Grouting device and method for semi-grouting sleeve of assembled integral shear wall structure
By using visual blockage and visual reflow bottles in semi-grouting sleeve grouting technology, the problems of incomplete filling of grouting materials and incomplete exhaust gases are solved, the construction quality and efficiency are improved, economic losses are reduced, and production costs are achieved. save.
Patent Information
- Application Number
- CN202411119940.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-15
- Publication Date
- 2024-11-08
AI Technical Summary
The existing semi-grouting sleeve grouting technology lacks visualization methods, resulting in the incomplete filling of grouting materials and the incomplete exhaustion of gases, affecting the connection strength and structural integrity, and increasing construction risks and maintenance costs.
Visual blockage and visual reflow bottles are used to observe the grouting process in real time to ensure that the grouting material is fully filled and gas discharged, and real-time monitoring and control of grouting materials are achieved through visual exhaust pipes and return pipes.
The compactness of grouting materials is improved, the phenomenon of grouting is reduced, the construction quality and efficiency are improved, economic losses are reduced, and the production cost savings that can be reused is achieved.
Smart Images

Figure CN118911430A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building assembly, in particular to a semi-grouting sleeve grouting device and method for assembling an integral shear wall structure. Background Art
[0002] In modern prefabricated buildings, the assembled integral shear wall structure is widely used due to its fast construction speed and good structural performance. Among them, the semi-grouting sleeve, as an important connection technology, is widely used to connect the steel bars in prefabricated components. The construction of the semi-grouting sleeve mainly involves adding a steel gasket between the bottom of the prefabricated wall and the floor panel, so that an empty space is formed between the bottom of the prefabricated wall and the floor surface, and then sealing the grouting material mold around it, using rubber plugs to seal the other grouting holes except the grouting holes of the grouting sleeve at the grouting position, and grouting from the grouting holes of the grouting sleeve at the grouting position. The slurry flows through the empty space below to each grouting sleeve. When the grouting holes of each grouting sleeve flow out slurry, it means that the grouting sleeve is filled with slurry. If the grouting holes of each grouting sleeve flow out slurry, it means that all grouting sleeves in the column have been grouted.
[0003] However, in the existing semi-grouting sleeve grouting technology, most of them rely on experience judgment and lack effective visualization means to observe and monitor the grouting process in real time. This makes it difficult for construction personnel to accurately judge whether the grouting material completely fills the space inside the sleeve, and it is impossible to ensure that all gases are discharged. This will cause bubbles to form in the grouting material, affecting the connection strength and the integrity of the structure. The presence of bubbles will also reduce the density of the grouting material and increase the potential risks of the structure. Due to the existence of the above problems, it is difficult for construction personnel to promptly discover and solve problems in the grouting process, thus affecting the construction quality. This not only increases the cost of later maintenance and repair, but may also lead to safety hazards. Summary of the invention
[0004] The object of the present invention is to provide a semi-grouting sleeve grouting device and method for an assembled integral shear wall structure. By replacing the wooden plugs of the grouting holes and the grouting holes with visual plugs and providing a visual reflux bottle, the wooden plugs are replaced after the grouting is completed and the grouting material has initially set, so that construction personnel can observe the grouting situation in real time, reduce the phenomenon of incomplete grouting of the grouting channel and the semi-grouting sleeve due to the reflux of the grouting material, effectively ensure the construction quality, improve the construction efficiency and reduce economic losses, thereby solving the problems raised in the above-mentioned background technology.
[0005] To achieve the above object, the present invention provides the following technical solutions:
[0006] A semi-grouting sleeve grouting device for an assembled integral shear wall structure comprises an upper prefabricated shear wall and a lower prefabricated shear wall, wherein a plurality of semi-grouting sleeves are arranged on the inner bottom of the upper prefabricated shear wall, and the steel bars buried on the top of the lower prefabricated shear wall are inserted into the semi-grouting sleeves, a connecting cavity is provided between the upper prefabricated shear wall and the lower prefabricated shear wall, a sealing bin is provided on the periphery of the connecting cavity, a visible exhaust pipe is passed through the end of the sealing bin, a grouting hole and a grouting outlet hole are respectively provided on the outer side of the upper prefabricated shear wall, the grouting hole and the grouting outlet hole are connected with the semi-grouting sleeves, a visible plug is provided in the grouting hole, and a visible reflux pipe is passed through the grouting hole.
