Thrust gauge pile for pipe jacking construction

By designing thrust positioning piles including positioning pile seats, reinforcement components and pulling and stabilizing components in the construction of the top pipe, the problems of easy damage and insufficient load-bearing capacity of the existing thrust positioning piles are solved, and higher stability and Easy to use.

CN118896192APending Publication Date: 2024-11-05THE SECOND CONSTR OF CHINA CONSTR EIGHTH ENG DIV
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202410961975.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-18
Publication Date
2024-11-05

AI Technical Summary

Technical Problem

The existing thrust positioning piles for pipe construction are prone to deformation and damage after long-term use, and have limited load-bearing capacity, which is not conducive to the high-power use of the thrust device and is inconvenient to use.

Method used

A thrust positioning pile including positioning pile seat, reinforcement assembly and pulling stabilization assembly was designed. By inserting the pile into the soil layer, combining the cooperation of the backing pile and pulling steel cable, the thrust stability of the push ring is improved. , and the synergistic effect of the stabilized assembly and hanging ring is enhanced by pulling and stabilizing the reaction force resistance.

Benefits of technology

It improves the thrust stability and reaction force resistance of the pushing ring, extends the service life of the equipment, is simple to operate and easy to use.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118896192A_ABST
    Figure CN118896192A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of pipe jacking construction, in particular to a thrust positioning pile for pipe jacking construction, which comprises a positioning pile seat, a reinforcing assembly and a traction stabilizing assembly, a thrust table is vertically arranged on one side of the upper end of the positioning pile seat, a pushing ring is arranged on one side of the thrust table, and two back bearing piles are symmetrically arranged on one side, far away from the pushing ring, of the thrust table; one sides of the two back bearing piles abut against one side of a steel plate fender post in a working well, a reinforcing pile penetrating into the ground is vertically inserted into one side of the positioning pile seat, and when the pushing ring above the positioning pile seat is used for pushing, under the cooperation effect of the reinforcing pile and the back bearing piles, the thrust stability of the pushing ring is improved, and the service life of the pushing ring is prolonged. Then, under the auxiliary action of a traction steel cable of the traction stabilizing assembly, inclined pulling compensation is conducted on the side, close to the pushing ring, of the thrust table, the thrust stability of the pushing ring is further enhanced, in addition, the traction stabilizing assembly is matched with the second hanging ring to provide power for the reinforcing pile to be inserted into the ground, and the whole device is easy to operate and convenient to use.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of pipe jacking construction, in particular to a thrust positioning pile for pipe jacking construction. Background Art

[0002] Pipe jacking construction refers to a construction method in which a prefabricated pipe section is pushed into the ground without trenching using a jacking device. Currently, most urban water supply and drainage pipeline reconstruction or expansion projects use pipe jacking construction.

[0003] The existing jacking device for pipe jacking construction is mainly fixed and installed by thrust positioning piles during installation. When the jacking device is in use, the thrust positioning piles need to withstand the reverse pushing force brought by the jacking device. Therefore, the common thrust positioning piles for pipe jacking construction are mostly abutted against the inner supporting steel plate protection piles of the construction well when in use. Since the steel plate protection piles need to provide safe support for the working well, the steel plate protection piles are prone to deformation and damage after the thrust positioning piles have been abutted against them for a long time. In addition, the bearing capacity of the steel plate protection piles is limited, which is not conducive to the high-power use of the jacking device and is inconvenient to use. Summary of the invention

[0004] The object of the present invention is to provide a thrust positioning pile for pipe jacking construction to solve the problems raised in the above-mentioned background technology.

[0005] To achieve the above object, the present invention provides the following technical solution: a thrust positioning pile for pipe jacking construction, the thrust positioning pile for pipe jacking construction comprising:

[0006] A positioning pile seat, wherein a thrust platform is vertically arranged on one side of the upper end of the positioning pile seat, a top thrust ring is arranged on one side of the thrust platform, two back-bearing piles are symmetrically arranged on one side of the thrust platform away from the top thrust ring, and one side of the two back-bearing piles is respectively abutted against one side of the steel plate retaining pile in the working pit;

[0007] A reinforcement component, the reinforcement component comprising two reinforcement piles, the two reinforcement piles respectively vertically move through both sides of the positioning pile seat and are inserted into the soil layer;

[0008] A pulling and stabilizing component is horizontally arranged at the upper end of the positioning pile seat. The pulling and stabilizing component includes a synchronous control seat and two pulling steel cables. One side of the two pulling steel cables respectively penetrates the upper end of the reinforcement pile and is connected to one side of the upper end of the thrust platform.

