By combining planting soil layers, Reno mattress layers, gabion toe protection layers, and grassed shallow ditches in the riverbank protection area, the problem of insufficient initial rainwater purification in traditional riverbank protection has been solved, achieving efficient rainwater management and water quality improvement.

CN118911072APending Publication Date: 2024-11-08CHANGJIANG SURVEY PLANNING DESIGN & RES CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411079128.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-07
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

Traditional riverbank protection systems have limited effectiveness in intercepting and purifying initial rainwater runoff, leading to the deterioration of urban river water quality.

Method used

The initial rainwater runoff management system adopts the concepts of sponge city and ecological bank protection, including the slope bank protection area, the toe protection area and the sponge storage area. Through the combination of planting soil layer, Reno cushion layer, gabion toe protection layer, grassed shallow trench, permeable blind pipe and sedimentation well, rainwater infiltration, retention, purification and discharge are achieved.

Benefits of technology

It effectively intercepts and purifies initial rainwater, reduces pollutants entering water bodies, improves river water quality, promotes the sustainable use of water resources, and enhances ecological landscape value.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911072A_ABST
    Figure CN118911072A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of ecological construction of riverway systems, in particular to an initial rainwater runoff treatment system and method integrating a sponge city and an ecological bank protection idea, and the treatment system comprises a side slope bank protection area, a foot protection area and a sponge regulation and storage area. The slope bank protection area comprises a first planting soil layer, a Reynolds protection cushion layer, a medium-coarse sand cushion layer and a first isolation layer which are sequentially arranged from top to bottom. The foot protection area comprises a gabion sidewalk road water paving surface layer, a gabion foot protection layer, a second isolation layer and artificial grading dry rubble which are sequentially arranged from top to bottom, a block stone pressing foot is arranged on the river channel side of the gabion foot protection layer, and rock ballast backfill is arranged on the side slope side of the gabion foot protection layer; the sponge regulation and storage area comprises a grass planting shallow ditch, a rainwater pipe, a first water permeable blind pipe, a dredge well and a waterfront planting area. Compared with a traditional riverway revetment, the ecological riverway revetment is utilized to conduct pollutant intercepting and pollutant removing treatment on initial rainwater to the maximum extent, and primary runoff rainwater non-point source pollution of the riverway slope is effectively controlled.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of river system ecological construction, and in particular to an initial rainwater runoff management system and method integrating the concepts of sponge city and ecological bank protection. Background Art

[0002] Rainwater runoff pollution is relatively serious in most cities in my country. Surface runoff is directly discharged into receiving water bodies through drainage outlets on the banks of urban rivers, which has become an important factor in the deterioration of urban river water quality.

[0003] Traditional river ecological revetments generally use gabion gabions to set up gabion gabion cushions with wire mesh boxes on both sides of the river revetment, so that the initial rainwater can penetrate through the gaps in the structural stone filling for discharge. However, this type of ecological revetment has limited effect on the interception and purification of initial rainwater. The effect of initial water quality management in urban rivers is not ideal.

[0004] The construction concept of sponge city is "infiltration, retention, storage, purification, use and discharge". Although the traditional ecological river bank protection does not isolate the exchange between water and soil, it lacks relevant measures such as water retention, water storage and water purification. When it rains, a large amount of harmful substances enter the water body, causing the water quality to deteriorate. Summary of the invention

[0005] In view of the deficiencies in the above-mentioned prior art, the purpose of the present invention is to provide an initial rainwater runoff management system and method that integrates the concepts of sponge city and ecological bank protection, so as to solve the technical problems of limited interception and purification of initial rainwater runoff on the banks of urban rivers.

[0006] To achieve the above object, the present invention adopts the following technical solutions:

[0007] The present invention provides an initial rainwater runoff treatment system integrating the concepts of sponge city and ecological revetment, comprising a slope revetment area, a footing area and a sponge storage area, wherein the slope revetment area comprises a planting soil layer 1, a Reynolds cushion layer, a medium-coarse sand cushion layer and an isolation layer 1 arranged in sequence from top to bottom; the footing area comprises a gabion sidewalk water paving surface layer, a gabion gabion footing layer, an isolation layer 2 and artificial graded dry masonry blocks arranged in sequence from top to bottom, a block stone pressure foot is arranged on the river channel side of the gabion gabion footing layer, and a slag backfill is arranged on the slope side of the gabion gabion footing layer; the sponge storage area comprises a grass-planting shallow ditch arranged at the bottom of the slope revetment area, a rainwater pipe parallel to the grass-planting shallow ditch, a permeable blind pipe 1 arranged at the bottom of the footing area, a silt well arranged at the end of the grass-planting shallow ditch and a waterfront planting area arranged at the outlet of the silt well.

