Integrated hydrogeological sampling and analysis integrated equipment
By integrating integrated hydrogeological sampling and analysis equipment, the complexity and single function problems of existing equipment in the collection and analysis process are solved, efficient and accurate collection and analysis of groundwater and geological samples are achieved, and on-site analysis is improved. Efficiency and accuracy.
Patent Information
- Application Number
- CN202411057309.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-02
- Publication Date
- 2024-11-08
AI Technical Summary
Existing equipment is complex in its operation when collecting groundwater and geological samples, making it difficult to accurately sample different depths, and cannot perform timely analysis and processing. Most of the equipment is a single function, so it is impossible to collect and analyze water samples and geological samples at the same time.
An integrated hydrogeological sampling and analysis equipment was designed, including sampling probe rods, water sampling devices, switching devices, geological sampling devices, detection and analysis devices and data processing units. Through the combined use of these devices, it can be collected at different depths. Groundwater and geological samples were performed and preliminary analysis was performed on site.
It realizes efficient collection and analysis of water samples and geological samples of different depths, improves analysis efficiency and accuracy, simplifies the operation process, and reduces the risk of external pollution.
Smart Images

Figure CN118913766A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of hydrogeological survey, and more specifically to an integrated hydrogeological sampling and analysis device. Background Art
[0002] Water is an indispensable and precious resource for human survival, and groundwater, as an important component of water resources, has the characteristics of wide distribution, good water quality, dynamic stability and easy application. It is an ideal source of drinking water and an important industrial, agricultural and ecological water source. With the acceleration of industrialization and the growth of population, the demand for water resources has increased dramatically. At the same time, problems such as groundwater over-exploitation, pollution, land subsidence, seawater intrusion and degradation of groundwater-dependent ecosystems have become increasingly severe. Therefore, accurately and efficiently collecting and analyzing groundwater and geological samples is of great significance for groundwater resource evaluation, development and utilization, ecological environment protection and national land space planning. However, most of the existing equipment is a single sampling device, which only collects groundwater or geological samples separately, and when sampling at different depths is required, the operation is complicated, it is difficult to accurately sample, the sampling process is complicated, time-consuming, and susceptible to external pollution, and it does not involve the collection of water samples and geological samples at different depths, and the samples cannot be analyzed and processed in time after being obtained. Therefore, it is necessary to provide an integrated hydrogeological sampling and analysis integrated equipment to solve the problems raised in the above background technology. Summary of the invention
[0003] To achieve the above object, the present invention provides the following technical solution: an integrated hydrogeological sampling and analysis device, comprising:
[0004] The sampling probe is drilled into the soil to take samples;
[0005] A water body sampling device is rotatably arranged on the outer wall of the sampling probe;
[0006] A switching device is rotatably arranged on the outer wall of the sampling probe and is located below the water sampling device, and the top of the switching device is rotatably connected to the bottom of the water sampling device;
[0007] The geological sampling device is rotatably arranged outside the water sampling device, and the bottom is detachably connected to the switching device;
[0008] The detection and analysis device is arranged on the soil, and the sampling probe, the water sampling device and the geological sampling device penetrate through the center of the detection and analysis device and penetrate into the soil;
[0009] A data processing unit is fixed on one side of the detection and analysis device;
[0010] A plurality of fixed columns are provided in an annular distribution and are fixed at the bottom of the detection and analysis device and fixed in the soil.
[0011] Further, as a preference, the sampling probe comprises:
[0012] The sampling drill bit is located at the bottom of the sampling probe;
[0013] The probe body passes through the center of the detection and analysis device and is fixedly connected to the sampling drill bit, and the top is connected to a driving device;
[0014] There are multiple rotating blocks distributed in a ring, fixed on the outer wall of the probe body (), and close to the sampling drill bit. That is to say, driven by the external driving device, the probe body drives the sampling drill bit to rotate, and then drives the water sampling device and the geological sampling device to penetrate into the soil to sample groundwater and soil. Under the action of the rotating blocks, water samples and geological products are collected respectively, and the probe body moves in the borehole to collect and store samples at different depths separately. After the sampling probe is taken out, the detection and analysis device performs a preliminary analysis on the sample, and the data processing unit records it.
