Deeply-buried water-rich stratum duct piece wall post-grouting construction technology

Through the grouting construction process after the pipe wall of the deep buried water-rich formation, synchronous and secondary grouting technology is used, combined with mortar and water glass and other materials, a compact hoop is formed, which solves the problem of filling the back wall void under water-rich formation conditions. Improves the efficiency and safety of shield construction.

CN118911719APending Publication Date: 2024-11-08CHINA TIESIJU CIVIL ENGINEERING GROUP CO LTD +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411343555.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-25
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

In the construction of the shield tunnel, especially under water-rich formations, it is difficult to fill the gap behind the wall, causing water to flow into the soil silo after the shield tail to cause abnormal increase in soil and water pressure, affecting construction efficiency.

Method used

A deep-buried water-rich formation pipe sheet wall grouting construction process is adopted, including synchronous grouting and secondary grouting, using mortar, water glass, cement slurry and other materials, through a specific grouting sequence and pressure relief hole design. Form a dense hoop to prevent water from coming from behind.

Benefits of technology

Effectively block the incoming water from the rear, improve the safety and efficiency of shield construction, solve the problems of poor slurry layering and grouting effects, and form a fast and dense annular filling.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911719A_ABST
    Figure CN118911719A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of backfill grouting construction, in particular to a backfill grouting construction technology for a deeply-buried water-rich stratum segment. Comprising the following steps that S1, in the tunneling process of a shield tunneling machine, synchronous grouting is conducted on a single-ring segment after five rings are inverted at the shield tail of the shield tunneling machine, and a hoop is formed; s2, secondary grouting is conducted on the segment, behind the inverted five rings, of the shield tail of the shield tunneling machine, and a dense hoop is formed in cooperation with synchronous grouting and ring sealing; s3, an anti-mud effect solution, a phosphoric acid solution and a water glass solution are injected into a gap between a shield shell of the shield tunneling machine and the soil layer, and water coming from the rear portion is prevented from rushing into the soil bin; and S4, improved double-liquid slurry is injected into gaps between segments of the inverted third ring and the inverted fourth ring of the shield tail of the shield tunneling machine and the soil layer. The grouting construction process is high in operability and easy to implement, a dense hoop can be formed outside the duct piece after grouting, and the grouting construction effect is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of wall back-grouting construction, and in particular to a wall back-grouting construction process for a segment buried in a deep water-rich stratum. Background Art

[0002] During shield tunnel construction, uniform and dense filling of the gaps at the shield tail is a prerequisite for ensuring stratum stability and waterproofing; however, grouting materials, grouting time, grouting pressure, grouting volume, grouting position, etc. will affect the filling effect behind the wall, especially dense filling of gaps under water-rich conditions behind the wall, which is a huge challenge.

[0003] If a shield cannot form a dense hoop during tunneling in water-rich strata, water from the rear of the shield tail will easily flow into the soil bin, causing abnormal increase in water and soil pressure in the bin, thinning of the slag, and difficulty in improvement, which will lead to frequent gushing of the screw machine, serious slag leakage at the shield tail, and long slag cleaning time, which seriously affects the construction efficiency. Especially when tunneling downhill for a long distance and when stratum fissures are developed, water from the rear of the shield tail wall will easily gather and flow into the soil bin, affecting the shield tunneling. Therefore, it is urgent to improve the on-site wall back grouting process and materials to form a dense hoop to block the water from the rear and improve the efficiency of shield tunneling construction.

[0004] The above contents are only used to assist in understanding the technical solution of the present invention, and do not constitute an admission that the above contents are the closest prior art. Summary of the invention

[0005] The technical problem to be solved by the present invention is to provide a grouting construction process for the wall of a deeply buried water-rich stratum pipe segment. The grouting construction process is not only highly operable and easy to implement, but also can form a dense hoop outside the pipe segment after grouting, thereby improving the grouting construction effect.

