Drainage dredging device for sponge city

By designing a sponge city drainage dredging device, rainwater flushing and rotating components are used to collect garbage. Combined with waterproof motor agitation and activated carbon adsorption, the problem of siltation in sponge city drainage channels is solved, achieving efficient dredging and sewage purification.

CN118911272AInactive Publication Date: 2024-11-08王孟翰
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411099839.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-12
Publication Date
2024-11-08
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In sponge city drainage systems, siltation caused by surface deposits and plant residues affects drainage efficiency.

Method used

A sponge city drainage and dredging device was designed, including components such as a cleaning shell, an operating shell, a shielding frame, a rotating column, a water wheel, a spiral groove, a sliding block, a pusher plate, and a collection bin. The rotating column is driven to rotate by rainwater flushing, pushing the garbage into the collection bin. A waterproof motor is used to agitate and unclog the components to prevent blockage. Activated carbon is used to adsorb odorous gases, and magnets are used to adsorb ferrous garbage.

Benefits of technology

It effectively cleans up accumulated silt and garbage in the drainage channels of sponge cities, prevents blockages, reduces sewage odor, and improves drainage efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911272A_ABST
    Figure CN118911272A_ABST
Patent Text Reader

Abstract

According to the technical scheme, the sponge city drainage and dredging device is characterized in that the sponge city drainage and dredging device comprises a cleaning shell, an operation shell is fixedly installed on one side of the cleaning shell, a shielding frame is movably sleeved with the cleaning shell, a supporting ring is fixedly sleeved with the shielding frame, and two limiting grooves are formed in the bottom face of the interior of the cleaning shell; a placing hole is formed in the inner bottom surface of the limiting groove, and a collecting bin is movably connected into the placing hole in a sleeving manner; the dredging assembly is arranged in the operation shell and used for dredging the sponge city drainage channel, and the cleaning shell, the operation shell, a shielding frame, a supporting ring, a collecting bin, a drainage hole, a rotating column, a spiral groove, a water wheel, a sliding hole, a baffle, a water inlet hole, a sliding block, a connecting column, a pushing plate and a steel ball are used in cooperation. And therefore, garbage entering the cleaning shell can be conveniently pushed, the garbage enters the collecting bin to be collected, and garbage such as silted leaves can be formed in the sponge city drainage channel.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of urban drainage, and in particular to a sponge urban drainage and silt removal device. Background Art

[0002] Sponge city is an urban planning and construction concept that aims to manage and regulate urban rainwater runoff through natural processes. As an effective solution to the problems of "urban waterlogging" and "urban water shortage", the core concept of sponge city is to reduce urban runoff and improve the efficiency of water resource utilization by simulating the natural process of water absorption, water storage, water infiltration, water purification and water release. This concept not only focuses on solving urban water problems, but also aims to improve the quality of urban ecosystems, improve the urban living environment, and ultimately achieve harmonious coexistence of man and nature.

[0003] In the prior art, since the silt in sponge city drainage mainly comes from surface sediments carried by rainwater, when rainwater flows on the surface, it will carry mud, stones and other garbage on the ground. These substances enter the drainage pipes with the rainwater, and the plants around the sponge city facilities may shed leaves or wither. These plant residues flow into the drainage system with rainwater. When the above-mentioned garbage is deposited in the sponge city drainage channel, siltation will form, which may affect the drainage effect of the sponge city drainage channel on rainwater. Summary of the invention

[0004] In view of the deficiencies in the prior art, the present invention provides a sponge city drainage and silt removal device to solve the problems raised in the above background technology.

[0005] The above technical objectives of the present invention are achieved through the following technical solutions:

[0006] A sponge city drainage dredging device comprises a cleaning shell, an operating shell is fixedly installed on one side of the cleaning shell, a shielding frame is movably sleeved inside the cleaning shell, a supporting ring is fixedly sleeved inside the shielding frame, two limiting grooves are arranged on the inner bottom surface of the cleaning shell, a placement hole is arranged on the inner bottom surface of the limiting groove, and a collection bin is movably sleeved inside the placement hole; a dredging component is arranged inside the operating shell for dredging the sponge city drainage channel, and the dredging component comprises: a rotating column, the rotating column is arranged inside the operating shell, a spiral groove is arranged on the outer circular wall surface of the rotating column, rotating grooves are respectively arranged on both sides of the interior of the operating shell, the rotating column is movably sleeved with the rotating groove, a water wheel is fixedly sleeved on the outer circular wall surface of the rotating column, and a sliding A movable hole, a sliding hole is provided on one side of the operating shell, the sliding hole corresponds to the sliding hole, a sliding block is movably sleeved inside the sliding hole and the sliding hole, a connecting column is fixedly installed on one side of the sliding block, a pushing plate is fixedly installed on one side of the connecting column, a resistance groove is provided on the other side of the sliding block, a rotating groove is provided on one side of the resistance groove, a steel ball is movably sleeved on the inner circular wall of the rotating groove, and the steel ball is movably sleeved on the spiral groove, a baffle is fixedly sleeved inside the operating shell, two water inlet holes are provided on the top surface of the baffle, and a plurality of drainage holes are provided on the bottom surface of the collecting bin; a turning component for stirring the garbage collected in the collecting bin is provided inside the collecting bin; a dredging component for preventing blockage of the sponge city drainage channel is provided on the bottom surface of the operating shell.

