Power module and inverter integrated test device and test method

By designing an integrated test device, the pressure drop test part and flow test part of the profile frame and test unit are used to solve the problem of time-consuming and inaccurate results of traditional test methods, and the efficient and accurate voltage drop of power modules and inverters are achieved. Tested to suit a variety of product specifications.

CN118913658APending Publication Date: 2024-11-08BORGWARNER DRIVE SYST (SUZHOU) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411163885.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2024-05-30
Filing Date
2024-08-23
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The traditional power module and inverter voltage drop testing method requires replacement of multiple components, which takes a long time and errors, resulting in inaccurate test results.

Method used

An integrated testing device for power module and inverter is designed, including a profile frame, a pressure drop test section and a flow test section. It uses a differential pressure transformer inverter and flowmeter to realize through the installation station and test unit on the profile frame. Pressure drop test of multi-module units reduces component replacement and improves testing efficiency and accuracy.

Benefits of technology

The voltage drop test of power modules and inverters is achieved with fewer components, reducing maintenance time and cost, improving the accuracy of test results and equipment flexibility, and is suitable for products of different specifications and models.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118913658A_ABST
    Figure CN118913658A_ABST
Patent Text Reader

Abstract

The invention relates to a power module and inverter integrated testing device and method, and the device comprises a profile frame which is provided with a power module installation station and an inverter installation station; the test unit is installed on the profile frame and comprises a pressure drop test part and a flow test part, the pressure drop test part is configured to form a test loop with the power module installed on the power module installation station or the inverter installed on the inverter installation station, and the flow test part is configured to form a flow test loop with the power module installed on the power module installation station or the inverter installed on the inverter installation station. The flow testing part is configured to be communicated with the power module or the inverter and detect the flow of liquid flowing into the power module or the inverter. Compared with the prior art, the device has the advantages of being convenient to install and maintain, wide in application range and the like.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of voltage drop testing, and in particular to a power module and inverter integrated testing device and testing method. Background Art

[0002] The inverter is the core component of electric and hybrid vehicles, responsible for current conversion and vehicle control. The power module, as a key component inside the inverter, is located between the DC bus and the three-phase AC bus. It can not only realize the conversion between DC and AC, but also has the functions of regulating, protecting and monitoring the power supply. As new energy vehicles develop towards high power and miniaturization, the accuracy requirements for the structural design of inverters and power modules are becoming more and more stringent, especially in the simulation of flow channel pressure drop. Flow channel pressure drop simulation is crucial for evaluating and optimizing the performance of the cooling system. It directly affects the thermal management efficiency of the power module, which in turn determines the reliability and life of the entire power system.

[0003] The voltage drop test method for power modules and inverters is mainly to simulate the pressure drop caused by the density and viscosity of a specific coolant under preset flow and temperature conditions. However, traditional test equipment and test fixtures can often only measure a single module. If a new module is to be tested, more parts need to be replaced. This method is usually time-consuming and there may be errors in the process of replacing equipment. There are no control variables, which will lead to deviations in the results. Summary of the invention

[0004] The purpose of the present invention is to provide a power module and inverter integrated test device and test method in order to overcome the defects of the above-mentioned prior art. The present invention only requires fewer components to complete the voltage drop test of the power module and inverter, and the test results are accurate.

[0005] The purpose of the present invention can be achieved by the following technical solutions:

[0006] The present invention provides a power module and inverter integrated testing device and testing method, comprising:

[0007] Profile rack, with power module installation stations and inverter installation stations arranged;

[0008] And a test unit installed on the profile frame, which includes a pressure drop test part and a flow test part, the pressure drop test part is configured to form a test loop with the power module installed on the power module installation station or the inverter installed on the inverter installation station, and the flow test part is configured to: connect to the power module or the inverter and detect the liquid flow flowing into the power module or the inverter.

[0009] Furthermore, the voltage drop testing part includes a differential pressure inverter installed on a profile frame, and the differential pressure inverter has a pressure change test interface that forms a test loop with the power module or inverter. The pressure change test interface is divided into two and is respectively connected to the power module or inverter through a test pipeline to form a test loop.

[0010] Furthermore, the flow testing unit includes a flow meter installed on the profile frame, and the flow meter is configured to test the liquid flow when the liquid flows into the power module or the inverter.

[0011] Furthermore, the flow testing unit also includes a flow meter base installed on the profile frame and used to install the flow meter, and a three-way valve connected to the flow meter base, and the three-way valve is configured to respectively connect the external water inlet, the flow meter, and the power module or inverter.