[0006] To achieve the above object, the technical solution of the present invention is implemented as follows: a deep buried water-rich formation segment wall back grouting construction process, comprising the following steps:

[0007] S1. During the tunneling process of the shield machine, the single ring segment behind the 5th ring of the shield tail of the shield machine is synchronously grouted to form a hoop;

[0008] S2, perform secondary grouting on the segments behind the 5th ring of the shield tail of the shield machine, and coordinate with the synchronous grouting sealing ring to form a dense hoop;

[0009] S3. Inject sludge, phosphoric acid solution and water glass solution into the gap between the shield shell and the soil layer of the shield machine to prevent water from flowing into the soil bin from the rear;

[0010] S4. Inject improved double-liquid slurry into the gap between the segments of the inverted 3rd ring and the inverted 4th ring at the tail of the shield machine and the soil layer.

[0011] Preferably, the synchronous grouting in step S1 comprises the following steps:

[0012] S11, dividing all the grouting holes on the single ring segment in the vertical direction, and grouting is performed in the grouting holes in sequence from bottom to top;

[0013] S12. Inject mortar and water glass into the grouting holes on the single-ring segments at the same time.

[0014] Preferably, the grouting from bottom to top in step S11 includes:

[0015] S111, grouting is performed simultaneously on two grouting holes at the bottom of the single-ring segment, and two grouting holes in the middle of the single-ring segment are set as pressure relief holes for pressure relief during grouting of the two grouting holes at the bottom of the single-ring segment;

[0016] S112, when the slurry injected into the two grouting holes at the bottom of the single-ring segment flows out from the two grouting holes in the middle of the single-ring segment, the grouting of the two grouting holes at the bottom of the single-ring segment is stopped;

[0017] S113, grouting is performed simultaneously in two grouting holes in the middle of the single segment, and two grouting holes at the top of the single ring segment are set as new pressure relief holes, until slurry flows out from the two grouting holes at the top of the single ring segment, and then grouting is stopped in the two grouting holes in the middle of the single segment;

[0018] S114. Grouting is performed on the two grouting holes at the top of the single-ring segment until the grouting pressure reaches a preset value, and then the grouting is stopped.

[0019] Preferably, the secondary grouting in step S2 comprises the following steps:

[0020] S21, the segments that are inverted 5 rings after coming out of the shield tail of the shield machine are used as the grouting points for the secondary grouting;

[0021] S22, selecting the grouting holes on the segments within a radius of 3.6 m from the grouting point as pre-grouting holes for secondary grouting, and setting the pre-grouting holes in the middle and upper parts of the segments where the pre-grouting holes are located and the adjacent segments as pressure relief holes;

[0022] S23, secondary grouting is performed on the pre-grouting holes on the single ring segment in the same bottom-up manner as the synchronous grouting;

[0023] S24, secondary grouting is performed on the pre-grouting holes on adjacent annular segments in a zigzag pattern from bottom to top and left to right alternately;

[0024] S25, inserting a grouting head connected to a ball valve into the pressure relief hole, and opening the grouting head connected to the ball valve to relieve pressure and drain water before grouting the pre-grouting hole;

[0025] S26. Injecting a single-liquid slurry consisting of cement slurry or a double-liquid slurry consisting of cement slurry and water glass into the pre-grouting hole.

[0026] Preferably, in step S24, the method of injecting the adjacent ring segments in a zigzag shape from bottom to top and alternately from left to right includes:

[0027] S241, selecting a pre-grouting hole on the segment at the grouting point as the first pre-grouting hole for grouting, and at the same time setting the pre-grouting hole at the middle and upper position adjacent to the first pre-grouting hole as the second pre-grouting hole for pressure relief, until the slurry injected from the first pre-grouting hole flows out of the second pre-grouting hole, and stopping grouting the first pre-grouting hole;

[0028] S242, grouting the second pre-grouting hole, and using the adjacent pre-grouting hole directly above the first pre-grouting hole as the third pre-grouting hole, and setting the third pre-grouting hole as the pressure relief hole for the second pre-grouting hole, until the slurry injected from the second pre-grouting hole flows out of the third pre-grouting hole, and then stopping grouting the second pre-grouting hole;

[0029] S243, grouting is performed on the third pre-grouting hole, and the pre-grouting hole adjacent to the second pre-grouting hole is used as the fourth pre-grouting hole, and the fourth pre-grouting hole is set as a pressure relief hole for the third pre-grouting hole, until the slurry injected from the third pre-grouting hole flows out of the fourth pre-grouting hole, and grouting of the third pre-grouting hole is stopped.

