Water-rich roadbed self-drainage pipeline construction measure and construction method thereof

By employing a sand cushion layer and multiple layers of geotextile wrapped with UPVC drainage pipes in water-rich roadbeds, combined with water spraying and cleaning devices, the problem of untimely drainage during the rainy season was solved, achieving efficient roadbed self-drainage and simplified construction.

CN118910966APending Publication Date: 2024-11-08CHINA CONSTR FOURTH BUREAU FOURTH CONSTR ENG +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411216981.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-02
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The existing self-drainage pipes for water-rich roadbeds do not drain water in time during the rainy season, resulting in poor water pumping from the roadbed, which can easily cause roadbed damage. In addition, the drainage holes are prone to blockage, affecting the drainage effect.

Method used

The UPVC drainage pipe is constructed by using a sand cushion layer and multiple layers of geotextile wrapping, combined with a water spraying device and a cleaning device. The water spraying and cleaning flow holes ensure that rainwater is quickly discharged into the pipe, and the piston plate and spring system are used to remove blockages.

Benefits of technology

It improves the self-drainage performance of the roadbed, reduces the probability of roadbed damage from water immersion, enhances the bearing capacity of the roadbed, simplifies construction, reduces ineffective pumping work, and improves drainage efficiency and construction cycle.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118910966A_ABST
    Figure CN118910966A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of roadbed self-drainage pipelines, and discloses a water-rich roadbed self-drainage pipeline structure measure and a construction method thereof. The water-rich roadbed self-drainage pipeline structure measure comprises a sand cushion layer, outer sand gravel is installed at the upper end of the sand cushion layer, outer geotechnical cloth is wrapped in the outer sand gravel, inner sand gravel is wrapped in the outer geotechnical cloth, and the inner sand gravel and the inner geotechnical cloth are arranged in a staggered mode. The inner geotextile is wrapped in the inner sand gravel, and the UPVC drainage pipe is wrapped in the inner geotextile. The drainage pipeline is effectively combined with the geotechnical cloth and the permeable material, the self-drainage performance of the roadbed is improved, the probability that the roadbed is damaged by soaking in water in the later period is greatly reduced, meanwhile, the overall bearing capacity performance of the roadbed and the structural layer is enhanced, invalid work of repeated pumping and drainage of underground water is effectively reduced, the overall performance of the road structure is better, and the service life of the roadbed is prolonged. The method has the advantages of simplicity in construction, short construction period, high operability, strong applicability, easiness in popularization in the existing engineering field, wide application range and the like.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of roadbed self-drainage pipelines, in particular to a water-rich roadbed self-drainage pipeline construction measure and a construction method thereof. Background Art

[0002] The rainfall in some areas during the rainy season is heavy and mostly concentrated in May-July. After the rainy season, the groundwater level rises to a high level, causing the roadbed to be saturated with water, which is easy to damage the roadbed. The roadbed bearing layer is the active layer of roadbed water. If the groundwater in the bearing layer cannot be removed in time and effectively, the strength of the roadbed soil will gradually decrease, causing water damage to the roadbed. The main purpose of setting up a blind ditch is to lower the groundwater level and effectively remove the groundwater from the base bed.

[0003] At present, in many actual projects, the drainage of construction sites still adopts relatively traditional water collection open drainage, generator drainage and other methods. In the rainy season, the roadbed water is often not pumped out in time, resulting in quality problems in the on-site roadbed. The rectification process is time-consuming and labor-intensive. In order to improve the supporting force of the drainage pipe and avoid pipe sinking and deformation, only a number of water holes are opened on the upper surface of the drainage pipe, and the aperture of the water hole is 8mm. Therefore, when the mud and water on the outer surface of the drainage pipe dries and cracks, the water holes will be blocked. When there is too much rain again, it takes some time to soften the solidified soil, so the drainage effect is still defective. Summary of the invention

[0004] The present invention provides a water-rich roadbed self-drainage pipeline construction measure and a construction method thereof, which solves the problem of untimely drainage of the existing water-rich roadbed self-drainage pipeline construction measures mentioned in the above background technology.