[0015] Further, as a preference, the water sampling device comprises:
[0016] A fixed tube body is fixedly arranged on the outside of the probe body, the bottom of which is rotatably connected to the switching device, and the probe body is rotatably arranged in the fixed tube body;
[0017] A fixed annular surface is arranged above the switching device, the inner ring is fixedly connected to the fixed tube body, and the outer ring is rotatably connected to the inner wall of the geological sampling device;
[0018] A collection cavity is located between the fixed annulus and the switching device;
[0019] A plurality of water sample collection tubes are provided in an annular distribution and are arranged in the collection cavity, the top of which is detachably fixed to the bottom of the fixed annular surface, and the bottom is fitted with the top of the switching device;
[0020] The air-filled tube passes through the fixed annular surface and connects the collection cavity and the external air-filled device. That is to say, when sampling groundwater, the fixed tube body remains fixed, and the probe body drives the switching device to rotate by rotating the card block, and then the switching device rotates along the bottom of the water sample collection tube, and the separate water sample collection tubes are opened in turn, so that the groundwater flows into the water sample collection tube and the collection cavity. After the water sample collection tube is collected, the switching device is rotated to close the water sample collection tube, and the external air is injected through the air-filled tube to discharge the water inside the collection cavity for the next collection. Through the up and down movement of the sampling probe and the successive rotation of the switching device, the groundwater at different depths is sampled in turn.
[0021] Further, as a preference, the water sample collection tube comprises:
[0022] The cylinder is fixed at the bottom of the fixed annular surface, and a water sample collection port is provided at the bottom of the cylinder;
[0023] A driving seat is fixed inside the cylinder at one end close to the fixed annular surface;
[0024] The telescopic rod is located below the driving seat and is fixedly connected to the driving seat;
[0025] The piston surface is slidably disposed in the cylinder body, and the top is fixedly connected to the telescopic rod;
[0026] The water-blocking bead is set at the water sample collection port at the bottom of the cylinder, and the bottom fits with the top of the switching device. When the switching device lifts the water-blocking bead at the bottom of the water sample collection cylinder, the driving seat drives the telescopic rod to contract, driving the piston surface to move up in the cylinder, and then the groundwater enters the cylinder through the water sample collection port at the bottom of the cylinder. After collecting sufficient water samples, the switching device rotates to disengage the water-blocking bead, and the driving seat controls the telescopic rod to extend, driving the piston surface to move down in the cylinder, pushing the water-blocking bead to the water sample collection port again, and sealing the cylinder. Then each water sample collection cylinder operates in turn to sample and seal groundwater at different depths. It should be noted that the water-blocking bead always sinks to the bottom of the water and moves upward only under the lifting action of the switching device.
[0027] Further, preferably, the switching device comprises:
[0028] The inner ring of the rotating ring surface is rotationally connected to the bottom of the fixed tube body, and the outer ring is rotationally connected to the inner wall of the geological sampling device;
[0029] A bayonet ring surface is fixed at the bottom of the rotating ring surface, and the bayonet on the bayonet ring surface corresponds to the rotating block on the sampling probe rod;
[0030] The water delivery port penetrates the rotating annular surface and the bayonet annular surface, corresponds to the water sample collection tube, and the water delivery port and the bayonet on the bayonet annular surface are not in the same position;
[0031] A lifting cross bar is fixed on the top of the rotating ring surface and is located at the center of the water delivery port, and the extension line of the lifting cross bar is at the center of the rotating ring surface;
[0032] The bayonet ring is arranged below the bayonet ring surface and is detachably connected to the bottom of the geological sampling device. The bayonet ring is provided with a bayonet corresponding to the rotating block on the sampling probe rod, and the interval between the bayonet ring and the bayonet ring surface is greater than the height of the rotating block. That is to say, when sampling groundwater, the sampling probe is connected to the bayonet annular surface by rotating the card block, and then, driven by the probe body, the bayonet annular surface and the rotating annular surface follow the rotation of the probe body. When the water body delivery port rotates to a position corresponding to the water sample collection port at the bottom of the water sample collection tube, the lifting cross bar lifts the water blocking bead at the bottom of the water sample collection tube, and then the groundwater flows into the collection cavity and the water sample collection port through the water body delivery port, that is, the groundwater enters the cylinder body with the cooperation of the water sample collection tube. After sufficient water samples are collected, the bayonet annular surface and the rotating annular surface rotate to make the lifting cross bar separate from the water blocking bead, and the driving seat in the water sample collection tube controls the telescopic rod to extend, driving the piston surface to move downward in the cylinder body, driving the water blocking bead to re-block the water sample collection port, and then injecting external air through the inflation tube to discharge the water inside the collection cavity, and then by moving the sampling probe up and down, the groundwater is collected and stored through different water sample collection tubes at different depths.
