Ground directional blocking treatment method for flowing water disaster of deep-buried tunnel in spring domain

Through ground directional drilling technology and grouting construction, a water blocking section was formed, which solved the problem of operation difficulty and poor results in the control of deep-buried tunnels in the spring area, achieved efficient and safe water blocking effect, and improved the tunnel structure stability.

CN118911728APending Publication Date: 2024-11-08BEIJING CHINA COAL MINE ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411119899.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-15
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

In the construction of deep-burned tunnels in the spring area, the management of dynamic and water disasters has problems such as difficult operation, poor results, high costs and low governance efficiency. Especially in large-scale and high-water pressure environments, traditional methods are difficult to accurately locate and Treats the source and channels of dynamic water.

Method used

The ground directional drilling technology is used to drill to the bottom plate of the tunnel, and the aggregate and water-absorbing and expansion materials are driven by the jet pump to form a water blocking section. In combination with grouting construction, the water blocking effect and stability are gradually enhanced, and the water blocking system is used to monitor and adjust the water blocking section. to ensure the blocking effect.

Benefits of technology

It has achieved effective control of water in the tunnel, improved construction safety and tunnel structure stability, significantly reduced water inflow, enhanced the stability and permeability of the water blocking section, and solved the limitations of traditional methods.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911728A_ABST
    Figure CN118911728A_ABST
Patent Text Reader

Abstract

The invention discloses a spring domain deep-buried tunnel flowing water disaster ground directional plugging treatment method, which comprises the following steps of: drilling a directional drill hole at a plugging section position in a tunnel on the ground, exploring the flowing water condition in the tunnel, feeding materials into the tunnel to form a water plugging section, injecting slurry into the water plugging section to enable the water plugging section to be combined with the slurry, and performing directional plugging treatment on the flowing water disaster in the tunnel. And tightly combining with rock walls around the tunnel to finish water plugging construction. By building the water blocking section, water burst in the tunnel can be effectively controlled, and construction safety and stability of the tunnel structure are guaranteed; high-speed water flow is generated through a jet pump, aggregate is driven to be put into a tunnel, the aggregate is driven by the water flow, and the aggregate has a certain initial speed after entering the tunnel, so that the aggregate is not prone to being washed away by the water flow, an accumulation body can be better formed, the plugging efficiency is improved, and the water absorption expansion material can be matched with the aggregate in cooperation with input of the water absorption expansion material; and the tunnel gushing water is quickly and effectively blocked.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of deep-buried tunnel water gushing control, and more particularly to a method for ground directional plugging and control of dynamic water disasters in deep-buried tunnels in a spring area. Background Art

[0002] When constructing and operating deep buried tunnels in spring areas, dynamic water disasters have always been a major problem that needs to be solved urgently. Due to the special geological and hydrological conditions of the spring area, the groundwater is abundant and the flow is complex, and deep buried tunnels are very susceptible to dynamic water.

[0003] Traditional methods for managing dynamic water disasters in tunnels have many limitations. For example, conventional in-tunnel plugging measures are often limited by construction space, are difficult to operate, and are difficult to ensure effectiveness. Moreover, in the case of high dynamic water pressure, in-tunnel plugging may not be able to effectively prevent water infiltration and flow, and may even cause more serious disasters. In addition, previous management methods lack in-depth consideration of the geological and hydrological characteristics of the spring area, and fail to fully utilize the advantages of ground directional technology. In the spring area environment, the geological structure is complex, and the aquifers and impermeable layers are unevenly distributed. Traditional management methods are difficult to accurately locate and treat the source and channel of dynamic water. At the same time, existing technologies have shown problems such as low management efficiency and high cost when dealing with large-scale, high-pressure dynamic water disasters. This not only affects the progress and quality of tunnel projects, but also brings huge economic losses and safety hazards. Summary of the invention

[0004] To this end, the technical problem to be solved by the present invention is to provide a method for ground directional plugging and control of dynamic water disasters in deep-buried tunnels in spring areas, which is easy to operate, has a safe process and reliable effects.

