Maintenance and reinforcement method for increasing section through active unloading of high-pile wharf track beam

Through the construction of the active unloading device and the enlarged cross-section of concrete beams, the structural damage caused by fatigue and erosion of the track beams of high pile docks is solved, and the rapid maintenance and reinforcement of the track beams is achieved, which improves safety and durability and is economical. and practical advantages.

CN118911466AActive Publication Date: 2024-11-08CCCC SECOND HARBOR ENGINEERING CO LTD +2
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202411076051.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-07
Publication Date
2024-11-08
Estimated Expiration
2044-08-07

AI Technical Summary

Technical Problem

The frequent use of high-pile dock track beams and fatigue damage, concrete deterioration and reinforcement corrosion caused by marine environments, affecting structural safety and durability.

Method used

Adopt active unloading device and optimize the construction process of enlarged concrete beams, unload the track beams in advance through the device composed of Beret truss, rebar booms and steel beams, clean and form a new cast structure and combine it with the original track beams to achieve rapid maintenance and reinforcement. .

Benefits of technology

It improves the load-bearing capacity and structural safety of track beams, extends service life, reduces maintenance costs and construction periods, and is suitable for the maintenance of reinforced concrete beams of various structures.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911466A_ABST
    Figure CN118911466A_ABST
Patent Text Reader

Abstract

The invention discloses a long-piled wharf track beam active unloading section increasing maintenance and reinforcement method which comprises the steps that firstly, an active unloading device is adopted to unload a track beam in advance, and the track beam is cleaned; and secondly, section increasing construction is conducted on the track beam to form a newly-cast structure, the newly-cast structure is combined with an original track beam structure to form a whole, and therefore rapid repairing of the damaged track beam of the long-pile wharf is achieved. By adopting the active unloading device composed of the bailey truss, the deformed steel bar suspender and the steel beam and optimizing a conventional concrete beam section increasing construction technology, rapid maintenance and reinforcement of the damaged track beam are achieved, the bearing capacity of the track beam is restored again, and the safety and durability of the high-pile wharf are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of port engineering construction, and more specifically, to a method for actively unloading and increasing the cross-section of a track beam at a high-pile dock to maintain and reinforce it. Background Art

[0002] High-pile docks are widely used in the field of port engineering due to their simple structure, small wave reflection, large load-bearing capacity, and strong adaptability to ultra-deep dredging. Track beams are important components of high-pile docks. They are mainly used to bear the heavy load of gantry cranes. They are key structures to ensure the normal operation of lifting equipment such as gantry cranes and play a decisive role in the production and operation of high-pile docks. However, with the increase in the volume of import and export cargo at ports, gantry cranes are often in a high-frequency reciprocating operation state, which will inevitably cause fatigue damage to the track beams and concrete cracking. The track beams of many high-pile docks in service have deteriorated and broken, affecting the normal use of components. On the other hand, high-pile docks are exposed to the atmosphere, especially in the marine environment, and have been corroded by chloride ions and sulfate ions for a long time, which accelerates the deterioration and breakage of the track beam concrete, and causes the internal steel bars to rust, bringing safety hazards to the structure. Therefore, affected by factors such as adverse environmental erosion and overloaded gantry crane operations, the structural safety and durability of the track beams have been greatly affected.

[0003] The present invention aims at the deterioration and damage problems of track beams of high-pile docks and provides a safe and efficient repair and reinforcement method, through which the bearing capacity of the track beams can be restored, thereby achieving the purpose of improving the performance of the high-pile dock. Summary of the invention

[0004] One object of the present invention is to provide a method for actively unloading and increasing the cross-section of track beams at high-pile docks for repair and reinforcement. By adopting an active unloading device composed of a Bailey truss, a threaded steel hanger, and a steel beam and optimizing the conventional concrete beam cross-section increase construction process, rapid repair and reinforcement of damaged track beams can be achieved, the bearing capacity of the track beams can be restored, and the safety and durability of the high-pile dock can be improved.

[0005] In order to solve the above technical problems, the present invention provides a method for actively unloading, increasing the cross-section, repairing and reinforcing the track beam of a high-pile wharf. First, an active unloading device is used to unload the track beam in advance and clean the track beam. Secondly, the cross-section of the track beam is increased to form a new cast structure, which is combined with the original track beam structure to form a whole, thereby realizing the rapid repair and reinforcement of the damaged track beam of the high-pile wharf.

