Digital sand table construction method based on BIM and GIS

The construction of digital sand tables through BIM and GIS technology has solved the problem that traditional sand tables cannot reflect complex spatial data information and lack of interactivity in real time, and achieved high-precision and multi-source data integration, improving planning efficiency and scientificity.

CN118918281AInactive Publication Date: 2024-11-08SICHUAN SURVEYING & MAPPING TECH SERVICE CENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410928437.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-11
Publication Date
2024-11-08
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Traditional physical sandboxes cannot reflect complex spatial data information in real time, and lack interactivity, which limits its application effect.

Method used

Using the digital sand table construction method based on BIM and GIS, digital elevation model and orthophotographs are constructed through data acquisition, processing, verification, and construction of digital elevation models and orthophotographs, and spatial sand table models are built, and functional interaction and scene verification are carried out to generate electronic sand tables.

Benefits of technology

It improves the accuracy and practicality of the digital sand table, enhances planning efficiency, meets personalized needs, improves the scientific nature of planning decisions, and integrates multi-source data to provide richer information.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118918281A_ABST
    Figure CN118918281A_ABST
Patent Text Reader

Abstract

The invention discloses a digital sand table construction method based on BIM (Building Information Modeling) and GIS (Geographic Information System), which relates to the field of electronic sand tables and comprises the following steps of: performing data acquisition on a target greening area to obtain corresponding area data information; carrying out data processing on the obtained regional data information to obtain a corresponding digital elevation model, carrying out model verification on the corresponding digital elevation model, and storing the corresponding digital elevation model after the verification is passed; constructing a corresponding digital orthoimage based on the stored digital elevation model; building a corresponding space sand table model based on the built digital orthoimage and the digital elevation model; performing function interaction and scene verification on the obtained space sand table model, and obtaining a corresponding electronic sand table after the verification is passed; according to the invention, the visual perception effect of users on landscaping can be enhanced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of electronic sand tables, and in particular to a digital sand table construction method based on BIM and GIS. Background Art

[0003] Compared with existing technologies, traditional physical sandboxes are intuitive, but inconvenient to update and cannot reflect complex spatial data information in real time. In addition, due to their static nature and limitations, and lack of interactivity, the role of traditional sandboxes is greatly limited. These are the problems we need to solve. For this reason, we provide a digital sandbox construction method based on BIM and GIS. Summary of the invention

[0004] The purpose of the present invention is to provide a digital sandbox construction method based on BIM and GIS.

[0005] The purpose of the present invention can be achieved by the following technical solution: A digital sandbox construction method based on BIM and GIS comprises the following steps:

[0006] Step 1: Collect data on the target greening area to obtain corresponding regional data information;

[0007] Step 2: Process the obtained regional data information to obtain a corresponding digital elevation model, and perform model verification on the corresponding digital elevation model. If the verification passes, the corresponding digital elevation model is saved;

[0008] Step 3: Construct the corresponding digital orthophoto based on the saved digital elevation model;

[0009] Step 4: Build a corresponding space sand table model based on the constructed digital orthophoto and digital elevation model;

[0010] Step 5: Perform functional interaction and scene verification on the obtained space sandbox model. After the verification is passed, the corresponding electronic sandbox is obtained.

[0011] Furthermore, the process of collecting data on the target greening area and obtaining corresponding regional data information includes:

[0012] A data collection unit and a collection database are provided, wherein the data collection unit is used to collect data from the target greening area through a variety of collection methods to obtain corresponding collection data;

[0013] The acquired collected data is read, summarized and sorted, corresponding regional data information is obtained, and the acquired regional data information is uploaded to the acquisition database for storage.

[0014] Furthermore, the process of processing the obtained regional data information to obtain the corresponding digital elevation model includes:

[0015] Perform data preprocessing on the obtained regional data information, and after the preprocessing is completed, read the preprocessed regional data information to obtain corresponding remote sensing data and laser measurement data, obtain the ground surface reflection or height information of the target area based on the obtained laser measurement data, and mark it in the corresponding remote sensing data to obtain the corresponding terrain data point cloud;

[0016] The obtained terrain data point cloud is divided based on the Delaunay triangulation algorithm to obtain the corresponding triangle network.

[0017] Verify the obtained triangular network to determine whether it meets the first preset standard. If it does not meet the requirements, continue to split it. If it meets the requirements, store the corresponding triangular network.

