Automatic gain control (AGC) coordination control method for mother system power plant

By calculating the residual energy space and difference of the power generation of the steam engine, adjusting the set value of the steam engine power generation and controlling the main valve, the problems of power generation and electricity use imbalance and steam pressure stability of the main control power plant are solved, and the economy of the power plant is improved sex.

CN118915666APending Publication Date: 2024-11-08沈阳昱铖科技有限公司

Patent Information

Application Number
CN202411014515.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-26
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

It is difficult for the parent-controlled power plant to achieve a balance between power generation and electricity consumption in chemical plants, and the stability of steam pressure is difficult to ensure, resulting in low economic efficiency.

Method used

By obtaining the measured value of each steam engine's power generation and the power generation of the lower power grid, calculating the remaining energy space and difference, assigning the set value of the steam engine's power generation and controlling the main valve, ensuring the balance between the power generation and the power consumption, and giving priority to stabilizing high-pressure steam Maternal tube pressure.

Benefits of technology

The power generation and electricity consumption of the power plant is achieved, the stability of the steam main tube pressure is ensured, and the economy of the power plant is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118915666A_ABST
    Figure CN118915666A_ABST
Patent Text Reader

Abstract

A header system power plant AGC coordination control method relates to the technical field of automatic control, and comprises the following steps: step S01, calculating the residual energy space of the generating capacity of each steam turbine, and calculating the maximum index of the residual energy space; s02, calculating the under-generating capacity or over-generating capacity of each steam turbine, and calculating the difference value between the power grid generating capacity measurement value and the total generating capacity of the steam turbines; step S03, calculating the maximum index of the residual energy space of the generated energy, calculating the increased or decreased load of the generated energy, and assigning the set value of the generated energy of each steam turbine; and S04, according to the pressure of the high-pressure steam main pipe and the generating capacity of each steam turbine, controlling a steam turbine main adjusting valve. Balance of power generation and power utilization of the power plant can be achieved, the stability of the pressure of the steam main pipe can be guaranteed, and the economical efficiency of power generation of the power plant is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of automatic control technology, and in particular to an AGC coordinated control method for a main control power plant. Background Art

[0002] Thermal power plants are divided into unit system and main pipe system according to the way the boiler produces steam to supply the steam turbine. Unit system means that one boiler produces steam and supplies only one corresponding steam turbine, while main pipe system means that the steam produced by multiple boilers is sent to the same steam main pipe, and multiple steam turbines obtain steam from the main pipe to generate electricity. Main pipe units are the most common operating mode in the production process of chemical plants. Main pipe units mainly provide stable electricity and steam of different pressure levels to the chemical production process. Usually, although the self-provided power plant of a chemical plant supplies electricity to the power grid, the main purpose of power generation is to supply the factory for its own use. Too much or too little power generation is not economical for the factory. Since the power generation of the factory's electrical equipment changes all the time, the power of the power grid also changes in real time. If the power generation of the power plant is not adjusted in time, it will cause an imbalance between the power generation and power consumption of the factory. In addition, since the self-provided power plant also needs to provide stable high-pressure steam to the chemical plant, if the steam pressure is not taken into account when adjusting the power generation of the steam turbine, it will cause steam fluctuations. Therefore, it is necessary to design a reasonable AGC (automatic generation control) coordination controller to achieve the balance between the power generation of the self-contained power plant and the power grid, and to ensure the stability of the steam target pressure. Summary of the invention

[0003] To solve the above problems, the present invention provides a main pipe power plant AGC coordinated control method, which can not only achieve the balance between power generation and power consumption of the power plant, but also ensure the stability of the steam main pipe pressure, thereby improving the economy of power generation in the power plant.

[0004] A method for coordinated control of AGC in a main control power plant comprises the following steps:

[0005] Step S01: Obtain the measured value of each steam turbine power generation, the controlled upper and lower limits of power generation, the current value of the main regulating valve opening, and the upper and lower limits of the main regulating valve control, calculate the remaining energy space of each steam turbine power generation, and calculate the maximum value index of the remaining energy space;

[0006] Step S02: obtaining the power generation measurement value of the downstream power grid and the power generation of each steam turbine, calculating the under-power generation or over-power generation of each steam turbine, and calculating the difference between the power generation measurement value of the downstream power grid and the total power generation of the steam turbine;

[0007] Step S03: assigning a set value of power generation to each steam turbine according to the maximum index of the remaining energy space of power generation calculated in step S01 and the power generation load increase or decrease calculated in step S02;

[0008] Step S04: Control the main regulating valve of the steam turbine according to the high-pressure steam main pipe pressure and the power generation of each steam turbine.