[0030] S244. Repeat operations S241 to S243 until a dense hoop is formed on the outside of the pipe segment at the grouting point.

[0031] Preferably, a grouting head for grouting is inserted in the grouting hole of the synchronous grouting, the grouting head is connected with the three-way ball valve, the three-way ball valve is provided with a water glass interface, a pressure relief port and a mortar interface; the pressure relief port is used for pressure relief, the mortar interface is connected with a pipeline for separately conveying mortar, the water glass interface is connected with a pipeline for separately conveying water glass, and the outlet of the water glass interface is set as a liquid outlet pipe sealed at one end, the liquid outlet pipe passes through the three-way ball valve and extends into the grouting head, and four liquid outlet holes for atomizing and spraying water glass are provided along the circumferential direction of the liquid outlet pipe.

[0032] Preferably, the slurry for the secondary grouting contains sawdust, and the volume of the cement slurry for the secondary grouting to the volume of the sawdust is 20:1.

[0033] Preferably, the bentonite in step S3 is driven into the shield tail through a shield bentonite pipeline.

[0034] Preferably, the water-cement ratio of the gram-mud effect is 2:1; the volume ratio of the phosphoric acid solution to the water glass solution in step S3 is 1:1, and the phosphoric acid solution is phosphoric acid: water = 1:30, and the water glass solution is water glass: water = 2:1.

[0035] Preferably, the ratio of the improved double-liquid slurry in step S4 is: 4 bags of cement, 4 bags of calcium-based bentonite, and 360 kg of water, and the shield tail grease must be continuously injected during the injection process of the improved double-liquid slurry.

[0036] The beneficial effects of the present invention are embodied in:

[0037] (1) The grouting construction process provided by the present invention improves the behind-the-wall grouting process and materials, so that during the grouting construction, the slurry can be quickly filled on the outside of the tunnel annular segment to form a dense hoop, thereby quickly blocking the water coming from the rear, thereby improving the safety of shield construction and the efficiency of shield excavation construction.

[0038] (2) The grouting construction process provided by the present invention improves the grouting methods of both simultaneous grouting and secondary grouting, which not only makes the operation more scientific and convenient, but also solves the problems of slurry stratification and inability to form a dense hoop on the outside of the pipe segment in the existing grouting process, thereby improving the grouting construction effect. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] Figure 1 A diagram showing the grouting sequence of the grouting holes of a single ring segment by synchronous grouting according to the present invention;

[0040] Figure 2 It is a schematic diagram of the secondary grouting hole arrangement of the present invention;

[0041] Figure 3 A diagram showing the grouting sequence of the secondary grouting of the present invention for the grouting holes of a single ring segment;

[0042] Figure 4 This is a diagram showing the grouting sequence of the secondary grouting of adjacent annular segments in the present invention. DETAILED DESCRIPTION

[0043] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. In the absence of conflict, the embodiments in this application and the features in the embodiments can be combined with each other. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0044] Example

[0045] See also Figure 1-4 As shown:

[0046] The present invention provides a deep buried water-rich stratum segment wall back grouting construction process, comprising the following steps:

[0047] S1. During the tunneling process of the shield machine, the inverted 5 rings at the tail of the shield machine and the single ring segments after the inverted 5 rings are synchronously grouted to form a hoop on the single ring segment to prevent water from entering the tunnel enclosed by the single ring segment.

[0048] The synchronous grouting in step S1 includes the following steps:

[0049] S11. All grouting holes on the single ring segment are divided in the vertical direction, and grouting is performed in the grouting holes in sequence from bottom to top.

[0050] The grouting from bottom to top adopted in step S11 includes:

[0051] S111. During the specific operation, grouting is performed simultaneously on the two grouting holes at the bottom of the single-ring segment, and the two grouting holes in the middle of the single-ring segment are set as pressure relief holes for pressure relief during grouting of the two grouting holes at the bottom of the single-ring segment.

