Multi-point leveling control method, device, electronic equipment and system for lifting sling
By setting sensors and use control strategies on the spreader, automatic leveling of building modules is achieved, which solves the problems of low efficiency and high safety risks in traditional lifting methods, and improves lifting efficiency and safety.
Patent Information
- Application Number
- CN202411042774.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-31
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2044-07-31
AI Technical Summary
Traditional lifting methods rely highly on manual adjustments on site, resulting in low lifting efficiency, high construction difficulty and high safety risks. Especially when lifting building modules with large volume and weight exceeding 30 tons, it is difficult to ensure the horizontal state of the module, and it is prone to inclination, resulting in construction. Difficulties and safety hazards.
The multi-point leveling control method is adopted, and by setting up multiple hoist components, displacement sensors, force sensors and inclination sensors on the spreader, the length of the rope is detected and adjusted in real time, and control strategies such as tension chase method, PID algorithm and genetic algorithm are used. Ensure that the building module maintains a preset inclination angle during the entire lifting process and achieves automatic leveling.
It improves lifting efficiency, quality and safety, realizes automatic leveling of the entire process of building modules, conforms to the development trend of new building industrialization, and reduces construction difficulties and safety hazards.
Smart Images

Figure CN118908026A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of automatic leveling of slings, and in particular to a method, device, electronic equipment and system for controlling multi-point leveling of a lifting sling. Background Art
[0002] Lifting equipment is widely used in various industries, including construction, mining, aviation, manufacturing, etc. It can be used to lift building materials, construction equipment, ores, aircraft parts and fuselage structures, as well as to move heavy machinery and equipment, raw materials and finished products in production lines.
[0003] For example, in the construction process of modular buildings, the hoisting of building modules is an important link. However, traditional hoisting methods are highly dependent on on-site manual adjustments, which not only reduces hoisting efficiency, but also increases construction difficulty and safety risks. Especially when facing large building modules weighing more than 30 tons, traditional hoisting methods often make it difficult to ensure the horizontal state of the modules during the hoisting process, and they are prone to tilting, which can cause damage to the building modules, as well as construction difficulties and safety hazards. Summary of the invention
[0004] In order to solve the problem that the existing technology is highly dependent on on-site manual adjustment, which not only reduces the lifting efficiency, but also increases the construction difficulty and safety risks. In particular, when facing building modules with large volumes and weighing more than 30 tons, the traditional lifting method often cannot ensure the horizontal state of the module during the lifting process, and it is easy to tilt, which leads to technical problems such as construction difficulties and safety hazards. The embodiment of the present invention provides a multi-point leveling control method, device, electronic equipment and system for lifting equipment. The technical solution is as follows:
[0005] On the one hand, a multi-point leveling control method for a lifting sling is provided, which is applied to the sling, wherein the sling comprises: a hoisting frame, a plurality of hoist assemblies, and an inclination sensor, wherein the plurality of hoist assemblies are arranged at the bottom of the hoisting frame, the hoist assembly comprises a hoist, a hoisting rope, and a displacement sensor and a force sensor arranged on the hoisting rope, the hoisting rope is connected to a prefabricated hoisting point on a building module, and the inclination sensor is arranged on the building module;
[0006] The method comprises:
[0007] Controlling the plurality of hoists to retract corresponding suspension ropes to load the building module, and when the building module is not off the ground, based on the tension chasing method, gradually retracting the suspension ropes on the plurality of hoists, so that the tension on each hoist is uniform and gradually increases;
[0008] When the building module is in a semi-off-the-ground stage, based on the tension exerted on each hoist and the relative position of the building module, the length of the suspension rope of each hoist is adjusted in real time to make the inclination angle of the building module lower than the preset inclination angle;
[0009] When the building module is in the fully off-the-ground stage, the inclination angle of the building module is controlled to be lower than the preset inclination angle by adjusting the length of the suspension rope of each hoist in real time, and the inclination angle of the building module is monitored;
[0010] After the building module is moved to a preset position, the hoist is controlled to lower the building module, and the length of the hoist rope of the hoist is kept unchanged until the tension is zero.
[0011] Optionally, before controlling the plurality of hoists to retract corresponding suspension ropes to load the building modules, the method further comprises:
[0012] The horizontal position of each hoist is controlled so that the hoist and the corresponding hanging point are on the same vertical line.
[0013] Optionally, based on the tension chasing method, gradually contracting the suspension ropes on the plurality of hoists comprises:
[0014] When F min <F max / 10, shortening the preset length of the hoist rope of the hoist with the smallest pulling force among the multiple hoists each time;
[0015] When F max / 10 <F min <F max Based on the PID algorithm, the length of the suspension rope is shortened each time;
[0016] In the formula, F min F is the value with the smallest pulling force among the plurality of hoists; max It is the value with the largest pulling force among the multiple gourds.
[0017] Optionally, based on the tension applied to each hoist and the relative position of the building module, the length of the suspension rope of each hoist is adjusted in real time so that the inclination angle of the building module is lower than a preset inclination angle, including:
[0018] When the inclination angle of the building module exceeds a preset inclination angle, obtaining an adjustment amount corresponding to each of the hoists;
[0019] Based on the adjustment amount corresponding to each of the hoists, the lengths of the suspension ropes of the plurality of hoists are controlled and adjusted so that the inclination angle is reduced to within the preset inclination angle.
[0020] Optionally, obtaining the adjustment amount corresponding to each of the gourds includes:
[0021] estimating the relative horizontal coordinates of the center of gravity of the building module according to the pulling force and relative horizontal coordinates of each hoist;
[0022] Based on the relative horizontal coordinates of the center of gravity of the building module and the bidirectional inclination angle, the adjustment amount corresponding to each hoist is obtained.
[0023] Optionally, based on the tension applied to each of the hoists and the relative position of the building modules, the length of the suspension rope of each of the hoists is adjusted in real time so that the inclination angle of the building module is lower than a preset inclination angle, and further comprising:
[0024] When the pulling forces on the plurality of hoists are uneven, a pulling force target value is calculated based on a genetic algorithm;
[0025] Based on the tension target value, the lengths of the suspension ropes of the plurality of hoists are adjusted based on PID algorithm control so that the tensions exerted on the plurality of hoists are balanced.
[0026] Optionally, the method further comprises:
[0027] When the building module is in the fully off-the-ground stage, when the inclination angle of the building module changes and exceeds a preset inclination angle, an alarm signal is issued;
[0028] When the inclination angle of the building module changes and is lower than a preset inclination angle, a target tension value is calculated based on a genetic algorithm;
[0029] Based on the tension target value, the lengths of the suspension ropes of the plurality of hoists are adjusted based on PID algorithm control so that the tensions exerted on the plurality of hoists are balanced.