[0009] Furthermore, the step S01 specifically includes the following steps:

[0010] Step S101: obtaining the power generation measurement value of each steam turbine, the controlled upper and lower limits of power generation, the current value of the main regulating valve opening, and the upper and lower limits of the main regulating valve control;

[0011] Step S102: Calculate the remaining energy space for increasing or decreasing the power generation of each steam turbine;

[0012] Each steam turbine increases the remaining energy space for power generation:

[0013]

[0014] Each steam turbine reduces the remaining energy space for power generation:

[0015]

[0016] Where m represents the mth steam turbine. Indicates that the steam turbine increases the remaining energy space for power generation. Indicates that the turbine power generation is controlled to the upper limit. Indicates the measured value of turbine power generation, Indicates the upper limit of the control of the main regulating valve of the steam turbine. Indicates the current value of the turbine main regulating valve. It means that the steam turbine reduces the remaining energy space for power generation. Indicates that the turbine power generation is controlled to the lower limit. Indicates the lower control limit of the turbine main regulating valve;

[0017] Step S103: Calculate the maximum value index of the remaining energy space for increasing or decreasing the power generation of each steam turbine;

[0018] The maximum value of the remaining energy space for steam turbine power generation maxval inc :

[0019]

[0020] The maximum value index of the remaining energy space for increasing the power generation of the steam turbine incm:

[0021]

[0022] The maximum value of the residual energy space of the steam turbine to reduce power generation maxval dec :

[0023]

[0024] The maximum value index of the space for reducing the remaining energy of the steam turbine to generate electricity is decm:

[0025]

[0026] Furthermore, the step S02 specifically includes the following steps:

[0027] Step S201: obtaining the measured value of power generation of the downstream power grid and the set value of power generation of each steam turbine;

[0028] Step S202: According to the remaining energy space of each steam turbine to increase or decrease the power generation, energy is recovered from the steam turbine with insufficient or excessive power generation.

[0029] For the mother control unit, the steam turbine needs to generate electricity on the one hand, and supply steam to the steam-consuming unit through steam extraction on the other hand. Since steam extraction of the steam turbine will affect the power generation of the steam turbine, when a steam turbine supplies steam through a large amount of steam extraction, even if the main regulating valve of the steam turbine is opened to the upper limit, the power generation of the steam turbine cannot reach the set value. At this time, it is necessary to recover the power generation of the steam turbine that exceeds the set value of the measured value and allocate it to other steam turbines with sufficient energy margin. Conversely, when a steam turbine reduces steam extraction, even if the main regulating valve of the steam turbine is closed to the lower limit, the power generation of the steam turbine cannot reach the set value. At this time, it is necessary to recover the power generation of the steam turbine that is lower than the set value of the measured value and allocate it to other steam turbines with sufficient energy margin.

[0030] when When the turbine under-generated energy is recovered, the new setting value of the turbine power generation is:

[0031]

[0032] Where m represents the mth steam turbine. Indicates that the steam turbine increases the remaining energy space for power generation. The new set value of turbine power generation after power generation energy recovery, Indicates the current set value of turbine power generation, WT a (m) Energy recovery weight coefficient, Indicates the current measured value of the turbine power generation.

[0033] when When the turbine over-generation energy is recovered, the new setting value of turbine generation is:

[0034]

[0035] Where m represents the mth steam turbine. It means that the steam turbine reduces the remaining energy space for power generation. The new set value of turbine power generation after power generation energy recovery, Indicates the current set value of turbine power generation, WT b (m) Energy recovery weight coefficient, Indicates the current measured value of the turbine power generation.

[0036] Step S203: Calculate the difference between the measured value of power generation of the power grid and the total power generation of the steam turbine;

[0037] The difference between the measured power generation of the lower grid and the total power generation of the steam turbine:

[0038]

[0039] in, Indicates the measured value of power generation in the power grid.

[0040] ΔPG power The difference in total turbine power generation, It represents the set value of the power generation of the i-th steam turbine, basis represents the bias, and m represents the number of steam turbines.