[0012] Further, the power module installation station includes a base plate installed on the profile frame, and a first water-passing seat arranged on the base plate;

[0013] The bottom plate is provided with two temperature sensor interfaces on both sides of its length direction;

[0014] A power module is installed on the first water seat, and both ends of the first water seat are connected to the pressure drop test part to form a test loop. The bottom of the first water seat is connected to a water inlet pipe and a water outlet pipe passing through the bottom plate, and the water inlet pipe is connected to the flow test part.

[0015] Furthermore, first pagoda joints are provided at both ends of the first water-passing seat, and the first pagoda joints are connected to the pressure drop testing part.

[0016] Furthermore, two clamping members are distributed at both ends of the upper surface of the first water-passing seat;

[0017] The clamping member comprises a quick clamp base mounted on the upper surface of the first water-passing seat, a quick clamp connected to the quick clamp base, and a pressure head connected to the quick clamp;

[0018] A positioning pin for positioning is also provided between the two clamping members.

[0019] Further, the inverter installation station includes two second water-passing seats installed on the profile frame, and the second water-passing seats have a second pagoda joint connected to the voltage drop test part, and two connection ports;

[0020] The second water-passing seat is configured such that when the second pagoda connector is connected to the voltage drop test part, the voltage drop test part, the second water-passing seat, an external inverter, another second water-passing seat, and the voltage drop test part are sequentially connected through the connection port to form the test loop;

[0021] The connection port is connected to the flow testing part or connected to the inverter or is used for water outlet.

[0022] Furthermore, the profile frame comprises an extension frame and a main frame, the power module installation station and the inverter installation station are installed on the main frame, and the test unit is installed on the extension frame.

[0023] The present invention also provides a testing method, which is performed by using the above-mentioned testing device, and is characterized in that the method comprises the following steps:

[0024] A coolant is introduced, and the coolant flows through the flow meter base, the water inlet pipe, the first water outlet seat, the power module, the water outlet pipe, or flows through the flow meter base, the second water outlet seat, the inverter, and another second water outlet seat;

[0025] Wherein, the flow meter tests the flow passing through the flow meter base, and the differential pressure inverter tests the pressure drop change of the test loop.

[0026] Compared with the prior art, the present invention has the following beneficial effects:

[0027] 1. The present invention is easy to install and maintain, and when a fault occurs, the faulty parts can be replaced in time, which reduces maintenance time and maintenance costs.

[0028] 2. The present invention has a wide range of applications. As a test device for power modules and inverters, the versatility of the device is reflected in its ability to adapt to products of various specifications and models. It can be easily adapted and tested by simply replacing the tooling without replacing the flow meter, pressure gauge, etc. This design greatly improves the flexibility and practicality of the device and meets the changing test requirements.

[0029] 3. The present invention can improve efficiency and accuracy. The present invention can quickly and accurately compare the pressure drop performance of different products, thereby optimizing product design and ensuring that the final product can accurately meet the specific design requirements. Through efficient testing processes and accurate data collection, the accuracy of simulation results can be significantly improved, thereby providing high-quality products. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 It is a schematic diagram of the structure of a testing device for testing a power module in an embodiment of the present invention.

[0031] Figure 21 is a front view of the clamping member of the testing device in the embodiment of the present invention.

[0032] Figure 3 FIG. 1 is a top view of the bottom plate of the testing device in an embodiment of the present invention.

[0033] Figure 4 It is a structural schematic diagram of a test device for testing an inverter in an embodiment of the present invention.

[0034] Numbers in the figure:

[0035] 100-profile rack;

[0036] 110-power module installation station, 111-bottom plate, 112-first water-passing seat, 113-water inlet pipe, 114-water outlet pipe, 115-first pagoda joint, 116-temperature sensor interface, 117-clamping piece, 1171-quick clamp base, 1172-quick clamp, 1173-pressure head, 118-positioning pin;

[0037] 120-Inverter installation station, 121-Second water supply seat, 122-Second pagoda connector, 123-Connection port

[0038] 130- extension rack;

[0039] 140-main frame;

[0040] 200-test unit;

[0041] 210-voltage drop test unit, 211-differential voltage inverter, 212-voltage transformer test interface

[0042] 220-flow test unit, 221-flow meter, 222-flow meter base, 223-three-way valve. DETAILED DESCRIPTION

[0043] The present invention is described in detail below in conjunction with the accompanying drawings and specific embodiments. This embodiment is implemented based on the technical solution of the present invention, and provides a detailed implementation method and specific operation process, but the protection scope of the present invention is not limited to the following embodiments.

