By monitoring and recording alarm events in the gas boiler control system and adjusting the execution time of action commands, the problem of failure to effectively handle secondary alarm events in the prior art is solved, and control efficiency and safety are improved.

CN118912490APending Publication Date: 2024-11-08HENAN ZHIXIN BOILER TECH INNOVATION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411231588.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-04
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The existing gas boiler monitoring and control system fails to effectively identify and handle secondary alarm events, resulting in low control efficiency and difficulty in preventing secondary alarm events.

Method used

The alarm event is monitored by the boiler controller, recorded in the association control table, the associated action command is determined, and the predetermined time is adjusted according to the secondary alarm event to automatically correct the execution time of the action command and reduce the occurrence of the secondary alarm event.

Benefits of technology

It improves the control efficiency of gas boilers, reduces the probability of secondary alarm events, and ensures the safe operation of gas boilers.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118912490A_ABST
    Figure CN118912490A_ABST
Patent Text Reader

Abstract

The invention discloses an intelligent control method for a gas-fired boiler. The intelligent control method comprises the steps that a boiler controller monitors a first alarm event; after the boiler controller monitors the first alarm event, the boiler controller determines whether the first alarm event is recorded in the associated control table or not; if the boiler controller determines that the first alarm event is recorded in the association control table, determining, by the boiler controller, a first action command and a second action command associated with the first alarm event based on the association control table; sending, by the boiler controller, the first action command to the gas-fired boiler so that the gas-fired boiler performs a first action based on the first action command; after the boiler controller sends the first action command to the gas-fired boiler, the boiler controller waits for a first preset time; and after the boiler controller waits for the first preset time, the boiler controller sends a second action command to the gas-fired boiler, so that the gas-fired boiler executes a second action based on the second action command.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of gas boilers, and in particular to an intelligent control method and device for a gas boiler. Background Art

[0002] Gas boilers use gas (natural gas, LPG, artificial gas, etc.) as fuel, which is mixed with air in a certain proportion and sprayed into the furnace through the burner to burn. The heat generated is transferred to water to generate water vapor or hot water for users. During the start-up and shutdown process of the gas boiler, if the operation is improper, it is easy to cause accidents such as boiler explosion. The purpose of program control is to control the gas boiler to start, stop and operate normally according to safe procedures. At present, the safety control of gas boilers mainly includes the following items: water level monitoring, steam pressure monitoring, gas pressure monitoring, flame state monitoring and blower condition monitoring. In the process of applying the existing gas boiler monitoring and control system, our company found that the existing gas boiler monitoring and control system has design defects. Summary of the invention

[0003] To achieve the above object, the present invention provides an intelligent control method for a gas boiler, comprising:

[0004] monitoring a first alarm event by the boiler controller;

[0005] After the boiler controller detects the first alarm event, the boiler controller determines whether the first alarm event is recorded in the associated control table;

[0006] If the boiler controller determines that the first alarm event is recorded in the associated control table, the boiler controller determines a first action command and a second action command associated with the first alarm event based on the associated control table;

[0007] The boiler controller sends a first action command to the gas boiler, so that the gas boiler performs a first action based on the first action command;

[0008] After the boiler controller sends the first action command to the gas boiler, the boiler controller waits for a first predetermined time, wherein the first predetermined time is recorded in the association control table;

[0009] After the boiler controller waits for the first predetermined time, the boiler controller sends a second action command to the gas boiler, so that the gas boiler performs a second action based on the second action command.

[0010] In a preferred embodiment, the method further comprises:

[0011] After the boiler controller sends the second action command to the gas boiler, the boiler controller monitors the second alarm event or the third alarm event, wherein the second alarm event and the third alarm event are recorded in the association control table;

[0012] If the boiler controller detects a second alarm event, the boiler controller increases the first predetermined time to obtain a second predetermined time;

[0013] The boiler controller replaces the first scheduled time in the associated control table with the second scheduled time.