[0041] Furthermore, step S03 specifically includes the following steps:

[0042] Step S301: obtaining the power generation setting value of each steam turbine, the upper and lower limits of the controlled power generation, and the power generation increase and decrease rate setting value;

[0043] Step S302: According to the result of step S02, specifically step S202, the current lifting load situation is determined.

[0044] When ΔPG power When >0, the turbine power generation set value is calculated as:

[0045]

[0046] Among them, incm represents the incm-th steam turbine, Indicates the new set value of the steam turbine. Indicates the current set value of the steam turbine, ΔPG power The difference between the measured power generation of the power grid and the total power generation of the steam turbine. Step represents the maximum step change of the set value of the steam turbine power generation. Indicates the lower limit of the turbine control. Indicates that the turbine is under control of the upper limit.

[0047] When ΔPG power <0, the turbine power generation setting value is calculated as:

[0048]

[0049] Among them, decm represents the decm-th steam turbine, Indicates the new set value of the steam turbine. Indicates the current set value of the steam turbine, ΔPG power The difference between the measured power generation of the power grid and the total power generation of the steam turbine. Step represents the maximum step change of the set value of the steam turbine power generation. Indicates the lower limit of the turbine control. Indicates that the turbine is under control of the upper limit.

[0050] Furthermore, in step S302, when the load is increased, a value is assigned to the steam turbine with the largest space for increasing the remaining energy for power generation, and when the load is reduced, a value is assigned to the steam turbine with the largest space for decreasing the remaining energy for power generation.

[0051] Furthermore, the step S04 specifically includes the following steps:

[0052] Step S401: obtaining the measured value and set value of the high-pressure steam main pipe pressure, calculating the change rate of the measured value of the high-pressure steam main pipe pressure, the deviation between the measured value and the set value, and performing weighted summation;

[0053] High-pressure steam main pipe pressure measurement value change rate:

[0054]

[0055] High-pressure steam main pipe pressure measurement value change rate:

[0056]

[0057] Weighted summation is used to calculate the output of the high-pressure steam main pipe pressure controller:

[0058]

[0059] Among them, n represents the current cycle, n-1 represents the previous cycle, Indicates the current high-pressure steam main pipe pressure measurement value. Indicates the high-pressure steam main pipe pressure setting value, WT c Represents the weight coefficient of the change rate of the high-pressure steam main pipe pressure measurement value, WT d Represents the weight coefficient of the rate of change of the high-pressure steam main pipe pressure measurement value.

[0060] Step S402: Calculate the change rate of the measured value of each steam turbine power generation, the deviation between the measured value and the set value, and perform weighted summation;

[0061] The rate of change of the measured value of power generation of each steam turbine:

[0062]

[0063] Deviation between the measured value and the set value of each turbine power generation:

[0064]

[0065] Weighted sum:

[0066]

[0067] Among them, n represents the current cycle, n-1 represents the previous cycle, The current measured value of the power generation of the mth steam turbine, Indicates the set value of the power generation of the mth steam turbine, WT e (m) represents the weight coefficient of the change rate of the measured value of the power generation of the mth steam turbine, WT f (m) represents the weight coefficient of the deviation between the measured value and the set value of the power generation of the mth steam turbine;

[0068] Step S403: Control the main regulating valve of the steam turbine according to the weighted results of steps S401 and S402; priority switching control

[0069] (1) When When, and Output turbine main regulating valve:

[0070]

[0071] (2) When When, and Output steam turbine main regulating valve:

[0072]

[0073] in, High-pressure steam main pipe pressure controller output, outm represents the outmth steam turbine, Indicates the final output value of the turbine main regulating valve. Indicates the current value of the turbine main regulating valve.

[0074] (3) When both "(1)" and "(2)" above are not met, the main regulating valve of the steam turbine remains unchanged. The reason is that due to the large lag characteristic of the boiler, the boiler steam production cannot meet the steam demand. At this time, the steam demand is controlled by the existing power plant main pipe coordinated control and polling recursive allocation method. This method is a prior art. For example, CN114488781A, a power plant main pipe coordinated control and polling recursive allocation method, can be used to control the boiler side. After waiting for several cycles, when the boiler steam load meets the steam demand, "(1)" or "(2)" can be achieved.

