Cement room connecting structure and stacking connecting method thereof

By using the combination design and hoisting socket connection method of planar steel plate and square pipe in the cement room connection structure, the problems of unstable structure and uneven load bearing in traditional cement room connection are solved, and stable and convenient cement room connection and stacking are achieved. Method, suitable for the rapid construction of temporary housing, tourist resorts, office spaces and commercial facilities.

CN118911275AInactive Publication Date: 2024-11-08陈思远
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411095827.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-12
Publication Date
2024-11-08
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Traditional prefabricated cement houses have problems such as structural instability, uneven load bearing, and complex installation when stacking and connecting, which affect the safety of use and construction efficiency.

Method used

The cement room connecting structure with four corner load-bearing columns is used. The top and bottom ends are combined with flat steel plates and square pipes to provide hoisting points and socket connections. The solid connection is achieved through small holes and large hole square pipes, and at the connection point Use high-strength grouting materials to ensure permanentness.

Benefits of technology

It achieves a stable structure, simple installation, uniform load and easy stacking, improves construction efficiency and safety, and adapts to the needs of rapid installation and modular construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911275A_ABST
    Figure CN118911275A_ABST
Patent Text Reader

Abstract

The invention discloses a cement room connecting structure and a stacking connecting method thereof, relates to the technical field of buildings, and realizes stable connection and convenient stacking through combination of plane steel plates and square pipes which are arranged up and down on a bearing column; the small-hole square pipes at the top end serve as hoisting points and connecting points of the upper layer, the large-hole square pipes at the bottom end are used for sleeving connection, and permanent connection is formed by combining the grouting technology. The structure is easy and convenient to install, uniform in bearing, flexible and changeable, and suitable for various scenes such as temporary houses, tourism resorts, office places, commercial facilities and public facilities; according to the application of the method, the building efficiency can be remarkably improved, the cost is reduced, the requirements of rapid building, transformation and upgrading are met, and the method has remarkable technical innovation and practical value.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of building technology, and in particular to a novel connection structure for prefabricated cement houses and a construction method for stacking and connecting the same, aiming to provide a cement house connection solution that has a stable structure, is easy to install, is easy to stack and has uniform load-bearing properties. Background Art

[0002] Traditional prefabricated cement houses often have problems such as unstable structure, uneven load-bearing and complex installation when stacking and connecting, which affects the safety of use and construction efficiency. Most of the existing connection methods rely on traditional means such as bolts and welding, which are not only difficult to construct, but also costly and difficult to adapt to the needs of rapid installation and modular construction. Summary of the invention

[0003] In view of the problems existing in the above-mentioned background technology, the present invention aims to provide a cement room connection structure and a connection method thereof which have a stable structure, are easy to install, have uniform load-bearing properties and are easy to stack.

[0004] To achieve the above object, the present invention adopts the following technical solutions:

[0005] A cement room connection structure,

[0006] The cement room is supported by four corner load-bearing columns to bear the entire weight. The top and bottom ends of the load-bearing columns are made of flat steel plates to increase the uniform load on the upper and lower contact points. The flat steel plate at the top is composed of a steel plate corner plane and a small-hole square tube, and the flat steel plate at the bottom is composed of a steel plate corner plane and a large-hole square tube.

[0007] Furthermore, the square hole in the center of the flat steel plate at the top of the cement room uses a square tube as a hoisting point and an upper layer connection point, which is convenient for hoisting and stacking.

[0008] Furthermore, the square hole in the center of the flat steel plate at the bottom end of the cement room is sleeved with a larger square tube to achieve a stable connection.

