Leveling frame, foundation trench bottom face gravel pier construction method and immersed tube construction method
By designing a leveling frame including frames and legs, combined with the construction method of gravel pier on the bottom of the foundation groove, the problem of low leveling accuracy and efficiency of the bottom of the underwater pipe trough during immersed pipe construction is solved, and high precision is achieved. High-efficiency leveling effect.
Patent Information
- Application Number
- CN202411079119.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-07
- Publication Date
- 2024-11-05
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
During the construction of immersed pipes, the leveling accuracy and efficiency of the bottom surface of the underwater pipe trough is low, and the existing leveling frame is difficult to operate, and divers have difficulty in adjusting the height structure underwater.
Design a leveling frame, including frame and legs, through up-adjustment screw, mounting block, adapter block and universal foot structure, the height adjustment of the frame is achieved, providing lifting lugs for easy lifting and underwater position adjustment. Combined with the construction method of gravel pier on the bottom surface of the foundation groove, a leveling frame is used to level the gravel pier underwater to improve the leveling accuracy and efficiency.
It improves the accuracy and efficiency of leveling the bottom surface of the underwater pipe trough, is convenient to operate, reduces the leveling workload, and improves the construction efficiency of immersed pipes.
Smart Images

Figure CN118895770A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of immersed tubes, and in particular to a leveling frame, a gravel pier construction method on the bottom surface of a foundation trench, and an immersed tube construction method. Background Art
[0002] During the construction of the river-crossing immersed pipe, after the excavation of the foundation trench of the underwater pipe trench is completed, a gravel cushion layer is usually dumped to level the bottom surface of the underwater foundation trench, and then the pipe is sunk into the leveled bottom surface of the foundation trench. The current leveling of the bottom surface of the foundation trench is done by divers pushing a scraper ruler along the center line of the underwater pipe trench. The scraper ruler is used to manually scrape the higher parts and supplement the lower parts in a targeted manner. There is no equipment such as a leveling frame to assist, resulting in low leveling accuracy. Moreover, the existing leveling frame is usually placed on the ground when in use, and the operator also stands on the ground. The height adjustment structure is set below the leveling plane, and the height of the leveling frame can be easily adjusted. When the bottom surface of the underwater pipe trench is leveled, people need to dive into the water and operate from top to bottom, which makes it difficult to operate the height adjustment structure set below the leveling plane. Summary of the invention
[0003] The problem to be solved by the present invention is to provide a leveling frame, a gravel pier construction method for the bottom surface of a foundation trench and a immersed pipe construction method, so that the bottom surface of an underwater pipe trench can be leveled with high precision and efficiency.
[0004] In order to solve the above technical problems, the present invention provides a leveling frame on one hand, including a frame and a plurality of legs, wherein the frame is supported by the legs to form a horizontal support frame surface; the legs include an upper adjusting screw, a mounting block, a transfer block and a universal foot; one end of the upper adjusting screw is connected to the transfer block, and the other end is provided with an end cap structure, and the middle part of the rod body is threadedly connected to the mounting block; the end cap structure is used to withstand torque to realize the rotation of the upper adjusting screw; the mounting block and the upper adjusting screw form a screw slider mechanism for fixedly connecting the frame; the universal foot includes a foot plate and a support rod, one end of the support rod is universally rotatably connected to the foot plate, and the other end is connected to the transfer block.
[0005] In the above-mentioned leveling frame, a screw slider mechanism is formed by the mounting block and the upper adjusting screw, and force is applied to the end cap structure located at the top of the frame to twist it, so that the position of the frame can be adjusted up and down, and then the height of the leveling surface can be adjusted, which is convenient for manual underwater operation and adjustment, and the threaded transmission adjustment has high precision and smooth adjustment.
[0006] Preferably, the end cap structure is a nut, a cap or the like fixed to the top end of the upper adjusting screw rod, so as to facilitate application of the torsional force.
[0007] Furthermore, the enclosure frame is provided with lifting lugs for lifting, and the enclosure frame is lifted and transported by the lifting lugs to achieve actions such as launching into water and adjusting the underwater position.
[0008] Furthermore, the mounting block includes a block body and two nuts, the block body is provided with a through hole, and a nut is respectively provided on the block body at both ends of the through hole; the inner diameter of the through hole is larger than the major diameter of the thread of the upper adjusting screw; the two nuts are coaxially arranged with the through hole, and the nuts can be screwed together with the thread of the upper adjusting screw.
