Flexible connection structure test assembly

By using a high-temperature resistant clamping structure to fix the CMC flame barrel simulation and the metal shrapnel simulation parts in the high-temperature generation device, the problem of the difference between the test results and the actual situation in the prior art is solved, and a more accurate flexible connection structure of the aircraft engine is achieved. Mechanical performance testing, guide the optimization design.

CN118896778APending Publication Date: 2024-11-05AECC HUNAN AVIATION POWERPLANT RES INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411117148.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-14
Publication Date
2024-11-05

AI Technical Summary

Technical Problem

现有技术在测试航空发动机中的柔性连接结构时,未能有效考虑结构特征和尺寸效应,且高温条件下的力学性能测试难度大,测试结果与实际情况差异较大,难以指导优化设计。

Method used

A flexible connection structure test assembly including a high temperature resistant clamping structure is designed, and the CMC flame cylinder simulation member and the metal shrapnel simulation member are fixed by the first clamping structure and the second clamping structure respectively, and tested in the high temperature generator. , simulate the actual environment and achieve more accurate mechanical performance testing.

Benefits of technology

The test component can more accurately simulate the actual situation under high temperature conditions, obtain more accurate mechanical performance data, and provide better guidance on the optimized design of actual components.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118896778A_ABST
    Figure CN118896778A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of aero-engines, and particularly provides a flexible connection structure test assembly, which comprises a first clamping structure, a second clamping structure and a high temperature generation device, the first clamping structure and the second clamping structure are both high-temperature-resistant clamping structures and are installed in the high-temperature generating device. The first clamping structure is used for fixing the CMC flame tube simulation piece, the second clamping structure is used for fixing the metal elastic piece simulation piece, and the first clamping structure and the second clamping structure are in flexible abutting connection. The high-temperature-resistant clamping structure is used for fixing the metal elastic sheet simulation piece and the CMC flame tube simulation piece respectively, the metal elastic sheet simulation piece and the CMC flame tube simulation piece are put into the high-temperature generation device for performance testing, the actual situation is simulated, and compared with the prior art in which a standard sample is adopted for obtaining the mechanical performance of related materials and testing is conducted at normal temperature, the performance of the simulation piece is greatly improved. According to the method, the test process of the simulation part in a real environment can be simulated, a more accurate test result can be obtained, and the method has guiding significance on optimization design of actual components.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of aeroengines and specifically proposes a flexible connection structure test component. Background Art

[0002] This section is used to explain the contents related to the present invention, which are not necessarily the disclosed prior art.

[0003] In the related art, the aircraft engine converts fuel into high-temperature combustion gas through the combustion process in the combustion chamber, and transmits it to the turbine through the flame tube, thereby generating thrust. Among them, the flame tube can be made of ceramic matrix composite (CMC) to withstand high temperatures, and metal elastic parts are used to flexibly connect with other parts, so as to play a role in vibration reduction and stress release, and can provide a margin for thermal expansion for the structure. In addition, in order to ensure the airtightness of the structure at room temperature, the metal shrapnel will be pre-compressed to a certain extent.

[0004] However, the flexible connection structure composed of CMC flame tube and metal shrapnel needs to undergo repeated mechanical performance tests to verify the feasibility of the structure in aircraft engine applications, and to provide a reference for subsequent optimization. In related technologies, standard specimens are usually used to obtain the mechanical properties of related materials, without considering the influence of structural characteristics and size effects. The data obtained are quite different from the actual situation, making it difficult to guide the actual optimization design; in addition, mechanical testing methods under normal temperature conditions are more common, while mechanical performance tests under high temperature conditions are relatively rare. High temperature conditions have higher requirements for test components and are more difficult to test. Summary of the invention

[0005] The purpose of the present invention is to solve at least part of the technical problems mentioned above, and this purpose is achieved through the following technical solutions:

[0006] The present invention proposes a flexible connection structure test assembly, which includes a first clamping structure, a second clamping structure and a high temperature generating device; the first clamping structure and the second clamping structure are both high temperature resistant clamping structures, and the two are respectively installed inside the high temperature generating device; the first clamping structure is used to fix a CMC flame tube simulation part, and the second clamping structure is used to fix a metal spring simulation part, and the metal spring simulation part is flexibly abutted against the CMC flame tube simulation part.