[0006] Preferably, the newly cast structure adopts an active unloading device to fix the casting formwork; the internal steel bars of the newly cast structure are anchored to the track beam and the pile-beam connection nodes respectively, so as to realize the connection of the new and old structures into one.

[0007] Preferably, the active unloading device includes a plurality of steel pads arranged transversely on the dock panel above the pile-beam connection node, a reaction beam erected on the steel pads, and a plurality of steel beams arranged on the reaction beams, wherein the steel beams are arranged transversely, and a plurality of threaded steel hangers are vertically penetrated on the steel beams, and the lower ends of the threaded steel hangers are fixed to the bottom of the dock panel; the track beam is actively unloaded by tightening the bolts at both ends of the plurality of threaded steel hangers.

[0008] Preferably, a plurality of the steel cross beams are symmetrically distributed along the longitudinal direction of the track beam, wherein the lower ends of the plurality of threaded steel hangers corresponding to a portion of the first steel cross beams are fixed to the bottom of the dock panel, and the plurality of threaded steel hangers corresponding to the remaining portion of the second steel cross beams are respectively passed through the corresponding plurality of steel supporting beams, and the plurality of steel supporting beams correspond one to one to the plurality of second steel cross beams, and the steel supporting beams are transversely arranged at the bottom of the track beam, and the plurality of steel supporting beams are used to fix and install the casting formwork of the new cast structure.

[0009] Preferably, the multiple first steel cross beams and the multiple threaded steel hangers corresponding to the multiple second steel cross beams are symmetrically arranged in the transverse and longitudinal directions along the center of the track beam; preferably, the multiple first steel cross beams are respectively arranged at positions close to 1 / 3 and 2 / 3 of the span of the track beam, and the multiple second steel cross beams are respectively arranged at positions close to both ends of the track beam and at 1 / 4, 1 / 2, and 3 / 4 of the span.

[0010] Preferably, the specific steps of increasing the cross-section of the track beam to form a new cast structure are:

[0011] First, longitudinal reinforcements are arranged on the bottom and sides of the track beam, and both ends of the longitudinal reinforcements are embedded in the pile-beam connection nodes;

[0012] Secondly, U-shaped stirrups are evenly arranged outside the longitudinal reinforcement and L-shaped stirrups are evenly arranged on the side of the track beam to fix the side longitudinal reinforcement and effectively combine the new and old structures;

[0013] Next, install the grouting templates and fixing wood blocks on the bottom and side surfaces of the track beam on the steel joists in sequence;

[0014] Then, grouting holes are drilled on the dock panels on both sides of the track beam, and high-strength grouting material is poured into the formwork for cast-in-place construction;

[0015] Finally, after the strength of the newly poured high-strength grouting material reaches 50% of the design strength, or 48 hours after the high-strength grouting material is poured, the formwork is removed for maintenance. At the same time, the reaction beam is removed, and the perforations on the dock panel for the threaded steel hangers are repaired with high-strength grouting material.

[0016] Preferably, both ends of the U-shaped stirrup are embedded in the track beam, and one end of the L-shaped stirrup is welded to the U-shaped stirrup, and the other end is embedded in the track beam.

[0017] Preferably, the templates on both sides are fixed by evenly arranging multiple pairs of vertical double-jointed channel steel straps on the sides of the track beam and installing threaded tie rods implanted in the track beam at both ends of the steel straps, and the bottom template is fixed by horizontally and vertically staggered square timbers.

[0018] Preferably, multiple pairs of grouting holes are drilled at both ends and the mid-span of the track beam, and high-strength grouting material is first poured into the grouting holes at both ends to a set height of the track beam, and then poured into the middle grouting hole until all the grouting holes are filled with overflow grout.

[0019] Preferably, cleaning the track beam includes: chiseling away deteriorated and damaged concrete of the track beam, roughening the surface, and then washing with high-pressure fresh water to remove scum and dust on the concrete surface and rust on the steel bar surface.

[0020] By adopting the above technical solution, the present invention can restore the use function of the damaged track beam of the high-pile wharf, and the present invention at least includes the following beneficial effects:

[0021] 1. High safety: The active unloading device is used to unload the track beam in advance, ensuring that the track beam will no longer deflect and crack during the maintenance and reinforcement process, thereby improving the safety and efficiency of the construction.

[0022] 2. Good economy: The active unloading device is low-cost, simple to make, easy to load and unload, and reusable; the grouting formwork adopts a suspended type, does not require the installation of lateral supports, and the construction is fast, saving cost and construction period.