[0009] The through hole provides a passage for the upper adjusting screw rod to pass through. The nut is screwed with the upper adjusting screw, so that the upper adjusting screw and the mounting block form a screw slider mechanism. When the upper adjusting screw is rotated, the mounting block will move along the axis on the upper adjusting screw.
[0010] Furthermore, the block body is in a U-shaped plate shape, the two side plates of the U-shaped plate are opposite to each other with holes, and the outer sides of the two side plates are respectively provided with a nut. The structural design is ingenious and simple, and the manufacturing cost is low.
[0011] Furthermore, the frame bars of the enclosure are made of steel pipes, and the frame bars are fixedly connected to the open ends of the U-shaped two side plates of the block body, preferably by welding.
[0012] Furthermore, the adapter block is a sleeve structure, one end of the inner hole of the adapter block is connected to the upper adjusting screw rod, and the other end is connected to the support rod. The adapter block provides a connection structure between the upper adjusting screw rod and the support rod.
[0013] Furthermore, the inner hole of the adapter block is a stepped hole structure, and the upper adjusting screw rod and the support rod are screwed together by threads.
[0014] Furthermore, one end of the upper adjusting screw is screwed into one end of the inner hole of the adapter block and then fixed; the other end of the support rod is screwed into the other end of the inner hole of the adapter block and then fixed.
[0015] Furthermore, there are four supporting legs in total.
[0016] In order to solve the above technical problems, the present invention provides a method for constructing a gravel pier on the bottom surface of a foundation trench, using the above-mentioned leveling frame, comprising:
[0017] The leveling frame is hoisted and placed at the designed construction position of a gravel pier on the bottom surface of the foundation trench excavation;
[0018] Artificially dive underwater and adjust the support height of the legs by rotating the end cap structure so that the horizontal support frame surface formed by the enclosure is the same as the design elevation of the gravel pier construction;
[0019] Throwing gravel to form gravel piers;
[0020] Push the scraper ruler to scrape across the top of the gravel pier. During the pushing process, keep the bottom edge of the scraper ruler in contact with the horizontal supporting frame surface of the enclosure frame, level the area below the bottom edge of the scraper ruler, and level the area above the bottom edge of the scraper ruler, so as to form a gravel pier with a flat top surface and qualified height.
[0021] In the above-mentioned foundation trench bottom gravel pier construction method, the above-mentioned leveling frame is used to level the top surface of the gravel pier, with high leveling accuracy and convenient operation. The top surface of the gravel pier constitutes the final bottom surface of the foundation trench supporting the placement of the pipeline, which will be described in the following immersed pipe construction method.
[0022] Furthermore, the surrounding frame is a rectangular frame, and the width of the surrounding frame is not greater than the width of the excavated bottom surface of the foundation trench.
[0023] Furthermore, before the leveling frame is hoisted and placed at a gravel pier construction design position on the bottom surface of the foundation trench excavation, the method further includes: adjusting the support height of the support legs on water to be equal to the gravel pier construction design height.
[0024] Furthermore, after the leveling frame is hoisted away, the method further includes: adding crushed stones to the incomplete parts left by the surrounding frame and the supporting legs.
[0025] Furthermore, before the leveling frame is hoisted and placed at a gravel pier construction design position on the bottom surface of the foundation trench excavation, it also includes: setting a leveling area for placing the anchor plate on the bottom surface of the foundation trench excavation. The leveling area is constructed in advance to facilitate the stable placement of the leveling frame.
[0026] Furthermore, in the crushed stone pier formed by throwing crushed stone: the top surface height of the formed crushed stone pier is 50-200mm higher than the design elevation of the crushed stone pier construction. The thrown gravel is slightly higher than the designed target leveling top surface height.
[0027] In order to solve the above technical problems, the present invention also provides a immersed tube construction method, comprising:
[0028] Adopting the above-mentioned gravel pier construction method on the bottom surface of the foundation trench, multiple gravel piers are constructed at intervals on the bottom surface of the excavation of the river crossing section of the foundation trench;
[0029] The pipeline is sunk into the foundation trench, and the corresponding pipeline section of the foundation trench across the river is supported by gravel piers;
[0030] Backfill the foundation trench in layers.