[0009] Preferably, two reinforcement holes are vertically symmetrically provided on both sides of the positioning pile seat, the lower ends of the two reinforcement piles are movably passed through the reinforcement holes, and a conical head is provided on one side of the reinforcement pile inserted into the soil layer.

[0010] Preferably, the reinforcing pile is provided with a descent limit plate horizontally at the upper end of the positioning pile seat, the lower end of the descent limit plate is arranged in contact with the upper end of the positioning pile seat, and a lap groove is opened at the center of the upper end of the descent limit plate of the reinforcing pile.

[0011] Preferably, the upper end of the positioning pile seat near the reinforcement hole is horizontally provided with a slide rail, and two slide grooves are horizontally symmetrically opened on both sides of the lower end of the synchronous control seat. The two slide grooves of the synchronous control seat are respectively movably connected to one side of the two slide rails, and the cross-sections of the slide rails and the slide grooves are both T-shaped structures.

[0012] Preferably, two pulling control cylinders are horizontally and symmetrically provided on both sides of the upper end of the positioning pile seat, and the two pulling control cylinders are respectively connected to one side of the synchronous control seat.

[0013] Preferably, two high-strength support shafts are vertically symmetrically provided at the upper end of the synchronous control seat, and winding drums are rotatably sleeved on the two high-strength support shafts through bearings, and one side of the pulling cable is wound around the winding drum.

[0014] Preferably, an extension plate is horizontally provided on one side of the synchronous control seat close to the winding disk, and a locking frame is vertically provided on the upper end of the extension plate. The pulling steel cable moves horizontally through the locking frame, and a clamping bolt is vertically inserted into the upper end of the locking frame. The clamping bolt is placed in the locking frame and a pressure stop plate is provided at the lower end through a threaded sleeve, and the lower end of the pressure stop plate is pressed against the upper end of the pulling steel cable.

[0015] Preferably, a force roller and an auxiliary guide wheel are vertically arranged at the lower and upper ends of the overlapping groove respectively through a rotating shaft, and the pulling steel cable passes through one side of the locking frame and is respectively inserted into the overlapping groove and overlapped with the lower end of the force roller and the upper end of the auxiliary guide wheel.

[0016] Preferably, a plurality of first hanging rings are symmetrically provided on both sides of the upper end of the thrust platform, the first hanging rings are arranged corresponding to the reinforcement piles, and the pulling steel cable passes over the upper end of the auxiliary guide wheel and is obliquely connected to the first hanging ring on one side.

[0017] Preferably, two second hanging rings are symmetrically provided on one side of the positioning pile seat away from the thrust platform, and the two second hanging rings are respectively arranged corresponding to the two reinforcing piles, and when the reinforcing piles are inserted into the soil layer, the pulling steel cable can be placed on the upper end of the force receiving roller and connected to the second hanging ring.

[0018] Compared with the prior art, the present invention has the following beneficial effects:

[0019] A reinforcing pile deep into the ground is vertically inserted on one side of the positioning pile seat. When the jacking ring above the positioning pile seat is used for pushing, the thrust stability of the jacking ring is improved with the cooperation of the reinforcing pile and the back-bearing pile. Then, with the auxiliary action of the pulling steel cable of the pulling stabilizing component, the side of the thrust platform close to the jacking ring is tilted and pulled to compensate, so as to further enhance the thrust stability of the jacking ring. In addition, the pulling stabilizing component cooperates with the second hanging ring to provide power for the reinforcing pile to be inserted into the ground, and the overall device is simple to operate and easy to use. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a schematic diagram of the structure of the present invention from a first viewing angle;

[0021] Figure 2 For the present invention Figure 1 Schematic diagram of part A;

[0022] Figure 3 It is a schematic diagram of the structure of the present invention from a second viewing angle;

[0023] Figure 4 For the present invention Figure 3 Schematic diagram of part B;

[0024] Figure 5 It is a partial side-cut schematic diagram of the structure of the present invention;

[0025] Figure 6 For the present invention Figure 5 Schematic diagram of the C part;

[0026] Figure 7 This is a schematic diagram of the connection between the synchronous control seat and the reinforcement pile of the present invention;

[0027] Figure 8 For the present invention Figure 7 Schematic diagram of part D.