[0023] 3. Strong practicability: It can be used for the repair and reinforcement of damaged track beams in high-pile docks, as well as for the repair of longitudinal beams, cross beams, etc. It also includes the repair and reinforcement of reinforced concrete beams of beam-slab bridge decks, floors and other structures, and has great promotion value.

[0024] 4. Reliability: The implementation process is simple, and the newly cast structure can be effectively combined with the original structure to form a whole, so that the bearing capacity of the damaged track beam can be fully restored.

[0025] Other advantages, objectives and features of the present invention will be embodied in part through the following description, and in part will be understood by those skilled in the art through study and practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 This is a schematic diagram of the reinforcement construction of damaged track beams at high-pile docks;

[0027] Figure 2 yes Figure 1 An enlarged schematic diagram of the middle cross section AA;

[0028] Figure 3 yes Figure 1An enlarged schematic diagram of the middle cross section BB;

[0029] Figure 4 yes Figure 1 Schematic diagram of the drilling distribution of the middle pier panel;

[0030] Figure 5 yes Figure 2 and Figure 3 Schematic diagram of the U-shaped stirrup;

[0031] Figure 6 yes Figure 2 and Figure 3 Schematic diagram of the middle L-shaped bib;

[0032] Among them: 1-track beam; 2-foundation piles; 3-pile-beam node; 4-dock panel; 5-steel pads; 6-Bailey truss reaction beam; 7-double-jointed channel steel beam; 8-through holes; 9-threaded steel hanger rod; 10-longitudinal reinforcement; 11-U-shaped stirrups; 12-L-shaped pocket reinforcement; 13-double-jointed channel steel support beam; 14-formwork; 15-wooden square; 16-double-jointed channel steel strap; 17-threaded steel tie rod; 18-grouting hole; 19-high-strength grouting material. DETAILED DESCRIPTION

[0033] In order to better understand the purpose, structure and function of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings so that those skilled in the art can implement it according to the description.

[0034] It should be noted that the experimental methods described in the following embodiments are conventional methods unless otherwise specified, and the reagents and materials are commercially available unless otherwise specified; in the description of the present invention, the terms "lateral", "longitudinal", "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0035] This application has developed a method for active unloading and cross-section enlargement repair and reinforcement of track beams at high-pile docks. By adopting an active unloading device and optimizing the construction process of increasing the cross-section of concrete beams, the damaged track beams can be quickly repaired. This technology has the beneficial effects of high safety, good economy, strong practicality, and reliability. The objects include not only the track beams, longitudinal beams, and cross beams of high-pile docks, but also the repair and reinforcement of reinforced concrete beams of beam-slab bridge decks, floors and other structures. An active unloading device composed of Bailey trusses, threaded steel hangers, and steel beams is used. First, it is to ensure that the track beams will no longer deflect and crack during the repair and reinforcement process, and second, it is used to fix the grouting formwork to improve construction efficiency.

[0036] See also Figures 1 to 6 , a method for actively unloading and increasing the cross-section of a high-pile wharf rail beam for maintenance and reinforcement, comprising the following steps:

[0037] Step 1: Arrange several steel beams above the reaction beam and raise it from the bottom with steel pads. The steel pads are arranged above the pile-beam nodes at both ends of the track beam. Specifically, two pairs of steel pads 5 are horizontally erected on the dock panel 4 above the connection node 3 between the track beam 1 and the foundation pile 2, and then a Bailey truss reaction beam 6 is erected on the steel pads 5, and seven double-jointed channel steel beams 7 are arranged thereon.

[0038] Step 2: Drill a number of small holes symmetrically and evenly on the dock panels on both sides of the track beam. A specific implementation example is: symmetrically drill 7 pairs of through holes 8 on the dock panels 4 on both sides of the track beam 1 near both ends and at 1 / 4, 1 / 3, 1 / 2, 2 / 3, and 3 / 4 of the span, and then insert the threaded steel hangers 9 in sequence, and fix the upper ends of the threaded steel hangers 9 to the steel beam 7 on the Bailey truss reaction beam 6, and fix the lower ends of some threaded steel hangers to the bottom of the dock panel, such as fixing the lower ends of two pairs of threaded steel hangers 9 near 1 / 3 and 2 / 3 of the span of the track beam to the bottom surface of the dock panel 4, and tighten the bolts at both ends at the same time to actively unload the track beam 1; at this point, the active unloading device is assembled.

[0039] Step 3: Chisel away the deteriorated and damaged concrete of the track beam 1, roughen the surface, and then rinse with high-pressure fresh water to remove scum and dust on the concrete surface and rust on the steel bar surface.

