Source load storage low-carbon economic dispatching method based on virtual carbon emission intensity of power plant

By introducing virtual carbon emission intensity and kilowatt-hour virtual carbon emission costs, the problems of carbon transaction correlation and carbon emission data accuracy of small and medium-sized users in the power system are solved, the carbon emissions of the power system are optimized, and the user-side low-carbon behavior guidance is achieved and the expansion of price adjustment space for power generation entities.

CN118920486AActive Publication Date: 2024-11-08STATE GRID FUJIAN ELECTRIC POWER CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202410787380.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-18
Publication Date
2024-11-08
Estimated Expiration
2044-06-18

AI Technical Summary

Technical Problem

The existing technology has failed to effectively link small and medium-sized power users with carbon trading and carbon emission reduction, and the carbon emission data is not accurate, resulting in the lack of clear low-carbon electricity signal guidance on the user side and the failure to fully optimize the carbon of the power system. emission.

Method used

It proposes a low-carbon economic scheduling method based on the virtual carbon emission intensity of power plants. Through virtual carbon emission intensity and kilowatt-hour virtual carbon emission cost, guide the user side to adjust the electricity consumption behavior, optimize the total cost of the power system, and realize carbon emission responsibility. Controllable and transferable.

Benefits of technology

The actual measurement of carbon emissions throughout the day has been achieved, the responsibility for carbon emissions is relaxed and the current is coupled, the user-side low-carbon behavior guidance has been supported, the power system carbon emissions have been reduced, and the price adjustment space for power generation entities has been expanded.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118920486A_ABST
    Figure CN118920486A_ABST
Patent Text Reader

Abstract

The invention relates to a power plant virtual carbon emission intensity-based source-load-storage low-carbon economic dispatching method, which comprises the following specific steps of calculating a composite electricity price of a power generation main body based on the declared electricity price, power and virtual carbon emission intensity of the power generation main body, carrying out electric power spot clearing according to the composite electricity price of the power generation main body, and calculating a node electricity price; based on the network topology, the first clearing result and the virtual carbon emission intensity declared by the power generation main body, applying a carbon flow algorithm to calculate the virtual carbon emission intensity of the node, and obtaining the virtual carbon emission cost per kilowatt hour of the node; because price fluctuation exists in the node electricity price and the node kilowatt-hour virtual carbon emission cost in the preset scheduling period, the two parameters are used for guiding the user to adjust the electricity consumption behavior, and in the preset scheduling period, the virtual carbon emission cost is considered, the minimum total cost of the power system is used as a target function, second clearing is carried out, and a scheduling result is obtained. The scheduling result comprises a unit combination, unit output, an energy storage equipment combination and an energy storage power station charging and discharging curve.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of power system regulation, and more specifically, to a source-load-storage low-carbon economic dispatching method based on the virtual carbon emission intensity of power plants. Background Art

[0002] In the power system, carbon emissions are directly generated by the power generation side, and the power is used on the user side. The power dispatch on the power generation side is carried out according to the power generation needs of the user side. In the construction of a new power system with new energy as the main body, energy storage and flexible loads on the user side are important technical means to solve the volatility, randomness and intermittency of new energy. Combining source-load-storage, conducting low-carbon dispatch research, and optimizing resource allocation in a wider range are important means to reduce carbon emissions in the power system.

[0003] The current carbon emission trading system mainly focuses on the power generation industry and some large demand-side users, while the majority of small and medium-sized power users have not yet been included in its coverage. How to link the massive power users on the demand side with carbon trading and carbon emission reduction is of great significance to further power emission reduction.

[0004] At the market level, in order to cope with real-time changes in electricity supply and demand, electricity spot trading is usually conducted every 15 minutes or every hour, while the frequency of carbon trading is usually lower. How to achieve the coupling of the two markets in a certain time dimension is the key to carrying out low-carbon electricity dispatch.

[0005] On the power generation side, real-time measurements of carbon emissions usually have the problem of low accuracy. Using inaccurate carbon emission data to transmit carbon emission intensity signals to the user side cannot effectively guarantee carbon reduction effects.