[0030] On the other hand, a multi-point leveling control device for a lifting sling is provided, which is applied to the sling, wherein the sling comprises: a hoisting frame, a plurality of hoist assemblies, and an inclination sensor, wherein the plurality of hoist assemblies are arranged at the bottom of the hoisting frame, the hoist assembly comprises a hoist, a hoisting rope, and a displacement sensor and a force sensor arranged on the hoisting rope, the hoisting rope is connected to a prefabricated hoisting point on a building module, and the inclination sensor is arranged on the building module;
[0031] The device comprises:
[0032] A loading module, used for controlling the plurality of hoists to retract corresponding suspension ropes to load the building module, and when the building module is not off the ground, based on a tension chasing method, gradually retracting the suspension ropes on the plurality of hoists, so that the tension on each hoist is uniform and gradually increases;
[0033] An adjustment module is used to adjust the length of the suspension rope of each hoist in real time when the building module is in a semi-off-the-ground stage based on the tension applied to each hoist and the relative position of the building module, so as to make the inclination angle of the building module lower than the preset inclination angle;
[0034] A mobile module, used for controlling the inclination angle of the building module to be lower than the preset inclination angle by adjusting the length of the suspension rope of each hoist in real time when the building module is in the fully off-ground stage, and monitoring the inclination angle of the building module;
[0035] The unloading module is used to control the lifting device to lower the building module after the building module is moved to a preset position, and to keep the length of the lifting rope of the hoist unchanged until the tension is zero.
[0036] On the other hand, an electronic device is provided, optionally including:
[0037] processor;
[0038] A memory having computer-readable instructions stored therein, wherein when the computer-readable instructions are executed by the processor, any one of the above-mentioned multi-point leveling control methods for a lifting device is implemented.
[0039] On the other hand, a multi-point leveling control system for a lifting sling is provided, and optionally, the system comprises: a sling and an electronic device;
[0040] The hoist comprises: a hoisting frame, a plurality of hoist assemblies, and an inclination sensor, wherein the plurality of hoist assemblies are arranged at the bottom of the hoisting frame, the hoist assembly comprises a hoist, a hoisting rope, and a displacement sensor and a force sensor arranged on the hoisting rope, the hoisting rope is connected to a prefabricated hoisting point on a building module, the inclination sensor is arranged on the building module, and the hoist, the displacement sensor, the force sensor, and the inclination sensor are all connected to the electronic device;
[0041] The electronic device is used to execute any of the above-mentioned multi-point leveling control methods for lifting equipment.
[0042] The beneficial effects brought about by the technical solution provided by the embodiment of the present invention include at least:
[0043] The multi-point leveling control method for lifting equipment provided by the embodiment of the present invention detects in real time the length of each hoist rope, the tension exerted on each hoist, and the inclination angle of the building module, and then makes multi-point real-time adjustments to the hoist rope length of the building module from the preparation stage, the stage not off the ground, the semi-off the ground stage, the fully off the ground stage, and the unloading stage, thereby realizing automatic leveling of the building module throughout the whole process, improving the lifting efficiency, quality, and safety, and conforming to the development trend of new building industrialization. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0045] Figure 1 It is one of the flow charts of a multi-point leveling control method for a lifting device provided by an embodiment of the present invention;
[0046] Figure 2 is a schematic diagram of a multi-point sling structure provided by an embodiment of the present invention;
[0047] Figure 3 This is the second flow chart of a multi-point leveling control method for a lifting device provided by an embodiment of the present invention;
[0048] Figure 4 It is a schematic diagram of a rally pursuit method provided by an embodiment of the present invention;
[0049] Figure 5 This is a flowchart of a multi-point leveling control method for a lifting device provided by an embodiment of the present invention;
[0050] Figure 6 This is a fourth flow chart of a multi-point leveling control method for a lifting device provided by an embodiment of the present invention;
[0051] Figure 7 It is a structural schematic diagram of a force and tilt schematic diagram of a building module provided by an embodiment of the present invention;
[0052] Figure 8 This is a fifth flow chart of a multi-point leveling control method for a lifting device provided by an embodiment of the present invention;
[0053] Fig. 9 This is the sixth flow chart of a multi-point leveling control method for a lifting device provided by an embodiment of the present invention;
[0054] Fig.10 This is the seventh flow chart of a multi-point leveling control method for a lifting device provided by an embodiment of the present invention;
[0055] Fig.11 This is a flowchart of a multi-point leveling control method for a lifting device provided by an embodiment of the present invention;
[0056] Fig.12 It is a block diagram of a multi-point leveling control device for a lifting device provided by an embodiment of the present invention;
[0057] Fig.13It is a structural schematic diagram of an electronic device provided by an embodiment of the present invention.
[0058] Reference numerals:
[0059] 1. Lifting frame; 2. Hoist assembly; 21. Hoist; 22. Lifting rope. DETAILED DESCRIPTION
[0060] The technical solution of the present invention is described below in conjunction with the accompanying drawings.
[0061] In the embodiments of the present invention, words such as "exemplarily" and "for example" are used to indicate examples, illustrations or explanations. Any embodiment or design described as "example" in the present invention should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of the word "example" is intended to present the concept in a specific way. In addition, in the embodiments of the present invention, the meaning expressed by "and / or" can be both, or it can be either of the two.
[0062] In the embodiments of the present invention, sometimes a subscript such as W1 may be mistakenly written as a non-subscript such as W1. When the difference is not emphasized, the meanings to be expressed are consistent.
[0063] In order to make the technical problems, technical solutions and advantages to be solved by the present invention more clear, a detailed description will be given below with reference to the accompanying drawings and specific embodiments.
[0064] Building modularization and mechanized construction refers to a new construction method that uses factory-prefabricated building modules and assembles them on site. This field involves multiple links such as building design, manufacturing, transportation, installation and maintenance, aiming to improve building quality, shorten construction period, reduce costs and reduce environmental pollution. It is widely used in various building types such as residential, commercial and public facilities, and is the development trend of the future construction industry.
[0065] Figure 1 This is one of the flow charts of a multi-point leveling control method for a lifting device provided by an embodiment of the present invention, see Figure 1 An embodiment of the present invention provides a multi-point leveling control method for a lifting sling, which is applied to a sling, wherein the sling includes: a lifting frame, a plurality of hoist assemblies, and an inclination sensor. The plurality of hoist assemblies are arranged at the bottom of the lifting frame, the hoist assembly includes a hoist, a lifting rope, and a displacement sensor and a force sensor arranged on the lifting rope. The lifting rope is connected to a prefabricated lifting point on a building module, and the inclination sensor is arranged on the building module.
[0066] The processing flow of the method may include the following steps:
[0067] 110. Control multiple hoists to retract corresponding ropes to load the building module. When the building module is not off the ground, based on the tension chasing method, gradually retract the ropes on the multiple hoists so that the tension on each hoist is uniform and gradually increases.