[0018] After the storage is completed, the elevation interpolation of the triangles in the corresponding triangular network is performed based on the Kriging interpolation method; the triangular network with completed elevation interpolation is rasterized and input into the GIS software to obtain the corresponding digital elevation model.

[0019] Furthermore, the process of model verification for the corresponding digital elevation model includes:

[0020] Obtain the corresponding digital elevation model and simultaneously obtain the three-dimensional coordinate system corresponding to the corresponding digital elevation model;

[0021] According to the division requirements, the obtained digital elevation model is divided into regions to obtain a number of identical square blocks;

[0022] Obtain the coordinate system of the corresponding digital elevation model and record it as the first coordinate system;

[0023] Acquire coordinate information corresponding to the corresponding square block based on the obtained first coordinate system;

[0024] Obtaining a visual point, and obtaining a visual distance and a blur degree corresponding to a corresponding visual point to a corresponding square block based on the obtained coordinate information and the visual point;

[0025] Obtain the node coefficient corresponding to the corresponding square block based on the obtained visual distance and the corresponding blur degree;

[0026] Set the node threshold and compare the obtained node coefficient with the node threshold;

[0027] If the node coefficient is not lower than the node threshold, no other operations are performed;

[0028] If the node coefficient is lower than the node threshold, the corresponding square block is adjusted. After the adjustment is completed, the model is verified again until all square blocks meet the requirements and the corresponding square blocks are recombined;

[0029] The reassembled digital elevation model is compared with the GIS data in the corresponding regional data information and the second preset standard, and whether the corresponding digital elevation model meets the requirements is judged based on the comparison result; if it does not meet the requirements, the corresponding triangle network is re-interpolated and the digital elevation model is verified to obtain a new digital elevation model. If it meets the requirements, the corresponding digital elevation model is saved.

[0030] Furthermore, the process of constructing a corresponding digital orthophoto based on the saved digital elevation model includes:

[0031] Based on the extracted remote sensing data, a number of remote sensing images are obtained, the obtained remote sensing images are mapped into the coordinate system of the corresponding digital elevation model, and the corresponding mapping process is digitally orthorectified;

[0032] Based on the mapping results, the mapped remote sensing images are image registered and image fused, and after the image registration and image fusion are completed, the corresponding digital orthophoto is obtained;

[0033] The obtained digital orthophoto is compared with the corresponding third preset standard. If it meets the third preset standard, the corresponding digital orthophoto is saved. If it does not meet the third preset standard, the resolution of the corresponding digital orthophoto is adjusted until it meets the requirements.

[0034] Furthermore, the process of building a corresponding space sand table model based on the constructed digital orthophoto and digital elevation model includes:

[0035] The obtained digital elevation model and digital orthophoto were input into ArcGIS Pro software to obtain the corresponding terrain-geomorphology model;

[0036] Import the corresponding regional data information into the corresponding professional software to obtain the corresponding GIS data set layer, BIM data set layer and vector data set layer;

[0037] At the same time, a corresponding vector annotation layer is constructed based on the data format, expression form and data volume corresponding to the terrain-geomorphology data, supporting roads, water conservancy, and management and maintenance room equipment data in the corresponding target area in the regional data information;

[0038] Using the corresponding terrain-geomorphology model base layer and the coordinate system of the digital elevation model as the auxiliary coordinate system, the obtained GIS dataset layer, BIM dataset layer, vector dataset layer and vector annotation layer are superimposed, and the corresponding layers are moved up and down according to the display order until the display effect between the layers meets the actual needs; the corresponding initial sand table model is obtained;

[0039] Importing part of the data in the corresponding area data information into the corresponding three-dimensional modeling software for modeling to obtain the corresponding three-dimensional model;

[0040] The obtained three-dimensional models are deployed to the corresponding layers in the corresponding initial sandbox model according to their types, and the deployed three-dimensional models are adjusted based on the corresponding auxiliary coordinate system; after the deployment is completed, the corresponding space sandbox model is obtained.

[0041] Furthermore, the process of functional interaction of the obtained space sandbox model includes:

[0042] Construct a sand table interactive platform, integrate the obtained sand table interactive platform with the corresponding space sand table model and the collected regional data information, and obtain the corresponding electronic sand table.