[0006] On the user side, the construction of the electricity market relies on time-of-use electricity prices to guide users to adjust their electricity usage behaviors, which can reduce carbon emissions to a certain extent. However, since the changing trends of electricity prices and carbon emissions are not consistent, there is currently a lack of clear and direct signals for users to guide them to make low-carbon electricity usage behavior adjustments.

[0007] Existing technologies such as the Chinese patent number "CN115511349A" disclose a user-side steam-heat-electricity coupling low-carbon scheduling method involving carbon emission quotas. The method includes the following steps: S1: Collect required data; S2: Establish a user-side steam-heat-electricity coupling conversion model; S3: Construct a user-side carbon emission cost model based on carbon emission quotas; S4: Construct a user-side steam-heat-electricity coupling low-carbon scheduling model taking into account carbon emission quotas; when carbon emissions are less than the carbon emission quota, dispatch is mainly based on electricity economy; when carbon emissions are higher than the carbon emission quota, dispatch is performed taking into account both carbon emissions and economy; S5: Based on a genetic algorithm, solve the user-side steam-heat-electricity coupling low-carbon scheduling model taking into account carbon emission quotas, and output the optimal total electricity consumption, basic electricity consumption, and gas consumption of users in different time periods.

[0008] Prior art, such as the Chinese patent with patent number "CN108229865A", discloses a low-carbon economic dispatch method for an electric, thermal and gas integrated energy system based on carbon trading. The method includes the following steps: determining the free carbon emission amount of IES based on the purchased electricity and the electricity generated by the gas turbine; determining the actual carbon emissions of IES; determining the step-type carbon trading cost of IES based on the free carbon emission amount of IES and the actual carbon emissions of IES; constructing an IES low-carbon economic dispatch model based on the step-type carbon trading cost, and obtaining the required dispatch plan based on the model. The present invention establishes a carbon trading model suitable for IES, introduces low-carbon cleanliness into IES dispatch, provides a low-carbon economic dispatch method suitable for IES, and optimizes the carbon trading cost calculation model to enable it to have stricter control over IES carbon emissions.

[0009] The problem with the above-mentioned prior art is that it only considers the carbon emissions generated by traditional power generation methods for optimization, and does not consider the introduction of clean energy to jointly constitute the power system. Or it only considers the carbon emissions on the market side and the power generation side, and does not take the user side as an object of optimization. In view of the shortcomings of the prior art and the urgent need for improvement, the present invention proposes a source-load-storage low-carbon economic scheduling method based on the virtual carbon emission intensity of power plants. This method proposes a virtual carbon emission intensity, and adds the virtual amortized cost to the electricity price cost, which can bring a larger electricity price quotation range to the power generation entity, and can better guide the user side to adjust the electricity consumption behavior and reduce carbon emissions. Summary of the invention

[0010] In order to solve the above technical problems, the present invention proposes a source-load-storage low-carbon economic scheduling method based on the virtual carbon emission intensity of power plants.

[0011] The technical solution of the present invention is as follows:

[0012] On the one hand, the present invention proposes a source-load-storage low-carbon economic dispatch method based on the virtual carbon emission intensity of a power plant, which is characterized by comprising the following specific steps:

[0013] The composite electricity price of the power generation entity is calculated based on the electricity price, power, and virtual carbon emission intensity reported by the power generation entity. The power spot is cleared based on the composite electricity price of the power generation entity to calculate the node electricity price.

[0014] Based on the network topology, the first clearing results and the virtual carbon emission intensity reported by the power generation entity, the carbon flow algorithm is applied to calculate the virtual carbon emission intensity of the node and obtain the virtual carbon emission cost per kilowatt-hour of the node;

[0015] Since node electricity prices and node virtual carbon emission prices per kilowatt-hour fluctuate within the preset scheduling cycle, these two parameters are used to guide users to adjust their electricity usage behavior. Within the preset scheduling cycle, the virtual carbon emission cost is taken into consideration, and the second clearing is carried out with the minimum total cost of the power system as the objective function to obtain the scheduling results. The scheduling results include unit combination, unit output, energy storage equipment combination and energy storage power station charging and discharging curves.

[0016] As a preferred implementation, the specific formula of the composite electricity price is as follows:

[0017] P compond =P single +P carbon ×ρ carbon

[0018] Where P compond represents the composite electricity price, P single represents the electricity price, P carbon represents the carbon price, ρ carbon Represents virtual carbon emission intensity.

