Soft start circuit, detection method thereof and light storage air conditioning system
By designing a soft start circuit in the optical storage and air conditioning system, closing the relay in turn and collecting voltage parameters, the problem of false triggering overcurrent faults and difficulty in identifying faults when the relay is closed at the same time is solved, and fault judgment and accurate positioning of a single relay are achieved. Improves maintenance efficiency and user experience.
Patent Information
- Application Number
- CN202410974945.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-19
- Publication Date
- 2024-11-08
AI Technical Summary
In existing optical storage and air conditioning systems, the risk of simultaneous closing of the relay is incorrectly triggering an overcurrent fault, and it is impossible to accurately locate the adhesion or open circuit fault of a single relay.
A soft start circuit is designed, including a relay unit, a bus capacitor, a charging unit and a sampling unit. By closing the relay in turn and collecting voltage parameters, we can determine whether the relay is faulty, and use the threshold voltage to determine whether the charging is normal or abnormal, and identify adhesion or open circuit faults.
Avoid falsely triggering of overcurrent faults, enable accurate positioning and identification of faults of individual relays, improving maintenance efficiency and user experience.
Smart Images

Figure CN118914831A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power transformation, and in particular to a soft start circuit and a detection method thereof, and a photovoltaic storage air conditioning system. Background Art
[0002] The photovoltaic energy storage air conditioning system refers to a system that combines photovoltaic power generation, energy storage system and air conditioning system. The electricity generated by the solar photovoltaic panels can be directly supplied to the air conditioning system, and the remaining electricity is stored in the battery for use when the sun is not shining or the demand for electricity increases. The photovoltaic energy storage converter (PCS) is an important component of the solar photovoltaic system responsible for energy conversion between the photovoltaic array and the battery energy storage system. It can convert the DC power generated by the photovoltaic array into AC power suitable for the power grid or load, and can also convert excess electricity into DC power and store it in the battery.
[0003] In the current main topology of the photovoltaic storage air conditioning system or photovoltaic storage converter, each phase of the three-phase line in the corresponding AC power grid is connected in series with a first relay and a second relay. When the AC power grid needs to be connected to the photovoltaic storage air conditioning system or photovoltaic storage converter, it is only necessary to close the first relay in each phase at the same time, and then close the second relay in each phase at the same time, but this processing method will bring the following problems:
[0004] First, when the relays in each phase are closed at the same time, the action of the relay contacts will cause impact interference, and there is a risk of false triggering of overcurrent faults.
[0005] Second, in order to detect whether a relay fails, the existing solution requires closing the relays in the two-phase circuit at the same time to form a loop. That is, two relays must be closed in each phase to form a loop to generate current to detect whether the relay fails. However, multiple relays are detected at the same time, and it is impossible to judge and identify the adhesion or open circuit fault of a single relay, so it is impossible to accurately locate the faulty relay. Summary of the invention
[0006] In view of this, the present invention provides a soft start circuit and a detection method thereof and a photovoltaic energy storage air conditioning system, which are used to solve the problem in the prior art that the relays in each phase are closed simultaneously, resulting in the risk of false triggering of overcurrent faults; and the inability to judge and identify adhesion or open circuit faults of a single relay, so the faulty relay cannot be accurately located.
[0007] The technical solution of the present invention is a soft start circuit, comprising: a relay unit connected between a three-phase alternating current and a three-phase bridge unit, wherein the relay unit comprises a first relay and a second relay connected in series with each phase of the three-phase alternating current; and further comprising:
[0008] A bus capacitor connected to both ends of the three-phase bridge unit;
[0009] a charging unit connected between the first phase of the three-phase alternating current and the first end of the bus capacitor, and connected between the third phase of the three-phase alternating current and the second end of the bus capacitor;
[0010] A sampling unit, used for collecting voltage parameters of the bus capacitor and the relay in the relay unit;
[0011] The control unit is used to close the relays in the relay unit in sequence and receive the voltage parameter of the currently closed relay to determine whether the relay is faulty.
[0012] Further, the charging unit includes a first charging relay, a second charging relay, a first resistor and a second resistor;
[0013] The first phase of the three-phase alternating current is connected to the first end of the first charging relay, the second end of the first charging relay is connected to the first end of the first resistor, and the second end of the first resistor is connected to the first end of the three-phase bridge unit and the first end of the bus capacitor respectively;
[0014] The third phase of the three-phase alternating current is connected to the first end of the second charging relay, the second end of the second charging relay is connected to the first end of the second resistor, and the second end of the second resistor is respectively connected to the second end of the three-phase bridge unit and the second end of the bus capacitor.
[0015] The present invention further proposes a detection method using the soft start circuit described above, the detection method comprising:
[0016] Turning on the charging unit, collecting the bus voltage of the bus capacitor, and analyzing whether the bus capacitor is charged normally or abnormally according to the bus voltage;
[0017] When the bus capacitor is charged normally, the relays in the relay unit are closed in sequence, and the voltage parameters of the currently closed relays are collected to determine whether the relays are faulty.
[0018] Furthermore, when the bus capacitor starts to charge, the bus voltage of the bus capacitor is collected, including:
[0019] Determining whether the bus voltage is greater than a first threshold voltage;
[0020] When the judgment is yes, the bus capacitor is charged normally;
[0021] When the determination is negative, the bus capacitor is abnormally charged, and all relays in the soft start circuit are disconnected.