[0068] 120. When the building module is in the semi-off-the-ground stage, based on the tension and relative position of each hoist, the length of the suspension rope of each hoist is adjusted in real time to make the inclination angle of the building module lower than the preset inclination angle.
[0069] 130. When the building module is in the stage of being completely off the ground, the inclination angle of the building module is controlled to be lower than the preset inclination angle by adjusting the length of the suspension rope of each hoist in real time, and the inclination angle of the building module is monitored.
[0070] 140. After the building module is moved to the preset position, the hoist is controlled to lower the building module and the length of the hoist rope is kept unchanged until the tension is zero.
[0071] In one embodiment provided by the present invention, before controlling the plurality of hoists to retract the corresponding suspension ropes to load the building modules, the method further comprises:
[0072] Control the horizontal position of each hoist so that the hoist and the corresponding hanging point are on the same vertical line.
[0073] In one embodiment provided by the present invention, based on the tension chasing method, gradually contracting the suspension ropes on multiple hoists includes:
[0074] When F min <F max / 10, shortening the preset length of the hoist rope of the hoist with the smallest pulling force among the plurality of hoists each time;
[0075] When F max / 10 <F min <F max Based on the PID algorithm, the length of the suspension rope is shortened each time;
[0076] In the formula, F min The minimum pulling force among multiple hoists; F max It is the value with the largest pulling force among multiple hoists.
[0077] In one embodiment provided by the present invention, based on the tension and relative position of each hoist, the length of the suspension rope of each hoist is adjusted in real time to make the inclination angle of the building module lower than the preset inclination angle, including:
[0078] When the inclination angle of the building module exceeds the preset inclination angle, the adjustment amount corresponding to each hoist is obtained;
[0079] Based on the adjustment amount corresponding to each hoist, the lengths of the suspension ropes of the multiple hoists are controlled and adjusted so that the inclination angle is reduced to within the preset inclination angle.
[0080] In one embodiment provided by the present invention, obtaining the adjustment amount corresponding to each gourd includes:
[0081] Estimate the relative horizontal coordinates of the center of gravity of the building module based on the tension and relative horizontal coordinates of each hoist;
[0082] Based on the relative horizontal coordinates and bidirectional tilt angles of the center of gravity of the building module, the corresponding adjustment amount of each hoist is obtained.
[0083] In one embodiment provided by the present invention, based on the tension and relative position of each hoist, the length of the suspension rope of each hoist is adjusted in real time so that the inclination angle of the building module is lower than the preset inclination angle, and further includes:
[0084] When the pulling forces on multiple hoists are uneven, the pulling force target value is calculated based on the genetic algorithm;
[0085] Based on the tension target value, the lengths of the suspension ropes of multiple hoists are adjusted based on the PID algorithm control to balance the tension on the multiple hoists.
[0086] In one embodiment provided by the present invention, the method further comprises:
[0087] When the building module is in the stage of being fully off the ground, when the inclination angle of the building module changes and exceeds the preset inclination angle, an alarm signal is issued;
[0088] When the inclination angle of the building module changes and is lower than the preset inclination angle, the target value of the pulling force is calculated based on the genetic algorithm;
[0089] Based on the tension target value, the lengths of the suspension ropes of multiple hoists are adjusted based on the PID algorithm control to balance the tension on the multiple hoists.
[0090] The multi-point leveling control method for lifting equipment provided by the embodiment of the present invention detects in real time the length of each hoist rope, the tension exerted on each hoist, and the inclination angle of the building module, and then makes multi-point real-time adjustments to the hoist rope length of the building module from the preparation stage, the stage not off the ground, the semi-off the ground stage, the fully off the ground stage, and the unloading stage, thereby realizing automatic leveling of the building module throughout the whole process, improving the lifting efficiency, quality, and safety, and conforming to the development trend of new building industrialization.
[0091] The embodiment of the present invention also provides a multi-point leveling control method for a lifting sling, which is applied to the sling and realizes automatic leveling of a building module by controlling the lifting process of the sling, thereby improving the lifting efficiency, quality and safety.
[0092] Specifically, Figure 2This is a schematic diagram of a multi-point sling structure provided by an embodiment of the present invention, see Figure 2 The hoist comprises: a hoisting frame 1, a plurality of hoist assemblies 2, and an inclination sensor. The plurality of hoist assemblies 2 are arranged at the bottom of the hoisting frame 1. The hoist assembly 2 comprises a hoist 21, a hoisting rope 22, and a displacement sensor and a force sensor arranged on the hoisting rope 22. The hoisting rope 22 is connected to a prefabricated hoisting point on a building module. The inclination sensor is arranged on the building module.
[0093] It should be noted that the hoist 21, displacement sensor, force sensor and tilt sensor mentioned above can all be connected to an electronic device, and the method can be executed by the electronic device. Of course, other devices can also be used to execute the method, which is not limited in this embodiment.
[0094] Among them, the hoist 21 can be electrically driven to provide lifting power, and the lifting rope 22 can be retracted and released by a motor or manual operation to control the lifting of the building module. Specifically, a hook can be set under the lifting rope 22, and the prefabricated lifting point of the building module can be hooked by the hook to achieve the connection between the lifting rope 22 and the building module. Of course, in a specific embodiment, it can also be connected through other connecting parts, which is not limited in this embodiment. During the lifting process, multiple hoists 21 are usually used to work together to share the weight of the module. For example, the number of the hoists 21 is multiple and arranged in two rows. The lifting rope 22 is used to transmit the lifting force to ensure that the building module rises or falls stably. The displacement sensor is used to monitor the elongation or shortening of the lifting rope 22 in real time, that is, the rising or falling distance of the building module. The force sensor is used to measure the force applied by the hoist 21 on the lifting rope 22, that is, the actual lifting force. This helps to monitor the overload during the lifting process and prevent safety accidents caused by overweight. The inclination sensor is installed on the building module to measure the inclination angle of the module during the hoisting process to ensure that the module remains level during the hoisting process.
[0095] Through the above structure, the length of the hoist rope 22 on each hoist 21, the tension on each hoist 21 and the inclination of the building module can be detected in real time during the process of the hoist lifting the building module. The number of the inclination sensors can be at least two, so as to monitor the bidirectional inclination of the building module.
[0096] Specifically, Figure 3 This is the second flow chart of a multi-point leveling control method for a lifting device provided by an embodiment of the present invention, please refer to Figure 3 , the method comprising:
[0097] In one embodiment provided by the present invention:
[0098] 210. Control the horizontal position of each hoist so that the hoist and the corresponding hanging point are on the same vertical line.
[0099] Specifically, in the sling, the hoist 21 is movably arranged on the support frame 1, so the position of the hoist 21 can be adjusted in the horizontal direction, and the sling rope can be independently scaled.