[0019] As a preferred implementation, the virtual carbon emission cost per kilowatt-hour of electricity of the node is as shown in the following formula:

[0020] C j =P carbon ×ρ j

[0021] Among them C j represents the virtual carbon emission cost per kWh of electricity of the node, P carbon represents the carbon price, ρ j Represents the virtual carbon emission intensity of the jth node, calculated according to the carbon flow theory.

[0022] As a preferred implementation, the total cost of the power system includes: energy storage power station charging and discharging costs, flexible load regulation costs, thermal power fuel costs, virtual carbon emission costs, wind power operation and maintenance costs, and photovoltaic operation and maintenance costs; the total cost of the power system within the dispatching period is expressed by the following formula:

[0023] C u,t =C bes,t+C wind,t +C solar,t +C fuel,t +C a,t +C carbon,t

[0024] Where t is the scheduling cycle time, C bes,t is the charge and discharge loss cost during period t, C wind,t is the operation and maintenance cost of the wind turbine in period t, C solar,t is the maintenance cost of the photovoltaic system in period t, C fuel,t is the operating cost of the thermal power unit during period t, C a,t is the adjustment cost caused by the user adjusting the electricity consumption strategy during period t, C carbon,t Virtual carbon emission cost in period t;

[0025] The calculation formula with the minimum total cost as the optimization goal is:

[0026]

[0027] As a preferred implementation, the flexible load adjustment cost is specifically:

[0028] C a,t =a t (ΔQ l,k ) 2 +b t ΔQ l,t

[0029] Among them, C a,t represents the adjustment cost caused by the user adjusting the electricity consumption strategy during period t, a t and b t To adjust the coefficient of the cost function, ΔQ l,t represents the amount of power adjustment of the user during time period t, which satisfies the following constraints:

[0030]

[0031] in, is the maximum load regulation.

[0032] On the other hand, the present invention also provides a source-load-storage low-carbon economic dispatching system based on the virtual carbon emission intensity of the power plant, comprising:

[0033] The electricity price calculation module, based on the electricity price, power, and virtual carbon emission intensity reported by the power generation entity, conducts electricity spot clearing with the power generation entity's composite electricity price and calculates the node electricity price;

[0034] The carbon emission cost calculation module uses the carbon flow algorithm to calculate the virtual carbon emission intensity of the node based on the network topology, the first clearing results and the virtual carbon emission intensity reported by the power generation entity, and obtains the virtual carbon emission cost per kilowatt-hour of the node;

[0035] The dispatch optimization module guides users to adjust their electricity consumption behavior based on node electricity prices and node kilowatt-hour virtual carbon emission costs. Within a day's dispatch cycle, the virtual carbon emission costs are considered, and the dispatch results are obtained with the minimum total cost of the power system as the objective function.

[0036] The result output module outputs the dispatching results of the unit combination, unit output, energy storage equipment combination and energy storage equipment charging and discharging curves.

[0037] As a preferred implementation, the carbon emission cost calculation module calculates the virtual carbon emission cost per kilowatt-hour of electricity of a node as shown in the following formula:

[0038] C j =P carbon ×ρ j

[0039] Among them C j represents the virtual carbon emission cost per kWh of electricity of the node, P carbon represents the carbon price, ρ j Represents the virtual carbon emission intensity of the j-th node.

[0040] As a preferred implementation, in the dispatch optimization module, the total cost of the power system within the dispatch period is expressed by the following formula:

[0041] C u,t =C bes,t +C wind,t +C solar,t +C fuel,t +C a,t +C carbon,t

[0042] Where t is the scheduling cycle time, C bes,t is the charge and discharge loss cost during period t, C wind,t is the operation and maintenance cost of the wind turbine in period t, C solar,t is the maintenance cost of the photovoltaic system in period t, C fuel,t is the operating cost of the thermal power unit during period t, C a,t is the adjustment cost caused by the user adjusting the electricity consumption strategy during period t, C carbon,t Virtual carbon emission cost in period t;

[0043] The calculation formula with the minimum total cost as the optimization goal is:

[0044]

[0045] On the other hand, the present invention further provides an electronic device having a computer program stored thereon, which, when executed by a processor, implements the source-load-storage low-carbon economic dispatching method based on the virtual carbon emission intensity of a power plant as described in any embodiment of the present invention.