[0007] By adopting the above technical solution, the staff will put the cleaning shell into the sponge city drainage channel through the setting push plate. When rain comes, as the rain washes, the leaves, soil and other garbage on the ground will follow the rain through the shielding frame into the interior of the cleaning shell. At the same time, the rain will enter the interior of the operating shell through the water inlet hole. Since the position of the water inlet hole corresponds to the position of the water wheel, when the rain enters the interior of the operating shell through the water inlet hole, the rain will impact the water wheel to make it rotate. When the water wheel rotates, it will drive the rotating column to rotate. As the rotating column and the spiral groove rotate, the steel ball can be moved inside the spiral groove. Through the spiral path of the spiral groove, the steel ball can drive the sliding block, the connecting column and the pushing plate to enter. The push plate will move back and forth along the inner bottom surface of the cleaning shell, so as to push the garbage entering the cleaning shell and collect it in the collecting bin. In this way, garbage such as leaves that may accumulate in the sponge city drainage channel will be collected in the collecting bin before entering the sponge city drainage channel. Then, liquids such as rainwater will flow out of the collecting bin through the drainage holes and enter the sponge city drainage channel, so as to facilitate the dredging of the sponge city drainage channel. Subsequently, the shielding frame can be moved out of the cleaning shell, and then the collecting bin can be moved out of the placement hole, so as to facilitate the cleaning of the accumulated garbage collected in the collecting bin.

[0008] Preferably, the flipping assembly comprises: two supporting columns, the two supporting columns are respectively fixedly mounted inside the two collecting bins, the outer circumferential wall surface of the supporting columns is provided with a moving column, the top surface of the moving column is fixedly mounted with a moving tube, the moving tube is movably sleeved with the supporting columns, the outer circumferential wall surface of the moving column is provided with a moving block, the top surface of the moving block is provided with a lifting hole, the lifting hole is movably sleeved with the moving column, a moving column is fixedly mounted on one side of the moving block, a stirring column is fixedly mounted on the other side of the moving block, a rotating block is provided on one side of the interior of the collecting bin, An adjustment hole is provided on the top surface of the rotating block, a telescopic column is movably sleeved on the inner circular wall of the adjustment hole, a connecting frame is fixedly installed on the bottom surface of the telescopic column, a spring is movably sleeved on the outer circular wall of the telescopic column, both ends of the spring are respectively fixedly installed on the connecting frame and the rotating block, a movable hole is provided on one side of the connecting frame, the movable hole is movably sleeved on the movable column, a protective shell is fixedly installed on one side of the collecting bin, a waterproof motor is fixedly installed inside the protective shell, a rotating hole is provided on one side of the collecting bin, and a driving shaft of the waterproof motor is fixedly installed on the rotating block.

[0009] By adopting the above technical solution, through the setting of the stirring column, when the garbage enters the interior of the collection bin, the waterproof motor is used, and the rotation of the driving shaft of the waterproof motor will drive the rotating block to rotate, and then the rotating block will drive the telescopic column and the connecting frame to rotate during the rotation, and then the connecting frame will drive the movable column, the moving block, the moving tube and the stirring column to move. As the rotating block rotates, it will drive the moving column, the moving block and the stirring column to move in a square path. At this time, the stirring column will stir the inside of the collection bin to prevent the accumulation of garbage inside the collection bin, which will make it difficult for rainwater to flow out of the water tank.

[0010] Preferably, the dredging component comprises: a mounting shell, the mounting shell is fixedly mounted on the bottom surface of the operating shell, a fixing column is fixedly mounted on one side of the interior of the mounting shell, a gear is movably sleeved on the outer circular wall surface of the fixing column, a rotating wheel is movably sleeved on the outer circular wall surface of the fixing column, a mounting tube is fixedly mounted between the gear and the rotating wheel, the mounting tube is movably sleeved on the fixing column, a pushing frame is movably sleeved on the interior of the mounting shell, an annular frame is arranged inside the pushing frame, a plurality of tooth grooves are provided inside the annular frame, and two sides of the interior of the pushing frame are respectively provided with Positioning groove, positioning blocks are fixedly installed on both sides of the annular frame, and the positioning blocks are movably connected with the positioning grooves. A plurality of water flow holes are provided on the inner bottom surface of the mounting shell. Mobile frames are fixedly installed on both sides of the push frame, and a dredging column is fixedly installed on one side of the mobile frame. Stabilizing holes are provided on both sides of the mounting shell, and the mobile frame is movably connected with the stabilizing holes. A limiting hole is provided on the top surface of the mounting shell, and a connecting pipe is fixedly connected to the inner circular wall of the limiting hole. A water outlet hole is provided on the bottom surface of the operating shell, and the water outlet hole is fixedly connected with the connecting pipe.