[0033] Further, as a preference, the geological sampling device comprises:
[0034] The lower rotating tube body is rotatably arranged outside the water sampling device, and the bottom is detachably connected to the bayonet ring;
[0035] The upper rotating tube body is rotated to be arranged outside the fixed tube body;
[0036] A fixed top surface is fixed on the outer wall of the fixed tube body and is rotatably connected to the top of the upper rotating tube body, and the upper rotating tube body is slidably connected to the fixed top surface;
[0037] The geological sampling assembly is arranged outside the fixed tube body and fixed between the upper rotating tube body and the lower rotating tube body. That is to say, when collecting geological samples, the probe body drives the rotating block to move downward, thereby connecting the rotating block to the bayonet ring. At this time, the lower rotating tube body and the bayonet ring are fixedly connected, and the fixed top surface and the upper rotating tube body are only connected in rotation, and then the bayonet ring is driven to rotate by the sampling probe, thereby driving the lower rotating tube body to rotate, and then the soil on the inner wall of the borehole is collected by the geological sampling assembly, and sampling points of different depths are selected by moving the sampling probe up and down, and the geological sampling assembly collects geological samples while rotating.
[0038] Further, as a preference, the geological sampling assembly comprises:
[0039] A bearing surface fixed to the top of the lower rotating tube body;
[0040] A control surface is fixed to the bottom of the upper rotating tube body and is provided with a control device inside;
[0041] a central body, fixed between the load-bearing surface and the control surface;
[0042] A plurality of closed surfaces are provided in an annular distribution and fixed on the side wall of the central body;
[0043] A plurality of rotating shafts are provided in an annular distribution, are spaced apart from the closed surface, and the top is fixedly connected to the control device in the control surface;
[0044] A rotating connecting piece is fixed on the rotating shaft;
[0045] The sampling shovel is arranged corresponding to the closed surface, and one side is fixedly connected to the rotating connector. When the sampling probe drives the bayonet ring to rotate, and then drives the geological sampling device to rotate, the control device in the control surface controls the single rotating shaft to rotate, and then drives the single sampling shovel to rotate through the rotating connector, and then separates from the closed surface. Then, during the rotation of the geological sampling device, the sampling shovel gradually rotates and opens, and the soil on the inner wall of the borehole is collected through the sampling shovel. It should be noted that the rotation direction of the geological sampling device is the same as the opening direction of the sampling shovel. After collecting enough samples, the sampling shovel rotates and resets under the action of the rotating shaft and the rotating connector, and then the samples in the sampling shovel are sealed and stored through the closed surface, and then the sampling probe is moved up and down, and different depths are selected to collect geological samples through different sampling shovels.
[0046] Further, as a preference, the detection and analysis device comprises:
[0047] The water sample analysis component is arranged at the lower part of the detection and analysis device and is fixedly connected to the fixed column;
[0048] The geological sample analysis component is fixed on the upper part of the water sample analysis component, and the sampling probe, water sampling device, switching device and geological sampling device pass through the water sample analysis component and the geological sample analysis component in sequence. When the sampling probe drives the water sampling device and the geological sampling device to complete the collection of groundwater and soil at different depths of the drilling, the sampling probe drives each component to move upward, and then when the geological sampling device moves to the geological sample analysis component, each sampling shovel is opened in sequence, and the collected samples are placed in the geological sample analysis component for preliminary analysis, and then the lower rotating tube body is disconnected from the bayonet ring, and the upper rotating tube body slides upward on the fixed top surface, so that the lower rotating tube body is separated from the water sampling device, and each water sample collection tube is transported to the water sample analysis component in sequence for preliminary analysis, and the data of the water sample and geological sample obtained by analysis are summarized in the data processing unit for processing.
[0049] Compared with the prior art, the present invention has the following beneficial effects:
[0050] In the present invention, by setting up a water body sampling device, groundwater at different depths is sampled and collected; by setting up a geological sampling device, geological samples at different depths are sampled and collected. Under the action of a switching device, the water body sampling device and the geological sampling device can be operated respectively to collect water samples and geological samples at different depths; by setting up a detection and analysis device, when samples are taken out at different depths, preliminary analysis of the samples is carried out in time at the sampling site to improve analysis efficiency and accuracy, and the data processing unit records the results. BRIEF DESCRIPTION OF THE DRAWINGS
[0051] Figure 1 It is a schematic diagram of the overall structure of an integrated hydrogeological sampling and analysis device;
[0052] Figure 2 It is a schematic diagram of the structure of a sampling probe and a water sampling device in an integrated hydrogeological sampling and analysis device;
[0053] Figure 3 This is a schematic diagram of the structure of a water sample collection tube in an integrated hydrogeological sampling and analysis device;
