Rectifier harmonic suppression model predictive control method and device based on current variance
Through a multi-stage control method based on current variance, the problem of harmonic pollution of high-power rectifiers is solved, the suppression of harmonics on the rectifier grid side and the stability of the grid current is achieved, and the switching frequency and calculation complexity of the system are reduced.
Patent Information
- Application Number
- CN202410946157.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-15
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2044-07-15
AI Technical Summary
Harmonic pollution of high-power rectifiers interferes with the stability of the power grid and the connected equipment, especially when the load changes, which may cause the equipment to fail to operate normally or reduce efficiency.
The prediction control method of rectifier harmonic suppression model based on current variance is adopted, and multi-level control is performed by setting priority order, including high-priority switch status preselecting, medium-priority mid-point voltage control and low-priority current tracking control to regulate the current Satisfied interval to suppress the harmonics on the rectifier network.
It effectively reduces the switching frequency of the rectifier, reduces harmonic pollution, improves the tracking ability of the grid current and the balance of voltage, realizes the equalization control of the midpoint voltage, and reduces the computational complexity and calculation amount.
Smart Images

Figure CN118900022A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of rectifier control, and in particular to a rectifier harmonic suppression model predictive control method and device based on current variance. Background Art
[0002] PWM rectifiers are directly connected to the power grid, so their harmonic content is a key performance indicator. Generally, the total harmonic distortion (THD) is required to be less than 5% to ensure the stability and power supply quality of the power grid. However, for high-power rectifiers, due to their low switching frequency, the problem of grid harmonic pollution is particularly prominent. This harmonic pollution not only affects the overall operation of the power grid, but may also cause interference to other devices connected to the same power grid. In severe cases, harmonic pollution may even cause these devices to fail to operate normally, malfunction, reduce efficiency or damage.
[0003] In addition, the rectifier harmonics vary with the load size. When the load is large, the rectifier harmonics decrease, and when the load is small, the rectifier harmonics increase. For high-power inverters, even with small loads, the impact of its harmonics is still very serious. In severe cases, it may even cause the auxiliary power supply system to fail to work normally due to large harmonics. Summary of the invention
[0004] In order to solve the above problems, the purpose of the embodiments of the present invention is to provide a rectifier harmonic suppression model predictive control method and device based on current variance. The present invention achieves indirect control of current harmonics by controlling current variance. Under the premise of taking into account the low harmonic content requirements of the rectifier, the switching frequency of the system is reduced.
[0005] In a first aspect, an embodiment of the present application provides a rectifier harmonic suppression model predictive control method based on current variance, wherein the control priority of the control target is divided into three levels according to the constraint conditions of the control target;
[0006] The three levels include: high priority, the control target constrains the switch state of the system output to ensure that the output voltage jump is less than half of the DC side voltage; medium priority, the control target is the DC side capacitor voltage balance; low priority, the control target is grid current tracking, and the current satisfaction interval of low priority is adjusted through the relationship between current variance and current total harmonic distortion rate and load current;
[0007] Multi-level control is performed by setting a priority order to achieve suppression of harmonics on the grid side of the rectifier; the specific process of performing multi-level control by setting a priority order includes:
[0008] The switch state is pre-selected by the high priority to obtain a pre-selected switch state set;
[0009] The obtained pre-selected switch state set is subjected to midpoint potential control through medium priority to obtain a candidate switch state set, and the value of the flag bit UN that the midpoint voltage is in a satisfactory interval is set;
[0010] The obtained candidate switch state set is subjected to current tracking control with low priority, and the optimal switch state is directly selected from the candidate switch state set through the cost function according to the value of the flag bit UN, or the optimal switch state is selected by adjusting the width of the satisfactory interval of the current through the current variance.
[0011] In one implementation, the switch state preselection is performed by a switch state selection logic, and the switch state selection logic includes that a line voltage jump and a phase voltage jump must not be a DC voltage value.
[0012] In one implementation, the midpoint voltage is controlled by the medium priority, a candidate switch state set is obtained, and the value of the flag bit UN indicating that the midpoint voltage is in a satisfactory range is set, including:
[0013] Collect the upper and lower DC voltages and calculate the midpoint voltage; the DC voltage is the capacitor voltage on the DC side of the three-level rectifier;
[0014] Set the satisfactory range of midpoint voltage according to the DC side voltage;
[0015] According to the relationship between the midpoint voltage and the satisfactory range of the midpoint voltage, the pre-selected switch state set is screened to obtain the candidate switch state set, and the value of the flag bit UN that the midpoint voltage is in the satisfactory range is set.
