Test device for inverting hydraulic parameters of tunnel based on multi-source hydrogeological data
By designing a multi-source hydrogeological data inversion test device, the problem of obtaining the impact of changes in groundwater temperature and solute concentration in tunnel construction was solved, and an experiment to simulate the hydraulic parameters of the tunnel indoors was realized, detailed data was provided, and data was improved. Reliability and representation reduce investigation costs.
Patent Information
- Application Number
- CN202410902141.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-05
- Publication Date
- 2024-11-05
AI Technical Summary
In tunnel construction, it is difficult for the prior art to effectively obtain the impact of changes in groundwater temperature and solute concentration on the tunnel seepage field, resulting in defects in the method of predicting water pressure and water inrush, and the field investigation is high and the data is not representative.
A test device based on multi-source hydrogeological data inversion was designed, including a data acquisition module, a model box module and a tunnel module. By simulating the physics around the tunnel, the probe and data collector were used to measure the volume moisture content, temperature and conductance. The experimental simulation of multi-field, multi-source heterogeneous seepage model is achieved.
The device can complete the integrated chromatography of multiple fields of multi-source hydrogeological information indoors, provide detailed experimental data, simulate tunnel hydraulic parameters in various situations, improve the reliability and representativeness of the data, and reduce investigation costs.
Smart Images

Figure CN118897067A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of tunnel testing, and more particularly to a testing device for inverting tunnel hydraulic parameters based on multi-source hydrogeological data. Background Art
[0002] At present, my country is the country with the largest scale, the largest number, and the most complex geological conditions for tunnel and underground engineering construction in the world. Tunnel construction is gradually developing towards the trend of "long tunnel line, deep burial, high stress, strong karst, high water pressure, and complex structure". Water and mud inrush disasters are becoming more and more serious, causing serious casualties and property losses. To predict water inrush during tunnel excavation, it is necessary to systematically extract parameter information such as groundwater level, water temperature, water volume, pressure, flow velocity, flow direction, permeability, resistivity, and hydrochemical indicators in the tunnel water inrush section. It is difficult to obtain hydrogeological parameters for tunnels in complex and dangerous mountainous areas, and detailed regional hydrogeological information is often not available. The key to solving this problem is to be able to invert the remaining parameters through the available parameters.
[0003] At present, there have been many studies on the impact of changes in conditions such as hydraulic gradient and joint characteristics on the tunnel seepage field, but there are few studies on the relationship between groundwater temperature and solute and the tunnel surrounding rock seepage field. In actual engineering, on the one hand, in addition to the above-mentioned influencing factors, changes in groundwater temperature and solute concentration will also cause changes in the tunnel seepage field. At this time, if the relevant results that only consider seepage conditions are used to predict the water pressure and water inflow of the tunnel, it is obviously flawed; on the other hand, regional hydrogeological information is obtained only through field pumping tests and water injection tests, and the results are not supported by other methods.
[0004] However, in the actual engineering implementation process, it is very expensive to obtain the temperature, solute concentration and seepage information of the study area points in real time. In addition, in the field investigation process, there are often shortcomings such as it is difficult to obtain ideal point data, the obtained data is not representative, and the repeatability is poor. It is rather difficult to use this data to study the integrated tomography method of multi-field and multi-source hydrogeological information in typical tunnel sections. Summary of the invention
[0005] The purpose of the present invention is to provide a test device for inverting tunnel hydraulic parameters based on multi-source hydrogeological data, in order to solve the technical problems in the background technology.
[0006] In order to achieve the above object, the present invention adopts the following technical solutions:
[0007] The test device for inverting tunnel hydraulic parameters based on multi-source hydrogeological data includes: a data acquisition module, a model box module, and a tunnel module; the model box module includes a sand box and a control boundary box; a base-raising sand box is provided at the bottom of the box, and a surrounding rock medium and a tunnel model are provided inside the sand box to simulate the physical field test of the area around the tunnel;
[0008] The tunnel module consists of a punched stainless steel outer tube with a solid cylinder mounted on a threaded shaft. The head of the tunnel is tangent to the main surface of the sand box, and a water pipe is extended to set a valve to simulate the tunnel drainage device. The tail of the tunnel is tangent to the rear surface of the sand box, and a rotatable handle is extended from the shaft. The length of the cylinder entering the sand box is adjusted by rotating the handle, simulating the tunnel drilling process.
