Icing type control method used in icing test

By setting the humidity and temperature in the test chamber, using circulating fans and background fans, the air supply and water supply pressure of the spray nozzle is accurately controlled, and the problem of unstable test conditions in the ice-covered test of large test pieces is solved, and the ice-covered type is achieved accurate control and reliability of test results.

CN118913735AActive Publication Date: 2024-11-08HARBIN INST OF TECH

Patent Information

Application Number
CN202410950313.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-16
Publication Date
2024-11-08
Estimated Expiration
2044-07-16

AI Technical Summary

Technical Problem

The existing spray icing test system cannot meet the ice covering needs of large test pieces, resulting in uneven stability of test conditions and ice covering effect, and it is impossible to accurately control the various parameters affecting icing.

Method used

A method of ice-covering type control is designed, including setting the humidity and temperature in the test chamber, using circulating fans and background fans to simulate climatic conditions in the real environment, and adjusting the spray nozzle by precisely controlling the air supply and water supply pressure of the spray nozzle. Particle size and spray rate ensure the reliability and accuracy of test results.

Benefits of technology

This method can accurately simulate the ice covering of large test pieces under different climatic conditions, improve the reliability and accuracy of test results, meet the ice covering test requirements of large test pieces, and ensure the accuracy and controllability of spray operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118913735A_ABST
    Figure CN118913735A_ABST
Patent Text Reader

Abstract

The invention discloses an icing type control method used in an icing test, and relates to the technical field of icing. The problem of accurately simulating an icing test of a large test piece is solved. The method comprises the following steps: setting the humidity in a test chamber, starting a demister, operating a circulating fan, and introducing low-humidity air; setting the temperature in the test chamber, starting cooling equipment, operating a circulating fan, and introducing low-temperature air; when the temperature reaches a set value, setting the frequency of a background fan, starting the background fan, and providing spraying background wind; air supply pressure is set, main air supply and secondary air supply are started, and compressed air is sprayed out through a nozzle; water supply pressure is set, main water supply and secondary water supply are started, low-temperature ultrapure water is conveyed, and spraying is started; after the test is finished, closing the water supply pressure, the water path valve, the air supply pressure and the air path valve, and stopping spraying; maintaining the set temperature and reinforcing the ice layer on the surface of the test piece; and after the icing test is finished, turning off the electric equipment. The method is used for evaluating the icing performance of the large test piece in the cold environment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of icing, and in particular to an icing type control method used in an icing test. Background Art

[0002] Icing is a complex phase change heat transfer process with many influencing parameters, including ambient temperature and humidity, air flow speed and direction, liquid water content in the cloud environment, and particle size distribution of supercooled droplets. Icing can be classified into three categories: frost accumulation, precipitation ice, and cloud ice. Cloud ice includes clear ice, frost ice, and mixed ice: different types of ice are easily formed under different cloud parameters and low ambient temperatures. When conducting icing tests, in order to ensure the repeatability of the test results, it is necessary to accurately control the main influencing factors that affect the experimental results.

[0003] The existing patent CN210953884U discloses a spray icing test system based on the Bernoulli effect in a low-temperature environment, specifically disclosing a low-temperature test box with a built-in test sample, an atomizing spray device arranged in the low-temperature test box for uniformly spraying the test sample, an air pressure control device connected to the atomizing spray device for controlling the pressure of the spray, and a water supply device connected to the atomizing spray device for supplying low-temperature water; the temperature in the low-temperature test box is below 0°C, and the temperature of the low-temperature water is close to 0°C; the atomizing spray device includes a nozzle rack, and a plurality of atomizing nozzles connected to the nozzle rack, the test sample is fixed in the nozzle rack, and the plurality of atomizing nozzles are evenly distributed around the test sample and equidistant from the center of the test sample.