[0028] In the figure: positioning pile seat 1, thrust platform 2, back-bearing pile 3, thrust ring 4, reinforcement hole 5, reinforcement pile 6, conical head 7, descending limit plate 8, overlapping groove 9, force roller 11, slide rail 12, synchronous control seat 13, pulling control cylinder 14, slide 15, high-strength support shaft 16, pulling steel cable 17, auxiliary guide wheel 18, first hanging ring 19, locking frame 20, clamping bolt 21, pressure stop plate 22, second hanging ring 23, winding drum 24. DETAILED DESCRIPTION

[0029] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0030] Please see attached Figure 1-8 , this application provides the following two embodiments of the preferred scheme.

[0031] Embodiment 1

[0032] A thrust positioning pile for pipe jacking construction, a thrust platform 2 is vertically arranged on one side of the upper end of the positioning pile seat 1, a thrust ring 4 is arranged on one side of the thrust platform 2, two back-bearing piles 3 are symmetrically arranged on one side of the thrust platform 2 away from the thrust ring 4, and one side of the two back-bearing piles 3 is respectively abutted against one side of the steel plate retaining pile in the working well, and a reinforcement component includes two reinforcement piles 6, the two reinforcement piles 6 are respectively vertically movable and penetrate the two sides of the positioning pile seat 1 and are inserted into the soil layer, two reinforcement holes 5 are vertically symmetrically opened on both sides of the positioning pile seat 1, and the lower ends of the two reinforcement piles 6 are respectively A movable through reinforcing hole 5 is provided, and a conical head 7 is provided on one side of the reinforcing pile 6 inserted into the soil layer. A descending limit plate 8 is provided horizontally at the upper end of the positioning pile seat 1. The lower end of the descending limit plate 8 is arranged in contact with the upper end of the positioning pile seat 1, and a lap groove 9 is provided at the center of the upper end of the descending limit plate 8 of the reinforcing pile 6. After the lower end of the reinforcing pile 6 is inserted into the soil layer, the front end of the positioning pile seat 1 can be thrust-loaded, and cooperate with the back-bearing pile 3 behind the thrust platform 2. The two cooperate with each other to improve the thrust-load stability of the thrust ring 4.

[0033] The pulling and stabilizing assembly is horizontally arranged at the upper end of the positioning pile seat 1, and the pulling and stabilizing assembly includes a synchronous control seat 13 and two pulling steel cables 17. One side of the two pulling steel cables 17 respectively penetrates the upper end of the reinforcing pile 6 and is connected to one side of the upper end of the thrust platform 2. Two pulling control cylinders 14 are horizontally symmetrically arranged on both sides of the upper end of the positioning pile seat 1. The two pulling control cylinders 14 are respectively connected to one side of the synchronous control seat 13. Two high-strength support shafts 16 are vertically symmetrically arranged on the upper end of the synchronous control seat 13. A winding disk 24 is rotatably sleeved on the two high-strength support shafts 16, and one side of the pulling steel cable 17 is wound around the winding disk 24. An extension plate is horizontally arranged on one side of the synchronous control seat 13 close to the winding disk 24, and a locking frame 20 is vertically arranged on the upper end of the extension plate. The pulling steel cable 17 is horizontally movable and penetrates the locking frame 20. A clamping bolt 21 is vertically inserted at the upper end of the locking frame 20, and the clamping bolt 21 is placed in the lower inner part of the locking frame 20. A pressure stop plate 22 is provided at the end through a threaded sleeve, and the lower end of the pressure stop plate 22 is pressed against the upper end of the pulling steel cable 17. A force roller 11 and an auxiliary guide wheel 18 are respectively vertically provided at the lower end and the upper end in the lap groove 9 through the rotation axis. The pulling steel cable 17 passes through one side of the locking frame 20 and is respectively inserted into the lap groove 9 and overlapped with the lower end of the force roller 11 and the upper end of the auxiliary guide wheel 18. A plurality of first hanging rings 19 are symmetrically provided on both sides of the upper end of the thrust platform 2. The first hanging ring 19 is arranged corresponding to the reinforcement pile 6. The pulling steel cable 17 passes over the upper end of the auxiliary guide wheel 18 and is obliquely connected to the first hanging ring 19 on one side. When the front of the positioning pile seat 1 is connected and fixed by the reinforcement pile 6, the horizontally slidable synchronous control seat 13 is connected above the positioning pile seat 1 through the pulling control cylinder 14. The upper part of the thrust platform 2 is obliquely pulled by the two first hanging rings 19 of the synchronous control seat 13, so as to improve the resistance strength of the reaction force of the push ring 4.