[0009] In some embodiments, a constant water head module is also included, which is located on both sides of the model box and includes a lifting device and an overflow box device; the upper and lower ends of the lifting device are fixed to the model box by bonding plexiglass plates, and the plexiglass plate is punched with holes to fix a rotating shaft with a threaded surface, a handle is set on the upper part, and the overflow box device is fixed in the middle area, and the overflow box position can be raised or lowered by rotating the handle.
[0010] In some embodiments, the overflow box device is an open plexiglass box with a plexiglass plate fixed in the middle that is lower than the surrounding plexiglass plates, forming two areas. Two holes are punched at the bottom of one side, one hole is connected to the drainage area through a water-transmitting rubber tube, and the other hole is connected to the water supply device; a hole is punched at the bottom of the other side and connected to the lower part of the control boundary box to achieve a constant water head through overflow.
[0011] In some embodiments, a water supply module is also included, and the water supply module includes a water supply bucket and a water pump, and the water pump is used to pump water in the water supply bucket to the fixed water head module.
[0012] In some embodiments, a data acquisition module is also included, and the data acquisition module includes a probe and a corresponding data collector.
[0013] In some embodiments, the probes include but are not limited to CS655 probes for measuring volumetric water content, temperature and conductivity, non-polarizable electrodes for measuring natural potential, ERT probes for resistivity tomography, and probes or pressure measuring tubes for determining the water head at a target location; data collectors include but are not limited to CR1000X, ERT data collectors, and computers for exporting data.
[0014] Compared with the prior art, the present invention has the following beneficial effects:
[0015] The present invention provides a test device for inverting tunnel hydraulic parameters based on multi-source hydrogeological data, which can be used to develop a multi-field multi-source heterogeneous seepage model device for hydrogeological information integrated tomography indoors to complete experimental simulations and data collection for various situations. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1-2 All of them are schematic diagrams of the experimental device for inverting tunnel hydraulic parameters based on multi-source hydrogeological data according to the embodiments of the present application. DETAILED DESCRIPTION
[0017] In order to make the purpose, technical solutions and advantages of the present application clearer, the technical solutions in the embodiments of the present application will be described in more detail below in conjunction with the drawings in the preferred embodiments of the present application. In the drawings, the same or similar reference numerals throughout represent the same or similar parts or parts with the same or similar functions. The described embodiments are part of the embodiments of the present application, not all of the embodiments. The embodiments described below with reference to the drawings are exemplary and are intended to be used to explain the present application, and should not be construed as limitations on the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present application.
[0018] The embodiments of the present application are described in detail below with reference to the accompanying drawings.
[0019] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, or it can be an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0020] In the description of the present application, it should be understood that the terms "upper", "lower", "front", "back", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating orientations or positional relationships, are orientations or positional relationships based on the drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0021] In addition, the terms "comprises," "comprising," and "having," and any variations thereof, are intended to cover a non-exclusive inclusion, for example, a process, method, system, product, or display that includes a series of steps or elements is not necessarily limited to those steps or elements explicitly listed but may include other steps or elements not explicitly listed or inherent to such process, method, product, or display.
[0022] The following will be combined Figure 1-2 , the experimental device for inverting tunnel hydraulic parameters based on multi-source hydrogeological data involved in the embodiment of the present application is described in detail. It is worth noting that the following embodiments are only used to explain the present application and do not constitute a limitation on the present application.
[0023] Embodiment 1:
[0024] like Figure 1As shown, the test device includes a data acquisition module 1, a model box module 2, a constant water head module 3, a water supply module, and a tunnel module.
[0025] The model box module includes a sand box and a control boundary box. The lower part of the box is equipped with a base to raise the sand box, which is convenient for measuring the water inflow. The sand box can be used as a medium for surrounding rock and a tunnel model to simulate the physical field test of the area around the tunnel.
[0026] Some perforated partitions can also be fixed to simulate heterogeneous formations by filling media with different properties; the control boundary box and the sand box are separated by perforated partitions to control the boundary conditions of the sand box in the test.
[0027] The tunnel module consists of a punched stainless steel outer tube with a solid cylinder mounted on a threaded shaft. The head of the tunnel is tangent to the main surface of the sand box, and a water pipe is extended to set a valve to simulate the tunnel drainage device. The tail of the tunnel is tangent to the rear surface of the sand box, and a rotatable handle is extended from the shaft. By turning the handle, the length of the cylinder entering the sand box can be changed, simulating the tunnel drilling process.
