Overhead transferring and hoisting method for cross-obstacle component

Through the coordinated operation of three cranes and the method of taking hooks with high altitude vehicles, the problem of lifting difficulties in heavy steel components when installing cross obstacles is solved, and the safe and efficient installation of components is achieved.

CN118908061AInactive Publication Date: 2024-11-08CHINA MCC5 GROUP CORP LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202410994801.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-24
Publication Date
2024-11-08
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

When the prior art cannot effectively lift and install heavy steel components, especially when crossing obstacles, the crane arm length limitation and excessive weight of the component will cause the crane to be unable to move after lifting, and the installation of the components will not be completed.

Method used

Three cranes are used to work together. Two cranes of the same model are first lifted and their center of gravity passes through obstacles. Then the third crane is used to cooperate or a single crane to lift the components to the installation position, or use a high-altitude truck to pick up the hook. Lifting.

Benefits of technology

It effectively solves the lifting difficulties caused by the length of the crane arm and the excessive weight of the components, and realizes the safe, scientific and efficient crossing obstacles and completing installation of the heavy components.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118908061A_ABST
    Figure CN118908061A_ABST
Patent Text Reader

Abstract

The invention discloses an air transfer hoisting method for a cross-obstacle component, which comprises the following steps: a crane A, a crane B and a crane C are adopted for cooperative operation, the crane A is distributed on one side of an obstacle, the crane B and the crane C are distributed on the other side of the obstacle, the crane A hoists one end of the component, the crane B hoists the other end of the component and simultaneously hoists, and then crane arms of the two cranes rotate at the same frequency; and then the crane C is adopted to cooperate with the crane A and the crane B to hoist the component to the installation working condition for installation of the component. According to the method, two cranes of the same model are adopted to lift a component, and the gravity center of the component crosses an obstacle; and then the third crane is used for sequentially cooperating with the first two cranes or hoisting the component to the installation position in a single-machine platform hoisting mode for component installation. In this way, the technical problem that in the prior art, due to the fact that the length of a crane arm is limited or the dead weight of a component is too heavy, the crane cannot run and move after hoisting, and the reconstructed component cannot be hoisted and mounted by crossing the obstacle can be effectively solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of steel component construction, and in particular relates to a method for aerial transfer and hoisting of components across obstacles. Background Art

[0002] During the construction of steel components, due to the limitation of the steel component assembly site and construction conditions, the steel components need to be hoisted and installed over obstacles at the construction conditions. Since the steel components themselves are heavy, for example, hundreds of tons of components need to be hoisted over obstacles for installation. Although the existing crane can lift the steel components, it is unable to complete the operation of lifting hundreds of tons of steel components and over obstacles due to the limitation of the crane's arm length and the inability of the crane to move after lifting. The existing technology also does not have a good way to solve this technical problem. Summary of the invention

[0003] The technical problem to be solved by the present invention is to provide a method for aerial transfer and hoisting of components across obstacles, so as to at least solve some of the above-mentioned technical problems.

[0004] To achieve the above purpose, the technical solution adopted by the present invention is as follows:

[0005] A method for aerial transfer and hoisting of components across obstacles, using three cranes, crane A, crane B and crane C, to work together, crane A is distributed on one side of the obstacle, and crane B and crane C are distributed on the other side of the obstacle, crane A hoists one end of the component and crane B hoists the other end of the component, and then hoists them simultaneously, then the crane arms of the two cranes rotate at the same frequency to make the center of gravity of the component pass the obstacle, and then crane C is used to cooperate with crane A and crane B to hoist the component to the installation condition for component installation.

[0006] Furthermore, after the center of gravity of the component passes over the obstacle, crane C sequentially cooperates with crane A and crane B to lift the component to the installation position for component installation.

[0007] Furthermore, after the center of gravity of the component passes the obstacle, crane C holds the other end of the component and slowly reduces the force until crane B completely unloads the force and unhooks from the component; crane B holds one end of the component and slowly reduces the force until crane A completely unloads the force and unhooks from the component; crane B and crane C jointly lift the component to the installation position for installation, and crane B and crane C unhook to complete the lifting.

[0008] Furthermore, when crane A, crane B and crane C unload the hook, an aerial vehicle is used to remove the hook.