[0031] In the above-mentioned immersed tube construction method, a plurality of gravel piers are constructed on the bottom surface of the excavation at the river crossing end of the foundation trench to support the corresponding section of the sunken pipe, so that only the top surface of the gravel pier needs to be leveled, thereby reducing the leveling workload and improving the efficiency of the immersed tube construction; and the leveling using the above-mentioned leveling frame has high leveling accuracy and is easy to operate.
[0032] In summary, by adopting the above-mentioned leveling frame, gravel pier construction method on the bottom of the foundation pit and immersed tube construction method, the frame supported by the legs can form a horizontal support frame surface, thereby forming a leveling reference surface. When divers use a scraper ruler to level, they can use the horizontal support frame surface to assist in leveling, thereby improving the accuracy and efficiency of leveling; in addition, the end cap structure of the leveling frame is located at the top of the leveling plane, and the height adjustment operation underwater is convenient. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] In the attached picture:
[0034] Figure 1 It is a front schematic diagram of the leveling frame of the present invention.
[0035] Figure 2 It is a top view schematic diagram of the leveling frame of the present invention.
[0036] Figure 3 This is a diagram of the installation structure of the installation block of the leveling frame of the present invention.
[0037] Figure 4 The present invention is a flow chart of the method for constructing a gravel pier on the bottom surface of a foundation trench.
[0038] Figure 5 It is a construction schematic diagram of the method for constructing a gravel pier on the bottom surface of a foundation trench according to the present invention.
[0039] Figure 6 It is a schematic diagram of the longitudinal section of the foundation pit.
[0040] Figure 7 The figure is a flow chart of the immersed tube construction method of the present invention.
[0041] In the figure, 1. outrigger; 11. upper adjusting screw; 12. mounting block; 121. block body; 122. nut; 13. adapter block; 14. universal foot; 141. foot plate; 142. support rod; 15. end cap structure; 2. frame; 3. lifting lug; 41. barge; 42. unloading platform; 43. unloading funnel; 44. steel conduit; 5. foundation trench; 51. excavation bottom surface; 6. pipeline. DETAILED DESCRIPTION
[0042] The specific embodiments of the present invention are further described below in conjunction with the accompanying drawings. It should be noted that the description of these embodiments is used to help understand the present invention, but does not constitute a limitation of the present invention.
[0043] Example 1
[0044] Figure 1-3 A leveling frame of the present invention is shown. Figure 1-3As shown, the leveling frame includes a frame 2 and a plurality of legs 1, and the frame 2 is supported by the legs 1 to form a horizontal support frame surface; the legs 1 include an upper adjusting screw 11, a mounting block 12, a transfer block 13 and a universal foot 14; one end of the upper adjusting screw 11 is connected to the transfer block 13, and the other end is provided with an end cap structure 15, and the middle part of the rod body is threadedly connected to the mounting block 12; the end cap structure 15 is used to withstand torque to realize the rotation of the upper adjusting screw 11; the mounting block 12 and the upper adjusting screw 11 form a screw slider mechanism for fixing the frame 2; the universal foot 14 includes a foot plate 141 and a support rod 142, one end of the support rod 142 is universally rotatably connected to the foot plate 141, and the other end is connected to the transfer block 13.
[0045] Optionally, the end cap structure 15 is a structure such as a nut or a cap fixed to the top end of the upper adjusting screw rod 11 to facilitate application of a torsional force.
[0046] Optional, such as Figure 2 As shown, a lifting lug 3 for lifting is provided on the enclosure 2. The enclosure 2 is lifted and transported by the lifting lug 3 to achieve actions such as launching and underwater position adjustment.
[0047] Optional, such as Figure 3 As shown, the mounting block 12 includes a block body 121 and two nuts 122. The block body 121 is provided with a through hole, and a nut 122 is respectively provided on the block body 121 at both ends of the through hole; the inner diameter of the through hole is larger than the major diameter of the thread of the upper adjusting screw 11; the two nuts 122 are coaxially arranged with the through hole, and the nuts 122 can be screwed together with the thread of the upper adjusting screw 11.
[0048] The through hole provides a passage for the upper adjusting screw 11 to pass through. The nut 122 is screwed together with the upper adjusting screw 11 so that the upper adjusting screw 11 and the mounting block 12 form a screw slider mechanism. When the upper adjusting screw 11 is rotated, the mounting block 12 will move along the axis on the upper adjusting screw 11.