[0054] Figure 4 It is a schematic diagram of the structure of a switching device in an integrated hydrogeological sampling and analysis device;
[0055] Figure 5 It is a schematic diagram of the structure of a geological sampling device in an integrated hydrogeological sampling and analysis device;
[0056] Figure 6 It is a schematic diagram of the structure of a geological sampling component in an integrated hydrogeological sampling and analysis device;
[0057] Figure 7 A top view of a geological acquisition component in an integrated hydrogeological sampling and analysis device;
[0058] Figure 8 A schematic diagram of sampling of a geological collection component in an integrated hydrogeological sampling and analysis device;
[0059] In the figure: 1, sampling probe; 2, water sampling device; 3, switching device; 4, geological sampling device; 5, detection and analysis device; 6, data processing unit; 7, fixed column; 11, sampling drill; 12, probe body; 13, rotating block; 21, fixed tube; 22, fixed annulus; 23, collection cavity; 24, water sample collection tube; 25, inflation tube; 31, rotating annulus; 32, bayonet annulus; 33, water delivery port; 34, lifting cross bar; 35, bayonet ring; 41 , lower rotating tube body; 42, upper rotating tube body; 43, fixed top surface; 44, geological sampling assembly; 51, water sample analysis assembly; 52, geological sample analysis assembly; 241, cylinder; 242, drive seat; 243, telescopic rod; 244, piston surface; 245, water blocking bead; 441, bearing surface; 442, control surface; 443, central body; 444, closing surface; 445, rotating shaft; 446, rotating connector; 447, sampling shovel; 2411, water sample collection port. DETAILED DESCRIPTION
[0060] See also Figures 1 to 8 In an embodiment of the present invention, an integrated hydrogeological sampling and analysis device includes:
[0061] The sampling probe 1 is drilled into the soil to take samples;
[0062] A water body sampling device 2 is rotatably arranged on the outer wall of the sampling probe 1;
[0063] The switching device 3 is rotatably arranged on the outer wall of the sampling probe 1 and is located below the water sampling device 2, and the top of the switching device 3 is rotatably connected to the bottom of the water sampling device 2;
[0064] The geological sampling device 4 is rotatably arranged outside the water sampling device 2, and the bottom is detachably connected to the switching device 3;
[0065] The detection and analysis device 5 is arranged on the soil, and the sampling probe 1, the water sampling device 2 and the geological sampling device 4 pass through the center of the detection and analysis device 5 and penetrate into the soil;
[0066] The data processing unit 6 is fixed on one side of the detection and analysis device 5;
[0067] A plurality of fixed columns 7 are provided in an annular arrangement and are fixed to the bottom of the detection and analysis device 5 and fixed in the soil.
[0068] In this embodiment, the sampling probe 1 includes:
[0069] The sampling drill bit 11 is located at the bottom of the sampling probe rod 1;
[0070] The probe body 12 passes through the center of the detection and analysis device 5 and is fixedly connected to the sampling drill bit 11, and the top is connected to a driving device;
[0071] The rotating blocks 13 are provided in a plurality of annular arrangements and are fixed on the outer wall of the probe body (12) and are close to the sampling drill bit 11. That is, driven by the external driving device, the probe body 12 drives the sampling drill bit 11 to rotate, thereby driving the water sampling device 2 and the geological sampling device 4 to penetrate into the soil to sample groundwater and soil. Under the action of the rotating blocks 13, water samples and geological samples are collected respectively, and the probe body 12 is moved in the borehole to collect and store samples at different depths separately. After the sampling probe 1 is taken out, the detection and analysis device 5 performs a preliminary analysis on the sample, and the data processing unit 6 records it.
[0072] In this embodiment, the water sampling device 2 includes:
[0073] The fixed tube body 21 is fixedly arranged on the outside of the probe body 12, the bottom of which is rotatably connected to the switching device 3, and the probe body 12 is rotatably arranged in the fixed tube body 21;
[0074] The fixed annular surface 22 is arranged above the switching device 3, the inner ring is fixedly connected to the fixed tube body 21, and the outer ring is rotatably connected to the inner wall of the geological sampling device 4;
[0075] The collection chamber 23 is located between the fixed annular surface 22 and the switching device 3;
[0076] A plurality of water sample collecting tubes 24 are provided in an annular distribution, and are disposed in the collecting cavity 23. The top of the tubes 24 is detachably fixed to the bottom of the fixed annular surface 22, and the bottom of the tubes 24 is fitted with the top of the switching device 3.
[0077] The air filling tube 25 passes through the fixed annular surface 22 and connects the collection cavity 23 and the external air filling device. That is to say, when sampling groundwater, the fixed tube body 21 remains fixed, and the probe body 12 drives the switching device 3 to rotate by rotating the block 13, and then the switching device 3 rotates along the bottom of the water sample collection tube 24, and opens the separate water sample collection tubes 24 in turn, so that the groundwater flows into the water sample collection tube 24 and the collection cavity 23. After the water sample collection tube 24 is collected, the switching device 3 is rotated to close the water sample collection tube 24, and the external air is injected through the air filling tube 25 to discharge the water inside the collection cavity 23 for the next collection. Through the up and down movement of the sampling probe 1 and the successive rotation of the switching device 3, the groundwater at different depths is collected and sampled in turn.