[0016] In one implementation, the method of screening the preselected switch state set to obtain the candidate switch state set according to the relationship between the midpoint voltage and the midpoint voltage satisfactory interval, and setting the value of the flag bit UN indicating that the midpoint voltage is in the satisfactory interval, includes:
[0017] The fluctuation of the midpoint voltage is divided into three cases, and the pre-selected switch state set is narrowed down according to the following three cases respectively;
[0018] Case 1: Midpoint voltage u o When it exceeds the satisfaction interval, that is, u o >δu o At this time, the small vector in the pre-selected switch state set that causes the midpoint voltage to drop is selected as the candidate switch state set 1, and the flag bit UN=1 that the midpoint voltage is in the satisfactory range is set;
[0019] Case 2, when the midpoint voltage is ±δu o interval, i.e. -δu o ≤u o ≤δu o, at this time, the midpoint voltage is in the satisfactory interval, and the pre-selected switch state set is not processed, and the pre-selected switch state set is directly used as the candidate switch state set 2, and the flag bit UN of the midpoint voltage being in the satisfactory interval is set to 0;
[0020] Case 3: When the midpoint voltage exceeds the lower limit of the satisfactory range, that is, u o <-δu o ,At this time, the small vector that makes the midpoint voltage rise in the pre-selected switch state set is selected as the candidate switch state set 3, and the flag UN=1 that the midpoint voltage is in the satisfactory range is set.
[0021] In one embodiment, the obtained candidate switch state set is subjected to current tracking control by a low priority, and the optimal switch state is directly selected from the candidate switch state set through a cost function according to the value of the flag bit UN, or the optimal switch state is selected by adjusting the width of the satisfactory interval of the current through the current variance, including:
[0022] If the value of UN is 1, the optimal on state is directly selected from the candidate switch state set 1 and the candidate switch state set 3 through the cost function; if the value of UN is 0, the incoming line voltage and current are collected to calculate the predicted values of the active current and reactive current of the rectifier;
[0023] According to the predicted values of the active current and reactive current of the rectifier, the variance of the active current and the reactive current is calculated;
[0024] The current variance is defined as the average value of reactive current and active current;
[0025] According to the current variance-load-harmonic curve, the current satisfaction interval is adjusted by the current variance average value;
[0026] According to the current satisfaction interval, it is determined whether the predicted values of active and reactive currents are in the current satisfaction interval; if they are in the satisfaction interval, the switch state at the previous moment is continued to be used; otherwise, the optimal switch state is selected from the candidate switch state set 2 through the cost function.
[0027] In one implementation, the calculation of the predicted values of the active current and reactive current of the rectifier is:
[0028]
[0029] The rate of change of current is calculated by the above formula, and the predicted value of current is calculated by the following formula:
[0030]
[0031] The variance of active current and reactive current is calculated as:
[0032]
[0033] Among them, i d (kn),i q (kn) are the calculated values of reactive current and active current at the time (kn), are the current reference values of the d-axis and q-axis respectively, N is the total number of statistical current sampling values, which is an integer multiple of the cycle; N is the total number of statistical current sampling values, which is an integer multiple of the grid voltage cycle; k is the sampling time, and n is the statistical number of times;
[0034] The variance of the grid current is defined as the average of the reactive current and the active current:
[0035]
[0036] In one implementation, the current satisfaction interval is adjusted by the current variance average value as follows:
[0037]
[0038] in, is the current variance reference value, ρ is the satisfaction interval adjustment coefficient, δ i (k), δ i (k+1) are the current satisfaction interval values at time k and k+1 respectively.
[0039] In one embodiment, the cost function is:
[0040]
[0041] Among them, i d * ,i q * is the given value of active current and reactive current, i d (k+1), i q (k+1) is the predicted value of active current and reactive current.