[0004] Although patent CN210953884U provides a spray icing test system, its design is mainly limited to the application of small test pieces. The scale of this system is relatively small and cannot meet the needs of ice coating tests on the surfaces of large test pieces. In practical applications, large test pieces require larger test spaces to ensure the accuracy and reliability of the tests due to their size and weight. Therefore, the existing spray icing test system cannot be directly applied to ice coating tests on large test pieces. The design parameters and control strategies of small-sized spray icing test systems are usually optimized to accommodate small test pieces. If a large test piece is placed in this system, the stability of the test conditions may be affected. For example, the adjustment of wind speed, humidity, and temperature may not be evenly distributed over the entire surface of the test piece, resulting in uneven icing effects or failure to achieve the expected test results.

[0005] And because there are many parameters that affect the icing effect, these parameters must be precisely controlled during the icing test. For example, the temperature and humidity in the icing test space have a direct impact on the icing speed and ice quality. The airflow speed and direction determine the airflow distribution on the surface of the test piece, thereby affecting the uniformity and morphology of the ice layer. The liquid water content and the particle size distribution of supercooled droplets in the cloud and fog environment are directly related to the rate and degree of icing on the surface of the test piece. These factors are interrelated and influence each other, making the icing test complex and precise.

[0006] In order to accurately simulate these complex parameters and ensure the reliability of the test results, a more advanced and flexible method for controlling the icing type in icing tests is needed. This method can simulate a variety of climate and meteorological conditions in real environments and accurately control various parameters that affect the icing effect. Summary of the invention

[0007] The present invention aims at the problem of accurately simulating an icing test of a large test piece and proposes a method for controlling the icing type in an icing test. The method comprises:

[0008] S1: Set the air humidity in the test chamber, turn on the defogger for dehumidification, and start the circulating fan to introduce low-humidity air from outside the test chamber;

[0009] S2: Set the air temperature in the test chamber, start cooling, and start the circulating fan to introduce low-temperature air from outside the test chamber;

[0010] S3: After the temperature in the test chamber reaches the set temperature, the operating frequency of the background fan is set according to the test requirements, and the background fan is turned on to provide the background wind required by the spray nozzle;

[0011] S4: Set the air supply pressure, open the main air supply and secondary air supply pipelines, and the compressed air generated by the air compressor is ejected through the nozzle;

[0012] S5: After 10 seconds, the nozzle water supply pressure is set, the main water supply and secondary water supply pipelines are opened, and the low-temperature ultrapure water delivered by the water pump is sprayed out through the nozzle to start spraying;

[0013] S6: After the test, the water supply pressure is set to 0 bar, the water valve is closed, and after 10 seconds, the air supply pressure is set to 0 bar, the air valve is closed, and the spraying stops;

[0014] S7: Keep the set temperature unchanged for 30 minutes to strengthen the ice layer on the surface of the test piece;

[0015] S8: After the icing test is completed, turn off the electrical equipment.

[0016] Furthermore, a preferred embodiment is proposed, in which the gas supply pressure is monitored by a pressure transmitter, the monitored value is fed back to a PLC industrial control computer, and the opening value of the electric regulating valve is output after PID calculation.

[0017] Furthermore, a preferred embodiment is proposed, wherein the spray nozzle is selected based on a continuously adjustable side spray rate of 5 to 50 mm / h and a spray particle size of 10 to 50 μm.

[0018] Furthermore, a preferred embodiment is proposed, wherein the test chamber comprises: an induced draft fan, a background fan, an air duct, a honeycomb panel, a spray rack, an exhaust fan and a test piece; the test piece is placed in the inner space of the test chamber, and the spray rack, the air duct, the honeycomb panel, the air duct and the background fan are sequentially installed in front of the test piece, the induced draft fan is installed at the front of the test chamber, the exhaust fan is installed at the rear, and a demister is installed at the rear of the test piece; the induced draft fan and the exhaust fan constitute a circulating fan.

[0019] Furthermore, a preferred embodiment is proposed, in which the circulating fan is controlled by a frequency converter, and a plurality of temperature sensors are used to respectively measure the temperature values ​​of different positions of the test piece, and the average is calculated, and the average is used as the temperature in the test chamber; when the temperature in the test chamber is higher than the set temperature of +1°C, the circulating fan operates at a full frequency of 50Hz; when the temperature in the test chamber is lower than the set temperature of -1°C, the circulating fan operates at a frequency of 30Hz; when the icing test is stopped, the fan stops running.