[0007] In some embodiments, the first clamping structure includes a first base and a first clamping plate, a first clamping cavity is formed between the first base and the first clamping plate, and the first clamping cavity matches the CMC flame tube simulation; the second clamping structure includes a second base and a second clamping plate, a second clamping cavity is formed between the second base and the second clamping plate, and the second clamping cavity matches the metal spring simulation; wherein the first base and the first clamping plate and the second base and the second clamping plate are respectively locked by fasteners.

[0008] In some embodiments, the first clamping structure and the second clamping structure respectively include at least three types, and the matching types between the two constitute a clamping combination; wherein the first clamping combination is used to fix the flexible connection structure of the straight section of the flame tube, the second clamping combination is used to fix the flexible connection structure of the inner ring section of the flame tube, and the third clamping combination is used to fix the flexible connection structure of the outer ring section of the flame tube.

[0009] In some embodiments, in the first clamping combination: the first base of the first clamping structure has a protrusion and a groove, and the first clamping plate is arranged corresponding to the protrusion; the second clamping structure is arranged corresponding to the groove, and a fastener avoidance gap is formed between the two; wherein the first clamping cavity of the first clamping structure and the second clamping cavity of the second clamping structure are both planar clamping cavities.

[0010] In some embodiments, in the second clamping combination: the first clamping plate of the first clamping structure and the second clamping plate of the second clamping structure are at least partially arranged in correspondence with each other, and the first clamping plate and / or the second clamping plate are provided with fastener recesses.

[0011] In some embodiments, in the third clamping combination: the first clamping cavities of the first clamping structure are distributed along a first direction, and the second clamping cavities of the second clamping structure are distributed along a second direction; wherein the first direction intersects with the second direction.

[0012] In some embodiments, in the second clamping combination and the third clamping combination: the first clamping cavity of the first clamping structure and the second clamping cavity of the second clamping structure are both arc-surface clamping cavities.

[0013] In some embodiments, the curvature of the curved clamping cavity is R, and 10°≤R≤30°.

[0014] In some embodiments, in each clamping combination: the first base of the first clamping structure is provided with a first connecting rod, and the first connecting rod is detachably connected to the first connecting part of the high temperature generating device; the second base of the second clamping structure is provided with a second connecting rod, and the second connecting rod is detachably connected to the second connecting part of the high temperature generating device.

[0015] In some embodiments, the amount of compression generated by the metal spring simulation component being pressed by the CMC flame tube simulation component is E, and then 0.2mm≤E≤2mm.

[0016] The technical solution provided by the present invention has at least the following technical effects:

[0017] The present invention utilizes a high temperature resistant clamping structure to respectively fix a metal spring simulation component and a CMC flame tube simulation component, and flexibly connects the two, and places them inside a high temperature generating device to test their performance to simulate the actual situation. Compared with the related art of using standard specimens to obtain the mechanical properties of related materials and testing at room temperature, the present invention can better simulate the simulation component testing process under the real environment, obtain more accurate test results, and be more instructive for the optimal design of actual components. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] In order to better combine the contents shown in the drawings of the specification with the contents described in the specific implementation methods, the drawings of the specification are briefly introduced below. It can be understood that the drawings of the specification mentioned below only schematically show some embodiments of the relevant technical solutions and the technical solutions of the present invention. Without paying creative labor, those skilled in the art can also make drawings showing other embodiments.

