Anti-liquefaction foundation of long and large underground structure of water-rich stratum and construction method
By adopting earthquake-proof structure design, crushed pile reinforcement and multi-layer backfill in water-rich formations, a stable seismic frame and drainage system is formed, which solves the problem of easy liquefaction of the foundation, improves the stability and seismic performance of the foundation, and ensures the structure. Safe and stable.
Patent Information
- Application Number
- CN202411281589.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-12
- Publication Date
- 2024-11-05
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
When building a large underground structure in a water-rich strata, the foundation is prone to liquefaction, resulting in a decrease in bearing capacity and unable to effectively support the superstructure. The existing technology only has passive earthquake resistance and lacks the function of actively dispersing seismic stress.
It adopts anti-shock structure design, gravel pile reinforcement, multi-layer backfill and shock absorbing layers, including supporting piles, gravel piles, ash soil backfill, plain soil backfill, shock absorbing layers, rubber concrete and steel mesh, combined with drainage system, Form a stable seismic frame and drainage system to enhance foundation bearing capacity and seismic performance.
It improves foundation stability and seismic resistance, reduces liquefaction risks, improves drainage conditions, enhances shock absorption effects, adapts to foundation deformation, and ensures the safety, stability and durability of the structure under extreme conditions.
Smart Images

Figure CN118895746A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of civil engineering, and in particular to a liquefaction-proof foundation for a large underground structure in a water-rich stratum and a construction method. Background Art
[0002] In the wave of rapid urbanization, the development and utilization of underground space has become a key factor in promoting sustainable urban development. With the continuous growth of urban population and the increasing shortage of ground space, the importance of underground space has become increasingly prominent. However, it is undoubtedly a very challenging engineering task to build long underground structures in strata rich in water and with complex geological conditions, such as criss-crossing subway tunnel networks and large-scale underground parking systems.
[0003] Because these strata have been in a high water level state for a long time, the soil has high water content and weak bonding between particles. Once they encounter natural disasters such as earthquakes, the foundation soil is very likely to liquefy. During the liquefaction process, the originally solid soil particles lose stability under the action of vibration and turn into a liquid-like state, causing the bearing capacity of the foundation to drop sharply and become unable to effectively support the upper structure. In this case, the underground structure may not only suffer serious damage, but may even trigger a series of chain reactions, such as structural collapse and groundwater surges.
[0004] In the prior art, a utility model patent with application number 201220728424.6 discloses an earthquake-resistant disaster reduction system for a liquefiable foundation, in which a permanent vertical pore pressure dissipation drainage body and a horizontal pore pressure dissipation drainage body are arranged in the liquefiable foundation. The vertical pore pressure dissipation drainage body is connected to the horizontal pore pressure dissipation drainage body and is connected to the surface drainage system.
[0005] In the utility model patent with application number 202020348138.1, an earthquake-resistant building foundation is disclosed, including a foundation body, a curved support plate, positioning bolts and a cornerstone, and pile seats are installed at the four corners of the bottom end of the foundation body, and the bottom ends of the four pile seats are respectively connected to right curved piles, front curved piles, left curved piles and rear curved piles, and the right curved piles, front curved piles, left curved piles and rear curved piles are located in the cornerstone, and a support beam is installed at the top of the foundation body.
[0006] However, the above patent only sets up an earthquake-resistant structure for the foundation, which does not have the function of seismic isolation and shock absorption. When facing external loads such as earthquakes, it can only passively resist earthquakes, but does not have the function of actively dispersing the stress caused by earthquakes. Summary of the invention
[0007] The purpose of the present invention is to provide a liquefaction-proof foundation and construction method for a large underground structure in a water-rich stratum. By comprehensively adopting measures such as earthquake-proof structure design, gravel pile reinforcement, multi-layer backfill and shock-absorbing layer, the foundation bearing capacity and seismic resistance of the large underground structure in the water-rich stratum can be effectively improved to ensure the safety, stability and durability of the structure under extreme conditions such as earthquakes.