[0022] Furthermore, when the bus capacitor is charged normally, the method further comprises:
[0023] Close the first relay connected to the first phase, collect the voltage U1 before the first relay connected to the first phase is closed and the voltage U1' after the first relay is closed, and determine whether the absolute value of the difference between the voltage U1 and the voltage U1' is less than a first preset voltage;
[0024] If the determination is negative, the first relay connected to the first phase is closed normally;
[0025] If the determination is yes, a first relay connected to the first phase fails, and all relays in the soft start circuit are disconnected.
[0026] Furthermore, when the first relay connected to the first phase is normally closed, the method further includes:
[0027] Close the first relay connected to the second phase, collect the voltage U2 before the first relay connected to the second phase is closed and the voltage U2' after the first relay is closed, and determine whether the absolute value of the difference between the voltage U2 and the voltage U2' is less than the first preset voltage;
[0028] If the determination is negative, the first relay connected to the second phase is normally closed;
[0029] If the determination is yes, the first relay connected to the second phase fails, and all relays in the soft start circuit are disconnected.
[0030] Furthermore, when the first relay connected to the second phase is normally closed, the method further includes:
[0031] Close the first relay connected to the third phase, collect the voltage U3 before and the voltage U3' of the first relay connected to the third phase, and determine whether the absolute value of the difference between the voltage U3 and the voltage U3' is less than the first preset voltage;
[0032] If the determination is negative, the first relay connected to the third phase is closed normally;
[0033] If the determination is yes, the first relay connected to the third phase fails, and all relays in the soft start circuit are disconnected.
[0034] Furthermore, when a first relay connected to the first phase, the second phase, or the third phase fails, the method further includes:
[0035] Determine whether the voltage U1' or the voltage U2' or the voltage U3' is less than a second preset voltage;
[0036] If the determination is yes, a first relay connected to the first phase, the second phase, or the third phase has a sticking fault;
[0037] If the determination is negative, an open circuit fault occurs in the first relay connected to the first phase, the second phase, or the third phase.
[0038] Further, when the first relay connected to the third phase is normally closed, it also includes:
[0039] Collecting the voltage before the second relay connected to each phase is closed, and determining whether the voltage before the second relay connected to each phase is closed is less than a third preset voltage;
[0040] When the determination is yes, a sticking fault occurs in the corresponding second relay, and all relays in the soft start circuit are disconnected.
[0041] Furthermore, when the voltage before the second relay connected to each phase is closed is not less than the third preset voltage, the method further includes:
[0042] closing the second relay connected to the first phase, disconnecting all the switch tubes of the three-phase bridge unit, disconnecting the first charging relay of the charging unit, and determining whether the bus voltage is less than a second threshold voltage;
[0043] When the determination is yes, an open circuit fault occurs in the second relay connected to the first phase, and all relays in the soft start circuit are disconnected;
[0044] When the determination is negative, the second relay connected to the first phase is normally closed.
[0045] Further, when the second relay connected to the first phase is normally closed, the method further includes:
[0046] closing the second relay connected to the second phase, only turning on the lower tube of the bridge arm connected to the second phase, disconnecting the second charging relay of the charging unit, and determining whether the bus voltage is less than the second threshold voltage;
[0047] When the determination is yes, an open circuit fault occurs in the second relay connected to the second phase, and all relays in the soft start circuit are disconnected;
[0048] When the determination is negative, the second relay connected to the second phase is normally closed.
[0049] Further, when the second relay connected to the second phase is normally closed, the method further includes:
[0050] closing the second relay connected to the third phase, disconnecting the second relay connected to the second phase, only turning on the lower tube of the bridge arm connected to the third phase, and judging whether the bus voltage is less than the second threshold voltage;
[0051] When the determination is yes, an open circuit fault occurs in the second relay connected to the third phase, and all relays in the soft start circuit are disconnected;
[0052] When the determination is negative, the second relay connected to the third phase is normally closed, and the second relay connected to the second phase is closed.
[0053] The present invention also provides a solar energy storage air conditioning system, comprising the soft start circuit described above.
[0054] Compared with the prior art, the present invention has at least the following beneficial effects:
[0055] The present invention can detect the currently closed single first relay or second relay while closing the first relay and the second relay in the relay unit in sequence, which can not only avoid the risk of false triggering of overcurrent fault in the soft start circuit, but also judge and identify the adhesion fault or open circuit fault of the single relay, so as to accurately locate the faulty relay, facilitate notifying maintenance personnel to repair it in time, speed up maintenance efficiency, and improve user experience. BRIEF DESCRIPTION OF THE DRAWINGS
[0056] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by technicians in the technical field of the present invention; the terms used in the specification of the application herein are only for the purpose of describing specific embodiments and are not intended to limit the present invention; the terms "including" and "having" and any variations thereof in the specification and claims of the present invention and the above-mentioned drawings are intended to cover non-exclusive inclusions. The terms "first", "second", etc. in the specification and claims of the present invention or the above-mentioned drawings are used to distinguish different objects, not to describe a specific order.