[0005] The present invention provides the following technical solution: a water-rich roadbed self-drainage pipeline construction measure includes a sand cushion layer, an outer layer of gravel is installed on the upper end of the sand cushion layer, the outer layer of gravel is wrapped with an outer layer of geotextile, the outer layer of geotextile is wrapped with an inner layer of gravel, the inner layer of gravel is wrapped with an inner layer of geotextile, the inner layer of geotextile is wrapped with a UPVC drainage pipe, and the outer surface of the UPVC drainage pipe is provided with a plurality of water flow holes;

[0006] The inner wall of the UPVC drain pipe is also equipped with a water spray device, and the upper end of the water spray device is equipped with a cleaning device, and the cleaning device is used to clean the water flow hole. The cleaning device includes a circular sleeve slidably connected to the upper end of the water spray device, and the diameter of the circular sleeve is the same as the diameter of the water flow hole. The water spray device includes a cylinder arranged on the inner wall of the UPVC drain pipe, and a piston plate is slidably connected to the inside of the cylinder. The piston plate and the UPVC drain pipe are connected by a first spring. A cylinder is installed on the upper end of the piston plate, and the cylinder passes through the water flow hole. The upper end of the cylinder is inserted into the inside of the circular sleeve, and the circular sleeve and the cylinder are connected by a second spring.

[0007] As an optional solution for the water-rich roadbed self-drainage pipeline construction measures of the present invention, wherein: the cylinder is provided with a first groove and a second groove respectively, the first groove is communicated with the second groove, the piston plate is slidably connected to the inside of the first groove, the diameter of the piston plate matches the inner diameter of the first groove, and the inner diameter of the first groove is smaller than the inner diameter of the second groove;

[0008] The inner wall of the cylinder is also provided with an elastic sheet, and the piston plate can be operated to squeeze the elastic sheet to deform.

[0009] As an optional solution for the construction measures of the water-rich roadbed self-drainage pipeline of the present invention, wherein: a collecting plate is connected between each two of the circular sleeves, the two collecting plates are hinged, elastic cloth is installed at both ends of the collecting plates, and a storage space is formed between the elastic cloth and the collecting plates.

[0010] As an optional solution for the water-rich roadbed self-drainage pipeline construction measures of the present invention, wherein: the outer surface of the UPVC drainage pipe is also installed with a spraying device, the spraying device is used to spray liquid, the spraying device includes a water push box installed on the outer surface of the UPVC drainage pipe, the collecting tank is provided with a collecting tank inside, and the inside of the collecting tank is slidably connected with a square frame;

[0011] The outer surface of the UPVC drainage pipe is also provided with a convex plate, which is used to lift up the collecting plate to pour and push the liquid into the water tank.

[0012] As an optional solution to the water-rich roadbed self-drainage pipeline construction measures of the present invention, a baffle is installed at one end of the circular sleeve, and the baffle is used to backflow the air injected at the water flow hole.

[0013] As an optional scheme for the construction measures of the self-draining pipeline of the water-rich roadbed described in the present invention, a transparent plate is arranged inside the square frame, a square plate is also slidably connected inside the collecting tank, the square plate is used to seal the transparent plate, a steel cable is installed at one end of the square frame, the steel cable passes through the square plate and the water push box and is connected to the piston plate.

[0014] As an optional scheme for the construction measures of the self-draining pipeline of the water-rich roadbed described in the present invention, a short shaft is installed at one end of the water push box, and the outer surface of the short shaft is rotatably connected with a water baffle plate, and the water baffle plate is used to seal one end of the collecting tank. A water spray hole is provided at one end of the water baffle plate, and the water spray hole is connected to the collecting tank. A limiting strip is also installed at one end of the water push box, and the limiting strip is used to abut against the water baffle plate.

[0015] As an optional solution for the water-rich roadbed self-drainage pipeline construction measures of the present invention, wherein: the square plate and the water push box are connected by a third spring;

[0016] The square frame is connected to the water push box.

[0017] As an optional scheme for the construction measures of the water-rich roadbed self-drainage pipeline of the present invention, the sand cushion layer includes medium sand, coarse sand, stone chips, crushed stone and pebbles, and the ratio of the sand, coarse sand, stone chips, crushed stone and pebbles is 2:3:1:1:0.5.

[0018] The present invention also provides a construction method for a water-rich roadbed self-drainage pipeline construction measure.