[0078] In this embodiment, the water sample collection tube 24 includes:
[0079] The cylinder 241 is fixed to the bottom of the fixed annular surface 22, and a water sample collection port 2411 is provided at the bottom of the cylinder 241;
[0080] A driving seat 242 is fixed inside the cylinder 241 at one end close to the fixed annular surface 22;
[0081] The telescopic rod 243 is located below the driving seat 242 and is fixedly connected to the driving seat 242;
[0082] The piston surface 244 is slidably disposed in the cylinder 241, and the top is fixedly connected to the telescopic rod 243;
[0083] The water blocking bead 245 is disposed at the water sample collection port 2411 at the bottom of the cylinder 241 , and the bottom thereof is in contact with the top of the switching device 3 . When the switching device 3 lifts up the water-blocking bead 245 at the bottom of the water sample collecting tube 24, the driving seat 242 drives the telescopic rod 243 to contract, driving the piston surface 244 to move upward in the cylinder 241, and then the groundwater enters the cylinder 241 through the water sample collecting port 2411 at the bottom of the cylinder 241. After collecting sufficient water samples, the switching device 3 rotates to disengage from the water-blocking bead 245, and the driving seat 242 controls the telescopic rod 243 to extend, driving the piston surface 244 to move downward in the cylinder 241, pushing the water-blocking bead 245 to the water sample collecting port 2411 again, and sealing the cylinder 241. Then, each water sample collecting tube 24 is operated in turn to sample and seal groundwater at different depths. It should be noted that the water-blocking bead 245 is always sunk to the bottom of the water and moves upward only under the pushing action of the switching device 3.
[0084] In this embodiment, the switching device 3 includes:
[0085] The inner ring of the rotating annular surface 31 is rotatably connected to the bottom of the fixed tube body 21, and the outer ring is rotatably connected to the inner wall of the geological sampling device 4;
[0086] The bayonet ring surface 32 is fixed to the bottom of the rotating ring surface 31, and the bayonet on the bayonet ring surface 32 corresponds to the rotating block 13 on the sampling probe rod 1;
[0087] The water delivery port 33 penetrates the rotating annular surface 31 and the bayonet annular surface 32, corresponds to the water sample collection tube 24, and the water delivery port 33 and the bayonet on the bayonet annular surface 32 are not in the same position;
[0088] A lifting cross bar 34 is fixed on the top of the rotating ring surface 31 and is located at the center of the water delivery port 33, and the extension line of the lifting cross bar 34 is at the center of the rotating ring surface 31;
[0089] The bayonet ring 35 is arranged below the bayonet annular surface 32, and is detachably connected to the bottom of the geological sampling device 4. The bayonet ring 35 is provided with a bayonet corresponding to the rotating block 13 on the sampling probe rod 1, and the interval between the bayonet ring 35 and the bayonet annular surface 32 is greater than the height of the rotating block 13. In other words, when sampling groundwater, the sampling probe rod 1 is connected to the bayonet annular surface 32 through the rotating block 13, and then driven by the probe rod body 12, the bayonet annular surface 32 and the rotating annular surface 31 rotate with the probe rod body 12, and when the water body conveying port 33 rotates to a position corresponding to the water sample collection port 2411 at the bottom of the water sample collection tube 24, the lifting cross bar 34 lifts the water blocking bead 245 at the bottom of the water sample collection tube 24, and then the groundwater flows into the collection cavity 23 and the water sample collection port 2411 through the water body conveying port 33, that is, the groundwater enters the tube with the cooperation of the water sample collection tube 24. After collecting sufficient water samples in the body 241, the bayonet ring surface 32 and the rotating ring surface 31 rotate to make the lifting cross bar 34 disengage from the water blocking bead 245, and the driving seat 242 in the water sample collection tube 24 controls the telescopic rod 243 to extend, driving the piston surface 244 to move downward in the cylinder body 241, driving the water blocking bead 245 to re-seal the water sample collection port 2411, and then injecting external air through the inflation tube 25 to discharge the water inside the collection cavity 23, and then by moving the sampling probe 1 up and down, the groundwater is collected and stored at different depths through different water sample collection tubes 24.
[0090] In this embodiment, the geological sampling device 4 includes:
[0091] The lower rotating tube body 41 is rotatably arranged outside the water sampling device 2, and the bottom is detachably connected to the bayonet ring 35;
[0092] The upper rotating tube body 42 is rotated to be arranged outside the fixed tube body 21;
[0093] The fixed top surface 43 is fixed on the outer wall of the fixed tube body 21 and is rotatably connected to the top of the upper rotating tube body 42. The upper rotating tube body 42 is slidably connected to the fixed top surface 43.