[0100] In the preparation stage, the hoist is first connected and fastened to the prefabricated lifting points on the building module to ensure the stability of the lifting. Then the horizontal position of the hoist is adjusted so that it is basically on the same vertical line as the lifting point, so as to maintain the balance of the prefabricated building module during the lifting process.
[0101] 220. Control multiple hoists to retract corresponding ropes to load the building module. When the building module is not off the ground, based on the tension chasing method, gradually retract the ropes on the multiple hoists so that the tension on each hoist is uniform and gradually increases.
[0102] In this step, the suspension ropes are gradually tightened by loading the building modules.
[0103] It should be noted that, during the loading process of the building module, the change of its inclination angle needs to be monitored in real time. If the inclinometer value on the prefabricated building module remains unchanged, it means that its inclination angle does not change, and then it is further determined whether the sum of the pulling forces of each hoist continues to increase. If the sum of the pulling forces of each hoist no longer increases, it indicates that the building module is in the stage of being fully lifted off the ground, and then step 240 is executed. If the sum of the pulling forces of each hoist continues to increase, it indicates that the building module is in the stage of not being lifted off the ground.
[0104] In the stage before leaving the ground, the tension chasing method is a control strategy that continuously monitors and adjusts the tension of each hoist to ensure that the load shared by all hoists during the lifting process is as even as possible, and gradually increases the tension until the building module begins to leave the ground, so that the building module can be lifted smoothly and the impact and vibration caused by sudden lifting off the ground can be reduced. Figure 4 During the control process by the pull-chasing method, if the inclination angle continues to change, it means that the building module enters the semi-off-the-ground stage, and step 230 is executed.
[0105] For step 220, further, Figure 5 This is a flowchart of a multi-point leveling control method for a lifting device provided by an embodiment of the present invention. Figure 5 In one embodiment provided by the present invention, based on the pulling force chasing method, the ropes on multiple hoists are gradually contracted, including:
[0106] 221. When F min <F max / 10, each time the preset length of the hoist rope of the hoist with the smallest pulling force among the multiple hoists is shortened.
[0107] In the formula, Fmin The minimum pulling force among multiple hoists; F max It is the value with the largest pulling force among multiple hoists.
[0108] Specifically, the preset length can be set as needed, for example, it can be 1-3 cm.
[0109] 222. When F max / 10 <F min <F max Based on the PID algorithm, the length of the suspension rope is shortened each time.
[0110] In the formula, F min The minimum pulling force among multiple hoists; F max It is the value with the largest pulling force among multiple hoists.
[0111] PID closed-loop control is a control strategy widely used in industrial automation and other fields. PID stands for proportional, integral and derivative control links, which work together on the controlled object to achieve the desired control effect. First, set a desired target value for the controlled object, which is the given value. The actual value of the controlled object is obtained through measurement means such as sensors. The actual value is compared with the given value to obtain the deviation or error. The deviation is sent to the PID controller, which is calculated according to the PID algorithm to obtain the control output. The control output is sent to the actuator, such as a motor, valve, etc., to adjust the controlled object so that its actual value approaches the given value.
[0112] Specifically, the steps for the PID algorithm in this embodiment may be:
[0113]
[0114] In the formula, u min is the length of the hoist rope with the smallest pulling force, Δu min (k) is the kth adjustment of the hoist rope length with the smallest pulling force, F max,k is the pull of the hoist with the largest pull during the kth adjustment, F min,k is the pull of the hoist with the smallest pull during the kth adjustment, F min,k-1 is the pull of the hoist with the smallest pull during the k-1th adjustment, F min,k-2 is the pull of the hoist with the smallest pull during the k-2th adjustment, K p is the proportionality coefficient, K i is the integral coefficient, K d is the differential coefficient, which is determined according to the elastic modulus of the actual suspension rope.
[0115] Through step 220, the length of the lifting rope of each hoist can be adjusted in real time to ensure that the force on each hoist is balanced, so that the building module is slightly lifted as a whole until the tilt angle changes and enters the semi-off-the-ground stage of step 230, or directly enters the full-off-the-ground stage of step 240 when the total pulling force remains unchanged.
[0116] 230. When the building module is in the semi-off-the-ground stage, based on the tension and relative position of each hoist, the length of the suspension rope of each hoist is adjusted in real time to make the inclination angle of the building module lower than the preset inclination angle.
[0117] It should be noted that if the inclinometer value on the prefabricated building module is monitored to be less than the preset inclination angle, it is further determined whether the sum of the pulling forces of the hoists continues to increase. If the sum of the pulling forces of the hoists no longer increases, it indicates that the building module is in the full-off-the-ground stage, and step 240 is executed. If the sum of the pulling forces of the hoists continues to increase, it indicates that the building module is still in the semi-off-the-ground stage, and steps 233-234 are executed.
[0118] When the building module is in the semi-off-the-ground stage, the inclinometer value begins to change. The sensor monitors the tension of the hoist and the position of the module, and adjusts the length of the lifting rope in real time to compensate for the tilt caused by uneven weight distribution of the module or external factors such as wind.
[0119] Furthermore, Figure 6 This is a flowchart of a multi-point leveling control method for a lifting device provided by an embodiment of the present invention. Figure 6 In one embodiment provided by the present invention, step 230 includes:
[0120] 231. When the inclination angle of the building module exceeds the preset inclination angle, the adjustment amount corresponding to each hoist is obtained.
[0121] In this step, the two-way inclination angles of the building module can be obtained. If one of the inclination angles exceeds the preset inclination angle, step 231 is executed.
[0122] Figure 7 This is a structural schematic diagram of a force and tilt diagram of a building module provided by an embodiment of the present invention, which can be seen in Figure 7 In this step, the adjustment amount can be obtained in a variety of ways. Specifically, the system may need to collect information about the current position of the building module, the weight distribution, the current rope length of the hoist, etc. Using this data, the rope length that needs to be adjusted for each hoist is calculated through a preset algorithm or mathematical model.
[0123] Specifically, Figure 8 This is a flowchart of a multi-point leveling control method for a lifting device provided by an embodiment of the present invention, see Figure 8 In step 231, the adjustment amount corresponding to each gourd is obtained, including:
[0124] 2311. Estimate the relative horizontal coordinates of the center of gravity of the building module based on the tension exerted on each hoist and the relative horizontal coordinates.
[0125] In this step, the system can establish one or more equations to estimate the relative horizontal coordinates of the center of gravity of the building module through mechanical principles (such as the moment balance principle). This coordinate is usually expressed as a two-dimensional coordinate (x, y) relative to the hanging point or a fixed reference point. In this embodiment, the relative horizontal coordinate usually refers to the projection position of the center of gravity of the building module or a specific point on a horizontal plane, which is relative to a fixed reference point or coordinate system.