[0009] Furthermore, any two cranes among crane A, crane B and crane C can meet the requirements of component lifting when used as double cranes.

[0010] Furthermore, after the center of gravity of the component passes over the obstacle, crane C replaces crane A and crane B in the air and uses a single-machine crane method to lift the component to the installation position for component installation.

[0011] Furthermore, after the center of gravity of the component passes the obstacle, crane C holds the center of gravity of the component and slowly reduces the force until crane A and crane B completely unload the force and unhook the component. Crane C uses a single-machine crane method to lift the component to the installation position for component installation.

[0012] Furthermore, crane A and crane B are of the same model, and crane A and crane B can meet the needs of component lifting when they are used as double-machine cranes, and crane C can meet the needs of component lifting when it is used as a single-machine crane.

[0013] Compared with the prior art, the present invention has the following beneficial effects:

[0014] The present invention is scientifically and reasonably designed. Through the coordinated operation of three cranes, two cranes of the same model are first used to lift the component and make its center of gravity pass over obstacles; then the third crane is used to sequentially cooperate with the first two cranes to lift the component to the installation position for component installation, or the third crane is used to lift the component to the installation position in a single-machine crane manner for component installation. This can effectively solve the technical problem of the prior art that the heavy component cannot be lifted and installed over obstacles due to the limitation of the crane arm length or the excessive weight of the component, which causes the crane to be unable to move after lifting. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 This is a schematic diagram of crane A and crane B jointly lifting a component when crane C of the present invention adopts a double-machine crane.

[0016] Figure 2 This is a schematic diagram of crane A and crane B jointly lifting a component and then crossing an obstacle when crane C of the present invention adopts a double-machine crane.

[0017] Figure 3 This is a schematic diagram of crane C replacing crane B when crane C of the present invention adopts a double-machine crane.

[0018] Figure 4 This is a schematic diagram of crane B replacing crane A when crane C of the present invention adopts a double-machine crane.

[0019] Figure 5 This is a schematic diagram of component installation when the crane C of the present invention adopts a double-machine crane and the crane C and the crane B cooperate to lift the component to the installation position.

[0020] Figure 6 This is a schematic diagram of crane A and crane B jointly lifting a component when crane C of the present invention adopts a single-machine crane.

[0021] Figure 7This is a schematic diagram of crane A and crane B jointly lifting a component and then crossing an obstacle when crane C of the present invention adopts a single-machine crane.

[0022] Figure 8 This is a schematic diagram of crane C replacing crane A and crane B simultaneously when crane C of the present invention adopts a single-machine crane.

[0023] Fig. 9 This is a schematic diagram of component installation when the crane C of the present invention adopts a single-machine crane to hoist the component to the installation position.

[0024] Fig.10 This is a schematic diagram of four groups of lifting eyes a, b, c, and d on a component when the crane C of the present invention adopts double-platform lifting.

[0025] The names corresponding to the reference numerals are:

[0026] 1-Crane A, 2-Crane B, 3-Crane C, 4-Component, 5-Obstacle. DETAILED DESCRIPTION

[0027] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0028] Example 1.

[0029] like Figure 1-Figure 10 As shown, the present invention provides a method for aerial transfer and hoisting of a component across an obstacle, which adopts three cranes, crane A, crane B and crane C, to work together. Crane A is distributed on one side of the obstacle, and crane B and crane C are distributed on the other side of the obstacle. Crane A hoists one end of the component and crane B hoists the other end of the component and then lifts them simultaneously. Afterwards, the crane arms of the two cranes rotate at the same frequency to make the center of gravity of the component pass over the obstacle. Then crane C is used to cooperate with crane A and crane B to hoist the component to the installation condition for component installation.

[0030] The present invention is scientifically and reasonably designed. Through the coordinated operation of three cranes, two cranes of the same model are first used to lift the component and make its center of gravity pass over obstacles; then the third crane is used to sequentially cooperate with the first two cranes to lift the component to the installation position for component installation, or the third crane is used to lift the component to the installation position in a single-machine crane manner for component installation. This can effectively solve the technical problem of the prior art that the heavy component cannot be lifted and installed over obstacles due to the limitation of the crane arm length or the excessive weight of the component, which causes the crane to be unable to move after lifting.

