press the rolling wheel 4004a to the ground, and move the electric trolley or the entire road making machine cluster to roll and roll to complete the road rolling.
[0060] The purpose of setting up this structure is that when one side of the suspension cable is fixed to the winch at one end and the other end thereof passes through the suspension cable saddle 2004d, it is necessary to equip the suspension cable with several construction units 4002 according to actual conditions. After the equipment is completed, the suspension cable is passed through the suspension cable saddle at the other end and connected to the winch. After the winches at both ends straighten the suspension cable, the electric trolley can move on it, and the construction unit 4002 performs mobile construction on the suspension cable. The construction unit 4002 can be installed between the road-building machines 1 for construction, or installed inside a single road-building machine 1 for transportation.
[0061] Compared with the prior art, the cable-suspended structure designed in the present invention cooperates with the structure of a cluster of road-building machines, so that the construction units 4002 on the different tracks formed by the arrangement and combination of several road-building machines can achieve extremely flexible construction. Whether it is the construction of winding back and forth roads or the one-time construction of a flat large area, it can cope with it well, and the construction equipment used thereon can be put into use after simple modification of existing equipment. The connection method is simple and the application prospect is good.
[0062] Accordingly, the cluster-type intelligent cable suspension road construction method of the present invention comprises the following steps:
[0063] S1. Cable connection: When connecting the cables, first determine the cable support units 2004 and winch units 2006 that need to be connected in pairs according to the actual situation, including the cables connected inside the road-making unit 1 and the cables connected between the road-making units 1, including the cables for internal transportation and the cables for construction. The connection method of the cables here can be a square connection or an X-shaped connection. At the same time, according to the usage, it can also be a cable connection between the lower installation area and the upper installation area with a certain height difference, ensuring that the internally connected cables and the externally connected cables overlap in the vertical direction, so that the construction equipment can be It can quickly move and switch between the internal cables and external cables within the body; after confirming the cables that need to be connected, first fix one end of the cables on the winch on one side, and the other end of the cables passes through the cable saddle 2004d and is connected to the winch on the other side. Before the connection process, the electric trolley in the winch unit 2006 is moved on the winch circular track 2005 to adjust the relative position, and at the same time, its rotating motor is controlled to rotate and adjust the direction of the winch, and then the saddle rotating motor 2004b in the cable support unit 2004 is used to rotate and adjust the direction of the cable saddle 2004d to ensure the stability of the cable connection.
[0064] S2. Installation of construction units: When one side of the suspension cable is fixed to the winch at one end and the other end passes through the suspension cable saddle 2004d, it is necessary to equip the suspension cable with several construction units 4002 according to actual conditions. After the equipment is completed, pass it through the suspension cable saddle at the other end and connect it to the winch. After the winches at both ends straighten the suspension cable, the electric trolley can move on it, and the construction unit 4002 performs mobile construction on the suspension cable. The construction unit 4002 can be installed between the road-building units 1 for construction, or installed inside a single road-building unit 1 for transportation.
[0065] S3. Transfer of equipment and materials between tracks: When transferring equipment and materials, a number of construction equipment transfer seats 3002 and construction material storage boxes 3004 are respectively provided on the transfer outer track 3001 and the transfer inner track 3003. The construction equipment is stored in the construction equipment transfer seat 3002, and the transfer seat electric push rod 3002b is lowered for storage, and the construction materials are stored in the construction material storage box 3004. If the equipment in the transfer outer track 3001 is transported to the transfer inner track 3003, the corresponding construction equipment transfer seat 3002 is controlled to come to the point where the first lifting track 3006a, the second lifting track 3006b and the transfer outer track 3001 overlap, and the electric push rod 3002b of the transfer seat is lowered for storage, and the construction materials are stored in the construction material storage box 3004. The electric push rod 3002b of the transfer seat pushes out the equipment, controls several lifting and transferring units on the first and second lifting tracks to come nearby, and lowers its lifting vertical electric push rod 3007b to make its clamping mechanism close to the equipment, controls the lifting vertical electric clamp 3007c to directly clamp the equipment vertically, or controls the lifting horizontal electric push rod 3007d of several lifting and transferring mechanisms to push out the lifting horizontal electric clamp 3007e to clamp the equipment horizontally. After clamping, the electric trolley is controlled to transport it to the overlap of the first and second lifting tracks and the transfer inner track 3003, and controls a construction equipment transfer seat 3002 or a construction material storage box 3004 to come underneath it to store the equipment in the opposite way.
