Man-machine intelligent collaborative power grid work order processing method and system

By building a grid equipment failure knowledge graph and natural language technology to process user voice input, automatically generate work orders and provide solutions, the problem of low efficiency in manual work order processing of customer service seats is solved, the work order processing efficiency and customer response capabilities are improved, and the work order processing efficiency and customer response capabilities are reduced. Operating costs.

CN118917794APending Publication Date: 2024-11-08广州市泺立能源科技有限公司
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410970064.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-19
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The customer service seat is in the telephone call seat service center due to manual checking and filling in the work order, and the repeated confirmation of information affects the efficiency of work order processing and response to customer requests.

Method used

Using the power grid work order processing method of human-machine intelligent collaboration, a power grid equipment failure knowledge graph is constructed by collecting historical work order data, equipment failure data and maintenance data, receiving user voice input and natural language understanding, generating power grid failure work orders, and based on Knowledge graph provides fault solutions to realize automated work order distribution.

Benefits of technology

It improves the efficiency of work order processing, reduces manual filling time, enhances interactivity and user experience, reduces operational costs, and improves customer satisfaction and accuracy of grid equipment fault handling.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118917794A_ABST
    Figure CN118917794A_ABST
Patent Text Reader

Abstract

The invention relates to a man-machine intelligent collaborative power grid work order processing method and system. The method comprises the steps of collecting historical work order data, equipment fault data and equipment maintenance data to construct a power grid equipment fault knowledge graph; receiving user voice input, converting the user voice input into a text, and performing semantic understanding on the text by adopting a natural language technology to obtain user fault description information; obtaining a fault reason based on the user fault description information and the power grid equipment fault knowledge graph, and generating a power grid fault work order; and obtaining a fault solution based on the power grid fault work order and providing the fault solution to the user for selection, and generating a power grid fault processing work order based on the selection of the user and distributing the work order. According to the invention, the power grid equipment fault processing efficiency and accuracy are improved, the customer satisfaction is improved, and the operation cost is reduced; and through continuous data accumulation and model optimization, the performance of the system is continuously improved, and the effect of the system in fault management in the power industry is further enhanced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of intelligent work order processing, and in particular relates to a human-machine intelligent collaborative power grid work order processing method and system. Background Art

[0002] In the telephone call agent service center, work orders are the main carrier of customer opinions and demands. Customer service personnel record customer feedback and then transfer it to the corresponding department for processing based on the type of work order.

[0003] Customer service agents have a high workload on a daily basis. When answering customer calls, they need to manually select the work order template and fill in the relevant work order content on the workbench, which leads to low call efficiency or repeated confirmation of information. Customer service agents need to input a lot of relevant information when creating work orders, and they need to ensure the accuracy of the work order information, which leads to longer service time for a single customer and affects the overall customer service efficiency.

[0004] Therefore, it is necessary to provide a human-machine collaborative work order processing method to assist customer service agents in work order processing and work order assignment, thereby improving the efficiency of work order processing and the efficiency of responding to customer demands. Summary of the invention

[0005] The purpose of the present invention is to provide a human-machine intelligent collaborative power grid work order processing method and system to solve the problems of low work order processing efficiency and low efficiency in responding to customer demands.

[0006] To achieve one of the above-mentioned purposes of the invention, an embodiment of the present invention provides a method for processing power grid work orders in human-machine intelligent collaboration, the method comprising:

[0007] Collect historical work order data, equipment failure data, and equipment maintenance data to build a knowledge graph of power grid equipment failures;

[0008] Receive user voice input, convert the user's voice input into text, and use natural language technology to perform semantic understanding on the text to obtain user fault description information;

[0009] Acquire the cause of the fault based on the user fault description information and the power grid equipment fault knowledge graph, and generate a power grid fault work order;

[0010] A fault solution is obtained based on the power grid fault work order and provided to the user for selection, and a power grid fault processing work order is generated based on the user's selection and the work order is distributed.

[0011] As a further improvement of an embodiment of the present invention, the method also includes that the historical work order data includes at least fault description, fault equipment model information, fault cause, fault solution and person responsible for equipment failure; the equipment failure data includes at least fault equipment model information and fault cause; the equipment maintenance data includes at least equipment model information and fault solution.

