TBM laser guiding method, device and equipment in tunnel excavation and storage medium

Through laser ranging and pipe segment scanning technology, combined with propulsion cylinder stroke data, the high-precision and efficient construction of the TBM laser guide system is achieved, solving the problem of insufficient measurement accuracy and environmental adaptability of the existing system, and improving construction efficiency and quality.

CN118911692APending Publication Date: 2024-11-08POWERCHINA WATER ENVIRONMENT GOVERANCE
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411251252.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-07
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The existing TBM laser guide system has shortcomings in measurement accuracy, environmental adaptability, data transmission stability and operational complexity, resulting in low construction efficiency and quality.

Method used

Obtain the shield tail gap value through laser ranging, calculate the posture data of the boring machine, obtain the angle and sorting data of the pipe sheet, and automatically capture the pipe sheet with the pipe sheet scanning image, improve the measurement accuracy and construction efficiency, simplify the operation process, and promote the oil cylinder The stroke data adjusts the direction of the excavator in real time to ensure construction accuracy and data integrity.

Benefits of technology

Maintaining stable measurement results in harsh environments improves construction accuracy and efficiency, reduces human errors, and improves construction quality and data security.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911692A_ABST
    Figure CN118911692A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of tunnel excavation, in particular to a TBM laser guiding method, device and equipment in tunnel excavation and a storage medium, and the method comprises the steps that laser ranging information is acquired, a shield tail gap value is acquired from the laser ranging information, and heading machine attitude data is acquired according to the shield tail gap value; obtaining capping segment angle data according to the heading machine attitude data, and obtaining segment sorting data according to the capping segment angle data; a segment scanning image is obtained according to the segment sorting data, and a segment grabbing instruction is triggered according to the segment scanning image; and obtaining segment assembling angle data from the segment scanning image, and triggering a segment assembling instruction according to the segment assembling angle data. The TBM laser guiding system has the advantages that the problems that a TBM laser guiding system is low in measurement precision, poor in environmental adaptability, unstable in data transmission and complex in operation are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of tunnel excavation, and in particular to a TBM laser guidance method, device, equipment and storage medium in tunnel excavation. Background Art

[0002] Tunnel boring machine (TBM) is an important equipment in modern tunnel construction. Its automation and precision are crucial to improving construction efficiency and quality. As a key component of TBM, laser guidance system can achieve precise guidance and construction quality control of tunnel. At present, laser guidance system has been applied in many major projects at home and abroad, and has achieved good economic and social benefits.

[0003] Existing TBM laser guidance systems usually use laser beams as guidance references and receive laser signals through laser receivers to determine the exact position and direction of the TBM. However, existing systems still need to be improved in terms of measurement accuracy, stability, and automation.

[0004] Deficiencies of existing technology: The TBM laser guidance systems currently on the market have problems such as limited measurement accuracy, poor adaptability to harsh environments, unstable data transmission, and complex operation. Summary of the invention

[0005] In order to solve the problems of low measurement accuracy, poor environmental adaptability, unstable data transmission and complex operation of TBM laser guidance system, the present application provides a TBM laser guidance method, device, equipment and storage medium in tunnel excavation.

[0006] The above-mentioned invention objective of the present application is achieved through the following technical solutions: A TBM laser guidance method in tunnel excavation, the TBM laser guidance method in tunnel excavation comprising: Acquire laser ranging information, acquire a shield tail clearance value from the laser ranging information, and acquire tunnel boring machine posture data according to the shield tail clearance value; Acquire capping segment angle data according to the tunnel boring machine posture data, and acquire segment sorting data according to the capping segment angle data; Acquire a pipe segment scanning image according to the pipe segment sorting data, and trigger a pipe segment grabbing instruction according to the pipe segment scanning image; Segment assembly angle data is acquired from the segment scanning image, and a segment assembly instruction is triggered according to the segment assembly angle data.