[0042] In one implementation, a method for determining whether the active current is within a satisfactory range is as follows:
[0043] Case 1: The predicted value of active current at time k+1 exceeds the upper limit of the satisfactory interval;
[0044] Case 2: The predicted value of active current at time k+1 is within the satisfactory range;
[0045] Case 3: The predicted value of active current at time k+1 exceeds the lower limit of the satisfactory interval;
[0046] In the above formula, i d(k+1) is the predicted value of active current, is the given value of active current, δ i (k+1) is the satisfactory interval of current;
[0047] Method to determine whether the reactive current is within a satisfactory range:
[0048] Case 1: The predicted value of reactive current at time k+1 exceeds the upper limit of the satisfactory interval;
[0049] Case 2: The predicted value of reactive current at time k+1 is within the satisfactory range;
[0050] Case 3: The predicted value of reactive current at time k+1 exceeds the lower limit of the satisfactory interval.
[0051] In the above formula, i q (k+1) is the predicted value of reactive current, is the given value of reactive current.
[0052] In one embodiment, the current variance-load-harmonic curve acquisition process includes:
[0053] Run the rectifier and adjust the current satisfaction range under different loads so that the output harmonics of the rectifier are the expected values;
[0054] When the output current harmonic is the expected value, the current variance average value is calculated and recorded to obtain a set of current variance-load-harmonic data of the current variance and current harmonics related to the load size;
[0055] The current variance-load-harmonic data are curve-fitted to obtain the variance curve of the same current harmonic content under different loads.
[0056] In a second aspect, an embodiment of the present application provides a rectifier harmonic suppression model predictive control based on current variance, the device comprising:
[0057] A high priority module is used to preselect the switch state and obtain a preselected switch state set;
[0058] The medium priority module is used to perform midpoint potential control on the obtained pre-selected switch state set through the medium priority, obtain the candidate switch state set, and set the value of the flag bit UN that the midpoint voltage is in the satisfactory interval;
[0059] The low priority module is used to perform current tracking control on the obtained candidate switch state set by low priority, and directly select the optimal switch state from the candidate switch state set through the cost function according to the value of the flag bit UN or select the optimal switch state by adjusting the current satisfaction interval width through the current variance.
[0060] In a third aspect, an embodiment of the present application provides a computer-readable storage medium having computer program instructions stored thereon, which, when executed by a processor, implement the above-mentioned current variance-based rectifier harmonic suppression model predictive control method.
[0061] Compared with the prior art, the present invention has the following advantages:
[0062] The present invention measures the relationship between load current and current variance under different current harmonics through offline experiments, and obtains the functional relationship between the two by curve fitting, thereby avoiding the harmonic calculation link and reducing the amount of calculation. The present invention can achieve equivalent control of current harmonics with a small amount of calculation. In addition, hierarchical control is used in model predictive control to reduce the computational complexity, avoid the design of weight coefficients, and achieve balanced control of the midpoint voltage. The present invention sets a satisfactory interval to limit the control target within a certain fluctuation range, so that the control strategy obtains a higher degree of control freedom and achieves the global optimal control effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0063] The accompanying drawings are part of the present invention and are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention, but do not constitute an improper limitation of the present invention. Obviously, the accompanying drawings described below are only some embodiments. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without creative work.
[0064] Figure 1 A flowchart of a specific process of performing multi-level control by setting a priority order in a rectifier harmonic suppression model predictive control method based on current variance provided by an embodiment of the present invention;
[0065] Figure 2 A switch state preselection logic diagram provided by an embodiment of the present invention;
[0066] Figure 3 It is the topological structure diagram of NPC three-level rectifier;
[0067] Figure 4 A schematic diagram of a satisfactory range of midpoint voltage provided by an embodiment of the present invention;
[0068] Figure 5 A fitting curve diagram of current variance-load-harmonic provided in an embodiment of the present invention;
[0069] Figure 6 A schematic diagram of a current satisfaction interval provided by an embodiment of the present invention.
[0070] It should be noted that these drawings and textual descriptions are not intended to limit the conceptual scope of the present invention in any way, but are intended to illustrate the concept of the present invention for those skilled in the art by referring to specific embodiments. DETAILED DESCRIPTION
[0071] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. The following embodiments are used to illustrate the present invention but are not used to limit the scope of the present invention.