[0044] Features such as component models, material names, connection structures, control methods, etc. that are not clearly stated in this technical solution shall be deemed as common technical features disclosed in the prior art.

[0045] In the description of the present invention, it is necessary to understand that the terms "upper", "lower", "vertical", "horizontal", "top", "bottom" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0046] In the description of the present invention, "multiple" means two or more than two, unless otherwise specifically defined. In addition, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integrated connection; it can be a bolt connection or a welding connection; it can be directly connected, or indirectly connected through an intermediate medium, or it can be the internal communication of two components. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0047] Traditional voltage drop test equipment can often only test a single power module or a single inverter. If it is necessary to test the power module and the inverter at the same time, more components need to be replaced. This method is usually time-consuming and may cause errors in the equipment replacement process. There are no controlled variables, which will lead to deviations in the results.

[0048] Based on this, Figures 1 to 4 As shown, an embodiment of the present application provides a power module and inverter integrated test device, including a profile frame 100 and a test unit 200 installed on the profile frame 100, wherein the profile frame 100 is arranged with a power module installation station 110 and an inverter installation station 120, the power module is installed on the power module installation station 110, and the inverter is installed on the inverter installation station 120, the test unit 200 includes a voltage drop test part 210 and a flow test part 220, the voltage drop test part 210 is configured to form a test loop with the power module installed on the power module installation station 110 or the inverter installed on the inverter installation station 120, respectively, and the flow test part 220 is configured to: connect the power module or the inverter and detect the liquid flow flowing into the power module or the inverter.

[0049] When testing the power module, it is only necessary to connect the flow test section 220 with the inverter, and at the same time connect the voltage drop test section 210 with the inverter to form a test loop.

[0050] When testing the inverter, it is only necessary to connect the flow test part 220 to the inverter, and at the same time connect the voltage drop test part 210 to the inverter to form a test loop.

[0051] In some embodiments, see also Figure 1 As shown, the voltage drop test part 210 includes a differential pressure inverter 211 installed on the profile frame 100, and the differential pressure inverter 211 has a pressure change test interface 212 that forms a test loop with the power module or inverter. The pressure change test interface 212 is divided into two and is respectively connected to the power module or inverter through a test pipeline to form a test loop. Specifically, the pressure change test interface 212 is respectively connected to the two ends of the power module or the two ends of the inverter. When the coolant passes through the inverter, the pressure is fed back through the pressure change test interface 212 at both ends of the differential pressure inverter 211 to obtain the pressure change.

[0052] In some embodiments, see also Figure 1 or Figure 4 As shown, the flow testing unit 220 includes a flow meter 221 installed on the profile frame 100 , and the flow meter 221 is configured to test the liquid flow when the liquid flows into the power module or the inverter.

[0053] For more specific implementations, please refer to Figure 1 or Figure 4 As shown, the flow testing unit 220 also includes a flow meter base 222 installed on the profile frame 100, and a three-way valve 223 connected to the flow meter base 222, and the three-way valve 223 is configured to connect the external water, the flow meter 221, and the power module or inverter respectively.

[0054] In the above technical solution, one of the three interfaces of the three-way valve 223 is connected to the external water inlet pipe, another is connected to the flow meter 221, and another is connected to the power module or the inverter. When the power module needs to be tested, the power module is connected, and when the inverter needs to be tested, the inverter is connected. In addition, the flow meter 221 is used to detect the flow rate of the coolant flowing into the device to determine whether it meets the required flow parameters.

[0055] When testing the power module, in some embodiments, please refer to Figure 1 , Figure 2 and Figure 3 As shown, the power module installation station 110 includes a bottom plate 111 installed on the profile frame 100, and a first water-passing seat 112 arranged on the bottom plate 111;

[0056] The bottom plate 111 is provided with two temperature sensor interfaces 116 on both sides of its length direction;

[0057] A power module is installed on the first water-passing seat 112 , and both ends of the first water-passing seat 112 are connected to the pressure drop test part 210 to form a test loop. The bottom of the first water-passing seat 112 is connected to a water inlet pipe 113 and a water outlet pipe 114 passing through the bottom plate 111 , and the water inlet pipe 113 is connected to the flow test part 220 .

[0058] For more specific implementations, please refer to Figure 1 , Figure 2 and Figure 3 As shown, first pagoda joints 115 are further provided at both ends of the first water-passing seat 112 , and the first pagoda joints 115 are connected to the pressure drop testing part 210 .