[0094] The geological sampling assembly 44 is arranged outside the fixed tube body 21 and fixed between the upper rotating tube body 42 and the lower rotating tube body 41. That is to say, when collecting geological samples, the probe body 12 drives the rotating block 13 to move downward, so that the rotating block 13 is connected with the bayonet ring 35. At this time, the lower rotating tube body 41 is fixedly connected with the bayonet ring 35, and the fixed top surface 43 is only connected with the upper rotating tube body 42 in rotation, and then the bayonet ring 35 is driven to rotate through the sampling probe 1, and then the lower rotating tube body 41 is driven to rotate, and then the soil on the inner wall of the borehole is collected through the geological sampling assembly 44, and the sampling points of different depths are selected by moving the sampling probe 1 up and down, and the geological sampling assembly 44 collects geological samples under rotation.
[0095] In this embodiment, the geological sampling component 44 includes:
[0096] The bearing surface 441 is fixed on the top of the lower rotating tube 41;
[0097] The control surface 442 is fixed to the bottom of the upper rotating tube 42 and has a control device inside;
[0098] The central body 443 is fixed between the bearing surface 441 and the control surface 442;
[0099] A plurality of closed surfaces 444 are provided in an annular distribution and fixed on the side wall of the central body 443;
[0100] A plurality of rotating shafts 445 are provided in an annular distribution, are spaced apart from the closed surface 444, and the tops are fixedly connected to the control device in the control surface 442;
[0101] A rotating connecting member 446 is fixed on the rotating shaft 445;
[0102] The sampling shovel 447 is arranged corresponding to the closed surface 444, and one side is fixedly connected to the rotating connection member 446. When the sampling probe rod 1 drives the bayonet ring 35 to rotate, and then drives the geological sampling device 4 to rotate, the control device in the control surface 442 controls the single rotating shaft 445 to rotate, and then drives the single sampling shovel 447 to rotate through the rotating connection member 446, and disengages from the closed surface 444, and then during the rotation of the geological sampling device 4, the sampling shovel 447 gradually rotates and opens, and the soil on the inner wall of the borehole is collected through the sampling shovel 447. It should be noted that the rotation direction of the geological sampling device 4 is the same as the opening direction of the sampling shovel 447. After collecting enough samples, the sampling shovel 447 rotates and resets under the action of the rotating shaft 445 and the rotating connection member 446, and then the samples in the sampling shovel 447 are sealed and stored through the closed surface 444, and then the sampling probe rod 1 is moved up and down, and different depths are selected to collect geological samples through different sampling shovels 447.
[0103] In this embodiment, the detection and analysis device 5 includes:
[0104] The water sample analysis component 51 is arranged at the lower part of the detection and analysis device 5 and is fixedly connected to the fixing column 7;
[0105] The geological sample analysis component 52 is fixed on the upper part of the water sample analysis component 51, and the sampling probe 1, the water sampling device 2, the switching device 3 and the geological sampling device 4 sequentially pass through the water sample analysis component 51 and the geological sample analysis component 52. When the sampling probe 1 drives the water sampling device 2 and the geological sampling device 4 to complete the collection of groundwater and soil at different depths of the well, the sampling probe 1 drives each component to move upward, and then when the geological sampling device 4 moves to the geological sample analysis component 52, each sampling shovel 447 is opened in turn, and the collected samples are placed in the geological sample analysis component 52 for preliminary analysis, and then the lower rotating tube body 41 is disconnected from the bayonet ring 35, and the upper rotating tube body 42 slides upward on the fixed top surface 43, so that the lower rotating tube body 41 is separated from the water sampling device 2, and each water sample collection tube 24 is sequentially transported to the water sample analysis component 51 for preliminary analysis, and the data of the water sample and geological sample obtained by analysis are summarized in the data processing unit 6 for processing.