[0066] S4. Handover of equipment between track cables: if the equipment in the transfer outer track 3001 is transported to the construction unit 4002 on the cable, if the height of the cable to be transported is relatively low, the electric push rod 3002b of the transfer seat can be raised outside the coverage of the cross-shaped and lifting transfer mechanism of the construction outer track, and the construction electric push rod 4002c and the construction electric clamp 4002d of the construction unit 4002 can be used for clamping. It is usually the transfer inside the road construction unit body. After the equipment is transported to the construction unit 4002 on the lower cable, it is controlled to move to the overlapping area with the upper higher cable, and then the upper construction unit 4002 clamps the equipment to complete the handover. Although the upper and lower cables overlap, there is still a certain distance between them, so the upper cable is The lower construction unit 4002 can be delivered in an offset manner, and this method can also be used for the delivery of equipment on the internal and external cables of the machine body; if the equipment on the outer transfer track 3001 and the inner transfer track 3003 is transported to the construction unit 4002 on the cable, and the height of the delivery cable is relatively high, the equipment can be first transported to the lifting and transfer units on the first, second or third lifting tracks, and then these lifting and transfer units will bring it to the transfer opening 3005c, align the equipment with the transfer opening 3005c, and the construction unit 4002 on the upper cable will come to the upper part of the transfer opening 3005c, lower its construction electric push rod 4002c to pass through the transfer opening 3005c to clamp the equipment, and release the clamps on the lifting and transfer unit to complete the equipment delivery.
[0067] S5. Road-building machine cluster combination: a number of road-building machines 1 are connected to each other through suspension cables. The specific connection method is as follows: Fig.11 As shown, four connection and moving construction methods are shown. Other specific changes can be adjusted according to actual conditions. Fig.11 (a) is a rectangular standard four-way mobile construction, which can well cope with the construction of standard bifurcated roads. Fig.11 (b) It is a straight-line bidirectional mobile construction, which can well cope with large-scale single road construction. Fig.11 (c) It is a special-shaped multi-faceted and multi-directional mobile construction, which can well cope with the construction of winding and non-standard roads. Fig.11 (d) is a triangular three-way construction, which can well cope with the construction of bifurcated intersections with certain angles.
[0068] S6. Road construction: The crawler chassis 1001 provides the power for the road construction machine 1 to travel on the wasteland. The hydraulic turntable 1003 thereon can drive the machine base 1004 to rotate relative to the crawler chassis 1001, similar to the rotating turret structure of a tank, so that the machine body can control the rotation of the upper mechanism when the crawler chassis 1001 is stationary. Several construction units 4002 move on the straightened suspension cable 4001, and the construction electric push rod 4002c is lowered to cooperate with the construction equipment to contact the ground for construction, including shoveling, bulldozing, flattening, paving, etc. Several groups of construction units 4002 can move back and forth on the suspension cable 4001 to carry out construction synchronously or sequentially, and carry out tight process construction on the road surface. At this point, the entire cluster intelligent suspension road construction is completed.
[0069] The cluster-type intelligent suspension road-building method of the present invention can be directly applied to the existing road-building construction. A cluster-type combination of several road-building units 1 is performed through suspension cables. Four connection and mobile construction methods are listed in this embodiment. The first is rectangular standard four-way mobile construction, which can well cope with the construction of standard bifurcated roads. The second is a straight-line two-way mobile construction, which can well cope with the construction of a large-scale single road. The third is a special-shaped multi-faceted multi-directional mobile construction, which can well cope with the construction of winding and tortuous non-standard roads. The fourth is a triangular three-way construction, which can well cope with the construction of bifurcated intersections with certain corners. Multiple connection methods make the road-building machine cluster more intelligent and efficient, and the actual connection methods are more varied. The suspension cables on the upper part of the road-building unit 1 can be used for weaving, and the two cross-shaped inner and outer tracks at the lower part are used for equipment and material storage. The three square-shaped tracks are used for equipment transportation of the inner and outer tracks and track suspension cables, which greatly improves the storage, transportation and switching efficiency of equipment and materials, so that the entire cluster-type intelligent suspension road-building machine can store more construction equipment and materials, so that the construction efficiency and endurance are guaranteed.