[0052] S112. When the slurry injected into the two grouting holes at the bottom of the single-ring segment flows out from the two grouting holes in the middle of the single-ring segment, the grouting of the two grouting holes at the bottom of the single-ring segment is stopped.

[0053] S113, grouting is performed simultaneously in two grouting holes in the middle of the single segment, and two grouting holes at the top of the single ring segment are set as new pressure relief holes, until slurry flows out from the two grouting holes at the top of the single ring segment, and then grouting is stopped in the two grouting holes in the middle of the single segment;

[0054] S114. Grouting is performed on the two grouting holes at the top of the single-ring segment until the grouting pressure reaches a preset value, and then the grouting is stopped.

[0055] During actual construction, surrounding rock fissure water is collected at the bottom of the single-ring segment. The above-mentioned synchronous grouting method from bottom to top ensures that the slurry ring behind the wall of the single-ring segment after grouting is dense, avoids slurry stratification, and improves the construction effect of synchronous grouting.

[0056] S12. Inject mortar and water glass into the grouting holes on the single-ring segments at the same time.

[0057] During synchronous grouting, a grouting head for grouting is inserted into the grouting hole, and the grouting head is connected to the three-way ball valve. The three-way ball valve is provided with a water glass interface, a pressure relief port and a mortar interface. The pressure relief port is used for pressure relief, the mortar interface is connected to a pipeline for conveying mortar alone, the water glass interface is connected to a pipeline for conveying water glass alone, and the outlet of the water glass interface is provided as a liquid outlet pipe with one end sealed, the liquid outlet pipe passes through the three-way ball valve and extends into the grouting head, and four liquid outlet holes for atomizing and spraying water glass are provided along the circumferential direction of the liquid outlet pipe.

[0058] Through such an arrangement, the mortar can be evenly mixed with the water glass sprayed from the liquid outlet pipe when entering the grouting head, which not only ensures the solidification time of the synchronous grouting slurry, but also solves the blockage problem of the existing grouting pipe.

[0059] S2. Carry out secondary grouting on the segments behind the inverted 5 rings at the tail of the shield machine, and coordinate with the synchronous grouting sealing ring to form a dense hoop.

[0060] The secondary grouting in step S2 includes the following steps:

[0061] S21. The 5-ring segments that have been pulled out of the tail of the shield machine will be used as the grouting points for the secondary grouting.

[0062] S22, selecting the grouting holes on the segments within a radius of 3.6 m from the grouting point as pre-grouting holes for secondary grouting, and setting the pre-grouting holes in the middle and upper parts of the segments where the pre-grouting holes are located and the adjacent segments as pressure relief holes;

[0063] S23. For the pre-grouting holes on the single-ring segments, secondary grouting is carried out in the same bottom-up manner as the synchronous grouting.

[0064] S24, secondary grouting is performed on the pre-grouting holes on adjacent annular segments in a zigzag pattern from bottom to top and left to right alternately;

[0065] In step S24, the method of injecting the adjacent ring segments in a zigzag pattern from bottom to top and alternately from left to right includes:

[0066] S241. Select a pre-grouting hole on the pipe segment at the grouting point as the first pre-grouting hole for grouting, and at the same time set the pre-grouting hole in the middle and upper position adjacent to the first pre-grouting hole as the second pre-grouting hole for pressure relief, until the slurry injected from the first pre-grouting hole flows out of the second pre-grouting hole, and stop grouting the first pre-grouting hole.

[0067] S242, grouting is performed on the second pre-grouting hole, and the adjacent pre-grouting hole directly above the first pre-grouting hole is used as the third pre-grouting hole, and the third pre-grouting hole is set as a pressure relief hole for the second pre-grouting hole, until the slurry injected from the second pre-grouting hole flows out of the third pre-grouting hole, and grouting of the second pre-grouting hole is stopped.