[0008] In the above technical solution, effective management of initial rainwater runoff is achieved by combining the synergistic effects of the slope revetment area, the foot protection area and the sponge storage area. This combination can ensure that rainwater can be effectively collected, retained, purified, and finally discharged into the water body, reducing the chance of pollutants directly entering the water body, thereby improving river water quality and promoting the sustainable use of water resources.

[0009] As a further optimization scheme of the present invention, the Reynolds cushion layer includes a double-partition Reynolds cushion net, stone one filled in the double-partition Reynolds cushion net, and a microbial carrier one.

[0010] In the above technical solution, the permeability and biological purification capacity of rainwater during the infiltration process are increased by filling stones and microbial carriers. Microorganisms can attach and grow on the carriers, so that the rainwater can be initially purified during the infiltration process and help degrade organic pollutants in the water.

[0011] As a further optimization scheme of the present invention, the gabion stone cage foot protection layer includes a hexagonal steel wire mesh, two stones filled in the hexagonal steel wire mesh, and two microbial carriers.

[0012] In the above technical solution, the gabion stone cage foot protection layer not only provides physical stability, but also enhances the permeability and biological purification function of the area by filling stones and microbial carriers, which helps to further reduce the pollutant load.

[0013] As a further optimization scheme of the present invention, the permeable blind pipe is arranged at the bottom of the slag backfill and is arranged parallel to the grass-planted shallow ditch, and one end of the permeable blind pipe leads to the silt well.

[0014] In the above technical solution, the provision of the permeable blind pipe 1 allows rainwater seeping into the foot protection area to be collected through the pipe, thereby improving the efficiency of rainwater collection and discharge.

[0015] As a further optimization scheme of the present invention, the grass-planted shallow ditch is arranged at the junction of the slope revetment area and the foot protection area. The grass-planted shallow ditch includes two planting soil layers and two permeable blind pipes arranged from top to bottom, and the two ends of the permeable blind pipes lead to the silt well.

[0016] In the above technical solution, the vegetation and soil layer of the grass-planted shallow ditch retain and purify rainwater, and at the same time, the permeable blind pipe 2 guides the purified rainwater into the sludge well, thereby realizing the effective management and utilization of rainwater.

[0017] As a further optimization solution of the present invention, the rainwater pipe is located on the river channel side of the foot protection area, and the end of the rainwater pipe leads to the sludge well.

[0018] In the above technical solution, the design of the rainwater pipe ensures that excess rainwater that exceeds the treatment capacity of the grass-planted shallow ditch can also be effectively guided and treated, avoiding the occurrence of floods.

[0019] As a further optimization scheme of the present invention, water-resistant and drought-resistant ground cover plants are planted in the planting soil layer.

[0020] As a further optimization scheme of the present invention, water-resistant and drought-resistant ground cover plants are planted in the second planting soil layer.

[0021] As a further optimization scheme of the present invention, wetland herbs are planted in the waterfront planting area.

[0022] In the above technical solution, planting water-resistant and drought-resistant ground cover plants can not only beautify the environment, but also further enhance the permeability of the soil and the purification capacity of rainwater through the root system of the plants. Planting wetland herbs in the waterfront planting area can further improve the biodiversity at the edge of the water body, and at the same time use the characteristics of these plants to purify rainwater and improve water quality.