[0075] Compared with the prior art, this technical solution has the following characteristics:

[0076] (1) AGC coordinated control of the main control units is achieved, so that the power generation of the main control units can meet the power balance of the factory;

[0077] (2) Based on the remaining energy space of the steam turbine power generation, the power generation target value of the steam turbine with under-generation or over-generation is recovered;

[0078] (3) Realize energy balance control of each steam turbine according to the size of the remaining energy space for power generation;

[0079] (4) When performing balanced power generation of steam turbines, priority should be given to ensuring the stability of the high-pressure main pipe pressure. BRIEF DESCRIPTION OF THE DRAWINGS

[0080] Figure 1 It is a schematic diagram of the flow chart of the main control power plant of the present invention;

[0081] Figure 2 This is a schematic diagram of the AGC coordinated control system of the main control power plant of the present invention;

[0082] Figure 3 It is a schematic diagram of the AGC coordinated control method and system of the main control power plant of the present invention;

[0083] Figure 4 It is a schematic diagram of calculating the remaining energy space and index of the present invention;

[0084] Figure 5 This is a schematic diagram of recovery of the steam turbine power generation set value of the present invention;

[0085] Figure 6 A schematic diagram of assigning new set values ​​for steam turbine power generation according to the present invention;

[0086] Figure 7 It is a schematic diagram of the control of the main regulating valve of the steam turbine of the present invention. DETAILED DESCRIPTION

[0087] The specific implementation process of the present invention is described in detail below with reference to the accompanying drawings.

[0088] The present invention provides an AGC coordinated control method for a busbar power plant. The schematic diagram of the busbar power plant flow chart is as follows: Figure 1 As shown, the method can be implemented on a DCS platform or on an independent server (high-performance desktop). Since the boiler, steam turbine, and power grid dispatching control systems are independent of each other, it is easier to implement on independent services. Deploy an intelligent control platform on an independent service (can be implemented using Python), implement the method of the present invention, and acquire and control data with the boiler, steam turbine, and power grid dispatching control system through the OPC communication protocol. Schematic diagram of the AGC coordinated control system of the mother control power plant, as shown Figure 2 shown.

[0089] Example 1

[0090] It is known that a power plant is equipped with 4 boilers and 6 units, with a unit capacity of 6×25MW units.

[0091] According to the method proposed by the present invention, Figure 3 The method comprises the following steps:

[0092] Step S01: Obtain the measured value of each steam turbine power generation, the controlled upper and lower limits of power generation, the current value of the main regulating valve opening, and the upper and lower limits of the main regulating valve control, calculate the remaining energy space of each steam turbine power generation, and calculate the maximum value index of the remaining energy space.

[0093] Step S02: Obtain the measured value of the power generation of the downstream grid and the power generation of each steam turbine, calculate the under-generation or over-generation of each steam turbine, and calculate the difference between the measured value of the power generation of the downstream grid and the total power generation of the steam turbine.

[0094] Step S03: According to the maximum index of the remaining energy space of the power generation calculated in S01 and the power generation load increase or decrease calculated in S02, the power generation set value of each steam turbine is assigned.

[0095] Step S04: Control the main regulating valve of the steam turbine according to the high-pressure steam main pipe pressure and the power generation of each steam turbine.

[0096] Furthermore, if Figure 4 As shown, step S01 includes the following functions:

[0097] Step S101: Obtain the power generation measurement value of each steam turbine, the controlled upper and lower limits of power generation, the current value of the main regulating valve opening, and the upper and lower control limits of the main regulating valve.

[0098] The following data are known:

[0099] Steam turbine No. 1: Power generation measurement Power generation measurement value of the last cycle Power generation is capped Power generation is controlled to the lower limit Current opening of main regulating valve Main control valve upper limit Main control valve lower limit

[0100] Second turbine: Power generation measurement Power generation measurement value of the last cycle Power generation is capped Power generation is controlled to the lower limit Current opening of main regulating valve Main control valve upper limit Main control valve lower limit

[0101] Turbine 3: Power generation measurement Power generation measurement value of the last cycle Power generation is capped Power generation is controlled to the lower limit Current opening of main regulating valve Main control valve upper limit Main control valve lower limit

[0102] Turbine 4: Power generation measurement Power generation measurement value of the last cycle Power generation is capped Power generation is controlled to the lower limit Current opening of main regulating valve Main control valve upper limit Main control valve lower limit

[0103]

[0104] Turbine 5: Power generation measurement Power generation measurement value of the last cycle Power generation is capped Power generation is controlled to the lower limit Current opening of main regulating valve Main control valve upper limit Main control valve lower limit

[0105] Turbine No. 6: Power generation measurement Power generation measurement value of the last cycle Power generation is capped Power generation is controlled to the lower limit Current opening of main regulating valve Main control valve upper limit Main control valve lower limit

[0106] Step S102: Calculate the remaining energy space for increasing or decreasing the power generation of each steam turbine.