[0007] By adopting the above technical solution, during the process of tunnel excavation by the roadheader, the detection window is reduced through the laser ranging technology, so that the target point can be captured more accurately, and a stable measurement effect can be maintained even in harsh construction environments. After obtaining the posture data of the roadheader, the angle and sequence of the tunnel laying segments are obtained, so that the corresponding segments can be automatically captured in combination with the segment scanning image, thereby improving the efficiency and accuracy of the construction, while also simplifying the operation process, reducing the wind direction caused by human errors, and improving the construction efficiency and quality.

[0008] In a preferred example, the present application may be further configured as follows: the step of obtaining capping segment angle data according to the tunnel boring machine posture data, and obtaining segment sorting data according to the capping segment angle data specifically includes: Acquire tunnel centerline data and propulsion cylinder stroke data, and update the tunnel boring machine posture data according to the tunnel centerline data and the propulsion cylinder stroke data; Acquire the current position of the tunnel boring machine from the tunnel boring machine posture data, and generate tunnel boring construction progress data according to the current position of the tunnel boring machine; The capping segment angle data is calculated according to the excavation construction progress data, and the segment sorting data is obtained according to the capping segment angle data.

[0009] By adopting the above technical solution, by obtaining the tunnel centerline data and cylinder stroke data, it is possible to determine whether the tunnel boring machine attitude data is in a normal state, and based on the tunnel boring machine attitude data, the current position of the tunnel boring machine can be obtained, thereby determining the current construction progress, and then the capping segment angle data can be calculated, and then accurate segment sorting data can be obtained.

[0010] In a preferred example, the present application may be further configured as follows: the step of acquiring tunnel centerline data and propulsion cylinder stroke data, and updating the roadheader posture data according to the tunnel centerline data and the propulsion cylinder stroke data specifically includes: The center position of the roadheader is acquired in real time according to the propulsion cylinder stroke data, and the real-time center position of the roadheader is compared with the tunnel centerline data to obtain a center position comparison result; When the center position comparison result exceeds a preset value, an excavation direction adjustment instruction is triggered according to the center position comparison result, and when the corresponding excavation direction adjustment feedback is obtained, the tunnel boring machine posture data is generated.

[0011] By adopting the above technical solution, the center position of the tunnel boring machine, that is, the center position of the tunnel boring machine, can be obtained through the propulsion cylinder stroke data, so that it can be compared with the tunnel centerline data comparison result. When the center position comparison result exceeds the preset value, that is, the tunnel boring machine is judged to have offset in the result of the laser guidance test, the corresponding tunnel boring machine direction adjustment instruction can be triggered, thereby obtaining the tunnel boring machine posture data to ensure the accuracy of construction.

[0012] In a preferred example, the present application can be further configured as follows: the center position of the tunnel boring machine is obtained in real time according to the propulsion cylinder stroke data, and the real-time center position of the tunnel boring machine is compared with the tunnel center line data to obtain the center position comparison result, specifically including: Obtain the center position of the tunnel boring machine for a preset time as a backup set of the current position of the tunnel boring machine; The latest center position of the tunnel boring machine is obtained from the backup set of the current position of the tunnel boring machine and compared with the tunnel centerline data.

[0013] By adopting the above technical solution, the center position of the tunnel boring machine with the acquired cycle duration is backed up to obtain a backup set of the current position of the tunnel boring machine, thereby being able to cope with data loss caused by the complex environment of the tunnel, thereby being able to ensure the security and integrity of the construction data.

[0014] In a preferred example, the present application may be further configured as follows: after obtaining the center position of the tunnel boring machine for a preset time as a backup set of the current position of the tunnel boring machine, the TBM laser guidance method in tunnel excavation further includes: In the process of storing the center position of the tunnel boring machine as a backup set of the current position of the tunnel boring machine, obtaining data acquisition time data corresponding to each center position of the tunnel boring machine; The time interval between adjacent data acquisition time data is obtained. When the time interval exceeds a preset value, an advance backup instruction is triggered and a data abnormality message is generated.