[0005] In order to solve the above technical problems, the present invention provides the following technical solution: comprising the following steps:

[0006] Step A: Drill a directional borehole on the ground at the location of the blocked section in the tunnel, the directional borehole penetrates the tunnel, and at least three directional boreholes are opened on the ground along the direction of the water flow in the tunnel;

[0007] Step B: Lowering an underground television into the tunnel through directional drilling to detect the magnitude and direction of the dynamic water pressure in the tunnel and the actual situation of the directional drilling;

[0008] Step C: Install casing in the directional borehole, connect a jet pump to the casing near both ends of the plugging section in the tunnel, install a hopper on the pipeline connecting the jet pump and the casing, and fill the hopper with aggregate:

[0009] Step D: Pump out water near the water inrush point in the tunnel to slow down the flow rate of water in the tunnel:

[0010] Step E: Start the jet pump, which inputs high-speed water flow into the casing, opens the hopper, and aggregate falls into the casing. The high-speed water flow drives the aggregate to move forward quickly and enter the tunnel, and accumulate at the blocking section to form an accumulation body; water-absorbing and expanding materials are added to the blocking section in the tunnel through the casing close to the middle of the blocking section, until the accumulation body in the tunnel and the water-absorbing and expanding materials are connected to the top of the tunnel to form a water-blocking section; the front and rear aggregate accumulation bodies are used to improve the stability and blocking effect, and when the water-absorbing and expanding materials are added, it is beneficial to the stability of the water-absorbing and expanding materials, and under the action of the gushing water flow, the water-absorbing and expanding materials are combined with the accumulation body to further improve the water blocking effect.

[0011] Step F: lower the drilling tool and downhole television into the tunnel through the drilling rig to detect the dynamic water flow rate in the tunnel and the height of the accumulation body in the tunnel and the hole. When the water in the tunnel changes from pipeline flow to seepage, stop adding aggregate and water-absorbing and expanding materials, and remove the hopper;

[0012] Step G: After drilling down and repeatedly flushing and sweeping the water blocking section, the height of the water blocking section can still reach the top of the tunnel, and when the drainage volume of the gushing water passing through the water blocking section is reduced to 50%, grouting is started after sweeping the hole to the bottom of the directional drilling hole, and grouting construction is carried out in the water blocking section, so that the water blocking section and the slurry form a whole, and the water blocking section is connected to the rock mass around the tunnel through the slurry to achieve blocking of the gushing water;

[0013] Step H: After the water gushing is blocked, the drill bit is lowered to the bottom of the directional borehole and grouting is performed through the drill bit using a single-liquid cement slurry with a water-cement ratio of 0.6:1. After the setting is completed for 48 hours, the remaining empty hole section of the directional borehole after the water is separated is backfilled with cement slurry to complete the hole sealing.

[0014] In the above-mentioned method for ground directional plugging and treatment of dynamic water disasters in deep-buried tunnels in spring areas, in step A, a directional borehole drilled by ground construction penetrates the tunnel and is drilled to a position 1m below the tunnel floor. The directional drilling deviation rate is less than or equal to 1‰. By drilling the directional borehole below the tunnel floor, the directional drilling success rate reaches 100%. During subsequent material feeding, in the initial state, no aggregates in the tunnel can be connected and relied on each other, and are easily washed away by the water flow. Holes are opened on the tunnel floor so that the aggregates can be first deposited on the holes on the tunnel floor, thereby stabilizing the aggregates and promoting the formation of an aggregate accumulation body.

[0015] In the above-mentioned method for ground directional plugging and control of dynamic water disasters in deep-buried tunnels in spring areas, in step C, a tee is coaxially fixedly connected to the pipe mouth of the casing, the end of the tee opposite to the pipe mouth of the casing is connected to the discharge port of the hopper, and the other end of the tee is connected to the water outlet of the jet pump.

