Sewage pipe network system and construction method thereof

By designing automated sand-shaking components and uniform sand components, the cost and labor intensity problems of backfill and uniform laying of medium coarse sand after sewage pipes are solved, automatic backfill and uniform laying are achieved, construction costs are reduced and pipeline use is improved life.

CN118911225AInactive Publication Date: 2024-11-08BAOXIONG CONSTR DEV CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411008017.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-26
Publication Date
2024-11-08
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

After the installation of existing sewage pipes, workers and sand discharge devices need to cooperate to carry out backfilling and even laying of medium-coarse sand, which increases construction costs and labor intensity.

Method used

A sewage pipeline system is designed, including a sand shock assembly and a sand uniform assembly. Through motor-driven track trucks and drive components, medium coarse sand and fine sand are automatically tiled in a uniform manner and mechanical manner, reducing the degree of Workers' dependence.

Benefits of technology

It reduces construction costs and workers' labor intensity, improves the efficiency of backfill testing operations, and increases the service life of the pipeline through fine sand layers.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911225A_ABST
    Figure CN118911225A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of a sewage pipe network system and a construction method thereof, in particular to a sewage pipe network system and a construction method thereof.The sewage pipe network system comprises an adjusting base, a protection base is fixedly connected to the adjusting base, and a sand shaking assembly for evenly spraying sand and stones is connected to one side of the protection base; one side of the sand shaking assembly is connected with a sand uniformizing assembly which is used for uniformly spreading the scattered sand and stone soil materials, the protective seat is fixedly connected with a supporting plate, the upper side of the supporting plate is fixedly connected with a sand storage bin which is used for conveying sand and stones, and the lower side of the supporting plate is fixedly connected with a motor seat; and a driving part for driving the sand homogenizing assembly and the sand shaking assembly in a linkage mode is fixedly connected to the motor base, a crawler for moving the adjusting base is fixedly connected to the lower side of the motor base, and a direction handle is fixedly connected between the supporting plate and the motor base. Through the technical scheme, the construction cost is reduced, the labor intensity of workers is reduced, and the construction efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of a sewage pipe network system and a construction method thereof, and specifically, to a sewage pipe network system and a construction method thereof. Background Art

[0002] Sewer pipes are pipe systems used to discharge and transport sewage. Sewer pipe systems are usually used to discharge sewage generated in residential, commercial and industrial areas from buildings or facilities to sewage treatment plants or treatment sites. These pipes can be buried underground or on the ground or inside buildings. When laying underground sewer pipes, it is necessary to groove the marked area on the road to ensure the installation of the pipes while reducing damage to the construction road surface. After the pipes are installed, medium-coarse sand is backfilled above the pipes to observe the working status of the pipes.

[0003] The existing Chinese patent with publication number "CN209464577U" discloses a sand pit flat rake, whose main structure includes: a front rake rod and a rear rake rod, a flat sand rake head is welded to the front end of the front rake rod, a toothed rake head is installed in the middle of the front rake rod, fixing rods are respectively welded to the two ends of the toothed rake head, the fixing rod is welded and fixed to the front rake rod, and the front rake rod is connected to the rear rake rod by an adjusting bolt.

[0004] After the existing sewage pipe is installed, it is necessary to observe the working condition of the pipe. The medium and coarse sand will be backfilled on the top of the pipe through an excavator or other sand discharge device, and the workers will move down to the groove filled with the medium and coarse sand, and use a sand rake to evenly level the medium and coarse sand so that the medium and coarse sand can be evenly spread in the groove. However, this processing method requires the cooperation of workers and sand discharge devices. Because the pipe needs to be protected, the sand discharge operation needs to be dumped intermittently, and then the workers need to evenly handle the dumped sand and gravel so that the fine sand part can completely cover and support the outer ring of the pipe, and the medium and coarse sand in the entire groove can be evenly spread, which increases the construction cost and the labor intensity of the workers. Summary of the invention

[0005] The present invention provides a sewage pipe network system, which reduces construction costs, reduces the labor intensity of workers, and improves construction efficiency.