[0015] By adopting the above technical solution, when the time interval data exceeds the preset value, it is determined that there is a risk of data loss, and the corresponding advance backup instruction is triggered, which helps to restore the data in time.

[0016] The second object of the invention is achieved by the following technical solutions: A TBM laser guide device for tunnel excavation, the TBM laser guide device for tunnel excavation comprising: A laser ranging module is used to obtain laser ranging information, obtain a shield tail clearance value from the laser ranging information, and obtain tunnel boring machine posture data according to the shield tail clearance value; A segment angle acquisition module, used to acquire capping segment angle data according to the tunnel boring machine posture data, and acquire segment sorting data according to the capping segment angle data; A pipe segment scanning module, used for acquiring a pipe segment scanning image according to the pipe segment sorting data, and triggering a pipe segment grabbing instruction according to the pipe segment scanning image; The pipe segment splicing module is used to obtain pipe segment assembly angle data from the pipe segment scanning image and trigger the pipe segment assembly instruction according to the pipe segment assembly angle data.

[0017] By adopting the above technical solution, during the process of tunnel excavation by the roadheader, the detection window is reduced through the laser ranging technology, so that the target point can be captured more accurately, and a stable measurement effect can be maintained even in harsh construction environments. After obtaining the posture data of the roadheader, the angle and sequence of the tunnel laying segments are obtained, so that the corresponding segments can be automatically captured in combination with the segment scanning image, thereby improving the efficiency and accuracy of the construction, while also simplifying the operation process, reducing the wind direction caused by human errors, and improving the construction efficiency and quality.

[0018] The third objective of the present application is achieved through the following technical solutions: A computer device comprises a memory, a processor and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the steps of the TBM laser guidance method in tunnel excavation are implemented.

[0019] The fourth objective of the present application is achieved through the following technical solutions: A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the steps of the TBM laser guidance method in tunnel excavation.

[0020] In summary, the present application includes at least one of the following beneficial technical effects: 1. During the tunnel excavation process of the roadheader, the detection window is narrowed by laser ranging technology, so that the target point can be captured more accurately, and a stable measurement effect can be maintained even in harsh construction environments. After obtaining the posture data of the roadheader, the angle and sequence of the tunnel laying segments are obtained, so that the corresponding segments can be automatically captured in combination with the segment scanning image, thereby improving the efficiency and accuracy of the construction, simplifying the operation process, reducing the wind direction caused by human errors, and improving the construction efficiency and quality; 2. The center position of the TBM can be obtained through the propulsion cylinder stroke data, that is, the center position of the TBM, so that it can be compared with the tunnel centerline data comparison result. When the center position comparison result exceeds the preset value, that is, the TBM is judged to have deviated in the result of the laser guidance test, the corresponding TBM direction adjustment instruction can be triggered, thereby obtaining the TBM posture data to ensure the accuracy of construction; 3. When the time interval data exceeds the preset value, it is judged that there is a risk of data loss, and the corresponding advance backup instruction is triggered, which helps to restore the data in time. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 is a flow chart of a TBM laser guidance method in tunnel excavation in one embodiment of the present application; Figure 2 This is a flowchart for implementing step S20 of the method in TBM laser guidance in tunnel excavation in one embodiment of the present application; Figure 3 This is a flowchart for implementing step S21 of the method for TBM laser guidance in tunnel excavation in one embodiment of the present application; Figure 4 This is a flowchart for implementing step S211 of the method for TBM laser guidance in tunnel excavation in one embodiment of the present application; Figure 5 is another implementation flow chart of the TBM laser guidance method in tunnel excavation in one embodiment of the present application; Figure 6 This is a principle block diagram of a TBM laser guidance system in tunnel excavation in one embodiment of the present application; Figure 7 It is a schematic diagram of a device in an embodiment of the present application. DETAILED DESCRIPTION

[0022] The present application is further described in detail below in conjunction with the accompanying drawings.