[0046] On the other hand, the present invention also provides a computer-readable medium for storing one or more programs. When the one or more programs are executed by the one or more processors, the one or more processors implement the source-load-storage low-carbon economic dispatch method based on the virtual carbon emission intensity of the power plant as described in any embodiment of the present invention.

[0047] The present invention has the following beneficial effects:

[0048] 1. From the perspective of the power system, the source-load-storage low-carbon economic dispatch method based on virtual carbon emission intensity proposed in the present invention relaxes the close coupling of carbon emission responsibility and trend on the basis of ensuring the actual measurement of carbon emissions throughout the day, and proposes "virtual carbon emission intensity", so that the carbon emission intensity of the power generation entity becomes a controllable variable, realizes the free transfer of carbon emission responsibility, supports low-carbon guidance of users' electricity consumption behavior, and reduces carbon emissions from the power system.

[0049] 2. From the perspective of power generation entities, the "virtual carbon emission intensity" proposed in the present invention, while ensuring the actual measurement of carbon emissions throughout the day by power generation entities, relaxes the close coupling of carbon emission responsibility and trend, distinguishes between electricity prices and implicit carbon prices, transfers carbon emission responsibility to the user side, and expands the price adjustment space of power generation entities, providing optimization space for the price declaration strategy of power generation entities.

[0050] 3. From the user's perspective, the method proposed in the present invention can receive the node electricity price containing time series information, the node's carbon emission cost per kilowatt-hour, and the node's carbon emission intensity at the user node, so as to guide the user to adjust his electricity consumption behavior with clear carbon cost and carbon emission intensity, thereby reducing the overall carbon emissions of the system. BRIEF DESCRIPTION OF THE DRAWINGS

[0051] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments of the present application will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.

[0052] Figure 1 Low carbon dispatch logic diagram;

[0053] Figure 2 The main body of electricity-carbon coupling and the cost structure of the power system;

[0054] Figure 3 Deconstruction of user-side electricity prices. DETAILED DESCRIPTION

[0055] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0056] It should be understood that the step numbers used in this article are only for the convenience of description and are not intended to limit the order in which the steps are executed.

[0057] It should be understood that the terms used in the present specification are only for the purpose of describing specific embodiments and are not intended to limit the present invention. As used in the present specification and the appended claims, unless the context clearly indicates otherwise, the singular forms "a", "an" and "the" are intended to include plural forms.

[0058] The terms “include” and “comprising” indicate the presence of described features, integers, steps, operations, elements and / or components, but do not exclude the presence or addition of one or more other features, integers, steps, operations, elements, components and / or combinations thereof.

[0059] The term "and / or" means and includes any and all possible combinations of one or more of the associated listed items.

[0060] Embodiment 1:

[0061] In order to make the purpose, technical solutions and advantages of the present invention more clear, the following will be combined with the specific embodiments of the present application and refer to the attached Figure 1 , clearly and completely describe the technical solution of the present invention.

[0062] In order to solve the problems of the prior art, the present invention provides a source-load-storage low-carbon economic dispatching method based on the virtual carbon emission intensity of a power plant, comprising the following steps:

[0063] 1) This invention proposes an electricity-carbon coupling mechanism, which targets the power system composed of power generation entities such as thermal power plants, wind power plants, photovoltaic power stations, electricity users, and energy storage power stations, and carries out low-carbon economic dispatch.

[0064] Market players under the carbon coupling mechanism are Figure 2 shown.

[0065] 2) The power generation entity declares the electricity price, power and virtual carbon emission intensity, and the declared electricity price is compounded through the electricity-carbon coupling mechanism, and the composite electricity price is used as the declared electricity price of the power generation entity.

[0066] P compond =P single +P carbon ×ρ carbon

[0067] Where P compond represents the composite electricity price, P single represents the electricity price, P carbon represents the carbon price, ρ carbon Represents virtual carbon emission intensity.