[0072] In high-power applications, under the premise of meeting the system grid connection requirements, the system switching frequency can be effectively reduced by appropriately reducing the control effect of the grid current and the DC side capacitor voltage. The present invention proposes a satisfactory model predictive control based on current variance. Variance is a measure used in statistics to measure the degree of deviation between each data point in a data set and its mean. In this method, variance is used to quantify the deviation between the actual current waveform and the ideal current waveform, thereby indirectly evaluating the magnitude of the harmonic content.
[0073] The disclosed embodiment provides a rectifier harmonic suppression model predictive control method based on current variance. The control method divides the control priority of the control target into three levels according to the constraint conditions of the control target. The three levels include high priority, medium priority and low priority. Among them, in high priority, the control target is to constrain the switching state of the system output to ensure that the output voltage jump is less than half of the DC side voltage. In medium priority, the control target is the DC side capacitor voltage balance. In low priority, the control target is grid current tracking, and through the relationship between current variance and current total harmonic distortion rate and load current, the current satisfaction interval of low priority is adjusted to achieve the suppression of rectifier grid-side harmonics. Multi-level control is performed by setting the priority order to achieve the suppression of rectifier grid-side harmonics. As Figure 1 As shown, the specific process of performing multi-level control by setting the priority order includes the following steps:
[0074] Step S100: preselecting switch states based on high priority to obtain a preselected switch state set.
[0075] For NPC rectifiers, direct switching of the bridge arm state between "1" and "-1" is prohibited, which may cause damage to semiconductor devices. The line voltage change is limited to u dc / 2 to reduce the impact on the power grid. Therefore, not all voltage vectors can be used as pre-selected voltage vectors.
[0076] Furthermore, the switch state preselection is performed by a switch state selection logic, and the switch state selection logic includes that the line voltage jump and the phase voltage jump must not be a DC voltage value.
[0077] Specifically, in high priority, use Figure 2 The switch state selection logic shown in the figure performs preselection of the switch state. For example, switch state 16, its selectable switch states include V4, V5, V6, V7, V16, V22, V23. And the switch states V4, V5, V6, V7, V16, V22, V23 are used as the preselected switch state set and enter the medium priority.
[0078] Step S200: performing midpoint potential control on the obtained preselected switch state set through medium priority, and setting the value of the flag bit UN indicating that the midpoint voltage is in a satisfactory interval.
[0079] In an embodiment of the present application, the midpoint potential is controlled by the medium priority for the obtained pre-selected switch state set, a candidate switch state set is obtained, and the value of the flag bit UN in which the midpoint voltage is in a satisfactory interval is set, including the following steps:
[0080] Step S210: Collect the upper and lower DC voltages and calculate the midpoint voltage.
[0081] The DC voltage is the capacitor voltage on the DC side of the three-level rectifier, such as Figure 3 middle u c1 ,u c2 shown.
[0082] Step S220: setting a satisfactory range of the midpoint voltage according to the DC side voltage.
[0083] The satisfactory range of the midpoint voltage is generally within 20% of the DC side voltage. In this embodiment, it is preferably set to 10%.
[0084] Step S230: According to the relationship between the midpoint voltage and the satisfactory range of the midpoint voltage, the pre-selected switch state set is screened to obtain the candidate switch state set, and the value of the flag UN indicating that the midpoint voltage is in the satisfactory range is set.
[0085] In a preferred embodiment, if Figure 4 As shown, the fluctuation of the midpoint voltage is divided into three cases, and the pre-selected switch state set is narrowed down according to the following three cases respectively.
[0086] Case 1: Midpoint voltage u o When it exceeds the satisfaction interval, u o >δu o ,like Figure 4At this time, a small vector in the pre-selected switch state set that causes the midpoint voltage to drop is selected as the candidate switch state set 1. The small vector is as shown in FIG. Figure 4 V4-V15. The midpoint voltage is reduced by the small vector to return the midpoint voltage to the satisfactory range. At this time, the abandoned small vector is deleted from the pre-selected switch state set, and the remaining switch states are transferred to step S300. The flag UN=1 indicating that the midpoint voltage is in the satisfactory range is set.
