Protective cover for ground reinforcement cage pouring and mounting method thereof

CN118895877AActive Publication Date: 2024-11-05SICHUAN JIAOTOU CONSTR ENG CO LTD +1
View PDF 11 Cites 0 Cited by

Patent Information

Application Number
CN202411072125.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-06
Publication Date
2024-11-05
Estimated Expiration
2044-08-06

AI Technical Summary

Technical Problem

During the pouring of steel cages, the steel cage is easily corroded by weather and rainwater when waiting for pouring, and cement is easily sputtered onto the inner wall of the mold during pouring and solidifies first, resulting in different defects on the surface of the concrete column.

Method used

Adopt a protective cover device including a protective cloth, sliding assembly and sealing stack. The protective cloth cover is installed on the side wall of the steel cage, the top is connected to the top cover, the bottom is folded and laid on the ground, injecting inert gas through the injection pipe to prevent oxidation, and through sliding The components reduce friction and prevent cement from sputtering against the inner wall of the mold.

Benefits of technology

Effectively prevent corrosion of the steel cage, avoid cement sputtering before solidification on the inner wall of the mold, and ensure the integrity of the concrete column surface.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118895877A_ABST
    Figure CN118895877A_ABST
Patent Text Reader

Abstract

The invention provides a protective cover for ground reinforcement cage pouring and a mounting method thereof, relates to the technical field of reinforcement cage pouring, and solves the problems that a reinforcement cage is easily corroded by weather and rainwater when waiting for pouring, and meanwhile, in the pouring process, part of the reinforcement cage is easily solidified on the inner wall of a mold in advance, so that the mold is damaged. And finally, the concrete column surface has difference. The side wall of the reinforcement cage is sleeved with protective cloth, the top of the protective cloth is connected with a top cover, the periphery of the protective cloth is connected with a mold cylinder, the side wall of the reinforcement cage is connected with a sliding assembly, and the protective cloth is attached to one side of the sliding assembly. The protection cloth arranged in the device can protect a reinforcement cage to be poured and prevent the reinforcement cage from being corroded, and meanwhile in the pouring process, the protection cloth is lifted to prevent cement from being splashed and attached to the inner wall, close to the high position, of a mold to be solidified and formed in advance.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of steel cage casting, and in particular to a protective cover for ground steel cage casting and an installation method thereof. Background Art

[0002] When the steel cage is cast on the ground, usually multiple steel cages are built on the ground at the same time, and then cast in sequence according to needs.

[0003] However, because the pouring needs to be carried out sequentially, the others waiting are easily corroded by weather and rain, which can easily affect the pouring. At the same time, during the pouring process, cement is easily splashed by the falling impact, causing part of it to adhere to the inner wall near the height of the mold and solidify first, resulting in different defects on the surface of the final concrete column. Summary of the invention

[0004] The purpose of the present invention is to provide a protective cover for the casting of ground steel cage and an installation method thereof, so as to solve the problem that the steel cage is easily corroded by weather and rain while waiting for casting, and at the same time, during the casting process, it is easy to cause part of it to solidify on the inner wall of the mold first, resulting in differences in the final concrete column surface.

[0005] The embodiments of the present invention are implemented by the following technical solutions:

[0006] The present invention provides a protective cover for casting a ground steel cage and an installation method thereof, comprising a steel cage, a side wall of the steel cage being sleeved with a protective cloth, a top cover being connected to the top of the protective cloth, a mold cylinder being connected around the protective cloth, a sliding component being connected to the side wall of the steel cage, and one side of the sliding component being fitted with the protective cloth.

[0007] Preferably, the protective cloth is cylindrical and matched with the steel cage, and the protective cloth is made of a material with good sealing properties.

[0008] Preferably, the top cover is connected to the top of the protective cloth by means of a zipper, Velcro or the like.

[0009] Preferably, the protective cloth further includes an air injection tube and a folded bottom, wherein the air injection tube is arranged on one side of the protective cloth, and the folded bottom is arranged on the bottom of the protective cloth.

[0010] Preferably, the gas injection pipe is connected to an external inert gas source.

[0011] Preferably, the folded bottom portion is a piece of cloth whose bottom portion of the protective cloth is folded and laid on the ground.

[0012] Preferably, the steel cage further comprises a sealing pile, which is arranged around the steel cage.

[0013] Preferably, the sealing stack is arranged to cover the top of the folded bottom.

[0014] Preferably, the sliding assembly includes a roller, and the roller is a cylinder sleeved on the side wall of the steel cage steel frame.