[0012] As a further improvement of an embodiment of the present invention, the method further includes: constructing a knowledge graph of power grid equipment failures includes:

[0013] Step 1: Define fault description, fault equipment model, fault cause, fault solution and fault person in charge as entities of the power grid equipment fault knowledge graph, and define "description", "cause", "solution" and "person in charge" as relationships of the power grid equipment fault knowledge graph;

[0014] Step 2: Preprocess the collected historical work order data, equipment failure data, and equipment maintenance data;

[0015] Step 3: Use named entity recognition model and relation extraction method based on preset rules to identify entities and relations from the processed data;

[0016] Step 4: Build a knowledge graph of power grid equipment failures and store it in the Neo4j graph database.

[0017] As a further improvement of an embodiment of the present invention, the method further includes that the use of natural language technology to perform semantic understanding on the text includes:

[0018] The text is preprocessed; the key entities in the preprocessed text are identified using an entity recognition model; entity relationships are identified using predefined rules; the user's demands are then determined using an intent recognition model; and finally the user's fault description information is obtained; the key entities include at least the user's account number, occurrence time, fault description, and faulty equipment model; the user's demands include at least maintenance, consultation, complaint, and order reminder.

[0019] As a further improvement of an embodiment of the present invention, the method further includes that obtaining the fault cause based on the user fault description information and the power grid equipment fault knowledge graph includes:

[0020] The similarity between the user fault description information and the fault description in the power grid equipment fault knowledge graph is calculated; the fault description with the highest similarity calculation result is selected as the fault description matching the user fault description information, and the cause of the fault is determined based on the fault description and the power grid equipment fault knowledge graph.

[0021] As a further improvement of an embodiment of the present invention, the method further includes: obtaining a fault solution based on the power grid fault work order and providing it to the user for selection includes:

[0022] The faulty equipment name and fault cause in the power grid fault work order are matched with the faulty equipment name and fault cause in the power grid equipment fault knowledge graph to obtain one or more fault solutions; the obtained one or more fault solutions are sent to the user, allowing the user to select and confirm the fault solution.

[0023] As a further improvement of an embodiment of the present invention, the method further includes that generating a power grid fault processing work order based on the user's selection and dispatching the work order includes:

[0024] When the fault solution selected by the user requires on-site service by the maintenance team, the person responsible for the fault is determined based on the solution selected by the user and the knowledge graph of power grid equipment faults, and a power grid fault handling work order is generated and assigned to the person responsible for the fault; when the fault solution selected by the user does not require on-site service by the maintenance team, a power grid fault handling work order is generated and the work order progress is updated to completed.

[0025] In order to achieve one of the above-mentioned purposes of the invention, an embodiment of the present invention further provides a human-machine intelligent collaborative power grid work order processing system, the system comprising:

[0026] Collection module, used to collect historical work order data, equipment failure data and equipment maintenance data;

[0027] Construction module, used to construct knowledge graph of power grid equipment failure;

[0028] A voice conversion module, used to receive user voice input and convert the user voice input into text;

[0029] The data processing module is used to use natural language technology to perform semantic understanding on text and obtain user fault description information; obtain the fault cause based on the user fault description information and the knowledge graph of power grid equipment faults and generate a power grid fault work order; obtain the fault solution based on the power grid fault work order;

[0030] The work order dispatching module is used to generate power grid fault handling work orders based on user selections and dispatch the work orders.

[0031] To achieve one of the above-mentioned purposes of the invention, an embodiment of the present invention further provides an electronic device, comprising a memory and a processor, characterized in that the memory stores a computer program that can be run on the processor, and when the program is executed on the processor, the steps in a human-machine intelligent collaborative power grid work order processing method as described in any one of the above items are implemented.

[0032] In order to achieve one of the above-mentioned purposes of the invention, an embodiment of the present invention further provides a storage medium, wherein the storage medium stores a computer program, and is characterized in that when the computer program is executed by a processor, the steps in a human-machine intelligent collaborative power grid work order processing method as described in any one of the above items are implemented.