[0016] In the above-mentioned method for ground directional plugging and treatment of dynamic water disasters in deep-buried tunnels in spring areas, in step G, grouting construction includes rotary jet grouting: a drill bit is installed on a drilling rig, the drill bit is lowered into the casing by the drilling rig, and the drill bit is driven by the drilling rig to drill into the water blocking section and rotate while moving up and down, and the slurry is discharged through the drill bit and injected into the water blocking section until the slurry fills the space around the drill bit where the water blocking section is located, and the rotary jet grouting is terminated; after the slurry has initially set for 6 to 10 hours, the above-mentioned operation is repeated to perform rotary jet grouting construction again; the rotary jet grouting adopts slurry self-flowing pressureless grouting, and the rotary jet grouting adopts single-liquid cement slurry with a water-cement ratio of 1:1, and rotary jet grouting is performed through the drill bit, and the drill bit is drilled into the hole on the bottom plate of the tunnel. After grouting, a solid central column combining slurry and aggregate is formed, which further improves the stability of the blocking section, and at the same time, the slurry can be better injected into the formation to enhance the water blocking effect.

[0017] In the above-mentioned method for ground directional plugging and control of dynamic water disasters in deep-buried tunnels in spring areas, in step G, the grouting construction also includes filling grouting. After the rotary jet grouting is completed, a large-flow grouting pump is used to grout into the water blocking section through directional drilling, so that the accumulation body and the water-absorbing and swelling material in the water blocking section further form a whole; when the drainage volume downstream of the tunnel further decreases and the grouting slurry continues to have pressure feedback, the grouting is stopped, and the accumulation body and the slurry are combined to form a stone body.

[0018] The above-mentioned method for ground directional plugging and control of dynamic water disasters in deep-buried tunnels in spring areas adopts single-liquid grouting or double-liquid grouting for self-flowing pressureless grouting of slurry. The single-liquid slurry is a single-liquid cement slurry with a water-cement ratio of 1:1, and the double-liquid slurry is a cement slurry: water glass volume ratio of 1:1 to 1:0.3, and the cement slurry water-cement ratio is 1:1. During the filling grouting construction process, multiple spaced directional drillings are used for simultaneous continuous grouting, and grouting is stopped when the slurry at the hole mouth reaches a hydrostatic pressure value consistent with the drilling depth.

[0019] In the above-mentioned method for ground directional plugging and control of dynamic water disasters in deep-buried tunnels in spring areas, the grouting construction also includes boosted grouting. After the filling grouting is completed, a drill bit is used to sweep the hole. When the drill bit sweeps the hole to the stone body, the stone body can support the drill bit, that is, the stone body has an initial compressive strength, and then boosted grouting construction is carried out. During boosted grouting, a pressure cap is installed on the orifice of the directional borehole, the slurry outlet of the high-pressure grouting pump is connected to the pressure cap, and slurry is injected into the stone body through the high-pressure grouting pump. The grouting is stopped when the grouting pressure reaches 2.5 times the hydrostatic pressure value corresponding to the borehole depth.

[0020] In the above-mentioned method for ground directional plugging and control of dynamic water disasters in deep-buried tunnels in spring areas, the boost grouting uses a single-liquid cement slurry with a water-cement ratio of 1:1.

[0021] The above-mentioned method of ground directional plugging and control of dynamic water disasters in deep-buried tunnels in spring areas is, after the pressure-boosting grouting is completed, the pumping and drainage volume near the water gushing point in the tunnel is further increased to increase the water level difference, and then the modified single-liquid cement slurry is continuously injected into the directional borehole through a high-pressure grouting pump to further reinforce the small cracks and weak zones of the water passage.

[0022] In the above-mentioned method for ground directional plugging and control of dynamic water disasters in deep-buried tunnels in spring areas, in step E, the water-absorbing and swelling material is a chain-type highly water-absorbing and swelling resin, a water-absorbing and swelling bag and / or a mold bag.

