Double-shield TBM supporting shield expanding process and double-shield TBM supporting shield thereof

By shifting the auxiliary push cylinder of the double shield TBM support shield and expanding the steel structure, combined with the welding of the arc plate and the reinforcement plate, the connection method is improved, and the problems of high diameter reduction cost and low construction efficiency are solved. It achieves flexibility and safety to adapt to different diameter requirements, reducing environmental impact.

CN118911694APending Publication Date: 2024-11-08CSIC (QINGDAO) RAIL TRANSPORTATION EQUIP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411023479.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-29
Publication Date
2024-11-08
Patent Text Reader

Abstract

The invention relates to a double-shield TBM supporting shield diameter expanding process and a double-shield TBM supporting shield thereof, and belongs to the field of tunneling, and the double-shield TBM supporting shield diameter expanding process comprises the following steps: (1) an auxiliary pushing oil cylinder is displaced, so that duct pieces are uniformly stressed during duct piece assembling; (2) expanding the diameter of the support shield steel structure so as to meet the diameter requirement of a cutter head; the method has the advantages that by expanding the existing supporting shield instead of manufacturing a new supporting shield, the material and manufacturing cost can be remarkably reduced, and the extra cost generated by purchasing new equipment is reduced. The existing supporting shield is used for transformation, the time required for manufacturing and delivery of new equipment can be saved, and therefore the overall construction period of a project is shortened.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a double-shield TBM support shield diameter expansion process and a double-shield TBM support shield thereof, and belongs to the field of tunnel excavation. Background Art

[0002] In the field of tunnel boring machines, there are many studies on the design of cutterhead diameter reduction, but there are very few studies on shield diameter reduction. In March 2024, China Railway Construction Heavy Industry Group's tunnel boring machine and tunnel boring machine diameter reduction method mentioned the shield diameter reduction method: the shield body includes a sub-shield body and a mother shield body, the mother shield body is surrounded by the outside of the sub-shield body, the mother shield body includes multiple shield body blocks, and multiple shield body blocks are spliced ​​together into a ring-shaped mother shield ring, and multiple mother rings are axially spliced ​​into a mother shield idea. However, this idea is only for some shields and cannot be used for diameter reduction of all equipment. For example, for double-shield TBMs, the diameter reduction cost of the inner telescopic shield, outer telescopic shield and tail shield is no less than the new manufacturing cost.

[0003] The common cutterhead diameter of tunnel boring machines ranges from 3 to 15 meters. In rail subway construction, the most commonly used diameter is about 6 meters. The outer diameter of the pipe segment is 6 meters. Combined with the TBM construction technology, the excavation diameter of the cutterhead is required to be 6.3 meters. In the second phase of the Qingdao Metro project, the outer diameter of the pipe segment was changed to 6.2 meters and the inner diameter was 5.5 meters, so the excavation diameter of the cutterhead was 6.5 meters. The cutterhead becomes a 6500 cutterhead. Considering the convergence of the surrounding rock and the double shield TBM function, the corresponding support shield should also be matched. The DS6300 cutterhead is equipped with a support shield with an outer diameter of φ6160mm, so the DS6500 cutterhead should be equipped with a support shield with an outer diameter of φ6360mm. A support shield weighs about 140 tons. It costs about 2 million to make a new support shield. The old support shield is only used for about 5km. Expanding the diameter on the basis of the old support shield is obviously the best solution, which can save materials and manufacturing costs, shorten the construction period and meet project needs.

[0004] The current domestic idea of ​​using mother-and-child shields to change the diameter cannot be applied to all TBM shield diameter changes. The diameter change of the shield equipment requires a specific analysis of each problem. The diameter change of the double-shield TBM support shield is not only a steel structure diameter change, but also needs to meet the functional requirements.

[0005] The disadvantages are: 1. Cost-effectiveness issues: The cost of shield diameter reduction can be very high, especially when it involves remanufacturing or major modifications to existing structures. This can lead to project budget overruns.

[0006] 2. Technical complexity: The shield diameter change requires precise engineering design and manufacturing technology to ensure that the shield after diameter change can meet the structural strength and functional requirements.

[0007] 3. Construction efficiency: As far as the engineering project is concerned, the new shield is made to meet the project needs, and the equipment requires a long production and manufacturing cycle, which affects the time for the equipment to enter the factory, and thus affects the progress of the entire tunnel excavation project. Summary of the invention

[0008] In order to overcome the defects of the prior art, the present invention provides a double shield TBM support shield expansion process and a double shield TBM support shield thereof. The technical solution of the present invention is: A double shield TBM support shield expansion process, comprising the following steps: (1) Shift the auxiliary thrust cylinder so that the segments are evenly stressed during assembly; (2) Expand the diameter of the support shield steel structure to meet the cutter head diameter requirements.