[0033] Compared with the prior art, the human-machine intelligent collaborative power grid work order processing method provided by the present invention can quickly identify the cause of the fault by matching the fault description provided by the user with the historical data in the power grid equipment fault knowledge graph, thereby avoiding the inefficiency and possible misjudgment of manual diagnosis; automatically generating a work order containing necessary information according to the fault description, reducing the time of manually filling out the work order and speeding up the fault handling process; based on the fault cases in the knowledge graph, the system can intelligently recommend verified solutions to reduce the cost of trial and error; users can quickly describe the problem through voice input, and the system will respond immediately and provide solution suggestions, thereby enhancing interactivity and user experience; users can choose the most appropriate solution according to their needs and preferences, thereby increasing the flexibility and satisfaction of the service; the method not only improves the efficiency and accuracy of power grid equipment fault handling, but also improves customer satisfaction, while reducing operating costs, and has significant economic benefits and social value; through continuous data accumulation and model optimization, the performance of the system will continue to be improved, further enhancing its role in fault management in the power industry. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] Figure 1 It is an overall flow chart of a method for processing power grid work orders with human-machine intelligent collaboration described in the present invention.

[0035] Figure 2 It is a schematic diagram of the knowledge graph of power grid equipment failures of a power grid work order processing method with human-machine intelligent collaboration described in the present invention.

[0036] Figure 3 It is a system structure diagram of a human-machine intelligent collaborative power grid work order processing system described in the present invention. DETAILED DESCRIPTION

[0037] The present invention will be described in detail below in conjunction with the specific embodiments shown in the accompanying drawings. However, these embodiments do not limit the present invention, and any structural, methodological, or functional changes made by a person skilled in the art based on these embodiments are all within the scope of protection of the present invention.

[0038] The embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.

[0039] In the first embodiment of the present invention, the present invention provides a method for processing power grid work orders in a human-machine intelligent collaborative manner, such as Figures 1-2 As shown, the method includes,

[0040] S1: Collect historical work order data, equipment failure data, and equipment maintenance data to build a knowledge graph of power grid equipment failures;

[0041] In a specific embodiment of the present invention, the collected historical work order data includes information such as fault description, fault equipment model information, fault cause, fault solution and person responsible for equipment failure; the collected equipment failure data includes at least fault equipment model information and fault cause; the collected equipment maintenance data includes at least equipment model information and fault maintenance plan.

[0042] In a specific embodiment of the present invention, "constructing a knowledge graph of power grid equipment failures" includes:

[0043] Step 1: Define the entity types and relationship types of the power grid equipment fault knowledge graph;

[0044] Step 2: Preprocess the collected historical work order data, equipment failure data, and equipment maintenance data;

[0045] Step 3: Use named entity recognition model and relation extraction method based on preset rules to identify entities and relations from the processed data;

[0046] Step 4: Define the attributes of entities and edges to construct a knowledge graph of power grid equipment failures and store the knowledge graph of power grid equipment failures in the Neo4j graph database.

[0047] In a specific embodiment of the present invention, "data preprocessing" includes cleaning the data, removing duplicate data and irrelevant information, correcting erroneous or missing data, and unifying device model information.

[0048] In a specific embodiment of the present invention, "defining entity types and relationship types of the power grid equipment failure knowledge graph" includes defining fault description, fault equipment model, fault cause, fault solution and fault person in charge as entities of the power grid equipment failure knowledge graph, and taking "description", "cause", "solution" and "person in charge" as relationships of the power grid equipment failure knowledge graph.

[0049] In a specific implementation scenario of the present invention, Figure 2As shown, in the constructed power grid equipment fault knowledge graph, the relationship between the fault description and the faulty equipment model is "description"; the relationship between the faulty equipment name and the fault cause is "cause"; the relationship between the fault cause and the fault solution is "solution"; the relationship between the fault solution and the person responsible for the fault is "person responsible".

[0050] S2: Receive user voice input, convert the user voice input into text, and use natural language technology to semantically understand the text to obtain fault description information.

