Pipe jacking force real-time monitoring and regulation system based on multivariate data
Through a real-time monitoring and control system for the top-up loading force based on multivariate data, combining image data and sensor data, a virtual three-dimensional model is generated, which solves the problem of insufficient accuracy of top-up loading force monitoring in the existing technology, and realizes the top-up loading force The precise monitoring and regulation of the push-in force improves the management efficiency of the construction process.
Patent Information
- Application Number
- CN202410907850.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-08
- Publication Date
- 2024-11-08
AI Technical Summary
The existing real-time monitoring and control system for the hoisting pipe is affected due to the sensor deployment location and monitoring force problems, and the hoisting pipe is too large or small, which affects the project cost and construction progress.
The real-time monitoring and regulation system for the top tube top propulsion based on multi-data is adopted, including data acquisition module, data matching module, virtual modeling module, real-time monitoring module, early warning module and maintenance simulation module. The natural language description ability is trained through the doubao model. Combining image data and sensor data, a virtual three-dimensional model is generated, and the cushioning force of the cushioning tube is monitored and regulated in real time, providing early warning and maintenance cost analysis.
Improve the accuracy and comprehensiveness of the overhead load monitoring of the overhead load, and can accurately monitor and control the data of the overhead load under different states, reduce the overhead load deviation, and help managers better understand and optimize the overhead load. Construction process.
Smart Images

Figure CN118917785A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of construction engineering monitoring, and in particular to a real-time monitoring and control system for pipe jacking force based on multivariate data. Background Art
[0002] As a trenchless technology, pipe jacking technology has little impact on the surrounding environment and buildings during construction. As an important parameter in the design and construction of pipe jacking projects, the jacking force is closely related to soil parameters, pipe diameter, buried depth of pipeline, jacking length, lubrication and drag reduction, etc. It is an important reference indicator for the design of engineering construction preparation, such as the thickness of the back wall, the number of jacking cylinders, and the layout of the relay room. Excessive or insufficient jacking force is directly related to the project cost and construction progress.
[0003] The jacking force is mainly composed of the head-on resistance and the friction resistance around the pipe. At present, the forward pressure is mostly provided by the jacking cylinder, and the jacking friction resistance is reduced by grouting to meet the jacking force requirements of the pipe jacking. However, in actual projects, the operators tend to apply a larger cylinder pressure, resulting in a larger jacking force for the pipe jacking, which far exceeds the minimum jacking force required for the pipe jacking.
[0004] However, in the existing real-time monitoring and control system of pipe jacking force, the monitoring accuracy of the monitoring system is affected by the deployment position of the sensor and the monitoring intensity. Therefore, we propose a real-time monitoring and control system of pipe jacking force based on multivariate data. Summary of the invention
[0005] The purpose of the present invention is to provide a real-time monitoring and control system for pipe jacking force based on multivariate data.
[0006] In order to solve the problems raised in the above background technology, the present invention provides the following technical solutions: a real-time monitoring system for pipe jacking force based on multivariate data, the monitoring system comprising a data acquisition module, a data matching module, a virtual modeling module, a real-time monitoring module, an early warning module and a maintenance simulation module;
[0007] The data acquisition module is used to obtain the jacking force data in the jacking pipe, integrate all the jacking pipe data into a data packet, and mark the data packets of different jacking pipes, respectively, as A1, A2, ..., A n ,Then the data packet is transmitted to the data matching module;
[0008] The data matching module includes a temporary storage unit and a data comparison unit. The temporary storage unit is used to store monitoring range data of jacking force and stress in different jacking pipes. The data comparison unit retrieves the data in the temporary storage unit and matches it with the data packet in the data acquisition module, and then determines whether the data packet in the current jacking pipe is within the data range in the temporary storage unit. When the data value of the data packet is within the monitoring range, the data matching module transmits the data packet to the virtual modeling module. When the data value of the data packet exceeds the monitoring range, the data matching module transmits the data packet to the virtual modeling module and transmits the warning data to the warning module.