[0011] By adopting the above technical scheme, through the set dredging column, when rainwater enters the interior of the operating shell, it will enter the interior of the installation shell through the connecting pipe, and the position of the connecting pipe corresponds to the position of the gear, and then the rainwater will impact the rotating wheel after flowing out of the connecting pipe, and then the rotating wheel will drive the installation pipe and the gear to rotate, and then the gear will engage the tooth groove to rotate, and with the rotation of the gear, it will push the annular frame to move and drive the pushing frame to move, and then the pushing frame will drive the moving frame and the dredging column to move linearly, and when the gear is engaged with the tooth groove on the bottom surface of the annular frame and rotates, the annular frame will push the pushing frame, the moving frame and the dredging column to move linearly to the left, conversely, when the gear is engaged with the internal top surface of the annular frame and rotates, the annular frame will push the pushing frame and the other moving frame and the dredging column to move to the right, at this time, the two moving frames and the dredging column will perform reciprocating linear motion left and right, and the moving frame and the dredging column are inside the sponge city drainage channel, thereby preventing siltation in the sponge city drainage channel at the cleaning shell position from clogging.

[0012] Preferably, the bottom surface of the cleaning shell is provided with a plurality of mounting holes, the inner circular wall surface of the mounting hole is provided with a thread, the inner circular wall surface of the mounting hole is threadedly connected with a feeding shell, the outer circular wall surface of the feeding shell is provided with a thread, a blocking net is fixedly installed on the bottom surface of the feeding shell, a bottom plate is fixedly installed on the bottom surface of the blocking net, a feeding hole is provided on the top surface of the feeding shell, and a sealing cover is movably sleeved on the inner circular wall surface of the feeding hole.

[0013] By adopting the above technical solution, through the setting of the blocking net, the staff will put the activated carbon into the feeding shell and the blocking net, so that it accumulates on the top surface of the bottom plate, and then the feeding shell and the blocking net will follow the cleaning shell inside the sponge city drainage channel, so that the blocking net is in the water in the sponge city drainage channel, and the high adsorption performance of activated carbon is utilized to adsorb and remove the malodorous gas through the activated carbon filling layer, thereby reducing the odor of sewage inside the sponge city drainage channel.

[0014] Preferably, a plurality of magnets are fixedly mounted on the outer circular wall surface of the bottom plate.

[0015] By adopting the above technical solution, through the set magnet, after the staff puts the feeding shell and the blocking net into the sponge city drainage channel, the magnet will be in the water, thereby facilitating the adsorption of iron waste in the water in the sponge city drainage channel.

[0016] Preferably, a water collection groove is provided on the top surface of the baffle, and a filter screen is fixedly sleeved inside the water collection groove.

[0017] By adopting the above technical solution, a water collection trough is set up, through which rainwater can be collected and concentrated to enter the water inlet hole, and then blocked by the filter net, it can prevent road garbage from entering the water collection trough and causing the water inlet hole to be blocked.

[0018] Preferably, the inner top surface and the bottom surface of the sliding hole are respectively fixedly mounted with limit columns, and one side of the sliding block is provided with two limit holes, and the limit holes are movably sleeved with the limit columns.

[0019] By adopting the above technical solution, the sliding block can be limited in movement.

[0020] Preferably, the surfaces of the sliding block, the connecting column, the pushing plate, the collecting bin, the supporting column, the rotating block, the moving column, the moving tube, the moving block, the movable column, the stirring column, the telescopic column, the spring and the connecting frame are respectively coated with corrosion-resistant coatings.

[0021] By adopting the above technical scheme, in order to increase the corrosion resistance of the sliding block, connecting column, pushing plate, collecting bin, supporting column, rotating block, moving column, moving tube, moving block, movable column, stirring column, telescopic column, spring and connecting frame, the corrosion caused by garbage and rainwater is reduced.

[0022] In summary, the present invention mainly has the following beneficial effects:

[0023] The cleaning shell, operating shell, shielding frame, supporting ring, collecting bin, drain hole, rotating column, spiral groove, water wheel, sliding hole, baffle, water inlet hole, sliding block, connecting column, pushing plate and steel ball are used in coordination with each other, so that the garbage entering the cleaning shell can be pushed into the collecting bin for collection, so that garbage such as leaves that may form siltation in the sponge city drainage channel can be collected in the collecting bin before entering the sponge city drainage channel, and then liquids such as rainwater can flow out of the collecting bin through the drain hole and enter the sponge city drainage channel, thereby facilitating the dredging of the sponge city drainage channel.

[0024] The cleaning shell, operating shell, shielding frame, supporting ring, limiting groove, placement hole and collecting bin are used in coordination with each other. The shielding frame can be moved out of the interior of the cleaning shell, and then the collecting bin can be moved out of the interior of the placement hole, thereby facilitating the cleaning of accumulated garbage collected in the collecting bin. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a three-dimensional structural schematic diagram of the present invention;

[0026] Figure 2 It is a schematic diagram of the shielding frame structure of the present invention;

[0027] Figure 3 It is a schematic diagram of the cleaning shell structure of the present invention;

[0028] Figure 4 yes Figure 3 Schematic diagram of the local structure of A;

[0029] Figure 5 It is a schematic diagram of the structure of the operating shell of the present invention;

[0030] Figure 6 It is a schematic diagram of the structure of the sliding block of the present invention;

[0031] Figure 7 It is a schematic diagram of the water outlet structure of the present invention;

[0032] Figure 8 It is a schematic diagram of the collection bin structure of the present invention;

[0033] Fig. 9 It is a schematic diagram of the support column structure of the present invention;

[0034] Fig.10 It is a schematic diagram of the installation shell structure of the present invention;

[0035] Fig.11 It is a schematic diagram of the push frame structure of the present invention;

[0036] Fig.12 It is a schematic diagram of the feeding shell structure of the present invention.