[0023] In one embodiment, if Figure 1 As shown, the present application discloses a TBM laser guidance method in tunnel excavation, which specifically includes the following steps: S10: Obtain laser ranging information, obtain a shield tail clearance value from the laser ranging information, and obtain tunnel boring machine posture data according to the shield tail clearance value.

[0024] In this embodiment, the laser ranging information refers to the data measured by the laser target technology during the tunneling process of the tunnel boring machine. The shield tail clearance value refers to the distance from the outer diameter of the segment to the inner wall of the tail shield measured during the tunneling of the tunnel boring machine.

[0025] Specifically, during the excavation process of the tunnel boring machine, the current travel distance of the tunnel boring machine is measured by laser target technology, thereby obtaining the laser distance measurement information. Furthermore, the distance between the outer diameter of the pipe segment laid on the inner wall of the tunnel and the tail shield is obtained from the laser distance measurement information as the shield tail gap value, so that the current posture of the tunnel boring machine is determined according to each shield tail gap value of the tail shield, thereby simulating the posture data of the tunnel boring machine.

[0026] S20: Acquire capping segment angle data according to the tunnel boring machine posture data, and acquire segment sorting data according to the capping segment angle data.

[0027] In this embodiment, the capping segment angle data refers to the angle data of each segment to be fixed to the inner wall of the tunnel. The segment sorting data refers to the fixing order of each fixed segment.

[0028] Specifically, the progress of the current excavation construction is obtained from the attitude data of the tunnel boring machine, such as the current excavation distance and the progress of the segment fixing, etc. Further, the image of the segment currently fixed on the inner wall of the tunnel is identified, and the angle measurement point is selected from the image to obtain the angle of the subsequent segment to be fixed as the capping segment angle data, and the sequence of the subsequent segments to be fixed is obtained according to the capping segment angle data, so that the corresponding segments are assembled to the corresponding positions according to the corresponding assembly angles, thereby obtaining the segment sorting data.

[0029] S30: Acquire a segment scanning image according to the segment sorting data, and trigger a segment grabbing instruction according to the segment scanning image.

[0030] Specifically, an image of the pipe segment to be fixed is acquired by an image scanning or photographing device on the tunnel boring machine, and the grabbing order is marked in the image of the pipe segment according to the pipe segment sorting data as a pipe segment scan image.

[0031] Furthermore, the pipe segment grabbing instruction is triggered according to the pipe segment scanning image carrying the grabbing sequence, so as to control the assembling machine to locate and grab each pipe segment according to the grabbing sequence and the shooting position of the pipe segment scanning image.

[0032] S40: Acquire segment assembly angle data from the segment scanning image, and trigger segment assembly instructions according to the segment assembly angle data.

[0033] In this embodiment, the segment assembly angle data refers to instructions for controlling the assembly machine to rotate to a corresponding angle.

[0034] Specifically, after grabbing the corresponding pipe segment, the capping pipe segment angle data corresponding to the currently grabbed pipe segment is obtained according to the pipe segment sorting data carried in the pipe segment scanning image, and is sent to the rotary encoder of the assembly machine as the pipe segment assembly angle data, so that the rotating mechanism of the assembly machine rotates to the corresponding angle, thereby triggering the pipe segment assembly instruction.

[0035] In this embodiment, during the tunnel excavation process of the roadheader, the detection window is reduced by using laser ranging technology, so that the target point can be captured more accurately, and a stable measurement effect can be maintained even in harsh construction environments. After obtaining the posture data of the roadheader, the angle and sequence of the tunnel laying segments are obtained, so that the corresponding segments can be automatically captured in combination with the segment scanning image, thereby improving the efficiency and accuracy of the construction, while also simplifying the operating process, reducing the wind direction caused by human errors, and improving the construction efficiency and quality.

[0036] In one embodiment, if Figure 2 As shown, in step S20, the capping segment angle data is obtained according to the attitude data of the tunnel boring machine, and the segment sorting data is obtained according to the capping segment angle data, which specifically includes: S21: Acquire tunnel centerline data and propulsion cylinder stroke data, and update the tunnel boring machine posture data according to the tunnel centerline data and propulsion cylinder stroke data.