[0006] The technical solution of the present invention is as follows:

[0007] A sewage pipe network system comprises an adjusting base, a protective base is fixedly connected to the adjusting base, a sand shaking assembly for evenly spreading sand and gravel is connected to one side of the protective base, a sand leveling assembly for evenly spreading the scattered sand and gravel is connected to one side of the sand shaking assembly, a supporting plate is fixedly connected to the protective base, a sand storage bin for transporting sand and gravel is fixedly connected to the upper side of the supporting plate, a motor base is fixedly connected to the lower side of the supporting plate, a driving component for linkage driving the sand leveling assembly and the sand shaking assembly is fixedly connected to the motor base, a crawler vehicle for moving the adjusting base is fixedly connected to the lower side of the motor base, and a direction handle is fixedly connected between the support plate and the motor base.

[0008] Furthermore, the sand leveling assembly includes a double-headed screw, which is rotatably connected to the adjustment base, and the lower side of the double-headed screw is fixedly connected to a limiting column, and two opposite threaded surfaces on the double-headed screw are threadedly connected to a limiting sleeve, and each of the limiting sleeves is slidingly connected to the limiting column, and each limiting sleeve is hinged with a sand leveling column, and each of the sand leveling columns is hinged with a sand leveling rake at the lower end, a shock-absorbing tension spring is connected between the sand leveling rake and the sand leveling column, and the end of the sand leveling column away from the sand leveling rake is connected to a height adjustment assembly for adjusting the height of the sand and stone.

[0009] Furthermore, the height adjustment assembly includes a limit plate, which is fixedly connected to the support plate, and two positioning columns are fixedly connected between the limit plate and the support plate, a second adjusting screw is rotatably connected between the two positioning columns, the second adjusting screw and the two positioning columns are covered with a positioning plate, the positioning plate is threadedly connected to the second adjusting screw, and an adjustment handle is fixedly connected to the upper end of the second adjusting screw.

[0010] Furthermore, a clamping plate is hinged on both sides of the clamping plate, and a clamping column is fixedly connected to one end of the clamping plate away from the clamping plate. A clamping groove is formed at one end of the sand leveling column away from the sand leveling rake, and the clamping column abuts against the inner wall of the clamping groove.

[0011] Furthermore, the sand-shaking assembly includes a driving disk, which is rotatably connected to a side of the protective seat away from the driving motor, a flip plate is hinged at a non-center portion of the driving disk, an end of the flip plate away from the driving disk is hinged to a linkage plate, two light rods are slidably connected to the linkage plate, the upper ends of the two light rods are fixedly connected to the lower side of the sand storage bin, both ends of the linkage plate are fixedly connected to a connecting plate, one end of each connecting plate away from the linkage plate is hinged to a limiting block, each limiting block is fixedly connected to a sand-shaking plate, and the two sand-shaking plates are hinged at the exits on both sides of the sand storage bin.

[0012] Furthermore, a plurality of sand discharge grooves are provided on the sand-shaking plate, a slide groove is provided on the limit block, and one end of the connecting plate close to the limit block abuts against the inner wall of the slide groove.

[0013] Furthermore, a first gear is coaxially fixedly connected to a side of the driving disk away from the flip plate, the first gear is meshed with a second gear, and the second gear is fixedly connected to the double-headed lead screw.

[0014] Furthermore, the driving component includes a driving motor, a driving shaft of the driving motor is fixedly connected to a first synchronous wheel, the double-headed screw is fixedly connected to a second synchronous wheel, and the first synchronous wheel and the second synchronous wheel are meshed with a synchronous belt.