[0059] In the above technical solution, when the first water seat 112 and the base plate 111 are assembled, it is necessary to reserve a water hole at the bottom of the first water seat 112 and a hole in the base plate 111, and the two holes are aligned to ensure water entering the first water seat 112. During operation, the power module is installed on the first water seat 112, and the water inlet pipe 113 is connected to the flow testing part 220. Specifically, the water inlet pipe 113 is connected to the three-way valve 223, and the coolant flows into the water inlet pipe 113 from the three-way valve 223, and then flows into the first water seat 112 from the water inlet pipe 113, and then flows out from the first water seat 112 to the water outlet pipe 114.

[0060] The fixing of the power module is further described. The power module is installed on the first water-passing seat 112. The first water-passing seat 112 is the power module water-passing group. In some embodiments, two clamping members 117 are distributed at both ends of the upper surface of the first water-passing seat 112.

[0061] The clamping member 117 includes a quick clamp base 1171 installed on the upper surface of the first water-passing seat 112, a quick clamp 1172 connected to the quick clamp base 1171, and a pressure head 1173 connected to the quick clamp 1172;

[0062] A positioning pin 118 for positioning is also provided between the two clamping members 117 .

[0063] Specifically, the positioning pin 118 positions the power module and the first water-passing seat 112 for assembly, and the clamping member is used to clamp the power module, specifically, the power module is clamped by the pressure head 1173 .

[0064] When testing the inverter, in some implementations, please refer to Figure 4 As shown, the inverter installation station 120 includes two second water-passing seats 121 installed on the profile frame 100, and the second water-passing seats 121 have a second pagoda connector 122 connected to the voltage drop test part 210, and two connection ports 123;

[0065] The second water-passing seat 121 is configured such that when the second pagoda connector 122 is connected to the voltage drop test unit 210, the voltage drop test unit 210, the second water-passing seat 121, the external inverter, another second water-passing seat 121, and the voltage drop test unit 210 are sequentially connected through the connection port 123 to form the test loop;

[0066] The connection port 123 is connected to the flow testing unit 220 or the inverter or is used for water discharge.

[0067] In some embodiments, see also Figure 1 As shown, the specific positions of the power module installation station 110 and the inverter installation station 120 are specifically detailed. The profile frame 100 has an extension frame 130 and a main frame 140. The power module installation station 110 and the inverter installation station 120 are installed on the main frame 140, and the test unit 200 is installed on the extension frame 130.

[0068] The present application also provides a testing method, which is performed by the above-mentioned testing device, and the method includes the following steps:

[0069] A coolant is introduced, and the coolant flows through the flow meter base 222, the water inlet pipe 113, the first water seat 112, the power module, the water outlet pipe 114, or flows through the flow meter base 222, the second water seat 121, the inverter, and another second water seat 121;

[0070] The flow meter 221 tests the flow through the flow meter base 222 , and the differential pressure inverter 211 tests the pressure drop change of the test loop.

[0071] The above implementation is described in more detail below in conjunction with specific examples.

[0072] Example

[0073] This embodiment provides a power module and inverter integrated test device. For specific structure, please refer to Figures 1 to 4As shown, it includes a profile frame 100 and a test unit 200. The profile frame 100 is arranged with a power module installation station 110 and an inverter installation station 120. The profile frame 100 has an extension frame 130 and a main frame 140. The power module installation station 110 and the inverter installation station 120 are installed on the main frame 140, and the test unit 200 is installed on the extension frame 130. The test unit 200 includes a pressure drop test part 210 and a flow test part 220. The pressure drop test part 210 is configured to form a test loop with the power module installed on the power module installation station 110 or the inverter installed on the inverter installation station 120, respectively. The flow test part 220 is configured to connect the power module or the inverter and detect the liquid flow flowing into the power module or the inverter.

[0074] Specifically, the pressure drop test unit 210 includes a differential pressure inverter 211 and a pressure change test interface 212. The differential pressure inverter 211 is installed on the profile frame 100. The pressure change test interface 212 is arranged on the differential pressure inverter 211. The pressure change test interface 212 forms a test loop with the power module or inverter. The pressure change test interface 212 is divided into two and is respectively connected to the power module or inverter through a test pipeline to form a test loop. The flow test unit 220 includes a flow meter 221, a flow meter base 222, and a three-way valve 223. The flow meter 221 is installed on the profile frame 100. The flow meter 221 is configured to test the liquid flow when the liquid flows into the power module or inverter. The flow meter base 222 is installed on the profile frame 100. The three-way valve 223 is connected to the flow meter base 222. The three-way valve 223 is configured to connect the external water inlet, the flow meter 221, and the power module or inverter respectively.