[0031] Example 2.

[0032] like Figure 1-Figure 10 As shown, the present invention provides a method for aerial transfer and hoisting of a component across an obstacle, which adopts three cranes, crane A, crane B and crane C, to work together. Crane A is distributed on one side of the obstacle, and crane B and crane C are distributed on the other side of the obstacle. Crane A hoists one end of the component and crane B hoists the other end of the component and then lifts them simultaneously. Afterwards, the crane arms of the two cranes rotate at the same frequency to make the center of gravity of the component pass over the obstacle. Then crane C is used to cooperate with crane A and crane B to hoist the component to the installation condition for component installation.

[0033] After the center of gravity of the component passes the obstacle, crane C cooperates with crane A and crane B in sequence to lift the component to the installation position for component installation.

[0034] The present invention is scientifically and reasonably designed. Through the coordinated operation of three cranes, two cranes of the same model are first used to lift the component and make its center of gravity pass over obstacles; then the third crane is used to sequentially cooperate with the first two cranes to lift the component to the installation position for component installation. This can effectively solve the technical problem of the prior art that the heavy component cannot be lifted and installed over obstacles due to the limitation of the crane arm length or the excessive weight of the component, which causes the crane to be unable to move after lifting.

[0035] Example 3.

[0036] like Figure 1-Figure 10 As shown, the present invention provides a method for aerial transfer and hoisting of a component across an obstacle, which adopts three cranes, crane A, crane B and crane C, to work together. Crane A is distributed on one side of the obstacle, and crane B and crane C are distributed on the other side of the obstacle. Crane A hoists one end of the component and crane B hoists the other end of the component and then lifts them simultaneously. Afterwards, the crane arms of the two cranes rotate at the same frequency to make the center of gravity of the component pass over the obstacle. Then crane C is used to cooperate with crane A and crane B to hoist the component to the installation condition for component installation.

[0037] After the center of gravity of the component passes the obstacle, crane C cooperates with crane A and crane B in sequence to lift the component to the installation position for component installation.

[0038] After the center of gravity of the component passes the obstacle, crane C holds the other end of the component and slowly reduces the force until crane B completely unloads the force and unhooks from the component; crane B holds one end of the component and slowly reduces the force until crane A completely unloads the force and unhooks from the component; crane B and crane C jointly lift the component to the installation position for installation, and crane B and crane C unhook to complete the lifting.

[0039] On the basis of Example 2, this Example 3 provides a more preferred method for installing the component by crane C cooperating with the first two cranes in sequence to lift the component to the installation position. Specifically: after the center of gravity of the component passes over the obstacle, crane C lifts the other end of the component and slowly reduces the force until crane B completely unloads the force and unhooks from the component; crane B lifts one end of the component and slowly reduces the force until crane A completely unloads the force and unhooks from the component; crane B and crane C jointly lift the component to the installation station for installation, and crane B and crane C unhook to complete the lifting. This can effectively solve the technical problem of the prior art that the heavy component cannot be lifted and installed over obstacles due to the limitation of the crane arm length or the excessive weight of the component, which causes the crane to be unable to move after lifting.

[0040] Example 4.

[0041] like Figure 1-Figure 10 As shown, the present invention provides a method for aerial transfer and hoisting of a component across an obstacle, which adopts three cranes, crane A, crane B and crane C, to work together. Crane A is distributed on one side of the obstacle, and crane B and crane C are distributed on the other side of the obstacle. Crane A hoists one end of the component and crane B hoists the other end of the component and then lifts them simultaneously. Afterwards, the crane arms of the two cranes rotate at the same frequency to make the center of gravity of the component pass over the obstacle. Then crane C is used to cooperate with crane A and crane B to hoist the component to the installation condition for component installation.

[0042] After the center of gravity of the component passes the obstacle, crane C cooperates with crane A and crane B in sequence to lift the component to the installation position for component installation.

[0043] After the center of gravity of the component passes the obstacle, crane C holds the other end of the component and slowly reduces the force until crane B completely unloads the force and unhooks from the component; crane B holds one end of the component and slowly reduces the force until crane A completely unloads the force and unhooks from the component; crane B and crane C jointly lift the component to the installation position for installation, and crane B and crane C unhook to complete the lifting.