[0015] The beneficial effects of the present invention are:

[0016] The sand-vibrating component can separate the sand and gravel to be laid, and lay the same batch of finer sand and gravel near the pipeline, so that these finer sand and gravel can completely cover and limit the pipeline, and fill a finer layer of sand and gravel around the pipeline, so that the impact from the outside world can be better offset by the sand and gravel layer, thereby increasing the service life of the pipeline. The sand-leveling component can mechanically mix the already laid sand and gravel, replacing the workers' uniform effect of sand and gravel, reducing construction costs, and reducing the labor intensity of workers. The crawler vehicle can drive the equipment to move, and because of the structure of the crawler track, the contact area with the sand and gravel is increased, so that the mass of the equipment can be distributed by the large contact area, ensuring that the equipment will not affect the pipeline under the sand and gravel, and ensuring the normal use of the equipment.

[0017] Another purpose of the present invention is to propose a sewage pipe network construction method, which reduces the use of sand discharge devices, reduces construction costs, increases the covering and supporting effect of backfilled medium and coarse sand on the outer ring of the pipe, reduces the labor intensity of workers, and improves the efficiency of backfill test operations.

[0018] S100: Plan the direction of the sewage pipe, isolate the construction area, prevent warning fences, and then mark the planned route to mark the construction area, and mark the sand storage area on one side of the marked area;

[0019] S200: Trenching: Trenching is performed in the marked area by using an excavator, and the excavated sand and soil are stored in the sand storage area;

[0020] S300: placing pipes: placing pipes to be placed in sequence on the side of the slot away from sand, stone and soil according to the opening direction of the slot;

[0021] S400: Laying pipes: Install pipes in the slots one by one by using a crane, and then splice the pipes;

[0022] S500: backfilling with coarse and fine sand: the medium-coarse sand and fine sand flowing out of the sand storage bin 14 are vibrated and laid flat in the grooves in turn by the sand shaking component 4, so that the medium-coarse sand and fine sand can be laid flatly on the top of the pipeline, and then the medium-coarse sand around the pipeline is further evenly laid by the sand leveling component 2 to ensure that the medium-coarse sand on the top of the pipeline can be more flat;

[0023] S600: Backfilling: After the coarse and fine yarns are leveled, the sealing and flowability between the pipelines are tested through the inspection wells between the pipelines. If they meet the design standards, the remaining sand, gravel and soil are filled to make the road completely level. Then, concrete or asphalt is poured on the road to restore it to its original state.

[0024] The beneficial effects of the present invention are:

[0025] It can reduce the use of sand discharge devices, reduce construction costs, and vibrate the discharged sand to separate the sand and gravel of the same batch, so that relatively finer sand and gravel can be accumulated around the pipeline, and then these sand and gravel can fill the gap between the pipeline and the slot more tightly, increase the covering and supporting effect of the backfilled medium and coarse sand on the outer circle of the pipeline, and through the mechanical stirring method, reduce the labor intensity of workers and improve the efficiency of backfill test operations. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0027] Figure 1 It is a schematic diagram of the positive axis of the present invention;

[0028] Figure 2 for Figure 1 A is an enlarged schematic diagram;

[0029] Figure 3 It is a schematic diagram of the positive axis of the sand leveling assembly of the present invention;

[0030] Figure 4 It is a schematic diagram of the explosion oblique axis of the sand leveling assembly of the present invention;

[0031] Figure 5 It is a partial enlarged schematic diagram of the present invention;

[0032] Figure 6 for Figure 5 A magnified schematic diagram of B.