[0070] The above description is only a specific implementation of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be understood by anyone familiar with the technology within the technical scope disclosed by the present invention should be included in the scope of the present invention.
Claims
1. A cluster type intelligent cable suspension road making machine, characterized in that: It comprises a road construction array formed by connecting a plurality of road construction units (1) via a suspension cable portion (4000), wherein the road construction unit (1) comprises a body portion (1000), an internal transfer portion (3000), and a suspension cable frame portion (2000) which are sequentially connected from bottom to top; The cable frame part (2000) is mainly composed of four main pillars (2001) installed at the four corners of the body base (1004) of the body part (1000), a main top plate (2002) is provided on the top of the main pillar (2001), four cable main brackets (2003) are provided between the body base (1004) and the main top plate (2002), inside the body, and near the four main pillars (2001), and each cable main bracket (2003) is provided with an installation area for two cable support units (2004); The internal transfer part (3000) comprises an outer transfer track (3001) installed as a main body on the upper surface of the body base (1004), and an inner transfer track (3003) installed inside the outer transfer track (3001); a plurality of construction equipment transfer seats (3002) are arranged on the outer transfer track (3001), and a plurality of construction material storage boxes (3004) are arranged on the inner transfer track (3003); the construction equipment transfer seat (3002) is connected from bottom to top by an electric trolley, a circular baffle (3002a), an electric push rod for the transfer seat (3002b), and a support plate (3002c) for the transfer seat, and in the storage area formed by the circular baffle (3002a), the electric push rod (3002b) for the transfer seat pushes the transfer seat support plate (3002c) on its output shaft to rise and fall, so that the equipment can be raised and lowered in the construction equipment transfer seat (3002) for easy access; The cable part (4000) includes a cable (4001) as a main body connecting the interior of the road-building unit (1) and each road-building unit (1), and also includes a plurality of construction units (4002) installed on the cable (4001) through an electric trolley; the construction unit (4002) is mainly composed of a construction electric trolley (4002a) installed on the cable (4001), on which a rotating motor is provided, and the output shaft of the rotating motor is connected to a construction electric push rod mounting seat (4002b), on which four construction electric push rods (4002c) are vertically downwardly provided around, and the output shaft of the construction electric push rod (4002c) is connected to a construction electric clamp (4002d).
2. The cluster type intelligent cable suspension road making machine according to claim 1 is characterized in that: The suspension cable support unit (2004) is formed by connecting a saddle rotating motor mounting seat (2004a), a saddle rotating motor (2004b), a saddle mounting seat (2004c), and a suspension cable saddle (2004d) in sequence from top to bottom; A hoist circular track (2005) is provided on the upper surface of the machine body base (1004) near the lower part of the main suspension cable support (2003), on which four hoist units (2006) are installed. The hoist units (2006) are connected from bottom to top in sequence by an electric trolley installed on the hoist circular track (2005), a rotating motor on the electric trolley, a hoist mounting seat on the output shaft of the rotating motor, and a hoist on the hoist mounting seat; each hoist unit The elements (2006) are connected to the cable support unit (2004) on the nearest cable main bracket (2003), and the four winch units (2006) correspond to the cable support units (2004) in pairs. The cable passes through the cable saddle (2004d) of the cable support unit (2004) through the winch, and after passing through, it can pass through other cable saddles (2004d) and then connect with other winches. After the winches at both ends are tightened, the cable can be straightened for construction.
3. The cluster type intelligent cable suspension road making machine according to claim 1, characterized in that: An internal lifting and transfer mechanism is arranged above the outer transfer track (3001) and the inner transfer track (3003). The internal lifting and transfer mechanism is composed of four auxiliary pillars (3005a) installed on the periphery of the outer transfer track (3001) and on the body base (1004) to form a main body. A secondary top plate (3005b) is arranged on the top. Four rectangular transfer openings (3005c) are arranged at the four corners of the auxiliary top plate (3005b) above the corners of the outer transfer track (3001). A rectangular transfer opening (3005c) is arranged in the middle of the auxiliary top plate (3005b) above the overlapping part in the middle of the inner transfer track (3003). The equipment is placed on the upper The construction unit (4002) on the suspension cable is taken; a first lifting track (3006a) is provided on the outer side of the four rectangular transfer openings (3005c) located at the four corners of the secondary top plate (3005b) and on the lower surface of the secondary top plate (3005b); a second lifting track (3006b) is provided on the inner side of the four rectangular transfer openings (3005c) and on the lower surface of the secondary top plate (3005b); a circle of third lifting track (3006c) is provided on the outer periphery of the transfer opening (3005c) located in the middle of the secondary top plate (3005b); and a plurality of lifting transfer units are provided on the first lifting track (3006a), the second lifting track (3006b) and the third lifting track (3006c).