[0043] Furthermore, the process of scene verification of the obtained electronic sand table includes:

[0044] Perform functional testing based on the obtained electronic sandbox and collect scene data during the corresponding functional testing process;

[0045] Obtaining scene rendering data of a corresponding electronic sandbox based on the obtained scene data;

[0046] Obtain the rendering standard, compare the obtained scene rendering data with the corresponding rendering standard. If there is at least one indicator data in the scene rendering data that is lower than the corresponding rendering standard, check and correct the scene rendering status of the corresponding electronic sand table; if it meets the requirements, output the corresponding electronic sand table to obtain the corresponding digital sand table, and complete the digital sand table construction.

[0047] Compared with the prior art, the present invention has the following beneficial effects:

[0048] 1. By creating a three-dimensional scene based on the regional digital elevation model (DEM) and orthophoto (DOM), superimposing vector data such as roads, water systems, and pipelines, the multi-source data is effectively integrated to improve the accuracy and practicality of the digital sand table;

[0049] 2. Through the integration of basic functions and auxiliary functions, improve planning efficiency, meet personalized needs, enhance the scientific nature of planning decisions, ensure the quality of digital sandbox, and integrate multi-source data to provide richer information. BRIEF DESCRIPTION OF THE DRAWINGS

[0050] Figure 1 It is a schematic diagram of the present invention. DETAILED DESCRIPTION

[0051] like Figure 1 As shown in the figure, the digital sandbox construction method based on BIM and GIS includes the following steps:

[0052] Step 1: Collect data on the target greening area to obtain corresponding regional data information;

[0053] Step 2: Process the obtained regional data information to obtain a corresponding digital elevation model, and perform model verification on the corresponding digital elevation model. If the verification passes, the corresponding digital elevation model is saved;

[0054] Step 3: Construct the corresponding digital orthophoto based on the saved digital elevation model;

[0055] Step 4: Build a corresponding space sand table model based on the constructed digital orthophoto and digital elevation model;

[0056] Step 5: Perform functional interaction and scene verification on the obtained space sandbox model. After the verification is passed, the corresponding electronic sandbox is obtained;

[0057] It should be further explained that, in the specific implementation process, the process of collecting data on the target greening area and obtaining the corresponding regional data information includes:

[0058] A data acquisition unit and an acquisition database are provided, wherein the data acquisition unit is used to collect data from the target greening area through a variety of acquisition methods to obtain corresponding acquisition data, wherein the acquisition data includes remote sensing data, laser measurement data, ground measurement data, sensor data, etc.; wherein the various acquisition methods include but are not limited to remote sensing acquisition (aerial remote sensing and satellite remote sensing), laser measurement, ground survey, sensor acquisition, etc.;

[0059] Read the acquired collected data, summarize and organize the acquired collected data, and obtain corresponding regional data information, wherein the regional data information includes GIS data, BIM data, vegetation data of the target area, and also includes roads, water systems, pipelines and other vector data; the GIS data includes geographical information such as topography, landform, and land use of the target area; the BIM data includes building information such as building structure and equipment layout in the target area; the vegetation data includes information such as vegetation type and vegetation coverage of the target area;

[0060] At the same time, the collected regional data information is uploaded to the collection database for storage.

[0061] It should be further explained that, in the specific implementation process, the process of performing data processing on the obtained regional data information to obtain the corresponding digital elevation model includes: performing data preprocessing on the obtained regional data information, and the data preprocessing includes but is not limited to data cleaning, data denoising, data correction and data filtering;

[0062] The data cleaning is used to identify and process abnormal data in the regional data information, including filling missing values, deleting duplicate records or correcting erroneous data; the data denoising is used to identify and remove noise data in the regional data information based on statistical algorithms; the data correction is used to correct inconsistent data in the regional data information; the data filtering is used to eliminate irrelevant data or invalid data in the regional data information based on pre-set data standards;

[0063] After the preprocessing is completed, the preprocessed regional data information is read to obtain the corresponding remote sensing data and laser measurement data, and the ground surface reflection or height information of the target area is obtained based on the obtained laser measurement data, and the corresponding remote sensing data is annotated according to the information to obtain the corresponding terrain data point cloud;

[0064] The obtained terrain data point cloud is divided based on the Delaunay triangulation algorithm to obtain the corresponding triangle network.