[0033] In the figure: 11, adjustment base; 12, protection seat; 13, support plate; 14, sand storage bin; 15, motor seat; 16, drive motor; 171, first synchronous wheel; 172, second synchronous wheel; 18, synchronous belt; 19, crawler; 110, direction handle; 2, sand leveling assembly; 21, double-headed screw; 22, limit column; 23, limit sleeve; 24, sand leveling column; 241, clamping groove; 25, sand leveling rake; 26, Shock-absorbing tension spring; 31, limit plate; 32, positioning column; 33, second adjusting screw; 34, positioning plate; 35, adjusting handle; 36, clamping plate; 37, clamping column; 4, sand-shaking assembly; 41, driving disk; 42, flip plate; 43, linkage plate; 44, light rod; 45, connecting plate; 46, limit block; 461, slide groove; 47, sand-shaking plate; 471, sand-discharging groove; 48, first gear; 49, second gear. DETAILED DESCRIPTION

[0034] The following will be combined with the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0035] Example 1

[0036] like Figure 1 to Figure 6As shown, this embodiment proposes a sewage pipe network system, including an adjusting base 11, a protective base 12 fixedly connected to the adjusting base 11, a sand shaking component 4 for evenly spreading sand and gravel is connected to one side of the protective base 12, the sand shaking component 4 can separate the sand and gravel to be laid flat, and lay the same batch of finer sand and gravel near the pipe, so that these finer sand and gravel can completely cover and limit the pipe, and fill a finer sand and gravel layer around the pipe, so that the impact of the outside world can be better offset by the sand and gravel layer, thereby increasing the service life of the pipe, and the sand leveling component 2 for evenly spreading the sprinkled sand and gravel is connected to one side of the sand shaking component 4, the sand leveling component 2 can mechanically mix the already laid sand and gravel, replacing the workers' uniform effect of sand and gravel, reducing construction costs, and reducing the labor intensity of workers, the support plate 13 is fixedly connected to the protective base 12, and the sand storage bin 14 for transporting sand and gravel is fixedly connected to On the upper side of the support plate 13, the sand storage bin 14 moves with the movement of the equipment, so that the sand covering operation will not be suspended due to illegal operation of the excavator due to site reasons, which increases the construction efficiency, that is, increases the construction effect. The motor seat 15 is fixedly connected to the lower side of the support plate 13, and the driving component for linkage driving the sand leveling component 2 and the sand vibration component 4 is connected to the motor seat 15. The crawler vehicle 19 that moves the adjustment base 11 is fixedly connected to the lower side of the motor seat 15. The crawler vehicle 19 can drive the equipment to move. At the same time, due to the structure of the crawler track of the crawler vehicle 19, the contact area with the sand and gravel is increased, so that the mass of the equipment can be shared by the contact area, ensuring that the equipment will not affect the pipeline under the sand and gravel, and ensuring the normal use of the equipment. The direction handle 110 is fixedly connected between the support plate 13 and the motor seat 15. The worker can control the direction of the equipment by controlling the direction handle 110, so that the equipment can cooperate with the workers to work reasonably.

[0037] like Figure 1 and Figures 4 to 6As shown, the sand-leveling assembly 2 includes a double-headed screw 21, which is rotatably connected to the adjustment base 11, and the lower side of the double-headed screw 21 is fixedly connected to the limit column 22. Two limit sleeves 23 are threadedly connected to two opposite threaded surfaces on the double-headed screw 21, and each limit sleeve 23 is slidably connected to the limit column 22. The limit sleeve 23 is hinged to the sand-leveling column 24, and the lower end of the sand-leveling column 24 is hinged to the sand-leveling rake 25. The shock-absorbing tension spring 26 is connected between the sand-leveling rake 25 and the sand-leveling column 24. The shock-absorbing tension spring 26 enables the sand-leveling rake 25 to stir the sand and gravel evenly. The shock absorbing and resetting is performed to increase the uniform mixing effect of the sand leveling rake 25 on the sand and gravel. At the same time, when the sand leveling rake 25 is squeezed by the sand and gravel, it can be offset by the shock absorbing tension spring 26, thereby increasing the service life of the sand leveling rake 25. The end of the sand leveling column 24 away from the sand leveling rake 25 is connected to the height adjustment component for adjusting the height of the sand and gravel. The forward and reverse rotation of the double-headed lead screw 21 can drive the two limit sleeves 23 to move left and right, thereby making the sand leveling rake 25 connected to the limit sleeve 23 move back and forth left and right towards the sand and gravel, further increasing the uniform mixing effect of the sand leveling rake 25 on the sand and gravel.