[0014] In a preferred embodiment, the method further comprises:

[0015] After the boiler controller replaces the first predetermined time in the associated control table with the second predetermined time, if the boiler controller detects the first alarm event again, the boiler controller sends the first action command to the gas boiler, so that the gas boiler performs the first action based on the first action command;

[0016] After the boiler controller sends the first action command to the gas boiler, the boiler controller waits for a second predetermined time;

[0017] After the boiler controller waits for the second predetermined time, the boiler controller sends a second action command to the gas boiler, so that the gas boiler performs a second action based on the second action command.

[0018] In a preferred embodiment, the method further comprises:

[0019] If the boiler controller detects a third alarm event, the boiler controller reduces the first predetermined time to obtain a third predetermined time;

[0020] The boiler controller replaces the first scheduled time in the associated control table with the third scheduled time.

[0021] In a preferred embodiment, the method further comprises:

[0022] After the boiler controller replaces the first predetermined time in the associated control table with the third predetermined time, if the boiler controller detects the first alarm event again, the boiler controller sends the first action command to the gas boiler, so that the gas boiler performs the first action based on the first action command;

[0023] After the boiler controller sends the first action command to the gas boiler, the boiler controller waits for a third predetermined time;

[0024] After the boiler controller waits for the third predetermined time, the boiler controller sends the second action command to the gas boiler, so that the gas boiler performs the second action based on the second action command.

[0025] The present invention provides an intelligent control device for a gas boiler, characterized in that the device comprises a module for performing the following operations:

[0026] monitoring a first alarm event by the boiler controller;

[0027] After the boiler controller detects the first alarm event, the boiler controller determines whether the first alarm event is recorded in the associated control table;

[0028] If the boiler controller determines that the first alarm event is recorded in the associated control table, the boiler controller determines a first action command and a second action command associated with the first alarm event based on the associated control table;

[0029] The boiler controller sends a first action command to the gas boiler, so that the gas boiler performs a first action based on the first action command;

[0030] After the boiler controller sends the first action command to the gas boiler, the boiler controller waits for a first predetermined time, wherein the first predetermined time is recorded in the association control table;

[0031] After the boiler controller waits for the first predetermined time, the boiler controller sends a second action command to the gas boiler, so that the gas boiler performs a second action based on the second action command.

[0032] In a preferred embodiment, the device further comprises a module for performing the following operations:

[0033] After the boiler controller sends the second action command to the gas boiler, the boiler controller monitors the second alarm event or the third alarm event, wherein the second alarm event and the third alarm event are recorded in the association control table;

[0034] If the boiler controller detects a second alarm event, the boiler controller increases the first predetermined time to obtain a second predetermined time;

[0035] The boiler controller replaces the first scheduled time in the associated control table with the second scheduled time.

[0036] In a preferred embodiment, the device further comprises a module for performing the following operations:

[0037] After the boiler controller replaces the first predetermined time in the associated control table with the second predetermined time, if the boiler controller detects the first alarm event again, the boiler controller sends the first action command to the gas boiler, so that the gas boiler performs the first action based on the first action command;

[0038] After the boiler controller sends the first action command to the gas boiler, the boiler controller waits for a second predetermined time;

[0039] After the boiler controller waits for the second predetermined time, the boiler controller sends a second action command to the gas boiler, so that the gas boiler performs a second action based on the second action command.

[0040] In a preferred embodiment, the device further comprises a module for performing the following operations:

[0041] If the boiler controller detects a third alarm event, the boiler controller reduces the first predetermined time to obtain a third predetermined time;

[0042] The boiler controller replaces the first scheduled time in the associated control table with the third scheduled time.

[0043] In a preferred embodiment, the device further comprises a module for performing the following operations:

[0044] After the boiler controller replaces the first predetermined time in the associated control table with the third predetermined time, if the boiler controller detects the first alarm event again, the boiler controller sends the first action command to the gas boiler, so that the gas boiler performs the first action based on the first action command;

[0045] After the boiler controller sends the first action command to the gas boiler, the boiler controller waits for a third predetermined time;

[0046] After the boiler controller waits for the third predetermined time, the boiler controller sends the second action command to the gas boiler, so that the gas boiler performs the second action based on the second action command.