[0057] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0058] Figure 1 It is a module block diagram of the soft start circuit of the present invention;
[0059] Figure 2 is a circuit diagram of a soft start circuit of the present invention;
[0060] Figure 3 A first flow chart of a detection method for a soft start circuit of the present invention;
[0061] Figure 4 A second flow chart of the detection method of the soft start circuit of the present invention;
[0062] Figure 5 A third flow chart of the detection method of the soft start circuit of the present invention;
[0063] Figure 6 This is a fourth flow chart of the detection method of the soft start circuit of the present invention.
[0064] Reference numerals:
[0065] 10. Three-phase alternating current;
[0066] 20. Relay unit;
[0067] 30. Three-phase bridge unit;
[0068] 40. Charging unit; 41. First charging unit; 42. Second charging unit;
[0069] 50. Sampling unit;
[0070] 60. Control unit;
[0071] 70. Auxiliary power supply. DETAILED DESCRIPTION
[0072] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention clearer, the present invention is further described in detail below in conjunction with the accompanying drawings and examples. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention. Thus, a feature indicated in this specification will be used to illustrate one of the features of an embodiment of the present invention, rather than implying that each embodiment of the present invention must have the described features. In addition, it should be noted that this specification describes many features. Although certain features can be combined together to illustrate possible system designs, these features can also be used in other combinations that are not explicitly described. Thus, unless otherwise stated, the described combinations are not intended to be limiting.
[0073] The principle and structure of the present invention are described in detail below with reference to the accompanying drawings and embodiments.
[0074] Example 1
[0075] In the existing photovoltaic storage air conditioning system or photovoltaic storage inverter main topology solution, each phase line of the three-phase line in the corresponding AC power grid is connected in series with a first relay and a second relay. When the AC power grid needs to be connected to the photovoltaic storage air conditioner or photovoltaic storage inverter, it is only necessary to close the first relay in each phase at the same time, and then close the second relay in each phase at the same time, but this processing method will bring the following problems:
[0076] First, when the relays in each phase are closed at the same time, the action of the relay contacts will cause impact interference, and there is a risk of false triggering of overcurrent faults.
[0077] Second, in order to detect whether a relay fails, the existing solution requires closing the relays in the two-phase circuit at the same time to form a loop. That is, two relays must be closed in each phase to form a loop to generate current to detect whether the relay fails. However, multiple relays are detected at the same time, and it is impossible to judge and identify the adhesion or open circuit fault of a single relay, so it is impossible to accurately locate the faulty relay.
[0078] To solve the above problems, refer to the attached Figure 1-2 The present invention proposes a soft start circuit that prevents a first relay and a second relay connected to each phase from being closed at the same time, and can judge and identify a single relay fault and accurately locate a relay fault, comprising: a relay unit 20 connected between a three-phase alternating current 10 and a three-phase bridge unit 30, the relay unit 20 including a first relay and a second relay connected in series with each phase of the three-phase alternating current 10; and further comprising:
[0079] A bus capacitor C is connected to both ends of the three-phase bridge unit 30;
[0080] The charging unit 40 is connected between the first phase of the three-phase alternating current 10 and the first end of the bus capacitor C, and is connected between the third phase of the three-phase alternating current 10 and the second end of the bus capacitor C;
[0081] The sampling unit 50 is used to collect the voltage parameters of the bus capacitor C and the relay in the relay unit 20 and upload them to the control unit 60;
[0082] The control unit 60 is used to close the relays in the relay unit 20 in sequence, and receive the voltage parameter of the currently closed relay to determine whether the current relay is faulty.
[0083] It should be noted that any two phases of the three-phase alternating current 10 are also connected to an auxiliary power supply 70 , and the auxiliary power supply 70 is used to supply power to the sampling unit 50 and the control unit 60 for their operation.
[0084] In this way, when the soft start circuit is started, the auxiliary power supply 70 is powered, and then the sampling unit 50 and the control unit 60 are powered and work normally, and then the control unit 60 controls the charging unit 40 to turn on, and the three-phase AC power 10 charges the bus capacitor C through the charging unit 40, and then the sampling unit 50 collects the bus voltage of the bus capacitor C and uploads it to the control unit 60, and the control unit 60 then determines whether the bus capacitor C is charged normally or abnormally according to the bus voltage; when the bus capacitor C is charged normally, the control unit 60 first controls the first relay connected to each phase to close in sequence, and then the sampling unit 50 collects the voltage before and after the first relay connected to one of the phases is closed and uploads it to the control unit 60, and then the control unit 60 determines whether the first relay connected to one of the phases is faulty, if not, it closes the first relay connected to one of the phases, and then determines whether the first relay connected to the other two phases is faulty. The sampling unit 50 collects the voltage before the second relay connected to each phase is closed and uploads it to the control unit 60. The control unit 60 determines whether the second relay has a sticking fault. Then the control unit 60 controls the second relays that have not had a sticking fault to close in sequence. Then the sampling unit 50 collects the bus voltage formed by the currently closed second relay and uploads it to the control unit 60. Then the control unit 60 determines whether the currently closed second relay has a fault. If not, the sampling unit 50 collects the bus voltage formed by the next closed second relay. The control unit 60 determines whether the second relay has a fault until all the second relays are closed. At this point, all relays in the relay unit 20 are closed and the detection is completed, and the soft start circuit is in standby mode.