[0037] Figure numerals: 1, cleaning shell; 2, operating shell; 3, shielding frame; 4, supporting ring; 5, limiting groove; 6, placing hole; 7, collecting bin; 8, filter screen; 9, drainage hole; 10, sliding hole; 11, limiting column; 12, rotating groove; 13, rotating column; 14, spiral groove; 15, water wheel; 16, sliding hole; 17, baffle; 18, water inlet hole; 19, sliding block; 20, connecting column; 21, pushing plate; 22, resistance groove; 23, rotating groove; 24, steel ball; 25, limiting hole; 26, supporting column; 27, moving column; 28, moving tube; 29, moving block; 30, lifting hole; 31, movable column; 32, stirring column; 33, rotating block; 34 , adjusting hole; 35, telescopic column; 36, spring; 37, connecting frame; 38, movable hole; 39, protective shell; 40, waterproof motor; 41, rotating hole; 42, water trough; 43, sealing cover; 44, mounting shell; 45, fixing column; 46, gear; 47, rotating wheel; 48, mounting pipe; 49, pushing frame; 50, annular frame; 51, tooth groove; 52, positioning block; 53, positioning groove; 54, water flow hole; 55, moving frame; 56, silt removal column; 57, stable hole; 58, limiting hole; 59, connecting pipe; 60, water outlet hole; 61, mounting hole; 62, feeding shell; 63, blocking net; 64, magnet; 65, bottom plate; 66, feeding hole. DETAILED DESCRIPTION

[0038] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0039] Embodiment 1

[0040] refer to Figure 1 , Figure 2 , Figure 3 , Figure 5 , Figure 6 and Figure 7A sponge city drainage silt removal device comprises a cleaning shell 1, an operating shell 2 is fixedly installed on one side of the cleaning shell 1, a shielding frame 3 is movably sleeved inside the cleaning shell 1, a support ring 4 is fixedly sleeved inside the shielding frame 3, two limiting grooves 5 are arranged on the inner bottom surface of the cleaning shell 1, a placement hole 6 is arranged on the inner bottom surface of the limiting groove 5, a collection bin 7 is movably sleeved inside the placement hole 6, a silt removal component is arranged inside the operating shell 2 for silting the sponge city drainage channel, the silt removal component comprises a rotating column 13, the rotating column 13 is arranged inside the operating shell 2, a spiral groove 14 is arranged on the outer circumferential wall surface of the rotating column 13, rotating grooves 12 are respectively arranged on both sides of the inner side of the operating shell 2, the rotating column 13 is movably sleeved with the rotating groove 12, and the outer circumference of the rotating column 13 is movably sleeved. A water wheel 15 is fixedly sleeved on the wall surface, a sliding hole 10 is provided on one side of the cleaning shell 1, a sliding hole 16 is provided on one side of the operating shell 2, the sliding hole 10 corresponds to the sliding hole 16, a sliding block 19 is movably sleeved inside the sliding hole 16 and the sliding hole 10, a connecting column 20 is fixedly installed on one side of the sliding block 19, a pushing plate 21 is fixedly installed on one side of the connecting column 20, a resistance groove 22 is provided on the other side of the sliding block 19, a rotating groove 23 is provided on one side of the resistance groove 22, a steel ball 24 is movably sleeved on the inner circular wall surface of the rotating groove 23, and the steel ball 24 is movably sleeved on the spiral groove 14, a baffle 17 is fixedly sleeved inside the operating shell 2, two water inlet holes 18 are provided on the top surface of the baffle 17, a plurality of drainage holes 9 are provided on the bottom surface of the collecting bin 7, and the collecting bin 7 A turning component for stirring the garbage collected in the collection bin 7 is provided inside the operating shell 2, and a dredging component for preventing the sponge city drain from being blocked is provided on the bottom surface of the operating shell 2. Through the provided pushing plate 21, the staff puts the cleaning shell 1 into the sponge city drain. When rain comes, as the rain washes, garbage such as leaves and soil on the ground will follow the rain through the shielding frame 3 into the interior of the cleaning shell 1, and at the same time, the rain will enter the interior of the operating shell 2 through the water inlet hole 18. Since the position of the water inlet hole 18 corresponds to that of the water wheel 15, when rainwater enters the interior of the operating shell 2 through the water inlet hole 18, the rainwater will impact the water wheel 15 to make it rotate. When the water wheel 15 rotates, it will drive the rotating column 13 to rotate. As the rotating column 13 and the spiral groove 14 rotate, The steel ball 24 can be moved inside the spiral groove 14. Through the spiral path of the spiral groove 14, the steel ball 24 can drive the sliding block 19, the connecting column 20 and the pushing plate 21 to move. At this time, the pushing plate 21 will reciprocate along the inner bottom surface of the cleaning shell 1, so as to facilitate the pushing of the garbage entering the cleaning shell 1, so that the garbage enters the collecting bin 7 for collection, so that the garbage such as leaves that will form siltation in the sponge city drainage channel will be collected in the collecting bin 7 after entering the sponge city drainage channel, and then the liquid such as rainwater will flow out of the collecting bin 7 through the drainage hole 9 and enter the sponge city drainage channel, so as to facilitate the dredging of the sponge city drainage channel, and then it can be moved out of the cleaning shell 1 by moving the shielding frame 3.Then, the collection bin 7 can be moved out of the placement hole 6, so as to facilitate the cleaning of the accumulated garbage collected in the collection bin 7.