[0009] The step (1) is specifically as follows: Step 1.1 Determine the displacement direction and distance of the auxiliary thrust cylinder to ensure that the segments are evenly stressed during segment assembly; Step 1.2: cutting or removing the fixing seat of the auxiliary thrust cylinder so that the auxiliary thrust cylinder can move along the predetermined path; Step 1.3 Adjust the position of the auxiliary thrust cylinder to adapt to the adjusted working diameter; Step 1.4 After the auxiliary thrust cylinder moves to the preset position, fix the auxiliary thrust cylinder to ensure that it is stable to prevent displacement or vibration during operation.

[0010] The step (2) is specifically as follows: Step 2.1 Evaluate the current size of the support shield steel structure and the required expansion size; Step 2.2: reducing the axial length of the support shield to meet the size requirements after the diameter is expanded; Step 2.3 welding a plurality of arc plates outside the arc plate of the support shield, wherein the arc plates are designed and installed according to the required diameter expansion size; Step 2.4 Weld the reinforcing rib plate at the original rib plate position of the support shield to enhance the structural strength and stability after the expansion; Step 2.5: Connect the arc plate to the reinforcing rib plate through the plug welding hole, and weld the edge of the arc plate to the groove of the rib plate to ensure the firmness and sealing of the welding; Step 2.6: Change the connection method between the support shield and the tail shield to flange connection to improve the flexibility of the connection and facilitate disassembly and assembly.

[0011] In the step 1.1, the auxiliary thrust cylinder moves radially up to 40 mm at most, and the diameter of the cylinder changes from φ5600 mm to φ5680 mm; in the step 1.4, the auxiliary thrust cylinder is fixed with a clamping structure to facilitate disassembly and reuse.

[0012] In the step 2.2, the axial length of the support shield is reduced by 440 mm, that is, the length of the support shield is changed from the previous 4105 mm to 3665 mm; in the step 2.3, Eight arc plates are welded outside the original arc plate of the support shield to expand the outer diameter of the support shield.

[0013] In the step (2), after the support shield is expanded, the large support shoe cylinders on both sides are adjusted to move the support shoes outward by 40 mm by adding gaskets to adapt to the support shield after the expansion.

[0014] A double-shield TBM support shield is suitable for implementing the double-shield TBM support shield diameter expansion process. The support shield has an enlarged outer diameter and can be used in conjunction with a corresponding cutterhead and pipe segment.

[0015] The advantages of the present invention are: 1. By expanding the diameter of the existing support shield instead of manufacturing a new one, the material and manufacturing costs can be significantly reduced, and the additional expenses incurred by purchasing new equipment are reduced.

[0016] 2. Using existing support shields for retrofitting can avoid the time required for manufacturing and delivering new equipment, thereby shortening the overall construction period of the project.

[0017] 3. This solution allows the shield machine to adapt to the needs of tunnels of different diameters, improving the versatility and adaptability of the equipment, enabling it to be used in different engineering projects.

[0018] 4. By welding arc plates and reinforcing rib plates on the support shield, the structural strength and stability after diameter expansion are enhanced, ensuring safety during construction.

[0019] 5. The movement and fixation of the auxiliary thrust cylinder adopts a simple clamping structure, which is easy to disassemble and reuse, thus improving the construction efficiency.

[0020] 6. Changing the connection method between the support shield and the tail shield to flange connection improves the flexibility of the connection and facilitates disassembly and assembly, which helps to quickly adjust and maintain the equipment.

[0021] 7. By reusing and transforming existing equipment, the environmental impact caused by manufacturing new equipment is reduced, which is in line with the concept of sustainable development and environmental protection. DETAILED DESCRIPTION

[0022] The present invention will be further described below in conjunction with specific embodiments, and the advantages and features of the present invention will become clearer as the description proceeds. However, these embodiments are exemplary only and do not constitute any limitation to the scope of the present invention. It should be understood by those skilled in the art that the details and forms of the technical solution of the present invention may be modified or replaced without departing from the spirit and scope of the present invention, but these modifications and replacements all fall within the scope of protection of the present invention.

[0023] The present invention relates to a double-shield TBM support shield expansion process, comprising the following steps: (1) Shift the auxiliary thrust cylinder so that the segments are evenly stressed during assembly; (2) Expand the diameter of the support shield steel structure to meet the cutter head diameter requirements.

[0024] The step (1) is specifically as follows: Step 1.1 Determine the displacement direction and distance of the auxiliary thrust cylinder to ensure that the segments are evenly stressed during segment assembly; there are 20 evenly distributed auxiliary thrust cylinders, and they are single cylinders; Step 1.2: cutting or removing the fixing seat of the auxiliary thrust cylinder so that the auxiliary thrust cylinder can move along the predetermined path; Step 1.3 Adjust the position of the auxiliary thrust cylinder to adapt to the adjusted working diameter; Step 1.4 After the auxiliary thrust cylinder moves to the preset position, fix the auxiliary thrust cylinder to ensure that it is stable to prevent displacement or vibration during operation.

