Electric power system automation fault alarm system based on electric power output operation prediction

By collecting and analyzing voltage operation data in real time in the power system, building prediction models and interactive models, and automatically identifying and alerting potential faults, the problems of low fault detection efficiency and insufficient early warning in the existing technology are solved, and efficient and automatic Fault monitoring and alarm.

CN118914758AActive Publication Date: 2024-11-08NANJING NORMAL UNIVERSITY
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411225166.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-03
Publication Date
2024-11-08
Estimated Expiration
2044-09-03

AI Technical Summary

Technical Problem

Existing power output fault detection methods are prone to missed early fault warnings and are not efficient.

Method used

The power system automated fault alarm system based on power output calculation prediction, including data acquisition module, data storage module and data analysis module, collect and analyze voltage operation data in real time, build a prediction reference model and system interaction model, and automatically identify and alert potential faults. .

Benefits of technology

Real-time monitoring and prediction of power system failures is realized, the accuracy and efficiency of fault detection is improved, and the ability to automatically identify and promptly alarms is reduced, thus reducing manual intervention.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118914758A_ABST
    Figure CN118914758A_ABST
Patent Text Reader

Abstract

The invention discloses a power system automation fault alarm system based on power output operation prediction, which comprises a data acquisition module, a data storage module, a data analysis module and an automation interaction module, and is characterized in that the data analysis module obtains each group of voltage operation data and constructs a prediction reference model; and the automatic interaction module obtains the voltage fault prediction reference values, constructs a system interaction model, outputs an overall prediction interaction value, compares the overall prediction interaction value with a preset basic warning threshold value, and carries out fault judgment and alarm on the overall prediction interaction value. A big data technology and model intelligent operation are applied to power system fault alarm, and potential power system faults are automatically identified and alarmed by monitoring and predicting the operation state of the power system in real time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power monitoring and alarm, and in particular to an automatic fault alarm system for a power system based on power output calculation prediction. Background Art

[0002] The power system is the infrastructure of modern society, and its stable operation is crucial to ensure the normal operation of society. However, due to the complexity of the power system, power output failures are difficult to avoid. Traditional fault detection methods mainly rely on manual inspections and scheduled inspections, which are not only inefficient but also prone to miss early warnings of faults.

[0003] Therefore, a new power system automated fault alarm system is needed that can monitor and predict potential faults in real time. Summary of the invention

[0004] The purpose of this section is to summarize some aspects of embodiments of the present invention and briefly introduce some preferred embodiments. Some simplifications or omissions may be made in this section and the specification abstract and the invention title of this application to avoid blurring the purpose of this section, the specification abstract and the invention title, and such simplifications or omissions cannot be used to limit the scope of the present invention.

[0005] In view of the problems existing in the above-mentioned existing power output fault detection method, the present invention is proposed.

[0006] Therefore, the technical problem solved by the present invention is to solve the problem that the existing power output fault detection method is easy to miss the early warning of the fault on the one hand, and is inefficient on the other hand.

[0007] To solve the above technical problems, the present invention provides the following technical solutions: an automatic fault alarm system for an electric power system based on power output calculation prediction, comprising the following components: a data acquisition module, arranged at the power output end of each transmission line, for real-time acquisition of voltage operation data at the power output end of the current transmission line, and uploading the corresponding voltage operation data to the data storage module; a data storage module, wirelessly connected to the data acquisition module, for acquiring and storing each group of voltage operation data; a data analysis module, embedded in the data storage module, for acquiring each group of voltage operation data, and for constructing a prediction reference model, and for calculating a voltage fault prediction reference value for each transmission line; an automatic interaction module, wirelessly connected to the data analysis module, for acquiring each of the voltage fault prediction reference values, and for constructing a system interaction model, for inputting each of the voltage fault prediction reference values, for outputting an overall prediction interaction value, for comparing the value with the preset basic warning threshold, and for performing a fault judgment alarm.

[0008] As a preferred solution of the power system automation fault alarm system based on power output calculation prediction described in the present invention, wherein: the data acquisition module is also embedded with a data preprocessing unit, which preprocesses the data of each group of voltage operation data after obtaining them, and uploads the preprocessed groups of voltage operation data to the data storage module; data preprocessing specifically includes: data cleaning, data conversion and data dimensionality reduction.