[0044] When crane A, crane B and crane C unload the hook, a high-altitude vehicle is used to remove the hook.

[0045] This embodiment 4 provides a more preferred method based on the embodiment 3. Specifically, when crane A, crane B and crane C unload the hook, an aerial vehicle is used to take the hook. Such a design is more efficient, scientific, convenient and safe.

[0046] Example 5.

[0047] like Figure 1-Figure 10As shown, the present invention provides a method for aerial transfer and hoisting of a component across an obstacle, which adopts three cranes, crane A, crane B and crane C, to work together. Crane A is distributed on one side of the obstacle, and crane B and crane C are distributed on the other side of the obstacle. Crane A hoists one end of the component and crane B hoists the other end of the component and then lifts them simultaneously. Afterwards, the crane arms of the two cranes rotate at the same frequency to make the center of gravity of the component pass over the obstacle. Then crane C is used to cooperate with crane A and crane B to hoist the component to the installation condition for component installation.

[0048] After the center of gravity of the component passes the obstacle, crane C cooperates with crane A and crane B in sequence to lift the component to the installation position for component installation.

[0049] Any two cranes among crane A, crane B and crane C can meet the needs of component lifting when used as double cranes.

[0050] This embodiment 5 provides a more preferred method based on embodiment 2. Specifically, any two cranes among crane A, crane B and crane C can meet the requirements of component hoisting when they are used as double cranes. Such a design is more efficient, scientific, convenient and safe.

[0051] Example 6.

[0052] like Figure 1-Figure 10 As shown, the present invention provides a method for aerial transfer and hoisting of a component across an obstacle, which adopts three cranes, crane A, crane B and crane C, to work together. Crane A is distributed on one side of the obstacle, and crane B and crane C are distributed on the other side of the obstacle. Crane A hoists one end of the component and crane B hoists the other end of the component and then lifts them simultaneously. Afterwards, the crane arms of the two cranes rotate at the same frequency to make the center of gravity of the component pass over the obstacle. Then crane C is used to cooperate with crane A and crane B to hoist the component to the installation condition for component installation.

[0053] After the center of gravity of the component passes the obstacle, crane C replaces crane A and crane B in the air and uses a single-machine crane method to lift the component to the installation position for component installation.

[0054] The present invention is scientifically and rationally designed. Through the coordinated operation of three cranes, two cranes of the same model are first used to lift the component and make its center of gravity pass over obstacles; then the third crane is used to lift the component to the installation position in a single-machine crane manner for component installation. This can effectively solve the technical problem of the prior art that the heavy component cannot be lifted and installed over obstacles due to the limitation of the crane arm length or the excessive weight of the component, which causes the crane to be unable to move after lifting.

[0055] Example 7.

[0056] like Figure 1-Figure 10As shown, the present invention provides a method for aerial transfer and hoisting of a component across an obstacle, which adopts three cranes, crane A, crane B and crane C, to work together. Crane A is distributed on one side of the obstacle, and crane B and crane C are distributed on the other side of the obstacle. Crane A hoists one end of the component and crane B hoists the other end of the component and then lifts them simultaneously. Afterwards, the crane arms of the two cranes rotate at the same frequency to make the center of gravity of the component pass over the obstacle. Then crane C is used to cooperate with crane A and crane B to hoist the component to the installation condition for component installation.

[0057] After the center of gravity of the component passes the obstacle, crane C replaces crane A and crane B in the air and uses a single-machine crane method to lift the component to the installation position for component installation.

[0058] After the center of gravity of the component passes the obstacle, crane C holds the center of gravity of the component and slowly reduces the force until crane A and crane B completely unload the force and unhook the component. Crane C uses a single-machine crane method to lift the component to the installation position for component installation.