[0068] S243, grouting is performed on the third pre-grouting hole, and the pre-grouting hole adjacent to the second pre-grouting hole is used as the fourth pre-grouting hole, and the fourth pre-grouting hole is set as the pressure relief hole for the third pre-grouting hole, until the slurry injected from the third pre-grouting hole flows out of the fourth pre-grouting hole, and grouting of the third pre-grouting hole is stopped.

[0069] S244. Repeat operations S241 to S243 until a dense hoop is formed on the outside of the pipe segment at the grouting point.

[0070] In order to ensure the solidification time of the secondary grouting slurry, sawdust is added to the secondary grouting slurry, and the initial setting time of the slurry is about 15s.

[0071] S25. Install the grouting head connected to the ball valve in the pressure relief hole, and open the grouting head connected to the ball valve to relieve pressure and drain water before grouting the pre-grouting hole. In this way, the water that affects the solidification of the slurry can be discharged, the slurry stratification can be avoided, and the effect of the grouting construction can be improved.

[0072] S26. Inject a single-liquid slurry consisting of cement slurry or a double-liquid slurry consisting of cement slurry and water glass into the pre-grouting hole. Single-liquid slurry is generally used in leakage situations, and double-liquid slurry is used for the external water-stop ring of the shield segment.

[0073] S3. Inject mud effect, phosphoric acid solution and water glass solution into the gap between the shield shell of the shield machine and the soil layer to prevent water from the rear from pouring into the soil bin.

[0074] The bentonite effect in step S3 is driven into the shield tail through the shield bentonite pipeline.

[0075] The mud effect is mainly composed of calcium-based bentonite, lime, cellulose and water glass, and the ratio of the mud effect is a water-cement ratio of 2:1.

[0076] In step S3, the volume ratio of the phosphoric acid solution to the water glass solution is 1:1, and the phosphoric acid solution is phosphoric acid: water = 1:30, and the water glass solution is water glass: water = 2:1. In actual use, the initial setting time of the phosphoric acid solution and the water glass solution is about 10 seconds, and there is no obvious volume expansion; and the solidification is a jelly-like colloid, which is brittle and crushed like solid alcohol. It is difficult to re-shape, and the final setting strength is low, so it is suitable to be injected in a static state.

[0077] S4. Inject improved double-liquid slurry into the gap between the segments of the inverted 3rd ring and the inverted 4th ring at the tail of the shield machine and the soil layer.

[0078] Steps In step S4, the ratio of the improved double-liquid slurry is: 4 bags of cement, 4 bags of calcium-based bentonite, and 360 kg of water, and the shield tail grease must be continuously injected during the injection process of the improved double-liquid slurry.

[0079] Example 2

[0080] like Figure 1 As shown in FIG. 1 , the specific operation of synchronous grouting is as follows:

[0081] During grouting, due to the high water pressure behind the wall, direct hole opening for grouting is likely to lead to excessive initial grouting pressure and slurry stratification. During grouting, the grouting hole above the grouting hole can be set as a temporary pressure relief hole, or a pressure relief hole can be opened above the grouting hole.

[0082] Start grouting from grouting holes 1 and 2 at the bottom of the single-ring segment, install ball valves in grouting holes 3 and 4, and open the ball valves to release pressure; when thicker slurry flows out from grouting holes 3 and 4, stop grouting from grouting holes 1 and 2.

[0083] Then, grouting is performed at grouting holes 3 and 4, and ball valves are installed in grouting holes 5 and 6, and the ball valves are opened to release the pressure; when thicker slurry flows out from grouting holes 5 and 6, grouting at grouting holes 3 and 4 is stopped.

[0084] Then grouting is performed in grouting holes 5 and 6. When the grouting pressure reaches a preset value, the grouting is stopped.

[0085] Through the coordination of the above-mentioned grouting holes and the pressure relief holes, the compactness of the slurry can be improved, and the position of the slurry can be preliminarily determined. In addition, the slurry ratio can be adjusted and the initial setting time can be improved according to the time when the slurry is initially injected into the pressure relief holes.