[0038] like Figure 4-5 The second adjusting screw 33 is rotatably connected to the two locking columns 32, and the locking plate 34 is sleeved on the second adjusting screw 33 and the two locking columns 32. The locking plate 34 is threadably connected to the second adjusting screw 33, and the upper end of the second adjusting screw 33 is fixedly connected to the adjusting handle 35. The worker can adjust the height of the sand leveling column 24 near the end of the adjusting handle 35 by rotating the adjusting handle 35, that is, adjust the depth of the sand leveling rake 25 inserted into the sand and gravel. By adjusting the depth, the uniform effect of the sand leveling rake 25 on the sand and gravel can be controlled. Because different sizes of sand and gravel require different depths of stirring, the height adjustment assembly can be used to stir sand and gravel of different particles, so that workers can make adjustments to cope with different situations, thereby increasing the practicality of the equipment.

[0039] like Figure 3 to Figure 5 As shown, the two clamping plates 36 are hinged on both sides of the clamping plate 34, and the end of the clamping plate 36 away from the clamping plate 34 is fixedly connected to the clamping column 37, and the clamping groove 241 is opened at the end of the sand leveling column 24 away from the sand leveling rake 25, and the clamping column 37 abuts against the inner wall of the clamping groove 241, so that when the sand leveling column 24 moves through the limiting sleeve 23, the clamping groove 241 can prevent the sand leveling column 24 from getting stuck under the premise that one end is restricted, so that the sand leveling column 24 can complete the further uniform paving of the medium and coarse sand laid in the groove as the limiting sleeve 23 moves, and the paving effect is increased and the construction cost is reduced by replacing the workers' work with machinery.

[0040] like Figure 1-2 and Figure 5-6 As shown, the sand-vibrating assembly 4 includes a driving disk 41, which is rotatably connected to a side of the protective seat 12 away from the driving motor 16, and a non-center portion of the driving disk 41 is hinged to a flip plate 42, and one end of the flip plate 42 away from the driving disk 41 is hinged to a linkage plate 43, and two light rods 44 are slidably connected to the linkage plate 43, and the upper ends of the two light rods 44 are fixedly connected to the lower side of the sand storage bin 14, and two connecting plates 45 are respectively fixedly connected to the two ends of the linkage plate 43, and one end of each connecting plate 45 away from the linkage plate 43 is hinged to a limit block 46, and a sand-vibrating plate 47 is fixedly connected to the limit block 46, and the two sand-vibrating plates 47 are hinged at the exits on both sides of the sand storage bin 14, and the driving disk 41 rotates to drive the flip plates hinged to the driving disk 41 As the driving disc 41 rotates, 42 moves up and down, and then moves up and down along the light rod 44 with the linkage plate 43, and then the sand-vibrating plates 47 on both sides are made to rise and fall upward around the hinge point with the sand storage bin 14 through the connecting plate 45, so that the medium-coarse sand flowing out of the sand storage bin 14 can be vibrated along the undulating sand-vibrating plates 47, so that the coarser sand and gravel in the same batch are moved to both sides of the slot, and the finer sand and gravel can be spread around the pipe, thereby increasing the supporting and limiting effect on the pipe, protecting the pipe body of the pipe, and increasing the spreading effect of the sand and gravel. At the same time, the dumping of sand and gravel can move with the equipment, so that the filling of sand and gravel does not need to be coordinated with the excavator, which is more convenient for workers to work.