[0085] Therefore, the soft start circuit proposed in the present invention can detect the currently closed single first relay or second relay while closing the first relay and the second relay in the relay unit 20 in sequence. This not only avoids the risk of false triggering of overcurrent faults in the soft start circuit, but also can judge and identify adhesion faults or open circuit faults of single relays to accurately locate the faulty relay, facilitate notifying maintenance personnel to carry out repairs in a timely manner, speed up maintenance efficiency, and improve user experience.
[0086] In order to facilitate the detection of a single first relay or a second relay, the soft start circuit can form a loop accordingly, so that the single first relay or the second relay can be detected through the voltage in the loop. Figure 2 The charging unit 40 includes a first charging relay K7 and a first resistor R1 constituting a first charging unit 41 , and a second charging relay K8 and a second resistor R2 constituting a second charging unit 42 .
[0087] The relay unit 20 includes a first relay K1, a second relay K2, a first relay K3, a second relay K4, a first relay K5, a second relay K6, an inductor L1, an inductor L2 and an inductor L3; the three-phase bridge unit 30 includes a switch tube Q1, a switch tube Q2, a switch tube Q3, a switch tube Q4, a switch tube Q5 and a switch tube Q6.
[0088] Among them, the switch tube Q1 and the switch tube Q2 form a first bridge arm, the switch tube Q3 and the switch tube Q4 form a second bridge arm, the switch tube Q5 and the switch tube Q6 form a third bridge arm, and the switch tube Q2, the switch tube Q4, and the switch tube Q6 belong to the lower tube.
[0089] It should be noted that the first phase of the three-phase alternating current 10 in this embodiment is preferably a U phase, the second phase is preferably a V phase, and the third phase is preferably a W phase. Of course, the first phase can also be a V phase or a W phase, the second phase can also be a U phase or a W phase, and the third phase can also be a U phase or a V phase, which is not limited here.
[0090] The first phase U of the three-phase alternating current 10 is respectively connected to the first end of the first charging relay K7 and the first end of the first relay K1, the second end of the first charging relay K7 is connected to the first end of the first resistor R1, the second end of the first resistor R1 is connected to the first wiring terminal, and the first wiring terminal is also respectively connected to the first end of the first bridge arm, the first end of the second bridge arm, the first end of the third bridge arm and the first end of the bus capacitor C; the second end of the first relay K1 is connected to the first end of the second relay K2, the second end of the second relay K2 is connected to the first end of the inductor L1, and the second end of the inductor L1 is connected to the midpoint of the first bridge arm.
[0091] The second phase V of the three-phase alternating current 10 is connected to the first end of the first relay K3, the second end of the first relay K3 is connected to the first end of the second relay K4, the second end of the second relay K4 is connected to the first end of the inductor L2, and the second end of the inductor L2 is connected to the midpoint of the second bridge arm.
[0092] The third phase W of the three-phase alternating current 10 is connected to the first end of the second charging relay K8 and the first end of the first relay K5 respectively, the second end of the second charging relay K8 is connected to the first end of the second resistor R2, the second end of the second resistor R2 is connected to the second wiring terminal, and the second wiring terminal is also respectively connected to the second end of the first bridge arm, the second end of the second bridge arm, the second end of the third bridge arm and the second end of the bus capacitor C; the second end of the first relay K5 is connected to the first end of the second relay K6, the second end of the second relay K6 is connected to the first end of the inductor L3, and the second end of the inductor L3 is connected to the midpoint of the third bridge arm.
[0093] Among them, a diode is connected in parallel between the emitter and the collector of each switch tube, and the emitter of each switch tube is connected to the positive electrode of the diode, and the collector of each switch tube is connected to the negative electrode of the diode.
[0094] It should be noted that when detecting the first relay K1 or the first relay K3 or the first relay K5 separately in sequence, it is only necessary to close the first relay K1 or the first relay K3 or the first relay K5. The sampling unit 50 collects the voltage before and after the first relay K1 or the first relay K3 or the first relay K5 is closed and uploads it to the control unit 60, so as to facilitate the control unit 60 to determine whether the relay is faulty.
[0095] When the second relay K2 or the second relay K4 or the second relay K6 is detected separately, the first relay K1, the first relay K3 and the first relay K5 are all in the closed state; when the second relay K2 is detected separately, all the switch tubes are disconnected, the first charging relay K7 is disconnected, and the second charging relay K8 is closed. At this time, the first relay K1, the second relay K2, the inductor L1, the diode connected in parallel with the switch tube Q1, the bus capacitor C, the second resistor R2 and the second charging relay K8 form a first loop; when the second relay K4 is detected separately, the second relay K4 is closed, and the first charging relay K7 and the second charging relay K8 are both disconnected. When the second relay K6 is detected alone, the second relay K6 is closed, the first charging relay K7 and the second charging relay K8 are both disconnected, and only the switch tube Q6 is turned on. At this time, the first relay K1, the second relay K2, the inductor L1, the diode connected in parallel with the switch tube Q1, the bus capacitor C, the switch tube Q6, the inductor L3, the second relay K6 and the first relay K5 form a third loop. Then the sampling unit 50 collects the voltage of the corresponding second relay in the first loop, the second loop or the third loop respectively and uploads it to the control unit 60, so that the control unit 60 can judge whether the second relay is faulty.