[0009] The virtual modeling module includes a doubao model unit, a processing unit and a three-dimensional model unit. The natural language description of the image is trained in the doubao model unit. After the virtual modeling module receives the data packet, the doubao model unit extracts the image data in the data packet, and then generates corresponding text data according to the image information in the data acquisition module through the doubao model unit, and transmits the text data to the processing unit. The processing unit cleans the text data and the data in the data packet and transmits them to the three-dimensional model unit. The three-dimensional model unit constructs a virtual three-dimensional model according to the cleaned data, and improves the virtual three-dimensional model according to the time series data.
[0010] The real-time monitoring module includes a first monitoring unit and a time-series monitoring unit. The first monitoring unit is used to monitor the current virtual three-dimensional model and determine the data of the virtual three-dimensional model of the current jacking pipe under the connection relationship. The time-series monitoring unit is used to monitor the state of the virtual three-dimensional model in the time-series data to facilitate the prediction of the jacking force data in the jacking pipe. The real-time monitoring module transmits the abnormal data monitored by the first monitoring unit and the time-series monitoring unit to the early warning module.
[0011] The warning module is used for warning and generating a warning instruction according to the received warning signal;
[0012] The maintenance simulation module is used to call the virtual three-dimensional model in the virtual modeling module, simulate the pipe jacking maintenance process in the virtual three-dimensional model, and generate a maintenance cost list according to the simulated maintenance process, and the maintenance simulation module is started by an early warning instruction.
[0013] As a further solution of the present invention: the data acquisition module can be converted into a jacking force sensor, a displacement sensor, a temperature sensor and a camera, and the jacking force sensor, the displacement sensor, the temperature sensor and the camera are used to collect various data of the jacking force of the jacking in real time and feed them back to the data matching module.
[0014] As a further solution of the present invention: the data comparison unit matches the data in the data acquisition module with the data in the temporary storage unit to determine whether the data in the data acquisition module is within the normal range, so as to facilitate the determination of whether different pipe jacking data are within the monitoring range, and mark the different pipe jacking monitoring range data in the temporary storage unit as B1, B2, ..., B n , that is, the data comparison unit determines A1∈B1, A2∈B2, ..., A n ∈B n , and then determine whether the data comparison unit needs to transmit a warning signal to the data matching module.
[0015] As a further solution of the present invention: a doubao model is provided in the doubao model unit, and the doubao model is trained with the natural language description capability of the jacking force of the pipe jacking, so that the doubao model recognizes the image and extracts the information data in the image, and the image data is combined with the data packet to improve the accuracy of data collection.
[0016] As a further solution of the present invention: the real-time monitoring module obtains the jacking force data of the jacking pipe through a formula, and the specific formula is as follows:
[0017] Z-Σ(f i ·A i )
[0018] Among them, Z represents the jacking force data, f i represents the force in the finite element, A i It represents the area of the corresponding unit, and then obtains the jacking force value of the entire jacking pipe at a specific position.
[0019] As a further solution of the present invention: different warning levels are set in the warning module, and the different warning levels are set according to the data comparison unit, the first monitoring unit and the timing monitoring unit respectively, and then the maintenance simulation module retrieves the abnormal data for simulation calculation, obtains the maintenance cost of the jacking pipe through the simulation calculation, and generates visual list data.
[0020] In addition, the present invention also provides a real-time control system for pipe jacking force based on multivariate data, wherein the control system includes a control data processing module, a control optimization module and a visualization module;
[0021] The control data processing module is used to process the warning data in the warning module, and analyze according to different warning data, analyze the warning instruction data received by the control data processing module and then generate a control instruction;
[0022] The control optimization module is provided with a simulation unit, and the simulation unit is provided with simulation algorithms of ANSYS and FLUENT. After receiving the control instruction, the control optimization module calls the virtual three-dimensional model and transmits the control instruction to ANSYS and FLUENT, so as to simulate the stress condition of the jacking pipe. When the simulation condition is normal, the control instruction is returned to the control data processing module, and the control data processing module transmits the control data to the jacking pipe. When the simulation data is abnormal, an early warning instruction is generated and transmitted to the early warning module.