[0041] like Figure 1 and Figure 2 As shown, several sand discharge troughs 471 are provided on the sand shaking plate 47, and the slide 461 is provided on the limit block 46. One end of the connecting plate 45 close to the limit block 46 abuts against the inner wall of the slide 461, so that the sand shaking plate 47 is subjected to up and down vibration, so that the same batch of medium and coarse sand with larger particles are spread to both sides of the groove through vibration, and the particles with smaller particles and smaller mass are spread near the pipeline through the sand discharge trough 471, so that these medium and coarse sands can better fill the gap between the pipeline and the sand and gravel, thereby increasing the supporting and limiting effect on the pipeline, and these finer sand layers can reduce the shock effect of the upper force on the lower pipeline, thereby ensuring the service life of the pipeline.

[0042] like Figure 1-2 and Figure 5-6As shown, the first gear 48 on the side of the driving disk 41 away from the flip plate 42 is coaxial and fixedly connected, the first gear 48 is meshed with the second gear 49, and the second gear 49 is fixedly connected to the double-headed screw 21. The rotation of the double-headed screw 21 can drive the driving disk 41 to rotate in conjunction, so that the sand leveling component 2 and the sand shaking component 4 can work in conjunction, reducing the driving source on the equipment, reducing the overall quality of the equipment, allowing workers to drive the running direction of the equipment more easily, and making the sand leveling component 2 and the sand shaking component 4 work synchronously, so that the medium and coarse sand in the groove can be more evenly spread above the pipe, and reducing the labor intensity of workers.

[0043] like Figures 4 to 6 As shown, the driving component includes a driving motor 16, the driving shaft of the driving motor 16 is fixedly connected to the first synchronous wheel 171, the double-headed screw 21 is fixedly connected to the second synchronous wheel 172, and the synchronous belt 18 is sleeved on the first synchronous wheel 171 and the second synchronous wheel 172 and meshed. The driving motor 16 drives the double-headed screw 21 to rotate, and then drives the limit sleeve 23 threadedly connected to the double-headed screw 21 to move.

[0044] The working principle of this embodiment is:

[0045] After the pipeline is installed, if it is necessary to test the tightness of the pipeline, 50 cm of medium-coarse sand needs to be backfilled above the pipeline, and the medium-coarse sand is loaded into the sand storage bin 14. The sand and gravel flow into the sand vibration plates 47 on both sides through the outlets on both sides of the sand storage bin 14, and slide down along the inclined surface of the sand vibration plates 47. The worker controls the direction of movement of the equipment through the direction handle 110, starts the drive motor 16 for forward and reverse rotation, and starts the crawler 19 at the same time, so that the crawler 19 can drive the equipment to move. Note that the space between the crawlers on the crawler 19 is reserved for the pipeline, that is, the crawler 19 will not press the pipeline, and the moving direction of the crawler 19 can be guided by the pipeline;

[0046] The driving motor 16 rotates forward and reversely to drive the double-headed screw 21 to rotate forward and reversely, and then drives the limit sleeves 23 on both sides to move left and right oppositely along the axis of the double-headed screw 21, so that the sand leveling rake 25 performs a reciprocating stirring action on the sand and gravel, so that the sand and gravel are spread more evenly. At the same time, through the meshing of the first gear 48 and the second gear 49, the driving disk 41 is driven to rotate, and then the flip plate 42 is driven to move up and down along with the rotation of the driving disk 41, and then the sand shaking plates 47 on both sides are driven to move up and down around the position hinged with the sand storage bin 14. The undulating vibration dumps the relatively large sand and gravel in the same batch of sand and gravel on the sand-vibrating plate 47 to both sides of the equipment, and dumps the relatively fine sand and gravel to the top of the pipeline, so that the relatively fine sand and gravel can more tightly fill the gap between the pipeline and the bottom wall of the slot, so that the pipeline can be completely shocked and covered by the sand layer, and then continue to accumulate sand layers above the pipeline to protect the pipeline. The sand rake 25 stirs these sand layers at all times, so that the sand layers in the slot can be more evenly spread. The workers move with the equipment and fill the sand material once along the extension direction of the pipeline;

[0047] The worker can also adjust the depth of the sand rake 25 sunk into the sand and gravel by rotating the adjustment handle 35, that is, the intensity of stirring the sand layer, so that the worker can fill the subsequent filling sand layers of different coarseness and fineness conveniently.