[0051] In a specific embodiment of the present invention, "converting the user's voice input into text" includes the user describing the fault condition through a telephone, mobile application or other voice interface; using a microphone or telephone line to receive a voice signal and collect the user's voice; and using automatic speech recognition technology to convert the collected user voice into text.

[0052] In a specific embodiment of the present invention, "using natural language technology to semantically understand text" includes: preprocessing the converted text; using an entity recognition model to identify key entities in the preprocessed text and extracting features from the text; using predefined rules to identify entity relationships; then using an intent recognition model to determine the user's demands; and finally obtaining the user's fault description information.

[0053] In a specific embodiment of the present invention, "text preprocessing" includes standardization, word segmentation and part-of-speech tagging of the converted text.

[0054] In a specific embodiment of the present invention, "standardization processing" includes correcting grammatical errors, unifying abbreviations and proper nouns, and processing homonyms.

[0055] In a specific embodiment of the present invention, "using an entity recognition model to identify key entities in the preprocessed text" includes combining a bidirectional long short-term memory network and a conditional random field to construct a neural network-based entity recognition model, and using the entity recognition model to identify key entity information in the user's voice text.

[0056] In a specific implementation of the present invention, the "key entity" includes user account number, occurrence time, fault description, fault device model, etc.

[0057] In a specific embodiment of the present invention, "feature extraction of text" includes using a bag-of-words model to count the frequency of words in the text; using word embedding technologies such as Word2Vec, GloVe or FastText to convert words into high-dimensional vectors, and capturing the semantic information of the words based on the vectors; and using dependency syntactic analysis to extract the dependency relationship between words in a sentence.

[0058] In a specific embodiment of the present invention, "user demands" include requests for maintenance, information consultation, complaints, work order reminders, etc.

[0059] S3: Determine the cause of the fault based on the fault description information and the knowledge graph of power grid equipment faults, and generate a power grid fault work order;

[0060] In a specific embodiment of the present invention, "determining the cause of the fault based on fault description information and the power grid equipment fault knowledge graph" includes: performing similarity calculation on the acquired user fault description information and the fault description in the power grid equipment fault knowledge graph; when the similarity calculation result is greater than a threshold, determining that the fault description is consistent; and determining the cause of the fault based on the fault description and the power grid equipment fault knowledge graph.

[0061] In a specific embodiment of the present invention, "generating a power grid fault work order" includes designing a standardized power grid fault work order template, filling in the acquired fault description, fault equipment model, fault cause and other information into the power grid fault work order template, and generating a power grid fault work order.

[0062] In a specific embodiment of the present invention, the "grid fault work order" includes the user account number, fault occurrence time, fault description, fault equipment model, and fault cause.

[0063] S4: Obtain fault handling suggestions based on the power grid fault work order and provide them to the user, and process and distribute the work order based on the user's selection.

[0064] In a specific embodiment of the present invention, "obtaining fault handling suggestions and providing them to users" includes obtaining one or more fault solutions based on the power grid fault work order and the power grid equipment fault knowledge graph; sending the obtained one or more fault solutions to the user, allowing the user to select and confirm the fault solution.

[0065] In a specific embodiment of the present invention, "processing and dispatching work orders based on user selection" includes, when the fault solution selected by the user requires on-site service by a maintenance team, determining the person responsible for the fault based on the solution selected by the user and the power grid equipment fault knowledge graph, and generating a power grid fault processing work order and dispatching it to the person responsible for the fault; when the fault solution selected by the user does not require on-site service by a maintenance team, generating a power grid fault processing work order and updating the work order progress to completed.

[0066] In a specific embodiment of the present invention, "generating a power grid fault handling work order" includes designing a standardized power grid fault handling work order template, and filling in the user account number, user contact information, fault occurrence time, fault description, fault equipment model, fault cause, fault solution, fault person in charge, and work order creation time into the power grid fault handling work order template.

[0067] In a specific embodiment of the present invention, the "grid fault handling work order" includes the user account number, user contact information, fault occurrence time, fault description, fault equipment model, fault cause, fault solution, fault person in charge and work order creation time.