[0106] In the specific implementation, first, the lower rotating tube body 41 is fixedly connected to the bayonet ring 35, and then the upper rotating tube body 42 is rotatably connected to the fixed top surface 43, and then the detection and analysis device 5 is fixed by the fixed column 7, and then the sampling probe rod 1 drives the water sampling device 2, the switching device 3 and the geological sampling device 4 to pass through the water sample analysis component 51 and the geological sample analysis component 52 in sequence to drill into the soil. Driven by the external driving device, the probe rod body 12 drives the sampling drill bit 11 to rotate, thereby driving the water sampling device 2 and the geological sample analysis component 52. The sampling device 4 penetrates deep into the soil. At this time, the rotating block 13 on the probe body 12 is connected to the bayonet ring 35, keeping the side wall of the device rotating with the inner wall of the borehole to facilitate efficient drilling. When sampling, groundwater is sampled first, and then the soil is sampled, and the sampling order is from deep to shallow. When sampling groundwater, the sampling probe 1 is connected to the bayonet ring surface 32 through the rotating block 13, and then driven by the probe body 12, the bayonet ring surface 32 and the rotating ring surface 31 rotate with the probe body 12. When the water body is transported When the opening 33 rotates to a position corresponding to the water sample collection opening 2411 at the bottom of the water sample collection tube 24, the lifting cross bar 34 lifts the water blocking bead 245 at the bottom of the water sample collection tube 24, and then the groundwater flows into the collection cavity 23 and the water sample collection opening 2411 through the water body delivery opening 33. At this time, the driving seat 242 in the water sample collection tube 24 drives the telescopic rod 243 to contract, driving the piston surface 244 to move upward in the cylinder 241, and then the groundwater enters the cylinder 241 through the water sample collection opening 2411 at the bottom of the cylinder 241. After sampling, the bayonet ring surface 32 and the rotating ring surface 31 rotate to make the lifting cross bar 34 separate from the water blocking bead 245, and the driving seat 242 in the water sample collection tube 24 controls the telescopic rod 243 to extend, driving the piston surface 244 to move downward in the cylinder 241, driving the water blocking bead 245 to re-block the water sample collection port 2411, and then injecting external air through the inflation tube 25 to discharge the water inside the collection cavity 23, and then by moving the sampling probe 1, the groundwater is collected and stored at different depths through different water sample collection tubes 24;When collecting geological samples, the sampling probe 1 drives the bayonet ring 35 to rotate, thereby driving the geological sampling device 4 to rotate. At this time, the control device in the control surface 442 controls the single rotating shaft 445 to rotate, and then drives the single sampling shovel 447 to rotate through the rotating connecting piece 446, and disengages from the closed surface 444. Then, during the rotation of the geological sampling device 4, the sampling shovel 447 is gradually rotated and opened, and the soil on the inner wall of the borehole is collected by the sampling shovel 447. After collecting enough samples, the sampling shovel 447 is rotated and reset under the action of the rotating shaft 445 and the rotating connecting piece 446, and then the samples in the sampling shovel 447 are sealed and stored through the closed surface 444, and then the sampling probe 1 is moved to select different depths. degree, the geological samples are collected by different sampling shovels 447. After collecting groundwater and soil at different depths, the sampling probe 1 drives each component to move upward, and then when the geological sampling device 4 moves to the geological sample analysis component 52, each sampling shovel 447 is opened in turn, and the collected samples are placed in the geological sample analysis component 52 for preliminary analysis, and then the lower rotating tube body 41 is disconnected from the bayonet ring 35, and the upper rotating tube body 42 slides upward on the fixed top surface 43, so that the lower rotating tube body 41 is separated from the water sampling device 2, and each water sample collection tube 24 is transported to the water sample analysis component 51 in turn for preliminary analysis, and the data of the water sample and geological sample obtained by analysis are summarized in the data processing unit 6 for processing. ;
[0107] What is described above is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. An integrated hydrogeological sampling and analysis device, characterized in that: include: A sampling probe (1) is inserted into the soil to take samples; A water body sampling device (2) is rotatably arranged on the outer wall of the sampling probe (1); A switching device (3) is rotatably arranged on the outer wall of the sampling probe (1) and is located below the water body sampling device (2), and the top of the switching device (3) is rotatably connected to the bottom of the water body sampling device (2); A geological sampling device (4) is rotatably arranged outside the water sampling device (2), and the bottom is detachably connected to the switching device (3); The detection and analysis device (5) is arranged on the soil, and the sampling probe (1), the water sampling device (2) and the geological sampling device (4) penetrate through the center of the detection and analysis device (5) and penetrate into the soil; A data processing unit (6) is fixed on one side of the detection and analysis device (5); A plurality of fixed columns (7) are provided in an annular arrangement and are fixed to the bottom of the detection and analysis device (5) and fixed in the soil.
2. The integrated hydrogeological sampling and analysis device according to claim 1, characterized in that: The sampling probe (1) comprises: A sampling drill bit (11) is located at the bottom of the sampling probe (1); The probe body (12) passes through the center of the detection and analysis device (5) and is fixedly connected to the sampling drill bit (11), and the top is connected to a driving device; A plurality of rotating clamping blocks (13) are provided in an annular arrangement and are fixed on the outer wall of the probe body (12) and are close to the sampling drill bit (11).