[0028] The constant water head module is located on both sides of the model box, including a lifting device and an overflow box device. The upper and lower ends of the lifting device are fixed to the model box by gluing plexiglass plates. A rotatable shaft with a threaded surface is fixed on the plexiglass plate with holes. A handle is set on the upper part, and the overflow box device is fixed in the middle area. The overflow box position can be raised or lowered by turning the handle; the overflow box device is a plexiglass box with an upper opening, and a plexiglass plate with a height lower than the surrounding plexiglass plates is fixed in the middle to form two areas. Two holes are punched at the bottom of one side, one hole is connected to the drainage place through a water conveying rubber pipe, and the other hole is connected to the water supply device. A hole is punched at the bottom of the other side to connect to the lower part of the control boundary box, and the constant water head is achieved through overflow.
[0029] The water supply module includes a supply source, a water supply barrel 5 and a water pump 4. The supply source can be a solution of various properties according to the purpose of the experiment; if the supply source is a solution different from room temperature, an aluminum foil insulation film needs to be pasted on the inner wall of the water supply barrel; the water pump can be, but is not limited to, a rated power of 100w, a maximum head of 4m, and a maximum flow of 3500L / h.
[0030] In this embodiment, the water supply tank adopts a water storage tank, and the water storage tank part includes a No. 1 water supply tank, a No. 2 water collection tank, a No. 3 buffer tank, and two solid partitions with holes. The No. 1 water supply tank includes two pumps, a heating device, and a refrigeration device. The pump is connected to the overflow tank in the fixed water head device through a water pipe, and an aluminum foil insulation film is pasted on the inner wall of the water supply tank; the No. 2 water collection tank is connected to the overflow tank in the fixed water head device at both ends and the drain port at the front end of the tunnel model through a water pipe, and is separated from the No. 3 buffer tank and the No. 1 water supply tank by a solid partition, and the built-in pump is connected to the No. 3 buffer tank through a water pipe with a valve; the No. 3 buffer tank includes a heating device and a refrigeration device, and an aluminum foil insulation film is pasted on the inner wall, and is separated from the No. 1 and No. 2 tanks by a solid partition, and the built-in pump is connected to the No. 1 water supply tank through a water pipe with a valve.
[0031] The data acquisition module includes various probes and corresponding data acquisition devices that meet the test purpose. Probes include but are not limited to CS655 probes for measuring volumetric water content, temperature and conductivity, non-polarizable electrodes for measuring spontaneous potential, ERT probes for resistivity tomography, and probes or pressure measuring tubes for measuring the water head at the target position; data acquisition devices include but are not limited to CR1000X, ERT data acquisition devices, and computers for exporting data.
[0032] The non-polarizable electrode used in this experiment is an electrode made of metal-metal salt electrode material. Due to the stability of the electrolyte, the potential of the metal in contact with the electrolyte can remain stable for a long time. The equipment system used to detect the potential in the experiment is Campbell Scientific's flagship data acquisition instrument CR1000X. This equipment needs to be used with a control computer to collect data. The CR1000X is connected to the electrode with two conductive wires. Set the CR1000X to read the potential difference between the two ends of the PVC pipe once a second.
[0033] CS655 (temperature and conductivity probe):
[0034] It can be used to monitor soil volumetric moisture content, volumetric conductivity and temperature. They will output an SDI-12 signal, which can be measured by most data loggers. The device needs to be used with a control computer to collect data. CR1000X and the probe are connected with five conductive wires. Set CR1000X to read the probe data every 12 seconds.
[0035] Electrical Resistivity Tomography (ERT):
[0036] Resistivity tomography is a real-time, fast and efficient in-situ monitoring method. It can analyze and study the changes in the physical field of the study area after the properties of the groundwater recharge solution change through resistivity profiles at different periods. This experiment uses a dipole-dipole device with a pole distance of 5 cm, and sets 4 measuring lines with a spacing of 20 cm between each measuring line.