[0037] In this embodiment, the tunnel centerline data refers to the position of the centerline of the tunnel to be excavated. The propulsion cylinder stroke data refers to the stroke of the cylinder used to propel the tunnel boring machine.

[0038] Specifically, the tunnel centerline data is determined based on the predetermined construction plan and the data measured on site before excavation. At the same time, during the movement of the tunnel boring machine, the cylinder propulsion stroke is obtained in real time to form the propulsion cylinder stroke data, and the current state of the tunnel boring machine is determined based on the cylinder stroke data, and compared with the tunnel centerline data, and the tunneling posture data is updated based on the comparison results.

[0039] S22: Acquire the current position of the tunnel boring machine from the tunnel boring machine posture data, and generate tunnel boring construction progress data according to the current position of the tunnel boring machine.

[0040] Specifically, the current position of the tunnel boring machine, i.e., the position in the excavated tunnel, is determined based on the progress of the cylinder propulsion in the tunnel boring machine posture data. Further, the progress of tunnel excavation is determined based on the current position of the tunnel boring machine, thereby obtaining the construction progress data.

[0041] S23: Calculate capping segment angle data according to the excavation construction progress data, and obtain segment sorting data according to the capping segment angle data.

[0042] Specifically, the correlation between the pre-correlated construction progress and the segment assembly progress is obtained. After the excavation construction progress data is obtained, the segment assembly progress is obtained according to the correlation, and then the capping segment angle data is obtained according to the assembly progress, and then the segment sorting data is obtained according to the capping segment angle data.

[0043] In one embodiment, if Figure 3 As shown, in step S21, the tunnel centerline data and the propulsion cylinder stroke data are obtained, and the tunnel boring machine posture data is updated according to the tunnel centerline data and the propulsion cylinder stroke data, which specifically includes: S211: The center position of the tunnel boring machine is obtained in real time according to the thrust cylinder stroke data, and the real-time center position of the tunnel boring machine is compared with the tunnel center line data to obtain the center position comparison result.

[0044] Specifically, the propulsion cylinder stroke data is acquired in real time through wireless technology, so that the direction of the tunnel boring machine can be determined according to the propulsion progress of each cylinder, thereby obtaining the center position of the tunnel boring machine. Further, after obtaining the center position of the tunnel boring machine, the corresponding center line of the tunnel boring machine is retrieved, and the angle of the center line of the tunnel boring machine is compared with the center line of the tunnel, and the angle value obtained by the comparison is used as the center position comparison result.

[0045] S212: When the center position comparison result exceeds a preset value, a tunneling direction adjustment instruction is triggered according to the center position comparison result, and when the corresponding tunneling direction adjustment feedback is obtained, tunneling machine posture data is generated.

[0046] Specifically, when the angle value is too large, that is, the center position comparison result exceeds the preset value, the excavation direction adjustment instruction is triggered according to the compared angle value. When the corresponding excavation direction adjustment feedback is obtained, the direction of the tunneling machine is corrected by controlling the action of the cylinder, and the tunneling machine posture data is generated.

[0047] In one embodiment, if Figure 4 As shown, in step S211, the center position of the tunnel boring machine is obtained in real time according to the propulsion cylinder stroke data, and the real-time center position of the tunnel boring machine is compared with the tunnel center line data to obtain the center position comparison result, which specifically includes: S2111: Obtain the center position of the tunnel boring machine for a preset time period as a backup set of the current position of the tunnel boring machine.

[0048] Specifically, a time period is preset, and the central position of the tunnel boring machine received in each time period is backed up, thereby obtaining a backup set of the current position of the tunnel boring machine.

[0049] S2112: Obtain the latest center position of the tunnel boring machine from the backup set of the current position of the tunnel boring machine and compare it with the tunnel centerline data.