[0087] Case 2, when the midpoint voltage is ±δu o Interval time -δu o ≤u o ≤δu o ,like Figure 4 At this time, the midpoint voltage is in the satisfactory interval, so the pre-selected switch state set may not be processed, and the pre-selected switch state set is directly used as the candidate switch state set 2, and the flag UN of the midpoint voltage being in the satisfactory interval is set to 0, and the pre-selected switch state set in the high priority is passed to step S300.
[0088] Case 3: The midpoint voltage exceeds the lower limit u of the satisfactory interval o <-δu o When, as shown in III in 4. At this time, the small vector in the pre-selected switch state set that makes the midpoint voltage rise is selected as the candidate switch state set 3. The small vector is as shown in III in 4. Figure 4 V4-V15. The midpoint voltage is raised by the small vector, so that the midpoint voltage returns to the satisfactory range. At this time, the abandoned small vector is deleted from the pre-selected switch state set, and the remaining switch states are transferred to step S300. The flag UN=1 that the midpoint voltage is in the satisfactory range is set.
[0089] It should be noted that the influence of small vectors on the midpoint voltage, that is, the redundant small vectors can raise and lower the midpoint voltage, is common knowledge and will not be explained in detail here.
[0090] Step S300: performing current tracking control on the obtained candidate switch state set with low priority, and selecting the optimal switch state from the candidate switch state set directly through the cost function according to the value of the flag bit UN or adjusting the width of the satisfactory interval of the current through the current variance to select the optimal switch state.
[0091] In the embodiment of the present application, the obtained candidate switch state set is subjected to current tracking control by a low priority, and the optimal switch state is directly selected from the candidate switch state set through a cost function according to the value of the flag bit UN, or the optimal switch state is selected by adjusting the width of the satisfactory interval of the current through the current variance, specifically including the following steps:
[0092] Step S310: Determine the value of the flag UN that the midpoint voltage is in the satisfactory range. If the value of UN is 1, the optimal on state is directly selected from the candidate switch state set through the cost function; if the value of UN is 0, the incoming line voltage and current are collected to calculate the predicted values of the active current and reactive current of the rectifier.
[0093] Step S320: Calculate the variance of the active current and the reactive current according to the predicted values of the active current and the reactive current of the rectifier.
[0094] Furthermore, the predicted values of the active current and reactive current of the rectifier are:
[0095]
[0096] The rate of change of the current is calculated by equation (1), and the predicted value of the current is calculated by equation (2):
[0097]
[0098] The variance of active current and reactive current is calculated as:
[0099]
[0100] where i d (kn),i q (kn) are the calculated values of reactive current and active current at the time (kn), are the current reference values of the d-axis and q-axis respectively. N is the total number of current sampling values counted, which is an integer multiple of the grid voltage cycle; k is the sampling time, and n is the number of statistics.
[0101] Step S330: define the current variance as the average value of the reactive current and the active current.
[0102] Furthermore, the variance of the grid current is:
[0103]
[0104] Step S340: According to the current variance-load-harmonic curve, the current satisfaction interval is adjusted by the current variance average value.
[0105] Furthermore, the current satisfaction interval at time k+1 is:
[0106]
[0107] in is the current variance reference value, ρ is the satisfaction interval adjustment coefficient, δ i (k), δ i (k+1) are the current satisfaction interval values at time k and k+1 respectively.
[0108] In the embodiment of the present application, the current variance-load-harmonic curve acquisition process includes:
[0109] Step S341: operate the rectifier, and adjust the current satisfaction interval under different loads so that the output harmonics of the rectifier are expected values. The output harmonics are obtained by testing with a power quality tester.
[0110] Step S342: When the output current harmonic is the expected value, the current variance average value is calculated, and the current variance average value at this time is recorded to obtain a set of current variance-load-harmonic data of the current variance and current harmonics related to the load size.
[0111] The calculation of current variance is shown in equations (3) to (5).
[0112] Step S343: Perform curve fitting on the current variance-load-harmonic data to obtain the variance curve of the same current harmonic content under different loads. Figure 5 shown.
[0113] The traditional method of obtaining the current harmonic distortion rate by calculation can obtain accurate current harmonic distortion rate, but its computational complexity is large and consumes too much computing resources, which increases the control period of model prediction, thereby affecting the control performance of model prediction. This embodiment obtains the relationship between the variance of the given current and the predicted current through experiments, and obtains the functional relationship between the two by curve fitting. This method can achieve equivalent control of harmonics with a small amount of computation.