[0047] Compared with the prior art, the present invention has the following advantages: most of the existing gas boiler monitoring and control systems have not yet realized the existence of such secondary alarm events. Although some studies may involve the problem of such secondary alarm events, the solutions proposed by these studies still cannot meet the control requirements. The technical solution proposed by the present invention aims to solve the technical problems existing in the prior art, improve the control efficiency, and prevent the probability of secondary alarm events. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] Figure 1 It is a schematic diagram of the system architecture of an embodiment of the present invention.

[0049] Figure 2 It is a method flow chart of an embodiment of the present invention. DETAILED DESCRIPTION

[0050] The specific implementation modes of the present invention are described in detail below in conjunction with the accompanying drawings, but it should be understood that the protection scope of the present invention is not limited by the specific implementation modes.

[0051] The design defects of the existing gas boiler monitoring and control system are analyzed as follows: Our company has found through research that the gas boiler is actually a complex system. In the process of safety control of the gas boiler, it often happens that after processing an alarm event, the processing of the alarm event will cause another alarm event. This other alarm event caused by processing an alarm event is called a secondary alarm event in the present invention. Correspondingly, an alarm event that is not caused by the processing of an alarm event is called an original alarm event. An example of a secondary alarm event is as follows: For example, when the steam pressure is too high (i.e., an original alarm event occurs), the current general control logic is to close the solenoid valve for inlet gas and then cut off the gas source, but this operation logic is very easy to cause a secondary alarm event. In short, since it is impossible to close the electromagnetic valve for gas inlet instantly, gas still enters the combustion chamber for combustion during the process of closing the electromagnetic valve. In order to ensure the pressure value of the gas transmission pipeline (if the pipeline pressure is too low, it will cause backfire after the next ignition, and if the pipeline pressure is too high, it will cause deflagration), the gas source must be closed later. However, due to the deviation of the manufacturing process of each gas boiler (this manufacturing process deviation cannot be avoided at the current technical level. For example, even if two gas boilers of the same model have the same combustion speed, gas pipeline diameter, gas inlet diameter, and valve closing speed in the combustion chamber, it is difficult to determine how long to close the gas source after closing the electromagnetic valve for gas inlet. Most existing gas boiler monitoring and control systems have not yet realized the existence of this secondary alarm event problem. Although some studies may involve the problem of this secondary alarm event, the solutions proposed by these studies still cannot meet the control requirements. The technical solution proposed by the present invention is intended to solve the above-mentioned technical problems.

[0052] Example 1

[0053] Figure 1 It is a schematic diagram of the system architecture of an embodiment of the present invention. As shown in the figure, the system of the present invention includes a boiler controller and a plurality of gas boilers. Of course, it can be understood by those skilled in the art that the boiler controller can also be an electronic device attached to a gas boiler. If the boiler controller is an electronic device attached to a gas boiler, then one boiler controller controls one gas boiler. The boiler controller can also be a remote terminal, which can control multiple gas boilers. It can be understood by those skilled in the art that as long as all types of gas boilers are electronically controlled, they can be applied to the method proposed in the present invention. Therefore, the present invention will no longer describe the specific models of gas boilers.