[0107] The first steam turbine increases the remaining energy space for power generation:

[0108]

[0109] The first steam turbine reduces the remaining energy space for power generation:

[0110]

[0111] The second steam turbine increases the remaining energy space for power generation:

[0112]

[0113] The second steam turbine reduces the remaining energy space for power generation:

[0114]

[0115] The third steam turbine increases the remaining energy space for power generation:

[0116]

[0117]

[0118] The third steam turbine reduces the remaining energy space for power generation:

[0119]

[0120] The fourth steam turbine increases the remaining energy space for power generation:

[0121]

[0122] The fourth steam turbine reduces the remaining energy space for power generation:

[0123]

[0124] The fifth steam turbine increases the remaining energy space for power generation:

[0125]

[0126] The fifth steam turbine reduces the remaining energy space for power generation:

[0127]

[0128] The sixth steam turbine increases the remaining energy space for power generation:

[0129]

[0130] The sixth steam turbine reduces the remaining energy space for power generation:

[0131]

[0132] Step S103: Calculate the maximum value index of the remaining energy space for each steam turbine to increase or decrease the power generation. inc :

[0133]

[0134] The maximum value index of the remaining energy space for increasing the power generation of the steam turbine incm:

[0135] So incm = 2

[0136] The maximum value of the residual energy space of the steam turbine to reduce power generation maxval dec :

[0137]

[0138] The maximum value index of the space for reducing the remaining energy of the steam turbine to generate electricity is decm:

[0139] So decm=3.

[0140] Furthermore, if Figure 5 As shown, step S02 includes the following functions:

[0141] Step S201: Obtain the measured value of the power generation of the downstream power grid and the set value of the power generation of each steam turbine.

[0142] The following data are known:

[0143] Measured value of power generation of the lower grid:

[0144] Steam turbine No. 1: Power generation setting value

[0145] Second steam turbine: power generation setting value

[0146] Turbine 3: Power generation setpoint

[0147] Turbine 4: Power generation setpoint

[0148] Turbine No. 5: Power generation setpoint

[0149] Turbine No. 6: Power generation setpoint

[0150] Step S202: According to the remaining energy space of each steam turbine to increase or decrease the power generation, energy is recovered from the steam turbine with insufficient or excessive power generation.

[0151] For the mother control unit, the steam turbine needs to generate electricity on the one hand, and supply steam to the steam-consuming unit through steam extraction on the other hand. Since steam extraction of the steam turbine will affect the power generation of the steam turbine, when a steam turbine supplies steam through a large amount of steam extraction, even if the main regulating valve of the steam turbine is opened to the upper limit, the power generation of the steam turbine cannot reach the set value. At this time, it is necessary to recover the power generation of the steam turbine that exceeds the set value of the measured value and allocate it to other steam turbines with sufficient energy margin. Conversely, when a steam turbine reduces steam extraction, even if the main regulating valve of the steam turbine is closed to the lower limit, the power generation of the steam turbine cannot reach the set value. At this time, it is necessary to recover the power generation of the steam turbine that is lower than the set value of the measured value and allocate it to other steam turbines with sufficient energy margin.

[0152] because Therefore, the 4th turbine performs energy recovery of turbine under-generated energy, and the weight coefficient WT a (4) = 0.632, the new setting value of turbine power generation is:

[0153]

[0154] Step S203: Calculate the difference between the measured value of the power generation of the lower grid and the total power generation of the steam turbine.

[0155] It is known that the power generation bias of the lower grid is basis = 3

[0156] The difference between the measured power generation of the lower grid and the total power generation of the steam turbine:

[0157]

[0158] Furthermore, if Figure 6 As shown, step S03 includes the following functions:

[0159] Step S301: Obtain the power generation setting value of each steam turbine, the upper and lower limits of the controlled power generation, and the power generation increase and decrease rate setting value.

[0160] The following data are known:

[0161] Steam turbine No. 1: Maximum step size of power generation increase or decrease per cycle step(1) = 0.25MW / h.