[0020] Furthermore, a preferred embodiment is proposed, wherein the temperature sensors are four temperature sensors, which respectively measure the temperature values ​​at four positions of the test piece: the left front, the left rear, the right front and the right rear.

[0021] Furthermore, a preferred embodiment is proposed, in which the air supply pipeline adopts a stainless steel hose.

[0022] Furthermore, a preferred embodiment is proposed, wherein the main air supply pipeline is arranged between the air compression system and the spray rack, for conveying all the compressed air required for the spray of the array nozzles, and 7 secondary air supply pipelines are arranged on each layer of the spray rack, for conveying the compressed air required for the spray of the nozzles in one layer of the spray rack; the main water supply pipeline is arranged between the pre-cooling water system and the spray rack, for conveying all the low-temperature ultrapure water required for the spray of the array nozzles, and 7 secondary water supply pipelines are arranged on each layer of the spray rack, for conveying the low-temperature ultrapure water required for the spray of the nozzles in one layer of the spray rack.

[0023] Furthermore, a preferred embodiment is proposed, wherein the air flow rate of the main air supply pipeline is 0.7-2.2 Nm 3 / min, the inner diameter of the main air supply pipe is 40mm.

[0024] Furthermore, a preferred embodiment is proposed, in which the water supply flow rate of the main water supply pipeline is 75.6-820 L / h, and the inner diameter of the main water supply pipeline is 40 mm.

[0025] The present invention is beneficial in that:

[0026] The present invention solves the problem of accurately simulating ice coating tests on large test pieces.

[0027] Icing tests are usually used to simulate the operation of large structures or equipment in cold environments. The icing type control method for icing tests proposed in the present invention can be applied to large test pieces, because it can accurately control parameters such as humidity, temperature and wind speed in the test chamber to meet the specific icing test requirements of large test pieces. By setting the humidity, temperature and background wind control in the test chamber, the method of the present invention can more accurately simulate the climatic conditions in the real environment. Large test pieces often need to be subjected to icing tests under different humidity and temperature conditions to evaluate their cold resistance under various environmental conditions. The method of the present invention can provide more realistic icing conditions for large test pieces and improve the reliability and accuracy of the test results.

[0028] In terms of spray control, the present invention proposes a method for controlling the type of ice coating in an ice coating test, which can accurately adjust the spray process by setting the air and water supply pressures and controlling the jet and water spray volume of the nozzle. Large test pieces usually need to be subjected to ice coating tests under different ice fog densities and particle sizes to evaluate their antifreeze performance to ice fog. The method of the present invention ensures the accuracy and controllability of the spray operation, making the test results more reliable.

[0029] For large test pieces, the formation and stability of the ice layer on the surface are very important to the accuracy of the icing test. After the test, the method of the present invention can better simulate the formation and stability of the ice layer in the actual environment by maintaining the set temperature and continuing the reinforcement operation for 30 minutes. This can provide more reliable data for evaluating the icing performance of large test pieces in cold environments. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 A flow chart of an icing type control method for an icing test according to the first embodiment;

[0031] Figure 2 This is the PID principle diagram described in the second implementation mode;

[0032] Figure 3 This is a schematic diagram of an ice coating test according to Embodiment 4. DETAILED DESCRIPTION

[0033] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments.

[0034] Implementation method 1, see Figure 1 This embodiment describes a method for controlling ice type in an ice test, the method comprising:

[0035] S1: Set the air humidity in the test chamber, turn on the defogger for dehumidification, and start the circulating fan to introduce low-humidity air from outside the test chamber to take away the high-humidity air in the test chamber;

[0036] S2: Set the air temperature in the test chamber, start cooling, and start the circulating fan to introduce low-temperature air from outside the test chamber to take away the normal-temperature air in the test chamber;

[0037] S3: After the temperature in the test chamber reaches the set temperature, the operating frequency of the background fan is set according to the test requirements, and the background fan is turned on to provide the background wind required by the spray nozzle;

[0038] S4: Set the air supply pressure, open the main air supply and secondary air supply pipelines, and the compressed air generated by the air compressor is ejected through the nozzle;