[0019] S1. First, dig the drainage pipe trench, lay the sand cushion layer, and place an inner geotextile on the sand cushion layer;

[0020] S2, then backfill the inner layer of sand and gravel on the inner layer of geotextile;

[0021] S3, then install the UPVC drainage pipe wrapped with the inner geotextile on the inner layer of gravel;

[0022] S4. Wrap the inner layer of gravel and UPVC drainage pipe with the outer layer of geotextile to form a double-layer geotextile filtration structure;

[0023] S5. Finally, backfill the pipeline trench with an outer layer of sand and gravel.

[0024] The present invention has the following beneficial effects:

[0025] 1. The self-drainage pipeline construction measures of the water-rich roadbed adopt the effective combination of drainage pipes, geotextiles and permeable materials to improve the self-drainage performance of the roadbed, and greatly reduce the probability of water damage to the roadbed in the later stage, while enhancing the overall bearing capacity of the roadbed and the structural layer. It is mainly composed of drainage pipes, geotextiles, permeable materials, etc. The structure is used to achieve self-drainage of the roadbed, and effectively reduce the ineffective work of repeated pumping and drainage of groundwater, so that the overall performance of the road structure is better, the construction is simple, the construction period is short, the operability is high, the applicability is strong, and it is easy to promote in the existing engineering field and has a wide range of applications.

[0026] 2. The water-rich roadbed self-drainage pipe construction measures use the rainwater mass to press the collection plate and the round sleeve downward to slide, and use the round sleeve to insert the water flow hole, so as to use the water flow hole to crush the soil inside the water flow hole, so that the water flow hole can discharge the rainwater into the inside of the UPVC drainage pipe again.

[0027] 3. The water-rich roadbed self-drainage pipeline construction measures use the first spring to pull the piston plate to reset. When the first spring pulls the piston plate to reset, when the piston plate slides to the first groove, the piston plate will squeeze the air inside the first groove and spray it out from the water flow hole. The air is used to blow away the nearby fine sand, so that rainwater on the road surface can flow quickly to the UPVC drainage pipe. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 It is the main cross-sectional view of the present invention as a whole.

[0029] Figure 2 It is a main cross-sectional view of the UPVC drainage pipe of the present invention.

[0030] Figure 3 It is a schematic structural diagram of the cleaning device of the present invention.

[0031] Figure 4 For the present invention Figure 3 Schematic diagram of the local structure at point A.

[0032] Figure 5 For the present invention Figure 4 Schematic diagram of the local structure at location B.

[0033] Figure 6 For the present invention Figure 1 Schematic diagram of the local structure at location C.

[0034] 1. Outer layer of gravel; 2. Outer layer of geotextile; 3. Inner layer of gravel; 4. Inner layer of geotextile; 5. UPVC drainage pipe; 6. Sand cushion layer; 7. Water spraying device; 8. Cleaning device; 9. Spraying device; 10. Water flow hole; 11. Water retaining plate; 12. Short axis; 13. Water spraying hole; 14. Limiting strip; 71. Cylinder; 72. First groove; 73. Second groove; 74. Piston plate; 75. Shrapnel; 76. Cylinder; 77. First spring; 81. Round sleeve; 82. Second spring; 83. Baffle; 84. Collecting plate; 85. Elastic cloth; 86. Convex plate; 91. Water push box; 92. Collecting groove; 93. Frame; 94. Transparent plate; 95. Square plate; 96. Third spring; 97. Fourth spring; 98. Steel cable. DETAILED DESCRIPTION

[0035] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0036] Example 1

[0037] See also Figure 1-2A water-rich roadbed self-drainage pipeline construction measure includes a sand cushion layer 6, an outer layer of gravel 1 is installed on the upper end of the sand cushion layer 6, the outer layer of gravel 1 is wrapped with an outer layer of geotextile 2, the outer layer of geotextile 2 is wrapped with an inner layer of gravel 3, the inner layer of gravel 3 is wrapped with an inner layer of geotextile 4, the inner layer of geotextile 4 is wrapped with a UPVC drainage pipe 5, and the outer surface of the UPVC drainage pipe 5 is provided with a plurality of water flow holes 10;