[0086] Adjust the synchronous grouting volume according to different strata. The better the compressibility of the strata, the greater the grouting volume. Generally, the filling coefficient should be greater than 1.5, and the filling coefficient of the hard rock section of the entire section is 1.2.

[0087] The speed and pressure of synchronous grouting should match the tunneling speed of the shield machine. The grouting pressure control value is the soil pressure and pore water pressure + 0.2 bar to overcome the resistance of the grouting pipeline. In specific implementation, the grouting pressure of the synchronous grouting system can be controlled by the variable frequency screw. During the initial injection, the synchronous grouting is injected at a high pressure to increase the diffusion range of the slurry behind the wall and effectively fill the gap behind the wall of the pipe segment. When the ball valve of the pressure relief hole has semi-solidified slurry squeezed out, the ball valve of the pressure relief hole is closed to reduce the grouting pressure, giving the slurry sufficient time to react in free flow, thereby improving the filling effect and material utilization.

[0088] The operator should pay attention to the grouting pressure during the synchronous grouting process. If the pressure does not change or changes slightly, stop grouting to avoid the shield tail. In addition, it is necessary to always observe the pressure rise speed and pressure value during the grouting process, and observe the grouting situation of the adjacent lifting holes to determine whether the gaps and cavities behind the pipe segments have been filled densely.

[0089] Implementation 3

[0090] like Figure 2-4 As shown in the figure, the specific construction operation of secondary grouting is:

[0091] During grouting, a hole is opened at a point on the upper part of the adjacent ring segment, or at a point on the upper part of a single ring segment or at the horizontal position of the adjacent ring. In principle, the pressure relief hole is located in the upper middle part of the pre-grouting hole. The grouting head is installed to connect the ball valve, which serves as a pressure relief hole or observation hole during grouting. The location of the pressure relief hole is determined in the order given by the shield tail during actual construction, and is generally determined according to the actual situation on site. The specific relationship between the grouting hole position and the pressure relief hole position is as follows: Figure 2 shown.

[0092] The purpose of using this type of grouting hole in conjunction with the pressure relief hole is to control the flow direction of the slurry behind the segment wall, as well as the solidification time and consolidation effect of the slurry after it is filled into the segment wall, so as to improve the construction effect of the secondary grouting.

[0093] Before grouting, select appropriate grouting hole positions and pre-grouting hole positions, install grouting heads and ball valves on the grouting holes, open the ball valves, and use a drill to drill through the protective layer behind the segment wall. Use a φ20mm drill bit with a length of 0.8m. Generally, the segment wall thickness is 0.4m and the gap is 0.33m, ensuring that the gap from the outer wall to the formation is completely drilled through.

[0094] After the hole is drilled, close the ball valve, connect the tee, cement slurry pipe and water glass slurry pipe; then open the ball valve at the pressure relief hole to relieve pressure and drain water to prevent the initial injection pressure from being too high, causing the pipe segment to be misaligned or damaged.

[0095] When secondary grouting is used to grout a single ring segment, the grouting principle can refer to the synchronous grouting sequence. Figure 3 As shown: when grouting is performed in grouting hole 1, grouting hole 2 is used as a pressure relief hole or an observation hole. When slurry flows out of grouting hole 2, grouting in grouting hole 1 is stopped, and then grouting is performed in grouting hole 2. Grouting hole 3 located above grouting hole 2 is used as a new grouting hole. The operation is performed in sequence until all secondary grouting construction is completed in the circumference of the single-ring segment.

[0096] When the secondary grouting is performed on adjacent rings, Figure 4 As shown: Due to the complex structure of the trolley and the segment trolley, there is a great influence and limitation on the grouting holes. When grouting, try to inject from bottom to top and left to right alternately within a radius of 3.6m at the selected grouting point in a zigzag shape to form an effective vertical water-stop ring.

[0097] In specific applications, if grouting is performed in grouting hole 1, grouting hole 2 is opened as a pressure relief hole; when thicker slurry flows out of grouting hole 2, the ball valve of grouting hole 1 is closed, grouting is performed in grouting hole 2, and grouting hole 3 is opened as a pressure relief hole; when thicker slurry flows out of grouting hole 3, the ball valve of grouting hole 2 is closed, grouting is performed in grouting hole 3, and grouting hole 4 is opened as a pressure relief hole; the operation is cyclically performed until a dense hoop is formed on the outside of the adjacent annular segments.