[0096] Example 2
[0097] Based on the same inventive concept, the present invention also proposes a detection method for a soft start circuit, the detection method comprising:
[0098] The control unit 60 controls the first charging relay K7 and the second charging relay K8 to close to turn on the charging unit 40, and the bus capacitor C starts to charge. The sampling unit 50 collects the bus voltage of the bus capacitor C and uploads it to the control unit 60. The control unit 60 then analyzes whether the bus capacitor C is charged normally or abnormally according to the bus voltage.
[0099] When the bus capacitor C is charged normally, the control unit 60 closes the first relay and the second relay in the relay unit 20 in sequence, and then the sampling unit 50 collects the voltage parameters of the currently closed first relay or the second relay and uploads them to the control unit 60, and the control unit 60 determines whether the currently closed first relay or the second relay is faulty.
[0100] In this way, while the present invention closes the first relay and the second relay in the relay unit 20 in sequence, it can also detect the currently closed single first relay or second relay, which not only avoids the risk of false triggering of overcurrent faults in the soft start circuit, but also can judge and identify adhesion faults or open circuit faults of the single first relay or second relay to accurately locate the faulty relay, facilitate notifying maintenance personnel to carry out repairs in a timely manner, speed up maintenance efficiency, and improve user experience.
[0101] Among them, refer to the attached Figure 3 , when the bus capacitor C starts to charge, the sampling unit 50 collects the bus voltage of the bus capacitor C and uploads it to the control unit 60, and then the control unit 60 determines whether the bus voltage is greater than the first threshold voltage;
[0102] When the judgment is yes, the bus capacitor C is charged normally;
[0103] When the judgment is no, the bus capacitor C is abnormally charged, and the control unit 60 disconnects all relays in the soft start circuit. Then the control unit 60 sends charging abnormality information to the upper computer to notify the maintenance personnel to carry out maintenance in time, speed up the maintenance efficiency, and improve the user experience.
[0104] It should be noted that the first phase of the three-phase alternating current 10 in this embodiment is preferably a U phase, the second phase is preferably a V phase, and the third phase is preferably a W phase. Of course, the first phase can also be a V phase or a W phase, the second phase can also be a U phase or a W phase, and the third phase can also be a U phase or a V phase, which is not limited here.
[0105] It should be noted that the first threshold voltage in this embodiment is preferably 85% of the voltage peak value of the three-phase alternating current 10. Of course, the first threshold voltage can also be determined according to actual conditions and is not limited here.
[0106] Further, see Attachment Figure 3 , when the bus capacitor C is charged normally, the control unit 60 closes the first relay K1 connected to the first phase U, the sampling unit 50 collects the voltage U1 before the first relay K1 is closed and the voltage U1' after the first relay K1 is closed and uploads them to the control unit 60, and then the control unit 60 determines whether the absolute value of the difference between the voltage U1 and the voltage U1' is less than the first preset voltage;
[0107] If the judgment is no, the first relay K1 is closed normally;
[0108] If it is determined to be yes, the first relay K1 fails, and the control unit 60 disconnects all relays in the soft start circuit. The control unit 60 then sends the fault information of the first relay K1 to the host computer, so as to notify the maintenance personnel to perform timely and accurate maintenance, speed up maintenance efficiency, and improve the user experience.
[0109] It should be noted that the first preset voltage in this embodiment is preferably 3V or 5V. Of course, the first preset voltage can also be set according to actual conditions and is not limited here.
[0110] Further, see Attachment Figure 3 , when the first relay K1 is normally closed, the control unit 60 then closes the first relay K3 connected to the second phase V, the sampling unit 50 collects the voltage U2 before the first relay K3 is closed and the voltage U2' after the first relay K3 is closed and uploads them to the control unit 60, and then the control unit 60 determines whether the absolute value of the difference between the voltage U2 and the voltage U2' is less than the first preset voltage;
[0111] If the judgment is no, the first relay K3 is closed normally;
[0112] If it is determined to be yes, the first relay K3 fails, and the control unit 60 disconnects all relays in the soft start circuit. The control unit 60 then sends the fault information of the first relay K3 to the host computer, so as to notify the maintenance personnel to perform timely and accurate maintenance, speed up maintenance efficiency, and improve the user experience.
[0113] Further, see Attachment Figure 3 , when the first relay K3 is normally closed, the control unit 60 then closes the first relay K5 connected to the third phase W, the sampling unit 50 collects the voltage U3 before the first relay K5 is closed and the voltage U3' after the first relay K5 is closed and uploads them to the control unit 60, and then the control unit 60 determines whether the absolute value of the difference between the voltage U3 and the voltage U3' is less than the first preset voltage;
[0114] If the judgment is no, the first relay K5 is closed normally;
[0115] If it is determined to be yes, the first relay K5 fails, and the control unit 60 disconnects all relays in the soft start circuit. The control unit 60 then sends the fault information of the first relay K5 to the host computer, so as to notify the maintenance personnel to perform timely and accurate maintenance, speed up maintenance efficiency, and improve the user experience.
[0116] Further, see Attachment Figure 3 When the first relay K1, the first relay K3, or the first relay K5 fails, the specific fault conditions are as follows:
[0117] The control unit 60 determines whether the voltage U1', the voltage U2', or the voltage U3' is less than a second preset voltage;
[0118] If the determination is yes, a sticking fault occurs in the first relay K1 or the first relay K3 or the first relay K5;
[0119] If the determination is negative, an open circuit fault occurs in the first relay K1 , the first relay K3 , or the first relay K5 .