[0023] The technical solution of the present invention achieves the following beneficial technical effects:

[0024] 1. By constructing a water-blocking section, the water gushing in the tunnel can be effectively controlled to ensure construction safety and the stability of the tunnel structure; a high-speed water flow is generated by a jet pump to drive aggregates into the tunnel, and the water flow is used to drive the aggregates so that the aggregates have a certain initial velocity after entering the tunnel, making them less likely to be washed away by the water flow, and can better form an accumulation body to improve the plugging efficiency. With the input of water-absorbing and expanding materials, they can cooperate with the aggregates to achieve rapid and effective blocking of tunnel water gushing, and after the water-absorbing and expanding materials are combined with the aggregates, the expansion of the water-absorbing and expanding materials can further improve the compactness of the plugging and improve the water plugging effect; the aggregate accumulation body after grouting reinforcement has higher strength and impermeability, which helps to improve the overall stability of the tunnel. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 A schematic diagram of the present invention for drilling a directional hole on the ground;

[0026] Figure 2 A schematic diagram of feeding materials into a tunnel through directional drilling according to the present invention;

[0027] Figure 3 A schematic diagram of performing rotary jet grouting in the water blocking section in the present invention;

[0028] Figure 4 A schematic diagram of performing pressure boost grouting in the present invention;

[0029] Figure 5 A schematic diagram of blocking water gushing according to the present invention;

[0030] Figure 6 A schematic diagram of the structure of the jet pump, hopper and sleeve connected to each other in the present invention;

[0031] Figure 7 A schematic diagram of the filling grouting process of the present invention using a single liquid grout for grouting;

[0032] Figure 8 A schematic diagram of the filling grouting process of the present invention using double-liquid grout for grouting.

[0033] The reference numerals in the figure are as follows: 1-directional drilling; 2-casing; 3-jet pump; 4-hopper; 5-aggregate; 6-pile; 7-water-swelling material; 8-tee pipe; 9-drill bit; 10-pressure cap. DETAILED DESCRIPTION

[0034] The method for ground directional plugging and control of dynamic water disasters in deep-buried tunnels in the spring area in this embodiment includes the following steps:

[0035] Step A: Figure 1 As shown, a directional borehole 1 is drilled on the ground at the blocking section in the tunnel, the directional borehole 1 passes through the tunnel, and at least three directional boreholes 1 are opened on the ground along the direction of water flow in the tunnel; the directional borehole 1 drilled by ground construction passes through the tunnel and is drilled to a position 1m below the tunnel floor, and the deviation rate of the directional borehole 1 is less than or equal to 1‰.

[0036] Step B: lowering a downhole television into the tunnel through the directional drilling hole 1 to detect the magnitude and direction of the dynamic water pressure in the tunnel and the actual situation of the directional drilling hole 1;

[0037] Step C: Figure 2 , Figure 6 As shown, a casing 2 is installed in a directional borehole 1, a jet pump 3 is connected to the casing 2 near both ends of the plugging section in the tunnel, a hopper 4 is installed on the pipeline connecting the jet pump 3 and the casing 2, and the hopper 4 is filled with aggregate 5. A tee pipe 8 is coaxially fixedly connected to the pipe mouth of the casing 2, and the end of the tee pipe 8 opposite to the pipe mouth of the casing 2 is connected to the discharge port of the hopper 4, and the other end of the tee pipe 8 is connected to the water outlet of the jet pump 3;

[0038] Step D: Pumping out water near the water inrush point in the tunnel to slow down the flow rate of the water in the tunnel;

[0039] Step E: Start the jet pump 3, the jet pump 3 inputs high-speed water flow into the casing 2, and opens the hopper 4, the aggregate 5 falls into the casing 2, the high-speed water flow drives the aggregate 5 to move forward quickly and enter the tunnel, and accumulates at the plugging section to form an accumulation body 6; the water-absorbing and swelling material 7 is added to the plugging section position in the tunnel through the casing 2 near the middle of the plugging section, the water-absorbing and swelling material 7 includes but is not limited to a chain-type highly water-absorbing and swelling resin, a water-absorbing and swelling bag and / or a mold bag, until the accumulation body 6 in the tunnel and the water-absorbing and swelling material 7 are connected to the top of the tunnel to form a water-blocking section;