[0019] Specifically, the annotations of the drawings in the specification are as follows:

[0020] Figure 1 It is a structural schematic diagram of the flame tube described in some embodiments of the present invention;

[0021] Figure 2 It is a structural schematic diagram of the first clamping assembly described in some embodiments of the present invention;

[0022] Figure 3 It is a structural schematic diagram of the second clamping assembly described in some embodiments of the present invention;

[0023] Figure 4 It is a structural schematic diagram of a third clamping assembly described in some embodiments of the present invention;

[0024] Figure 5 It is a schematic diagram of the structure of the fastener sink groove according to some embodiments of the present invention;

[0025] Figure 6 It is a schematic structural diagram of the arc surface clamping cavity described in some embodiments of the present invention.

[0026] Specifically, the annotations of the accompanying drawings in the specification are as follows:

[0027] 100, flame tube; 110, flame tube inner ring; 120, flame tube outer ring; A, flame tube straight section flexible connection structure; B, flame tube inner ring section flexible connection structure; C, flame tube outer ring section flexible connection structure; X1, first clamping combination; X2, second clamping combination; X3, third clamping combination; M, first clamping structure; N, second clamping structure; m1, first base; m2, first clamping plate; n1, second base; n2, second clamping plate; E, metal spring simulation part; F, CMC flame tube simulation part; T, fastener; L1, first connecting rod; L2, second connecting rod; a, raised portion; b, groove portion; c, fastener avoidance gap; d, fastener recess; e, plane clamping cavity; f, arc clamping cavity. DETAILED DESCRIPTION

[0028] In order to make the contents of the embodiments of the present invention clearer, the following description will be made in conjunction with the accompanying drawings. It can be understood that the contents mentioned below are only some embodiments of the present invention, and all embodiments are listed in detail. Therefore, without paying creative work, other embodiments obtained based on the following embodiments fall within the protection scope of the present invention.

[0029] It should be understood that the terms used herein are only for the purpose of describing specific embodiments and are not intended to strictly limit the technical solutions unless the context clearly indicates otherwise. For example, the use of "a", "an" and "the" to modify a feature does not exclude that the feature may also be plural in other embodiments.

[0030] It should be understood that the terms "include", "comprises", and "have" are open ended, indicating the presence of the stated features, but not excluding the possibility that the embodiment may have other features. Similarly, the use of the terms first, second, etc. in the text to describe multiple features only means to distinguish one feature from another, and unless the context clearly indicates otherwise, such terms do not imply an order or sequence.

[0031] It should be understood that, unless the context clearly indicates otherwise, the terms "dispose", "connect", and "install" should be understood in a broad sense, for example, they can be fixedly connected, detachably connected, or integrally connected; they can be directly connected or indirectly connected through a medium. For those skilled in the art, the specific meanings of the above terms in the text can be understood according to the specific circumstances.

[0032] In addition, for the convenience of description, the text will use terms of spatial relative relationships to illustrate the position of one feature relative to another feature, for example, "inside", "outside", "end", "side", "top", "middle", "bottom", "high", "low", "axial", "circumferential", "radial", "horizontal", "vertical", "first direction", "second direction", etc. It can be understood that the spatial relative relationship between two features should include other specific situations in addition to those shown in the drawings of the specification.

[0033] The embodiments of the present invention are described below in conjunction with the accompanying drawings.

[0034] Reference Figures 2 to 4 The present invention proposes a flexible connection structure test assembly, which includes a first clamping structure M, a second clamping structure N and a high temperature generating device; the first clamping structure M and the second clamping structure N are both high temperature resistant clamping structures, and the two are respectively installed inside the high temperature generating device; the first clamping structure M is used to fix the CMC flame tube simulation part F, and the second clamping structure N is used to fix the metal spring simulation part E, and the metal spring simulation part E is flexibly abutted against the CMC flame tube simulation part F.

[0035] The present invention utilizes a high temperature resistant clamping structure to respectively fix the metal spring simulation part E and the CMC flame tube simulation part F, and flexibly connect the two, and place them inside a high temperature generating device to test their performance to simulate the actual situation. Compared with the related art of using standard specimens to obtain the mechanical properties of related materials and testing at room temperature, the test results obtained by the present invention are more accurate and can provide guidance for the actual optimization design.