[0037] Water pressure probe:
[0038] The data information acquisition system for this test is composed of HC-25 micro pore water pressure sensor and HCSC-32 pressure acquisition system. The pore water pressure changes of each layer of the internal soil are monitored through the highly sensitive pore water pressure sensor. At the same time, the data collected by the sensor is transmitted to the computer professional software for processing through the data acquisition system to achieve real-time monitoring of groundwater. (If this is not possible, you can also use a pressure measuring tube, using a nylon tube to extend from the hole in the side wall to the test position)
[0039] The dimensions of the simulated sand box are length × width × height = 200cm × 45cm × 55cm, the tunnel section radius is 4cm, and the longitudinal length of the tunnel is 45cm. To simulate heterogeneous strata, the surrounding rock area is simulated with quartz sand with a larger permeability coefficient. The cracks are filled with quartz sand with a much smaller permeability coefficient than the surrounding rock medium at a position 6.5cm away from the rear view surface of the sand box as shown in the figure, and the direction cuts through the sand box area. The cracks are separated from the surrounding rock by a pre-fixed perforated partition, and the outer walls of all perforated partitions are pasted with nylon screens with a specification of 200 mesh.
[0040] The three-view diagram of the probe layout position includes but is not limited to the following figure. After the electrode layout is completed, the physical field change law of the area near the tunnel under different working conditions can be studied by changing the initial test conditions. The changeable initial test conditions include but are not limited to the initial hydraulic gradient of the area, tunnel drainage rate, surrounding rock permeability coefficient, fracture permeability coefficient, fracture width, single-sided or double-sided constant head recharge boundary, and solution recharge source with different properties from the solution in the sand box.
[0041] The surrounding rock medium near the tunnel was simulated by quartz sand. The fracture medium and surrounding rock medium were distinguished by different permeability coefficients. The fracture medium was simulated by coarse sand, with a reference permeability coefficient of 1×10 -3 ~1×10 -4 m / s; the surrounding rock medium is simulated by fine sand, and the reference permeability coefficient is 1×10 -6 ~1×10 -8 The quartz sand used for the test was first sieved, and then the ratio of sands with different particle sizes was fixed to ensure the homogeneity of the medium. The ratio required for the test was determined and stirred by a mixer for subsequent use.
[0042] The sand box can simulate the heterogeneity of the entire box by setting partitions. Here, a strip of cracks with an inclination angle tangent to the longitudinal section of the crack is used as an example.
[0043] Preparation work before sand filling: (1) Glue plexiglass strips at the preset position of the fracture zone to leave a groove at the preset position of the partition used as the fracture zone boundary; (2) The partition used as the fracture zone boundary can be made of but not limited to PP material, with full plate punching, 3 holes and 2 spacing, and the length is the internal length of the sand box; (3) To facilitate sand filling, cut the punched partition to a height of about 25 cm, and stick a nylon screen on the surface of the punched partition to prevent sand leakage during the sand filling process.
[0044] In order to reduce the difficulty of operation, we considered layered sand filling this time. In order to ensure that the permeability coefficient of the surrounding rock is not affected by bubbles, the principle of "adding water first and then filling sand" is adopted during the sand filling process. First, insert the perforated partition of the first layer into the groove, and arrange the probe of the first layer to the corresponding position according to the figure (probe schematic diagram). First, add 5 cm of water, and then fill 3 cm of sand. Different areas are filled with sand with different permeability coefficients. After filling the first layer, install the perforated partition layer by layer and fill with sand according to the same idea until the entire sand box is filled.
[0045] The required initial conditions are set by the constant water head device and the tunnel device, including but not limited to single-sided or double-sided constant water head water supply, setting the initial hydraulic gradient, setting the tunnel water inlet length by rotating the handle at the end of the tunnel model, including but not limited to simulating tunnel excavation to expose the fracture section. After setting the initial conditions, the test begins. Here, the test example of simulating low temperature, 1g / L NaCl solution supplying a saturated pure water sand box and full tunnel drainage is used to illustrate, but this device can simulate more test conditions, including but not limited to setting a saturated solution with different properties from pure water in the sand box as a liquid medium, etc., which is convenient for studying the hydrogeological information integrated tomography problem.