[0065] Verify the obtained triangular network to determine whether it meets the first preset standard. If it does not meet the requirements, continue to split it. If it meets the requirements, store the corresponding triangular network. The first prediction standard includes that there are no overlapping triangles in the obtained triangular network and the inscribed circle of each triangle does not contain other terrain data points.

[0066] After the storage is completed, the elevation interpolation of the triangles in the corresponding triangle network is performed based on the Kriging interpolation method to achieve a smooth transition between triangles;

[0067] The triangle network with completed elevation interpolation is rasterized and input into GIS software to obtain a corresponding digital elevation model; the digital elevation model is expressed in the form of grid cells, and each grid cell contains the elevation information of the surface in the target area;

[0068] It should be further explained that, in the specific implementation process, the process of model verification of the corresponding digital elevation model includes:

[0069] Obtain the corresponding digital elevation model and simultaneously obtain the three-dimensional coordinate system corresponding to the corresponding digital elevation model;

[0070] Performing regional division on the obtained digital elevation model according to division requirements to obtain a plurality of identical square blocks, wherein the division requirements include that the obtained square blocks cannot overlap, there can be only one terrain data point in each square block and the terrain data point is located at the center of the corresponding square block, and the position of the terrain data point can represent the position of the corresponding square block;

[0071] Obtain the coordinate system of the corresponding digital elevation model and record it as the first coordinate system;

[0072] The obtained square blocks are numbered as i, where i=1, 2, ..., n, n>0 and n is an integer;

[0073] Based on the obtained first coordinate system, coordinate information corresponding to the corresponding square block is obtained and recorded as (xi, yi, zi);

[0074] A coordinate point is randomly selected and marked as a visual point P, wherein the visual point is in the first coordinate system but outside the corresponding digital elevation model, that is, the corresponding digital elevation model can be viewed at the corresponding visual point;

[0075] Based on the obtained coordinate information and the visual point, the visual distance from the corresponding visual point to the corresponding square block i is obtained, and the obtained visual distance is recorded as L;

[0076] Where, L = |xi-xp|+|yi-yp|+|zi-zp|;

[0077] At the same time, the blur degree between the corresponding visual point P and the corresponding square block is obtained and recorded as M, where Among them, θ refers to the angle between the corresponding visual point p and the horizontal plane where the square block i is located; d represents the side length corresponding to the corresponding square data block i;

[0078] Further, based on the obtained visual distance and the corresponding blur level, the node coefficient corresponding to the corresponding square block i is obtained, and the obtained node coefficient is marked as Ji;

[0079] in, In the formula, C and c represent the corresponding distance adjustment factor and fuzzy adjustment factor respectively, which are determined according to actual needs;

[0080] Set the node threshold and compare the obtained node coefficient with the node threshold;

[0081] If the node coefficient is not lower than the node threshold, no other operations are performed;

[0082] If the node coefficient is lower than the node threshold, the corresponding laser measurement data is read, and based on the data point adjustment, the terrain data points in the corresponding square block are adjusted. The data point adjustment includes adding or modifying the corresponding terrain control points in the corresponding square data block. The terrain control points are reference points for correcting and adjusting the data in the digital elevation model, that is, they can be used to check and correct errors in the digital elevation model to improve the quality and accuracy of the digital elevation model.

[0083] After the adjustment is completed, the model is verified again until all square blocks meet the requirements, and the corresponding square blocks are reassembled;

[0084] Comparing the reassembled digital elevation model with the GIS data in the corresponding regional data information and the second preset standard, and judging whether the corresponding digital elevation model meets the requirements according to the comparison result; wherein the second preset standard refers to that the resolution of the digital elevation model is better than 30m;

[0085] If it does not meet the requirements, the corresponding triangle network is re-interpolated and the digital elevation model is verified to obtain a new digital elevation model. If it meets the requirements, the corresponding digital elevation model is saved.