[0068] In the second embodiment of the present invention, the present invention provides a human-machine intelligent collaborative power grid work order processing system, such as Figure 3 As shown, the system comprises:

[0069] Collection module, used to collect historical work order data, equipment failure data and equipment maintenance data;

[0070] Construction module, used to construct knowledge graph of power grid equipment failure;

[0071] A voice conversion module, used to receive user voice input and convert the user voice input into text;

[0072] The data processing module is used to use natural language technology to perform semantic understanding on the text and obtain user fault description information; obtain the fault cause based on the user fault description information and the knowledge graph of power grid equipment faults and generate a power grid fault work order; obtain the fault solution based on the power grid fault work order;

[0073] The work order dispatching module is used to generate power grid fault handling work orders based on user selections and dispatch the work orders.

[0074] In embodiment three of the present invention, the present invention provides an electronic device, comprising a memory and a processor, characterized in that the memory stores a computer program that can be run on the processor, and when the program is executed on the processor, the steps in the power grid work order processing method of human-machine intelligent collaboration as described in any one of the above items are implemented.

[0075] In a fourth embodiment of the present invention, the present invention provides a storage medium storing a computer program, wherein the computer program, when executed by a processor, implements the steps in the method for processing power grid work orders with human-machine intelligent collaboration as described in any one of the above.

[0076] In summary, the human-machine intelligent collaborative power grid work order processing method provided by the present invention can quickly identify the cause of the fault by matching the fault description provided by the user with the historical data in the power grid equipment fault knowledge graph, thereby avoiding the inefficiency of manual diagnosis and possible misjudgment; automatically generating a work order containing necessary information according to the fault description, reducing the time of manually filling out the work order and speeding up the fault handling process; based on the fault cases in the knowledge graph, the system can intelligently recommend verified solutions to reduce the cost of trial and error; users can quickly describe the problem through voice input, and the system will respond immediately and provide solution suggestions, thereby enhancing interactivity and user experience; users can choose the most appropriate solution according to their needs and preferences, thereby increasing the flexibility and satisfaction of the service; the method not only improves the efficiency and accuracy of power grid equipment fault handling, but also improves customer satisfaction, while reducing operating costs, and has significant economic benefits and social value; through continuous data accumulation and model optimization, the performance of the system will continue to be improved, further enhancing its role in fault management in the power industry.

[0077] It should be understood that although this specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each implementation mode may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

[0078] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working process of the modules described above can refer to the corresponding process in the aforementioned method implementation, and will not be repeated here.

[0079] The modules described as separate components may or may not be physically separated, and the components shown as modules may or may not be physical modules, that is, they may be located in one place or distributed on multiple network modules. Some or all of the modules may be selected according to actual needs to achieve the purpose of the present implementation scheme.

[0080] In addition, each functional module in each embodiment of the present application can be integrated into one processing module, or each module can exist physically separately, or two or more modules can be integrated into one module. The above integrated modules can be implemented in the form of hardware or in the form of hardware plus software functional modules.

[0081] The above-mentioned integrated module implemented in the form of a software function module can be stored in a computer-readable storage medium. The above-mentioned software function module is stored in a storage medium, including a number of instructions for a computer system (which can be a personal computer, a server, or a network system, etc.) or a processor to perform some steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (Read-Only Memory, ROM), random access memory (Random Access Memory, RAM), disk or optical disk and other media that can store program codes.

[0082] Finally, it should be noted that the above implementation modes are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned implementation modes, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned implementation modes, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the various implementation modes of the present application.

Claims

1. A method for processing power grid work orders with human-machine intelligent collaboration, Features: include, Collect historical work order data, equipment failure data, and equipment maintenance data to build a knowledge graph of power grid equipment failures; Receive user voice input, convert the user's voice input into text, and use natural language technology to perform semantic understanding on the text to obtain user fault description information; Acquire the cause of the fault based on the user fault description information and the power grid equipment fault knowledge graph, and generate a power grid fault work order; A fault solution is obtained based on the power grid fault work order and provided to the user for selection, and a power grid fault processing work order is generated based on the user's selection and the work order is distributed.