4. The cluster type intelligent cable suspension road making machine according to claim 3 is characterized in that: The lifting and transfer unit is connected from top to bottom in sequence by an electric trolley, a rotating motor, a lifting electric push rod mounting seat (3007a), and a lifting vertical electric push rod (3007b). The output shaft of the lifting vertical electric push rod (3007b) is connected to a clamping mechanism, which is composed of a lifting vertical electric clamp (3007c) and a horizontal lifting horizontal electric push rod (3007d) nearby. The output shaft of the lifting horizontal electric push rod (3007d) is also connected to a lifting horizontal electric clamp (3007e).
5. The cluster type intelligent cable suspension road making machine according to claim 1, characterized in that: The suspension cable part (4000) further comprises an excavation module (4003) and a road compaction module (4004); the excavation module (4003) is mainly composed of an excavation bucket, and a first clamping seat (4003a) and a second clamping seat (4003b) of the excavation bucket are respectively arranged on both sides of the excavation bucket. When excavating, one electric clamping claw clamps the first clamping seat, and the other clamps the second clamping seat. The electric push rods on the two electric clamping claws are extended to different lengths to complete the rotary excavation action of the excavation bucket and shovel the soil; The road rolling module (4004) is mainly composed of a rolling wheel (4004a), and the two sides of the rolling wheel are connected to a road rolling clamping seat (4004b) through a rotating shaft. It only needs the electric clamping claw to clamp the clamping seat and then push out the electric push rod to press the rolling wheel (4004a) to the ground, and move the electric trolley or the entire road making machine cluster to roll and roll to complete the road rolling.
6. The cluster type intelligent cable suspension road making machine according to claim 1, characterized in that: The machine body (1000) is connected in sequence from bottom to top by a crawler chassis (1001), a hydraulic turntable mounting seat (1002), a hydraulic turntable (1003), and a machine body base (1004); the crawler chassis (1001) provides power for the road construction machine (1) to travel on wasteland, and the hydraulic turntable (1003) thereon can drive the machine body base (1004) to rotate relative to the crawler chassis (1001).
7. A cluster-type intelligent cable suspension road construction method using the road construction machine according to any one of claims 1 to 6, characterized in that: The steps are: S1. Suspension cable connection: When the suspension cable connection is performed, the suspension cable support units (2004) and the hoisting machine units (2006) that need to be connected in pairs are first determined according to the actual situation, including the suspension cables connected inside the road construction unit (1) and the suspension cables connected between the road construction units (1), which include the suspension cables for internal transportation and the suspension cables for construction. The connection method of the suspension cables here can be a square connection or an X-shaped connection. After confirming the suspension cables that need to be connected, first fix one end of the suspension cable to one side. On the hoist, the other end of the suspension cable passes through the suspension cable saddle (2004d) and is connected to the hoist on the other side. Before the connection process, the electric trolley in the hoist unit (2006) is moved on the hoist circular track (2005) to adjust the relative position, and at the same time, the rotation motor is controlled to rotate and adjust the direction of the hoist, and then the saddle rotation motor (2004b) in the suspension cable support unit (2004) is used to rotate and adjust the direction of the suspension cable saddle (2004d) to ensure the stability of the suspension cable connection; S2. Installation of construction units: After one side of the suspension cable is fixed to the hoist at one end and the other end thereof passes through the suspension cable saddle (2004d), it is necessary to equip the suspension cable with a number of construction units (4002) according to the actual situation. After the equipment is completed, the construction units (4002) are passed through the suspension cable saddle at the other end and connected to the hoist. After the hoists at both ends straighten the suspension cable, the electric trolley can move on it, and the construction unit (4002) performs mobile construction on the suspension cable. The construction unit (4002) can be installed between the road construction units (1) for construction, or installed inside a single road construction unit (1) for transportation; S3. Transfer of equipment and materials between tracks: When transferring equipment and materials, a number of construction equipment transfer seats (3002) and construction material storage boxes (3004) are respectively provided on the transfer outer track (3001) and the transfer inner track (3003). The