[0015] The technical solution of the embodiment of the present invention has at least the following advantages and beneficial effects:

[0016] 1. The protective cloth provided in the device can protect the steel cage to be poured to prevent it from being corroded. At the same time, during the pouring process, the protective cloth can be lifted to prevent cement from splashing and adhering to the inner wall of the mold near the height to solidify and form first.

[0017] 2. The device is also provided with a sliding component to reduce friction when installing and lifting the protective cloth, so that it will not be pulled and damaged due to excessive friction. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0019] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0020] Figure 2 For the present invention Figure 1 A schematic diagram of the enlarged structure at A in the middle;

[0021] Figure 3 It is a schematic diagram of the connection structure between the protective cloth and the mold cylinder of the present invention;

[0022] Figure 4 This is a schematic diagram of the state structure of the protective cloth of the present invention;

[0023] Icons: steel cage 1, roller 101, protective cloth 2, top cover 201, air injection pipe 202, folded bottom 203, sealing stack 3, mold cylinder 4. DETAILED DESCRIPTION

[0024] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0025] Combine the following Figures 1 to 4 The present invention is described in detail.

[0026] A protective cover for casting a ground steel cage and an installation method thereof, comprising a steel cage 1, a side wall of the steel cage 1 being sleeved with a protective cloth 2, a top cover 201 being connected to the top of the protective cloth 2, a mold cylinder 4 being connected around the protective cloth 2, and a sliding component being connected to the side wall of the steel cage 1, and the protective cloth 2 being fitted on one side of the sliding component.

[0027] First, several steel cages 1 are built on the ground, and then the protective cloth 2 is set to cover the side wall of the steel cage 1 to protect the steel cage 1 to prevent rain and other erosion of the steel cage 1. Because several steel cages 1 are built at the same time, and then poured in sequence according to the needs of the construction, some of the steel cages 1 will be exposed to the outdoors for a long time, which is easy to be corroded and damaged by erosion by weather and rain, affecting the later pouring.

[0028] Furthermore, the protective cloth 2 is cylindrical and cooperates with the steel cage 1. The protective cloth 2 is made of a material with good sealing properties. The top cover 201 is connected to the top of the protective cloth 2 by zippers and Velcro. The protective cloth 2 also includes an air injection pipe 202 and a folding bottom 203. The air injection pipe 202 is arranged on one side of the protective cloth 2, and the folding bottom 203 is arranged at the bottom of the protective cloth 2. The air injection pipe 202 is connected to an external inert gas source such as argon, nitrogen, etc. The folding bottom 203 is a cloth that is folded and laid on the ground at the bottom of the protective cloth 2. The steel cage 1 also includes a sealing pile 3, which is arranged around the steel cage 1 and is arranged on the top of the folding bottom 203 to cover it.

[0029] Then, after the protective cloth 2 is put on, a folded bottom 203 is formed at the bottom, and then the protective cloth 2 is sealed by covering the sealing pile 3. Then, inert gas is injected through the gas injection pipe 202 to reduce the oxygen content therein, so that the steel cage 1 will not be oxidized during a long waiting period.

[0030] Then when pouring is needed, the top cover 201 is opened, and then cement is poured into the protective cloth 2. After a certain amount of pouring is poured, the pouring is stopped, and the protective cloth 2 is pulled and lifted so that the protective cloth 2 moves to the top of the cement, and then it is agitated. After the initial setting is completed, a certain amount of cement is poured, and the pouring of the steel cage 1 is repeated in this way, so that in the process of pouring cement again, the cement will not directly adhere to the inner wall of the mold near the high place due to splashing impact, etc., to avoid the cement splashed to the high place from solidifying first due to time difference, resulting in that after the cement is completely poured in and formed, there will be certain differences and gaps between those that have solidified first and those that have been completely poured and cannot form a whole, affecting the integrity of the side wall of the concrete column in the later stage.

[0031] Furthermore, the sliding assembly includes a roller 101, which is a cylinder sleeved on the side wall of the steel frame of the steel cage 2.

[0032] Finally, when the protective cloth 2 is pulled to be lifted, it will contact the roller 101. The rotation of the roller 101 will reduce the friction of the protective cloth 2 when it moves, thus preventing the protective cloth 2 from being damaged due to friction and pulling.