[0039] S5: After 10 seconds, the nozzle water supply pressure is set, the main water supply and secondary water supply pipelines are opened, and the low-temperature ultrapure water delivered by the water pump is sprayed out through the nozzle to start spraying;

[0040] S6: After the test, the water supply pressure is set to 0 bar, the water valve is closed, and after 10 seconds, the air supply pressure is set to 0 bar, the air valve is closed, and the spraying stops;

[0041] S7: Keep the set temperature unchanged for 30 minutes to strengthen the ice layer on the surface of the test piece;

[0042] S8: After the icing test is completed, turn off the electrical equipment.

[0043] The present embodiment is designed to control the type of ice in the ice test. By setting the humidity and temperature in the test chamber, the defogger and cooling equipment are used in steps S1 and S2 to accurately control the climate conditions in the test chamber. In this way, the ice conditions under different humidity and temperature conditions in the real environment can be simulated, and the background fan can be flexibly adjusted according to the test needs. In step S3, the operating frequency of the background fan is set according to the test needs, and the background fan is turned on to provide the background wind required by the nozzle. This can better simulate the wind speed conditions in the actual environment, which is of great significance to the accuracy and reliability of the test results. By setting the air supply and water supply pressures in steps S4 and S5, opening the corresponding air and water circuits, and controlling the jet and water spray of the nozzle, the spray operation is realized. In this way, the spray process in the ice test can be accurately controlled to simulate the actual formation of ice fog. In step S6, the water supply pressure is set to 0 bar, where 0 bar represents the water supply gauge pressure. After 10 seconds, the air supply pressure is set to 0 bar, where 0 bar represents the air supply gauge pressure. In step S7, the set temperature is maintained constant for 30 minutes to strengthen the surface ice layer of the test piece. This can better simulate the formation and stability of the ice layer in the actual environment and provide reliable data for the evaluation of the icing performance of the test. Each step in this method can be implemented by an automated control system, which improves the convenience and stability of the test operation. The automated control system can accurately control the parameter settings and operating status of each step, improving the accuracy and consistency of the test.

[0044] Icing tests are usually used to simulate the operation of large structures or equipment in cold environments. The method provided in this embodiment can be applied to large test pieces because it can accurately control parameters such as humidity, temperature and wind speed in the test chamber to meet the specific icing test requirements of large test pieces. By setting the humidity, temperature and background wind control in the test chamber, the method provided in this embodiment can more accurately simulate the climatic conditions in the real environment. Large test pieces often need to be tested for icing under different humidity and temperature conditions to evaluate their cold resistance under various environmental conditions. The method of this embodiment can provide more realistic icing conditions for large test pieces and improve the reliability and accuracy of the test results. In terms of spray control, the method of this embodiment can accurately adjust the spray process by setting the air supply and water supply pressures, and controlling the jet and water spray volume of the nozzle. Large test pieces usually need to be tested for icing under different ice fog densities and particle sizes to evaluate their antifreeze performance to ice fog. The method of this embodiment ensures the accuracy and controllability of the spray operation, making the test results more reliable.

[0045] For large test pieces, the formation and stability of the ice layer on the surface is very important to the accuracy of the icing test. After the test, the method of this embodiment can better simulate the formation and stability of the ice layer in the actual environment by maintaining the set temperature and continuing the reinforcement operation for 30 minutes. This can provide more reliable data for evaluating the icing performance of large test pieces in cold environments.

[0046] Implementation Method 2: See Figure 2 This embodiment further limits the ice type control method used in ice test described in embodiment 1, wherein the air supply pressure is monitored by a pressure transmitter, and the monitoring value is fed back to the PLC industrial computer, and the electric regulating valve opening value is output after PID calculation.

[0047] Specifically, in this embodiment, a pressure transmitter is first installed to monitor the gas pressure in the gas supply pipeline. The pressure transmitter is a sensor that can convert gas pressure into an electrical signal. The gas pressure value measured by the pressure sensor will be transmitted to the PLC (Programmable Logic Controller) industrial computer. PLC is a computer device used for industrial automation control, with fast processing and logic control capabilities.