[0040] Step F: lower the drilling tool and downhole television into the tunnel through the drilling rig to detect the dynamic water flow rate in the tunnel and the height of the accumulation body 6 in the tunnel and the hole. When the water in the tunnel changes from pipeline flow to seepage flow, stop adding aggregate 5 and water-absorbing and expanding material 7, and remove the hopper 4;

[0041] Step G: Figure 3 As shown, after drilling down and repeatedly flushing and sweeping the water blocking section, the height of the water blocking section can still reach the top of the tunnel, and when the drainage volume of the gushing water passing through the water blocking section is reduced to 50%, grouting is started after sweeping the hole to the bottom of the directional drilling hole 1, and grouting construction is carried out in the water blocking section, so that the water blocking section and the slurry form a whole, and the water blocking section is connected to the rock mass around the tunnel through the slurry to achieve blocking of the gushing water;

[0042] Step H: After the water gushing is blocked, the drill bit is lowered to the bottom of the directional borehole 1, and grouting is performed through the drill bit using a single-liquid cement slurry with a water-cement ratio of 0.6:1; after the completion, it is allowed to set for 48 hours, and after the water is separated, the remaining empty hole section of the directional borehole 1 is backfilled with cement slurry to complete the hole sealing.

[0043] In step G, if Figure 3 As shown, the grouting construction includes rotary jet grouting: the drill bit 9 is installed on the drilling rig, the drill bit 9 is lowered into the casing 2 by the drilling rig, and the drill bit 9 is driven by the drilling rig to drill into the water plugging section and move up and down while rotating, and the slurry is discharged through the drill bit 9 and injected into the water plugging section until the slurry fills the space around the drill bit 9 in the water plugging section, and the rotary jet grouting is completed; after the slurry is initially set for 6 to 10 hours, the above operation is repeated to carry out the rotary jet grouting construction again; the rotary jet grouting adopts slurry self-flowing pressureless grouting, and the rotary jet grouting adopts single-liquid cement slurry with a water-cement ratio of 1:1.

[0044] The grouting construction also includes filling grouting. After the jet grouting is completed, a large-flow grouting pump is used to grout the water blocking section through the directional drilling hole 1, so that the accumulation body 6 and the water-absorbing and expanding material 7 in the water blocking section are further integrated; when the drainage volume of the tunnel downstream further decreases and the grouting slurry continues to have pressure feedback, the grouting is stopped, and the accumulation body 6 combines with the slurry to form a stone body; the filling grouting adopts single-liquid grouting or double-liquid grouting to perform slurry self-flowing pressureless grouting. The single-liquid grout is a single-liquid cement slurry with a water-cement ratio of 1:1, and the double-liquid slurry is a cement slurry: water glass volume ratio of 1:1 to 1:0.3, and the cement slurry water-cement ratio is 1:1. The grouting process of the single-liquid slurry is as follows: Figure 7 As shown in Figure 2, the perfusion process of the double-liquid slurry is as follows: Figure 8 As shown, during the filling grouting construction process, a method of simultaneously and continuously grouting multiple spaced directional drill holes 1 is adopted, all of which are based on the principle of no pressure increase at the hole mouth.

[0045] Grouting construction also includes boost grouting. After the filling grouting is completed, the drilling tool is used to sweep the hole. When the drilling tool sweeps the hole to the stone body, the stone body can support the drilling tool, that is, the stone body has the initial compressive strength. Figure 4As shown, the boost grouting construction is then carried out. During the boost grouting, a pressure cap 10 is installed on the orifice of the directional borehole 1, and the grouting outlet of the high-pressure grouting pump is connected to the pressure cap 10. The slurry is injected into the stone body through the high-pressure grouting pump. The grouting is stopped when the grouting pressure reaches 2.5 times the hydrostatic pressure value corresponding to the borehole depth. The boost grouting adopts single-liquid grouting with a water-cement ratio of 1:1.