[0114] Step S350: determine whether the predicted values of active and reactive currents are in the current satisfaction interval according to the current satisfaction interval; if they are in the satisfaction interval, continue to use the switch state at the previous moment; otherwise, select the optimal switch state in the candidate switch state set 2 through the cost function.
[0115] Furthermore, the cost function is:
[0116]
[0117] The satisfactory range of current is as follows Figure 6 As shown. Method for judging whether the active current prediction value is within the satisfactory range:
[0118] Case 1: The predicted value of active current at time k+1 exceeds the upper limit of the satisfactory interval;
[0119] Case 2: The predicted value of active current at time k+1 is within the satisfactory range;
[0120] Case 3: The predicted value of active current at time k+1 exceeds the lower limit of the satisfactory interval.
[0121] In the above formula, i d (k+1) is the predicted value of active current, is the given value of active current, δ i (k+1) is the satisfactory interval of current;
[0122] Method to determine whether the reactive current is within a satisfactory range:
[0123] Case 1: The predicted value of reactive current at time k+1 exceeds the upper limit of the satisfactory interval;
[0124] Case 2: The predicted value of reactive current at time k+1 is within the satisfactory range;
[0125] Case 3: The predicted value of reactive current at time k+1 exceeds the lower limit of the satisfactory interval.
[0126] In the above formula, i q (k+1) is the predicted value of reactive current, is the given value of reactive current.
[0127] In one embodiment, a rectifier harmonic suppression model predictive control device is shown, the device comprising:
[0128] A control priority setting module is used to divide the control priority of the control target into three levels according to the constraint conditions of the control target;
[0129] The three levels include: high priority, the control target constrains the switch state of the system output to ensure that the output voltage jump is less than half of the DC side voltage; medium priority, the control target is the DC side capacitor voltage balance; low priority, the control target is grid current tracking, and the current satisfaction interval of low priority is adjusted through the relationship between current variance, current total harmonic distortion rate and load current;
[0130] A multi-level control module is used to perform multi-level control by setting a priority order to achieve the suppression of harmonics on the grid side of the rectifier; the multi-level control module includes:
[0131] A high priority module is used to preselect the switch state and obtain a preselected switch state set;
[0132] The medium priority module is used to perform midpoint potential control on the obtained pre-selected switch state set through the medium priority, obtain the candidate switch state set, and set the value of the flag bit UN that the midpoint voltage is in the satisfactory interval;
[0133] The low priority module is used to perform current tracking control on the obtained candidate switch state set by low priority, and directly select the optimal switch state from the candidate switch state set through the cost function according to the value of the flag bit UN or select the optimal switch state by adjusting the current satisfaction interval width through the current variance.
[0134] It should be noted that the rectifier harmonic suppression model predictive control device based on current variance provided in the above embodiment only uses the division of the above functional modules as an example when executing a rectifier harmonic suppression model predictive control method based on current variance. In actual applications, the above functional distribution can be completed by different functional modules as needed, that is, the internal structure of the device is divided into different functional modules to complete all or part of the functions described above. In addition, the rectifier harmonic suppression model predictive control device based on current variance provided in the above embodiment and the rectifier harmonic suppression model predictive control method embodiment based on current variance belong to the same concept. The implementation process thereof is detailed in the rectifier harmonic suppression model predictive control method embodiment based on current variance, which will not be repeated here.
[0135] In one embodiment, a computer-readable storage medium is provided, on which computer program instructions are stored. When the instructions are executed by a processor, the above-mentioned rectifier harmonic suppression model predictive control method based on current variance is implemented.
[0136] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0137] The above-mentioned embodiments only express several implementation methods of the present invention, and the description thereof is relatively specific and detailed, but it cannot be understood as limiting the scope of the patent of the present invention. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be subject to the attached claims.