[0007] Preferably, the grout outlet hole is located directly above the grouting hole.
[0008] Preferably, the visual reflux pipe and the exhaust pipe are in an "L"-shaped structure, and the top of the visual exhaust pipe is connected to a visual reflux bottle.
[0009] Preferably, the upper end of the visualization exhaust pipe is higher than the slurry outlet, and the height difference is greater than 100 mm.
[0010] Preferably, the connection ends of the visualized exhaust pipe, the visualized blockage and the visualized reflux pipe are of conical structures.
[0011] Preferably, the lower end of the semi-grouting sleeve is connected to the connecting cavity, and the visual exhaust pipe is connected to the connecting cavity.
[0012] A construction method for assembling a semi-grouting sleeve grouting device for an integral shear wall structure is implemented based on an assembly of a semi-grouting sleeve grouting device for an integral shear wall structure, and comprises the following steps:
[0013] Step 1: Hoist the upper prefabricated shear wall, insert the steel bars into the semi-grouting sleeve, set a sealing chamber around the connecting cavity, and set a visual exhaust pipe at the end of the sealing chamber;
[0014] Step 2: Except for the grouting holes to be grouted, the rest of the grouting holes are blocked by visual plugging, and visual reflux pipes and visual reflux bottles are installed at the grouting holes;
[0015] Step 3: Use special equipment to grout the grouting holes. When the grouting material in the visualization reflux bottle is filled with more than 1 / 3, stop grouting when the liquid level in the visualization reflux bottle does not drop after stabilizing for 30 seconds. After the grouting material initially sets, remove the visualization reflux pipe and visualization reflux bottle and replace them with a wooden plug. Finally, remove the wooden plug and visualization plug after the grouting material finally sets.
[0016] Compared with the prior art, the present invention has the following beneficial effects:
[0017] 1. The present invention provides a visual exhaust pipe, a visual blockage, a visual reflux pipe and a visual reflux bottle, so that construction personnel can clearly observe the internal grouting status from the outside, and it is easier to accurately judge the sufficiency of the grouting material filling the sleeve, ensuring that all gases are discharged, improving the grouting density, and effectively reducing the phenomenon of incomplete grouting of the grouting channel and the semi-grouting sleeve caused by the reflux of the grouting material, thereby improving the construction quality and construction efficiency.
[0018] 2. The visualized exhaust pipe, visualized blockage, visualized reflux pipe and visualized reflux bottle in the present invention can be reused after cleaning, effectively saving production costs.
[0019] 3. The grouting material in the visual reflux bottle provided in the present invention can be filled when the grouting material in the connecting cavity refluxes, effectively ensuring the fullness of the grouting of the semi-grouting sleeve and reducing the construction period and economic losses caused by rework in the later stage. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is an axonometric diagram of the overall structure of the present invention;
[0021] Figure 2 It is a side sectional view of the overall structure of the present invention;
[0022] Figure 3 It is an axonometric diagram of a visualized reflux bottle and a visualized reflux tube of the present invention;
[0023] Figure 4 Axonometric diagram of the visual blockage of the present invention;
[0024] Figure 5 It is a visual exhaust pipe axonometric diagram of the present invention.
[0025] In the figure: 1. Upper prefabricated shear wall; 2. Lower prefabricated shear wall; 3. Visual reflux bottle; 4. Visual blockage; 5. Visual exhaust pipe; 6. Grouting hole; 7. Grouting hole; 8. Connecting cavity; 9. Semi-grouting sleeve; 10. Sealing bin; 11. Steel bars; 12. Visual reflux pipe. DETAILED DESCRIPTION
[0026] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0027] In order to solve the problem of incomplete grouting of the semi-grouting sleeve in the existing assembled integral shear wall structure residential building, please refer to Figure 1-5 , this embodiment provides the following technical solutions:
[0028] A semi-grouting sleeve grouting device for an assembled integral shear wall structure comprises an upper prefabricated shear wall 1 and a lower prefabricated shear wall 2, wherein a plurality of semi-grouting sleeves 9 are arranged on the inner bottom of the upper prefabricated shear wall 1, and steel bars 11 embedded in the top of the lower prefabricated shear wall 2 are inserted into the semi-grouting sleeves 9, and a connecting cavity 8 is provided between the upper prefabricated shear wall 1 and the lower prefabricated shear wall 2, and a sealing bin 10 is provided on the periphery of the connecting cavity 8. The sealing bin 10 is provided after the upper prefabricated shear wall 1 is hoisted, and the grouting work of the semi-grouting sleeves 9 is generally carried out 24 hours after the sealing bin 10 is completed. When the grouting material is mixed, a filter is used to separate the coarse particles in the grouting material to prevent the semi-grouting sleeves 9 from being blocked during the grouting process, and grouting is carried out from the grouting hole 6.