[0126] Specifically, the estimation process can be:
[0127]
[0128] In the formula, (x g ,y g ) is the estimated value of the relative horizontal coordinate of the center of gravity of the building module, which approaches the true value as the building module gradually leaves the ground. i is the pulling force of the i-th gourd, (x i ,y i ) is the relative horizontal coordinate of the i-th gourd.
[0129] By estimating the relative horizontal coordinates of the center of gravity of the building module, it is convenient to obtain the corresponding adjustment amount of each gourd later.
[0130] 2312. Based on the relative horizontal coordinates and bidirectional tilt angles of the center of gravity of the building module, obtain the corresponding adjustment amount of each gourd.
[0131] In this step, first, it is necessary to determine the target posture that the module should achieve, that is, the preset inclination angle. Next, a mechanical analysis is performed to analyze how factors such as the weight of the building module, the center of gravity position, the current inclination angle, and the layout position of the hoist affect the posture of the module, and calculate the force or rope length change that needs to be applied to each hoist in order to achieve the target posture. Finally, the adjustment amount corresponding to each hoist is calculated based on the results of the mechanical analysis. These adjustment amounts may be specific values to increase or decrease the rope length, or they may be instructions to control the movement of the hoist, such as rising, falling, moving to the left, moving to the right, etc., which are not limited in this embodiment.
[0132] Specifically, when one of the two-way inclination angles on the building module reaches the preset inclination angle, the length of the hoist rope is roughly adjusted, and each adjustment does not exceed 1 degree to return it to the preset inclination angle. The preset inclination angle can be set as needed, for example, it can be 8-10 degrees. At this time, the following formula can be used to calculate the adjustment amount:
[0133]
[0134] In the formula, u i is the length of the rope of the i-th hoist, Δu i is the adjustment of the rope length of the i-th hoist, θ x and θ y is the bidirectional tilt angle, Δθ x and Δθ y is the adjustment amount of the bidirectional tilt angle, (x g ,y g ) is the estimated value of the relative horizontal coordinate of the center of gravity of the building module, (x i ,y i ) is the relative horizontal coordinate of the i-th gourd.
[0135] 232. Based on the adjustment amount corresponding to each hoist, control and adjust the length of the suspension ropes of multiple hoists so that the inclination angle is reduced to within the preset inclination angle.
[0136] Based on the adjustment calculated in step 231, a corresponding control signal is sent to each hoist to instruct it to increase or decrease the rope length. After receiving the control signal, the hoist begins to adjust its rope length. These adjustments may be synchronized or performed according to a specific sequence or strategy to ensure that the module returns smoothly and safely to the predetermined inclination range. During the adjustment process, the system may continuously monitor the inclination of the module to verify that the adjustment is effective and make fine adjustments if necessary. Once the inclination of the module is reduced to within the preset inclination, the system may stop adjusting and wait for the next operation or maintain the current state.
[0137] Fig. 9 This is a flowchart of a multi-point leveling control method for a lifting device provided by an embodiment of the present invention, see Fig. 9 In one embodiment provided by the present invention, step 230 further includes:
[0138] 233. When the pulling forces on multiple hoists are uneven, the pulling force target value is calculated based on the genetic algorithm.
[0139] In this step, the length of the suspension rope can be controlled by a PID algorithm.
[0140] Suppose the target pulling force of the ith hoist after equilibrium is F i,target , let F max,target =max(F i,target ), then the optimization goal of the genetic algorithm is to make F max,target Minimum, during the optimization process, the following force balance constraints must be met:
[0141]
[0142] In the genetic algorithm, based on the Gray code, F i,targetEncode with max(F i )-max(F i,target ) is the objective function, and the following formula is used as the penalty function of the population. The optimization direction is to maximize the objective function. The local optimal solution can be calculated by multiple iterations:
[0143]
[0144] Based on the calculated F i,target , calculate the fine adjustment of the hoist rope length according to the following formula:
[0145]
[0146] In the formula, u i is the length of the rope of the i-th hoist, Δu i (k) is the kth adjustment of the length of the rope of the i-th hoist, F i,k is the pulling force of the i-th hoist during the k-th adjustment, F i,k-1 is the pulling force of the i-th hoist during the k-1th adjustment, F i,k-2 is the pulling force of the i-th gourd during the k-2-th adjustment.
[0147] 234. Based on the tension target value, the lengths of the suspension ropes of multiple hoists are adjusted based on the PID algorithm control so that the tensions on the multiple hoists are balanced.
[0148] Through step 230, the length of the suspension rope of each hoist can be adjusted in real time to ensure that the force on each hoist is balanced, so that the building module is slightly lifted as a whole until the tilt angle changes and the total pulling force remains unchanged, and the full lift-off stage of step 250 is directly entered.
[0149] 240. When the building module is in the stage of being completely off the ground, the inclination angle of the building module is controlled to be lower than the preset inclination angle by adjusting the length of the suspension rope of each hoist in real time, and the inclination angle of the building module is monitored.
[0150] Specifically, the full-off-the-ground stage means that the building module has completely left the ground and entered the aerial movement stage. By continuing to adopt real-time adjustment strategies, the module can be ensured to remain stable during the movement and avoid excessive tilting.
[0151] By monitoring the inclination of the building module, corresponding processing can be performed according to the change of the inclination. If the inclination does not change, no adjustment is required; if the inclination changes, step 241 is executed, or steps 242-243 are executed according to whether the inclination exceeds the preset inclination.
[0152] In one embodiment provided by the present invention, the method further comprises:
[0153] 241. When the building module is in the stage of being fully off the ground, when the inclination angle of the building module changes and exceeds the preset inclination angle, an alarm signal is issued.
[0154] By continuously monitoring the inclination angle of the building module, the change in the inclination angle caused by the movement of the building module or the swing caused by wind can be identified. When the inclination angle exceeds the preset angle, the system will issue an alarm for subsequent processing. The preset inclination angle can be set as needed, for example, 8-10 degrees, which is not limited in this embodiment.
[0155] When the inclination angle is less than the preset inclination angle, F can be calculated according to the semi-lift-off stage method. i,target , and fine-tune the length of the hoist rope to make the hoist bear a balanced force. Fig.10 This is the seventh flow chart of a multi-point leveling control method for a lifting device provided by an embodiment of the present invention. Fig.10 The step 240 may specifically include the following steps:
[0156] 242. When the inclination angle of the building module changes and is lower than the preset inclination angle, the tension target value is calculated based on the genetic algorithm.
[0157] In this step, the length of the suspension rope can be controlled by a PID algorithm.