[0038] The inner wall of the UPVC drain pipe 5 is also provided with a water spraying device 7, and a cleaning device 8 is provided at the upper end of the water spraying device 7. The cleaning device 8 is used to clean the water flow hole 10. The cleaning device 8 includes a circular sleeve 81 slidably connected to the upper end of the water spraying device 7, and the diameter of the circular sleeve 81 is the same as the diameter of the water flow hole 10. The water spraying device 7 includes a cylinder 71 arranged on the inner wall of the UPVC drain pipe 5, and a piston plate 74 is slidably connected inside the cylinder 71. The piston plate 74 and the UPVC drain pipe 5 are connected by a first spring 77. A cylinder 76 is provided at the upper end of the piston plate 74, and the cylinder 76 passes through the water flow hole 10. The upper end of the cylinder 76 is inserted into the interior of the circular sleeve 81, and the circular sleeve 81 and the cylinder 76 are connected by a second spring 82.

[0039] The sand cushion layer 6 comprises medium sand, coarse sand, stone chips, crushed stone and pebbles, and the ratio of sand, coarse sand, stone chips, crushed stone and pebbles is 2:3:1:1:0.5.

[0040] In order to improve the support force of the UPVC drainage pipe 5 and avoid the sinking and deformation of the pipe, only a number of water holes 10 are opened on the upper surface of the UPVC drainage pipe 5, and the aperture of the water hole 10 is 8mm. Therefore, when the muddy water on the outer surface of the UPVC drainage pipe 5 dries and cracks, it will block the water holes 10. When there is too much rain again, it takes a little time to soften the solidified mud. Therefore, the drainage effect is still defective. For this, a water spray device 7 and a cleaning device 8 are installed inside the UPVC drainage pipe 5. Figure 1 and Figure 2 As shown, when the road surface is drained again, the rainwater will accumulate in the storage space between the elastic cloth 85 and the collecting plate 84. The mass of the rainwater presses the collecting plate 84 and the circular sleeve 81 downward, and the circular sleeve 81 is inserted into the water flow hole 10, so that the water flow hole 10 is used to crush the soil inside the water flow hole 10, so that the water flow hole 10 can drain the rainwater into the UPVC drainage pipe 5 again.

[0041] A sand cushion layer is laid at the bottom of the trench, which is mainly used to bear the weight of the pipeline and form a certain supporting force to prevent the pipeline from sinking and deformation.

[0042] The drainage pipe is a UPVC buried drainage pipe, model DN150, the upper 2 / 3 of the pipe has holes, 48 ​​holes per row per linear meter, the hole diameter is 8mm, and the lower 1 / 3 of the pipe is used for self-drainage collection.

[0043] The permeable material is mainly gravel mixed in a ratio of 1:3, which can not only meet the permeability of roadbed drainage, but also meet the bearing capacity requirements of the foundation.

[0044] Non-woven geotextile, unit area mass not less than 300g / m2, thickness not less than 2.4mm, longitudinal and transverse tensile strength not less than 20kN / m, longitudinal and transverse elongation at break 25%, tear strength not less than 0.6kN, CBR bursting strength not less than 1.8kN, vertical permeability 10-1 ~ 10-3cm / s, mainly plays the role of filtering and drainage. When water flows from the fine soil layer into the coarse soil layer, the good air permeability and water permeability of the non-woven geotextile are used to allow water to pass through, while effectively carrying soil particles, fine sand, small stones, etc., to keep the pipeline unobstructed and the stability of water and soil engineering. At the same time, the geotextile has good water conductivity. It can form a drainage channel inside the soil to discharge excess liquid and gas in the soil structure. The filtering and protection effect of the double-layer geotextile can make it difficult for fine soil layers, mud residues, etc. to enter the drainage pipe, avoiding later blockage and maintenance. At the same time, the geotextile wrapping can also prevent the drainage pipe from being squeezed by gravel and ruptured.

[0045] Example 2

[0046] This embodiment is an improvement made on the basis of embodiment 1. For details, please refer to Figure 1-3 The cylinder 71 is provided with a first groove 72 and a second groove 73, the first groove 72 is connected to the second groove 73, the piston plate 74 is slidably connected to the inside of the first groove 72, the diameter of the piston plate 74 matches the inner diameter of the first groove 72, and the inner diameter of the first groove 72 is smaller than the inner diameter of the second groove 73;

[0047] The inner wall of the cylinder 71 is also provided with a spring sheet 75, and the piston plate 74 can be operated to squeeze the spring sheet 75 to deform;

[0048] A collecting plate 84 is connected between each two circular sleeves 81 . The two collecting plates 84 are hinged to each other. Elastic cloths 85 are installed at both ends of the collecting plates 84 . A storage space is formed between the elastic cloths 85 and the collecting plates 84 .