[0048] In the PLC industrial computer, the gas pressure value measured by the sensor is calculated and analyzed through the PID (proportional, integral, differential) control algorithm. The PID algorithm can automatically adjust the output signal according to the difference between the current pressure value and the set value. After the PID calculation, the PLC industrial computer will output the opening value of an electric control valve, which is used to control the gas flow. The electric control valve can automatically adjust the opening size according to the PLC instruction to change the gas flow and pressure.

[0049] The corresponding needle-type electric regulating valve is adjusted according to the opening value output by the PLC industrial computer to control the supply pressure of the gas. By changing the opening of the electric regulating valve, the channel area of ​​the valve can be adjusted, thereby changing the flow rate and pressure of the gas. By continuously monitoring the gas pressure, calculating the control opening value, and adjusting the gas supply pressure in real time through the electric regulating valve, it is ensured that the pressure during the test is always kept within the set value range.

[0050] This process can achieve precise control of the air supply pressure to meet the needs of the icing test. In the icing test of large test pieces, the control of the air supply pressure is very important for generating a specific type of ice layer. This embodiment uses a pressure transmitter to monitor the air supply pressure and feeds the monitoring value back to the PLC industrial computer. After PID calculation, the opening value of the electric control valve can be accurately output, thereby accurately controlling the air supply pressure. By using this control method, the stability and consistency of the test conditions can be ensured, thereby obtaining repeatable experimental results.

[0051] Embodiment 3: This embodiment further limits the method for controlling the ice type in an ice test described in embodiment 1, and the spray nozzle is selected based on a continuously adjustable side spray rate of 5 to 50 mm / h and a spray particle size of 10 to 50 μm.

[0052] In the ice coating test of large test pieces, the spray rate is very important for forming a suitable ice layer. The spray nozzle in this embodiment provides a continuously adjustable side spray rate in the range of 5 to 50 mm / h. This means that the test personnel can accurately select the appropriate spray rate according to the test needs and requirements, the characteristics of the large test piece and the target ice layer thickness. By adjusting the spray rate, the predictive growth and control of the ice layer can be achieved, ensuring the accuracy and repeatability of the test.

[0053] In the icing test, the spray particle size is one of the important factors affecting the formation and characteristics of the ice layer. The spray nozzle in this embodiment provides a spray particle size selection range of 10 to 50 μm. By carefully selecting the appropriate spray particle size, the roughness and morphology of the ice layer surface, as well as the structure and performance of the ice layer can be adjusted according to the test requirements. This fine selection of spray particle size can meet the specific requirements of large test pieces and make the test results more accurate and reliable.

[0054] From the perspective of ice coating tests applicable to large test pieces, the further limitations of this embodiment have significant improvements in the rate regulation of the spray nozzle and the selection of the spray particle size. These improvements improve the flexibility, accuracy and controllability of the test, so that the ice coating test of large test pieces can better meet specific research and evaluation needs and produce accurate and repeatable test results. Different nozzles have different spray characteristics, including spray particle size, spray volume, spray cone angle, spray distance, etc. In this embodiment, the BMIJ 7004 air atomizing nozzle produced by Ikenai Co., Ltd. of Japan Mist is selected.

[0055] Implementation method 4: See Figure 3 This embodiment is described. This embodiment is a further limitation of the method for controlling the type of ice in an ice test described in Embodiment 1, wherein the test chamber comprises: an induced draft fan, a background fan, an air duct, a honeycomb panel, a spray rack, an exhaust fan and a test piece; the test piece is placed in the inner space of the test chamber, and the spray rack, the air duct, the honeycomb panel, the air duct and the background fan are sequentially installed in front of the test chamber, an induced draft fan is installed at the front of the test chamber, an exhaust fan is installed at the rear, and a defogger is installed at the rear of the test piece; the induced draft fan and the exhaust fan constitute a circulating fan.