[0041] Embodiment 2

[0042] Based on the above embodiment 1, refer to Figure 1 , Figure 2 , Figure 3 , Figure 5 , Figure 8 and Fig. 9 The flipping assembly includes two support columns 26, which are respectively fixedly installed in the two collecting bins 7. A moving column 27 is provided on the outer circumferential wall of the support column 26. A moving tube 28 is fixedly installed on the top surface of the moving column 27. The moving tube 28 is movably sleeved with the support column 26. A moving block 29 is provided on the outer circumferential wall of the moving column 27. A lifting hole 30 is provided on the top surface of the moving block 29. The lifting hole 30 is movably sleeved with the moving column 27. A moving column 31 is fixedly installed on one side of the moving block 29, and a stirring column 32 is fixedly installed on the other side of the moving block 29. A rotating block 33 is provided on one side of the collecting bin 7. An adjusting hole 34 is provided on the top surface of the rotating block 33. A telescopic column 35 is movably sleeved on the inner circumferential wall of the adjusting hole 34. A connecting frame 37 is fixedly installed on the bottom surface of the telescopic column 35. A spring 36 is movably sleeved on the outer circumferential wall of the telescopic column 35. The two ends of the spring 36 are respectively fixedly installed on the connecting frame 37 and the rotating block 33. One side of the connecting frame 37 is provided with a The movable hole 38 is movably connected with the movable column 31. A protective shell 39 is fixedly installed on one side of the collecting bin 7. A waterproof motor 40 is fixedly installed inside the protective shell 39. A rotating hole 41 is opened on one side of the collecting bin 7. The driving shaft of the waterproof motor 40 is fixedly installed with the rotating block 33. Through the provided stirring column 32, when garbage enters the interior of the collecting bin 7, the waterproof motor 40 is used. The rotation of the driving shaft of the waterproof motor 40 will drive the rotating block 33 to rotate, and then the rotating block 33 will drive the telescopic column 35 and the connecting frame 37 to rotate during the rotation, and then the connecting frame 37 will drive the movable column 31, the moving block 29, the moving tube 28 and the stirring column 32 to move. As the rotating block 33 rotates, the moving column 27, the moving block 29 and the stirring column 32 will be driven to move in a square path. At this time, the stirring column 32 will stir inside the collecting bin 7 to prevent the garbage inside the collecting bin 7 from accumulating and rainwater from flowing out of the water trough 42.

[0043] Embodiment 3

[0044] Based on the above embodiment 1 or 2, refer to Figure 1 , Figure 2 , Figure 3 , Figure 7 , Fig.10 and Fig.11The dredging assembly includes a mounting shell 44, which is fixedly mounted on the bottom surface of the operating shell 2. A fixing column 45 is fixedly mounted on one side of the interior of the mounting shell 44. A gear 46 is movably sleeved on the outer circumferential wall of the fixing column 45. A rotating wheel 47 is movably sleeved on the outer circumferential wall of the fixing column 45. A mounting tube 48 is fixedly mounted between the gear 46 and the rotating wheel 47. The mounting tube 48 is movably sleeved on the fixing column 45. A push frame 49 is movably sleeved on the interior of the mounting shell 44. An annular frame 50 is arranged inside the push frame 49. A plurality of tooth grooves 51 are provided inside the annular frame 50. The inner sides of the push frame 49 are divided into A positioning groove 53 is separately provided, and positioning blocks 52 are fixedly installed on both sides of the annular frame 50, and the positioning blocks 52 are movably sleeved with the positioning grooves 53. A plurality of water flow holes 54 are provided on the inner bottom surface of the installation shell 44, and a moving frame 55 is fixedly installed on both sides of the push frame 49, and a dredging column 56 is fixedly installed on one side of the moving frame 55. Stable holes 57 are respectively provided on both sides of the installation shell 44, and the moving frame 55 is movably sleeved with the stable hole 57. A limiting hole 58 is provided on the top surface of the installation shell 44, and a connecting pipe 59 is fixedly sleeved on the inner circular wall surface of the limiting hole 58. A water outlet hole 60 is provided on the bottom surface of the operating shell 2. The water outlet 60 is fixedly connected with the connecting pipe 59. Through the provided desilting column 56, when rainwater enters the interior of the operating shell 2, it will enter the interior of the mounting shell 44 through the connecting pipe 59. The position of the connecting pipe 59 corresponds to the position of the gear 46. Then, after the rainwater flows out of the connecting pipe 59, it will impact the rotating wheel 47. Then, the rotating wheel 47 will drive the mounting pipe 48 and the gear 46 to rotate. Then, the gear 46 will mesh with the tooth groove 51 to rotate. As the gear 46 rotates, the annular frame 50 will be pushed to move and the pushing frame 49 will be driven to move. Then, the pushing frame 49 will drive the moving frame 55 and the desilting column 56 to move. Linear movement, when the gear 46 engages and rotates with the tooth groove 51 on the inner bottom surface of the annular frame 50, the annular frame 50 will push the pushing frame 49, the moving frame 55 and the dredging column 56 to move linearly to the left. Conversely, when the gear 46 engages and rotates with the inner top surface of the annular frame 50, the annular frame 50 will push the pushing frame 49 and the other moving frame 55 and the dredging column 56 to move to the right. At this time, the two moving frames 55 and the dredging column 56 will perform reciprocating linear motion left and right, and the moving frame 55 and the dredging column 56 are inside the sponge city drainage channel, thereby preventing siltation in the sponge city drainage channel at the position of the cleaning shell 1 from being blocked.