[0049] When liquid enters the first groove 72 through the water flow hole 10, it will accumulate on the upper end of the piston plate 74. At this time, the piston plate 74 contacts the spring 75. When the mass of the liquid above the piston plate 74 is greater than the spring force of the spring 75, the liquid will squeeze the piston plate 74 and slide downward instantly, so that the piston plate 74 generates negative pressure from the first groove 72. The negative pressure is used to collect liquid from the water flow hole 10 to the first groove 72. Then, when the piston plate 74 moves to the second groove 73, the liquid on the upper end of the piston plate 74 It will flow out from the gap between the piston plate 74 and the second groove 73, so that a large amount of liquid can flow into the UPVC drain pipe 5 for easy discharge, and then the piston plate 74 is pulled back to its original position by the first spring 77. When the first spring 77 pulls the piston plate 74 back to its original position, when the piston plate 74 slides to the first groove 72, the piston plate 74 will squeeze the air inside the first groove 72 and spray it out from the water flow hole 10. The air is used to blow away the fine sand nearby, so that rainwater on the road surface can flow quickly to the UPVC drain pipe 5.

[0050] Example 3

[0051] This embodiment is an improvement made on the basis of embodiment 2. For details, please refer to Figure 1-3 The outer surface of the UPVC drain pipe 5 is also equipped with a spraying device 9, which is used to spray liquid. The spraying device 9 includes a water push box 91 installed on the outer surface of the UPVC drain pipe 5, and a collecting tank 92 is provided inside the collecting tank 92. The inside of the collecting tank 92 is slidably connected with a frame 93;

[0052] The outer surface of the UPVC drain pipe 5 is also provided with a convex plate 86, which is used to lift the collecting plate 84 to pour the liquid into the water box 91;

[0053] A baffle 83 is installed at one end of the circular sleeve 81, and the baffle 83 is used to reverse the air injected at the water flow hole 10;

[0054] The square plate 95 is connected to the water push box 91 via a third spring 96;

[0055] The square frame 93 is connected to the water push box 91 via a fourth spring 97 .

[0056] according to Figure 3 As shown, when the piston plate 74 squeezes the air inside the first groove 72 to be ejected from the water flow hole 10, and the air is used to blow away the nearby fine sand, the air ejected from the water flow hole 10 flows back through the baffle 83 at one end of the circular sleeve 81, so that the air is ejected in an inclined state, and because the piston plate 74 continuously slides upward, the piston plate 74 also drives the cylinder 76, the circular sleeve 81 and the baffle 83 to slide upward, so that the air is ejected through the continuously changing baffle 83 by utilizing the continuously changing baffle 83, thereby blowing away the fine sand above the UPVC drainage pipe 5 over a large area up and down.

[0057] Example 4

[0058] This embodiment is an improvement made on the basis of embodiment 3. For details, please refer to Figure 1-6 A transparent plate 94 is arranged inside the square frame 93, and a square plate 95 is also slidably connected inside the collecting tank 92. The square plate 95 is used to seal the transparent plate 94. A steel cable 98 is installed at one end of the square frame 93. The steel cable 98 passes through the square plate 95 and the water push box 91 and is connected to the piston plate 74;

[0059] A short shaft 12 is installed at one end of the water push box 91, and the outer surface of the short shaft 12 is rotatably connected to a water baffle plate 11. The water baffle plate 11 is used to seal one end of the collecting tank 92. A water spray hole 13 is provided at one end of the water baffle plate 11, and the water spray hole 13 is connected to the collecting tank 92. A limit strip 14 is also installed at one end of the water push box 91, and the limit strip 14 is used to abut against the water baffle plate 11.