[0046] (1) Keep all valves closed and prepare the 10°C low-temperature, 1g / L NaCl solution to be studied in advance in the No. 1 water supply tank and No. 3 buffer tank as the water source for the sand box;
[0047] (2) Before the test, the hydrogeological information data of the initial state of the sand box were measured, including the natural potential method data of the observation surface, the resistivity data used for tomography, the initial conductivity and temperature data, and the initial water head data. The ERT probe was closed after measuring the resistivity data, and the rest remained open throughout the test;
[0048] (3) Open the tunnel drainage valve and the valve on the water pipe connecting the water pump and the overflow tank at the same time to start the test;
[0049] (4) The temperature conduction process and the solute migration process are generally long, so the water source in the No. 1 water supply tank is not enough to supply the sand box throughout the process. When the solution in the No. 1 water supply tank is one-half, open the pump valve in the No. 3 buffer tank, and the No. 3 buffer tank begins to supply the No. 1 water supply tank. When the supply reaches three-quarters, close the pump valve in the No. 3 tank, open the pump valve in the No. 2 water collection tank, and supply water to the No. 3 tank. After the supply is completed, close the pump valve in the No. 2 tank, configure the solution in the No. 3 buffer tank to meet the test conditions through auxiliary means including but not limited to conductivity meters, and then open the pump valve in the No. 3 buffer tank to supply water to the No. 1 tank again, and complete the entire test in this cycle;
[0050] (5) When the conductivity data and temperature data in the sand box are stable, turn on the ERT related equipment again, measure the ERT resistivity data, and the test is completed.
[0051] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. Experimental device for inverting tunnel hydraulic parameters based on multi-source hydrogeological data, It is characterized in that include: Data acquisition module, model box module, tunnel module; the model box module includes a sand box and a control boundary box; a base-raising sand box is provided at the bottom of the box, and surrounding rock media and tunnel models are provided inside the sand box to simulate the physical field test of the area around the tunnel; The tunnel module consists of a punched stainless steel outer tube with a solid cylinder mounted on a threaded shaft. The head of the tunnel is tangent to the main surface of the sand box, and a water pipe is extended to set a valve to simulate the tunnel drainage device. The tail of the tunnel is tangent to the rear surface of the sand box, and a rotatable handle is extended from the shaft. The length of the cylinder entering the sand box is adjusted by rotating the handle, simulating the tunnel drilling process.
2. The test device for inverting tunnel hydraulic parameters based on multi-source hydrogeological data according to claim 1, It is characterized in that It also includes a constant water head module, which is located on both sides of the model box and includes a lifting device and an overflow box device; the upper and lower ends of the lifting device are fixed to the model box by bonding organic glass plates, and the organic glass plate is punched with holes to fix a rotating shaft with a threaded surface, a handle is set on the upper part, and the overflow box device is fixed in the middle area, and the overflow box position can be raised or lowered by rotating the handle.
3. The test device for inverting tunnel hydraulic parameters based on multi-source hydrogeological data according to claim 1, It is characterized in that The overflow box device is an open plexiglass box with a plexiglass plate fixed in the middle with a height lower than the surrounding plexiglass plates, forming two areas. Two holes are punched at the bottom of one side, one hole is connected to the drainage place through a water supply rubber pipe, and the other hole is connected to the water supply device; a hole is punched at the bottom of the other side and connected to the lower part of the control boundary box to achieve a constant water head through overflow.
4. The test device for inverting tunnel hydraulic parameters based on multi-source hydrogeological data according to claim 1, It is characterized in that It also includes a water supply module, which includes a water supply bucket and a water pump. The water pump is used to pump water in the water supply bucket to the fixed water head module.
5. The test device for inverting tunnel hydraulic parameters based on multi-source hydrogeological data according to claim 1, It is characterized in that It also includes a data acquisition module, which includes a probe and a corresponding data collector.
6. The test device for inverting tunnel hydraulic parameters based on multi-source hydrogeological data according to claim 5, It is characterized in that The probes include but are not limited to CS655 probes for measuring volumetric water content, temperature and conductivity, non-polarizable electrodes for measuring natural potential, ERT probes for resistivity tomography and probes or pressure measuring tubes for measuring the water head at the target location; data loggers include but are not limited to CR1000X, ERT data loggers and computers for exporting data.
Citation Information
Patent Citations
Test device for determining non-saturated soil osmotic parameter
CN102680374A
Flow-splitting water-distributing device of constant head
CN106351170A
Darcy-like experimental device and using method
CN110702573A
Model test device for ground collapse caused by pipeline leakage
CN112578101A
Tunnel engineering water-rich disaster-caused structure hydrogeological parameter inversion test system and method
CN114019137A