[0059] Based on Example 6, this Example 7 provides a more preferred method for crane C to hoist the component to the installation position in a single-machine crane manner for component installation. Specifically, after the center of gravity of the component passes over the obstacle, crane C holds the center of gravity of the component and slowly retracts the force until crane A and crane B completely unload the force and unhook the component, and crane C uses a single-machine crane to hoist the component to the installation position for component installation. This can effectively solve the technical problem of the prior art that the heavy component cannot be lifted and installed over obstacles due to the limitation of the crane arm length or the excessive weight of the component, which causes the crane to be unable to move after lifting.

[0060] Example 8.

[0061] like Figure 1-Figure 10 As shown, the present invention provides a method for aerial transfer and hoisting of a component across an obstacle, which adopts three cranes, crane A, crane B and crane C, to work together. Crane A is distributed on one side of the obstacle, and crane B and crane C are distributed on the other side of the obstacle. Crane A hoists one end of the component and crane B hoists the other end of the component and then lifts them simultaneously. Afterwards, the crane arms of the two cranes rotate at the same frequency to make the center of gravity of the component pass over the obstacle. Then crane C is used to cooperate with crane A and crane B to hoist the component to the installation condition for component installation.

[0062] After the center of gravity of the component passes the obstacle, crane C replaces crane A and crane B in the air and uses a single-machine crane method to lift the component to the installation position for component installation.

[0063] Crane A and crane B are of the same model, and crane A and crane B can meet the needs of component lifting when they are hoisted in pairs, and crane C can meet the needs of component lifting when it is hoisted in a single unit.

[0064] This embodiment 8 provides a more preferred method based on embodiment 6. Specifically, crane A and crane B are cranes of the same model, and crane A and crane B can meet the requirements of component hoisting when they are double cranes, and crane C can meet the requirements of component hoisting when it is single crane. Such a design is more efficient, scientific, convenient and safe.

[0065] like Figure 1-Figure 10 As shown, the present invention provides a method for aerial transfer and hoisting of components across obstacles, which is specifically divided into the following two methods.

[0066] Method 1:

[0067] Step 1: According to the weight of the component, select suitable cranes A1, B2 and C3 of the same model. When selecting, ensure that any two cranes can meet the lifting requirements of the component when lifting with double cranes; determine the arm length and lifting radius R, and then determine the four sets of lifting ears a, b, c, d;

[0068] Step 2: Set up crane A1 on one side of obstacle 5, and crane B2 and crane C3 on the other side. The lifting ropes of crane A1 and crane B2 are connected to the two sets of lifting ears a and b respectively. After the connection is completed; before lifting the component, the booms of crane A1 and crane B2 are parallel to each other, and the component 4 is lifted by trial. After it is correct, the crane arms are rotated at the same frequency to make the center of gravity G of the component pass over obstacle 5 and reach the operating radius position of crane C3.

[0069] Step 3: The lifting rope of crane C3 is connected to the lifting lugs of group c, and the lifting rope of crane C3 is retracted to unload the lifting rope of crane B2; a high-altitude vehicle is used to take the hook of crane B2;

[0070] Step 4: Connect the lifting rope of crane B2 to the lifting lugs of group d, and retract the lifting rope of crane B2 to unload the lifting rope of crane A1; use an aerial vehicle to take the hook of crane A1;

[0071] Step 5: Crane B2 and crane C3 rotate at the same frequency to lift the component to the installation location;

[0072] Step 6: After the components are fixed, use an aerial vehicle to take the hooks of crane B2 and crane C3 to complete the lifting.

[0073] The a and b groups of the present invention have the same size and style, and the c and d groups of the present invention have the same size and style; each group of the present invention has 4 hanging ears in total. The center distance L of the two groups of hanging ears a and c and b and d satisfies 1 / 2(B+B1)+500<L≤1 / 2(B+B1)+1000.

[0074] Method 2:

[0075] Step 1: According to the weight of the component, select 3 cranes, namely crane A1, crane B2 and crane C3; among them, crane A1 and crane B2 are cranes of the same model, and a double-machine crane can meet the lifting needs of the component; crane C3 is a single-machine crane that can meet the lifting needs of component 4.