[0098] Whether the secondary grouting is for a single ring segment or adjacent ring segments, high-speed grouting is used. During the initial injection, the secondary grouting machine uses the 4th gear to increase the diffusion range of the slurry behind the wall, effectively fill the gap behind the segment wall, and form an effective water-stop ring with other selected grouting holes to prevent water from coming from behind the segment wall.

[0099] When slurry comes out of the pressure relief hole, the operator needs to change gears in time. In addition, during the grouting period, open the pressure relief hole ball valve to relieve pressure and drain water. When semi-solidified slurry is squeezed out of the pressure relief hole ball valve, close the pressure relief hole ball valve and reduce the gear to 3rd or 2nd gear for injection.

[0100] Inject at low gear until the pressure reaches 2.0Mpa. Use low gear to continue injecting, reduce the gear to gear 3 and gear 2, observe the changes in grouting pressure, and control the continuous grouting pressure not to exceed 2.0Mpa. If the pressure relief hole is higher than the grouting hole and semi-solidified slurry is squeezed out, stop at that hole and move the grouting hole up once.

[0101] In summary, the grouting process provided by the present invention is highly operable and easy to implement, and solves the problems of slow slurry solidification, slurry stratification, and poor grouting effect in the existing grouting process. Moreover, the grouting process provided by the present invention improves the construction effect of grouting.

[0102] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A deep buried water-rich formation segment wall back grouting construction process, characterized in that: The following steps are involved: S1. During the tunneling process of the shield machine, the single ring segment behind the 5th ring of the shield tail of the shield machine is synchronously grouted to form a hoop; S2, perform secondary grouting on the segments behind the 5th ring of the shield tail of the shield machine, and coordinate with the synchronous grouting sealing ring to form a dense hoop; S3. Inject sludge, phosphoric acid solution and water glass solution into the gap between the shield shell and the soil layer of the shield machine to prevent water from flowing into the soil bin from the rear; S4. Inject improved double-liquid slurry into the gap between the segments of the inverted 3rd ring and the inverted 4th ring at the tail of the shield machine and the soil layer.

2. The deep buried water-rich formation segment wall back grouting construction process according to claim 1 is characterized in that: The synchronous grouting in step S1 comprises the following steps: S11, dividing all the grouting holes on the single ring segment in the vertical direction, and grouting is performed in the grouting holes in sequence from bottom to top; S12. Inject mortar and water glass into the grouting holes on the single-ring segments at the same time.

3. The back grouting construction process for deep buried water-rich formation segment wall according to claim 2 is characterized in that: The grouting from bottom to top adopted in step S11 includes: S111, grouting is performed simultaneously on two grouting holes at the bottom of the single-ring segment, and two grouting holes in the middle of the single-ring segment are set as pressure relief holes for pressure relief during grouting of the two grouting holes at the bottom of the single-ring segment; S112, when the slurry injected into the two grouting holes at the bottom of the single-ring segment flows out from the two grouting holes in the middle of the single-ring segment, the grouting of the two grouting holes at the bottom of the single-ring segment is stopped; S113, grouting is performed simultaneously in two grouting holes in the middle of the single segment, and two grouting holes at the top of the single ring segment are set as new pressure relief holes, until slurry flows out from the two grouting holes at the top of the single ring segment, and then grouting is stopped in the two grouting holes in the middle of the single segment; S114. Grouting is performed on the two grouting holes at the top of the single-ring segment until the grouting pressure reaches a preset value, and then the grouting is stopped.