[0008] To achieve the above-mentioned purpose, the present invention provides a liquefaction-proof foundation for a large underground structure in a water-rich stratum, comprising a foundation body and an earthquake-proof structure, wherein mounting seats are arranged at the four corners of the bottom of the foundation body, and the mounting seats are respectively connected to support piles, and a gray soil backfill layer, a plain soil backfill layer and a shock-absorbing layer are arranged in sequence on the upper part of the foundation body, and a plurality of gravel piles are arranged inside the foundation body, and the upper part of the gravel piles is placed inside the plain soil backfill layer;
[0009] The earthquake-proof structure includes a lower ground beam, a middle beam, an upper ground beam and a first steel mesh frame which are arranged in sequence from bottom to top. The bottom of the upper ground beam and the top of the lower ground beam are symmetrically provided with a first groove and a second groove. The top of the middle beam is inserted into the first groove, and the bottom of the middle beam is inserted into the second groove. The first steel mesh frame is arranged between the upper ground beam and the lower ground beam.
[0010] Preferably, a drainage pipe is connected to the upper portion of the gravel pile, and the drainage pipe is connected to an external sump.
[0011] Preferably, the spacing between the gravel piles is 3.5 times the pile diameter.
[0012] Preferably, a first expansion joint is provided in the lower ground beam, and a second expansion joint is provided between the lower ground beam and the first reinforced steel grid.
[0013] Preferably, the first expansion joint and the second expansion joint are arranged vertically.
[0014] Preferably, shock-absorbing pads are provided in both the first groove and the second groove.
[0015] Preferably, the shock-absorbing pad is made of chloroprene rubber.
[0016] Preferably, a second steel grid is provided inside the shock-absorbing layer and is filled with rubber concrete.
[0017] Preferably, it is characterized in that the shock-absorbing layer is also filled with rubber concrete, and the rubber concrete is composed of expanded perlite, rubber, petroleum resin, silicate cement, water, water reducing agent, glass fiber, carbon fiber and wollastonite;
[0018] Among them, the weight ratio of expanded perlite, rubber, petroleum resin, silicate cement, water, water reducing agent, glass fiber, carbon fiber and wollastonite is 1:0.55:0.24:2.4:0.5:0.12:0.2:0.2:1.5.
[0019] The present invention also provides a method for constructing a liquefaction-proof foundation of a large underground structure in a water-rich stratum as described above, comprising the following steps:
[0020] S1. Preliminary preparation;
[0021] S11. Conduct geological surveys of the construction area, including the distribution of water-rich strata, water levels and soil characteristics;
[0022] S12. Review and adjust the foundation design plan based on the survey results;
[0023] S2, excavation of foundation pit;
[0024] S3. Set up foundation and earthquake-proof structure;
[0025] S31, installing mounting seats at the four corners of the bottom of the ground base body;
[0026] S32, using a pile driver to drive the support piles into a predetermined depth in sequence;
[0027] S33, using the vibrating pipe sinking method to construct gravel piles in the foundation body, with a spacing of 3.5 times the pile diameter, and the upper part of the gravel pile exposed to the inside of the plain soil backfill layer;
[0028] S34, laying a lime soil backfill layer on the upper part of the foundation body and performing compaction treatment;
[0029] S35, laying a plain soil backfill layer on the upper part of the lime soil backfill layer and performing compaction treatment;
[0030] S36, preparing rubber concrete in a weight ratio of expanded perlite, rubber, petroleum resin, silicate cement, water, water reducing agent, glass fiber, carbon fiber and wollastonite of 1:0.55:0.24:2.4:0.5:0.12:0.2:0.2:1.5;
[0031] S37, laying a shock-absorbing layer on the top of the plain soil backfill layer, then setting a second steel grid in the shock-absorbing layer, and then filling the shock-absorbing layer with the configured rubber concrete;
[0032] S38, installing a lower ground beam on the upper part of the shock-absorbing layer, setting a first expansion joint in the lower ground beam, setting a first groove at the bottom of the upper ground beam, and then inserting the top of the middle beam into the groove, setting a second groove at the top of the lower bottom beam, and inserting the bottom of the middle beam into the groove;
[0033] S39, setting a first steel mesh frame between the upper ground beam and the lower ground beam, setting a second expansion joint between the lower ground beam and the first steel mesh frame, and filling the first steel mesh frame with concrete.