[0023] The visualization module is used to display data in the monitoring system and the control system;
[0024] The warning data is divided into first-level warning data, second-level warning data, third-level warning data and fourth-level warning data through the control data processing module, and the first-level warning data is converted from the warning instructions in the data matching module, the second-level warning data is converted from the warning instructions in the first monitoring unit in the real-time monitoring module, the third-level warning data is converted from the warning instructions in the timing monitoring unit in the real-time monitoring module, and the fourth-level warning data is converted from the warning data in the control optimization module, which makes it convenient for management personnel to handle according to different levels of warnings.
[0025] As a further solution of the present invention: an execution unit is provided in the control data processing module. When the control data processing module receives the early warning instruction generated in the data matching module, the control data processing module calls the virtual modeling module to analyze the control instruction, and calculates the control instruction through the simulation unit to ensure that the jacking pipe control is normal. After the simulation of the simulation unit is completed, the normal instruction is transmitted to the execution unit, and then the execution unit controls the control equipment in the jacking pipe to work according to the control instruction.
[0026] As a further solution of the present invention: after receiving the data from the early warning module, the visualization module converts the received data into a visualization list, and then the visualization module displays the visualization list. At the same time, the management personnel modify the control data by typing data in the visualization module, and transmit the control data to the control optimization module, and then transmit the optimization results back to the visualization module, so that the management personnel can understand the feasibility of the optimization plan more clearly.
[0027] By adopting the above technical solution, compared with the prior art, the beneficial effects of the present invention are:
[0028] 1. The present invention facilitates the identification and extraction of information about pipe jacking in the image by training the doubao model, combines the image data with the pipe jacking force data, and transmits the combined data to the three-dimensional model unit, so that the collected data is more complete and accurate, which is convenient for tuning the virtual three-dimensional model and can improve the accuracy and comprehensiveness of the monitoring system for pipe jacking force monitoring;
[0029] 2. The present invention uses a data matching module and a real-time monitoring module to monitor different states of the jacking force of the jacking pipe in real time, so that the data matching module monitors different jacking pipes, and the real-time monitoring module monitors the entire jacking pipe, thereby improving the overall monitoring state, so that the monitoring system can more accurately monitor the data of the jacking pipe in different states, so as to facilitate subsequent regulation and control based on the monitoring;
[0030] 3. The present invention cooperates with the control data processing module and the control optimization module, so that after the control data processing module generates the corresponding control instructions, the control optimization module simulates the jacking force of the jacking pipe after the control, so as to judge whether the current control instructions will cause damage to the jacking pipe, thereby better controlling the jacking pipe;
[0031] 4. The present invention uses the visualization module to retrieve the data in the early warning module, the virtual modeling module, the real-time monitoring module, the early warning module, the maintenance simulation module and the control optimization module for display, so that the management personnel can more clearly understand the various data on the jacking pipe and the jacking force of the jacking pipe, and can more conveniently allow the management personnel to control the jacking pipe. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] Figure 1 A step diagram of a monitoring system in an embodiment of the present invention;
[0033] Figure 2 A diagram showing the steps of a control system in an embodiment of the present invention;
[0034] Figure 3 1 is a step diagram of the monitoring and control system in an embodiment of the present invention. DETAILED DESCRIPTION
[0035] The specific embodiments of the present invention will be further described below in conjunction with the accompanying drawings. It should be noted that the description of these embodiments is used to help understand the present invention, but does not constitute a limitation of the present invention.
[0036] In addition, the technical features involved in the various embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0037] Please refer to the attached Figure 1 -Attached Figure 3The present invention discloses a real-time monitoring system for pipe jacking force based on multivariate data. The monitoring system comprises a data acquisition module, a data matching module, a virtual modeling module, a real-time monitoring module, an early warning module and a maintenance simulation module.
[0038] The data acquisition module is used to obtain the jacking force data in the jacking pipe, integrate all the jacking pipe data into a data packet, and mark the data packets of different jacking pipes, respectively, as A1, A2, ..., A n , and then transmit the data packet to the data matching module.
[0039] The data matching module includes a temporary storage unit and a data comparison unit. The temporary storage unit is used to store the monitoring range data of the jacking force and stress in different jacking pipes. The data comparison unit retrieves the data in the temporary storage unit and matches it with the data packet in the data acquisition module, and then determines whether the data packet in the current jacking pipe is within the data range in the temporary storage unit. When the data value of the data packet is within the monitoring range, the data matching module transmits the data packet to the virtual modeling module. When the data value of the data packet exceeds the monitoring range data, the data matching module transmits the data packet to the virtual modeling module and transmits warning data to the warning module.