[0049] Optionally, the block body 121 is in a U-shaped plate shape, the two side plates of the U-shaped plate are opposite to each other with openings, and the outer surfaces of the two side plates are respectively provided with a nut 122. The structural design is ingenious and simple, and the manufacturing cost is low.
[0050] Optionally, the frame bars of the surrounding frame 2 are made of steel pipes, and the frame bars are fixedly connected to the open ends of the U-shaped two side plates of the block body 121 .
[0051] Optionally, holes are opened on the steel pipes of the frame bars of the enclosure 2 to facilitate rapid water inflow into the steel pipes when the leveling frame is put into water, and rapid water outflow after the water comes out, so as to maintain overall stability.
[0052] Optionally, the adapter block 13 is a sleeve structure, one end of the inner hole of the adapter block 13 is connected to the upper adjustment screw 11, and the other end is connected to the support rod 142. The adapter block 13 provides a connection structure between the upper adjustment screw 11 and the support rod 142.
[0053] Optionally, the inner hole of the adapter block 13 is a stepped hole structure, and is connected to the adjusting screw 11 and the support rod 142 through threaded engagement.
[0054] Optionally, one end of the upper adjusting screw 11 is screwed into one end of the inner hole of the adapter block 13 and then fixed; the other end of the support rod 142 is screwed into the other end of the inner hole of the adapter block 13 and then fixed. Specifically, it can be screwed in and fixed by welding, or it can be fixed by a nut limit lock.
[0055] Optionally, the surrounding frame 2 is a rectangular frame, the number of the hanging ears 3 is four, and the number of the supporting legs 1 is also four, which are distributed at both ends of the long side.
[0056] Optionally, the lifting ear 3 is a lug seat structure with a hole welded on the surrounding frame 2 .
[0057] Optionally, the frame bar steel pipe of the enclosure 2 is a φ146mm×8mm steel pipe, which can be 6000mm long and 1800mm wide; the U-shaped plate-shaped block body 121 is welded from three 10mm steel plates, which can be 120mm×120mm square steel plates; the block body 121 is connected to the steel pipe of the enclosure 2 by welding, and the steel pipe is clamped at the opening of the U-shaped plate and welded and fixed. The upper adjustment screw 11 is an M48mm, coarse thread screw with a pitch of 1mm; the nut 122 is an M48 nut. The support rod 142 is an M36mm screw.
[0058] When in use, the leveling frame is lifted to a predetermined position via the lifting ears 3 and supported by the universal feet 14 to make the frame surface of the surrounding frame 2 horizontal; then the end cap structure 15 is screwed to rotate the upper adjusting screw 11 and the support rod 142 together. Since the support rod 142 is universally rotatably connected to the anchor plate 141, the anchor plate 141 remains stationary, so that the mounting block 12 moves on the upper adjusting screw 11 and can be reversed as needed to move upward or downward, thereby achieving the purpose of adjusting the height of the surrounding frame 2, that is, adjusting the height of the leveling surface to meet the use requirements.
[0059] Example 2
[0060] Figure 4 and Figure 5 The present invention shows a method for constructing a gravel pier on the bottom surface of a foundation trench. Figure 4As shown, the method for constructing the gravel pier on the bottom surface of the foundation trench includes the following steps S10-S40. It should be noted that after the foundation trench is initially excavated, an excavation bottom surface is formed, and gravel is dumped on the excavation bottom surface and then leveled to form a final bottom surface, on which a pipeline is placed; in addition, the foundation trench for a cross-river pipeline generally includes a straight cross-river section and riverside sections at both ends of the cross-river section, such as Figure 6 As shown, the whole is in a U-shape, and the gravel piers of the present invention are constructed on the bottom surface of the foundation trench excavation of the river crossing section.
[0061] Optionally, the method further includes step S05: adjusting the support height of the support legs 1 on water to be equal to the designed height of the gravel pier. The height is initially adjusted before the leveling frame is launched into water, and the height is finely adjusted in step 20 after the launch, so as to reduce the workload of underwater adjustment and improve efficiency.
[0062] Optionally, step S06 is also included: setting a placement leveling area on the excavated bottom surface of the foundation trench for placing the anchor plate 141. The placement leveling area is constructed in advance on the excavated bottom surface where the legs are placed, so as to facilitate the stable placement of the leveling frame and reduce the workload of underwater adjustment.
[0063] Step S10: hoist the leveling frame to a gravel pier design position on the bottom surface of the foundation trench excavation. The hoisting lug 3 can easily realize the overall hoisting and launching of the leveling frame.