[0158] Suppose the target pulling force of the ith hoist after equilibrium is F i,target , let F max,target =max(F i,target ), then the optimization goal of the genetic algorithm is to make F max,target Minimum, during the optimization process, the following force balance constraints must be met:
[0159]
[0160] In the genetic algorithm, based on the Gray code, F i,target Encode with max(F i )-max(F i,target ) is the objective function, and the following formula is used as the penalty function of the population. The optimization direction is to maximize the objective function. The local optimal solution can be calculated by multiple iterations:
[0161]
[0162] Based on the calculated F i,target , calculate the fine adjustment of the hoist rope length according to the following formula:
[0163]
[0164] In the formula, u i is the length of the rope of the i-th hoist, Δu i(k) is the kth adjustment of the length of the rope of the i-th hoist, F i,k is the pulling force of the i-th hoist during the k-th adjustment, F i,k-1 is the pulling force of the i-th hoist during the k-1th adjustment, F i,k-2 is the pulling force of the i-th gourd during the k-2-th adjustment.
[0165] 243. Based on the tension target value, the lengths of the ropes of multiple hoists are adjusted based on the PID algorithm control so that the tensions on the multiple hoists are balanced.
[0166] Through step 243, the length of the suspension rope of each hoist can be adjusted in real time to ensure that the force on each hoist is balanced, so as to facilitate the subsequent movement of the building module.
[0167] 250. After moving the building module to the preset position, control the hoist to lower the building module and keep the length of the hoist rope unchanged until the tension is zero.
[0168] During the unloading phase, the length of the hoist rope is kept unchanged and the building module is lowered until the tension is zero, ensuring that the building module is unloaded safely and stably.
[0169] Specifically, after the building module is accurately moved to the designated position, the module is slowly lowered. During the lowering process, the length of the suspension rope is kept relatively stable until the building module is stably in contact with the ground and the pulling force of all hoists is gradually reduced to zero.
[0170] Fig.11 This is a flowchart of a multi-point leveling control method for a lifting device provided by an embodiment of the present invention. Fig.11 The multi-point leveling control method for lifting equipment provided by the embodiment of the present invention detects in real time the length of each hoist rope, the tension on each hoist, and the inclination of the building module, and then makes multi-point real-time adjustments to the length of the hoist rope during the preparation stage, the stage before lifting off the ground, the semi-lifting stage, the full lifting off the ground, and the unloading stage of the building module, thereby realizing automatic leveling of the building module and balanced force on the hoist throughout the whole process, improving the lifting efficiency, quality, and safety, and conforming to the development trend of new building industrialization.
[0171] Furthermore, the automatic leveling technology in this embodiment uses sensors and control systems to monitor the posture of the module in real time and automatically adjusts the length of the lifting rope to ensure that the module remains level during the lifting process, avoiding construction difficulties and safety hazards caused by tilting.
[0172] During the lifting process, multiple hoists are usually used to work together to share the weight of the module. In this method, the force applied to each hoist is precisely controlled to ensure that the load on each hoist is balanced, thus avoiding equipment damage or module structure stress concentration caused by uneven force.
[0173] In addition, due to the complex construction conditions, there are many uncertain factors, such as the prefabrication accuracy of the module itself, on-site wind speed, ground flatness, etc., which may affect the accuracy of the hoisting. Fuzzy error control is achieved through this method. Specifically, fuzzy error control is a control method based on fuzzy logic, which can handle these uncertain factors, adjust the hoisting parameters in real time through fuzzy error control, reduce the impact of external factors on the hoisting accuracy, and improve the accuracy and reliability of the hoisting.
[0174] The present invention also provides a multi-point leveling control device for a lifting device. Fig.12 This is a block diagram of a multi-point leveling control device for a lifting device provided by an embodiment of the present invention, see Fig.12 . Applied to a sling, the sling includes: a sling frame, a plurality of hoist assemblies, and an inclination sensor. The plurality of hoist assemblies are arranged at the bottom of the sling frame. The hoist assembly includes a hoist, a sling rope, and a displacement sensor and a force sensor arranged on the sling rope. The sling rope is connected to a prefabricated sling point on a building module. The inclination sensor is arranged on the building module.
[0175] The device includes: a loading module 1201 , an adjusting module 1202 , a moving module 1203 and an unloading module 1204 .
[0176] The loading module 1201 is used to control the multiple hoists to retract the corresponding suspension ropes to load the building module. When the building module is not off the ground, based on the tension chasing method, the suspension ropes on the multiple hoists are gradually retracted so that the tension on each hoist is uniform and gradually increases.
[0177] The adjustment module 1202 is used to adjust the length of the suspension rope of each hoist in real time based on the tension and relative position of each hoist when the building module is in the semi-off-the-ground stage, so that the inclination angle of the building module is lower than the preset inclination angle;
[0178] The mobile module 1203 is used to control the inclination angle of the building module to be lower than the preset inclination angle by adjusting the length of the suspension rope of each hoist in real time when the building module is in the fully off-ground stage, and monitor the inclination angle of the building module;
[0179] The unloading module 1204 is used to control the hoist to lower the building module after the building module is moved to the preset position, and to keep the length of the hoist rope of the hoist unchanged until the tension is zero.
[0180] The multi-point leveling control device for lifting equipment provided by the embodiment of the present invention detects in real time the length of each hoist rope, the tension exerted on each hoist, and the inclination angle of the building module, and then makes multi-point real-time adjustments to the hoist rope length of the building module from the preparation stage, the stage not off the ground, the semi-off the ground stage, the fully off the ground stage, and the unloading stage, thereby realizing automatic leveling of the building module throughout the whole process, improving the lifting efficiency, quality, and safety, and conforming to the development trend of new building industrialization.
[0181] Fig.13 is a schematic diagram of the structure of an electronic device provided by an embodiment of the present invention, such as Fig.13 As shown, the electronic device may include the above Fig.12 The multi-point leveling control device for the lifting equipment shown. The electronic equipment includes:
[0182] processor;
[0183] A memory having computer-readable instructions stored therein, which, when executed by a processor, implements a multi-point leveling control method for a lifting device as provided in any of the above embodiments.
[0184] Optionally, the electronic device 1310 may include a first processor 1301 .
[0185] Optionally, the electronic device 1310 may further include a memory 1302 and a transceiver 1303 .
[0186] The first processor 1301, the memory 1302 and the transceiver 1303 may be connected via a communication bus.
[0187] Combine the following Fig.13 The components of the electronic device 1310 are described in detail:
[0188] The first processor 1301 is the control center of the electronic device 1310, and may be a processor or a general term for multiple processing elements. For example, the first processor 1301 is one or more central processing units (CPUs), or may be application specific integrated circuits (ASICs), or may be one or more integrated circuits configured to implement the embodiments of the present invention, such as one or more microprocessors (digital signal processors, DSPs), or one or more field programmable gate arrays (field programmable gate arrays, FPGAs).