[0120] At this time, the control unit 60 will disconnect all relays in the soft start circuit, and then the control unit 60 sends the fault information of the first relay K1 or the first relay K3 or the first relay K5 to the host computer. The fault information includes adhesion fault and open circuit fault. This makes it easier to notify maintenance personnel to carry out timely maintenance and more accurate maintenance, speed up maintenance efficiency, and improve user experience.
[0121] It should be noted that the second preset voltage in this embodiment is preferably 3V or 5V. Of course, the first preset voltage can also be taken according to actual conditions and is not limited here.
[0122] Further, see Attachment Figure 4 , when the first relay K1, the first relay K3 and the first relay K5 are all closed normally, then the sampling unit 50 collects the voltage U4 before the second relay K2 connected to the first phase U is closed, the voltage U5 before the second relay K4 connected to the second phase V is closed, and the voltage U6 before the second relay K6 connected to the third phase W is closed, and uploads them to the control unit 60, and then the control unit 60 respectively determines whether the voltage U4, the voltage U5 and the voltage U6 are less than the third preset voltage;
[0123] When the judgment is yes, the corresponding second relay has a sticking fault. At this time, all relays in the soft start circuit are disconnected, and then the control unit 60 sends the sticking fault information of the second relay to the host computer, so as to notify the maintenance personnel to carry out timely and accurate maintenance, speed up the maintenance efficiency, and improve the user experience.
[0124] If the voltage U4 , the voltage U5 and the voltage U6 are not less than the third preset voltage, proceed to the next step.
[0125] At this time, the control unit 60 closes the second relay K2 connected to the first phase U, disconnects all the switch tubes in the three-phase bridge unit 30, disconnects the first charging relay K7, keeps the second charging relay K8 closed, and then the control unit 60 determines whether the bus voltage is less than the second threshold voltage;
[0126] When the judgment is yes, the second relay K2 has an open circuit fault, disconnecting all relays in the soft start circuit, and then the control unit 60 sends the open circuit fault information of the second relay K2 to the host computer, so as to notify the maintenance personnel to carry out timely and accurate maintenance, speed up the maintenance efficiency, and improve the user experience.
[0127] When the determination is negative, the second relay K2 is normally closed.
[0128] It should be noted that the third preset voltage in this embodiment is preferably 3V or 5V. Of course, the third preset voltage can also be set according to actual conditions and is not limited here.
[0129] Further, see Attachment Figure 5 , when the second relay K2 is normally closed, the control unit 60 then closes the second relay K4 connected to the second phase V, only turns on the lower tube of the bridge arm connected to the second phase V, disconnects the first charging relay K7 and the second charging relay K8, and then the control unit 60 determines whether the bus voltage is less than the second threshold voltage;
[0130] When the judgment is yes, the second relay K4 has an open circuit fault, disconnecting all relays in the soft start circuit, and then the control unit 60 sends the open circuit fault information of the second relay K4 to the host computer, so as to notify the maintenance personnel to carry out timely and accurate maintenance, speed up the maintenance efficiency, and improve the user experience.
[0131] When the determination is negative, the second relay K4 is normally closed.
[0132] It should be noted that the lower tube of the bridge arm connected to the second phase V is equivalent to the switch tube Q4 of the second bridge arm connected to the second phase V. The second threshold voltage in this embodiment is preferably 75% of the voltage peak of the three-phase alternating current 10. Of course, the second threshold voltage can also be taken according to actual conditions and is not limited here.
[0133] Further, see Attachment Figure 6 , when the second relay K4 is normally closed, the control unit 60 closes the second relay K6 connected to the third phase W, disconnects the second relay K4 connected to the second phase V, and only turns on the lower tube of the bridge arm connected to the third phase W, while the first charging relay K7 and the second charging relay K8 are still disconnected, and then the control unit 60 determines whether the bus voltage is less than the second threshold voltage;
[0134] When the judgment is yes, the second relay K6 has an open circuit fault, disconnecting all relays in the soft start circuit, and then the control unit 60 sends the open circuit fault information of the second relay K6 to the host computer, so as to notify the maintenance personnel to carry out timely and accurate maintenance, speed up the maintenance efficiency, and improve the user experience.
[0135] When the judgment is no, the second relay K6 is closed normally, and then the control unit 60 closes the second relay K4, disconnecting the lower tube of the second bridge arm connected to the third phase W. At this point, all relays in the relay unit 20 are closed and the detection is completed, and the soft start circuit is in standby state.
[0136] It should be noted that the lower tube of the bridge arm connected to the third phase W is equivalent to the switch tube Q6 of the second third bridge arm connected to the third phase W; and when the soft start circuit is in the standby state, the state of the first charging relay K7 and the second charging relay K8 in this embodiment is preferably in the disconnected state. Of course, based on actual conditions, the first charging relay K7 and the second charging relay K8 can also be closed, which is not limited here.
[0137] Example 3
[0138] Based on the same inventive concept, the present invention also proposes a solar-storage air-conditioning system, which includes the soft start circuit described above.