[0040] Step 4: Arrange longitudinal reinforcements on the bottom and sides of the track beam, and implant the two ends of the longitudinal reinforcement into the pile-beam connection node 3. A specific implementation is: arrange two rows of longitudinal reinforcements 10 on the bottom of the track beam 1, arrange one row of longitudinal reinforcements 10 on the side, and implant the two ends of the longitudinal reinforcement 10 into the pile-beam connection node 3. Then, evenly arrange U-shaped stirrups 11 outside the longitudinal reinforcement 10 and evenly arrange L-shaped pocket reinforcements 12 on the side of the track beam 1 (for fixing the side longitudinal reinforcements and effectively combining the new and old structures). Among them, both ends of the U-shaped stirrups 11 are implanted into the track beam 1, and one end of the L-shaped pocket reinforcement 12 is welded to the U-shaped stirrup 11, and the other end is implanted into the track beam 1. Among them, the size and arrangement quantity of the longitudinal reinforcement, U-shaped stirrups and L-shaped pocket reinforcement are all determined in advance through design calculations, generally according to the beam reinforcement calculation in the concrete structure design specification or using software reinforcement calculation.

[0041] Step 5: Arrange 5 double-jointed channel steel joists 13 horizontally at the bottom of the track beam 1, and connect and fix them with the lower ends of the remaining 5 pairs of threaded steel hangers 9. Then, install the grouting templates 14 and the fixing wood 15 on the bottom and side surfaces of the track beam 1 on the steel joists 13 in sequence. Among them, the templates 14 on both sides are fixed by evenly arranging 10 pairs of vertical double-jointed channel steel straps 16 on the side of the track beam 1 and installing threaded tie rods 17 implanted in the track beam 1 at both ends of the steel straps 16.

[0042] Step 6: Drill three pairs of grouting holes 18 on the dock panels 3 at both ends of the track beam 1 and on both sides of the mid-span position, and then pour in high-strength grouting material 19. The high-strength grouting material 19 is first poured from the grouting holes 18 at both ends, and after pouring to 2 / 3 of the height of the track beam 1, it is poured from the middle grouting hole 18 until all the grouting holes 18 are filled with overflow grout.

[0043] Step 7: After the strength of the newly poured high-strength grouting material reaches 50% of the design strength, or after the high-strength grouting material 19 is poured for 48 hours, the formwork is removed for curing, the Bailey truss reaction beam 6 is removed, and the through holes 8 on the dock panel are repaired with high-strength grouting material 19.

[0044] By adopting the above steps, the bearing capacity of the damaged track beam of the high-pile wharf can be restored.

[0045] It is understood that the present invention is described by some embodiments, and those skilled in the art are aware that various changes or equivalent substitutions may be made to these features and embodiments without departing from the spirit and scope of the present invention. Although the embodiments of the present invention have been disclosed as above, they are not limited to the applications listed in the specification and the implementation mode, and they can be fully applied to various fields suitable for the present invention. For those familiar with the art, other modifications can be easily implemented, so without departing from the general concept defined by the claims and the equivalent scope, the present invention is not limited to the specific details and the illustrations shown and described here.

Claims

1. A method for actively unloading and increasing the cross-section of a high-pile wharf rail beam for repair and reinforcement, characterized in that: First, an active unloading device is used to unload the track beam in advance and clean the track beam; secondly, the cross-section of the track beam is increased to form a new cast structure, which is combined with the original track beam structure to form a whole, thereby achieving rapid repair and reinforcement of damaged track beams at high-pile wharfs.

2. The method for actively unloading and increasing the cross-section of the high-pile wharf track beam maintenance and reinforcement as claimed in claim 1 is characterized in that: The newly cast structure uses an active unloading device to fix the casting formwork; the internal steel bars of the newly cast structure are anchored to the track beam and pile-beam connection nodes respectively, realizing the connection of the new and old structures into one.

3. The method for actively unloading and increasing the cross-section of the high-pile wharf track beam maintenance and reinforcement as claimed in claim 1, characterized in that: The active unloading device includes a plurality of steel pads arranged transversely on the dock panel above the pile-beam connection node, a reaction beam erected on the steel pads, and a plurality of steel beams arranged on the reaction beams. The steel beams are arranged transversely, and a plurality of threaded steel hangers are vertically penetrated on the steel beams, and the lower ends of the threaded steel hangers are fixed to the bottom of the dock panel; the track beam is actively unloaded by tightening the bolts at both ends of the plurality of threaded steel hangers.