[0075] In addition, the power module installation station 110 includes a base plate 111 and a first water-passing seat 112. The base plate 111 is installed on the profile frame 100. The first water-passing seat 112 is arranged on the base plate 111. The base plate 111 is provided with two temperature sensor interfaces 116 on both sides of its length direction. The power module is installed on the first water-passing seat 112. Both ends of the first water-passing seat 112 are connected to the pressure drop test part 210 to form a test loop. The bottom of the first water-passing seat 112 is connected to a water inlet pipe 113 and a water outlet pipe 114 that pass through the base plate 111. The water inlet pipe 113 is connected to the flow The first water-passing seat 112 is connected to the pressure test part 220, and first pagoda joints 115 are provided at both ends of the first water-passing seat 112. The first pagoda joints 115 are connected to the pressure drop test part 210. Two clamping members 117 are distributed at both ends of the upper surface of the first water-passing seat 112; the clamping member 117 includes a quick clamp base 1171 installed on the upper surface of the first water-passing seat 112, a quick clamp 1172 connected to the quick clamp base 1171, and a pressure head 1173 connected to the quick clamp 1172; a positioning pin 118 for positioning is also provided between the two clamping members 117.

[0076] Specifically, the inverter installation station 120 includes two second water seats 121, which are installed on the profile frame 100. The second water seat 121 has a second pagoda joint 122 connected to the voltage drop test part 210, and two connecting ports 123. The second water seat 121 is configured as follows: when the second pagoda joint 122 is connected to the voltage drop test part 210, the voltage drop test part 210, the second water seat 121, the external inverter, another second water seat 121, and the voltage drop test part 210 are connected in sequence through the connecting port 123 to form a test loop, and the connecting port 123 is connected to the flow test part 220 or the inverter or is used for water discharge.

[0077] The working principle of this embodiment is as follows:

[0078] During operation, coolant with a predetermined flow rate and temperature is introduced through the machine water tank, and the coolant first flows into the three-way valve 223, and the flow meter 221 detects the flowing coolant to confirm whether it meets the required flow parameters.

[0079] When measuring power module voltage drop, refer to Figures 1 to 3 The coolant first flows into the three-way valve 223, then flows into the water inlet pipe 113 at the bottom of the first water-passing seat 121 through the three-way valve 223, then flows through the power module clamped by the clamping assembly, and finally is discharged from the water outlet pipe 114 at the bottom of the first water-passing seat 121, and re-enters the circulation system of the machine water tank equipment. In this process, the pressure difference generated when the coolant passes through the power module is transmitted to the differential pressure transmitter 211 through the first pagoda connector 122 located at both ends of the first water-passing seat 121. The value displayed on the differential pressure transmitter 211 reflects the specific data of the pressure difference. At the same time, the temperature sensor is connected to the temperature sensor interface 116, and the displayed value represents the temperature of the coolant when it enters and leaves the power module.

[0080] When measuring inverter voltage drop, refer to Figure 4 The coolant first flows into the three-way valve 223, then flows into the connection port 123 of one of the second water-passing seats 121 through the three-way valve 223, and then flows into the water inlet of the inverter to be tested from the other connection port 123 of the second water-passing seat 121, flows through the inverter water channel, flows into the connection port 123 of another second water-passing seat 121 from the inverter water channel outlet, and finally flows out of the second water-passing seat 121 and re-enters the circulation system of the machine water tank equipment. During the test, when the coolant flows through the second water-passing seat 121, the second pagoda connector 122 located at the second water-passing seat 121 transmits pressure to the differential pressure transmitter 211, reflecting the pressure drop of the inverter to be tested during the measurement process.

[0081] Example 2

[0082] This embodiment provides a testing method, which is performed using the testing device in Embodiment 1, and the method includes the following steps:

[0083] The coolant is introduced, and the coolant flows through the flow meter base 222, the water inlet pipe 113, the first water seat 112, the power module, the water outlet pipe 114, or flows through the flow meter base 222, the second water seat 121, the inverter, and another second water seat 121;

[0084] The flow meter 221 tests the flow through the flow meter base 222 , and the differential pressure inverter 211 tests the pressure drop change of the test loop.