[0139] In this way, when the photovoltaic storage air conditioning system is powered on and started, the soft start circuit is started accordingly, and the auxiliary power supply 70 is also powered accordingly, so that the sampling unit 50 and the control unit 60 are powered and work normally, and then the control unit 60 controls the first charging relay K7 and the second charging relay K8 to close, so that the charging unit 40 is turned on. At this time, the three-phase AC power 10 will charge the bus capacitor C through the charging unit 40, and then the sampling unit 50 collects the bus voltage of the bus capacitor C and uploads it to the control unit 60. The control unit 60 then determines whether the bus voltage is greater than the first threshold voltage. If so, the bus capacitor C is charged normally; if not, the bus capacitor C is charged abnormally.
[0140] When the bus capacitor C is charged normally, the control unit 60 needs to control the first relay connected to each phase to close in sequence. Specifically, the sampling unit 50 first collects the voltage before and after the first relay connected to the first phase is closed and uploads it to the control unit 60. Then the control unit 60 determines whether the absolute value of the difference between the voltage before and after the first relay connected to the first phase is less than the first preset voltage. If not, the first relay connected to the first phase is closed normally; if so, the first relay connected to the first phase is faulty. In this way, it is determined in sequence whether the first relays connected to the second phase and the third phase are faulty until all the first relays are closed.
[0141] The control unit 60 also needs to determine whether the voltage after the first relay connected to each phase is closed is less than the second preset voltage. If so, the corresponding first relay has a sticking fault; if not, the corresponding first relay has an open circuit fault.
[0142] Then, after all the first relays are closed, the sampling unit 50 collects the voltage before the second relay connected to each phase is closed and uploads it to the control unit 60. The control unit 60 then determines whether the voltage before the second relay connected to each phase is less than the third preset voltage; if so, the corresponding second relay has a sticking fault; if the voltage before the second relay connected to each phase is not less than the third preset voltage, the next step is performed, specifically:
[0143] The control unit 60 closes the second relay connected to the first phase, disconnects all switch tubes, disconnects the first charging relay K7, and then determines whether the bus voltage is less than the second threshold voltage at this time. If so, the second relay connected to the first phase has an open circuit fault; if not, the second relay connected to the first phase is closed normally, and then the control unit 60 closes the second relay connected to the second phase again, only turns on the lower tube of the bridge arm connected to the second phase, disconnects the first charging relay K7 and the second charging relay K8, and then determines whether the bus voltage is less than the second threshold voltage at this time. If so, the second relay connected to the second phase has an open circuit fault; if not, the second relay connected to the second phase is closed normally, and then the control unit 60 closes the second relay connected to the third phase again, disconnects the second relay connected to the second phase, and only turns on the lower tube of the bridge arm connected to the third phase, and then determines whether the bus voltage is less than the second threshold voltage at this time. If so, the second relay connected to the third phase has an open circuit fault; if not, the second relay connected to the third phase is closed normally, and then the second relay connected to the second phase is closed, and the lower tube of the second bridge arm connected to the third phase is disconnected. At this point, all relays in the relay unit 20 are closed and detected respectively, and the solar storage air conditioning system is in standby mode.
[0144] Therefore, the photovoltaic storage air-conditioning system proposed in the present invention can detect the currently closed single first relay or second relay while closing the first relay and the second relay in the relay unit 20 in sequence. This not only avoids the risk of false triggering of overcurrent faults in the photovoltaic storage air-conditioning system, but also can judge and identify adhesion faults or open circuit faults of single relays to accurately locate the faulty relay, facilitate notifying maintenance personnel to carry out repairs in a timely manner, speed up maintenance efficiency, and improve user experience.
[0145] It should be noted that the photovoltaic storage air conditioning system in this embodiment can also be replaced by a photovoltaic storage inverter.
[0146] Obviously, the embodiments described above are only some embodiments of the present invention, rather than all embodiments. The preferred embodiments of the present invention are given in the accompanying drawings, but they do not limit the patent scope of the present invention. The present invention can be implemented in many different forms. On the contrary, the purpose of providing these embodiments is to make the understanding of the disclosure of the present invention more thorough and comprehensive. Although the present invention has been described in detail with reference to the aforementioned embodiments, for those skilled in the art, it is still possible to modify the technical solutions recorded in the aforementioned specific embodiments, or to perform equivalent replacements for some of the technical features therein. Any equivalent structure made using the contents of the specification and drawings of the present invention, directly or indirectly used in other related technical fields, is also within the scope of patent protection of the present invention.
Claims
1. Soft start circuit, including: A relay unit is connected between the three-phase alternating current and the three-phase bridge unit, wherein the relay unit includes a first relay and a second relay connected in series with each phase of the three-phase alternating current; and is characterized in that it also includes: A bus capacitor connected to both ends of the three-phase bridge unit; a charging unit connected between the first phase of the three-phase alternating current and the first end of the bus capacitor, and connected between the third phase of the three-phase alternating current and the second end of the bus capacitor; A sampling unit, used for collecting voltage parameters of the bus capacitor and the relay in the relay unit; The control unit is used to close the relays in the relay unit in sequence and receive the voltage parameter of the currently closed relay to determine whether the relay is faulty.