[0040] The virtual modeling module includes a doubao model unit, a processing unit and a three-dimensional model unit. The natural language description of the image is trained in the doubao model unit. After the virtual modeling module receives the data packet, the doubao model unit extracts the image data in the data packet, and then generates corresponding text data according to the image information in the data acquisition module through the doubao model unit, and transmits the text data to the processing unit. The processing unit cleans the text data and the data in the data packet and transmits them to the three-dimensional model unit. The three-dimensional model unit constructs a virtual three-dimensional model according to the cleaned data, and improves the virtual three-dimensional model according to the time series data.
[0041] The real-time monitoring module includes a first monitoring unit and a timing monitoring unit. The first monitoring unit is used to monitor the current virtual three-dimensional model and determine the data of the virtual three-dimensional model of the current jacking pipe under the connection relationship. The timing monitoring unit is used to monitor the state of the virtual three-dimensional model in the timing data to facilitate the prediction of the jacking force data in the jacking pipe. The real-time monitoring module transmits the abnormal data monitored by the first monitoring unit and the timing monitoring unit to the early warning module.
[0042] The early warning module is used for early warning and generates early warning instructions according to the received early warning signal.
[0043] The maintenance simulation module is used to call the virtual three-dimensional model in the virtual modeling module, simulate the pipe jacking maintenance process in the virtual three-dimensional model, and generate a maintenance cost list according to the simulated maintenance process, and the maintenance simulation module is started by an early warning instruction.
[0044] In one embodiment of the present invention: the data acquisition module can be converted into a jacking force sensor, a displacement sensor, a temperature sensor and a camera, wherein the imaging modes of the camera include infrared imaging, light imaging and thermal imaging respectively. The jacking force sensor, the displacement sensor, the temperature sensor and the camera are used to collect various data of the jacking force of the jacking pipe in real time and feed them back to the data matching module.
[0045] In one embodiment of the present invention, the data comparison unit matches the data in the data acquisition module with the data in the temporary storage unit to determine whether the data in the data acquisition module is within the normal range, so as to determine whether different pipe jacking data are within the monitoring range, and mark the different pipe jacking monitoring range data in the temporary storage unit as B1, B2, ..., B n , that is, the data comparison unit determines A1∈B1, A2∈B2, ..., A n ∈B n , and then determine whether the data comparison unit needs to transmit a warning signal to the data matching module.
[0046] In one embodiment of the present invention: a doubao model is provided in the doubao model unit, and the doubao model is trained with the natural language description capability of the jacking force of the pipe jacking, so that the doubao model recognizes the image and extracts the information data in the image, and the image data is combined with the data packet to improve the accuracy of data collection.
[0047] In one embodiment of the present invention: the real-time monitoring module obtains the jacking force data of the jacking pipe through a formula, and the specific formula is as follows:
[0048] Z=∑(f i ·A i )
[0049] Among them, Z represents the jacking force data, f i represents the force in the finite element, A i It represents the area of the corresponding unit, and then obtains the jacking force value of the entire jacking pipe at a specific position.
[0050] In one embodiment of the present invention: different warning levels are set in the warning module, and the different warning levels are set according to the data comparison unit, the first monitoring unit and the timing monitoring unit respectively, and then the maintenance simulation module retrieves the abnormal data for simulation calculation, obtains the maintenance cost of the jacking pipe through simulation calculation, and generates visual list data.
[0051] The present invention also provides a real-time control system for pipe jacking force based on multivariate data, characterized in that: the real-time control system for pipe jacking force based on multivariate data is obtained according to the real-time monitoring system for pipe jacking force based on multivariate data according to any one of claims 1-6, and the control system includes a control data processing module, a control optimization module and a visualization module.
[0052] The control data processing module is used to process the warning data in the warning module, and analyze according to different warning data, analyze the warning instruction data received by the control data processing module and then generate a control instruction.