[0086] It should be further explained that, in the specific implementation process, the process of constructing the corresponding digital orthophoto based on the saved digital elevation model includes:

[0087] Based on the extracted remote sensing data, a number of remote sensing images are obtained, and the obtained remote sensing images are mapped into the coordinate system of the corresponding digital elevation model, and the corresponding mapping process is digitally orthorectified, wherein the digital orthorectification is used to map the remote sensing images into the coordinate system and eliminate the image distortion caused by the ground deformation and the terrain undulation;

[0088] Further, based on the mapping results, the mapped remote sensing images are subjected to image registration and image fusion, wherein the image registration is to align the coordinate systems of different remote sensing images so that they are within the same geographic space, and the image fusion is to fuse multiple remote sensing images into a seamless image; after the image registration and image fusion are completed, the corresponding digital orthophoto is obtained;

[0089] The obtained digital orthophoto is compared with the corresponding third preset standard. If it meets the third preset standard, the corresponding digital orthophoto is saved. If it does not meet the third preset standard, the resolution of the corresponding digital orthophoto is adjusted until it meets the requirements; wherein the third preset standard refers to that the resolution of the digital orthophoto is better than 1m.

[0090] It should be further explained that, in the specific implementation process, the process of building the corresponding space sand table model based on the constructed digital orthophoto and digital elevation model includes:

[0091] The obtained digital elevation model and digital orthophoto were input into ArcGIS Pro software to obtain the corresponding terrain-geomorphology model;

[0092] Import the corresponding regional data information into the corresponding professional software respectively to obtain the corresponding GIS data set layer, BIM data set layer and vector data set layer; the GIS data set layer includes but is not limited to the feature layer, cadastral layer, geocoding layer, environment layer and vegetation layer; the BIM layer includes but is not limited to the building structure layer, equipment and facility layer, building appearance layer, space planning layer and material layer; the vector data set layer includes but is not limited to the road and trail layer, water system layer and pipeline layer;

[0093] At the same time, based on the regional data information, the data format, expression form and data volume corresponding to the terrain-geomorphology data, supporting road, water conservancy, management and maintenance room and other facilities and equipment data in the corresponding target area and various green vegetation data are obtained, and then the corresponding vector annotation layer is constructed based on them;

[0094] Further, the coordinate system of the digital elevation model is used as the auxiliary coordinate system, and the obtained GIS dataset layer, BIM dataset layer, vector dataset layer and vector annotation layer are superimposed, and the corresponding layers are moved up and down according to the display order until the display effect between the layers meets the actual needs; the corresponding initial sand table model is obtained;

[0095] Import part of the data in the corresponding area data information into the corresponding 3D modeling software for modeling to obtain the corresponding 3D model, wherein the 3D model includes but is not limited to a terrain model, a building model, an equipment model, an object model and an environment model. It should be further explained that the present invention performs 3D modeling based on DP-Modeler 3D modeling software linked to 3Ds Max by default, and the model accuracy is better than 10 cm;

[0096] The obtained three-dimensional models are deployed to the corresponding layers in the corresponding initial sandbox model according to their types, and the deployed three-dimensional models are adjusted based on the corresponding auxiliary coordinate system to make them more in line with the actual scene; after the deployment is completed, the corresponding space sandbox model is obtained.

[0097] It should be further explained that, in the specific implementation process, the obtained space sand table model is functionally interacted and scene verification is performed. After the verification is passed, the process of obtaining the corresponding electronic sand table includes:

[0098] Constructing a sandbox interactive platform, wherein the sandbox interactive platform has the functions of three-dimensional display, interactive operation, data analysis, etc.;

[0099] Integrate the obtained sand table interaction platform with the corresponding space sand table model and the collected regional data information to obtain a corresponding electronic sand table, which can provide users with a variety of basic functions and auxiliary functions based on the corresponding sand table interaction platform;

[0100] The basic functions include spatial measurement, analysis and statistics, roaming, space and attribute bidirectional query, and spatial object editing;

[0101] The spatial measurement, analysis and statistics function refers to outputting corresponding three-dimensional scenes to users based on the design planning drawings of the target area and the regional data information collected in real time, and can perform spatial distance and orientation measurement, data statistics and analysis through the corresponding three-dimensional scenes;

[0102] The roaming function is used to provide the user with a scene video of the target area based on the electronic sand table, and then the user can overlook and roam the corresponding scene video at any angle and height through the VR glasses to understand the regional scene of the corresponding target area in detail;

[0103] The spatial and attribute bidirectional query function means that users can query attribute information of the spatial data of the target area based on the sandbox interactive platform. The spatial data includes but is not limited to the land parcels and vegetation coverage status of the target area;