[0054] Example 2

[0055] Figure 2 1 is a method flow chart of an embodiment of the present invention. As shown in the figure, the method of the present invention includes the following steps:

[0056] Step 1: The boiler controller monitors the first alarm event; those skilled in the art can understand that the first alarm event can be any alarm-triggering event monitored during water level monitoring, steam pressure monitoring, gas pressure monitoring, flame state monitoring, and blower operating condition monitoring. In the present invention, in order to more clearly disclose the scheme of the present invention, the present invention will subsequently discuss the steam pressure being too high as the first alarm event. After reading the specification of the present invention, those skilled in the art can completely design other types of alarm events with reference to the example of the steam pressure being too high;

[0057] Step 2: After the boiler controller detects the first alarm event, the boiler controller determines whether the first alarm event is recorded in the association control table; in one example, the association control table can be set by experience. For example, the boiler supervisor can find the frequently occurring original alarm events and secondary alarm events by analyzing the records of the alarm events. Generally speaking, if an alarm event always occurs after another alarm event, then the two events have the relationship between the original alarm event and the secondary alarm event. Of course, after the boiler supervisor makes a preliminary judgment on the original alarm event and the secondary alarm event, he can also work with the manufacturer's technical personnel (for example, our company has hired a professional technician to provide services for customers) to determine whether the first alarm event is recorded in the association control table. The accuracy of the original alarm event and the secondary alarm event is determined by professional technicians who provide after-sales service to customers; the determination of the original alarm event and the secondary alarm event is relatively professional, which may involve a lot of logical reasoning and investigation by technicians, but since the types and contents of the specific original alarm events and the secondary alarm events are not the focus of the present invention, and the method of determining the original alarm event and the secondary alarm event is obvious (that is, the boiler supervisors and the manufacturer's technicians determine it based on knowledge and specific circumstances), therefore, the present invention still only introduces the original alarm event and the secondary alarm event by taking the excessive steam pressure and the abnormal gas pipeline pressure as an example;

[0058] Step 3: If the boiler controller determines that the first alarm event is recorded in the associated control table, the boiler controller determines the first action command and the second action command associated with the first alarm event based on the associated control table; in one example, there may be a special entry in the associated control table that includes excessive steam pressure, so the boiler controller determines that the first alarm event is recorded in the associated control table by determining that there is an entry in the associated control table that includes excessive steam pressure; of course, those skilled in the art should understand that if the boiler controller determines that the first alarm event is not recorded in the associated control table, the boiler controller handles the situation of excessive steam pressure based on the current existing control logic. All existing electric-controlled gas boilers are equipped with control logic for handling excessive steam pressure, and the present invention will not elaborate on the prior art; in one example, the first action command and the second action command associated with the first alarm event can be closing the solenoid valve for inlet gas and cutting off the gas source, respectively, both of which are also recorded in the entry of excessive steam pressure in the associated control table;

[0059] Step 4: The boiler controller sends a first action command to the gas boiler, so that the gas boiler performs a first action based on the first action command; in one example, the first action is to close the solenoid valve for inlet gas;

[0060] Step 5: After the boiler controller sends the first action command to the gas boiler, the boiler controller waits for a first predetermined time, wherein the first predetermined time is recorded in the associated control table; in one example, the first predetermined time is still generated by the judgment of the technician, and different boilers generally determine different first predetermined times. The specific determination method can be performed by a known numerical simulation method. Of course, in the subsequent embodiments, the method of the present invention also has an operation of adaptively adjusting the predetermined time, so even if the first predetermined time determined at the beginning is not appropriate, the method of the present invention can automatically correct the predetermined time later;

[0061] Step 6: After the boiler controller waits for the first predetermined time, the boiler controller sends a second action command to the gas boiler, so that the gas boiler performs a second action based on the second action command. In one example, the second action is to cut off the gas source.

[0062] Example 3

[0063] In embodiment 3, the method further comprises:

[0064] After the boiler controller sends the second action command to the gas boiler, the boiler controller monitors the second alarm event or the third alarm event, wherein the second alarm event and the third alarm event are recorded in the associated control table; in one example, the second alarm event may be that the gas pipeline pressure is too low, and the third alarm event may be that the gas pipeline pressure is too high;