[0053] The control and optimization module is provided with a simulation unit, and the simulation unit is provided with simulation algorithms of ANSYS and FLUENT. After receiving the control instruction, the control and optimization module calls the virtual three-dimensional model and transmits the control instruction to ANSYS and FLUENT, thereby simulating the stress condition of the jacking pipe. When the simulation condition is normal, the control instruction is returned to the control data processing module, and the control data processing module transmits the control data to the jacking pipe. When the simulation data is abnormal, an early warning instruction is generated and transmitted to the early warning module.
[0054] The visualization module is used to display data in the monitoring system and the control system.
[0055] The warning data is divided into first-level warning data, second-level warning data, third-level warning data and fourth-level warning data through the control data processing module, and the first-level warning data is converted from the warning instructions in the data matching module, the second-level warning data is converted from the warning instructions in the first monitoring unit in the real-time monitoring module, the third-level warning data is converted from the warning instructions in the timing monitoring unit in the real-time monitoring module, and the fourth-level warning data is converted from the warning data in the control optimization module, which makes it convenient for management personnel to handle according to different levels of warnings.
[0056] In one embodiment of the present invention: an execution unit is provided in the control data processing module. When the control data processing module receives the early warning instruction generated in the data matching module, the control data processing module calls the virtual modeling module to analyze the control instruction, calculates the control instruction through the simulation unit to ensure that the jacking pipe control is normal, and transmits normal instructions to the execution unit after the simulation of the simulation unit is completed. Then, the execution unit controls the control equipment in the jacking pipe to work according to the control instruction.
[0057] In one embodiment of the present invention: after receiving the data from the early warning module, the visualization module converts the received data into a visualization list, and then the visualization module displays the visualization list. At the same time, the management personnel modify the control data by typing data in the visualization module, and transmit the control data to the control optimization module, and transmit the optimization results back to the visualization module, so that the management personnel can understand the feasibility of the optimization plan more clearly.
[0058] Example 1, please refer to the attached Figure 1 -Attached Figure 3 The virtual three-dimensional model in the time series data is monitored by the time series monitoring unit, and then the data status of the jacking pipe at different times is obtained, and then the jacking force of the jacking pipe is predicted within a period of time, which is convenient for the monitoring system to predict the jacking force of the jacking pipe, and then the control system extracts and makes judgments based on the prediction of the jacking force of the jacking pipe, so that the control system can control more accurately and timely.
[0059] Example 2, please refer to the attached Figure 2 By setting a deep reinforcement learning neural network in the control data processing module, it is convenient for the deep reinforcement learning neural network to learn the analysis method of the warning instructions. At the same time, the deep reinforcement learning neural network analyzes the warning instructions under different states, and then quickly solves different warning data, so that some warning instructions can be quickly processed.
[0060] Example 3, please refer to the attached Figure 1 -Attached Figure 3 After receiving the normal simulation control instruction through the control data processing module, the control instruction is parsed by the execution unit, and the parsed jacking control data is transmitted to the jacking control device.
[0061] Example 4, please refer to the attached Figure 1 -Attached Figure 3 , the early warning information is retrieved through the maintenance simulation module, and the cost of pipe jacking during the maintenance process is calculated, and the maintenance cost list data is transmitted to the visualization module, which is convenient for management personnel to perform maintenance according to the cost list data.
[0062] Specifically, by training the doubao model, it is convenient to identify and extract information about pipe jacking in the image, combine the image data with the pipe jacking force data, and transmit the combined data to the three-dimensional model unit, so that the collected data is more complete and accurate, which is convenient for tuning the virtual three-dimensional model and can improve the accuracy and comprehensiveness of the monitoring system's monitoring of pipe jacking force.
[0063] Specifically, the different states of the jacking force of the jacking pipe are monitored in real time through the data matching module and the real-time monitoring module, so that the data matching module monitors different jacking pipes, and the real-time monitoring module monitors the entire jacking pipe, thereby improving the overall monitoring status, so that the monitoring system can more accurately monitor the data of the jacking pipe in different states, so as to facilitate subsequent monitoring and regulation.
[0064] Specifically, through the cooperation between the control data processing module and the control optimization module, after the control data processing module generates the corresponding control instructions, the control optimization module simulates the jacking force of the jacking pipe after control, so as to judge whether the current control instructions will cause damage to the jacking pipe, thereby better controlling the jacking pipe.