[0045] Embodiment 4

[0046] Based on the above embodiments 1, 2 or 3, refer to Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 , Figure 6 , Figure 7 and Fig.12The bottom surface of the cleaning shell 1 is provided with a plurality of mounting holes 61, the inner circumferential wall surface of the mounting hole 61 is provided with a thread, the inner circumferential wall surface of the mounting hole 61 is threadedly connected with a feeding shell 62, the outer circumferential wall surface of the feeding shell 62 is provided with a thread, a blocking net 63 is fixedly installed on the bottom surface of the feeding shell 62, a bottom plate 65 is fixedly installed on the bottom surface of the blocking net 63, a feeding hole 66 is provided on the top surface of the feeding shell 62, and a sealing cover 43 is movably sleeved on the inner circumferential wall surface of the feeding hole 66, through the provided blocking net 63, the staff can pass Activated carbon is put into the feeding shell 62 and the blocking net 63 so that it accumulates on the top surface of the bottom plate 65, and then the feeding shell 62 and the blocking net 63 will follow the cleaning shell 1 inside the sponge city drainage channel, so that the blocking net 63 is in the water in the sponge city drainage channel, and the high adsorption performance of the activated carbon is utilized to adsorb and remove the malodorous gas through the activated carbon filling layer, thereby reducing the odor of the sewage inside the sponge city drainage channel, and the outer circular wall surface of the bottom plate 65 is fixedly installed with a plurality of magnets 64. Through the set magnets 64, after the staff puts the feeding shell 62 and the blocking net 63 into the sponge city drainage channel, the magnets 64 will be in the water, thereby facilitating the adsorption of iron garbage in the water in the sponge city drainage channel, and the top surface of the baffle 17 is provided with a water collection groove 42, and the interior of the water collection groove 42 is fixedly sleeved with a filter net 8, and the water collection groove 42 is provided to collect rainwater, so that it can enter the interior of the water inlet 18 after being concentrated, and then prevent the road garbage from entering the water collection groove 42 through the blocking of the filter net 8. The water inlet 18 is blocked internally, and the limiting columns 11 are fixedly installed on the inner top and bottom surfaces of the sliding hole 10 respectively. Two limiting holes 25 are opened on one side of the sliding block 19, and the limiting holes 25 are movably connected with the limiting columns 11. The surfaces of the sliding block 19, the connecting column 20, the pushing plate 21, the collecting bin 7, the supporting column 26, the rotating block 33, the moving column 27, the moving tube 28, the moving block 29, the movable column 31, the stirring column 32, the telescopic column 35, the spring 36 and the connecting frame 37 are respectively coated with corrosion-resistant coatings.

[0047] Working principle: Please refer to Figure 1-Figure 12As shown, through the push plate 21, the staff puts the cleaning shell 1 into the sponge city drainage channel. When rain comes, as the rain washes, garbage such as leaves and soil on the ground will follow the rain through the shielding frame 3 into the interior of the cleaning shell 1. At the same time, the rain will enter the interior of the operating shell 2 through the water inlet hole 18. Since the position of the water inlet hole 18 corresponds to the position of the water wheel 15, when the rain enters the interior of the operating shell 2 through the water inlet hole 18, the rain will impact the water wheel 15 to rotate. When the water wheel 15 rotates, it will drive the rotating column 13 to rotate. As the rotating column 13 and the spiral groove 14 rotate, the steel ball 24 can be moved inside the spiral groove 14. Through the spiral path of the spiral groove 14, the steel ball 24 can drive the sliding block 19 and the connecting column 19. 20 and the pushing plate 21 move, and at this time the pushing plate 21 will move back and forth along the inner bottom surface of the cleaning shell 1, so as to facilitate the pushing of the garbage entering the cleaning shell 1, so that the garbage enters the collecting bin 7 for collection, so that the garbage such as leaves that will form siltation in the sponge city drainage channel will be collected in the collecting bin 7 before entering the sponge city drainage channel, and then the liquid such as rainwater will flow out of the collecting bin 7 through the drainage hole 9 and enter the sponge city drainage channel, so as to facilitate the dredging of the sponge city drainage channel, and then the shielding frame 3 can be moved out of the cleaning shell 1, and then the collecting bin 7 can be moved out of the placement hole 6, so as to facilitate the cleaning of the siltation garbage collected in the collecting bin 7.