Claims
1. A rectifier harmonic suppression model predictive control method based on current variance, characterized in that: The method divides the control priority of the control target into three levels according to the constraint conditions of the control target; the three levels include: High priority, the control goal is to constrain the switch state of the system output to ensure that the output voltage jump is less than half of the DC side voltage; Medium priority, the control target is the DC side capacitor voltage balance; Low priority, the control target is grid current tracking, and the current satisfaction interval of low priority is adjusted through the relationship between current variance, total harmonic distortion rate of current and load current; Multi-level control is performed by setting the priority order to suppress the harmonics on the grid side of the rectifier; The specific process of performing multi-level control by setting the priority order includes: The switch state is pre-selected by the high priority to obtain a pre-selected switch state set; The obtained pre-selected switch state set is subjected to midpoint potential control through medium priority to obtain a candidate switch state set, and the value of the flag bit UN that the midpoint voltage is in a satisfactory interval is set; The obtained candidate switch state set is subjected to current tracking control with low priority, and the optimal switch state is directly selected from the candidate switch state set through the cost function according to the value of the flag bit UN, or the optimal switch state is selected by adjusting the width of the satisfactory interval of the current through the current variance.
2. The rectifier harmonic suppression model predictive control method based on current variance according to claim 1, characterized in that: The method of controlling the midpoint voltage through the medium priority, obtaining a candidate switch state set, and setting the value of the flag bit UN indicating that the midpoint voltage is in a satisfactory interval includes: Collect the upper and lower DC voltages and calculate the midpoint voltage; the DC voltage is the capacitor voltage on the DC side of the three-level rectifier; Set the satisfactory range of midpoint voltage according to the DC side voltage; According to the relationship between the midpoint voltage and the satisfactory range of the midpoint voltage, the pre-selected switch state set is screened to obtain the candidate switch state set, and the value of the flag bit UN that the midpoint voltage is in the satisfactory range is set.
3. The rectifier harmonic suppression model predictive control method based on current variance according to claim 2, characterized in that: The method of screening the pre-selected switch state set to obtain the candidate switch state set according to the relationship between the midpoint voltage and the midpoint voltage satisfactory interval, and setting the value of the flag bit UN indicating that the midpoint voltage is in the satisfactory interval, includes: The fluctuation of the midpoint voltage is divided into three cases, and the pre-selected switch state set is narrowed down according to the following three cases respectively; Case 1: When the midpoint voltage u o When it exceeds the satisfaction interval, that is, u o >δu o At this time, the small vector in the pre-selected switch state set that causes the midpoint voltage to drop is selected as the candidate switch state set 1, and the flag bit UN=1 that the midpoint voltage is in the satisfactory range is set; Case 2, when the midpoint voltage is ±δu o interval, i.e. -δu o ≤u o ≤δu o , at this time, the midpoint voltage is in the satisfactory interval, and the pre-selected switch state set is not processed, and the pre-selected switch state set is directly used as the candidate switch state set 2, and the flag bit UN of the midpoint voltage being in the satisfactory interval is set to 0; Case 3: When the midpoint voltage exceeds the lower limit of the satisfactory range, that is, u o <-δu o At this time, the small vector that makes the midpoint voltage rise in the pre-selected switch state set is selected as the candidate switch state set 3, and the flag UN=1 that the midpoint voltage is in the satisfactory range is set.
4. The rectifier harmonic suppression model predictive control method based on current variance according to claim 3 is characterized in that: The obtained candidate switch state set is subjected to current tracking control by a low priority, and the optimal switch state is directly selected from the candidate switch state set through a cost function according to the value of the flag bit UN, or the optimal switch state is selected by adjusting the width of the satisfactory interval of the current through the current variance, including: Determine the value of the flag UN that the midpoint voltage is within the satisfactory range; If the value of UN is 1, the optimal on state is directly selected from the candidate switch state set 1 and the candidate switch state set 3 through the cost function; if the value of UN is 0, the incoming line voltage and current are collected to calculate the predicted values of the active current and reactive current of the rectifier; According to the predicted values of the active current and reactive current of the rectifier, the variance of the active current and the reactive current is calculated; The current variance is defined as the average value of reactive current and active current; According to the current variance-load-harmonic curve, the current satisfaction interval is adjusted by the current variance average value; According to the current satisfaction interval, it is determined whether the predicted values of active and reactive currents are in the current satisfaction interval; if they are in the satisfaction interval, the switch state at the previous moment is continued to be used; otherwise, the optimal switch state is selected from the candidate switch state set 2 through the cost function.