[0023] The present invention also provides a method for treating an initial rainwater runoff treatment system that integrates the concepts of sponge city and ecological revetment, the method comprising the following steps:

[0024] Step 1, infiltration: The initial runoff rainwater of the river bank infiltrates through the Reno cushion layer and the gabion stone cage foot layer, and after being oxidized between the microbial carrier gravels, it flows into the permeable blind pipe 1 at the bottom of the foot area, and then flows to the sedimentation well. Part of the initial runoff rainwater overflows into the grass-planted shallow ditch;

[0025] Step 2, retention and storage: the runoff rainwater infiltrates through the grass-planted shallow ditch to the permeable blind pipe 2 and flows to the sedimentation well along the drainage slope. When the rainfall is greater than the designed rainfall of the grass-planted shallow ditch, the runoff rainwater overflows to the rainwater pipe and then flows to the sedimentation well;

[0026] Step 3, sedimentation purification: After the runoff rainwater flows into the sedimentation well, the suspended matter in the rainwater settles at the bottom of the well;

[0027] Step 4, discharge: The rainwater after sedimentation and filtration is further filtered through the waterfront planting area and then discharged into the river.

[0028] The above technical solution describes the working method of the above system, ensuring that rainwater is discharged into the water body after multiple stages of treatment, thereby significantly reducing the content of pollutants and improving the quality of the water body. Through these steps, the environmental pollution caused by initial rainwater runoff can be effectively reduced, while also improving the ecological value and aesthetics of urban rivers.

[0029] Compared with the prior art, the present invention has the following advantages and beneficial effects:

[0030] 1) Compared with traditional river bank protection, ecological river bank protection is used to the maximum extent to intercept and reduce pollution in the initial rainwater, effectively controlling the surface source pollution of primary runoff rainwater on the river slope.

[0031] 2) Compared with traditional ecological revetments, the Reno cushion layer and gabion stone cage layer are fully utilized to allow rainwater to infiltrate, which plays a role in reducing and slowing down rainwater discharge. At the same time, the infiltrated rainwater can also effectively conserve groundwater, reduce the amount of water used for irrigation of ecological river bank protection, and save water resources.

[0032] 3) Compared with traditional sponge city construction, the construction concept of sponge city is expanded to the field of river bank protection.

[0033] 4) Water-resistant and drought-resistant ground cover plants are planted in the bank planting soil layer and grass-planting shallow ditches, wetland herbaceous plants are planted in the waterfront planting area, and microbial carriers are placed in the Reno cushion layer and the gabion stone cage foot layer. The pollution of rainwater runoff is purified through oxidation between plant roots and microbial gravels, which further improves the water quality of runoff into the river and creates a good ecological landscape.

[0034] 5) Rationally utilize the ecological river bank protection structure to set up pedestrian roads, thereby increasing the hydrophilicity of the bank protection while ensuring the runoff management function of the ecological river bank protection. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] Figure 1 It is a cross-sectional schematic diagram of the urban ecological river bank protection of the present invention.

[0036] Figure 2 It is a plan view of the urban ecological river bank protection of the present invention.

[0037] Figure 3 This is a flow chart of the initial rainwater runoff treatment process of the present invention.

[0038] In the figure: 1-slope revetment area, 101-planting soil layer 1, 102-Reno cushion layer, 103-double partition Reno cushion net, 104-stone 1, 105-microbial carrier 1, 106-medium coarse sand cushion layer, 107-isolation layer 1, 2-foot protection area, 201-gabion pedestrian road water paving surface layer, 202-gabion stone cage foot protection layer, 203-hexagonal steel wire mesh, 204-stone 2, 205-microbial carrier 2, 206-isolation layer 2, 207-block stone pressure foot, 208-artificial graded dry masonry block stone, 209-slag backfill, 3-sponge storage area, 301-grass planting shallow ditch, 302-planting soil layer 2, 303-permeable blind pipe 2, 304-rainwater pipe, 305-permeable blind pipe 1, 306-sludge well, 307-waterfront planting area. DETAILED DESCRIPTION

[0039] In order to enable those skilled in the art to better understand the technical solution of the present invention, the preferred implementation scheme of the present invention is described below in conjunction with specific embodiments. However, it should be understood that the drawings are only for illustrative purposes and cannot be understood as limiting the present invention. In order to better illustrate the present embodiment, some parts of the drawings may be omitted, enlarged or reduced, and do not represent the size of the actual product. For those skilled in the art, it is understandable that some well-known structures and their descriptions in the drawings may be omitted. The positional relationship described in the drawings is only for illustrative purposes and cannot be understood as limiting the present invention.

[0040] The following is combined with Figure 1-3 The present invention is further described in detail to illustrate an initial rainwater runoff management system and method that integrates the concepts of sponge city and ecological revetment.