[0009] A method for connecting cement room stacks, comprising the following specific steps:

[0010] S1: Preparation stage: Check and ensure that the bottom flat steel plate and large-hole square tube, top flat steel plate and small-hole square tube of each cement room are intact, and the lifting points and docking tips on the small-hole square tube have been correctly installed;

[0011] S2: Foundation fixation and preliminary stacking: After the foundation structure is installed at the predetermined position, the first-floor cement room is hoisted above the foundation, and the small-hole square tube on the top flat steel plate is used for precise positioning, and the cement room is fixed to the foundation through the hoisting device; for the stacking of multiple cement rooms, a flat steel plate needs to be added between adjacent cement rooms and covered on the top square tube to enhance the overall stability;

[0012] S3: Socketing and permanent connection: After hoisting the upper cement room to the predetermined height, the large-hole square tube at its bottom is socketed with the small-hole square tube at the top of the next cement room; after the socketing is completed, the steel bars are inserted through the holes of the square tube in the bottom column to the top hoisting hole, and grouting is performed to achieve permanent connection; the grouting material should be high-strength and weather-resistant materials to ensure the stability and durability of the connection point.

[0013] S4: Inspection and adjustment: After completing the stacking and connection, conduct a comprehensive inspection of the overall structure to ensure that all connection points are firm and reliable. If necessary, some connection points can be reinforced or the stacking position can be adjusted.

[0014] Beneficial effects of the present invention:

[0015] 1. Stable structure: The combined design of flat steel plate and square tube improves the bearing capacity of the contact surface and the stability of the connection;

[0016] 2. Easy installation: The use of lifting points and socketing simplifies the installation process and improves construction efficiency;

[0017] 3. Uniform load-bearing: Flat steel plates are set on the upper and lower parts of the load-bearing columns to effectively disperse the weight and ensure uniform load-bearing;

[0018] 4. Easy to stack: The unique connection structure enables cement rooms to be easily stacked to meet the needs of different heights. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 This is a schematic diagram of a cement room connection structure of the present invention. DETAILED DESCRIPTION

[0020] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.

[0021] In the description of the embodiments of the present invention, it should be noted that if the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. appear, the orientation or position relationship indicated is based on the orientation or position relationship shown in the drawings, or the orientation or position relationship in which the invented product is usually placed when used. It is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, the terms "first", "second", "third", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.

[0022] In addition, the terms "horizontal", "vertical", "overhanging" and the like do not mean that the components must be absolutely horizontal or overhanging, but can be slightly tilted. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but can be slightly tilted.

[0023] In the description of the embodiments of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal connection of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0024] Example:

[0025] A cement room connection structure,

[0026] The cement room is supported by four corner bearing columns. The top and bottom of the bearing columns are made of flat steel plates to increase the uniform load of the upper and lower contact points. The flat steel plate at the top is composed of a steel plate corner plane 10 and a small-hole square tube 11, and the flat steel plate at the bottom is composed of a steel plate corner plane 20 and a large-hole square tube 21.

[0027] The square hole in the center of the flat steel plate at the top of the cement room uses a square tube as a hoisting point and an upper layer connection point, which is convenient for hoisting and stacking.

[0028] The square hole in the center of the flat steel plate at the bottom of the cement room is sleeved with a larger square tube to achieve a stable connection.

[0029] A method for connecting cement room stacks, comprising the following specific steps:

[0030] S1: Preparation stage: Check and ensure that the bottom flat steel plate and large-hole square tube, top flat steel plate and small-hole square tube of each cement room are intact, and the lifting points and docking tips on the small-hole square tube have been correctly installed;

[0031] S2: Foundation fixation and preliminary stacking: After the foundation structure is installed at the predetermined position, the first-floor cement room is hoisted above the foundation, and the small-hole square tube on the top flat steel plate is used for precise positioning, and the cement room is fixed to the foundation through the hoisting device; for the stacking of multiple cement rooms, a flat steel plate needs to be added between adjacent cement rooms and covered on the top square tube to enhance the overall stability;

[0032] S3: Socketing and permanent connection: After hoisting the upper cement room to the predetermined height, the large-hole square tube at its bottom is socketed with the small-hole square tube at the top of the next cement room; after the socketing is completed, the steel bars are inserted through the holes of the square tube in the bottom column to the top hoisting hole, and grouting is performed to achieve permanent connection; the grouting material should be high-strength and weather-resistant materials to ensure the stability and durability of the connection point.