[0009] As a preferred solution of the power system automation fault alarm system based on power output calculation prediction described in the present invention, wherein: calculating the voltage fault prediction reference value of each transmission line specifically includes the following steps: S1: real-time acquisition of voltage operation data α at the power output end of the current transmission line; S2: built-in MCU microprocessor synchronously outputs time-voltage curve; S3: obtains pressure difference change information in the real-time output time-voltage curve; S4: constructs the prediction reference model, inputs the pressure difference change information, and outputs the corresponding voltage fault prediction reference value.

[0010] As a preferred solution of the power system automation fault alarm system based on power output calculation prediction described in the present invention, the prediction reference model constructed is specifically:

[0011]

[0012] Wherein, δ is the voltage fault prediction reference value of the corresponding transmission line, U1, U2, ..., U n is the real-time voltage value corresponding to each selected point on the time-voltage curve, n is the number of selected points, D1, D2, ..., D n is the derivative value corresponding to each selected point on the time-voltage curve, U Q1 is the real-time voltage value corresponding to the maximum derivative point on the time-voltage curve, U Q2 is the real-time voltage value corresponding to the minimum point of the derivative on the time-voltage curve, and dx is the integral operation.

[0013] As a preferred solution of the power system automatic fault alarm system based on power output calculation prediction described in the present invention, the constructed system interaction model is specifically:

[0014]

[0015] Where η is the overall predicted interaction value, δ1, δ2, ..., δ m is the voltage fault prediction reference value obtained for each transmission line, and m is the number of transmission lines in the power system.

[0016] As a preferred solution of the power system automation fault alarm system based on power output calculation prediction described in the present invention, the preset basic warning threshold is set to 2.360 or 2.361 or 2.362.

[0017] As a preferred solution of the power system automation fault alarm system based on power output calculation prediction described in the present invention, wherein: the overall predicted interaction value is output, compared with the preset basic warning threshold, and a fault judgment alarm is issued therefor: when the overall predicted interaction value is not lower than the preset basic warning threshold, a fault alarm is issued.

[0018] The present invention provides an automatic fault alarm system for power systems based on power output calculation prediction, applies big data technology and model intelligent calculation to power system fault alarm, and automatically identifies and alarms potential power system faults by real-time monitoring and predicting the operating status of the power system. Compared with the prior art, the present invention has the following creativity:

[0019] 1. Real-time monitoring: Compared with traditional periodic inspections and manual inspections, the system of the present invention can collect and analyze the operating data of the power system in real time, greatly improving the real-time and accuracy of monitoring.

[0020] 2. Predictive analysis: Through big data technology and model intelligent calculation, the system of the present invention can predict the future output of the power system, thereby discovering potential faults in advance.

[0021] 3. Automatic warning: Through the fault warning module, the system of the present invention can automatically identify and warn of potential power system faults without manual intervention. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative labor. Among them:

[0023] Figure 1 A system module diagram of the power system automation fault alarm system based on power output calculation prediction provided by the present invention.

[0024] Figure 2 A flow chart of the method for calculating a voltage fault prediction reference value for each transmission line provided by the present invention. DETAILED DESCRIPTION

[0025] In order to make the above-mentioned purposes, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the drawings of the specification. Obviously, the described embodiments are part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary persons in the art without creative work should fall within the scope of protection of the present invention.

[0026] Due to the complexity of the power system, power output failures are difficult to avoid. Traditional fault detection methods mainly rely on manual inspections, including professional training, infrared measurement, device alarms, non-stop power detection, as well as timing detection, electrical testing, etc. Such methods are not only inefficient, but also prone to miss early warnings of faults.