[0048] Example 2

[0049] like Figure 1 to Figure 6 As shown, this embodiment proposes a sewage pipe network construction method based on embodiment 1, comprising the following steps:

[0050] S100: Plan the direction of the sewage pipe, isolate the construction area, prevent warning fences, and then mark the planned route to mark the construction area, and mark the sand storage area on one side of the marked area;

[0051] S200: Trenching: Trenching is performed in the marked area by using an excavator, and the excavated sand and soil are stored in the sand storage area;

[0052] S300: placing pipes: placing pipes to be placed in sequence on the side of the slot away from sand, stone and soil according to the opening direction of the slot;

[0053] S400: Laying pipes: Install pipes in the slots one by one by using a crane, and then splice the pipes;

[0054] S500: backfilling with coarse and fine sand: the medium-coarse sand and fine sand flowing out of the sand storage bin 14 are vibrated and laid flat in the grooves in turn by the sand shaking component 4, so that the medium-coarse sand and fine sand can be laid flatly on the top of the pipeline, and then the medium-coarse sand around the pipeline is further evenly laid by the sand leveling component 2 to ensure that the medium-coarse sand on the top of the pipeline can be more flat;

[0055] S600: Backfilling: After the coarse and fine yarns are leveled, the sealing and flowability between the pipelines are tested through the inspection wells between the pipelines. If they meet the design standards, the remaining sand, gravel and soil are filled to make the road completely level. Then, concrete or asphalt is poured on the road to restore it to its original state.

[0056] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A sewage pipe network system, comprising an adjusting base (11), It is characterized in that The adjusting base (11) is fixedly connected to a protection base (12), one side of the protection base (12) is connected to a sand shaking assembly (4) for evenly spreading sand and stone, one side of the sand shaking assembly (4) is connected to a sand leveling assembly (2) for evenly spreading the sand and stone soil materials that have been spread, a support plate (13) is fixedly connected to the protection base (12), the upper side of the support plate (13) is fixedly connected to a sand storage bin (14) for transporting sand and stone, the lower side of the support plate (13) is fixedly connected to a motor base (15), the motor base (15) is fixedly connected to a driving component for driving the sand leveling assembly (2) and the sand shaking assembly (4) in a linked manner, the lower side of the motor base (15) is fixedly connected to a crawler vehicle (19) for moving the adjusting base (11), and a direction handle (110) is fixedly connected between the support plate (13) and the motor base (15).

2. The sewage pipe network system according to claim 1, It is characterized in that The sand leveling assembly (2) comprises a double-ended lead screw (21), the double-ended lead screw (21) is rotatably connected to the adjustment base (11), the lower side of the double-ended lead screw (21) is fixedly connected to a limit column (22), two opposite threaded surfaces on the double-ended lead screw (21) are threadedly connected to a limit sleeve (23), each of the limit sleeves (23) is slidably connected to the limit column (22), each of the limit sleeves (23) is hingedly connected to a sand leveling column (24), the lower end of each of the sand leveling columns (24) is hingedly connected to a sand leveling rake (25), a shock-absorbing tension spring (26) is connected between the sand leveling rake (25) and the sand leveling column (24), and one end of the sand leveling column (24) away from the sand leveling rake (25) is connected to a height adjustment assembly for adjusting the height of the sand leveling stone.

3. The sewage pipe network system according to claim 2, It is characterized in that The height adjustment assembly comprises a limit plate (31), the limit plate (31) is fixedly connected to the support plate (13), two locking columns (32) are fixedly connected between the limit plate (31) and the support plate (13), a second adjusting screw (33) is rotatably connected between the two locking columns (32), a locking plate (34) is sleeved on the second adjusting screw (33) and the two locking columns (32), the locking plate (34) is threadedly connected to the second adjusting screw (33), and an adjusting handle (35) is fixedly connected to the upper end of the second adjusting screw (33).