[0034] Therefore, the present invention adopts the above-mentioned anti-liquefaction foundation and construction method of a large underground structure in a water-rich stratum, and the beneficial technical effects are as follows:
[0035] (1) Improving foundation stability: By setting up support piles and gravel piles, the bearing capacity and stability of the foundation are effectively enhanced, the risk of foundation liquefaction in natural disasters such as earthquakes is reduced, and the safety of underground structures is ensured.
[0036] (2) Enhanced seismic performance: The design of the seismic structure, especially the combination of the lower ground beam, middle beam, upper ground beam and steel grid, forms a stable seismic framework that can effectively disperse and absorb seismic wave energy and improve the overall seismic performance.
[0037] (3) Improve drainage conditions: The combination of gravel piles and drainage pipes forms an effective drainage system that can promptly drain the accumulated water in the foundation, lower the groundwater level, and reduce the liquefaction of the foundation caused by excessive moisture. It also improves the construction and use environment of underground structures.
[0038] (4) Enhanced shock absorption effect: The setting of shock absorption layer and shock absorption pad further improves the shock absorption effect of foundation and structure, which can effectively alleviate the impact of external forces such as earthquakes on underground structures and protect the structure from damage.
[0039] (5) Adapting to foundation deformation: By setting expansion joints, such as the first expansion joint and the second expansion joint, the structure can better adapt to the deformation of the foundation caused by various factors (such as temperature changes, humidity changes, foundation settlement, etc.), thereby avoiding structural damage caused by stress concentration.
[0040] In summary, the scheme of anti-liquefaction foundation for large underground structures in water-rich strata has shown significant beneficial technical effects in improving foundation stability, enhancing seismic resistance, improving drainage conditions, enhancing shock absorption effect, adapting to foundation deformation, simple construction, controllable costs, and environmental friendliness. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] Figure 1 This is a schematic structural diagram of a liquefaction-proof foundation for a large underground structure in a water-rich stratum according to the present invention;
[0042] Figure 2 The present invention is a flow chart of a construction method for a liquefaction-proof foundation of a large underground structure in a water-rich stratum.
[0043] Reference numerals
[0044] 1. Foundation body; 2. Mounting seat; 3. Support piles; 4. Gray soil backfill layer; 5. Plain soil backfill layer; 6. Shock-absorbing layer; 7. Gravel piles; 8. Lower ground beam; 9. Middle beam; 10. Upper ground beam; 11. First steel mesh frame; 12. First groove; 13. Second groove; 14. Second steel mesh frame. DETAILED DESCRIPTION
[0045] In order to make the purpose, technical scheme and advantages disclosed in the embodiments of the present invention clearer, the embodiments of the present invention are further described in detail in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the embodiments of the present invention and are not intended to limit the embodiments of the present invention. Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application. Examples of the embodiments are shown in the accompanying drawings, where the same or similar reference numerals throughout represent the same or similar elements or elements with the same or similar functions.
[0046] It should be noted that the terms "include", "have" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, system, product or server comprising a series of steps or units is not necessarily limited to those steps or units explicitly listed, but may include other steps or units not explicitly listed or inherent to these processes, methods, products or devices.
[0047] Like reference numerals and letters denote similar items in the following drawings, and thus, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.
[0048] In the description of the present invention, it should be noted that the terms "upper", "lower", "inside", "outside", etc. indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, or are directions or positional relationships in which the product of the invention is usually placed when in use. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as a limitation on the present invention.
[0049] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "setting", "installation" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0050] Embodiment 1
[0051] like Figure 1 As shown, the present invention provides a liquefaction-proof foundation for a large underground structure in a water-rich stratum, comprising a foundation body 1 and an earthquake-proof structure.