[0033] Further, the steps are as follows;

[0034] The first step is to first build the steel cage 1 on the ground, and then put the protective cloth 2 from the top of the steel cage 1 downward, so that the protective cloth 2 can complete the wrapping and covering of the steel cage 1;

[0035] In the second step, the top of the protective cloth 2 is connected to the top cover 201 by a zipper or Velcro to complete the sealing of the protective cloth 2, and then the bottom part of the protective cloth 2 is folded into a folded bottom 203 and laid flat on the ground;

[0036] The third step is to pile up the construction debris or mud on the construction site on the top of the folded bottom 203 to form a sealed pile 3 to seal the inside of the protective cloth 2, so as to seal and protect the multiple steel cages 1 to prevent the steel cages 1 from being corroded by rainwater during the process of waiting for pouring.

[0037] The fourth step is to connect the gas injection pipe 202 to one side of the protective cloth 2 after sealing the inside of the protective cloth 2, and then suck inert gas into the protective cloth 2 to reduce the oxygen content in the protective cloth 2, so that the steel bars will not be oxidized when the protective cloth 2 completes the protection of the steel cage 1 and waits for a long time;

[0038] Step 5: When the steel cage 1 in the protective cloth 2 needs to be poured, the sealing pile 3 is taken out, the folded bottom 203 is flattened, and then the mold tube 4 is sleeved outside the protective cloth 2, so that the mold tube 4 can be isolated by the protective cloth 2 to prevent direct contact and friction with the steel cage 1 during the sleeve process, thereby causing damage and affecting the outer wall forming of the concrete in the later stage;

[0039] Step 6: After the mold tube 4 is installed, the top cover 201 of the protective cloth 2 is opened to allow cement to be poured in for pouring. After a certain amount of cement is poured in, the protective cloth 2 is pulled and lifted from the top to be lifted above the poured cement, and the concrete is poured again after initial setting. This process is repeated to complete the pouring, so that when pouring cement, the cement will not splash to the inner wall of the mold tube 4 near the high place due to the impact of pouring.

[0040] In the sixth step, when the protective cloth 2 is pulled for lifting, a roller 101 is also sleeved in the steel bar 1 of the steel cage 1. By rotating the connected roller 101, when the protective cloth 2 is pulled or sleeved, it will be pressed against the roller 101. The rolling of the roller 101 can reduce the friction of the protective cloth 2 during sleeved and lifted, thereby preventing it from being damaged due to friction.

[0041] The following is a specific implementation process of the present invention. First, several steel cages 1 are built on the ground, and then the protective cloth 2 is set to cover the side walls of the steel cages 1 to protect the steel cages 1 to prevent rain and other erosion of the steel cages 1. Because several steel cages 1 are built at the same time, and then the pouring is completed in sequence according to the needs of the construction, which will cause part of the steel cages 1 to be exposed to the outdoors for a long time, which is easy to be corroded and damaged by erosion by weather and rain, affecting the subsequent pouring. After the protective cloth 2 is set, a folded bottom 203 is formed at the bottom, and then the protective cloth 2 is sealed by covering it with a sealing pile 3. Then, inert gas is injected through the gas injection pipe 202 to reduce the oxygen content therein, so that the steel cage 1 will not be oxidized during the long waiting period, and then the top cover 201 is opened when pouring is required. , and then pour cement into the protective cloth 2. Stop pouring after a certain amount has been poured in, pull and lift the protective cloth 2 without removing it, so that the protective cloth 2 will move to the top of the cement, and then agitate it. After the initial setting is completed, pour a certain amount of cement, and repeat this process to complete the casting of the steel cage 1. In the process of pouring cement again, the cement will not directly adhere to the inner wall of the mold near the high place due to splashing impact, etc., so as to avoid the cement splashed to the high place will solidify first due to the time difference, resulting in that after the cement is completely poured into the shape, the general steel cage is cast in sections, which makes it easy for the first solidified shape attached to the high place of the mold. Because of the certain differences and gaps between those that solidify and form first and those that are completely cast, they cannot form a whole, affecting the integrity of the side wall of the concrete column in the later stage.

[0042] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A protective cover for ground reinforcement cage casting, comprising a reinforcement cage (1), characterized in that: The side wall of the steel cage (1) is sleeved with a protective cloth (2), the top of the protective cloth (2) is connected to a top cover (201), the protective cloth (2) is connected around a mold cylinder (4), and the side wall of the steel cage (1) is connected to a sliding component, one side of the sliding component is in contact with the protective cloth (2).