[0041] Example 1

[0042] like Figure 1 and Figure 2 As shown, an initial rainwater runoff management system integrating the concepts of sponge city and ecological revetment includes a slope revetment area 1, a foot protection area 2 and a sponge storage area 3.

[0043] In this scheme, the slope revetment area 1 is one of the core areas of the management system, with a slope ratio of 1:3, and includes a planting soil layer 101, a Reynolds cushion layer 102, a medium-coarse sand cushion layer 106 and an isolation layer 107 from top to bottom.

[0044] Among them, the planting soil layer 101: the thickness is about 30cm, and soil rich in organic matter is selected, and water-resistant and drought-resistant ground cover plants such as Bermuda grass, Flat-spiked Hornwort, etc. are planted in this layer to enhance the ecological effect and interception and purification function.

[0045] Reynolds cushion layer 102: a double-partition Reynolds cushion net 103 structure is adopted, the cushion net is filled with stones 104 (such as boulders or pebbles) with a size of 8-15 cm, and microbial carriers 105 (such as biological ceramsite or ceramsite filter material) are evenly placed between the stones to enhance the penetration ability of rainwater and the microbial purification effect.

[0046] Medium-coarse sand cushion layer 106: It is laid below the Reno cushion layer 102, with a thickness of about 10 cm. Medium-coarse sand is used as the cushion material to improve the infiltration speed and uniformity of rainwater.

[0047] Isolation layer 107: Anti-filtration geotextile is used to prevent plant roots from adversely affecting the structure below, while maintaining the independence of the soil and the structure below.

[0048] In this solution, the foot protection area 2 mainly plays a supporting and stabilizing role, including a gabion sidewalk water paving surface layer 201, a gabion gabion foot protection layer 202, an isolation layer 206 and an artificial graded dry block stone 208 arranged in sequence from top to bottom, a block stone pressure foot 207 is arranged on the river channel side of the gabion gabion foot protection layer 202, and a slag backfill 209 is arranged on the slope side of the gabion gabion foot protection layer 202.

[0049] Among them, the gabion pedestrian road water paving surface layer 201 is paved with permeable bricks or permeable concrete with a thickness of 8-10cm, which not only meets the pedestrian needs but also has good permeability.

[0050] Gabion stone cage foot protection layer 202: It adopts a hexagonal steel wire mesh 203 structure, filled with stones 204 (such as boulders or pebbles) with a size of 10-20 cm, and microbial carriers 205 are placed between the stones to enhance the penetration and purification capacity of rainwater. Stone pressure feet 207 are set on the river side to enhance stability, and slag backfill 209 is carried out on the slope side to facilitate construction and subsequent maintenance.

[0051] Isolation layer 2 206: Same as isolation layer 107 of slope revetment area 1, it is paved with anti-filtration geotextile.

[0052] Artificial graded dry masonry stone 208: serves as the bottom layer of the footing area 2, and is used to further enhance the stability of the overall structure.

[0053] In this plan, the sponge storage area 3 is one of the core areas of the management system, including a grass-planted shallow ditch 301 at the bottom of the slope revetment area 1, a rainwater pipe 304 parallel to the grass-planted shallow ditch 301, a permeable blind pipe 305 at the bottom of the foot protection area 2, a sludge well 306 at the end of the grass-planted shallow ditch 301 and a waterfront planting area 307 at the outlet of the sludge well 306.

[0054] Among them, the grass-planted shallow ditch 301 is set at the junction of the slope revetment area 1 and the foot protection area 2, with a width of about 100 cm and a depth of about 30 cm. From top to bottom, the planting soil layer 2 302 (thickness of about 20 cm, planted with water-resistant and drought-resistant ground cover plants) and the permeable blind pipe 2 303 (diameter 5 cm, laid along the bottom of the ditch) are laid in sequence. The end of the permeable blind pipe 2 303 is connected to the silt well 306.

[0055] Rainwater pipe 304: It is arranged parallel to the grass-planted shallow ditch 301 on the river side of the foot protection area 2. The diameter is determined according to the designed flow rate, generally 15-30 cm, and the end is also connected to the silt well 306.