[0027] Therefore, please refer to Figure 1 The present invention provides an automatic fault alarm system for an electric power system based on power output calculation prediction, comprising the following components:

[0028] The data acquisition module 100 is configured at the power output end of each transmission line, and is used to collect the voltage operation data of the power output end of the current transmission line in real time, and upload the corresponding voltage operation data to the data storage module 200;

[0029] It should be noted that the data acquisition module 100 can generally be configured at the power output end of the transmission line, and a conventional and durable voltage monitoring sensor can be selected. After monitoring the voltage, the data is uploaded to the data storage module 200 through the built-in microprocessor. The data acquisition module 100 and the data storage module 200 involved in the present invention are direct applications of existing conventional components, and will not be elaborated here.

[0030] Furthermore, the data acquisition module 100 is also embedded with a data preprocessing unit, which preprocesses each set of voltage operation data after acquiring the data, and uploads the preprocessed data of each set of voltage operation data to the data storage module 200;

[0031] Data preprocessing specifically includes: data cleaning, data conversion and data dimensionality reduction.

[0032] Specific:

[0033] 1. Data cleaning is an important step in data preprocessing. It involves a series of cleaning operations on the data to eliminate noise, missing values, outliers and redundant data in the data, so as to provide high-quality data for data analysis or machine learning model training. Specifically, data cleaning techniques include the following aspects:

[0034] Handling missing values: Missing values ​​may be caused by errors in the data collection process, natural missing data, etc. There are many ways to handle missing values, such as filling the mean, median, using interpolation, or simply deleting records with missing values.

[0035] Detect and handle outliers: Outliers may be caused by errors in the data collection process, special circumstances, etc. After detecting outliers, it may be necessary to identify and possibly fix or exclude unreasonable values. This can be handled by removing outliers or using smoothing techniques.

[0036] De-duplicate records: Duplicate records may lead to inconsistent or redundant data, so duplicate records need to be removed to avoid data confusion. This can be achieved by using unique identifiers or using de-duplication algorithms.

[0037] In addition, there are other common cleaning techniques, such as normalization, standardization, and encoding conversion. Normalization is to adjust the data range to a certain range, usually to facilitate subsequent data analysis and machine learning modeling. Standardization is to convert data to a unified scale, usually used to enhance the comparability between different features. Encoding conversion is to convert unstructured data into structured values ​​or labels for data processing and analysis.

[0038] In short, the goal of data cleaning is to ensure the quality and consistency of data in order to provide reliable and accurate data support for subsequent data analysis and machine learning modeling.

[0039] 2. Data conversion is a key step in the data preprocessing process, which involves converting raw data into a format suitable for analysis or modeling. The following are some specific techniques for data type conversion and character encoding conversion during data extraction:

[0040] ①Data type conversion:

[0041] Numeric conversion: Convert a string value to a numeric type (such as an integer or floating point number) for mathematical operations. For example, convert the string "123" to the integer 123 or the floating point number 123.0.

[0042] Date and time conversion: Convert date and time from string format to date and time objects for date calculations and time series analysis. This usually involves parsing date and time formats (such as "YYYY-MM-DD HH:MM:SS") and converting to a standardized date and time format.

[0043] Category conversion: Convert categorical data to numerical types for numerical calculations. This can be achieved through label encoding or one-hot encoding.

[0044] ②Character encoding conversion:

[0045] Character set conversion: Convert data from one character set (such as ASCII) to another character set (such as UTF-8) to ensure the consistency of data in different systems or applications.

[0046] Language encoding conversion: If the data involves multiple languages, you may need to convert the string from one language encoding (such as ISO-8859-1) to another language encoding (such as UTF-8) to support multi-language processing.

[0047] ③Data formatting:

[0048] Remove leading and trailing blanks: Delete blank characters on both sides of a string, such as spaces, tabs, and newlines.

[0049] String length normalization: Trim or pad strings to a specific length to unify the dimensions of different data items.

[0050] Data segmentation: For text data, sentences or paragraphs are segmented into words, phrases, or sentence fragments for lexical analysis and natural language processing.

[0051] ④Data normalization / standardization:

[0052] Normalization: Scaling numerical data to a fixed range, such as [0,1] or [-1,1]. This can be achieved by scaling the maximum and minimum values ​​of the data to the target range.

[0053] Standardization: Transform the data to have zero mean and unit variance by subtracting the mean and dividing by the standard deviation. This helps enhance comparisons between different features.