[0029] A visual exhaust pipe 5 runs through the end of the sealing bin 10, and a grouting hole 6 and a grouting hole 7 are respectively provided on the outer side of the upper prefabricated shear wall 1. The grouting hole 7 is located directly above the grouting hole 6. The grouting hole 6 and the grouting hole 7 are connected to the semi-grouting sleeve 9, and grouting is poured into the semi-grouting sleeve 9 through the grouting hole 6; a visual plug 4 is provided in the grouting hole 6, and the visual plug 4 is inserted into the remaining grouting holes 6 when grouting is carried out in one of the grouting holes 6. When the grouting material fills the visual plug 4, it indicates that the bottom connecting cavity 8 to the grouting hole 6 is unobstructed. After final setting, the visual plug 4 is removed and replaced with a wooden plug; the lower end of the semi-grouting sleeve 9 is connected to the connecting cavity 8, and the visual exhaust pipe 5 is connected to the connecting cavity 8.
[0030] A visual reflux pipe 12 runs through the slurry outlet hole 7. The visual reflux pipe 12 and the exhaust pipe 5 are in an "L" shape. The top of the visual exhaust pipe 5 is connected to a visual reflux bottle 3. The visual reflux bottle 3 can be made of discarded mineral water bottles to save costs. Before grouting, the visual reflux pipe 12 is inserted into the slurry outlet hole 7. During grouting, the overflowing slurry flows to the visual reflux bottle 3 through the visual reflux pipe 12. The construction personnel observe in real time and stop grouting when the grouting material in the visual reflux bottle 3 is filled with more than 1 / 3, and stabilize for 30 seconds before the liquid level in the visual reflux bottle 3 does not drop. The grouting material in the visual reflux bottle 3 can be filled when the grouting material refluxes in the connecting cavity 8, which effectively ensures the fullness of the grouting of the semi-grouting sleeve 9 and reduces the construction period and economic losses caused by rework in the later stage.
[0031] The upper end of the visual exhaust pipe 5 is higher than the slurry outlet hole 7, and the height difference is greater than 100 mm. The visual exhaust pipe 5 is buried in the end of the upper prefabricated shear wall 1 when making the sealing chamber 10, which is conducive to discharging the gas in the connecting cavity 8 and ensuring the smoothness of the grouting line.
[0032] The connection ends of the visual exhaust pipe 5, the visual plug 4 and the visual return pipe 12 are conical structures, which are convenient for installation and removal.
[0033] A construction method for assembling a semi-grouting sleeve grouting device for an integral shear wall structure is implemented based on an assembly of a semi-grouting sleeve grouting device for an integral shear wall structure, and comprises the following steps:
[0034] Step 1: Release the position and control line of the vertical components according to the drawings, roughen and clean the bottom of the vertical components, so that the gas is difficult to accumulate in the pits of the rough surface and can be discharged in time, and use a high-pressure fan for ventilation before lifting, clean the gravel and other garbage in the semi-grouting sleeve 9, the visual exhaust pipe 5 and the visual return pipe 12 to ensure that the grouting route is unobstructed;
[0035] Step 2: hoist the upper prefabricated shear wall 1, install the oblique support and adjust the vertical flatness. If the grouting route length exceeds 1.5m, divide it into compartments, make the steel bar 11 pass through the semi-grouting sleeve 9, and set a sealing compartment 10 on the periphery of the connecting cavity 8, and set a visual exhaust pipe 5 at the end of the sealing compartment 10;
[0036] Step 3: Except for the grouting hole 6 to be grouted, the other grouting holes 6 are blocked by the visual plug 4, and the visual reflux pipe 12 and the visual reflux bottle 3 are installed at the grouting hole 7;
[0037] Step 3: Use special equipment to grout the grouting hole 6, with a grouting pressure of 0.2-0.3Mpa. When the grouting material in the visualization reflux bottle 3 is filled with more than 1 / 3, stop grouting when the liquid level in the visualization reflux bottle 3 does not drop after stabilizing for 30s. After the grouting material is initially solidified (generally 2-4 hours in hot summer weather, and the time in winter is increased according to the temperature), remove the visualization reflux pipe 12 and the visualization reflux bottle 3 and replace them with wooden plugs. The visualization reflux pipe 12 and the visualization reflux bottle 3 can be cleaned for recycling. Finally, after the grouting material is finally solidified, remove the wooden plug and the visualization plug 4;
[0038] Step 4: 24 hours after the grouting is completed, the grouting fullness test of the semi-grouting sleeve 9 is carried out.