[0025] The step (2) is specifically as follows: Step 2.1 Evaluate the current size of the support shield steel structure and the required expansion size; Step 2.2: reducing the axial length of the support shield to meet the size requirements after the diameter is expanded; Step 2.3 welding a plurality of arc plates outside the arc plate of the support shield, wherein the arc plates are designed and installed according to the required diameter expansion size; Step 2.4 Weld the reinforcing rib plate at the original rib plate position of the support shield to enhance the structural strength and stability after the expansion; Step 2.5: Connect the arc plate to the reinforcing rib plate through the plug welding hole, and weld the edge of the arc plate to the groove of the rib plate to ensure the firmness and sealing of the welding; Step 2.6: Change the connection method between the support shield and the tail shield to flange connection to improve the flexibility of the connection and facilitate disassembly and assembly.

[0026] The present invention may also include the following steps: Step 2.7: Rearrange or adjust the position of the advance grouting holes on the expanded support shield to adapt to the new structural layout.

[0027] Step 2.8: Conduct structural strength and stability tests to ensure that the expanded support shield meets the working requirements of the tunnel boring machine.

[0028] In the step 1.1, the auxiliary thrust cylinder moves radially at a maximum of 40 mm, and the diameter of the cylinder changes from φ5600 mm to φ5680 mm. The original step form of the support shoe plate (nylon material) can prevent damage to the pipe segment water stop strip during assembly. When the diameter of the auxiliary thrust cylinder changes, the support shoe plate 5 does not need a step, so the pipe segment water stop strip can be used.

[0029] In the step 1.4, the auxiliary thrust cylinder is fixed with a clamp structure to facilitate disassembly and reuse.

[0030] In the step 2.2, the axial length of the support shield is reduced by 440mm, that is, the length of the support shield is changed from the previous 4105mm to 3665mm. When the auxiliary thrust cylinder is retracted to the limit position, the support shoe plate must expose the support shield steel structure. At the same time, an anti-rotation device is welded at the position of the support shoe plate to ensure that the auxiliary thrust cylinder can be extended and retracted freely.

[0031] In the step 2.3, eight arc plates are welded outside the original arc plate of the support shield to expand the outer diameter of the support shield.

[0032] In the step (2), after the support shield is expanded, the large support shoe cylinders on both sides are adjusted to move the support shoes outward by 40 mm by adding gaskets to adapt to the support shield after the expansion.

[0033] A double-shield TBM support shield is suitable for implementing the double-shield TBM support shield diameter expansion process. The support shield has an enlarged outer diameter and can be used in conjunction with a corresponding cutterhead and pipe segment.

[0034] In the present invention, the displacement of the auxiliary thrust cylinder enables the pipe segments to be more evenly stressed when assembling the pipe segments. Regarding the fixation of the cylinder during the displacement process, a clamp-fixed structure is proposed in consideration of the convenience of disassembly and the satisfaction of strength.

[0035] During the diameter change of the supporting shield steel structure, the axial shield size is shortened first to allow the auxiliary thrust cylinder to freely extend and retract; the rib plate support is welded at the corresponding rib plate of the old shield, and the arc plate plug is welded to the rib plate position. At the same time, the advance grouting holes are taken into consideration and the replacement plate is welded to the arc shield body; in the diameter expansion of the large support boots on both sides, the initial position of the cylinder is adjusted by adding gaskets, and the expansion method of arc plate plug welding saves costs to the greatest extent; the welding at the connection between the shield and the shield body is changed to flange connection for easy disassembly and assembly.

[0036] In the step (1), the displacement of the auxiliary thrust cylinder has the following advantages: Uniform force: By shifting the auxiliary thrust cylinder, the segments can be uniformly stressed during assembly to avoid local stress concentration, thereby improving the installation quality of the segments and the stability of the tunnel.

[0037] Flexibility: The displacement of the auxiliary thrust cylinder provides adaptability to different segment diameters, allowing the TBM to meet different engineering requirements.

[0038] Easy maintenance: The auxiliary thrust cylinder is fixed with a clamping structure, which is easy to disassemble and reuse, reducing maintenance costs and time.

[0039] Working principle: The displacement of the auxiliary thrust cylinder is achieved by determining its displacement direction and distance to ensure uniform force during segment assembly.

[0040] The cutting or removal of the auxiliary thrust cylinder mount is to allow the cylinder to move along a predetermined path and adjust to a new position to accommodate a changed working diameter.