[0034] Furthermore, the reinforcing pile 6 can be used as a turning point for pulling the steel cable 17 , thereby improving the force stability of the diagonal support of the thrust platform 2 .

[0035] Embodiment 2

[0036] On the basis of the first embodiment, the reinforcement pile 6 is assisted in being pressed down, the upper end of the positioning pile seat 1 near the reinforcement hole 5 is horizontally provided with a slide rail 12, and two slide grooves 15 are horizontally symmetrically provided on both sides of the lower end of the synchronous control seat 13. The two slide grooves 15 of the synchronous control seat 13 are respectively movably connected to one side of the two slide rails 12, and the cross-sections of the slide rails 12 and the slide grooves 15 are both T-shaped structures. The side of the positioning pile seat 1 away from the thrust platform 2 is symmetrically provided with two second hanging rings 23, and the two second hanging rings 23 are respectively arranged corresponding to the two reinforcement piles 6, and when the reinforcement pile 6 is inserted into the soil layer, the pulling steel cable 17 can be connected to the force receiving roller 11. The upper end is connected to the second hanging ring 23. When the reinforcement pile 6 passes through the reinforcement hole 5 and is inserted into the soil layer, the vertical pile driver in the prior art can be used to perform the downward insertion operation, and the pulling steel cable 17 of the device can also be passed through the overlapping groove 9 of the reinforcement pile 6 and fixedly hung with the second hanging ring 23. The pulling steel cable 17 is overlapped on one side of the overlapping groove 9 at the upper end of the force roller 11. When the pulling control cylinder 14 pulls the synchronous control seat 13 to move, the reinforcement pile 6 can be slowly pressed downward by the pulling steel cable 17. When the pulling steel cable 17 is pulled and controlled, it is pressed and fixed by the pressure stop plate 22 to prevent the loosening of the pulling steel cable 17 from affecting the force.

[0037] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A thrust positioning pile for pipe jacking construction, characterized in that: The thrust positioning pile for pipe jacking construction comprises: A positioning pile seat (1), wherein a thrust platform (2) is vertically arranged on one side of the upper end of the positioning pile seat (1), a top thrust ring (4) is arranged on one side of the thrust platform (2), two back-bearing piles (3) are symmetrically arranged on one side of the thrust platform (2) away from the top thrust ring (4), and one side of the two back-bearing piles (3) is respectively arranged to abut against one side of a steel plate retaining pile in the working pit; A reinforcement component, the reinforcement component comprising two reinforcement piles (6), the two reinforcement piles (6) respectively vertically movably penetrate through both sides of the positioning pile seat (1) and are inserted into the soil layer; A pulling and stabilizing component is horizontally arranged at the upper end of the positioning pile seat (1), and comprises a synchronous control seat (13) and two pulling steel cables (17), one side of the two pulling steel cables (17) respectively passes through the upper end of the reinforcement pile (6) and is connected to one side of the upper end of the thrust platform (2).

2. The thrust positioning pile for pipe jacking construction according to claim 1, characterized in that: Two reinforcement holes (5) are vertically and symmetrically provided on both sides of the positioning pile seat (1), the lower ends of the two reinforcement piles (6) are movably arranged to penetrate the reinforcement holes (5), and a conical head (7) is provided on one side of the reinforcement pile (6) inserted into the soil layer.