[0054] The choice and implementation of data conversion technology depends on the characteristics of the data, the analysis objectives, and the requirements of subsequent processing. Correct data conversion can improve data quality and provide a better foundation for data analysis and machine learning models.

[0055] 3. Data dimensionality reduction is a technique to simplify a data set by reducing the data dimension, so as to reduce the complexity of data processing and analysis, while retaining as much useful information as possible in the data. The following is a detailed explanation of two commonly used data dimensionality reduction methods: PCA (Principal Component Analysis) and LDA (Latent Dirichlet Allocation):

[0056] ①Principal Component Analysis (PCA):

[0057] -PCA is an unsupervised learning algorithm that aims to transform data into a set of linearly uncorrelated principal components through an orthogonal transformation.

[0058] The steps include:

[0059] Compute the covariance matrix of the data.

[0060] Compute the eigenvalues ​​and eigenvectors of the covariance matrix.

[0061] The eigenvector corresponding to the largest eigenvalue is selected as the first principal component, and then the eigenvector corresponding to the second largest eigenvalue is selected as the second principal component, and so on, until the required number of principal components is reached.

[0062] Transform the data using these eigenvectors as the new axes.

[0063] PCA can be used for data visualization and feature extraction because it can identify the main directions of variation in the data and retain most of the information in these directions.

[0064] ② Latent Dirichlet Allocation (LDA):

[0065] LDA is a supervised learning algorithm that aims to project high-dimensional data into a lower-dimensional space while preserving maximum separability between different classes.

[0066] The steps include:

[0067] Calculate the intra-class divergence and inter-class divergence. The intra-class divergence represents the distribution within the data of the same category, while the inter-class divergence represents the distribution between different categories.

[0068] Find a transformation matrix by which the data can be projected into a new space where the within-class divergence is minimized and the between-class divergence is maximized.

[0069] Transform the data using this transformation matrix.

[0070] LDA is often used for data dimensionality reduction in multi-class classification problems because it helps to distinguish different categories of data, making different categories of data more separable in a low-dimensional space.

[0071] The choice of using PCA or LDA depends on the characteristics of the data and the analysis objectives. PCA is suitable for unsupervised data dimensionality reduction, while LDA is suitable for supervised data dimensionality reduction, especially when it is necessary to maintain the separability of categories in a low-dimensional space. Data dimensionality reduction can significantly improve the training speed and prediction performance of the model while reducing the risk of overfitting.

[0072] The data storage module 200 is wirelessly connected to the data acquisition module 100 to obtain and store each group of voltage operation data;

[0073] The data analysis module 300 is embedded in the data storage module 200, obtains each set of voltage operation data, and constructs a prediction reference model to calculate the voltage fault prediction reference value of each transmission line;

[0074] For further information, see Figure 2 , calculating the voltage fault prediction reference value of each transmission line specifically includes the following steps:

[0075] S1: Real-time acquisition of voltage operation data α at the power output end of the current transmission line;

[0076] S2: Built-in MCU microprocessor synchronously outputs time-voltage curve graph;

[0077] S3: Obtain the voltage difference change information in the real-time output time-voltage curve diagram;

[0078] S4: Build a prediction reference model, input voltage difference change information, and output the corresponding voltage fault prediction reference value.

[0079] Furthermore, the prediction reference model constructed is as follows:

[0080]

[0081] Among them, δ is the reference value for voltage fault prediction of the corresponding transmission line, U1, U2, ..., U n is the real-time voltage value corresponding to each selected point on the time-voltage curve, n is the number of selected points, D1, D2, ..., D n is the derivative value corresponding to each selected point on the time-voltage curve, U Q1 is the real-time voltage value corresponding to the maximum derivative point on the time-voltage curve, U Q2 is the real-time voltage value corresponding to the minimum point of the derivative on the time-voltage curve, and dx is the integral operation.

[0082] It should be noted that the number n of selected points is actually a virtual value and can be infinitely selected. In the specific operation process, it is only necessary to uniformly select a finite number of selected points.

[0083] The automated interaction module 400 is wirelessly connected to the data analysis module 300 to obtain reference values ​​for voltage fault prediction, construct a system interaction model, input reference values ​​for voltage fault prediction, output an overall prediction interaction value, compare it with a preset basic warning threshold, and issue a fault judgment alarm.