[0041] After the auxiliary thrust cylinder is moved to the preset position, it is fixed with a clamp structure to ensure stability during operation.

[0042] In the step (2), the expansion of the support shield steel structure has the following advantages: Adaptability: The expanded support shield can adapt to cutterheads with larger diameters, improving the applicability and flexibility of the TBM.

[0043] Cost-effectiveness: By enlarging the diameter of existing support shields rather than manufacturing new ones, costs are significantly reduced.

[0044] Structural strength: By welding arc plates and reinforcing rib plates, the structural strength and stability of the support shield are enhanced, ensuring construction safety.

[0045] Connection improvement: Changing to flange connection improves connection flexibility and facilitates disassembly and assembly, which is conducive to quick adjustment and maintenance.

[0046] Working principle: Begin by evaluating the current size of the support shield steel structure and the required expansion size.

[0047] The axial length of the support shield is reduced to meet the size requirements after the diameter is expanded.

[0048] A plurality of arc plates are welded outside the arc plate of the support shield. The arc plates are designed and installed according to the required diameter expansion size to expand the outer diameter of the support shield.

[0049] Reinforcing ribs are welded at the original rib positions of the support shield to enhance the structural strength and stability after the diameter is expanded.

[0050] The arc plate is connected to the reinforcing rib plate through the plug welding hole to ensure the firmness and sealing of the welding.

[0051] Adjust the large support shoe cylinders on both sides and move the support shoes outward by adding gaskets to adapt to the support shield after the diameter is expanded.

[0052] This double-shield TBM support shield expansion process achieves the transformation and upgrading of existing equipment through precise engineering calculations and structural design, enabling it to adapt to greater construction needs while maintaining the safety and economy of construction.

[0053] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A double shield TBM support shield expansion process, characterized in that: The following steps are involved: (1) Shift the auxiliary thrust cylinder so that the segments are evenly stressed during assembly; (2) Expand the diameter of the support shield steel structure to meet the cutter head diameter requirements.

2. The double shield TBM support shield expansion process according to claim 1 is characterized in that: The step (1) is specifically as follows: Step 1.1 Determine the displacement direction and distance of the auxiliary thrust cylinder to ensure that the segments are evenly stressed during segment assembly; Step 1.2: cutting or removing the fixing seat of the auxiliary thrust cylinder so that the auxiliary thrust cylinder can move along the predetermined path; Step 1.3 Adjust the position of the auxiliary thrust cylinder to adapt to the adjusted working diameter; Step 1.4 After the auxiliary thrust cylinder moves to the preset position, fix the auxiliary thrust cylinder to ensure that it is stable to prevent displacement or vibration during operation.

3. The double shield TBM support shield expansion process according to claim 1 is characterized in that: The step (2) is specifically as follows: Step 2.1 Evaluate the current size of the support shield steel structure and the required expansion size; Step 2.2: reducing the axial length of the support shield to meet the size requirements after the diameter is expanded; Step 2.3 welding a plurality of arc plates outside the arc plate of the support shield, wherein the arc plates are designed and installed according to the required diameter expansion size; Step 2.4 Weld the reinforcing rib plate at the original rib plate position of the support shield to enhance the structural strength and stability after the expansion; Step 2.5: Connect the arc plate to the reinforcing rib plate through the plug welding hole, and weld the edge of the arc plate to the groove of the rib plate to ensure the firmness and sealing of the welding; Step 2.6: Change the connection method between the support shield and the tail shield to flange connection to improve the flexibility of the connection and facilitate disassembly and assembly.

4. The double shield TBM support shield expansion process according to claim 2 or 3, characterized in that: In the step 1.1, the auxiliary thrust cylinder moves radially up to 40 mm at most, and the diameter of the cylinder changes from φ5600 mm to φ5680 mm; in the step 1.4, the auxiliary thrust cylinder is fixed with a clamping structure to facilitate disassembly and reuse.

5. The double shield TBM support shield expansion process according to claim 2 or 3, characterized in that: In the step 2.2, the axial length of the support shield is reduced by 440 mm, that is, the length of the support shield is changed from the previous 4105 mm to 3665 mm; in the step 2.3, Eight arc plates are welded outside the original arc plate of the support shield to expand the outer diameter of the support shield.

6. The double shield TBM support shield expansion process according to claim 5 is characterized in that: In the step (2), after the support shield is expanded, the large support shoe cylinders on both sides are adjusted to move the support shoes outward by 40 mm by adding gaskets to adapt to the support shield after the expansion.

7. A double shield TBM support shield, characterized in that: The invention is suitable for implementing the double shield TBM support shield expansion process described in any one of claims 1 to 6, wherein the support shield has an enlarged outer diameter and can be used in conjunction with a corresponding cutterhead and segment.