[0065] If the boiler controller detects the second alarm event, the boiler controller increases the first preset time to obtain the second preset time; in one example, since the second alarm event is that the gas pipeline pressure is too low, this may indicate that the gas source is cut off too early according to the first preset time, resulting in insufficient gas in the gas pipeline, resulting in too low gas pipeline pressure, so the boiler controller increases the first preset time to the second preset time to extend the gas pipeline charging time, thereby preventing the problem of too low gas pipeline pressure from occurring again; the increase in the first preset time can be calculated based on the gas pipeline pressure value, specifically, the current gas pipeline pressure (that is, the too low pressure value), the reasonable gas pipeline pressure, the gas pipeline space, and the gas flow rate of the gas inlet are known, and then the increase in the first preset time can be calculated based on simple mathematical operations; of course, it is also necessary for those skilled in the art to understand that the cause of the second alarm event or the third alarm event may be that the initial setting of the first preset time mentioned above is unreasonable, but according to our experiments, the first preset time generally determined by numerical simulation can ensure that no secondary alarm events occur, but after the gas boiler has been running for a period of time, due to the aging of equipment parts, the originally set first preset time may not meet the control requirements of the aging gas boiler;

[0066] The boiler controller replaces the first scheduled time in the associated control table with the second scheduled time.

[0067] In a preferred embodiment, the method further comprises:

[0068] After the boiler controller replaces the first predetermined time in the associated control table with the second predetermined time, if the boiler controller detects the first alarm event again, the boiler controller sends the first action command to the gas boiler, so that the gas boiler performs the first action based on the first action command;

[0069] After the boiler controller sends the first action command to the gas boiler, the boiler controller waits for a second predetermined time;

[0070] After the boiler controller waits for the second predetermined time, the boiler controller sends a second action command to the gas boiler, so that the gas boiler performs a second action based on the second action command.

[0071] Example 4

[0072] In embodiment 4, the method further comprises:

[0073] If the boiler controller detects the third alarm event, the boiler controller reduces the first preset time to obtain the third preset time; in one example, since the third alarm event is that the gas pipeline pressure is too high, this may indicate that the gas source is cut off too late according to the first preset time, resulting in too much gas in the gas pipeline, resulting in too high gas pipeline pressure, so the boiler controller reduces the first preset time to the third preset time to shorten the gas pipeline charging time, thereby preventing the problem of excessive gas pipeline pressure from occurring again; the reduction amount of the first preset time can be calculated based on the gas pipeline pressure value, specifically, the current gas pipeline pressure (that is, the excessively high pressure value), the reasonable gas pipeline pressure, the gas pipeline space, and the gas flow rate of the gas inlet are known, and then a reduction amount of the first preset time can be calculated based on simple mathematical operations;

[0074] The boiler controller replaces the first scheduled time in the associated control table with the third scheduled time.

[0075] In a preferred embodiment, the method further comprises:

[0076] After the boiler controller replaces the first predetermined time in the associated control table with the third predetermined time, if the boiler controller detects the first alarm event again, the boiler controller sends the first action command to the gas boiler, so that the gas boiler performs the first action based on the first action command;

[0077] After the boiler controller sends the first action command to the gas boiler, the boiler controller waits for a third predetermined time;

[0078] After the boiler controller waits for the third predetermined time, the boiler controller sends the second action command to the gas boiler, so that the gas boiler performs the second action based on the second action command.

[0079] Example 5

[0080] The present invention provides an intelligent control device for a gas boiler, characterized in that the device comprises a module for performing the following operations:

[0081] monitoring a first alarm event by the boiler controller;

[0082] After the boiler controller detects the first alarm event, the boiler controller determines whether the first alarm event is recorded in the associated control table;

[0083] If the boiler controller determines that the first alarm event is recorded in the associated control table, the boiler controller determines a first action command and a second action command associated with the first alarm event based on the associated control table;

[0084] The boiler controller sends a first action command to the gas boiler, so that the gas boiler performs a first action based on the first action command;

[0085] After the boiler controller sends the first action command to the gas boiler, the boiler controller waits for a first predetermined time, wherein the first predetermined time is recorded in the association control table;

[0086] After the boiler controller waits for the first predetermined time, the boiler controller sends a second action command to the gas boiler, so that the gas boiler performs a second action based on the second action command.