[0065] Specifically, the data in the early warning module, virtual modeling module, real-time monitoring module, early warning module, maintenance simulation module and control optimization module are retrieved and displayed through the visualization module, so that management personnel can more clearly understand the various data on pipe jacking and pipe jacking force, and can more conveniently control pipe jacking.
[0066] Working principle:
[0067] First, the data acquisition module collects data on the jacking force of the jacking pipe, and the data matching module monitors and manages the collected jacking data for the first time. The doubao model unit in the virtual modeling module extracts the image data in the collected data, and then generates a corresponding virtual three-dimensional model. The real-time monitoring module monitors the model data on the jacking force of the jacking pipe again, so that the monitoring system can monitor the jacking force of the jacking pipe multiple times. By combining the control system and the monitoring system, the control data processing module can better adjust the jacking pipe according to the monitoring results of the monitoring system. At this point, the entire workflow is completed.
[0068] Those skilled in the art should understand that the above-mentioned modules or steps of the present invention can be implemented by a general-purpose computer device. Alternatively, they can be implemented by a program code executable by a computing device, so that they can be stored in a storage device and executed by the computing device, or they can be made into individual integrated circuit modules, or multiple modules or steps therein can be made into a single integrated circuit module for implementation. The present invention is not limited to any specific combination of hardware and software.
[0069] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various changes and variations. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
[0070] Although the above describes the specific implementation mode of the present invention in conjunction with the accompanying drawings, it is not intended to limit the scope of protection of the present invention. Those skilled in the art should understand that various modifications or changes that can be made by those skilled in the art on the basis of the technical solution of the present invention without creative work are still within the scope of protection of the present invention.
Claims
1. A real-time monitoring system for pipe jacking force based on multivariate data, characterized in that: It includes data acquisition module, data matching module, virtual modeling module, real-time monitoring module, early warning module and maintenance simulation module; The data acquisition module is used to obtain the jacking force data in the jacking pipe, integrate all the jacking pipe data into a data packet, and mark the data packets of different jacking pipes, respectively, as A1, A2, ..., A n ,Then the data packet is transmitted to the data matching module; The data matching module includes a temporary storage unit and a data comparison unit. The temporary storage unit is used to store monitoring range data of jacking force and stress in different jacking pipes. The data comparison unit retrieves the data in the temporary storage unit and matches it with the data packet in the data acquisition module, and then determines whether the data packet in the current jacking pipe is within the data range in the temporary storage unit. When the data value of the data packet is within the monitoring range, the data matching module transmits the data packet to the virtual modeling module. When the data value of the data packet exceeds the monitoring range, the data matching module transmits the data packet to the virtual modeling module and transmits the warning data to the warning module. The virtual modeling module includes a doubao model unit, a processing unit and a three-dimensional model unit. The natural language description of the image is trained in the doubao model unit. After the virtual modeling module receives the data packet, the doubao model unit extracts the image data in the data packet, and then generates corresponding text data according to the image information in the data acquisition module through the doubao model unit, and transmits the text data to the processing unit. The processing unit cleans the text data and the data in the data packet and transmits them to the three-dimensional model unit. The three-dimensional model unit constructs a virtual three-dimensional model according to the cleaned data, and improves the virtual three-dimensional model according to the time series data. The real-time monitoring module includes a first monitoring unit and a time-series monitoring unit. The first monitoring unit is used to monitor the current virtual three-dimensional model and determine the data of the virtual three-dimensional model of the current jacking pipe under the connection relationship. The time-series monitoring unit is used to monitor the state of the virtual three-dimensional model in the time-series data to facilitate the prediction of the jacking force data in the jacking pipe. The real-time monitoring module transmits the abnormal data monitored by the first monitoring unit and the time-series monitoring unit to the early warning module. The warning module is used for warning and generating a warning instruction according to the received warning signal; The maintenance simulation module is used to call the virtual three-dimensional model in the virtual modeling module, simulate the pipe jacking maintenance process in the virtual three-dimensional model, and generate a maintenance cost list according to the simulated maintenance process, and the maintenance simulation module is started by an early warning instruction.