3. The thrust positioning pile for pipe jacking construction according to claim 2, characterized in that: The reinforcing pile (6) is horizontally provided with a descending limit plate (8) at the upper end of the positioning pile seat (1), the lower end of the descending limit plate (8) is arranged in contact with the upper end of the positioning pile seat (1), and a lap groove (9) is provided at the center of the upper end of the reinforcing pile (6) at the descending limit plate (8).

4. The thrust positioning pile for pipe jacking construction according to claim 3, characterized in that: The upper end of the positioning pile seat (1) near the reinforcement hole (5) is horizontally provided with a slide rail (12), and two slide grooves (15) are horizontally symmetrically provided on both sides of the lower end of the synchronous control seat (13). The two slide grooves (15) of the synchronous control seat (13) are movably connected to one side of the two slide rails (12), and the cross-sections of the slide rails (12) and the slide grooves (15) are both T-shaped structures.

5. The thrust positioning pile for pipe jacking construction according to claim 4, characterized in that: Two pulling control cylinders (14) are horizontally and symmetrically arranged on both sides of the upper end of the positioning pile seat (1), and the two pulling control cylinders (14) are respectively connected to one side of the synchronous control seat (13).

6. The thrust positioning pile for pipe jacking construction according to claim 5, characterized in that: Two high-strength support shafts (16) are vertically symmetrically arranged at the upper end of the synchronous control seat (13), and winding disks (24) are rotatably sleeved on the two high-strength support shafts (16) through bearings, and one side of the pulling steel cable (17) is wound around the winding disk (24).

7. The thrust positioning pile for pipe jacking construction according to claim 6, characterized in that: An extension plate is horizontally provided on one side of the synchronous control seat (13) close to the winding drum (24), a locking frame (20) is vertically provided on the upper end of the extension plate, the pulling steel cable (17) is horizontally movable and passes through the locking frame (20), a clamping bolt (21) is vertically inserted at the upper end of the locking frame (20), the clamping bolt (21) is placed in the locking frame (20) and a pressure stop plate (22) is provided at the lower end through a threaded sleeve, and the lower end of the pressure stop plate (22) is pressed against the upper end of the pulling steel cable (17).

8. The thrust positioning pile for pipe jacking construction according to claim 7, characterized in that: A force-bearing roller (11) and an auxiliary guide wheel (18) are respectively vertically arranged at the lower end and the upper end of the overlapping groove (9) through a rotation axis, and a pulling steel cable (17) passes through one side of the locking frame (20) and is respectively inserted into the overlapping groove (9) and overlapped with the lower end of the force-bearing roller (11) and the upper end of the auxiliary guide wheel (18).

9. The thrust positioning pile for pipe jacking construction according to claim 8, characterized in that: A plurality of first hanging rings (19) are symmetrically arranged on both sides of the upper end of the thrust platform (2), the first hanging rings (19) are arranged corresponding to the reinforcing piles (6), and the pulling steel cable (17) passes over the upper end of the auxiliary guide wheel (18) and is obliquely connected to the first hanging ring (19) on one side.

10. The thrust positioning pile for pipe jacking construction according to claim 9, characterized in that: Two second hanging rings (23) are symmetrically arranged on one side of the positioning pile seat (1) away from the thrust platform (2), and the two second hanging rings (23) are respectively arranged corresponding to the two reinforcing piles (6). When the reinforcing piles (6) are inserted into the soil layer, the pulling steel cable (17) can be placed on the upper end of the force receiving roller (11) and connected to the second hanging ring (23).

Citation Information

Patent Citations

  • Horizontal pushing structure for large-tonnage object and follow-up reverse pushing method for blast furnace

    CN113895887A

  • Soft soil area pipe jacking reaction wall composite structure and green construction technology thereof

    CN118066372A

  • Clinical traction device

    CN219148104U

  • Soft soil foundation large-section jacking pipe pushing counter-force balancing device

    CN219796333U

  • Electric pile driver

    CN221144324U