3. The integrated hydrogeological sampling and analysis device according to claim 2 is characterized in that: The water sampling device (2) comprises: A fixed tube body (21) is fixedly arranged on the outside of the probe body (12), the bottom of which is rotatably connected to the switching device (3), and the probe body (12) is rotatably arranged in the fixed tube body (21); A fixed annular surface (22) is arranged above the switching device (3), the inner ring is fixedly connected to the fixed tube body (21), and the outer ring is rotatably connected to the inner wall of the geological sampling device (4); A collection chamber (23) is located between the fixed annular surface (22) and the switching device (3); A plurality of water sample collecting tubes (24) are provided in an annular distribution and are arranged in the collecting cavity (23). The top of the tubes can be detachably fixed to the bottom of the fixed annular surface (22), and the bottom of the tubes fits the top of the switching device (3); The inflation tube (25) passes through the fixed annular surface (22) and connects the collection cavity (23) and the external inflation device.
4. The integrated hydrogeological sampling and analysis device according to claim 3 is characterized by: The water sample collection tube (24) comprises: A cylinder (241) is fixed to the bottom of the fixed annular surface (22), and a water sample collection port (2411) is provided at the bottom of the cylinder (241); A driving seat (242) is fixed inside the cylinder (241) at one end close to the fixed annular surface (22); The telescopic rod (243) is located below the driving seat (242) and is fixedly connected to the driving seat (242); The piston surface (244) is slidably disposed in the cylinder (241), and the top is fixedly connected to the telescopic rod (243); The water-blocking bead (245) is arranged at the water sample collection port (2411) at the bottom of the cylinder (241), and the bottom thereof is in contact with the top of the switching device (3).
5. The integrated hydrogeological sampling and analysis device according to claim 4 is characterized in that: The switching device (3) comprises: The inner ring of the rotating annular surface (31) is rotationally connected to the bottom of the fixed tube body (21), and the outer ring is rotationally connected to the inner wall of the geological sampling device (4); A bayonet ring surface (32) is fixed at the bottom of the rotating ring surface (31), and the bayonet on the bayonet ring surface (32) corresponds to the rotating block (13) on the sampling probe rod (1); A water body delivery port (33) penetrates the rotating annular surface (31) and the bayonet annular surface (32), corresponds to the water sample collection tube (24), and the water body delivery port (33) and the bayonet on the bayonet annular surface (32) are not located at the same position; A lifting cross bar (34) is fixed on the top of the rotating ring surface (31) and is located at the center of the water delivery port (33), and the extension line of the lifting cross bar (34) is located at the center of the rotating ring surface (31); A bayonet ring (35) is arranged below the bayonet ring surface (32) and is detachably connected to the bottom of the geological sampling device (4). The bayonet ring (35) is provided with a bayonet corresponding to the rotating block (13) on the sampling probe rod (1). The interval between the bayonet ring (35) and the bayonet ring surface (32) is greater than the height of the rotating block (13).
6. The integrated hydrogeological sampling and analysis device according to claim 5 is characterized in that: The geological sampling device (4) comprises: The lower rotating tube body (41) is rotatably arranged outside the water sampling device (2), and the bottom is detachably connected to the bayonet ring (35); The upper rotating tube body (42) is rotated to be arranged outside the fixed tube body (21); A fixed top surface (43) is fixed on the outer wall of the fixed tube body (21) and is rotatably connected to the top of the upper rotating tube body (42), and the upper rotating tube body (42) is slidably connected to the fixed top surface (43); The geological sampling assembly (44) is arranged outside the fixed tube body (21) and fixed between the upper rotating tube body (42) and the lower rotating tube body (41).
7. The integrated hydrogeological sampling and analysis device according to claim 6 is characterized by: The geological sampling assembly (44) comprises: A bearing surface (441) is fixed on the top of the lower rotating tube (41); A control surface (442) is fixed to the bottom of the upper rotating tube (42) and is provided with a control device inside; A central body (443) is fixed between the bearing surface (441) and the control surface (442); A plurality of closed surfaces (444) are provided in an annular distribution and fixed on the side wall of the central body (443); A plurality of rotating shafts (445) are provided in an annular distribution, are spaced apart from the closed surface (444), and have their tops fixedly connected to a control device in the control surface (442); A rotating connecting member (446) is fixed on the rotating shaft (445); The sampling shovel (447) is arranged corresponding to the closed surface (444), and one side of the sampling shovel is fixedly connected to the rotating connecting member (446).
8. The integrated hydrogeological sampling and analysis device according to claim 1 is characterized by: The detection and analysis device (5) comprises: A water sample analysis component (51) is arranged at the lower part of the detection and analysis device (5) and is fixedly connected to the fixing column (7); The geological sample analysis component (52) is fixed on the upper part of the water sample analysis component (51), and the sampling probe (1), the water body sampling device (2), the switching device (3) and the geological sampling device (4) pass through the water sample analysis component (51) and the geological sample analysis component (52) in sequence.