[0056] Permeable blind pipe 1 305: It is set at the bottom of the slag backfill 209, parallel to the grass-planted shallow ditch 301, and is used to collect and discharge the infiltrated rainwater.

[0057] Sedimentation well 306: located at the end of the grass-planted shallow ditch 301 and the rainwater pipe 304, used to precipitate suspended matter in rainwater to reduce the burden of subsequent treatment.

[0058] Waterfront planting area 307: located at the exit of the sludge well 306, where wetland herbs such as calamus and cattail are planted to further purify rainwater and enhance the landscape effect.

[0059] Example 2

[0060] On the basis of Example 1, Figure 3 As shown, the methods for initial rainwater runoff treatment are as follows:

[0061] Step 1: Infiltration

[0062] The initial rainwater runoff first infiltrates through the Reno cushion layer 102 of the slope revetment area 1 and the gabion stone cage footing layer 202 of the footing area 2, and is initially purified by the oxidation between the microbial carrier gravels. The purified rainwater flows into the permeable blind pipe 305 at the bottom of the footing area 2, and then flows to the silt well 306; part of the initial runoff rainwater overflows through the slope revetment area 1 and the footing area 2 to the grass-planted shallow ditch 301.

[0063] Step 2: Detention and accumulation

[0064] The rainwater falling and overflowing into the grass-planting shallow ditch 301 further infiltrates into the permeable blind pipe 2 303 through the planting soil layer 2 302, and flows along the drainage slope to the sedimentation well 306. When the rainfall exceeds the design capacity of the grass-planting shallow ditch 301, the excess rainwater will be directly discharged into the sedimentation well 306 through the rainwater pipe 304 of the foot protection area 2.

[0065] Step 3: Sedimentation and purification

[0066] The rainwater entering the sedimentation well 306 stays and settles in the well, and the suspended matter gradually settles at the bottom of the well, thereby achieving preliminary purification of the rainwater.

[0067] Step 4: Emission

[0068] The rainwater purified by sedimentation flows out from the sedimentation well 306 and enters the waterfront planting area 307 for further biological purification. Finally, the purified rainwater is discharged into the river, effectively improving the water quality of the river and reducing non-point source pollution.

[0069] Through the above implementation methods, the initial rainwater runoff treatment system and method provided by the present invention, which integrates the concepts of sponge city and ecological revetment, can effectively control the surface source pollution of primary runoff rainwater on the river slope, make full use of the Reno cushion layer and the gabion stone cage layer to allow rainwater to infiltrate, and play a role in reducing and slowing down the discharge of rainwater. At the same time, the infiltrated rainwater can also effectively conserve groundwater, reduce the amount of water used for irrigation of ecological river bank protection, and save water resources. In addition, through the oxidation and purification of rainwater runoff pollution by plant roots and microorganisms between gravels, the water quality of runoff entering the river is further improved, and a good ecological landscape is created at the same time.

[0070] According to the description and drawings of the present invention, those skilled in the art can easily manufacture or use the initial rainwater runoff management system and method of the present invention that integrates the concepts of sponge city and ecological revetment, and can produce the positive effects recorded in the present invention.

[0071] Unless otherwise specified, in the present invention, the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicating orientation or positional relationships are based on the orientation or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation. Therefore, the terms describing the orientation or positional relationships in the present invention are only used for illustrative purposes and cannot be understood as limitations on the present invention. For ordinary technicians in this field, the specific meanings of the above terms can be understood in conjunction with the accompanying drawings and according to specific circumstances.

[0072] Unless otherwise clearly specified and limited, in the present invention, the terms "disposed", "connected" and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be directly connected, or indirectly connected through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0073] The above is only a preferred embodiment of the present invention, but the present invention is not limited to the above specific embodiments. Those skilled in the art may make some modifications, supplements or use similar methods instead without departing from the principle of the present invention, which should also be regarded as the protection scope of the present invention.