[0162] The second steam turbine: the maximum step size of power generation increase or decrease per cycle step(2) = 0.25MW / h.

[0163] The third steam turbine: the maximum step size of power generation increase or decrease per cycle step(3) = 0.25MW / h.

[0164] The fourth steam turbine: the maximum step size of power generation increase or decrease per cycle step(4) = 0.25MW / h.

[0165] The fifth steam turbine: the maximum step size of power generation increase or decrease per cycle is step(5) = 0.25MW / h.

[0166] The sixth steam turbine: the maximum step size of power generation increase or decrease per cycle is step(6) = 0.25 MW / h.

[0167] Step S302: According to the result of calculation in S202, the current load increase or decrease is determined. When the load is increased, the value is assigned to the steam turbine with the largest space for increasing the remaining energy for power generation; when the load is decreased, the value is assigned to the steam turbine with the largest space for decreasing the remaining energy for power generation.

[0168] Due to ΔPG power =3.62>0, the turbine power generation setting value is calculated as:

[0169]

[0170] Furthermore, if Figure 7 As shown, step S04 includes the following functions:

[0171] Step S401: Obtain the measured value and set value of the high-pressure steam main pipe pressure, calculate the change rate of the measured value of the high-pressure steam main pipe pressure, the deviation between the measured value and the set value, and perform weighted summation.

[0172] The following data are known:

[0173] High-pressure steam main pipe pressure measurement value: Current Last cycle

[0174]

[0175] High-pressure steam main pipe pressure setting value:

[0176] High-pressure steam main pipe pressure measurement value change rate:

[0177]

[0178] The difference between the measured value and the set value of the high-pressure steam main pipe pressure:

[0179]

[0180] Weighted summation, where the weight coefficient WT c =0.4, WT d =0.01:

[0181]

[0182] Step S402: Calculate the change rate of the measured value of the power generation of each steam turbine, the deviation between the measured value and the set value, and perform weighted summation.

[0183] The rate of change of the measured value of the power generation of the first steam turbine:

[0184]

[0185] Deviation between the measured value and the set value of the power generation of the first steam turbine:

[0186]

[0187] Weighted summation, where the weight coefficient WT e (1) = -0.2375, WT f (1) = -0.002013:

[0188]

[0189] The rate of change of the measured value of the power generation of the second steam turbine:

[0190]

[0191] Deviation between the measured value and the set value of the power generation of the second steam turbine:

[0192]

[0193] Weighted summation, where the weight coefficient WT e (2) = -0.2212, WT f (2) = -0.002912:

[0194]

[0195] The rate of change of the measured value of the power generation of the third steam turbine:

[0196]

[0197] Deviation between the measured value and the set value of the power generation of the third steam turbine:

[0198]

[0199] Weighted summation, where the weight coefficient WT e (3) = -0.1878, WT f (3) = -0.001876:

[0200]

[0201] The rate of change of the measured value of the power generation of the fourth steam turbine:

[0202]

[0203] Deviation between the measured value and the set value of the power generation of the fourth steam turbine:

[0204]

[0205] Weighted summation, where the weight coefficient WT e (4) = -0.2156, WT f (4) = -0.002976:

[0206]

[0207] The rate of change of the measured value of the fifth turbine power generation:

[0208]

[0209] Deviation between the measured value and the set value of the power generation of the fifth steam turbine:

[0210]

[0211] Weighted summation, where the weight coefficient WT e (5) = -0.2389, WT f (5) = -0.002431:

[0212]

[0213] The rate of change of the measured value of the power generation of the sixth steam turbine:

[0214]

[0215] Deviation between the measured value and the set value of the power generation of the sixth steam turbine:

[0216]

[0217] Weighted summation, where the weight coefficient WT e (6) = -0.20987, WT f (6) = -0.002346:

[0218]

[0219] Step S403: Control the main regulating valve of the steam turbine according to the weighted results of S401 and S402.

[0220] Priority switching control

[0221] The first steam engine:

[0222] because When, and Not true, the output of the steam turbine main regulating valve remains unchanged.

[0223] The second steam engine:

[0224] because When, and Not true, the output of the steam turbine main regulating valve remains unchanged.

[0225] The third steam engine:

[0226] because When, and Not true, the output of the steam turbine main regulating valve remains unchanged.