4. The sewage pipe network system according to claim 3, It is characterized in that A clamping plate (36) is hingedly connected to both sides of the clamping plate (34); one end of the clamping plate (36) away from the clamping plate (34) is fixedly connected to a clamping column (37); one end of the sand leveling column (24) away from the sand leveling rake (25) is provided with a clamping groove (241); and the clamping column (37) abuts against the inner wall of the clamping groove (241).

5. The sewage pipe network system according to claim 1, It is characterized in that The sand-vibrating assembly (4) comprises a driving disk (41), wherein the driving disk (41) is rotatably connected to a side of the protective seat (12) away from the driving motor (16), a flip plate (42) is hingedly connected to a non-center portion of the driving disk (41), an end of the flip plate (42) away from the driving disk (41) is hingedly connected to a linkage plate (43), two light rods (44) are slidably connected to the linkage plate (43), the upper ends of the two light rods (44) are fixedly connected to the lower side of the sand storage bin (14), both ends of the linkage plate (43) are fixedly connected to a connecting plate (45), one end of each connecting plate (45) away from the linkage plate (43) is hingedly connected to a limiting block (46), each limiting block (46) is fixedly connected to a sand-vibrating plate (47), and the two sand-vibrating plates (47) are hingedly connected to the exits on both sides of the sand storage bin (14).

6. The sewage pipe network system according to claim 5, It is characterized in that The sand-shaking plate (47) is provided with a plurality of sand-discharging grooves (471), the limit block (46) is provided with a slide groove (461), and one end of the connecting plate (45) close to the limit block (46) abuts against the inner wall of the slide groove (461).

7. The sewage pipe network system according to claim 5, It is characterized in that A first gear (48) is coaxially fixedly connected to the side of the driving disk (41) away from the flip plate (42); the first gear (48) is meshed with a second gear (49); and the second gear (49) is fixedly connected to the double-headed lead screw (21).

8. The sewage pipe network system according to claim 2, It is characterized in that The driving component comprises a driving motor (16), a driving shaft of the driving motor (16) is fixedly connected to a first synchronous wheel (171), the double-headed lead screw (21) is fixedly connected to a second synchronous wheel (172), and a synchronous belt (18) is meshed on the first synchronous wheel (171) and the second synchronous wheel (172).

9. A sewage pipe network construction method according to any one of claims 1 to 8, It is characterized in that The following steps are involved: S100: Plan the direction of the sewage pipe, isolate the construction area, prevent warning fences, and then mark the planned route to mark the construction area, and mark the sand storage area on one side of the marked area; S200: Trench excavation: trenching is performed in the marked area by using an excavator, and the excavated sand, stone and soil are accumulated in the sand storage area; S300: placing pipes: placing pipes to be placed in sequence on the side of the slot away from sand, stone and soil according to the opening direction of the slot; S400: Laying pipes: Install pipes in the slots one by one by using a crane, and then splice the pipes; S500: backfilling of coarse and fine sand: the medium-coarse sand and fine sand flowing out of the sand storage bin (14) are vibrated and spread in the slots in turn by means of a sand shaking assembly (4), so that the medium-coarse sand and fine sand can be spread evenly on the top of the pipe, and then the medium-coarse sand around the pipe is further evenly spread by means of a sand leveling assembly (2), so as to ensure that the medium-coarse sand on the top of the pipe can be more evenly spread; S600: Backfilling: After the coarse and fine yarns are leveled, the sealing and flow between the pipelines are tested through the inspection wells between the pipelines, and the remaining sand, gravel and soil are filled to make the road completely level. Then, concrete or asphalt is poured on the road to restore it to its original state.