[0052] Mounting seats 2 are provided at the four corners of the bottom of the foundation body 1, and the mounting seats 2 are respectively connected to support piles 3. The support piles 3 can effectively transfer the bearing capacity of the foundation to a deeper soil layer, play an "anchoring" role, and prevent the foundation from liquefying or displacing under the action of external forces such as earthquakes, thereby enhancing the stability of the foundation. The support piles 3 can be arranged vertically or in an arc shape, preferably in an arc shape, which is more conducive to enhancing the stability of the foundation.
[0053] The upper part of the foundation body 1 is provided with a ash backfill layer 4, a plain soil backfill layer 5 and a shock-absorbing layer 6 in sequence. The ash backfill layer 4, the plain soil backfill layer 5 and the shock-absorbing layer 6 are compacted layer by layer to improve the compactness of the foundation. At the same time, the combination of different material layers can give play to their respective advantages and improve the overall performance of the foundation. It is worth noting that in this embodiment, the shock-absorbing layer is filled with rubber concrete, which has good shock-absorbing performance, can effectively absorb and disperse the energy generated by external forces such as earthquakes, and protect the underground structure from damage.
[0054] A second steel grid 14 is arranged inside the shock-absorbing layer 6 and is filled with rubber concrete.
[0055] Rubber concrete is composed of expanded perlite, rubber, petroleum resin, silicate cement, water, water reducing agent, glass fiber, carbon fiber and wollastonite;
[0056] Among them, the weight ratio of expanded perlite, rubber, petroleum resin, silicate cement, water, water reducing agent, glass fiber, carbon fiber and wollastonite is 1:0.55:0.24:2.4:0.5:0.12:0.2:0.2:1.5.
[0057] The foundation body 1 is provided with a gravel pile 7, and the upper part of the gravel pile 7 is placed inside the plain soil backfill layer 5; the gravel pile 7 has good permeability, which can significantly reduce the pore water pressure and prevent the foundation soil from liquefying. At the same time, the gravel pile 7 can also accelerate the drainage and consolidation process of the foundation and improve the bearing capacity of the foundation. In addition, under the action of dynamic loads such as earthquakes, the gravel pile 7 can concentrate the shear stress and reduce the shear stress on the soil between the piles, thereby further enhancing the liquefaction resistance of the formation. The gravel pile 7 forms a composite foundation with the surrounding soil, which improves the overall stiffness of the foundation and also helps to resist external forces such as earthquakes.
[0058] The drainage pipe connected to the upper part of the gravel pile 7 is connected to the external sump, which can timely drain the accumulated water in the foundation and lower the groundwater level, thereby preventing the foundation from liquefaction and sedimentation due to excessive moisture.
[0059] The spacing between the gravel piles 7 is 3.5 times the pile diameter.
[0060] The earthquake-proof structure comprises a lower ground beam 8, a middle beam 9, an upper ground beam 10 and a first steel mesh frame 11 which are arranged in sequence from bottom to top.
[0061] A first groove 12 and a second groove 13 are symmetrically arranged at the bottom of the upper ground beam 10 and the top of the lower ground beam 8, the top of the middle beam 9 is inserted into the first groove 12, the bottom of the middle beam 9 is inserted into the second groove 13, and the first steel grid 11 is arranged between the upper ground beam 10 and the lower ground beam 8.
[0062] A first expansion joint is provided in the lower ground beam 8, and a second expansion joint is provided between the lower ground beam 8 and the first steel grid 11. The first expansion joint and the second expansion joint are vertically arranged. The expansion joint is a kind of deformation joint, which is the prior art and will not be described in detail.
[0063] Shock-absorbing pads are arranged in the first groove 12 and the second groove 13. The shock-absorbing pads are made of chloroprene rubber.
[0064] The combination of the lower ground beam 8, the middle beam 9, the upper ground beam 10, the first steel mesh frame 11, the shock-absorbing pad, the first expansion joint, and the second expansion joint forms a stable earthquake-resistant system, which can disperse the stress generated by external forces such as earthquakes to the entire system, reduce the stress concentration of a single component, and thus improve the overall earthquake-resistant performance. The expansion joint allows the foundation to deform and displace to a certain extent under the action of external forces, thereby preventing the structure from being damaged due to excessive stress.