[0060] according to Figure 4-6 As shown, when the circular sleeve 81 moves downward, the circular sleeve 81 will drive the collecting plate 84 and the elastic cloth 85 to slide downward. When the convex plate 86 abuts between the two collecting plates 84, the convex plate 86 will squeeze the two collecting plates 84 and push them upward, so that the rainwater in the storage space will flow into the collecting groove 92 through the circular sleeve 81 and the baffle plate 83. Since the collecting groove 92 is an arc groove, the rainwater will pass through the transparent plate 94 and flow into the middle of the collecting groove 92. As the rainwater continues to fill the collecting groove 92, when the piston plate 74 slides downward, the piston plate 74 will also pull the steel cable 98 to slide downward, and through the steel cable 98, the square frame 93 is pulled to slide toward one end, and the square frame 93 is abutted against the square plate 95. The transparent plate 94 is sealed, so that the rainwater inside the collection tank 92 is squeezed through the square frame 93 and the square plate 95 and sprayed out from one end of the collection tank 92, so that the rainwater is sprayed on the outer surface of the UPVC drain pipe 5, so that more rainwater contacts the dried water flow hole 10, so that the soil inside the water flow hole 10 is softened, and the sprayed rainwater will also fall on the storage space, so that the circular sleeve 81 can be squeezed to slide downward through the water flow hole 10, so that when one of the cleaning devices 8 and the water spraying device 7 moves, it will radiate other cleaning devices 8 and water spraying devices 7 by spraying rainwater, so that more cleaning devices 8 and water spraying devices 7 can move, and it is no longer necessary for external rainwater to soften the soil at the water flow hole 10 little by little;

[0061] It should be particularly noted that when the baffle 83 sends rainwater into one end of the collecting trough 92, the rainwater will impact the water baffle 11, causing the water baffle 11 to rotate toward the inside of the collecting trough 92, so that the water baffle 11 opens a hole at one end of the collecting trough 92, allowing a large amount of rainwater to quickly enter. Subsequently, when the square frame 93 and the square plate 95 push the rainwater to spray out, the rainwater and the squeezing water baffle 11 rotate in the opposite direction, causing the water baffle 11 to contact the limiting strip 14, resulting in the rainwater being able to spray out only from the water spray hole 13, thereby increasing the hydraulic pressure of the rainwater, so that the rainwater can impact farther.

[0062] The present invention also provides a construction method for a water-rich roadbed self-drainage pipeline construction measure.

[0063] S1. First, dig a drainage pipe trench, lay a sand cushion layer 6, and arrange an inner geotextile 4 on the sand cushion layer 6;

[0064] S2, then backfill the inner layer of sand and gravel 3 on the inner layer of geotextile 4;

[0065] S3, then install the UPVC drainage pipe 5 wrapped with the inner geotextile 4 on the inner gravel 3;

[0066] S4, wrap the inner layer of gravel 3 and UPVC drainage pipe 5 with the outer layer of geotextile 2 to form a double-layer geotextile filtration structure;

[0067] S5. Finally, the pipeline trench is backfilled with an outer layer of gravel 1.

[0068] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0069] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A water-rich roadbed self-drainage pipeline construction measure, comprising a sand cushion layer (6), characterized in that: An outer layer of gravel (1) is installed at the upper end of the sand cushion layer (6), the outer layer of gravel (1) is wrapped with an outer layer of geotextile (2), the outer layer of geotextile (2) is wrapped with an inner layer of gravel (3), the inner layer of gravel (3) is wrapped with an inner layer of geotextile (4), the inner layer of geotextile (4) is wrapped with a UPVC drainage pipe (5), and the outer surface of the UPVC drainage pipe (5) is provided with a plurality of water flow holes (10); The inner wall of the UPVC drain pipe (5) is also provided with a water spray device (7), the upper end of which is provided with a cleaning device (8), the cleaning device (8) being used for cleaning the water flow hole (10), the cleaning device (8) comprising a circular sleeve (81) slidably connected to the upper end of the water spray device (7), the diameter of the circular sleeve (81) being the same as the diameter of the water flow hole (10), the water spray device (7) comprising a circular sleeve (81) arranged on the inner wall of the UPVC drain pipe (5), The cylinder (71) is provided with a piston plate (74) which is slidably connected to the inside of the cylinder (71); the piston plate (74) is connected to the UPVC drainage pipe (5) via a first spring (77); a cylinder (76) is installed on the upper end of the piston plate (74); the cylinder (76) passes through the water flow hole (10); the upper end of the cylinder (76) is inserted into the inside of a circular sleeve (81); the circular sleeve (81) and the cylinder (76) are connected via a second spring (82).