[0227] The fourth steam engine:

[0228] because When, and Steam turbine main regulating valve output:

[0229] Since 80.006028 exceeds So in the end

[0231]

[0232] The fifth turbine:

[0233] because When, and Steam turbine main regulating valve output:

[0234]

[0235] The sixth turbine:

[0236] because When, and Not true, the output of the steam turbine main regulating valve remains unchanged.

[0237] Due to the large hysteresis of the boiler, the steam production of the boiler cannot meet the steam demand. At this time, the steam demand is controlled by the "A method for coordinated control and recursive allocation of power plant main pipes [P] (Chinese patent: CN114488781A)" to control the boiler side. After waiting for several cycles, the output of the steam turbine main regulating valve can be realized when the boiler steam load meets the steam demand.

Claims

1. A method for coordinated AGC control of a main control power plant, characterized in that: The steps include: Step S01: Obtain the measured value of each steam turbine power generation, the controlled upper and lower limits of power generation, the current value of the main regulating valve opening, and the upper and lower limits of the main regulating valve control, calculate the remaining energy space of each steam turbine power generation, and calculate the maximum value index of the remaining energy space; Step S02: obtaining the power generation measurement value of the downstream power grid and the power generation of each steam turbine, calculating the under-power generation or over-power generation of each steam turbine, and calculating the difference between the power generation measurement value of the downstream power grid and the total power generation of the steam turbine; Step S03: assigning a set value of power generation to each steam turbine according to the maximum index of the remaining energy space of power generation calculated in step S01 and the power generation load increase or decrease calculated in step S02; Step S04: Control the main regulating valve of the steam turbine according to the high-pressure steam main pipe pressure and the power generation of each steam turbine.

2. The AGC coordinated control method for a main control power plant according to claim 1, characterized in that: The step S01 specifically includes the following steps: Step S101: obtaining the power generation measurement value of each steam turbine, the controlled upper and lower limits of power generation, the current value of the main regulating valve opening, and the upper and lower limits of the main regulating valve control; Step S102: Calculate the remaining energy space for increasing or decreasing the power generation of each steam turbine; Each steam turbine increases the remaining energy space for power generation: Each steam turbine reduces the remaining energy space for power generation: Where m represents the mth steam turbine. Indicates that the steam turbine increases the remaining energy space for power generation. Indicates that the turbine power generation is controlled to the upper limit. Indicates the measured value of turbine power generation, Indicates the upper limit of the control of the main regulating valve of the steam turbine. Indicates the current value of the turbine main regulating valve. It means that the steam turbine reduces the remaining energy space for power generation. Indicates that the turbine power generation is controlled to the lower limit. Indicates the lower control limit of the steam turbine main regulating valve; Step S103: Calculate the maximum value index of the remaining energy space for increasing or decreasing the power generation of each steam turbine; The maximum value of the remaining energy space for steam turbine power generation maxval inc : The maximum value index of the remaining energy space for increasing the power generation of the steam turbine incm: The maximum value of the residual energy space of the steam turbine to reduce power generation maxval dec : The maximum value index of the space for reducing the remaining energy of the steam turbine to generate electricity is decm:

3. The AGC coordinated control method for a main control power plant according to claim 1, characterized in that: The step S02 specifically includes the following steps: Step S201: obtaining the measured value of power generation of the downstream power grid and the set value of power generation of each steam turbine; Step S202: According to the remaining energy space of each steam turbine to increase or decrease the power generation, energy recovery is performed for the steam turbine with insufficient or excessive power generation; when When the turbine under-generated energy is recovered, the new setting value of the turbine power generation is: Where m represents the mth steam turbine. Indicates that the steam turbine increases the remaining energy space for power generation. The new set value of turbine power generation after power generation energy recovery, Indicates the current set value of turbine power generation, WT a (m) Energy recovery weight coefficient, Indicates the current measured value of turbine power generation; when When the turbine over-generation energy is recovered, the new setting value of turbine generation is: Where m represents the mth steam turbine. It means that the steam turbine reduces the remaining energy space for power generation. The new set value of turbine power generation after power generation energy recovery, Indicates the current set value of turbine power generation, WT b (m) Energy recovery weight coefficient, Indicates the current measured value of turbine power generation; Step S203: Calculate the difference in total power generation of the steam turbine according to the power generation measurement value of the downstream power grid: in, Indicates the measured value of power generation in the lower grid, ΔPG power The difference in total turbine power generation, It represents the set value of the power generation of the i-th steam turbine, basis represents the bias, and m represents the number of steam turbines.