[0087] In a preferred embodiment, the device further comprises a module for performing the following operations:

[0088] After the boiler controller sends the second action command to the gas boiler, the boiler controller monitors the second alarm event or the third alarm event, wherein the second alarm event and the third alarm event are recorded in the association control table;

[0089] If the boiler controller detects a second alarm event, the boiler controller increases the first predetermined time to obtain a second predetermined time;

[0090] The boiler controller replaces the first scheduled time in the associated control table with the second scheduled time.

[0091] In a preferred embodiment, the device further comprises a module for performing the following operations:

[0092] After the boiler controller replaces the first predetermined time in the associated control table with the second predetermined time, if the boiler controller detects the first alarm event again, the boiler controller sends the first action command to the gas boiler, so that the gas boiler performs the first action based on the first action command;

[0093] After the boiler controller sends the first action command to the gas boiler, the boiler controller waits for a second predetermined time;

[0094] After the boiler controller waits for the second predetermined time, the boiler controller sends a second action command to the gas boiler, so that the gas boiler performs a second action based on the second action command.

[0095] In a preferred embodiment, the device further comprises a module for performing the following operations:

[0096] If the boiler controller detects a third alarm event, the boiler controller reduces the first predetermined time to obtain a third predetermined time;

[0097] The boiler controller replaces the first scheduled time in the associated control table with the third scheduled time.

[0098] In a preferred embodiment, the device further comprises a module for performing the following operations:

[0099] After the boiler controller replaces the first predetermined time in the associated control table with the third predetermined time, if the boiler controller detects the first alarm event again, the boiler controller sends the first action command to the gas boiler, so that the gas boiler performs the first action based on the first action command;

[0100] After the boiler controller sends the first action command to the gas boiler, the boiler controller waits for a third predetermined time;

[0101] After the boiler controller waits for the third predetermined time, the boiler controller sends the second action command to the gas boiler, so that the gas boiler performs the second action based on the second action command.

[0102] It should be understood that the above specific embodiments of the present invention are only used to illustrate or explain the principles of the present invention, and do not constitute a limitation of the present invention. Therefore, any modifications, equivalent substitutions, improvements, etc. made without departing from the spirit and scope of the present invention should be included in the protection scope of the present invention. In addition, the appended claims of the present invention are intended to cover all changes and modifications that fall within the scope and boundaries of the appended claims, or the equivalent forms of such scope and boundaries.

Claims

1. An intelligent control method for a gas boiler, characterized in that: The steps include: monitoring a first alarm event by the boiler controller; After the boiler controller detects the first alarm event, the boiler controller determines whether the first alarm event is recorded in the association control table; If the boiler controller determines that the first alarm event is recorded in the association control table, the boiler controller determines a first action command and a second action command associated with the first alarm event based on the association control table; The boiler controller sends the first action command to the gas boiler, so that the gas boiler performs a first action based on the first action command; After the boiler controller sends the first action command to the gas boiler, the boiler controller waits for a first predetermined time, wherein the first predetermined time is recorded in the association control table; After the boiler controller waits for a first predetermined time, the boiler controller sends the second action command to the gas boiler, so that the gas boiler performs a second action based on the second action command.

2. The intelligent control method according to claim 1, wherein: The intelligent control method further comprises: After the boiler controller sends the second action command to the gas boiler, the boiler controller monitors a second alarm event or a third alarm event, wherein the second alarm event and the third alarm event are recorded in the association control table; If the boiler controller detects the second alarm event, the boiler controller increases the first predetermined time to obtain a second predetermined time; The boiler controller replaces the first scheduled time in the associated control table with the second scheduled time.