5. The rectifier harmonic suppression model predictive control method based on current variance according to claim 4, characterized in that: The predicted values of active current and reactive current of the rectifier are: The current change rate is calculated by the above formula, and the predicted value of the current is calculated by the following formula: The variance of the active current and reactive current is: Among them, i d (kn),i q (kn) are the calculated values of reactive current and active current at the time (kn), are the current reference values of the d-axis and q-axis respectively, N is the total number of statistical current sampling values, which is an integer multiple of the grid voltage cycle; k is the sampling time, and n is the statistical number of times; The variance of the grid current is defined as the average value of the reactive current and the active current:
6. The rectifier harmonic suppression model predictive control method based on current variance according to claim 4, characterized in that: The formula for adjusting the current satisfaction interval by the current variance average value is: in, is the current variance reference value, ρ is the satisfaction interval adjustment coefficient, δ i (k), δ i (k+1) are the current satisfaction interval values at time k and k+1 respectively.
7. The rectifier harmonic suppression model predictive control method based on current variance according to claim 4, characterized in that: The cost function is: Among them, i d * ,i q * is the given value of active current and reactive current, i d (k+1), i q (k+1) is the predicted value of active current and reactive current.
8. The rectifier harmonic suppression model predictive control method based on current variance according to claim 4, characterized in that: Method to determine whether the active current prediction value is within the satisfactory range: Case 1: The predicted value of active current at time k+1 exceeds the upper limit of the satisfactory interval; Case 2: The predicted value of active current at time k+1 is within the satisfactory range; Case 3: The predicted value of active current at time k+1 exceeds the lower limit of the satisfactory interval. In the above formula, i d (k+1) is the predicted value of active current, is the given value of active current, δ i (k+1) is the satisfactory interval of current; Method to determine whether the reactive current is within a satisfactory range: Case 1: The predicted value of reactive current at time k+1 exceeds the upper limit of the satisfactory interval; Case 2: The predicted value of reactive current at time k+1 is within the satisfactory range; Case 3: The predicted value of reactive current at time k+1 exceeds the lower limit of the satisfactory interval. In the above formula, i q (k+1) is the predicted value of reactive current, is the given value of reactive current.
9. The rectifier harmonic suppression model predictive control method based on current variance according to claim 4, characterized in that: The current variance-load-harmonic curve acquisition process includes: Run the rectifier and adjust the current satisfaction range under different loads so that the output harmonics of the rectifier are the expected values; When the output current harmonic is the expected value, the current variance average value is calculated and recorded to obtain a set of current variance-load-harmonic data of the current variance and current harmonics related to the load size; The current variance-load-harmonic data are curve-fitted to obtain the variance curve of the same current harmonic content under different loads.
10. A rectifier harmonic suppression model predictive control device based on current variance, characterized in that: The device comprises: A control priority setting module is used to divide the control priority of the control target into three levels according to the constraint conditions of the control target; The three levels include: high priority, the control target constrains the switch state of the system output to ensure that the output voltage jump is less than half of the DC side voltage; medium priority, the control target is the DC side capacitor voltage balance; low priority, the control target is grid current tracking, and the current satisfaction interval of low priority is adjusted through the relationship between current variance and current total harmonic distortion rate and load current; A multi-level control module is used to perform multi-level control by setting a priority order to achieve the suppression of rectifier grid-side harmonics; the multi-level control module includes: A high priority module is used to preselect the switch state and obtain a preselected switch state set; The medium priority module is used to perform midpoint potential control on the obtained pre-selected switch state set through the medium priority, obtain the candidate switch state set, and set the value of the flag bit UN that the midpoint voltage is in the satisfactory interval; The low priority module is used to perform current tracking control on the obtained candidate switch state set by low priority, and directly select the optimal switch state from the candidate switch state set through the cost function according to the value of the flag bit UN or select the optimal switch state by adjusting the current satisfaction interval width through the current variance.
11. A computer-readable storage medium having computer program instructions stored thereon, wherein when the instructions are executed by a processor, the rectifier harmonic suppression model predictive control method based on current variance according to any one of claims 1 to 8 is implemented.
Citation Information
Patent Citations
Vienna rectifier negative sequence current self-adjusting method under power grid voltage drop condition
CN116054160A
Method for controlling three-phase reactive compensator on basis of double predictive control
WO2023087551A1