[0064] Step S20: Manually dive underwater and adjust the support height of the legs 1 by rotating the end cap structure 15 so that the horizontal support frame surface formed by the frame 2 is the same as the design elevation of the gravel pier construction. The support height of the legs 1 is adjusted so that the horizontal support frame surface formed by the frame 2, i.e., the leveling reference surface, reaches the design height.
[0065] Step S30: Throwing gravel to form gravel piers. Optionally, the top surface height of the formed gravel pier is 50-200mm higher than the designed elevation of the gravel pier. Throwing gravel is slightly higher than the designed target leveling top surface height, which is convenient for subsequent leveling operation using a hanging board ruler.
[0066] Optionally, after the underwater excavation of the foundation trench 5 is completed, an ultrasonic echo sounder is used to detect the underwater pipe trench. After the inspection depth and width meet the design requirements, a gravel cushion layer can be laid on the underwater pipe trench to carry out the construction of gravel piers in the river crossing section and leveling of the river bank section. Figure 5 As shown, a barge 41 on the water surface is used to carry crushed stone, generally sand and gravel, with the particle size controlled according to the design requirements, and the crushed stone is thrown onto the excavated bottom surface 51 of the foundation trench 5 through the cooperation of a discharge platform 42, a discharge funnel 43 and a steel pipe 44.
[0067] Step S40: Push the scraper ruler to scrape across the top of the gravel pier. During the pushing process, keep the bottom edge of the scraper ruler in contact with the horizontal support frame surface of the surrounding frame 2, and level the area below the bottom edge of the scraper ruler and level the area above the bottom edge of the scraper ruler, thereby forming a gravel pier with a flat top surface and qualified height.
[0068] The specific operation of throwing gravel on the bottom surface of the excavation of the river crossing section to form gravel piers is as follows: the divers actually survey the underwater pipe trench conditions underwater and direct the water staff to cooperate with the divers, such as Figure 5 As shown, the excavated bottom surface 51 of the underwater foundation trench 5 is filled with gravel through the steel conduit 44. The gravel to be filled should be slightly higher than the designed top surface height of the gravel pier, and then the diver pushes the scraper ruler forward along the center line of the underwater pipe trench, so that the higher part will be scraped flat. The diver walks back and forth beside the scraper ruler and finds that the lower part of the bottom of the underwater pipe trench is supplemented to the predetermined position through the steel conduit 44. The top elevation of the sand cushion layer to be filled is required to be consistent with the bottom elevation of the scraper ruler until the flatness reaches the design and specification requirements, and the pipeline 6 can be supported.
[0069] Optionally, the method further includes step S50: hoisting the leveling frame away and moving it to the next gravel pier construction design position to construct the next gravel pier.
[0070] Optionally, the surrounding frame 2 is a rectangular frame, and the width of the surrounding frame 2 is not greater than the width of the excavated bottom surface of the foundation trench.
[0071] Optionally, after the leveling frame is hoisted away, the method further includes: adding crushed stones to the incomplete parts left by the surrounding frame 2 and the supporting legs 1.
[0072] Example 3
[0073] Figure 7 A method for constructing a submerged tube according to the present invention is shown. Figure 7 As shown, the immersed tube construction method includes the following steps P10-P30.
[0074] Step P10: Adopting the above-mentioned method for constructing gravel piers on the bottom surface of the foundation trench, a plurality of gravel piers are constructed at intervals on the bottom surface of the excavation of the river crossing section of the foundation trench.
[0075] Step P20: The pipeline is sunk into the foundation trench, and the river crossing section of the foundation trench is supported by gravel piers for the corresponding pipeline section.
[0076] Step P30: Backfill the foundation trench in layers. The foundation trench backfilling needs to be carried out according to the design requirements. Generally, gravel is used for backfilling, followed by underwater gabion stone cage installation, underwater installation of bagged sandbags, and finally graded gravel is used for backfilling to restore the original riverbed.
[0077] For the excavated bottom surface of the riverside section, the distance is relatively short. According to the original method, a layer of crushed stone is directly thrown to form a cushion layer covering all the excavated bottom surfaces, and the pipeline is directly placed on the top surface of the cushion layer. In the above-mentioned immersed pipe construction method, multiple crushed stone piers are constructed on the excavated bottom surface of the river crossing end of the foundation trench to support the corresponding section of the sunken pipe, so that only the top surface of the crushed stone pier needs to be leveled, which reduces the leveling workload and improves the efficiency of the immersed pipe construction; and the above-mentioned leveling frame has high leveling accuracy and convenient operation.