[0076] Step 2: Determine the arm length and lifting radius of crane A1 and crane B2 when lifting with two cranes, determine the arm length and lifting radius of crane C3 when lifting with one crane, and then determine the three sets of lifting eyes a, b, e;

[0077] Step 3: Set up crane A1 on one side of obstacle 5 and crane B2 on the other side; set up crane C3 on the opposite side of crane B2. The lifting ropes of crane A1 and crane B2 are connected to the two sets of lifting ears a and b respectively. After the connection is completed; before lifting the component, the crane A1 and crane B2 arms are parallel to each other, and the component 4 is lifted for trial. After it is correct, the crane arms rotate at the same frequency to make the center of gravity of the component pass the obstacle and reach the operating radius position of crane C3.

[0078] Step 4: The lifting rope of crane C3 is connected to the lifting lugs of group c, and the lifting rope of crane C3 is retracted to unload the lifting ropes of cranes A1 and B2; an aerial vehicle is used to take the hooks of cranes A1 and B2;

[0079] Step 5: Crane C3 lifts the component to the installation location; after the component is fixed, use an aerial vehicle to take the hook of crane C3 to complete the lifting.

[0080] Finally, it should be noted that the above embodiments are only preferred embodiments of the present invention to illustrate the technical solution of the present invention, but not to limit it, and certainly not to limit the patent scope of the present invention. Any changes or modifications that are made to the main design concept and spirit of the present invention without any substantial meaning, and the technical problems they solve are still consistent with the present invention, should be included in the protection scope of the present invention; in addition, the direct or indirect application of the technical solution of the present invention in other related technical fields is also included in the patent protection scope of the present invention.

Claims

1. A method for aerial transfer and hoisting of components across obstacles. It is characterized in that Three cranes, crane A, crane B and crane C, are used to work together. Crane A is distributed on one side of the obstacle, and crane B and crane C are distributed on the other side of the obstacle. Crane A lifts one end of the component and crane B lifts the other end of the component and then lifts them at the same time. After that, the crane arms of the two cranes rotate at the same frequency to make the center of gravity of the component pass the obstacle. Then crane C is used to cooperate with crane A and crane B to lift the component to the installation condition for component installation.

2. A method for aerial transfer and hoisting of a component across obstacles according to claim 1, It is characterized in that After the center of gravity of the component passes the obstacle, crane C cooperates with crane A and crane B in sequence to lift the component to the installation position for component installation.

3. A method for aerial transfer and hoisting of a component across obstacles according to claim 2, It is characterized in that After the center of gravity of the component passes the obstacle, crane C holds the other end of the component and slowly reduces the force until crane B completely unloads the force and unhooks from the component; crane B holds one end of the component and slowly reduces the force until crane A completely unloads the force and unhooks from the component; crane B and crane C jointly lift the component to the installation position for installation, and crane B and crane C unhook to complete the lifting.

4. A method for aerial transfer and hoisting of a component across obstacles according to claim 3, It is characterized in that When crane A, crane B and crane C unload the hook, a high-altitude vehicle is used to remove the hook.

5. A method for aerial transfer and hoisting of a component across obstacles according to claim 2, It is characterized in that Any two cranes among crane A, crane B and crane C can meet the needs of component lifting when used as double cranes.

6. A method for aerial transfer and hoisting of a component across obstacles according to claim 1, It is characterized in that After the center of gravity of the component passes the obstacle, crane C replaces crane A and crane B in the air and uses a single-machine crane method to lift the component to the installation position for component installation.

7. A method for aerial transfer and hoisting of a component across obstacles according to claim 6, It is characterized in that After the center of gravity of the component passes the obstacle, crane C holds the center of gravity of the component and slowly reduces the force until crane A and crane B completely unload the force and unhook the component. Crane C uses a single-machine crane method to lift the component to the installation position for component installation.

8. A method for aerial transfer and hoisting of a component across obstacles according to claim 6, It is characterized in that Crane A and crane B are of the same model, and crane A and crane B can meet the needs of component lifting when they are hoisted in pairs, and crane C can meet the needs of component lifting when it is hoisted in a single unit.

Citation Information

Patent Citations

  • Three-stage-relay hoisting construction method for large-span arc-shaped truss

    CN104652827A

  • High-speed rail operating line spanning beam body hoisting and separating method

    CN106276602A

  • Transportation method for overall obstacle crossing transmission of hanging beam

    CN118343610A

  • Luffing crane with overload protection mechanism

    US4047617A