[0084] Furthermore, the constructed system interaction model is as follows:

[0085]

[0086] Among them, η is the overall predicted interaction value, δ1, δ2, …, δ m is the voltage fault prediction reference value obtained for each transmission line, and m is the number of transmission lines in the power system.

[0087] Specifically, the preset basic warning threshold is set to 2.360 or 2.361 or 2.362.

[0088] It should be noted that the preset basic warning threshold depends on the calculation model adopted by the user. After selecting the above model, the present invention selects the above three preferred values ​​after verification by a simulation machine and specific experiments. Of course, other values ​​are also acceptable as long as they are not very different from the above three values.

[0089] It should be noted that outputting the overall predicted interaction value, comparing it with the preset basic warning threshold, and issuing a fault judgment alarm is specifically: when the overall predicted interaction value is not lower than the preset basic warning threshold, a fault alarm is issued.

[0090] In order to verify the technical effect of the present invention, the first batch of test operations were carried out on the simulation machine, and some data forms are shown in Table 1 below:

[0091] Table 1: Performance data sheet

[0092] Data Item Numeric Real-time monitoring duration 12 months Frequency of collecting power system operation data 1 time per second Power output parameters Voltage Historical data analysis duration Last 36 months Fault warning accuracy ≥95% Fault response time ≤1 minute System operation stability 99.99% uptime System maintenance frequency Monthly User feedback satisfaction ≥90%

[0093] In addition, in order to discuss in detail the beneficial effects of the technical solution of the present invention from another aspect, the following specific experimental verification process is now given:

[0094] 1. System construction:

[0095] Build a simulated power system including key components such as generators, transmission lines, transformers, and more.

[0096] Install sensors and data acquisition equipment to monitor the operating parameters of the power system in real time.

[0097] 2. Data Collection:

[0098] Collect power system operation data in real time.

[0099] The data collection interval is set to a short time interval (such as every second or every minute).

[0100] 3. Model training and testing:

[0101] Using the collected historical data, a predictive model is trained to predict the future output of the power system.

[0102] Test the accuracy and reliability of the model to ensure it can effectively identify potential failures.

[0103] 4. Fault simulation:

[0104] Some faults are artificially introduced into the power system, such as short circuit, overload, insulation aging, etc.

[0105] Observe the system's response and alarm capabilities to these faults.

[0106] 5. Performance evaluation:

[0107] Evaluate the system's performance in fault detection and alarm, including the timeliness, accuracy, and completeness of the alarm.

[0108] The data table is shown in Table 2 below:

[0109] Table 2: Test data performance table

[0110]

[0111]

[0112] Experimental data analysis:

[0113] The test results of sample A show that the system can collect the operation data of the power system in real time at a frequency of 10 times per second, and the data transmission delay is ≤1 millisecond, ensuring the real-time and accuracy of the data.

[0114] The test results of sample B show that the mean square error of the prediction model is 0.025 and the determination coefficient is 0.98, which indicates that the model has high prediction accuracy and can accurately predict the future output of the power system.

[0115] The test results of sample C show that the system can cover a variety of fault types, and the fault detection coverage rate is ≥90%, indicating that the system has comprehensive fault detection capabilities.

[0116] The test results of sample D show that the system's response time to faults is 0.3 seconds on average, and the maximum delay does not exceed 0.5 seconds, which means that the system responds to faults quickly and without delay and can issue an alarm in a timely manner.

[0117] The test results of sample E show that the system's alarm accuracy is 98.5% and the false alarm rate is ≤1.5%, indicating that the system's fault alarm accuracy is high and the false alarm rate is low.

[0118] The above data proves the superiority of the power system automation fault alarm system of the present invention in terms of real-time monitoring, prediction analysis, automatic early warning, etc.

[0119] The present invention provides an automatic fault alarm system for power systems based on power output calculation prediction, applies big data technology and model intelligent calculation to power system fault alarm, and automatically identifies and alarms potential power system faults by real-time monitoring and predicting the operating status of the power system. Compared with the prior art, the present invention has the following creativity:

[0120] 1. Real-time monitoring: Compared with traditional periodic inspections and manual inspections, the system of the present invention can collect and analyze the operating data of the power system in real time, greatly improving the real-time and accuracy of monitoring.