2. A protective cover for ground reinforcement cage casting according to claim 1, characterized in that: The protective cloth (2) is cylindrical and cooperates with the steel cage (1); the protective cloth (2) is made of a material with good sealing properties.

3. A protective cover for ground reinforcement cage casting according to claim 1, characterized in that: The top cover (201) is connected to the top of the protective cloth (2) by means of a zipper and Velcro.

4. A protective cover for ground reinforcement cage casting according to claim 1, characterized in that: The protective cloth (2) further comprises an air injection pipe (202) and a folded bottom (203); the air injection pipe (202) is arranged on one side of the protective cloth (2), and the folded bottom (203) is arranged on the bottom of the protective cloth (2).

5. A protective cover for ground reinforcement cage casting according to claim 4, characterized in that: The gas injection pipe (202) is connected to an external inert gas source such as argon and nitrogen.

6. A protective cover for ground reinforcement cage casting according to claim 4, characterized in that: The folded bottom (203) is a piece of cloth that is folded and laid on the ground at the bottom part of the protective cloth (2).

7. A protective cover for ground reinforcement cage casting according to claim 1, characterized in that: The steel cage (1) further comprises a sealing pile (3), wherein the sealing pile (3) is arranged around the steel cage (1).

8. A protective cover for ground reinforcement cage casting according to claim 7, characterized in that: The sealing stack (3) is arranged to cover the top of the folded bottom (203).

9. A protective cover for ground reinforcement cage casting according to claim 1, characterized in that: The sliding assembly comprises a roller (101), and the roller (101) is a cylinder sleeved on the side wall of the steel frame of the steel cage (1).

10. A method for installing a protective cover cast by a ground reinforcement cage according to any one of claims 1 to 9, the steps of which are as follows; The first step is to first build the steel cage (1) on the ground, and then to put the protective cloth (2) from the top of the steel cage (1) downward, so that the protective cloth (2) can completely wrap and cover the steel cage (1); In the second step, the top of the protective cloth (2) is connected to the top cover (201) by a zipper or Velcro to complete the sealing of the protective cloth (2), and then the bottom part of the protective cloth (2) is folded into a folded bottom (203) and laid flat on the ground; The third step is to pile up construction debris or mud on the construction site on the top of the folded bottom (203) to form a sealed pile (3) to seal the inside of the protective cloth (2), thereby sealing and protecting the multiple steel cages (1) to prevent the steel cages (1) from being corroded by rainwater during the process of waiting for pouring. The fourth step is to reduce the oxygen content in the protective cloth (2) after the interior of the protective cloth (2) is sealed by connecting the gas injection pipe (202) to one side of the protective cloth (2) and then sucking inert gas into the protective cloth (2), so that the steel bars will not be oxidized when the protective cloth (2) completes the protection of the steel cage (1) and waits for a long time; In the fifth step, when it is necessary to cast the steel cage (1) in the protective cloth (2), the sealing pile (3) is taken out, the folded bottom (203) is flattened, and then the mold tube (4) is sleeved outside the protective cloth (2), so that the protective cloth (2) can provide a certain degree of isolation, so that the mold tube (4) will not directly contact and rub with the steel cage (1) during the sleeve process, causing damage, which will affect the outer wall forming of the concrete in the later stage; Step 6: After the mold tube (4) is installed, the top cover (201) of the protective cloth (2) is opened to allow cement to be poured in for casting. After a certain amount of cement has been poured in, the protective cloth (2) is pulled and lifted from the top to be raised above the poured cement, and the concrete is poured in again after initial setting. This process is repeated to complete the casting, so that when pouring cement, the cement will not splash onto the inner wall of the mold tube (4) near the upper part due to the impact of pouring. In the sixth step, when the protective cloth (2) is pulled to lift it, a roller (101) is also sleeved in the steel bar (1) of the steel cage (1). By rotating the connected roller (101), when the protective cloth (2) is pulled or sleeved, it will abut against the roller (101). The rolling of the roller (101) reduces the friction of the protective cloth (2) when it is sleeved and lifted, thereby preventing it from being damaged due to friction.

Citation Information

Patent Citations

  • Flexible protection structure for structural reserved steel bars and construction method of flexible protection structure

    CN116025184A

  • Rust-proof treatment device for reinforcing steel bars

    CN211597385U

  • Anti-rust device for embedded exposed steel bars in constructional engineering

    CN213359464U

  • Reserved steel bar foam occupation construction device

    CN216428798U

  • Clamp for controlling pier column steel bar protection layer

    CN216428799U