[0056] The design of the test chamber in this embodiment takes into account the placement and operation requirements of large test pieces. The test pieces can be placed in the internal space of the test chamber, which provides sufficient space to accommodate and place large test pieces. Through a reasonable installation sequence and configuration (spray rack, air duct, honeycomb panel, air duct and background fan), appropriate space between the test piece and other test equipment can be ensured, and the test piece can obtain the required icing conditions.

[0057] In this embodiment, the configuration of the induced draft fan, background fan, exhaust fan and other equipment can realize the control and recycling of wind flow. The induced draft fan and exhaust fan form a circulating fan system, the induced draft fan is installed at the front of the test chamber, and the exhaust fan is installed at the rear. Through the circulating fan system, the wind speed and wind direction can be controlled, so that the airflow distribution in the icing test is uniform and controllable, ensuring the repeatability and accuracy of the test.

[0058] The dehumidifier in this embodiment is installed at the rear of the test piece, which can realize humidity control and dehumidification in the test environment. This is very important for humidity condition control in ice test, especially in long-term test, maintaining the stability and constant humidity of the test environment can improve the accuracy and reliability of the test results.

[0059] Implementation method five. This implementation method is a further limitation of the icing type control method for icing test described in implementation method one. The circulating fan is controlled by a frequency converter, and multiple temperature sensors are used to measure the temperature values ​​of different positions of the test piece, and the average is calculated, and the average is used as the temperature in the test chamber; when the temperature in the test chamber is higher than the set temperature +1°C, the circulating fan runs at a full frequency of 50Hz; when the temperature in the test chamber is lower than the set temperature -1°C, the circulating fan runs at a frequency of 30Hz; when the icing test is stopped, the fan stops running.

[0060] In this embodiment, multiple temperature sensors are used to measure the temperature values ​​of different positions of the test piece, and the average value is used as the temperature in the test chamber. In this way, the temperature in the test chamber can be monitored more accurately, and the operating frequency of the circulating fan can be adjusted in real time. In this embodiment, a frequency converter is used to control the operating frequency of the circulating fan. When the temperature in the test chamber is higher than the set temperature +1°C, the circulating fan runs at a full frequency of 50Hz to provide sufficient cooling effect. When the temperature in the test chamber is lower than the set temperature -1°C, the circulating fan runs at a frequency of 30Hz to avoid overcooling. This precise temperature control can maintain the stability of the test environment and ensure the accuracy of the test results. By adjusting the operating frequency of the circulating fan according to the change of the temperature in the test chamber, this embodiment can optimize energy consumption. When the temperature in the test chamber is lower than the set temperature -1°C, reducing the fan operating frequency can reduce energy consumption and improve energy efficiency.

[0061] Embodiment 6. This embodiment is a further limitation of the method for controlling the ice type in an ice test described in embodiment 5. The temperature sensors are four temperature sensors, which respectively measure the temperature values ​​of the test piece at the left front, left rear, right front and right rear positions.

[0062] Compared with the fifth embodiment, four temperature sensors are used in this embodiment to measure the temperature values ​​of the left front, left rear, right front and right rear positions of the test piece. This can provide a more comprehensive understanding of the temperature distribution at different positions of the test piece, thereby more accurately controlling the ice type. Especially for large test pieces, there may be large temperature differences in the test chamber. Using multiple sensors can better cover the entire test piece, ensuring the accuracy and stability of the test process.

[0063] By using temperature sensors at four locations, the temperature of the test piece can be measured in real time at different locations and the overall temperature can be calculated. This will help to more accurately determine the temperature of the test piece and adjust the icing method more finely to meet the test requirements. For example, if the temperature at a certain location is high, icing can be strengthened at that location to achieve uniform temperature distribution.

[0064] By monitoring and controlling the temperature at different positions of the test piece, this embodiment can better maintain the stability and uniformity of the test environment. This will help improve the test efficiency and accuracy and ensure the reliability of the test results. In the icing test, accurate temperature control is very critical, especially for large test pieces, because of their large size and slow radiation heat dissipation. The use of temperature sensors at four positions for control makes the icing type more accurate and effective.

[0065] Embodiment 7: This embodiment further limits the method for controlling the icing type in an icing test described in embodiment 1, and the air supply pipeline adopts a stainless steel hose.