4. The back grouting construction process for deep buried water-rich formation segment wall according to claim 3 is characterized in that: The secondary grouting in step S2 comprises the following steps: S21, the segments that are inverted 5 rings after coming out of the shield tail of the shield machine are used as the grouting points for the secondary grouting; S22, selecting the grouting holes on the segments within a radius of 3.6 m from the grouting point as pre-grouting holes for secondary grouting, and setting the pre-grouting holes in the middle and upper parts of the segments where the pre-grouting holes are located and the adjacent segments as pressure relief holes; S23, secondary grouting is performed on the pre-grouting holes on the single ring segment in the same bottom-up manner as the synchronous grouting; S24, secondary grouting is performed on the pre-grouting holes on adjacent annular segments in a zigzag pattern from bottom to top and alternately from left to right; S25, inserting a grouting head connected to a ball valve into the pressure relief hole, and opening the grouting head connected to the ball valve to relieve pressure and drain water before grouting the pre-grouting hole; S26. Injecting a single-liquid slurry consisting of cement slurry or a double-liquid slurry consisting of cement slurry and water glass into the pre-grouting hole.

5. The deep buried water-rich formation segment wall back grouting construction process according to claim 4 is characterized in that: The method of injecting the adjacent ring segments in a zigzag pattern from bottom to top and alternately from left to right in step S24 includes: S241, selecting a pre-grouting hole on the segment at the grouting point as the first pre-grouting hole for grouting, and at the same time setting the pre-grouting hole at the middle and upper position adjacent to the first pre-grouting hole as the second pre-grouting hole for pressure relief, until the slurry injected from the first pre-grouting hole flows out of the second pre-grouting hole, and stopping grouting the first pre-grouting hole; S242, grouting the second pre-grouting hole, and using the adjacent pre-grouting hole directly above the first pre-grouting hole as the third pre-grouting hole, and setting the third pre-grouting hole as the pressure relief hole for the second pre-grouting hole, until the slurry injected from the second pre-grouting hole flows out of the third pre-grouting hole, and then stopping grouting the second pre-grouting hole; S243, grouting is performed on the third pre-grouting hole, and the pre-grouting hole adjacent to the second pre-grouting hole is used as the fourth pre-grouting hole, and the fourth pre-grouting hole is set as a pressure relief hole for the third pre-grouting hole, until the slurry injected from the third pre-grouting hole flows out of the fourth pre-grouting hole, and grouting of the third pre-grouting hole is stopped. S244. Repeat operations S241 to S243 until a dense hoop is formed on the outside of the pipe segment at the grouting point.

6. The back grouting construction process for deep buried water-rich formation segment wall according to claim 4 is characterized in that: A grouting head for grouting is inserted into the grouting hole of the synchronous grouting, and the grouting head is connected with the three-way ball valve. The three-way ball valve is provided with a water glass interface, a pressure relief port and a mortar interface; the pressure relief port is used for pressure relief, the mortar interface is connected with a pipeline for separately conveying mortar, the water glass interface is connected with a pipeline for separately conveying water glass, and the outlet of the water glass interface is set as a liquid outlet pipe with one end sealed, the liquid outlet pipe passes through the three-way ball valve and extends into the grouting head, and four liquid outlet holes for atomizing and spraying water glass are provided along the circumferential direction of the liquid outlet pipe.

7. The back grouting construction process for deep buried water-rich formation segment wall according to claim 5 is characterized in that: The secondary grouting slurry contains sawdust, and the volume of the cement slurry for the secondary grouting and the volume of the sawdust are 20:

1.

8. The back grouting construction process for deep buried water-rich formation segment wall according to claim 6 is characterized in that: The bentonite effect in step S3 is driven into the shield tail through the shield bentonite pipeline.

9. The back grouting construction process for deep buried water-rich formation segment wall according to claim 7, characterized in that: The gram-mud-effective water-cement ratio is 2:1; the volume ratio of the phosphoric acid solution to the water glass solution in step S3 is 1:1, and the phosphoric acid solution is phosphoric acid: water = 1:30, and the water glass solution is water glass: water = 2:

1.

10. The back grouting construction process for deep buried water-rich formation segment wall according to claim 9, characterized in that: In step S4, the ratio of the improved double-liquid slurry is: 4 bags of cement, 4 bags of calcium-based bentonite, and 360 kg of water, and the shield tail grease is continuously injected during the injection process of the improved double-liquid slurry.

Citation Information