[0068] 3) Carry out electricity spot clearing with the composite electricity price of power generation entities and calculate the node electricity price; based on the network topology and the virtual carbon emission intensity reported by the power generation entities, apply the carbon flow algorithm to calculate the virtual carbon emission intensity of the node and obtain the virtual carbon emission cost per kilowatt-hour of the node. Introduction to the carbon emission flow theory:

[0069] The branch carbon flow density can be expressed as the ratio of the cumulative carbon emissions flowing through the branch over a period of time to the amount of electricity passing through the branch, that is:

[0070]

[0071] Where L represents the set of branches, is the average branch carbon flow density of the ith branch, F i represents the cumulative amount of carbon emissions passing through branch i within a certain period of time, Q i Represents the amount of electricity passing through branch i within a certain period of time. Branch carbon flow density can describe the relationship between the flow and carbon emission flow on the branch in the power network. Similarly, there is a physical quantity used to describe the relationship between the carbon emission flow and flow at the node, namely, the node carbon emission intensity:

[0072]

[0073] Where N represents the set of nodes, ρ j represents the carbon emission intensity of the jth node, F j represents the carbon emissions flowing into node j per unit time, Q j It represents the power consumed by node j per unit time.

[0074] The virtual carbon emission cost per kilowatt-hour of the node is:

[0075] C j =P carbon ×ρ j

[0076] Among them C jrepresents the carbon emission cost of virtual electricity of the node, P carbon represents the carbon price, ρ j Represents the virtual carbon emission intensity of the j-th node.

[0077] 4) Since node electricity prices and node kilowatt-hour carbon emission prices fluctuate within the preset scheduling cycle, Figure 3 As shown, these two parameters are used to guide users to adjust their electricity consumption behavior. Within the preset scheduling period, the virtual carbon emission cost is considered, and the minimum total cost of the power system is used as the objective function to carry out the second clearing and obtain the scheduling results. The scheduling results include unit combination, unit output, energy storage equipment combination and energy storage power station charging and discharging curves.

[0078] 5) The present invention takes the minimum total cost of the power system as the optimization goal and solves the optimal power generation and utilization strategy of the power system within a period of time. The total cost of the power system includes the charging and discharging cost of the energy storage power station, the flexible load regulation cost, the thermal power fuel cost, the virtual carbon emission cost, the wind power operation and maintenance cost, and the photovoltaic operation and maintenance cost. Figure 2 shown.

[0079] 6) The state of charge of the energy storage device can be expressed as:

[0080]

[0081] Among them, SOC t Indicates the state of charge of the energy storage during the time period. and Respectively represent the charging and discharging amount of energy storage in the time period, η c and η d They are respectively the charging coefficient and the discharging coefficient of energy storage.

[0082] 7) The charging and discharging loss cost of the energy storage during period t can be expressed as C bes,t express:

[0083] C bes,t =τ bes |SOC t -SOC t-1 |

[0084] where τ bes It is a coefficient related to the loss cost of energy storage charging and discharging.

[0085] 8) The randomness of wind speed determines the uncertainty of the output power of wind turbines, which can be described by Weibull distribution. The wind speed calculation model is as follows:

[0086]

[0087] In the formula, v is the wind speed, c is the scale parameter of the Weibull distribution, and k is the state parameter. Using the above formula to calculate the probability density of wind speed, the relationship between the output power of the wind turbine and the real-time wind speed is as follows:

[0088]

[0089] In the formula, is the power generated by the wind turbine at time t; C p is the wind energy utilization coefficient; is the air density; A ω It is the vertical projection area of ​​the wind speed in the area swept by the unit blades; is the rated power of the unit; v in is the cut-in wind speed; v rated is the rated wind speed; v out To cut out wind speed.

[0090] 9) Operation and maintenance cost C of wind turbines in user period t wind,t It can be expressed as:

[0091]

[0092] In the formula, C Wind,t is the maintenance cost of the wind turbines in the park; K Wind is the operation and maintenance coefficient of the rth wind turbine; M t is the scheduling cycle, 24 hours; N Wind is the number of wind turbines.

[0093] 10) The randomness of solar radiation intensity determines the uncertainty of photovoltaic generator sets, which can be described by Beta distribution. The solar radiation intensity calculation model is as follows:

[0094]

[0095] In the formula, γ and γ max are the solar irradiance and maximum solar irradiance in period t respectively; α and β are the relevant parameters of Beta distribution respectively.