[0050] Specifically, when comparing the center position of the TBM with the tunnel centerline data, the most recent center position of the TBM is obtained from the latest backup set of the TBM's current position for comparison. This allows for comparison of whether the TBM has position deviations and for timely data backup, thereby improving the security and integrity of construction data.

[0051] In one embodiment, if Figure 5 After step S2111, the TBM laser guidance method in tunnel excavation further includes: S21111: In the process of storing the center position of the tunnel boring machine as the current position backup set of the tunnel boring machine, the data acquisition time data corresponding to the center position of each tunnel boring machine is obtained.

[0052] Specifically, when storage backup is performed at each tunnel boring machine center position, data corresponding to the received data is synchronously obtained as the data acquisition time data.

[0053] S21112: Obtain the time interval between adjacent data acquisition time data. When the time interval exceeds a preset value, an advance backup instruction is triggered and a data exception message is generated.

[0054] Specifically, the time interval between adjacent data acquisition time data is obtained. If the time interval exceeds the preset value or the time interval acquisition fails, it is determined that the data reception is abnormal, and the advance backup instruction is triggered to store the received data as a backup set of the current position of the tunnel boring machine, and trigger a data exception message to control the data sending end of the tunnel boring machine to pre-store the data. After the exception is eliminated, the pre-stored data is restored.

[0055] It should be understood that the size of the serial numbers of the steps in the above embodiments does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.

[0056] In one embodiment, a TBM laser guidance device for tunnel excavation is provided, and the TBM laser guidance device for tunnel excavation corresponds to the TBM laser guidance method for tunnel excavation in the above embodiment. Figure 6 As shown, the TBM laser guidance device in the tunnel excavation includes a laser ranging module, a segment angle acquisition module, a segment scanning module and a segment splicing module. The detailed description of each functional module is as follows: The laser ranging module is used to obtain laser ranging information, obtain the shield tail clearance value from the laser ranging information, and obtain the tunnel boring machine posture data according to the shield tail clearance value; The segment angle acquisition module is used to acquire the capping segment angle data according to the attitude data of the tunnel boring machine, and acquire the segment sorting data according to the capping segment angle data; A pipe segment scanning module is used to obtain a pipe segment scanning image according to the pipe segment sorting data, and trigger a pipe segment grabbing instruction according to the pipe segment scanning image; The segment splicing module is used to obtain segment assembly angle data from the segment scanning image and trigger the segment assembly instruction according to the segment assembly angle data.

[0057] Optional laser ranging module includes: The posture data acquisition submodule is used to acquire the tunnel centerline data and the propulsion cylinder stroke data, and update the tunnel boring machine posture data according to the tunnel centerline data and the propulsion cylinder stroke data; The construction progress submodule is used to obtain the current position of the tunnel boring machine from the tunnel boring machine posture data and generate tunnel boring construction progress data according to the current position of the tunnel boring machine; The segment sorting acquisition submodule is used to calculate the capping segment angle data based on the excavation construction progress data, and obtain the segment sorting data based on the capping segment angle data.

[0058] Optionally, the posture data acquisition submodule includes: The center comparison unit is used to obtain the center position of the roadheader in real time according to the propulsion cylinder stroke data, and compare the real-time center position of the roadheader with the tunnel centerline data to obtain the center position comparison result; The position adjustment unit is used to trigger the excavation direction adjustment instruction according to the center position comparison result when the center position comparison result exceeds the preset value. After obtaining the corresponding excavation direction adjustment feedback, the tunnel boring machine posture data is generated.

[0059] Optionally, the central comparison unit includes: A data backup subunit is used to obtain the center position of the tunnel boring machine for a preset time period as a backup set of the current position of the tunnel boring machine; The center comparison subunit is used to obtain the latest center position of the tunnel boring machine from the backup set of the current position of the tunnel boring machine and compare it with the tunnel centerline data.