[0065] like Figure 2 As shown, the present invention also provides a method for constructing a liquefaction-proof foundation of a large underground structure in a water-rich stratum, comprising the following steps:
[0066] S1. Preliminary preparation;
[0067] S11. Conduct geological surveys of the construction area, including the distribution of water-rich strata, water levels and soil characteristics;
[0068] S12. Review and adjust the foundation design plan based on the survey results;
[0069] S2, excavation of foundation pit;
[0070] S3. Set up foundation and earthquake-proof structure;
[0071] S31, installing mounting seats 2 at the four corners of the bottom of the ground base body 1;
[0072] S32, using a pile driver to drive the support piles 3 into a predetermined depth in sequence;
[0073] S33, using the vibrating pipe sinking method to construct gravel piles 7 in the foundation body 1, with a spacing of 3.5 times the pile diameter, and the upper part of the gravel piles 7 is exposed to the inside of the plain soil backfill layer 5;
[0074] S34, laying a lime soil backfill layer 4 on the upper part of the foundation body 1 and performing compaction treatment;
[0075] S35, laying a plain soil backfill layer 5 on the upper part of the lime soil backfill layer 4 and performing compaction treatment;
[0076] S36, preparing rubber concrete in a weight ratio of expanded perlite, rubber, petroleum resin, silicate cement, water, water reducing agent, glass fiber, carbon fiber and wollastonite of 1:0.55:0.24:2.4:0.5:0.12:0.2:0.2:1.5;
[0077] S37, laying a shock-absorbing layer 6 on the top of the plain soil backfill layer 5, then setting a second steel grid 14 in the shock-absorbing layer 6, and then filling the shock-absorbing layer with the configured rubber concrete;
[0078] S38, installing the lower ground beam 8 on the upper part of the shock-absorbing layer 6, setting a first expansion joint in the lower ground beam 8, and setting a first groove 12 at the bottom of the upper ground beam 10, and then inserting the top of the middle beam 9 into it, setting a second groove 13 at the top of the lower ground beam 8, and inserting the bottom of the middle beam 9 into it;
[0079] S39. A first steel mesh 11 is set between the upper ground beam 10 and the lower ground beam 8, a second expansion joint is set between the lower ground beam 8 and the first steel mesh 11, and concrete is filled inside the first steel mesh 11 (the concrete here is ordinary concrete, which is the prior art and will not be described in detail here).
[0080] Through the above construction method, the stability and seismic resistance of the anti-liquefaction foundation of the underground structure in the water-rich stratum can be ensured, providing reliable support for the superstructure.
[0081] It is worth noting that the contents not elaborated in detail in the present invention are all prior art and are well known to those skilled in the art.
[0082] Therefore, the present invention adopts the above-mentioned anti-liquefaction foundation and construction method for long underground structures in water-rich strata, and effectively improves the foundation bearing capacity and seismic resistance of long underground structures in water-rich strata by comprehensively adopting measures such as earthquake-proof structure design, gravel pile reinforcement, multi-layer backfill and shock-absorbing layer, thereby ensuring the safety, stability and durability of the structure under extreme conditions such as earthquakes.
[0083] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that they can still modify or replace the technical solution of the present invention with equivalents, and these modifications or equivalent replacements cannot cause the modified technical solution to deviate from the spirit and scope of the technical solution of the present invention.
Claims
1. A liquefaction-proof foundation for a large underground structure in a water-rich stratum, characterized in that: It includes a foundation body and an earthquake-proof structure. The four corners of the bottom of the foundation body are provided with mounting seats, and the mounting seats are respectively connected to support piles. The upper part of the foundation body is provided with a gray soil backfill layer, a plain soil backfill layer and a shock-absorbing layer in sequence. A number of gravel piles are provided in the foundation body, and the upper part of the gravel piles is placed inside the plain soil backfill layer. The earthquake-proof structure includes a lower ground beam, a middle beam, an upper ground beam and a first steel mesh frame which are arranged in sequence from bottom to top. The bottom of the upper ground beam and the top of the lower ground beam are symmetrically provided with a first groove and a second groove. The top of the middle beam is inserted into the first groove, and the bottom of the middle beam is inserted into the second groove. The first steel mesh frame is arranged between the upper ground beam and the lower ground beam.