4. The method for actively unloading and increasing the cross-section of the high-pile wharf track beam maintenance and reinforcement as claimed in claim 3 is characterized in that: The steel cross beams are symmetrically distributed along the longitudinal direction of the track beam, wherein the lower ends of the corresponding multiple threaded steel hangers on a portion of the first steel cross beams are fixed to the bottom of the dock panel, and the corresponding multiple threaded steel hangers on the remaining second steel cross beams are respectively passed through the corresponding multiple steel support beams, and the multiple steel support beams correspond to the multiple second steel cross beams one by one. The steel support beams are arranged at the bottom of the track beam in the transverse direction, and the multiple steel support beams are used to fix and install the casting template of the new cast structure.

5. The method for actively unloading and increasing the cross-section of the high-pile wharf track beam maintenance and reinforcement as claimed in claim 4, characterized in that: The multiple first steel cross beams and the multiple threaded steel hangers corresponding to the multiple second steel cross beams are symmetrically arranged in the horizontal and vertical directions along the center of the track beam; preferably, the multiple first steel cross beams are respectively arranged at positions close to 1 / 3 and 2 / 3 of the span of the track beam, and the multiple second steel cross beams are respectively arranged at positions close to both ends of the track beam and at 1 / 4, 1 / 2, and 3 / 4 of the span.

6. The method for actively unloading and increasing the cross-section of the high-pile wharf track beam maintenance and reinforcement as claimed in claim 4, characterized in that: The specific steps for increasing the cross-section of the track beam to form a new cast structure are: First, longitudinal reinforcements are arranged on the bottom and sides of the track beam, and both ends of the longitudinal reinforcements are embedded in the pile-beam connection nodes; Secondly, U-shaped stirrups are evenly arranged outside the longitudinal reinforcement and L-shaped stirrups are evenly arranged on the side of the track beam to fix the side longitudinal reinforcement and effectively combine the new and old structures; Next, install the grouting templates and fixing wood blocks on the bottom and side surfaces of the track beam on the steel joists in sequence; Then, grouting holes are drilled on the dock panels on both sides of the track beam, and high-strength grouting material is poured into the formwork for cast-in-place construction; Finally, after the strength of the newly poured high-strength grouting material reaches 50% of the design strength, or 48 hours after the high-strength grouting material is poured, the formwork is removed for maintenance. At the same time, the reaction beam is removed, and the perforations on the dock panel for the threaded steel hangers are repaired with high-strength grouting material.

7. The method for repairing and reinforcing the high-pile wharf track beam by active unloading and increasing the cross section as claimed in claim 6, characterized in that: Both ends of the U-shaped stirrups are embedded in the track beam, one end of the L-shaped stirrup is welded to the U-shaped stirrup, and the other end is embedded in the track beam.

8. The method for actively unloading and increasing the cross-section of the high-pile wharf track beam maintenance and reinforcement as claimed in claim 6, characterized in that: The templates on both sides are fixed by evenly arranging multiple pairs of vertical double-jointed channel steel straps on the side of the track beam and installing threaded tie rods implanted in the track beam at both ends of the steel straps. The template at the bottom is fixed by horizontal and vertical staggered square timbers.

9. The method for actively unloading and increasing the cross-section of a high-pile wharf track beam as claimed in claim 6, characterized in that: Multiple pairs of grouting holes are drilled at both ends and the mid-span of the track beam. High-strength grouting material is first poured into the grouting holes at both ends. After it reaches the set height of the track beam, it is poured into the middle grouting hole until all the grouting holes are filled with overflow grout.

10. The method for actively unloading and increasing the cross-section of a high-pile wharf track beam as claimed in claim 1, characterized in that: Cleaning the track beams involves chiseling away the deteriorated and damaged concrete on the beams, roughening the surface, and then washing with high-pressure fresh water to remove scum and dust on the concrete surface and rust on the steel bars.

Citation Information

Patent Citations

  • Suspension mold for enlarging and reinforcing concrete beam and construction method of suspension mold

    CN103556820A

  • Building structure reinforcement method through self-generating reaction force

    CN104695721A

  • Long piled wharf panel bottom large-area damage repairing construction method

    CN106337391A

  • Construction method for cast-in-place lower cross beam of high-pile wharf

    CN108330902A

  • Bailey reverse hanging combined beam device for dismantling tied-arch bridge and dismantling method thereof

    CN108411804A