[0104] The spatial object editing function refers to the ability to create, modify and delete objects in the electronic sandbox based on the sandbox interactive platform;

[0105] At the same time, the sandbox interactive platform is also used to provide users with relevant auxiliary functions for regional planning based on the integrated basic functions; the specific auxiliary functions are as follows: by integrating the spatial object editing function, the spatial objects of the corresponding electronic sandbox are edited based on the existing planning scheme, and the edited electronic sandbox is displayed to the user with a roaming function, so that the user can quickly obtain a planning scheme with high satisfaction. At the same time, the data of the corresponding spatial object editing process is recorded, and the obtained time and space information such as creation and modification of the spatial object can be used for the management and dynamic monitoring of the planning object; and by statistics and analysis of the recorded data, it is conducive to the construction of various application models, and the spatial effect of the corresponding planning scheme is analyzed based on the constructed model;

[0106] Perform functional testing based on the obtained electronic sandbox and collect scene data during the corresponding functional testing process;

[0107] Obtaining scene rendering data of the corresponding electronic sandbox based on the obtained scene data; the scene rendering data includes but is not limited to scene geometry data, material data, lighting data and texture data;

[0108] Obtain rendering standards, where the rendering standards refer to the expected requirements for various rendering results set by staff based on actual needs;

[0109] The obtained scene rendering data is compared with the corresponding rendering standard. If there is at least one indicator data in the scene rendering data that is lower than the corresponding rendering standard, it means that the corresponding electronic sand table does not meet the expected requirements, and the scene rendering status of the corresponding electronic sand table is checked and corrected; if it meets the requirements, the corresponding electronic sand table is output to obtain the corresponding digital sand table, and the digital sand table construction is completed.

[0110] The above embodiments are only used to illustrate the technical method of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical method of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical method of the present invention.

Claims

1. A digital sandbox construction method based on BIM and GIS, characterized in that: The following steps are involved: Step 1: Collect data on the target greening area to obtain corresponding regional data information; Step 2: Process the obtained regional data information to obtain a corresponding digital elevation model, and perform model verification on the corresponding digital elevation model. If the verification passes, the corresponding digital elevation model is saved; Step 3: Construct the corresponding digital orthophoto based on the saved digital elevation model; Step 4: Build a corresponding space sand table model based on the constructed digital orthophoto and digital elevation model; Step 5: Perform functional interaction and scene verification on the obtained space sandbox model. After the verification is passed, the corresponding electronic sandbox is obtained.

2. The method for constructing a digital sandbox based on BIM and GIS according to claim 1, characterized in that: The process of collecting data on the target greening area and obtaining the corresponding regional data information includes: A data collection unit and a collection database are provided, wherein the data collection unit is used to collect data from the target greening area through a variety of collection methods to obtain corresponding collection data; The acquired collected data is read, summarized and sorted, corresponding regional data information is obtained, and the acquired regional data information is uploaded to the acquisition database for storage.

3. The method for constructing a digital sandbox based on BIM and GIS according to claim 2, characterized in that: The process of processing the obtained regional data information and obtaining the corresponding digital elevation model includes: Perform data preprocessing on the obtained regional data information, and after the preprocessing is completed, read the preprocessed regional data information to obtain corresponding remote sensing data and laser measurement data, obtain the ground surface reflection or height information of the target area based on the obtained laser measurement data, and mark it in the corresponding remote sensing data to obtain the corresponding terrain data point cloud; The obtained terrain data point cloud is divided based on the Delaunay triangulation algorithm to obtain the corresponding triangle network. Verify the obtained triangular network to determine whether it meets the first preset standard. If it does not meet the requirements, continue to split it. If it meets the requirements, store the corresponding triangular network. After the storage is completed, the elevation interpolation of the triangles in the corresponding triangular network is performed based on the Kriging interpolation method; the triangular network with completed elevation interpolation is rasterized and input into the GIS software to obtain the corresponding digital elevation model.