[0085] The above description of the embodiments is to facilitate the understanding and use of the invention by those skilled in the art. It is obvious that those skilled in the art can easily make various modifications to these embodiments and apply the general principles described herein to other embodiments without creative work. Therefore, the present invention is not limited to the above embodiments, and improvements and modifications made by those skilled in the art based on the disclosure of the present invention without departing from the scope of the present invention should be within the scope of protection of the present invention.

Claims

1. A power module and inverter integrated test device, characterized in that: include: A profile frame (100) is provided with a power module installation station (110) and an inverter installation station (120); and a test unit (200) installed on the profile frame (100), comprising a pressure drop test section (210) and a flow test section (220), wherein the pressure drop test section (210) is configured to form a test loop with a power module installed on the power module installation station (110) or an inverter installed on the inverter installation station (120), and the flow test section (220) is configured to connect to the power module or the inverter and detect the flow of liquid flowing into the power module or the inverter.

2. A power module and inverter integrated test device according to claim 1, characterized in that: The voltage drop test section (210) comprises a differential pressure inverter (211) mounted on a profile frame (100), the differential pressure inverter (211) having a pressure change test interface (212) forming a test loop with the power module or inverter, the pressure change test interface (212) being divided into two and respectively connected to the power module or inverter through a test pipeline to form a test loop.

3. A power module and inverter integrated test device according to claim 1, characterized in that: The flow testing section (220) comprises a flow meter (221) mounted on the profile frame (100), and the flow meter (221) is configured to test the flow rate of the liquid when the liquid flows into the power module or the inverter.

4. A power module and inverter integrated test device according to claim 3, characterized in that: The flow testing unit (220) further comprises a flow meter base (222) mounted on the profile frame (100) and used for mounting a flow meter (221), and a three-way valve (223) connected to the flow meter base (222), wherein the three-way valve (223) is configured to respectively connect external water inlet, the flow meter 221, and the power module or inverter.

5. A power module and inverter integrated test device according to claim 1, characterized in that: The power module installation station (110) comprises a base plate (111) installed on the profile frame (100), and a first water passing seat (112) arranged on the base plate (111); The bottom plate (111) is provided with two temperature sensor interfaces (116) on both sides in the length direction thereof; A power module is installed on the first water-passing seat (112); two ends of the first water-passing seat (112) are connected to the pressure drop test section (210) to form a test loop; a water inlet pipe (113) and a water outlet pipe (114) passing through the bottom plate (111) are connected at the bottom of the first water-passing seat (112); and the water inlet pipe (113) is connected to the flow test section (220).

6. A power module and inverter integrated test device according to claim 5, characterized in that: First pagoda joints (115) are also provided at both ends of the first water-passing seat (112), and the first pagoda joints (115) are connected to the pressure drop test part (210).

7. A power module and inverter integrated test device according to claim 5, characterized in that: Two clamping members (117) are distributed at both ends of the upper surface of the first water-passing seat (112); The clamping member (117) comprises a quick clamp base (1171) mounted on the upper surface of the first water-passing seat (112), a quick clamp (1172) connected to the quick clamp base (1171), and a pressure head (1173) connected to the quick clamp (1172); A positioning pin (118) for positioning is also provided between the two clamping members (117).

8. A power module and inverter integrated test device according to claim 1, characterized in that: The inverter installation station (120) comprises two second water-passing seats (121) installed on the profile frame (100), and the second water-passing seats (121) are provided with a second pagoda joint (122) connected to the voltage drop test part (210), and two connection ports (123); The second water-passing seat (121) is configured such that when the second pagoda connector (122) is connected to the voltage drop test unit (210), the voltage drop test unit (210), the second water-passing seat (121), an external inverter, another second water-passing seat (121), and the voltage drop test unit (210) are sequentially connected through the connection port (123) to form the test loop; The connection port (123) is in communication with the flow testing unit (220) or with the inverter or is used for water discharge.

9. A power module and inverter integrated test device according to claim 1, characterized in that: The profile frame (100) comprises an extension frame (130) and a main frame (140); the power module installation station (110) and the inverter installation station (120) are installed on the main frame (140); and the test unit (200) is installed on the extension frame (130).

10. A testing method, performed by using the testing device according to any one of claims 1 to 9, characterized in that: The method comprises the following steps: A coolant is introduced, wherein the coolant flows through the flow meter base (222), the water inlet pipe (113), the first water outlet seat (112), the power module, and the water outlet pipe (114), or flows through the flow meter base (222), the second water outlet seat (121), the inverter, and another second water outlet seat (121); The flow meter (221) tests the flow passing through the flow meter base (222), and the differential pressure inverter (211) tests the pressure drop change of the test loop.