[0048] By setting up the stirring column 32, when the garbage enters the interior of the collecting bin 7, the waterproof motor 40 is used, and the rotation of the driving shaft of the waterproof motor 40 will drive the rotating block 33 to rotate, and then the rotating block 33 will drive the telescopic column 35 and the connecting frame 37 to rotate during the rotation, and then the connecting frame 37 will drive the movable column 31, the moving block 29, the moving tube 28 and the stirring column 32 to move. As the rotating block 33 rotates, the moving column 27, the moving block 29 and the stirring column 32 will move in a square path. At this time, the stirring column 32 will stir the inside of the collecting bin 7 to prevent the accumulation of garbage inside the collecting bin 7 and the rainwater from flowing out of the water trough 42.

[0049] Through the provided dredging column 56, when rainwater enters the interior of the operating shell 2, it will enter the interior of the mounting shell 44 through the connecting pipe 59, and the position of the connecting pipe 59 corresponds to the position of the gear 46, so that after the rainwater flows out of the connecting pipe 59, it will impact the rotating wheel 47, and then the rotating wheel 47 will drive the mounting tube 48 and the gear 46 to rotate, and then the gear 46 will mesh with the tooth groove 51 to rotate, and with the rotation of the gear 46, the annular frame 50 will be pushed to move and the pushing frame 49 will be driven to move, and then the pushing frame 49 will drive the moving frame 55 and the dredging column 56 to move in a straight line, and when the gear 46 rotates, the annular frame 50 will be pushed to move and the pushing frame 49 will be driven to move, and then the pushing frame 49 will drive the moving frame 55 and the dredging column 56 to move in a straight line. When the gear 46 engages and rotates with the tooth groove 51 on the inner bottom surface of the annular frame 50, the annular frame 50 will push the pushing frame 49, the moving frame 55 and the dredging column 56 to move linearly to the left. Conversely, when the gear 46 engages and rotates with the inner top surface of the annular frame 50, the annular frame 50 will push the pushing frame 49 and the other moving frame 55 and the dredging column 56 to move to the right. At this time, the two moving frames 55 and the dredging column 56 will perform reciprocating linear motion left and right, and the moving frame 55 and the dredging column 56 are inside the sponge city drainage channel, thereby preventing siltation in the sponge city drainage channel at the cleaning shell 1 from being blocked.

[0050] Through the setting of the blocking net 63, the staff puts the activated carbon into the feeding shell 62 and the blocking net 63 to make it accumulate on the top surface of the bottom plate 65, and then the feeding shell 62 and the blocking net 63 will follow the cleaning shell 1 inside the sponge city drainage channel, so that the blocking net 63 is in the water in the sponge city drainage channel, and the high adsorption performance of the activated carbon is utilized to adsorb and remove the malodorous gas through the activated carbon filling layer, thereby reducing the odor of the sewage inside the sponge city drainage channel.

[0051] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A sponge city drainage and dredging device, characterized in that: include: A cleaning shell (1), an operating shell (2) is fixedly mounted on one side of the cleaning shell (1), a shielding frame (3) is movably sleeved inside the cleaning shell (1), a support ring (4) is fixedly sleeved inside the shielding frame (3), two limiting grooves (5) are provided on the inner bottom surface of the cleaning shell (1), a placement hole (6) is provided on the inner bottom surface of the limiting groove (5), and a collection bin (7) is movably sleeved inside the placement hole (6); A dredging component is arranged inside the operating shell (2) and is used for dredging a sponge city drainage channel. The dredging component comprises: a rotating column (13), the rotating column (13) is arranged inside the operating shell (2), a spiral groove (14) is provided on the outer circumferential wall surface of the rotating column (13), rotating grooves (12) are provided on both sides of the interior of the operating shell (2), the rotating column (13) is movably sleeved with the rotating grooves (12), a water wheel (15) is fixedly sleeved on the outer circumferential wall surface of the rotating column (13), a sliding hole (10) is provided on one side of the cleaning shell (1), a sliding hole (16) is provided on one side of the operating shell (2), the sliding hole (10) corresponds to the sliding hole (16), and the sliding hole (10) corresponds to the sliding hole (16). 16) and the sliding hole (10) are movably sleeved with a sliding block (19), a connecting column (20) is fixedly installed on one side of the sliding block (19), a pushing plate (21) is fixedly installed on one side of the connecting column (20), a resistance groove (22) is provided on the other side of the sliding block (19), a rotating groove (23) is provided on one side of the resistance groove (22), a steel ball (24) is movably sleeved on the inner circular wall surface of the rotating groove (23), and the steel ball (24) is movably sleeved with the spiral groove (14), a baffle (17) is fixedly sleeved inside the operating shell (2), two water inlet holes (18) are provided on the top surface of the baffle (17), and a plurality of drainage holes (9) are provided on the bottom surface of the collecting bin (7); The interior of the collection bin (7) is provided with a stirring assembly for stirring the garbage collected in the collection bin (7); The bottom surface of the operating shell (2) is provided with a dredging component for preventing the sponge city drainage channel from being blocked.