[0039] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0040] While the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that many changes, modifications, substitutions and variations can be made to the embodiments without departing from the principles and spirit of the invention.
Claims
1. A semi-grouting sleeve grouting device for an assembled integral shear wall structure, comprising an upper prefabricated shear wall (1) and a lower prefabricated shear wall (2), characterized in that: A plurality of semi-grouting sleeves (9) are arranged at the inner bottom of the upper prefabricated shear wall (1), and the steel bars (11) embedded in the top of the lower prefabricated shear wall (2) are inserted into the semi-grouting sleeves (9). A connecting cavity (8) is provided between the upper prefabricated shear wall (1) and the lower prefabricated shear wall (2). A sealing chamber (10) is provided on the periphery of the connecting cavity (8), and a visible exhaust pipe (5) is passed through the end of the sealing chamber (10). A grouting hole (6) and a grouting hole (7) are respectively provided on the outer side of the upper prefabricated shear wall (1), and the grouting hole (6) and the grouting hole (7) are connected to the semi-grouting sleeves (9). A visible plug (4) is provided in the grouting hole (6), and a visible return pipe (12) is passed through the grouting hole (7).
2. According to claim 1, a semi-grouting sleeve grouting device for an assembled integral shear wall structure is characterized in that: The grout outlet hole (7) is located directly above the grouting hole (6).
3. The semi-grouting sleeve grouting device for an assembled integral shear wall structure according to claim 2 is characterized in that: The visual reflux pipe (12) and the visual exhaust pipe (5) are in an "L"-shaped structure, and the top of the visual exhaust pipe (5) is connected to a visual reflux bottle (3).
4. The semi-grouting sleeve grouting device for an assembled integral shear wall structure according to claim 3 is characterized in that: The upper end of the visual exhaust pipe (5) is higher than the pulp outlet hole (7), and the height difference is greater than 100 mm.
5. The semi-grouting sleeve grouting device for an assembled integral shear wall structure according to claim 4 is characterized in that: The connection ends of the visualized exhaust pipe (5), the visualized blockage (4) and the visualized reflux pipe (12) are of conical structures.
6. The semi-grouting sleeve grouting device for an assembled integral shear wall structure according to claim 5, characterized in that: The lower end of the semi-grouting sleeve (9) is connected to the communication cavity (8), and the visual exhaust pipe (5) is connected to the communication cavity (8).
7. A construction method for a semi-grouting sleeve grouting device for an assembled integral shear wall structure, which is implemented based on the semi-grouting sleeve grouting device for an assembled integral shear wall structure according to any one of claims 1 to 6, characterized in that: The following steps are involved: Step 1: hoisting the upper prefabricated shear wall (1), inserting the steel bar (11) into the semi-grouting sleeve (9), and setting a sealing chamber (10) on the periphery of the connecting cavity (8), and setting a visible exhaust pipe (5) at the end of the sealing chamber (10); Step 2: Except for the grouting hole (6) to be grouted, the remaining grouting holes (6) are blocked by the visual plug (4), and a visual reflux pipe (12) and a visual reflux bottle (3) are installed at the grouting hole (7); Step 3: Use special equipment to grout the grouting hole (6). When the grouting material in the visual reflux bottle (3) is filled with more than 1 / 3 of the grouting material, stop grouting when the liquid level in the visual reflux bottle (3) does not drop after stabilizing for 30 seconds. After the grouting material initially solidifies, remove the visual reflux pipe (12) and the visual reflux bottle (3) and replace them with a wooden plug. Finally, after the grouting material finally solidifies, remove the wooden plug and the visual plug (4).
Citation Information
Patent Citations
Sleeve grouting construction defect detection and control device and method
CN111321896A
Sleeve grouting connecting joint, connecting structure of prefabricated part and construction method
CN111335548A
Jig for ensuring grouting fullness of vertical sleeve for prefabricated structure and working method