3. The intelligent control method according to claim 2, wherein: The intelligent control method further comprises: After the boiler controller replaces the first predetermined time in the association control table with the second predetermined time, if the boiler controller detects the first alarm event again, the boiler controller sends the first action command to the gas boiler, so that the gas boiler performs a first action based on the first action command; After the boiler controller sends the first action command to the gas boiler, the boiler controller waits for a second predetermined time; After the boiler controller waits for a second predetermined time, the boiler controller sends the second action command to the gas boiler, so that the gas boiler performs a second action based on the second action command.

4. The intelligent control method according to claim 3, wherein: The intelligent control method further comprises: If the boiler controller detects the third alarm event, the boiler controller reduces the first predetermined time to obtain a third predetermined time; The boiler controller replaces the first scheduled time in the associated control table with the third scheduled time.

5. The intelligent control method according to claim 4, wherein: The intelligent control method further comprises: After the boiler controller replaces the first predetermined time in the association control table with the third predetermined time, if the boiler controller detects the first alarm event again, the boiler controller sends the first action command to the gas boiler, so that the gas boiler performs a first action based on the first action command; After the boiler controller sends the first action command to the gas boiler, the boiler controller waits for a third predetermined time; After the boiler controller waits for a third predetermined time, the boiler controller sends the second action command to the gas boiler, so that the gas boiler performs a second action based on the second action command.

6. An intelligent control device for a gas boiler, characterized in that: The intelligent control device includes modules for performing the following operations: monitoring a first alarm event by the boiler controller; After the boiler controller detects the first alarm event, the boiler controller determines whether the first alarm event is recorded in the association control table; If the boiler controller determines that the first alarm event is recorded in the association control table, the boiler controller determines a first action command and a second action command associated with the first alarm event based on the association control table; The boiler controller sends the first action command to the gas boiler, so that the gas boiler performs a first action based on the first action command; After the boiler controller sends the first action command to the gas boiler, the boiler controller waits for a first predetermined time, wherein the first predetermined time is recorded in the association control table; After the boiler controller waits for a first predetermined time, the boiler controller sends the second action command to the gas boiler, so that the gas boiler performs a second action based on the second action command.

7. The intelligent control device according to claim 6, wherein: The intelligent control device also includes a module for performing the following operations: After the boiler controller sends the second action command to the gas boiler, the boiler controller monitors a second alarm event or a third alarm event, wherein the second alarm event and the third alarm event are recorded in the association control table; If the boiler controller detects the second alarm event, the boiler controller increases the first predetermined time to obtain a second predetermined time; The boiler controller replaces the first scheduled time in the associated control table with the second scheduled time.

8. The intelligent control device according to claim 7, wherein: The intelligent control device also includes a module for performing the following operations: After the boiler controller replaces the first predetermined time in the association control table with the second predetermined time, if the boiler controller detects the first alarm event again, the boiler controller sends the first action command to the gas boiler, so that the gas boiler performs a first action based on the first action command; After the boiler controller sends the first action command to the gas boiler, the boiler controller waits for a second predetermined time; After the boiler controller waits for a second predetermined time, the boiler controller sends the second action command to the gas boiler, so that the gas boiler performs a second action based on the second action command.

9. The intelligent control device according to claim 8, wherein: The intelligent control device also includes a module for performing the following operations: If the boiler controller detects the third alarm event, the boiler controller reduces the first predetermined time to obtain a third predetermined time; The boiler controller replaces the first scheduled time in the associated control table with the third scheduled time.

10. The intelligent control device according to claim 9, wherein: The intelligent control device also includes a module for performing the following operations: After the boiler controller replaces the first predetermined time in the association control table with the third predetermined time, if the boiler controller detects the first alarm event again, the boiler controller sends the first action command to the gas boiler, so that the gas boiler performs a first action based on the first action command; After the boiler controller sends the first action command to the gas boiler, the boiler controller waits for a third predetermined time; After the boiler controller waits for a third predetermined time, the boiler controller sends the second action command to the gas boiler, so that the gas boiler performs a second action based on the second action command.