[0046] After the boost grouting is completed, the pumping and drainage volume near the water gushing point in the tunnel is further increased to increase the water level difference. Subsequently, the modified single-liquid cement slurry is continuously injected into the directional borehole 1 through a high-pressure grouting pump to reinforce the fine cracks and weak zones of the water passage.

[0047] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the claims of this patent application.

Claims

1. A method for ground directional plugging and treatment of dynamic water disasters in deep-buried tunnels in spring areas, characterized in that: The following steps are involved: Step A: drilling a directional borehole (1) on the ground at the location of the blocking section in the tunnel, the directional borehole (1) passes through the tunnel, and at least three directional boreholes (1) are opened on the ground along the direction of water flow in the tunnel; Step B: lowering a downhole television into the tunnel through directional drilling (1) to detect the magnitude and direction of the dynamic water pressure in the tunnel and the actual situation of the directional drilling (1); Step C: installing a casing (2) in the directional borehole (1), connecting a jet pump (3) to the casing (2) near both ends of the plugging section in the tunnel, installing a hopper (4) on the pipeline connecting the jet pump (3) and the casing (2), and loading aggregate (5) into the hopper (4); Step D: Pumping out water near the water inrush point in the tunnel to slow down the flow rate of the water in the tunnel; Step E: Start the jet pump (3), the jet pump (3) inputs high-speed water flow into the casing (2), and opens the hopper (4), the aggregate (5) falls into the casing (2), the high-speed water flow drives the aggregate (5) to move forward quickly and enter the tunnel, and accumulate at the blocking section to form an accumulation body (6); the water-absorbing and swelling material (7) is input into the blocking section in the tunnel through the casing (2) near the middle of the blocking section, until the accumulation body (6) and the water-absorbing and swelling material (7) in the tunnel are connected to the top of the tunnel to form a water blocking section; Step F: lowering the drilling tool and the downhole television into the tunnel through the drilling rig to detect the dynamic water flow rate in the tunnel and the height of the accumulation body (6) in the tunnel and the hole. When the water in the tunnel changes from pipeline flow to seepage flow, stop adding aggregate (5) and water-swelling material (7) and remove the hopper (4); Step G: After drilling down and repeatedly flushing and sweeping the water blocking section, the height of the water blocking section can still reach the top of the tunnel, and when the drainage volume of the gushing water passing through the water blocking section is reduced to 50%, grouting is started after the hole is swept to the bottom of the directional drill hole (1), and grouting is performed in the water blocking section so that the water blocking section and the slurry form a whole, and the water blocking section is connected to the rock mass around the tunnel through the slurry to achieve blocking of the gushing water; Step H: After the water gushing is sealed, the drill bit is lowered to the bottom of the directional borehole (1), and grouting is performed through the drill bit using a single-liquid cement slurry with a water-cement ratio of 0.6:1; after the setting is completed for 48 hours, the remaining empty hole section of the directional borehole (1) after the water is separated is backfilled with cement slurry to complete the hole sealing.

2. The method for ground directional plugging and treatment of dynamic water disasters in deep-buried tunnels in spring areas according to claim 1 is characterized in that: In step A, a directional borehole (1) drilled by ground construction penetrates the tunnel and is drilled to a position 1 m below the tunnel floor, and the deflection rate of the directional borehole (1) is less than or equal to 1‰.

3. The method for ground directional plugging and treatment of dynamic water disasters in deep-buried tunnels in spring areas according to claim 1 is characterized in that: In step C, a three-way pipe (8) is coaxially fixedly connected to the pipe mouth of the sleeve (2), the end of the three-way pipe (8) opposite to the pipe mouth of the sleeve (2) is connected to the discharge port of the hopper (4), and the other end of the three-way pipe (8) is connected to the water outlet of the jet pump (3).