Claims

1. An initial rainwater runoff management system integrating the concepts of sponge city and ecological revetment, characterized by: The invention comprises a slope revetment area (1), a foot protection area (2) and a sponge storage area (3), wherein the slope revetment area (1) comprises a planting soil layer (101), a Reno cushion layer (102), a medium-coarse sand cushion layer (106) and an isolation layer (107) arranged in sequence from top to bottom; the foot protection area (2) comprises a gabion sidewalk water paving surface layer (201), a gabion gabion foot protection layer (202), an isolation layer (206) and an artificial graded dry block stone (208) arranged in sequence from top to bottom, and the gabion gabion foot protection layer (20 2) is provided with a stone pressure foot (207) on the river channel side, and a slag backfill (209) is provided on the slope side of the gabion stone cage foot protection layer (202); the sponge storage area (3) comprises a grass-planted shallow ditch (301) arranged at the bottom of the slope revetment area (1), a rainwater pipe (304) parallel to the grass-planted shallow ditch (301), a permeable blind pipe (305) arranged at the bottom of the foot protection area (2), a silt pit (306) arranged at the end of the grass-planted shallow ditch (301), and a waterfront planting area (307) arranged at the outlet of the silt pit (306).

2. The initial rainwater runoff management system integrating the sponge city and ecological revetment concepts according to claim 1 is characterized by: The Reynolds cushion layer (102) comprises a double-partition Reynolds cushion net (103), stone material one (104) filled in the double-partition Reynolds cushion net (103), and microbial carrier one (105).

3. The initial rainwater runoff management system integrating the sponge city and ecological revetment concepts according to claim 1 is characterized by: The gabion stone cage foot protection layer (202) comprises a hexagonal steel wire mesh (203), a second stone (204) filled in the hexagonal steel wire mesh (203), and a second microbial carrier (205).

4. The initial rainwater runoff management system integrating the sponge city and ecological revetment concepts according to claim 1 is characterized by: The permeable blind pipe 1 (305) is arranged at the bottom of the slag backfill (209) and is arranged parallel to the grass-planted shallow ditch (301). The end of the permeable blind pipe 1 (305) leads to the silt well (306).

5. The initial rainwater runoff treatment system integrating the sponge city and ecological revetment concepts according to claim 1 is characterized by: The grass-planting shallow ditch (301) is arranged at the junction of the slope revetment area (1) and the foot protection area (2), and the grass-planting shallow ditch (301) includes a second planting soil layer (302) and a second permeable blind pipe (303) arranged from top to bottom, and the end of the second permeable blind pipe (303) leads to the silt well (306).

6. The initial rainwater runoff treatment system integrating the sponge city and ecological bank protection concepts according to claim 1 is characterized by: The rainwater pipe (304) is located on the river channel side of the foot protection area (2), and the end of the rainwater pipe (304) leads to the sludge well (306).

7. The initial rainwater runoff treatment system integrating the sponge city and ecological revetment concepts according to claim 1 is characterized by: Water-tolerant and drought-tolerant ground cover plants are planted in the planting soil layer one (101).

8. The initial rainwater runoff treatment system integrating the sponge city and ecological revetment concepts according to claim 1 is characterized by: Water-resistant and drought-resistant ground cover plants are planted in the second planting soil layer (302).

9. The initial rainwater runoff treatment system integrating the sponge city and ecological revetment concepts according to claim 1 is characterized by: The waterfront planting area (307) is planted with wetland herbaceous plants.

10. A method for treating initial rainwater runoff by using a system integrating the concepts of sponge city and ecological revetment as described in any one of claims 1 to 9, characterized in that: The governance method comprises the following steps: Step 1, infiltration: The initial runoff rainwater of the river bank infiltrates through the Reno cushion layer (102) and the gabion stone cage foot layer (202), and after being oxidized between the microbial carrier gravels, flows into the permeable blind pipe 1 (305) at the bottom of the foot area (2), and then flows to the sludge well (306). Part of the initial runoff rainwater overflows into the grass-planted shallow ditch (301); Step 2, retention and storage: the runoff rainwater infiltrates through the grass-planted shallow ditch (301) to the second permeable blind pipe (303) and flows to the sedimentation well (306) along the drainage slope. When the rainfall is greater than the designed rainfall of the grass-planted shallow ditch (301), the runoff rainwater overflows to the rainwater pipe (304) and then flows to the sedimentation well (306); Step 3, sedimentation purification: After the runoff rainwater flows into the sedimentation well (306), the suspended matter in the rainwater settles at the bottom of the well; Step 4, discharge: The rainwater after sedimentation and filtration is further filtered through the waterfront planting area (307) and then discharged into the river.