2. The water-rich roadbed self-drainage pipeline construction measure according to claim 1 is characterized by: The cylinder (71) is provided with a first groove (72) and a second groove (73) inside, respectively. The first groove (72) is communicated with the second groove (73). The piston plate (74) is slidably connected inside the first groove (72). The diameter of the piston plate (74) matches the inner diameter of the first groove (72). The inner diameter of the first groove (72) is smaller than the inner diameter of the second groove (73). The inner wall of the cylinder (71) is also provided with an elastic sheet (75), and the piston plate (74) is operable to squeeze the elastic sheet (75) to deform.

3. The water-rich roadbed self-drainage pipeline construction measure according to claim 2 is characterized by: A collecting plate (84) is connected between each two of the circular sleeves (81), and the two collecting plates (84) are hinged to each other. Elastic cloth (85) is installed at both ends of the collecting plate (84), and a storage space is formed between the elastic cloth (85) and the collecting plate (84).

4. The water-rich roadbed self-drainage pipeline construction measure according to claim 3 is characterized by: The outer surface of the UPVC drain pipe (5) is also provided with a spraying device (9), the spraying device (9) is used to spray liquid, the spraying device (9) comprises a water push box (91) installed on the outer surface of the UPVC drain pipe (5), the collecting tank (92) is provided inside the collecting tank (92), and the inside of the collecting tank (92) is slidably connected with a square frame (93); The outer surface of the UPVC drainage pipe (5) is also provided with a convex plate (86), and the convex plate (86) is used to lift the collecting plate (84) to pour and push the liquid into the interior of the water box (91).

5. The water-rich roadbed self-drainage pipeline construction measure according to claim 4 is characterized by: A baffle (83) is installed at one end of the circular sleeve (81), and the baffle (83) is used to reverse the air sprayed at the water flow hole (10).

6. The water-rich roadbed self-drainage pipeline construction measure according to claim 4 is characterized by: A transparent plate (94) is arranged inside the square frame (93), and a square plate (95) is slidably connected inside the collecting tank (92). The square plate (95) is used to seal the transparent plate (94). A steel cable (98) is installed at one end of the square frame (93), and the steel cable (98) passes through the square plate (95) and the water push box (91) and is connected to the piston plate (74).

7. The water-rich roadbed self-drainage pipeline construction measure according to claim 6 is characterized by: A short shaft (12) is installed at one end of the water push box (91), and the outer surface of the short shaft (12) is rotatably connected with a water baffle (11), and the water baffle (11) is used to seal one end of the collecting tank (92). A water spray hole (13) is arranged at one end of the water baffle (11), and the water spray hole (13) is connected to the collecting tank (92). A limit strip (14) is also installed at one end of the water push box (91), and the limit strip (14) is used to abut against the water baffle (11).

8. The water-rich roadbed self-drainage pipeline construction measure according to claim 6 is characterized by: The square plate (95) is connected to the water push box (91) via a third spring (96); The square frame (93) is connected to the water push box (91) via a fourth spring (97).

9. The water-rich roadbed self-drainage pipeline construction measure according to claim 8 is characterized by: The sand cushion layer (6) comprises medium sand, coarse sand, stone chips, crushed stone and pebbles, and the ratio of the sand, coarse sand, stone chips, crushed stone and pebbles is 2:3:1:1:0.

5.

10. The construction method of the water-rich roadbed self-drainage pipeline construction measures according to claim 9, characterized in that: S2, firstly, dig a drainage pipe trench, lay a sand cushion layer (6), and at the same time, arrange an inner geotextile (4) on the sand cushion layer (6); S3, then backfilling the inner layer of sand and gravel (3) on the inner layer of geotextile (4); S4, then installing the UPVC drainage pipe (5) wrapped with the inner geotextile (4) on the inner gravel (3); S5, wrapping the inner layer of gravel (3) and the UPVC drainage pipe (5) with the outer layer of geotextile (2) to form a double-layer geotextile filtration structure; S6. Finally, the pipeline trench is backfilled with an outer layer of gravel (1).