2. The soft start circuit according to claim 1, characterized in that: The charging unit includes a first charging relay, a second charging relay, a first resistor and a second resistor; The first phase of the three-phase alternating current is connected to the first end of the first charging relay, the second end of the first charging relay is connected to the first end of the first resistor, and the second end of the first resistor is connected to the first end of the three-phase bridge unit and the first end of the bus capacitor respectively; The third phase of the three-phase alternating current is connected to the first end of the second charging relay, the second end of the second charging relay is connected to the first end of the second resistor, and the second end of the second resistor is respectively connected to the second end of the three-phase bridge unit and the second end of the bus capacitor.
3. A detection method for a soft start circuit according to claim 1 or 2, characterized in that: The detection method comprises: Turning on the charging unit, collecting the bus voltage of the bus capacitor, and analyzing whether the bus capacitor is charged normally or abnormally according to the bus voltage; When the bus capacitor is charged normally, the relays in the relay unit are closed in sequence, and the voltage parameters of the currently closed relays are collected to determine whether the relays are faulty.
4. The detection method of the soft start circuit according to claim 3, characterized in that: When the bus capacitor starts to charge, the bus voltage of the bus capacitor is collected, including: Determining whether the bus voltage is greater than a first threshold voltage; When the judgment is yes, the bus capacitor is charged normally; When the determination is negative, the bus capacitor is abnormally charged, and all relays in the soft start circuit are disconnected.
5. The detection method of the soft start circuit according to claim 3, characterized in that: When the bus capacitor is charged normally, the method further includes: Close the first relay connected to the first phase, collect the voltage U1 before the first relay connected to the first phase is closed and the voltage U1' after the first relay is closed, and determine whether the absolute value of the difference between the voltage U1 and the voltage U1' is less than a first preset voltage; If the determination is negative, the first relay connected to the first phase is closed normally; If the determination is yes, a first relay connected to the first phase fails, and all relays in the soft start circuit are disconnected.
6. The detection method of the soft start circuit according to claim 5, characterized in that: When the first relay connected to the first phase is closed normally, the method further includes: Close the first relay connected to the second phase, collect the voltage U2 before the first relay connected to the second phase is closed and the voltage U2' after the first relay is closed, and determine whether the absolute value of the difference between the voltage U2 and the voltage U2' is less than the first preset voltage; If the determination is negative, the first relay connected to the second phase is normally closed; If the determination is yes, the first relay connected to the second phase fails, and all relays in the soft start circuit are disconnected.
7. The detection method of the soft start circuit according to claim 6, characterized in that: When the first relay connected to the second phase is normally closed, the method further includes: Close the first relay connected to the third phase, collect the voltage U3 before and the voltage U3' of the first relay connected to the third phase, and determine whether the absolute value of the difference between the voltage U3 and the voltage U3' is less than the first preset voltage; If the determination is negative, the first relay connected to the third phase is closed normally; If the determination is yes, the first relay connected to the third phase fails, and all relays in the soft start circuit are disconnected.
8. The detection method of the soft start circuit according to any one of claims 5 to 7, characterized in that: When a first relay connected to the first phase, the second phase, or the third phase fails, the method further includes: Determine whether the voltage U1' or the voltage U2' or the voltage U3' is less than a second preset voltage; If the determination is yes, a first relay connected to the first phase, the second phase, or the third phase has a sticking fault; If the determination is negative, an open circuit fault occurs in the first relay connected to the first phase, the second phase, or the third phase.
9. The detection method of the soft start circuit according to claim 7, characterized in that: When the first relay connected to the third phase is closed normally, the method further comprises: Collecting the voltage before the second relay connected to each phase is closed, and determining whether the voltage before the second relay connected to each phase is closed is less than a third preset voltage; When the determination is yes, a sticking fault occurs in the corresponding second relay, and all relays in the soft start circuit are disconnected.
10. The detection method of the soft start circuit according to claim 9, characterized in that: When the voltage before the second relay connected to each phase is closed is not less than the third preset voltage, the method further includes: closing the second relay connected to the first phase, disconnecting all the switch tubes of the three-phase bridge unit, disconnecting the first charging relay of the charging unit, and determining whether the bus voltage is less than a second threshold voltage; When the determination is yes, an open circuit fault occurs in the second relay connected to the first phase, and all relays in the soft start circuit are disconnected; When the determination is negative, the second relay connected to the first phase is normally closed.
11. The detection method of the soft start circuit according to claim 10, characterized in that: When the second relay connected to the first phase is normally closed, the method further includes: closing the second relay connected to the second phase, only turning on the lower tube of the bridge arm connected to the second phase, disconnecting the second charging relay of the charging unit, and determining whether the bus voltage is less than the second threshold voltage; When the determination is yes, an open circuit fault occurs in the second relay connected to the second phase, and all relays in the soft start circuit are disconnected; When the determination is negative, the second relay connected to the second phase is normally closed.
12. The detection method of the soft start circuit according to claim 11, characterized in that: When the second relay connected to the second phase is normally closed, the method further includes: closing the second relay connected to the third phase, disconnecting the second relay connected to the second phase, only turning on the lower tube of the bridge arm connected to the third phase, and judging whether the bus voltage is less than the second threshold voltage; When the determination is yes, an open circuit fault occurs in the second relay connected to the third phase, and all relays in the soft start circuit are disconnected; When the determination is negative, the second relay connected to the third phase is normally closed, and the second relay connected to the second phase is closed.
13. The solar energy storage air conditioning system is characterized by: The invention comprises the soft start circuit as claimed in claim 1 or 2.