[0066] In icing tests, compressed air is usually required to be introduced into the test chamber for spraying, and stainless steel hoses can effectively withstand high pressure and ensure the reliability of the air supply pipeline.

[0067] Embodiment 8. This embodiment is a further limitation of the method for controlling the icing type in an icing test described in Embodiment 5. The air supply pipeline includes a main air supply pipeline and a secondary air supply pipeline. The main air supply pipeline is arranged between the air compression system and the spray rack, and is used to transport all the compressed air required for the spray of the array nozzles. Seven secondary air supply pipelines are arranged on each layer of the spray rack, and are used to transport the compressed air required for the spray of the nozzles in one layer of the spray rack; the main water supply pipeline is arranged between the pre-cooling water system and the spray rack, and is used to transport all the low-temperature ultrapure water required for the spray of the array nozzles. Seven secondary water supply pipelines are arranged on each layer of the spray rack, and are used to transport the low-temperature ultrapure water required for the spray of the nozzles in one layer of the spray rack.

[0068] The main water supply and air supply pipelines in the spray rack are divided into 7 secondary branches, corresponding to each layer of the spray rack, to transport the compressed air and low-temperature ultrapure water required for the spray of each layer of nozzles, which is convenient for maintenance and repair. The connection between the spray rack and the air compression system and the pre-cooling water system uses a main air (water) supply pipeline, which simplifies the connection between the subsystems while meeting the required water and air supply.

[0069] Embodiment 9: This embodiment further defines the method for controlling the icing type in an icing test described in Embodiment 1. The air supply flow rate of the main air supply pipeline is 0.7 to 2.2 Nm 3 / min, the inner diameter of the main air supply pipe is 40mm.

[0070] The air supply pipeline described in this embodiment can provide an air supply flow rate of 13 to 45NL / min. Large test pieces usually require a larger air supply flow rate to ensure sufficient coverage and effect of the icing process. By expanding the air supply flow rate range, this embodiment can meet the requirements of large test pieces for higher air supply needs and provide better test results. The air supply pipeline specification is a British 4-point stainless steel pipe, which is selected based on the size of large test pieces. Large test pieces usually have a large surface area, so a larger air supply channel is required to ensure uniform air supply and consistency of icing effect. By adopting a 4-point pipe, this embodiment can ensure the stability and uniformity of the air supply and provide sufficient ice coverage for large test pieces.

[0071] Embodiment 10: This embodiment further limits the ice type control method for ice test described in embodiment 5. The water supply flow rate of the main water supply pipeline is 75.6-820 L / h, and the inner diameter of the main water supply pipeline is 40 mm.

[0072] The range of water supply flow is determined by multiplying the water flow range of a single nozzle by 42, which can ensure the water flow required for array nozzle spraying. The inner diameter of the main water supply pipe is selected based on the inner diameter of the nozzle water supply 6mm multiplied by It was determined to be about 38.8 mm and then determined to be 40 mm to ensure that there was enough margin to transport the low-temperature ultrapure water for the spray icing test.

[0073] The above further describes in detail the technical solution provided by the present invention in conjunction with the accompanying drawings in order to highlight the advantages and benefits, and is not intended to be a limitation of the present invention. Any modification, combination of implementation modes, improvement and equivalent substitution of the present invention within the spirit and scope of the present invention shall be included in the protection scope of the present invention.

Claims

1. A method for controlling ice type in an ice test, characterized in that: The method comprises: S1: Set the air humidity in the test chamber, turn on the dehumidifier for dehumidification, and start the circulating fan to introduce low-humidity air from outside the test chamber; S2: Set the air temperature in the test chamber, start cooling, and start the circulating fan to introduce low-temperature air from outside the test chamber; S3: After the temperature in the test chamber reaches the set temperature, the operating frequency of the background fan is set according to the test requirements, and the background fan is turned on; S4: Set the air supply pressure, open the main air supply and secondary air supply pipelines, and the compressed air generated by the air compressor is ejected through the nozzle; S5: After 10 seconds, the nozzle water supply pressure is set, the main water supply and secondary water supply pipelines are opened, and the low-temperature ultrapure water delivered by the water pump is sprayed out through the nozzle to start spraying; S6: After the test, the water supply pressure is set to 0 bar, the water valve is closed, and after 10 seconds, the air supply pressure is set to 0 bar, the air valve is closed, and the spraying stops; S7: Keep the set temperature unchanged for 30 minutes to strengthen the ice layer on the surface of the test piece; S8: After the icing test is completed, turn off the electrical equipment.