[0189] Optionally, the first processor 1301 may execute various functions of the electronic device 1310 by running or executing a software program stored in the memory 1302 , and calling data stored in the memory 1302 .
[0190] In a specific implementation, as an embodiment, the first processor 1301 may include one or more CPUs, such as Fig.13 CPU0 and CPU1 are shown in FIG.
[0191] In a specific implementation, as an embodiment, the electronic device 1310 may also include multiple processors, such as Fig.13 1301 and the second processor 1304 are shown in FIG. Each of these processors may be a single-core processor (single-CPU) or a multi-core processor (multi-CPU). The processor here may refer to one or more devices, circuits, and / or processing cores for processing data (e.g., computer program instructions).
[0192] The memory 1302 is used to store the software program for executing the solution of the present invention, and is controlled to be executed by the first processor 1301. The specific implementation method can refer to the above method embodiment, which will not be repeated here.
[0193] Optionally, the memory 1302 may be a read-only memory (ROM) or other types of static storage devices that can store static information and instructions, a random access memory (RAM) or other types of dynamic storage devices that can store information and instructions, or an electrically erasable programmable read-only memory (EEPROM), a compact disc read-only memory (CD-ROM) or other optical disc storage, optical disc storage (including compressed optical disc, laser disc, optical disc, digital versatile disc, Blu-ray disc, etc.), a magnetic disk storage medium or other magnetic storage device, or any other medium that can be used to carry or store the desired program code in the form of instructions or data structures and can be accessed by a computer, but is not limited thereto. The memory 1302 may be integrated with the first processor 1301, or may exist independently and access the first processor 1301 through the interface circuit ( Fig.13 The processor 1302 is coupled to the first processor 1301 (not shown), which is not specifically limited in this embodiment of the present invention.
[0194] The transceiver 1303 is used to communicate with a network device or a terminal device.
[0195] Optionally, the transceiver 1303 may include a receiver and a transmitter ( Fig.13 The receiver is used to implement a receiving function, and the transmitter is used to implement a sending function.
[0196] Optionally, the transceiver 1303 may be integrated with the first processor 1301, or may exist independently and communicate with the first processor 1301 through the interface circuit ( Fig.13The processor 1302 is coupled to the first processor 1301 (not shown), which is not specifically limited in this embodiment of the present invention.
[0197] It should be noted that Fig.13 The structure of the electronic device 1310 shown in the figure does not constitute a limitation on the router, and the actual knowledge structure identification device may include more or fewer components than shown in the figure, or combine certain components, or arrange the components differently.
[0198] In addition, the technical effects of the electronic device 1310 can refer to the technical effects of the multi-point leveling control method for the lifting equipment described in the above method embodiment, and will not be repeated here.
[0199] It should be understood that the first processor 1301 in the embodiment of the present invention may be a central processing unit (CPU), and the processor may also be other general-purpose processors, digital signal processors (DSP), application specific integrated circuits (ASIC), field programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or the processor may also be any conventional processor, etc.
[0200] It should also be understood that the memory in the embodiments of the present invention may be a volatile memory or a non-volatile memory, or may include both volatile and non-volatile memories. Among them, the non-volatile memory may be a read-only memory (ROM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), an electrically erasable programmable read-only memory (EEPROM), or a flash memory. The volatile memory may be a random access memory (RAM), which is used as an external cache. By way of example and not limitation, many forms of random access memory (RAM) are available, such as static RAM (SRAM), dynamic random access memory (DRAM), synchronous DRAM (SDRAM), double data rate synchronous dynamic random access memory (DDR SDRAM), enhanced synchronous dynamic random access memory (ESDRAM), synchronous link DRAM (SLDRAM), and direct rambus RAM (DR RAM).
[0201] The above embodiments can be implemented in whole or in part by software, hardware (such as circuits), firmware or any other combination. When implemented by software, the above embodiments can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions or computer programs. When the computer instructions or computer programs are loaded or executed on a computer, the process or function described in the embodiment of the present invention is generated in whole or in part. The computer can be a general-purpose computer, a special-purpose computer, a computer network, or other programmable device. The computer instructions can be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium. For example, the computer instructions can be transmitted from one website, computer, server or data center to another website, computer, server or data center by wired (such as infrared, wireless, microwave, etc.). The computer-readable storage medium can be any available medium that can be accessed by a computer or a data storage device such as a server or data center that contains one or more available media sets. The available medium can be a magnetic medium (for example, a floppy disk, a hard disk, a tape), an optical medium (for example, a DVD), or a semiconductor medium. The semiconductor medium can be a solid-state hard disk.
[0202] The present invention also provides a multi-point leveling control system for a lifting sling, the system comprising: a sling and electronic equipment;
[0203] The hoist comprises: a hoisting frame, a plurality of hoist assemblies, and an inclination sensor. The plurality of hoist assemblies are arranged at the bottom of the hoisting frame. The hoist assembly comprises a hoist, a hoisting rope, and a displacement sensor and a force sensor arranged on the hoisting rope. The hoisting rope is connected to a prefabricated hoisting point on a building module. The inclination sensor is arranged on the building module, and the hoist, the displacement sensor, the force sensor, and the inclination sensor are all connected to the electronic equipment.
[0204] The electronic device is used to execute the multi-point leveling control method for a lifting device as provided in any of the above embodiments.
[0205] The multi-point leveling control system for lifting equipment provided by the embodiment of the present invention detects in real time the length of each hoist rope, the tension exerted on each hoist, and the inclination angle of the building module, and then makes multi-point real-time adjustments to the hoist rope length of the building module from the preparation stage, the stage not lifted off the ground, the semi-lifted off the ground stage, the fully lifted off the ground stage, and the unloading stage, thereby realizing automatic leveling of the building module throughout the entire process, improving the lifting efficiency, quality, and safety, and conforming to the development trend of new building industrialization.
[0206] It should be understood that the term "and / or" in this article is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. A and B can be singular or plural. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship, but it may also indicate an "and / or" relationship. Please refer to the context for specific understanding.
[0207] In the present invention, "at least one" means one or more, and "plurality" means two or more. "At least one of the following" or similar expressions refers to any combination of these items, including any combination of single items or plural items. For example, at least one of a, b, or c can mean: a, b, c, ab, ac, bc, or abc, where a, b, and c can be single or multiple.
[0208] It should be understood that in various embodiments of the present invention, the size of the serial numbers of the above-mentioned processes does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present invention.
[0209] The above are only specific embodiments of the present invention, but the protection scope of the present invention is not limited thereto. Any person skilled in the art who is familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.