[0060] Optionally, the TBM laser guidance device in tunnel excavation also includes: A time acquisition module, used to acquire data acquisition time data corresponding to the center position of each tunnel boring machine in the process of storing the center position of the tunnel boring machine as a backup set of the current position of the tunnel boring machine; The data backup module is used to obtain the time interval between adjacent data acquisition time data. When the time interval exceeds a preset value, an advance backup instruction is triggered and a data abnormality message is generated.

[0061] The specific definition of the TBM laser guidance device in tunnel excavation can be found in the above definition of the TBM laser guidance method in tunnel excavation, which will not be repeated here. Each module in the above-mentioned TBM laser guidance device in tunnel excavation can be implemented in whole or in part by software, hardware and a combination thereof. The above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the operations corresponding to the above modules.

[0062] In one embodiment, a computer device is provided. The computer device may be a server, and its internal structure diagram may be as follows: Figure 7 As shown. The computer device includes a processor, a memory, a network interface and a database connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The network interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a TBM laser guidance method in tunnel excavation is implemented.

[0063] In one embodiment, a computer device is provided, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the following steps when executing the computer program: Obtain laser ranging information, obtain the shield tail clearance value from the laser ranging information, and obtain the tunnel boring machine posture data according to the shield tail clearance value; Obtain capping segment angle data based on the tunnel boring machine posture data, and obtain segment sorting data based on the capping segment angle data; Acquire the segment scanning image according to the segment sorting data, and trigger the segment grabbing instruction according to the segment scanning image; The segment assembly angle data is obtained from the segment scanning image, and the segment assembly instruction is triggered according to the segment assembly angle data.

[0064] In one embodiment, a computer readable storage medium is provided, on which a computer program is stored, and when the computer program is executed by a processor, the following steps are implemented: Obtain laser ranging information, obtain the shield tail clearance value from the laser ranging information, and obtain the tunnel boring machine posture data according to the shield tail clearance value; Obtain capping segment angle data based on the tunnel boring machine posture data, and obtain segment sorting data based on the capping segment angle data; Acquire the segment scanning image according to the segment sorting data, and trigger the segment grabbing instruction according to the segment scanning image; The segment assembly angle data is obtained from the segment scanning image, and the segment assembly instruction is triggered according to the segment assembly angle data.

[0065] Those of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be implemented by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application may include non-volatile and / or volatile memory. Non-volatile memory may include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory may include random access memory (RAM) or external cache memory. By way of illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM), etc.

[0066] Those skilled in the art can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example. In actual applications, the above-mentioned functions can be distributed and completed by different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above.

[0067] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.

Claims

1. A TBM laser guidance method in tunnel excavation, It is characterized in that The TBM laser guidance method in tunnel excavation includes: Acquire laser ranging information, acquire a shield tail clearance value from the laser ranging information, and acquire tunnel boring machine posture data according to the shield tail clearance value; Acquire capping segment angle data according to the tunnel boring machine posture data, and acquire segment sorting data according to the capping segment angle data; Acquire a pipe segment scanning image according to the pipe segment sorting data, and trigger a pipe segment grabbing instruction according to the pipe segment scanning image; Segment assembly angle data is acquired from the segment scanning image, and a segment assembly instruction is triggered according to the segment assembly angle data.

2. The TBM laser guidance method in tunnel excavation according to claim 1, It is characterized in that The step of acquiring capping segment angle data according to the tunnel boring machine posture data, and acquiring segment sorting data according to the capping segment angle data specifically includes: Acquire tunnel centerline data and propulsion cylinder stroke data, and update the tunnel boring machine posture data according to the tunnel centerline data and the propulsion cylinder stroke data; Acquire the current position of the tunnel boring machine from the tunnel boring machine posture data, and generate tunnel boring construction progress data according to the current position of the tunnel boring machine; The capping segment angle data is calculated according to the excavation construction progress data, and the segment sorting data is obtained according to the capping segment angle data.