2. According to the method for processing power grid work orders with human-machine intelligent collaboration as described in claim 1, Features: The historical work order data includes at least fault description, fault equipment model information, fault cause, fault solution and person responsible for equipment failure; the equipment failure data includes at least fault equipment model information and fault cause; the equipment maintenance data includes at least equipment model information and fault solution.

3. According to the method for processing power grid work orders with human-machine intelligent collaboration as described in claim 1, Features: The construction of the knowledge graph of power grid equipment failures includes: Step 1: Define fault description, fault equipment model, fault cause, fault solution and person in charge as entities of the power grid equipment fault knowledge graph, and define "description", "cause", "solution" and "person in charge" as the relationships of the power grid equipment fault knowledge graph; Step 2: Preprocess the collected historical work order data, equipment failure data, and equipment maintenance data; Step 3: Use named entity recognition model and relation extraction method based on preset rules to identify entities and relations from the processed data; Step 4: Build a knowledge graph of power grid equipment failure and store it in the Neo4j graph database.

4. According to the method for processing power grid work orders with human-machine intelligent collaboration as described in claim 1, Features: The use of natural language technology to perform semantic understanding on the text includes: Performing text preprocessing on the text; using an entity recognition model to identify key entities in the preprocessed text; and using predefined rules to identify entity relationships; Then use the intention recognition model to determine the user's demands; finally obtain the user's fault description information; the key entities at least include the user's account number, occurrence time, fault description, and faulty equipment model; the user's demands at least include maintenance, consultation, complaints, and order reminders.

5. According to the method for processing power grid work orders with human-machine intelligent collaboration as described in claim 1, Features: The obtaining of the fault cause based on the user fault description information and the power grid equipment fault knowledge graph includes: The similarity between the user fault description information and the fault description in the power grid equipment fault knowledge graph is calculated; the fault description with the highest similarity calculation result is selected as the fault description matching the user fault description information, and the cause of the fault is determined based on the fault description and the power grid equipment fault knowledge graph.

6. A method for processing power grid work orders in human-machine intelligent collaboration according to claim 1, Features: The obtaining of a fault solution based on the power grid fault work order and providing it to the user for selection comprises: The faulty equipment name and fault cause in the power grid fault work order are matched with the faulty equipment name and fault cause in the power grid equipment fault knowledge graph to obtain one or more fault solutions; the obtained one or more fault solutions are sent to the user, allowing the user to select and confirm the fault solution.

7. A method for processing power grid work orders in human-machine intelligent collaboration according to claim 1, Features: The generating of a power grid fault processing work order based on the user's selection and the dispatching of the work order include: When the fault solution selected by the user requires on-site service by the maintenance team, the person responsible for the fault is determined based on the solution selected by the user and the knowledge graph of power grid equipment faults, and a power grid fault handling work order is generated and assigned to the person responsible for the fault; when the fault solution selected by the user does not require on-site service by the maintenance team, a power grid fault handling work order is generated and the work order progress is updated to completed.

8. A human-machine intelligent collaborative power grid work order processing system, Features: include, Collection module, used to collect historical work order data, equipment failure data and equipment maintenance data; Construction module, used to construct knowledge graph of power grid equipment failure; A voice conversion module, used to receive user voice input and convert the user voice input into text; The data processing module is used to use natural language technology to understand the text semantics and obtain user fault description information; Obtain the cause of the fault based on the user fault description information and the knowledge graph of power grid equipment faults, and generate a power grid fault work order; obtain the fault solution based on the power grid fault work order; The work order dispatching module is used to generate power grid fault handling work orders based on user selections and dispatch the work orders.

9. An electronic device comprising a memory and a processor, Features: The memory stores a computer program that can be run on the processor, and when the program is executed on the processor, the steps in the human-machine intelligent collaborative power grid work order processing method as described in any one of claims 1-7 are implemented.

10. A storage medium storing a computer program. Features: When the computer program is executed by the processor, the steps in the method for processing power grid work orders in human-machine intelligent collaboration as described in any one of claims 1 to 7 are implemented.