[0121] 2. Predictive analysis: Through big data technology and model intelligent calculation, the system of the present invention can predict the future output of the power system, thereby discovering potential faults in advance.

[0122] 3. Automatic warning: Through the fault warning module, the system of the present invention can automatically identify and warn of potential power system faults without manual intervention.

[0123] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.

Claims

1. An automatic fault alarm system for a power system based on power output calculation prediction, characterized in that: Includes the following components: A data acquisition module (100) is arranged at the power output end of each transmission line, and is used to collect voltage operation data of the power output end of the current transmission line in real time, and upload the corresponding voltage operation data to the data storage module (200); A data storage module (200) is wirelessly connected to the data acquisition module (100) to obtain and store each group of voltage operation data; A data analysis module (300) is embedded in the data storage module (200), acquires each group of voltage operation data, builds a prediction reference model, and calculates a voltage fault prediction reference value for each transmission line; The automated interaction module (400) is wirelessly connected to the data analysis module (300) to obtain each of the voltage fault prediction reference values, construct a system interaction model, input each of the voltage fault prediction reference values, output an overall prediction interaction value, compare it with a preset basic warning threshold, and issue a fault judgment alarm.

2. The power system automation fault alarm system based on power output calculation prediction according to claim 1 is characterized in that: The data acquisition module (100) is also embedded with a data preprocessing unit, which preprocesses each set of voltage operation data after acquiring the data, and uploads the preprocessed voltage operation data to the data storage module (200); Data preprocessing specifically includes: data cleaning, data conversion and data dimensionality reduction.

3. The power system automation fault alarm system based on power output calculation prediction according to claim 2 is characterized in that: Calculating the voltage fault prediction reference value of each transmission line specifically includes the following steps: S1: Real-time acquisition of voltage operation data α at the power output end of the current transmission line; S2: Built-in MCU microprocessor synchronously outputs time-voltage curve graph; S3: Obtain the voltage difference change information in the real-time output time-voltage curve diagram; S4: construct the prediction reference model, input the voltage difference change information, and output the corresponding voltage fault prediction reference value.

4. The power system automation fault alarm system based on power output calculation prediction according to claim 3 is characterized in that: The prediction reference model constructed is specifically: Wherein, δ is the voltage fault prediction reference value of the corresponding transmission line, U1, U2, ..., U n is the real-time voltage value corresponding to each selected point on the time-voltage curve, n is the number of selected points, D1, D2, ..., D n is the derivative value corresponding to each selected point on the time-voltage curve, U Q1 is the real-time voltage value corresponding to the maximum derivative point on the time-voltage curve, U Q2 is the real-time voltage value corresponding to the minimum point of the derivative on the time-voltage curve, and dx is the integral operation.

5. The power system automation fault alarm system based on power output calculation prediction according to claim 4 is characterized in that: The system interaction model constructed is specifically as follows: Where η is the overall predicted interaction value, δ1, δ2, ..., δ m is the voltage fault prediction reference value obtained for each transmission line, and m is the number of transmission lines in the power system.

6. The power system automation fault alarm system based on power output calculation prediction according to claim 5 is characterized in that: The preset basic warning threshold is set to 2.360 or 2.361 or 2.

362.

7. The power system automation fault alarm system based on power output calculation prediction according to claim 6 is characterized in that: Output the overall predicted interaction value, compare it with the preset basic warning threshold, and issue a fault judgment alarm. Specifically, when the overall predicted interaction value is not lower than the preset basic warning threshold, issue a fault alarm.

Citation Information

Patent Citations

  • Method for rapidly assessing multi-antenna system channel capacity stability

    CN106301632A

  • Method and device for determining large-capacity main transformer optimal split-phase closing time

    CN109412126A

  • Energy storage optimal configuration method considering transient support

    CN114825387A

  • Novel power system stability distributed discrimination method and device

    CN115954861A

  • Electric power conversion system

    JP2015186436A