3. The TBM laser guidance method in tunnel excavation according to claim 2, It is characterized in that The step of acquiring tunnel centerline data and propulsion cylinder stroke data, and updating the roadheader posture data according to the tunnel centerline data and the propulsion cylinder stroke data specifically includes: The center position of the roadheader is acquired in real time according to the propulsion cylinder stroke data, and the real-time center position of the roadheader is compared with the tunnel centerline data to obtain a center position comparison result; When the center position comparison result exceeds a preset value, an excavation direction adjustment instruction is triggered according to the center position comparison result, and when the corresponding excavation direction adjustment feedback is obtained, the tunnel boring machine posture data is generated.

4. The TBM laser guidance method in tunnel excavation according to claim 3, It is characterized in that The method of acquiring the center position of the roadheader in real time according to the propulsion cylinder stroke data, and comparing the real-time center position of the roadheader with the tunnel centerline data to obtain the center position comparison result specifically includes: Obtain the center position of the tunnel boring machine for a preset time as a backup set of the current position of the tunnel boring machine; The latest center position of the tunnel boring machine is obtained from the backup set of the current position of the tunnel boring machine and compared with the tunnel centerline data.

5. The TBM laser guidance method in tunnel excavation according to claim 4, It is characterized in that After obtaining the center position of the tunnel boring machine for a preset time as a backup set of the current position of the tunnel boring machine, the TBM laser guidance method in tunnel excavation further includes: In the process of storing the center position of the tunnel boring machine as a backup set of the current position of the tunnel boring machine, obtaining data acquisition time data corresponding to each center position of the tunnel boring machine; The time interval between adjacent data acquisition time data is obtained. When the time interval exceeds a preset value, an advance backup instruction is triggered and a data abnormality message is generated.

6. A TBM laser guidance device in tunnel excavation, It is characterized in that The TBM laser guide device in the tunnel excavation comprises: A laser ranging module is used to obtain laser ranging information, obtain a shield tail clearance value from the laser ranging information, and obtain tunnel boring machine posture data according to the shield tail clearance value; A segment angle acquisition module, used to acquire capping segment angle data according to the tunnel boring machine posture data, and acquire segment sorting data according to the capping segment angle data; A pipe segment scanning module, used for acquiring a pipe segment scanning image according to the pipe segment sorting data, and triggering a pipe segment grabbing instruction according to the pipe segment scanning image; The pipe segment splicing module is used to obtain pipe segment assembly angle data from the pipe segment scanning image and trigger the pipe segment assembly instruction according to the pipe segment assembly angle data.

7. The TBM laser guide device in tunnel excavation according to claim 6, It is characterized in that The laser ranging module comprises: A posture data acquisition submodule, used to acquire tunnel centerline data and propulsion cylinder stroke data, and update the tunnel boring machine posture data according to the tunnel centerline data and the propulsion cylinder stroke data; A construction progress submodule, used to obtain the current position of the tunnel boring machine from the tunnel boring machine posture data, and generate tunnel boring construction progress data according to the current position of the tunnel boring machine; The segment sorting acquisition submodule is used to calculate the capping segment angle data according to the excavation construction progress data, and acquire the segment sorting data according to the capping segment angle data.

8. The TBM laser guide device in tunnel excavation according to claim 7, It is characterized in that The posture data acquisition submodule includes: A center comparison unit, used for acquiring the center position of the roadheader in real time according to the propulsion cylinder stroke data, and comparing the real-time center position of the roadheader with the tunnel centerline data to obtain a center position comparison result; The position adjustment unit is used to trigger the excavation direction adjustment instruction according to the center position comparison result when the center position comparison result exceeds the preset value, and generate the tunnel boring machine posture data after obtaining the corresponding excavation direction adjustment feedback.

9. A computer device comprising a memory, a processor and a computer program stored in the memory and executable on the processor, It is characterized in that When the processor executes the computer program, the steps of the TBM laser guidance method in tunnel excavation as claimed in any one of claims 1 to 5 are implemented.

10. A computer-readable storage medium storing a computer program. It is characterized in that When the computer program is executed by a processor, the steps of the TBM laser guidance method in tunnel excavation as claimed in any one of claims 1 to 5 are implemented.