[0078] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit its protection scope. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the field should understand that after reading the present invention, those skilled in the art can still make various changes, modifications or equivalent substitutions to the specific implementation methods of the invention, but these changes, modifications or equivalent substitutions are all within the protection scope of the pending claims of the invention.
Claims
1. A leveling frame, It is characterized in that The invention comprises a frame (2) and a plurality of legs (1), wherein the frame (2) is supported by the legs (1) to form a horizontal support frame surface; the legs (1) comprise an upper adjustment screw (11), a mounting block (12), a transfer block (13) and a universal foot (14); one end of the upper adjustment screw (11) is connected to the transfer block (13), the other end is provided with an end cap structure (15), and the middle part of the rod body is threadedly connected to the mounting block (12); the end cap structure (15) is used to withstand torque to realize rotation of the upper adjustment screw (11); the mounting block (12) and the upper adjustment screw (11) form a screw slider mechanism, which is used to be fixedly connected to the frame (2); the universal foot (14) comprises a foot plate (141) and a support rod (142); one end of the support rod (142) is universally rotatably connected to the foot plate (141), and the other end is connected to the transfer block (13).
2. A leveling frame according to claim 1, It is characterized in that The surrounding frame (2) is provided with lifting ears (3) for lifting.
3. A leveling frame according to claim 1, It is characterized in that The mounting block (12) comprises a block body (121) and two nuts (122); the block body (121) is provided with a through hole, and one nut (122) is provided on the block body (121) at each end of the through hole; the inner diameter of the through hole is larger than the major thread diameter of the upper adjusting screw (11); the two nuts (122) are coaxially arranged with the through hole, and the nuts (122) can be screwed together with the threads of the upper adjusting screw (11).
4. A leveling frame according to claim 3, It is characterized in that The block body (121) is in the shape of a U-shaped plate, with holes facing each other on two side plates of the U-shaped plate, and a nut (122) is respectively arranged on the outer side surfaces of the two side plates.
5. A leveling frame according to claim 4, It is characterized in that The frame bars of the surrounding frame (2) are made of steel pipes, and the frame bars are fixedly connected to the open ends of the U-shaped two side plates of the block body (121).
6. A leveling frame according to claim 1, It is characterized in that The adapter block (13) is in the form of a sleeve structure; one end of the inner hole of the adapter block (13) is connected to the upper adjusting screw rod (11), and the other end is connected to the support rod (142).
7. A leveling frame according to claim 6, It is characterized in that The inner hole of the adapter block (13) is a stepped hole structure, and is screwed together with the upper adjusting screw rod (11) and the support rod (142) through threads.
8. A method for constructing a gravel pier on the bottom surface of a foundation trench, using the leveling frame according to any one of claims 2 to 7, It is characterized in that include: The leveling frame is hoisted and placed at the designed construction position of a gravel pier on the bottom surface of the foundation trench excavation; The support height of the support legs (1) is adjusted by rotating the end cap structure (15) so that the horizontal support frame surface formed by the surrounding frame (2) is the same as the design elevation of the gravel pier construction; Throwing gravel to form gravel piers; The scraper ruler is pushed to scrape across the top of the gravel pier, and during the pushing process, the bottom edge of the scraper ruler is kept in contact with the horizontal support frame surface of the surrounding frame (2), and the area below the bottom edge of the scraper ruler is leveled, and the area above the bottom edge of the scraper ruler is scraped flat, thereby forming a gravel pier with a flat top surface and a qualified height.
9. A method for constructing a gravel pier on the bottom surface of a foundation trench according to claim 1, It is characterized in that The surrounding frame (2) is a rectangular frame, and the width of the surrounding frame (2) is not greater than the width of the excavated bottom surface of the foundation trench.
10. A method for constructing an immersed tube, It is characterized in that include: Adopting the method for constructing gravel piers on the bottom surface of the foundation trench as claimed in claim 8 or 9, a plurality of gravel piers are constructed at intervals on the bottom surface of the excavation of the river crossing section of the foundation trench; The pipeline is sunk into the foundation trench, and the corresponding pipeline section of the foundation trench across the river is supported by gravel piers; Backfill the foundation trench in layers.