2. The anti-liquefaction foundation of a large underground structure in a water-rich stratum according to claim 1, characterized in that: A drainage pipe is connected to the upper part of the gravel pile, and the drainage pipe is connected to an external sump.
3. The anti-liquefaction foundation of a large underground structure in a water-rich stratum according to claim 2, characterized in that: The spacing between the gravel piles is 3.5 times the pile diameter.
4. The anti-liquefaction foundation of a large underground structure in a water-rich stratum according to claim 3, characterized in that: A first expansion joint is arranged in the lower ground beam, and a second expansion joint is arranged between the lower ground beam and the first steel reinforcement steel grid.
5. The anti-liquefaction foundation of a large underground structure in a water-rich stratum according to claim 4, characterized in that: The first expansion joint and the second expansion joint are arranged vertically.
6. The anti-liquefaction foundation of a large underground structure in a water-rich stratum according to claim 5, characterized in that: Shock-absorbing pads are disposed in the first groove and the second groove.
7. The anti-liquefaction foundation of a large underground structure in a water-rich stratum according to claim 6, characterized in that: The material of the shock-absorbing pad is chloroprene rubber.
8. The anti-liquefaction foundation of a large underground structure in a water-rich stratum according to claim 7, characterized in that: A second steel grid is arranged inside the shock-absorbing layer and is filled with rubber concrete.
9. The anti-liquefaction foundation of a large underground structure in a water-rich stratum according to claim 8, characterized in that: The shock-absorbing layer is also filled with rubber concrete, which is composed of expanded perlite, rubber, petroleum resin, silicate cement, water, water reducing agent, glass fiber, carbon fiber and wollastonite; Among them, the weight ratio of expanded perlite, rubber, petroleum resin, silicate cement, water, water reducing agent, glass fiber, carbon fiber and wollastonite is 1:0.55:0.24:2.4:0.5:0.12:0.2:0.2:1.
5.
10. A method for constructing a liquefaction-proof foundation for a large underground structure in a water-rich stratum as claimed in any one of claims 1 to 9, characterized in that: The following steps are involved: S1. Preliminary preparation; S11. Conduct geological surveys of the construction area, including the distribution of water-rich strata, water levels and soil characteristics; S12. Review and adjust the foundation design plan based on the survey results; S2, excavation of foundation pit; S3. Set up foundation and earthquake-proof structure; S31, installing mounting seats at the four corners of the bottom of the ground base body; S32, using a pile driver to drive the support piles into a predetermined depth in sequence; S33, using the vibrating pipe sinking method to construct gravel piles in the foundation body, with a spacing of 3.5 times the pile diameter, and the upper part of the gravel pile exposed to the inside of the plain soil backfill layer; S34, laying a lime soil backfill layer on the upper part of the foundation body and performing compaction treatment; S35, laying a plain soil backfill layer on the upper part of the lime soil backfill layer and performing compaction treatment; S36, preparing rubber concrete in a weight ratio of expanded perlite, rubber, petroleum resin, silicate cement, water, water reducing agent, glass fiber, carbon fiber and wollastonite of 1:0.55:0.24:2.4:0.5:0.12:0.2:0.2:1.5; S37, laying a shock-absorbing layer on the top of the plain soil backfill layer, then setting a second steel grid in the shock-absorbing layer, and then filling the shock-absorbing layer with the configured rubber concrete; S38, installing a lower ground beam on the upper part of the shock-absorbing layer, setting a first expansion joint in the lower ground beam, setting a first groove at the bottom of the upper ground beam, and then inserting the top of the middle beam into the groove, setting a second groove at the top of the lower bottom beam, and inserting the bottom of the middle beam into the groove; S39, setting a first steel mesh frame between the upper ground beam and the lower ground beam, setting a second expansion joint between the lower ground beam and the first steel mesh frame, and filling the first steel mesh frame with concrete.