2. A sponge city drainage and silt removal device according to claim 1, characterized in that: The flip assembly comprises: Two support columns (26), the two support columns (26) are respectively fixedly installed inside the two collecting bins (7), the outer circumferential wall surface of the support column (26) is provided with a moving column (27), the top surface of the moving column (27) is fixedly installed with a moving tube (28), the moving tube (28) is movably connected with the support column (26), the outer circumferential wall surface of the moving column (27) is provided with a moving block (29), the top surface of the moving block (29) is provided with a lifting hole (30), the lifting hole (30) is movably connected with the moving column (27), a moving column (31) is fixedly installed on one side of the moving block (29), and a stirring column (32) is fixedly installed on the other side of the moving block (29), a rotating block (33) is provided on one side of the interior of the collecting bin (7), and the top surface of the rotating block (33) is An adjusting hole (34) is provided, a telescopic column (35) is movably sleeved on the inner circular wall of the adjusting hole (34), a connecting frame (37) is fixedly installed on the bottom surface of the telescopic column (35), a spring (36) is movably sleeved on the outer circular wall of the telescopic column (35), two ends of the spring (36) are respectively fixedly installed on the connecting frame (37) and the rotating block (33), a movable hole (38) is provided on one side of the connecting frame (37), the movable hole (38) is movably sleeved on the movable column (31), a protective shell (39) is fixedly installed on one side of the collecting bin (7), a waterproof motor (40) is fixedly installed inside the protective shell (39), a rotating hole (41) is provided on one side of the collecting bin (7), and a driving shaft of the waterproof motor (40) is fixedly installed on the rotating block (33).

3. A sponge city drainage and silt removal device according to claim 1, characterized in that: The dredging component comprises: A mounting shell (44), wherein the mounting shell (44) is fixedly mounted on the bottom surface of the operating shell (2), a fixing column (45) is fixedly mounted on one side of the interior of the mounting shell (44), a gear (46) is movably sleeved on the outer circumferential wall surface of the fixing column (45), a rotating wheel (47) is movably sleeved on the outer circumferential wall surface of the fixing column (45), a mounting tube (48) is fixedly mounted between the gear (46) and the rotating wheel (47), the mounting tube (48) is movably sleeved on the fixing column (45), a pushing frame (49) is movably sleeved on the interior of the mounting shell (44), an annular frame (50) is arranged inside the pushing frame (49), a plurality of tooth grooves (51) are provided inside the annular frame (50), positioning grooves (53) are respectively provided on both sides of the interior of the pushing frame (49), and the Positioning blocks (52) are fixedly mounted on both sides of the annular frame (50), and the positioning blocks (52) are movably sleeved with the positioning grooves (53). A plurality of water flow holes (54) are provided on the inner bottom surface of the mounting shell (44). Moving frames (55) are fixedly mounted on both sides of the push frame (49), and a dredging column (56) is fixedly mounted on one side of the moving frame (55). Stabilizing holes (57) are respectively provided on both sides of the mounting shell (44), and the moving frame (55) is movably sleeved with the stabilizing holes (57). A limiting hole (58) is provided on the top surface of the mounting shell (44), and a connecting pipe (59) is fixedly sleeved on the inner circular wall surface of the limiting hole (58). A water outlet hole (60) is provided on the bottom surface of the operating shell (2), and the water outlet hole (60) is fixedly sleeved with the connecting pipe (59).

4. A sponge city drainage and silt removal device according to claim 1, characterized in that: The bottom surface of the cleaning shell (1) is provided with a plurality of mounting holes (61), the inner circumferential wall surface of the mounting hole (61) is provided with a thread, the inner circumferential wall surface of the mounting hole (61) is threadedly connected with a feeding shell (62), the outer circumferential wall surface of the feeding shell (62) is provided with a thread, a blocking net (63) is fixedly mounted on the bottom surface of the feeding shell (62), a bottom plate (65) is fixedly mounted on the bottom surface of the blocking net (63), a feeding hole (66) is provided on the top surface of the feeding shell (62), and a sealing cover (43) is movably sleeved on the inner circumferential wall surface of the feeding hole (66).

5. A sponge city drainage and silt removal device according to claim 4, characterized in that: A plurality of magnets (64) are fixedly mounted on the outer circular wall surface of the bottom plate (65).

6. A sponge city drainage and desilting device according to claim 1, characterized in that: A water collection groove (42) is provided on the top surface of the baffle (17), and a filter screen (8) is fixedly sleeved inside the water collection groove (42).

7. A sponge city drainage and silt removal device according to claim 1, characterized in that: The inner top surface and bottom surface of the sliding hole (10) are respectively fixedly mounted with a limiting column (11); one side of the sliding block (19) is provided with two limiting holes (25); the limiting holes (25) are movably sleeved with the limiting column (11).

8. The sponge city drainage and silt removal device according to claim 2 is characterized by: The surfaces of the sliding block (19), the connecting column (20), the pushing plate (21), the collecting bin (7), the supporting column (26), the rotating block (33), the moving column (27), the moving tube (28), the moving block (29), the movable column (31), the stirring column (32), the telescopic column (35), the spring (36) and the connecting frame (37) are respectively coated with corrosion-resistant coatings.