2. The method for controlling ice type in an ice test according to claim 1, characterized in that: The gas supply pressure is monitored by a pressure transmitter, and the monitored value is fed back to the PLC industrial computer, and the electric regulating valve opening value is output after PID calculation.

3. The method for controlling ice type in an ice test according to claim 1, characterized in that: The spray nozzle is selected according to a continuously adjustable side spraying rate of 5 to 50 mm / h and a spray particle diameter of 10 to 50 μm.

4. The method for controlling ice type in an ice test according to claim 1, characterized in that: The test chamber comprises: an induced draft fan, a background fan, an air duct, a honeycomb panel, a spray rack, an exhaust fan and a test piece; the test piece is placed in an internal space formed by the test chamber, and the spray rack, the air duct, the honeycomb panel, the air duct and the background fan are sequentially installed in front of the test piece; the induced draft fan is installed at the front of the test chamber, the exhaust fan is installed at the rear, and a defogger is installed at the rear of the test piece; the induced draft fan and the exhaust fan constitute a circulating fan.

5. The method for controlling ice type in an ice test according to claim 1, characterized in that: The circulating fan is controlled by a frequency converter, and multiple temperature sensors are used to measure the temperature values ​​at different positions of the test piece, and the average is calculated, which is used as the temperature in the test chamber; when the temperature in the test chamber is higher than the set temperature +1°C, the circulating fan runs at a full frequency of 50Hz; when the temperature in the test chamber is lower than the set temperature -1°C, the circulating fan runs at a frequency of 30Hz; when the icing test is stopped, the fan stops running.

6. The method for controlling ice type in an ice test according to claim 5, characterized in that: The temperature sensors are four temperature sensors, which respectively measure the temperature values ​​at four positions of the test piece: the left front, the left rear, the right front and the right rear.

7. The method for controlling ice type in an ice test according to claim 1, characterized in that: The air supply pipeline adopts a stainless steel hose.

8. The method for controlling ice type in an ice test according to claim 1, characterized in that: The main air supply pipeline is arranged between the air compression system and the spray rack, and is used to transport all the compressed air required for the spray of the array nozzles. The 7 secondary air supply pipelines are arranged on each layer of the spray rack, and are used to transport the compressed air required for the spray of the nozzles in one layer of the spray rack; the main water supply pipeline is arranged between the pre-cooling water system and the spray rack, and is used to transport all the low-temperature ultrapure water required for the spray of the array nozzles. The 7 secondary water supply pipelines are arranged on each layer of the spray rack, and are used to transport the low-temperature ultrapure water required for the spray of the nozzles in one layer of the spray rack.

9. The method for controlling ice type in an ice test according to claim 1, characterized in that: The air supply flow rate of the air supply pipeline is 0.7-2.2Nm 3 / min, the inner diameter of the main air supply pipe is 40mm.

10. The method for controlling ice type in an ice test according to claim 1, characterized in that: The water supply flow rate of the main water supply pipeline is 75.6-820L / h, and the inner diameter of the main water supply pipeline is 40mm.

Citation Information

Patent Citations

  • Bernoulli effect-based spray icing test system in low-temperature environment

    CN210953884U

  • Direct-cooling freezing wind tunnel realization method and direct-cooling freezing wind tunnel realization system

    CN102914416A

  • Artificial ice-coating test platform capable of simulating field ice-coating meteorological condition

    CN105509785A

  • Isothermal and isobaric humidification control system and method for large-scale icing wind tunnel body loop

    CN112432279A

  • Icing test method for aircraft test

    CN115180174A

Cited By

  • Test method for ice accretion and freezing rain by using high-low temperature test box

    CN119738340A