4. The AGC coordinated control method for a main control power plant according to claim 1, characterized in that: Step S03 specifically includes the following steps: Step S301: obtaining the power generation setting value of each steam turbine, the upper and lower limits of the controlled power generation, and the power generation increase and decrease rate setting value; Step S302: According to the calculation result of step S02, determine the current lifting load situation. When ΔPG power When >0, the turbine power generation set value is calculated as: Among them, incm represents the incm-th steam turbine, Indicates the new set value of the steam turbine. Indicates the current set value of the steam turbine, ΔPG power The difference between the measured power generation of the power grid and the total power generation of the steam turbine. Step represents the maximum step change of the set value of the steam turbine power generation. Indicates the lower limit of the turbine control. Indicates that the turbine is under control upper limit; When ΔPG power <0, the turbine power generation setting value is calculated as: Among them, decm represents the decm-th steam turbine, Indicates the new set value of the steam turbine. Indicates the current set value of the steam turbine, ΔPG power The difference between the measured power generation of the power grid and the total power generation of the steam turbine. Step represents the maximum step change of the set value of the steam turbine power generation. Indicates the lower limit of the turbine control. Indicates that the turbine is under control of the upper limit.

5. The AGC coordinated control method for a busbar power plant according to claim 4 is characterized in that: In step S302, when the load is increased, a value is assigned to the steam turbine with the largest space for increasing the remaining energy for power generation, and when the load is reduced, a value is assigned to the steam turbine with the largest space for decreasing the remaining energy for power generation.

6. The AGC coordinated control method for a busbar power plant according to claim 1, characterized in that: The step S04 specifically includes the following steps: Step S401: obtaining the measured value and set value of the high-pressure steam main pipe pressure, calculating the change rate of the measured value of the high-pressure steam main pipe pressure, the deviation between the measured value and the set value, and performing weighted summation; High-pressure steam main pipe pressure measurement value change rate: Deviation between the measured value and the set value of the high-pressure steam main pipe pressure: Weighted summation is used to calculate the output of the high-pressure steam main pipe pressure controller: Among them, n represents the current cycle, n-1 represents the previous cycle, Indicates the current high-pressure steam main pipe pressure measurement value. Indicates the high-pressure steam main pipe pressure setting value, WT c Represents the weight coefficient of the change rate of the high-pressure steam main pipe pressure measurement value, WT d Indicates the weight coefficient of the rate of change of the high-pressure steam main pipe pressure measurement value; Step S402: Calculate the change rate of the measured value of each steam turbine power generation, the deviation between the measured value and the set value, and perform weighted summation; The rate of change of the measured value of power generation of each steam turbine: Deviation between the measured value and the set value of each turbine power generation: Weighted sum: Among them, n represents the current cycle, n-1 represents the previous cycle, The current measured value of the power generation of the mth steam turbine, Indicates the set value of the power generation of the mth steam turbine, WT e (m) represents the weight coefficient of the change rate of the measured value of the power generation of the mth steam turbine, WT f (m) represents the weight coefficient of the deviation between the measured value and the set value of the power generation of the mth steam turbine; Step S403: Control the main regulating valve of the steam turbine according to the weighted results of steps S401 and S402.

7. A method for coordinated AGC control of a busbar power plant according to claim 6, characterized in that: In step S403, the main regulating valve of the steam turbine is controlled by switching control according to the priority: (1) When When, and Output steam turbine main regulating valve: (2) When When, and Output steam turbine main regulating valve: in, High-pressure steam main pipe pressure controller output, outm represents the outmth steam turbine, Indicates the final output value of the turbine main regulating valve. Indicates the current value of the main regulating valve of the steam turbine; (3) When neither "(1)" nor "(2)" mentioned above is satisfied, the main regulating valve of the steam turbine remains unchanged, and the steam consumption is controlled by the power plant main pipe coordinated control and polling recursive allocation method to control the boiler side. After several cycles, when the boiler steam load meets the steam demand, "(1)" or "(2)" is achieved.

Citation Information

Patent Citations

  • Power plant mother pipe coordination control and polling recursive distribution method

    CN114488781A

Cited By

  • Coordination control method and device for header unit, electronic equipment and storage medium

    CN120491426A