[0036] It should be noted that the above-mentioned high temperature resistant clamping structure includes but is not limited to being made of alloy and ceramic.

[0037] In some embodiments, reference Figures 2 to 4 The first clamping structure M includes a first base m1 and a first clamping plate m2, a first clamping cavity is formed between the first base m1 and the first clamping plate m2, and the first clamping cavity matches the CMC flame tube simulation part F; the second clamping structure N includes a second base n1 and a second clamping plate n2, a second clamping cavity is formed between the second base n1 and the second clamping plate n2, and the second clamping cavity matches the metal spring simulation part E; wherein, the first base m1 and the first clamping plate m2, as well as the second base n1 and the second clamping plate n2 are respectively locked by fasteners T.

[0038] In some embodiments, reference Figures 2 to 4The first clamping structure M and the second clamping structure N respectively include at least three types, and the types matched between the two constitute a clamping combination; wherein the first clamping combination X1 is used to fix the flexible connection structure A of the straight section of the flame tube, the second clamping combination X2 is used to fix the flexible connection structure B of the inner ring section of the flame tube, and the third clamping combination X3 is used to fix the flexible connection structure C of the outer ring section of the flame tube. In some embodiments, referring to Figure 2 In the first clamping assembly X1, the first base m1 of the first clamping structure M has a protrusion a and a groove b, and the first clamping plate m2 is arranged corresponding to the protrusion a; the second clamping structure N is arranged corresponding to the groove b, and a fastener avoidance gap c is formed between the two; wherein the first clamping cavity of the first clamping structure M and the second clamping cavity of the second clamping structure N are both planar clamping cavities e. In some embodiments, referring to Figure 3 and Figure 5 In the second clamping assembly X2, the first clamping plate m2 of the first clamping structure M and the second clamping plate n2 of the second clamping structure N are at least partially arranged in correspondence with each other, and the first clamping plate m2 and / or the second clamping plate n2 are provided with a fastener recess d. In some embodiments, referring to Figure 4 In the third clamping combination X3: the first clamping cavity of the first clamping structure M is distributed along the first direction, and the second clamping cavity of the second clamping structure N is distributed along the second direction; wherein the first direction intersects with the second direction.

[0039] In some embodiments, reference Figure 6 In the second clamping combination X2 and the third clamping combination X3: the first clamping cavity of the first clamping structure M and the second clamping cavity of the second clamping structure N are both arc surface clamping cavities f. In some embodiments, the arc of the arc surface clamping cavity f is R, then 10°≤R≤30°.

[0040] It should be noted that, refer to Figure 1 In practice, the flame tube 100 includes an inner flame tube ring 110 and an outer flame tube ring 120 which are nested inside and outside, and in order to ensure the fitting effect, the metal spring is also set to have a certain curvature; in the present invention, different parts of the flame tube 100 are directly intercepted or simulated to form a CMC flame tube simulation part F, and the metal spring simulation part E is also set in the same way; wherein, the flame tube straight section flexible connection structure A only needs to be fixed by the plane clamping cavity e, and in order to ensure a better fixing effect, the flame tube inner ring section flexible connection structure B and the flame tube outer ring section flexible connection structure C both need to be fixed by the arc clamping cavity f. In particular, the curvature of the selected simulation part should not be too small, otherwise it will not achieve the effect of real simulation, and it is difficult to reflect the influence of structural characteristics, size effect, etc. in the test. At the same time, it should not be too large, otherwise it will increase the manufacturing cost of the simulation part and the clamping structure, and will also increase the occupied space of the test assembly; therefore, the selected curvature should be moderate, such as 10°, 20°, 30°, etc.

[0041] In particular, the fastener T can be a combination of a fastening bolt and a nut, and holes need to be opened on the first clamping structure M and the second clamping structure N to complete the fastening fit; specifically, when manufacturing the first clamping structure M and the second clamping structure N, a processing method of first drilling the bolt through hole and then wire cutting can be adopted, which can effectively ensure that the clamping surface of the clamp is tightly fitted with the structural simulation part, and can ensure that the fastening bolt can perfectly fix the clamp.