2. The real-time monitoring system for pipe jacking force based on multivariate data according to claim 1 is characterized in that: The data acquisition module can be converted into a jacking force sensor, a displacement sensor, a temperature sensor and a camera, and use the jacking force sensor, the displacement sensor, the temperature sensor and the camera to collect various data of the jacking force of the jacking in real time and feed them back to the data matching module.
3. The real-time monitoring system for pipe jacking force based on multivariate data according to claim 1 is characterized in that: The data comparison unit matches the data in the data acquisition module with the data in the temporary storage unit, determines whether the data in the data acquisition module is within the normal range, and marks the data in different pipe jacking monitoring ranges in the temporary storage unit as B1, B2, ..., B n , that is, the data comparison unit determines A1∈B1, A2∈B2, ..., A n ∈B n , and then determine whether the data comparison unit needs to transmit a warning signal to the data matching module.
4. The real-time monitoring system for pipe jacking force based on multivariate data according to claim 1 is characterized in that: The doubao model unit is provided with a doubao model. By training the doubao model with the natural language description capability of the jacking force of the pipe jacking, the doubao model recognizes the image and extracts the information data in the image, and combines the image data with the data packet to improve the accuracy of data collection.
5. The real-time monitoring system for pipe jacking force based on multivariate data according to claim 1 is characterized by: The real-time monitoring module obtains the jacking force data of the jacking pipe through a formula, and the specific formula is as follows: Z=∑(f i ·A i ) Among them, Z represents the jacking force data, f i represents the force in the finite element, A i It represents the area of the corresponding unit, and then obtains the jacking force value of the entire jacking pipe at a specific position.
6. The real-time monitoring system for pipe jacking force based on multivariate data according to claim 1 is characterized in that: Different warning levels are set in the warning module, and different warning levels are set according to the data comparison unit, the first monitoring unit and the timing monitoring unit respectively. Then the maintenance simulation module retrieves the abnormal data for simulation calculation, obtains the maintenance cost of the jacking pipe through simulation calculation, and generates visual list data.
7. A real-time control system for pipe jacking force based on multivariate data, comprising a real-time monitoring system for pipe jacking force based on multivariate data according to any one of claims 1 to 6, characterized in that: It also includes a control data processing module, a control optimization module and a visualization module; The control data processing module is used to process the warning data in the warning module, and analyze according to different warning data, analyze the warning instruction data received by the control data processing module and then generate a control instruction; The control optimization module is provided with a simulation unit, and the simulation unit is provided with simulation algorithms of ANSYS and FLUENT. After receiving the control instruction, the control optimization module calls the virtual three-dimensional model and transmits the control instruction to ANSYS and FLUENT, so as to simulate the stress condition of the jacking pipe. When the simulation condition is normal, the control instruction is returned to the control data processing module, and the control data processing module transmits the control data to the jacking pipe. When the simulation data is abnormal, an early warning instruction is generated and transmitted to the early warning module. The visualization module is used to display data in the monitoring system and the control system.
8. The real-time control system for pipe jacking force based on multivariate data according to claim 7 is characterized by: The control data processing module is provided with an execution unit. When the control data processing module receives the early warning instruction generated in the data matching module, the control data processing module calls the virtual modeling module to analyze the control instruction, calculates the control instruction through the simulation unit to ensure that the jacking pipe is normal, and transmits normal instructions to the execution unit after the simulation of the simulation unit is completed. Then the execution unit controls the control equipment in the jacking pipe to work according to the control instruction.
9. The real-time control system for pipe jacking force based on multivariate data according to claim 7 is characterized by: After receiving the data from the early warning module, the visualization module converts the received data into a visualization list, which is then displayed by the visualization module. At the same time, the management personnel modify the control data by typing data in the visualization module, which is then transmitted to the control optimization module through the control data, and the optimization results are transmitted back to the visualization module.
Citation Information
Cited By
Pipe-jacking construction full-period and full-section soil pressure monitoring system and method thereof
CN121235463A
Methods for real-time deviation monitoring of miniature pipe roofing jacking pipe of spiral soil-discharging
US12392609B2
Methods for real-time deviation monitoring of miniature pipe roofing jacking pipe of spiral soil-discharging
US20250231026A1