Claims
1. A multi-point leveling control method for a lifting device, characterized in that: Applied to a sling, the sling comprises: a sling frame, a plurality of hoist assemblies, and an inclination sensor, wherein the plurality of hoist assemblies are arranged at the bottom of the sling frame, the hoist assembly comprises a hoist, a sling rope, and a displacement sensor and a force sensor arranged on the sling rope, the sling rope is connected to a sling point prefabricated on a building module, and the inclination sensor is arranged on the building module; The method comprises: Controlling the plurality of hoists to retract corresponding suspension ropes to load the building module, and when the building module is not off the ground, based on the tension chasing method, gradually retracting the suspension ropes on the plurality of hoists, so that the tension on each hoist is uniform and gradually increases; When the building module is in a semi-off-the-ground stage, based on the tension exerted on each hoist and the relative position of the building module, the length of the suspension rope of each hoist is adjusted in real time to make the inclination angle of the building module lower than the preset inclination angle; When the building module is in the fully off-the-ground stage, the inclination angle of the building module is controlled to be lower than the preset inclination angle by adjusting the length of the suspension rope of each hoist in real time, and the inclination angle of the building module is monitored; After the building module is moved to a preset position, the hoist is controlled to lower the building module, and the length of the hoist rope of the hoist is kept unchanged until the tension is zero.
2. The multi-point leveling control method for a lifting device according to claim 1, characterized in that: Before controlling the plurality of hoists to retract corresponding suspension ropes to load the building modules, the method further comprises: The horizontal position of each hoist is controlled so that the hoist and the corresponding hanging point are on the same vertical line.
3. The multi-point leveling control method for a lifting device according to claim 1, characterized in that: Based on the pulling force chasing method, the hanging ropes on the plurality of hoists are gradually retracted, including: When F min <F max / 10, shortening the preset length of the hoist rope of the hoist with the smallest pulling force among the plurality of hoists each time; When F max / 10 <F min <F max Based on the PID algorithm, the length of the suspension rope is shortened each time; In the formula, F min F is the value with the smallest pulling force among the plurality of hoists; max It is the value with the largest pulling force among the multiple gourds.
4. The multi-point leveling control method for a lifting device according to claim 1, characterized in that: Based on the tension applied to each hoist and the relative position of the building module, the length of the suspension rope of each hoist is adjusted in real time to make the inclination angle of the building module lower than the preset inclination angle, including: When the inclination angle of the building module exceeds a preset inclination angle, obtaining an adjustment amount corresponding to each of the hoists; Based on the adjustment amount corresponding to each of the hoists, the lengths of the suspension ropes of the plurality of hoists are controlled and adjusted so that the inclination angle is reduced to within the preset inclination angle.
5. The multi-point leveling control method for a lifting device according to claim 4, characterized in that: The obtaining of the adjustment amount corresponding to each of the gourds includes: estimating the relative horizontal coordinates of the center of gravity of the building module according to the pulling force and relative horizontal coordinates of each hoist; Based on the relative horizontal coordinates of the center of gravity of the building module and the bidirectional inclination angle, the adjustment amount corresponding to each hoist is obtained.
6. The multi-point leveling control method for a lifting device according to claim 4, characterized in that: Based on the pulling force on each hoist and the relative position of the building module, the length of the suspension rope of each hoist is adjusted in real time to make the inclination angle of the building module lower than the preset inclination angle, and further comprising: When the pulling forces on the plurality of hoists are uneven, a pulling force target value is calculated based on a genetic algorithm; Based on the tension target value, the rope lengths of the plurality of hoists are adjusted based on PID algorithm control so that the tensions exerted on the plurality of hoists are balanced.
7. The multi-point leveling control method for a lifting device according to claim 1, characterized in that: The method further comprises: When the building module is in the fully off-the-ground stage, when the inclination angle of the building module changes and exceeds a preset inclination angle, an alarm signal is issued; When the inclination angle of the building module changes and is lower than a preset inclination angle, a target tension value is calculated based on a genetic algorithm; Based on the tension target value, the lengths of the suspension ropes of the plurality of hoists are adjusted based on PID algorithm control so that the tensions exerted on the plurality of hoists are balanced.
8. A multi-point leveling control device for a lifting device, characterized in that: Applied to a sling, the sling comprises: a sling frame, a plurality of hoist assemblies, and an inclination sensor, wherein the plurality of hoist assemblies are arranged at the bottom of the sling frame, the hoist assembly comprises a hoist, a sling rope, and a displacement sensor and a force sensor arranged on the sling rope, the sling rope is connected to a sling point prefabricated on a building module, and the inclination sensor is arranged on the building module; The device comprises: A loading module, used for controlling the plurality of hoists to retract corresponding suspension ropes to load the building module, and when the building module is not off the ground, based on a tension chasing method, gradually retracting the suspension ropes on the plurality of hoists, so that the tension on each hoist is uniform and gradually increases; An adjustment module is used to adjust the length of the suspension rope of each hoist in real time when the building module is in a semi-off-the-ground stage based on the tension applied to each hoist and the relative position of the building module, so as to make the inclination angle of the building module lower than the preset inclination angle; A mobile module, used for controlling the inclination angle of the building module to be lower than the preset inclination angle by adjusting the length of the suspension rope of each hoist in real time when the building module is in the fully off-ground stage, and monitoring the inclination angle of the building module; The unloading module is used to control the lifting device to lower the building module after the building module is moved to a preset position, and to keep the length of the lifting rope of the hoist unchanged until the tension is zero.
9. An electronic device, characterized in that: include: processor; A memory having computer-readable instructions stored thereon, wherein when the computer-readable instructions are executed by the processor, the multi-point leveling control method for a lifting device according to any one of claims 1 to 7 is implemented.
10. A multi-point leveling control system for a lifting device, characterized in that: The system comprises: a sling and electronic equipment; The hoist comprises: a hoisting frame, a plurality of hoist assemblies, and an inclination sensor, wherein the plurality of hoist assemblies are arranged at the bottom of the hoisting frame, the hoist assembly comprises a hoist, a hoisting rope, and a displacement sensor and a force sensor arranged on the hoisting rope, the hoisting rope is connected to a prefabricated hoisting point on a building module, the inclination sensor is arranged on the building module, and the hoist, the displacement sensor, the force sensor, and the inclination sensor are all connected to the electronic device; The electronic device is used to execute the multi-point leveling control method for a lifting device according to any one of claims 1 to 7.
Citation Information
Patent Citations
Cable traction automatic leveling hanger and method thereof
CN101633478A
Hanger
CN103449300A
Building construction hoisting device with impurity falling prevention and overload prompting functions
CN114314366A
Self-balancing hoisting system and method for test model
CN114803828A
Lifting appliance leveling method, device, equipment and system
CN117142312A
Cited By
Self-balancing intelligent hoisting system for prefabricated part
CN120817539A
Multi-point synchronous lifting control method and device of lifting mechanism
CN120817546A