[0033] S4: Inspection and adjustment: After completing the stacking and connection, conduct a comprehensive inspection of the overall structure to ensure that all connection points are firm and reliable. If necessary, some connection points can be reinforced or the stacking position can be adjusted.

[0034] Applicable scenarios:

[0035] Temporary housing: occasions where temporary housing needs to be built quickly, such as post-disaster reconstruction, construction site dormitories, military camps, etc.

[0036] Tourist resorts: When constructing resorts, homestays and other accommodation facilities in tourist resorts, this cement room connection structure can be used to quickly build a beautiful and comfortable accommodation environment.

[0037] Office space: In situations where office space needs to be set up quickly, such as entrepreneurial parks, temporary office areas, etc., this structure can be used to quickly meet office needs.

[0038] Commercial facilities: When constructing commercial facilities such as shops and showrooms in commercial areas such as commercial streets and shopping centers, this structure can be used to quickly build flexible and changeable commercial spaces.

[0039] Public facilities: When building public facilities in public areas such as parks and squares, such as public toilets and ticket booths, this structure can be used to quickly build convenient and practical service facilities.

[0040] In summary, this design adopts a sleeve connection method to ensure that the cement house will not shift horizontally and the stacked house can also adopt the method of inserting steel bars and grouting to make it a whole from the foundation to the multi-story house. At the same time, in the case of multiple houses, a flat steel plate is placed between the two rooms to cover the square tube to ensure the integrity of a single level. The cement house connection structure and its stacking connection method have broad application prospects and market demand, and can play an important role in many fields.

[0041] The present invention and its embodiments are described above, and such description is not restrictive. The drawings show only one embodiment of the present invention, and the actual structure is not limited thereto. In short, if ordinary technicians in the field are inspired by it, without departing from the purpose of the invention, they can design a structure and embodiment similar to the technical solution without creativity, which should belong to the protection scope of the present invention.

Claims

1. A cement room connection structure, characterized in that: The cement room is supported by four corner load-bearing columns to bear the entire weight. The top and bottom ends of the load-bearing columns are made of flat steel plates to increase the uniform load on the upper and lower contact points. The flat steel plate at the top is composed of a steel plate corner plane and a small-hole square tube, and the flat steel plate at the bottom is composed of a steel plate corner plane and a large-hole square tube.

2. A cement room connection structure according to claim 1, characterized in that: The square hole in the center of the flat steel plate at the top of the cement room uses a square tube as a hoisting point and an upper layer connection point, which is convenient for hoisting and stacking.

3. A cement room connection structure according to claim 1, characterized in that: The square hole in the center of the flat steel plate at the bottom of the cement room is sleeved with a larger square tube to achieve a stable connection.

4. A method for connecting cement room stacks, characterized in that: The specific steps include: S1: Preparation stage: Check and ensure that the bottom flat steel plate and large-hole square tube, top flat steel plate and small-hole square tube of each cement room are intact, and the lifting points and docking tips on the small-hole square tube have been correctly installed; S2: Foundation fixation and preliminary stacking: After the foundation structure is installed at the predetermined position, the first-floor cement room is hoisted above the foundation, and the small-hole square tube on the top flat steel plate is used for precise positioning, and the cement room is fixed to the foundation through the hoisting device; for the stacking of multiple cement rooms, a flat steel plate needs to be added between adjacent cement rooms and covered on the top square tube to enhance the overall stability; S3: Socketing and permanent connection: After hoisting the upper cement room to the predetermined height, the large-hole square tube at its bottom is socketed with the small-hole square tube at the top of the next cement room; after the socketing is completed, the steel bars are inserted through the holes of the square tube in the bottom column to the top hoisting hole, and grouting is performed to achieve permanent connection; the grouting material should be high-strength and weather-resistant materials to ensure the stability and durability of the connection point. S4: Inspection and adjustment: After completing the stacking and connection, conduct a comprehensive inspection of the overall structure to ensure that all connection points are firm and reliable. If necessary, some connection points can be reinforced or the stacking position can be adjusted.