[0042] In some embodiments, reference Figures 2 to 4 In each clamping combination: the first base m1 of the first clamping structure M is provided with a first connecting rod L1, and the first connecting rod L1 is detachably connected to the first connecting part of the high temperature generating device; the second base n1 of the second clamping structure N is provided with a second connecting rod L2, and the second connecting rod L2 is detachably connected to the second connecting part of the high temperature generating device.

[0043] The above-mentioned embodiment proposes a variety of clamping combinations, which are convenient for testing the flexible connection structure at various locations of the flame tube 100 in practice, and the various clamping combinations designed by the present invention are basically consistent with the actual structure, ensuring the accuracy of the test, and various clamping combinations are respectively designed with fastener T avoidance methods to facilitate the installation of the fastener T, while eliminating the possibility of interference between the first clamping structure M and the second clamping structure N.

[0044] In addition, the high temperature generating device can be a high temperature furnace, and the first connecting part and the second connecting part inside it can be threaded joints and are arranged in fixed positions, for example, at upper and lower positions respectively; the first connecting rod L1 and the second connecting rod L2 in each clamping combination can be threaded rods matching the threaded joints, and the two threaded rods in each clamping combination can be distributed in the upper and lower directions respectively, thereby forming a universal connection method.

[0045] Specifically, after the high-temperature furnace temperature reaches the target temperature and is kept warm for a certain period of time, the test plan is implemented, and the test process is simultaneously observed online through the digital image correlation method; in multiple tests, after the clamping assembly is installed for the first time, it does not need to be disassembled subsequently, but only the metal spring simulation part E, the CMC flame tube simulation part F and the fastener T need to be adjusted.

[0046] In some embodiments, the amount of compression generated by the metal spring simulation part E being pressed by the CMC flame tube simulation part F is E, and then 0.2mm≤E≤2mm.

[0047] It should be noted that in practice, in order to ensure the airtightness of the flexible connection structure at room temperature, the metal spring will be pre-compressed to a certain extent. Therefore, the same compression is also set for this test assembly to better simulate the actual situation, so as to obtain more accurate test results. The compression should not be too small, otherwise it will be difficult to achieve the airtight effect, and it should not be too large, otherwise it will be easy to cause elastic failure due to excessive stress when expanding at high temperature; therefore, the compression of the metal spring simulation E should be moderate, for example, 0.2mm, 0.5mm, 1mm, 1.5mm, 2mm, etc.

[0048] In addition, in order to test the service life of the flexible connection structure, the test can be repeated many times, that is, after the high-temperature test, it is cooled to room temperature and the high-temperature test is performed again to simulate the multiple repeated operations of the flame tube 100 in practice to observe whether the flexible connection structure fails and to determine whether its service life meets the requirements; among them, the number of repeated tests is more appropriate to be 1000 to 2000 times, and the flexible connection structure that passes this number is more in line with the actual use requirements.

[0049] In particular, the term "and / or" in the present invention should be understood as follows:

[0050] In the first case, the term "and / or" located between a first subject and a second subject includes any one of the following meanings: (1) only the first subject; (2) only the second subject; and (3) the first subject and the second subject.

[0051] In the second case, the term "and / or" between the last two subjects among three or more subjects means including at least any one of the multiple subjects. For example, "the first subject, the second subject and / or the third subject" has the same meaning as "the first subject and / or the second subject and / or the third subject", specifically including the following combinations: (1) only the first subject; (2) only the second subject; (3) only the third subject; (4) the first subject and the second subject but not the third subject; (5) the first subject and the third subject but not the second subject; (6) the second subject and the third subject but not the first subject; and (7) the first subject, the second subject and the third subject.

[0052] In addition, although the above content describes the embodiments of the present invention in conjunction with the accompanying drawings, those skilled in the art can also make various modifications and variations without departing from the concept of the present invention, and such modifications and variations all fall within the scope of protection of the present invention.