4. The method for constructing a digital sandbox based on BIM and GIS according to claim 3, characterized in that: The process of model validation for the corresponding digital elevation model includes: Obtain the corresponding digital elevation model and simultaneously obtain the three-dimensional coordinate system corresponding to the corresponding digital elevation model; According to the division requirements, the obtained digital elevation model is divided into regions to obtain a number of identical square blocks; Obtain the coordinate system of the corresponding digital elevation model and record it as the first coordinate system; Acquire coordinate information corresponding to the corresponding square block based on the obtained first coordinate system; Obtaining a visual point, and obtaining a visual distance and a blur degree corresponding to a corresponding visual point to a corresponding square block based on the obtained coordinate information and the visual point; Obtain the node coefficient corresponding to the corresponding square block based on the obtained visual distance and the corresponding blur degree; Set the node threshold and compare the obtained node coefficient with the node threshold; If the node coefficient is not lower than the node threshold, no other operations are performed; If the node coefficient is lower than the node threshold, the corresponding square block is adjusted. After the adjustment is completed, the model is verified again until all square blocks meet the requirements and the corresponding square blocks are recombined; The reassembled digital elevation model is compared with the GIS data in the corresponding regional data information and the second preset standard, and whether the corresponding digital elevation model meets the requirements is judged based on the comparison result; if it does not meet the requirements, the corresponding triangle network is re-interpolated and the digital elevation model is verified to obtain a new digital elevation model. If it meets the requirements, the corresponding digital elevation model is saved.

5. The method for constructing a digital sandbox based on BIM and GIS according to claim 4, characterized in that: The process of constructing the corresponding digital orthophoto based on the saved digital elevation model includes: Based on the extracted remote sensing data, a number of remote sensing images are obtained, the obtained remote sensing images are mapped into the coordinate system of the corresponding digital elevation model, and the corresponding mapping process is digitally orthorectified; Based on the mapping results, the mapped remote sensing images are image registered and image fused, and after the image registration and image fusion are completed, the corresponding digital orthophoto is obtained; The obtained digital orthophoto is compared with the corresponding third preset standard. If it meets the third preset standard, the corresponding digital orthophoto is saved. If it does not meet the third preset standard, the resolution of the corresponding digital orthophoto is adjusted until it meets the requirements.

6. The method for constructing a digital sandbox based on BIM and GIS according to claim 5, characterized in that: The process of building the corresponding spatial sand table model based on the constructed digital orthophoto and digital elevation model includes: The obtained digital elevation model and digital orthophoto were input into ArcGIS Pro software to obtain the corresponding terrain-geomorphology model; Import the corresponding regional data information into the corresponding professional software to obtain the corresponding GIS data set layer, BIM data set layer and vector data set layer; At the same time, a corresponding vector annotation layer is constructed based on the data format, expression form and data volume corresponding to the terrain-geomorphology data, supporting roads, water conservancy, and management and maintenance room equipment data in the corresponding target area in the regional data information; Using the corresponding terrain-geomorphology model base layer and the coordinate system of the digital elevation model as the auxiliary coordinate system, the obtained GIS dataset layer, BIM dataset layer, vector dataset layer and vector annotation layer are superimposed, and the corresponding layers are moved up and down according to the display order until the display effect between the layers meets the actual needs; the corresponding initial sand table model is obtained; Importing part of the data in the corresponding area data information into the corresponding three-dimensional modeling software for modeling to obtain the corresponding three-dimensional model; The obtained three-dimensional models are deployed to the corresponding layers in the corresponding initial sandbox model according to their types, and the deployed three-dimensional models are adjusted based on the corresponding auxiliary coordinate system; after the deployment is completed, the corresponding space sandbox model is obtained.

7. The method for constructing a digital sandbox based on BIM and GIS according to claim 6, characterized in that: The process of functional interaction of the obtained space sandbox model includes: Construct a sand table interactive platform, integrate the obtained sand table interactive platform with the corresponding space sand table model and the collected regional data information, and obtain the corresponding electronic sand table.

8. The method for constructing a digital sandbox based on BIM and GIS according to claim 7, characterized in that: The process of scene verification on the obtained electronic sand table includes: Perform functional testing based on the obtained electronic sandbox and collect scene data during the corresponding functional testing process; Obtaining scene rendering data of a corresponding electronic sandbox based on the obtained scene data; Obtain the rendering standard, compare the obtained scene rendering data with the corresponding rendering standard. If there is at least one indicator data in the scene rendering data that is lower than the corresponding rendering standard, check and correct the scene rendering status of the corresponding electronic sand table; if it meets the requirements, output the corresponding electronic sand table to obtain the corresponding digital sand table, and complete the digital sand table construction.