4. The method for ground directional plugging and treatment of dynamic water disasters in deep-buried tunnels in spring areas according to claim 1 is characterized in that: In step G, the grouting construction includes jet grouting: the drill bit (9) is mounted on a drilling rig, the drill bit (9) is lowered into the casing (2) by the drilling rig, and the drill bit (9) is driven by the drilling rig to drill into the water plugging section and move up and down while rotating, and the slurry is discharged through the drill bit (9) and injected into the water plugging section, until the slurry fills the space around the drill bit (9) in the water plugging section, and the jet grouting is completed; after the slurry is initially set for 6 to 10 hours, the above operation is repeated to perform the jet grouting construction again; the jet grouting adopts slurry self-flowing pressureless grouting, and the jet grouting adopts single-liquid cement slurry with a water-cement ratio of 1:

1.

5. The method for ground directional plugging and treatment of dynamic water disasters in deep-buried tunnels in spring areas according to claim 4 is characterized in that: In step G, the grouting construction also includes filling grouting. After the rotary jet grouting is completed, a large-flow grouting pump is used to grout into the water blocking section through the directional drilling hole (1), so that the accumulation body (6) and the water-absorbing and swelling material (7) in the water blocking section further form a whole; when the drainage volume downstream of the tunnel further decreases and the grouting slurry continues to have pressure feedback, the grouting is stopped, and the accumulation body (6) combines with the slurry to form a stone body.

6. The method for ground directional plugging and treatment of dynamic water disasters in deep-buried tunnels in spring areas according to claim 5 is characterized in that: The filling grouting adopts single-liquid grouting or double-liquid grouting to perform grouting by self-flowing pressureless grouting. The single-liquid grout is a single-liquid cement grout with a water-cement ratio of 1:1, and the double-liquid grout is a cement grout: water glass volume ratio of 1:1 to 1:0.3, and the cement grout water-cement ratio is 1:

1. During the filling grouting construction process, a plurality of spaced directional drill holes (1) are used for simultaneous continuous grouting, and the grouting is stopped when the grout at the hole mouth reaches a hydrostatic pressure value corresponding to the drilling depth.

7. The method for ground directional plugging and treatment of dynamic water disasters in deep-buried tunnels in spring areas according to claim 6 is characterized in that: The grouting construction also includes boosted grouting. After the filling grouting is completed, a drilling tool is used to sweep the hole. When the drilling tool sweeps the hole to the stone body, the stone body can support the drilling tool, that is, the stone body has an initial compressive strength, and then boosted grouting construction is carried out. During boosted grouting, a pressure cap (10) is installed on the hole mouth of the directional drill hole (1), and the grout outlet of the high-pressure grouting pump is connected to the pressure cap (10). Slurry is injected into the stone body through the high-pressure grouting pump. Grouting is stopped when the grouting pressure reaches 2.5 times the hydrostatic pressure value corresponding to the drilling depth.

8. The method for ground directional plugging and treatment of dynamic water disasters in deep-buried tunnels in spring areas according to claim 7 is characterized in that: The boost grouting uses single-liquid cement slurry with a water-cement ratio of 1:

1.

9. A method for ground directional plugging and treatment of dynamic water disasters in deep-buried tunnels in spring areas according to claim 8, characterized in that: After the boost grouting is completed, the pumping and drainage volume near the water inflow point in the tunnel is further increased to increase the water level difference, and then the modified single-liquid cement slurry is continuously injected into the directional borehole (1) by a high-pressure grouting pump, so that the single-liquid cement slurry penetrates into the fine cracks and weak zones of the water passage.

10. The method for ground directional plugging and treatment of dynamic water disasters in deep-buried tunnels in spring areas according to claim 1 is characterized in that: In step E, the water-swellable material (7) is a chain-type highly water-swellable resin, a water-swellable bag and / or a mold bag.