construction equipment is stored in the construction equipment transfer seat (3002), and the transfer seat electric push rod (3002b) is lowered for storage, and the construction materials are stored in the construction material storage box (3004); if the equipment in the transfer outer track (3001) is transported to the transfer inner track (3003), the corresponding construction equipment transfer seat (3002) is controlled to come to the first lifting track (3006a), the second lifting track (3006b) and the transfer outer track (3001) overlap. At the place where the equipment is located, the electric push rod (3002b) of the transfer seat is raised to push out the equipment, and several lifting and transfer units on the first and second lifting tracks are controlled to come nearby, and the lifting vertical electric push rod (3007b) is lowered to make its clamping mechanism close to the equipment, and the lifting vertical electric clamp (3007c) is controlled to directly clamp the equipment vertically, or the lifting horizontal electric push rods (3007d) of several lifting and transfer mechanisms push out the lifting horizontal electric clamp (3007e) to clamp the equipment horizontally, and after clamping, the electric trolley is controlled to transport it to the overlap of the first and second lifting tracks and the transfer inner track (3003), and a construction equipment transfer seat (3002) or a construction material storage box (3004) is controlled to come below it, and the equipment is stored in the opposite way; S4. Handover of equipment between track cables: if the equipment in the transfer outer track (3001) is transported to the construction unit (4002) on the cable, if the height of the cable to be transported is relatively low, the electric push rod (3002b) of the transfer seat is raised outside the coverage of the cross-shaped lifting and transfer mechanism of the construction outer track, and the construction electric push rod (4002c) and the construction electric clamp (4002d) of the construction unit (4002) are used to clamp the equipment. This is usually the internal transportation of the road construction unit. After the equipment is transported to the construction unit (4002) on the lower cable, it is controlled to move to the overlapping area with the upper higher cable, and then the upper construction unit (4002) clamps the equipment to complete the handover. Although the upper and lower cables overlap, there is still a certain distance between them, so the upper and lower construction units are connected. The units (4002) can be delivered in a staggered manner, and this method can also be used for the delivery of equipment on the internal and external cables of the machine body; if the equipment on the external transfer track (3001) and the internal transfer track (3003) is delivered to the construction unit (4002) on the cable, and the height of the delivery cable is relatively high, the equipment can be first delivered to the lifting and transfer units on the first, second or third lifting tracks, and then these lifting and transfer units bring it to the transfer opening (3005c), align the equipment with the transfer opening (3005c), and the construction unit (4002) on the upper cable comes to the upper part of the transfer opening (3005c), lowers its construction electric push rod (4002c) through the transfer opening (3005c) to clamp the equipment, and releases the clamping claws on the lifting and transfer unit to complete the equipment delivery; S5. Road-building machine cluster combination: a number of road-building machines (1) are connected to each other through suspension cables, and the specific connection method is adjusted according to the actual situation; S6. Road construction: The crawler chassis (1001) provides the power for the road construction machine (1) to travel on the wasteland. The hydraulic turntable (1003) thereon can drive the machine base (1004) to rotate relative to the crawler chassis (1001), similar to the rotating turret structure of a tank, so that the machine body can control the rotation of the upper mechanism when the crawler chassis (1001) is stationary. Several construction units (4002) move on the straightened suspension cable (4001), and the construction equipment is contacted with the ground to carry out construction by lowering the construction electric push rod (4002c). Several groups of construction units (4002) move back and forth on the suspension cable (4001) to carry out construction synchronously or sequentially, and carry out tight process construction on the road surface. At this point, the entire cluster-type intelligent suspension road construction is completed.
Citation Information
Patent Citations
Long-span cableway suspension vehicle-mounted movable multi-machine combined traction excavating system
CN105317061A
Large-span movable combined-type cableway suspending, shoveling, excavating, grabbing, hoisting and traction transportation system
CN106149782A
Intelligent soil surface temper mill and use method thereof
CN114908825A
Flexible control soil feeding excavation system
CN115341602A
Cast-in-situ bored pile construction robot and method
CN116356826A