Claims

1. A flexible connection structure test assembly, characterized in that: It includes a first clamping structure (M), a second clamping structure (N) and a high temperature generating device; The first clamping structure (M) and the second clamping structure (N) are both high temperature resistant clamping structures, and the two are respectively installed inside the high temperature generating device; The first clamping structure (M) is used to fix the CMC flame tube simulation component (F), and the second clamping structure (N) is used to fix the metal spring simulation component (E), and the metal spring simulation component (E) is flexibly abutted against the CMC flame tube simulation component (F).

2. The flexible connection structure test assembly according to claim 1, characterized in that: The first clamping structure (M) comprises a first base (m1) and a first clamping plate (m2), a first clamping cavity is formed between the first base (m1) and the first clamping plate (m2), and the first clamping cavity matches the CMC flame tube simulation component (F); The second clamping structure (N) comprises a second base (n1) and a second clamping plate (n2), a second clamping cavity is formed between the second base (n1) and the second clamping plate (n2), and the second clamping cavity matches the metal spring simulation member (E); The first base (m1) and the first clamping plate (m2) as well as the second base (n1) and the second clamping plate (n2) are respectively locked by fasteners (T).

3. The flexible connection structure test assembly according to claim 2, characterized in that: The first clamping structure (M) and the second clamping structure (N) respectively include at least three types, and the types matched between the two constitute a clamping combination; Among them, the first clamping combination (X1) is used to fix the flexible connection structure (A) of the straight section of the flame tube, the second clamping combination (X2) is used to fix the flexible connection structure (B) of the inner ring section of the flame tube, and the third clamping combination (X3) is used to fix the flexible connection structure (C) of the outer ring section of the flame tube.

4. The flexible connection structure test assembly according to claim 3, characterized in that: In the first clamping combination (X1): The first base (m1) of the first clamping structure (M) has a protruding portion (a) and a recessed portion (b), and the first clamping plate (m2) is arranged corresponding to the protruding portion (a); The second clamping structure (N) is arranged corresponding to the groove portion (b), and a fastener avoidance gap (c) is formed between the two; Wherein, the first clamping cavity of the first clamping structure (M) and the second clamping cavity of the second clamping structure (N) are both planar clamping cavities (e).

5. The flexible connection structure test assembly according to claim 3, characterized in that: In the second clamping combination (X2): The first clamping plate (m2) of the first clamping structure (M) and the second clamping plate (n2) of the second clamping structure (N) are at least partially arranged to correspond to each other, and the first clamping plate (m2) and / or the second clamping plate (n2) are provided with a fastener recess (d).

6. The flexible connection structure test assembly according to claim 3, characterized in that: In the third clamping combination (X3): The first clamping cavities of the first clamping structure (M) are distributed along a first direction, and the second clamping cavities of the second clamping structure (N) are distributed along a second direction; The first direction intersects with the second direction.

7. The flexible connection structure test assembly according to any one of claims 3 to 6, characterized in that: In the second clamping combination (X2) and the third clamping combination (X3): The first clamping cavity of the first clamping structure (M) and the second clamping cavity of the second clamping structure (N) are both arc-surface clamping cavities (f).

8. The flexible connection structure test assembly according to claim 7, characterized in that: The curvature of the arc surface clamping cavity (f) is R, then 10°≤R≤30°.

9. The flexible connection structure test assembly according to any one of claims 3 to 6, characterized in that: In each of the clamping combinations: The first base (m1) of the first clamping structure (M) is provided with a first connecting rod (L1), and the first connecting rod (L1) is detachably connected to the first connecting portion of the high temperature generating device; The second base (n1) of the second clamping structure (N) is provided with a second connecting rod (L2), and the second connecting rod (L2) is detachably connected to the second connecting part of the high temperature generating device.

10. The flexible connection structure test assembly according to any one of claims 1 to 6, characterized in that: The amount of compression of the metal spring simulation part (E) caused by the pressure of the CMC flame tube simulation part (F) is E, then 0.2mm≤E≤2mm.