[0096] Output model of photovoltaic power generation:

[0097]

[0098] In the formula, χ Solar is the transformation efficiency; ρ Solar is the total area of ​​the photovoltaic module; θ t is the solar radiation intensity at time t.

[0099] 11) User photovoltaic unit operation and maintenance cost C during period t solar,t It can be expressed as:

[0100]

[0101] In the formula, C solar,t is the maintenance cost of the photovoltaic units in the park; K Solar is the operation and maintenance coefficient of the xth photovoltaic unit; M t is the scheduling cycle, 24 hours; N Solar is the number of PV panels.

[0102] 12) The calculation model of thermal power unit is as follows:

[0103] P H,b,t =P ruel,b,t η b,t

[0104]

[0105] Where P H,b,t P is the thermal power of the thermal power unit; fuel,b,t is the fuel consumption power; b,t is the thermal efficiency of the thermal power unit corresponding to the load rate at time t; r b,t is the load rate of the thermal power unit at time t; P H,b,max is the rated power of the thermal power unit; a1, a2, a3 are -0.6849, 1.525, 0.0951.

[0106] 13) Operation cost of thermal power unit during period t C fuel,t It can be expressed as:

[0107]

[0108] In the formula, C fuel,t is the operating cost of thermal power units; C fuel is the unit fuel cost coefficient; q is the fuel calorific value; s gb (t) is the start / stop status of the thermal power unit at time t; C gb,st It is the cost of starting up a thermal power unit once.

[0109] 14) For a large number of flexible and adjustable loads such as air conditioners, flexible users adjusting their electricity consumption strategies will inevitably cause some other problems such as loss of comfort. The losses caused by these problems can be described by a cost function. As the load adjustment amount increases, the accompanying regulation cost gradually increases. In this regard, the present invention describes the adjustment cost of the flexible load on the user side in the form of a quadratic function:

[0110] C a,t =a t (ΔQ l,t ) 2 +b t ΔQl,t

[0111] Among them, C a,t represents the adjustment cost caused by the user adjusting the electricity consumption strategy during period t, a t and b t To adjust the coefficient of the cost function, ΔQ l,t It represents the amount of power adjustment of the user during period t, which must meet the following constraints:

[0112]

[0113] in, is the maximum load regulation.

[0114] 15) For virtual carbon emission costs:

[0115]

[0116] Among them, C conv,gb is the conversion coefficient of unit fuel to carbon dioxide; P carbon The carbon price.

[0117] 16) Finally, the total cost C of the power system in period t is obtained u,t :

[0118] C u,t =C bes,t +C wind,t +C solar,t +C fuel,t +C a,t +C carbon,t

[0119] The objective function to be optimized in the system from 0 to T is:

[0120]

[0121] 17) Taking the minimization of the total cost of the power system as the objective function, the second clearing is carried out to obtain the dispatching results, which include the unit combination, unit output, energy storage equipment combination and the charging and discharging curves of the energy storage power station.

[0122] 18) The main constraints considered by the function include the self-operation constraints of various types of equipment such as units and energy storage, power balance constraints, etc., as follows:

[0123] a) System power balance constraints

[0124]

[0125] In the formula, is the power generation capacity of the thermal power unit at time t; is the wind power at time t; is the photovoltaic power generation power at time t; T t is the power input into the interconnection line at time t; is the power load at time t; is the energy storage charging power at time t; is the common power consumption of each subsystem at time t.

[0127] b) System backup constraints

[0128] System positive spare capacity constraint

[0129]

[0130] Among them, α i,t represents the start and stop status of thermal power unit i in period t, α i,t =0 means the unit is shut down, α i,t =1 indicates that the unit is on; N is the total number of thermal power units; is the maximum output of unit i in period t (usually rated capacity); β j,t represents the call status of energy storage j in period t, β j,t =0 means that the energy storage is not used, β j,t =1 means that the energy storage is called; is the energy storage discharge power; M is the total number of energy storage devices; D t is the system load in period t, which has deducted the net input power of the interconnection line; RtU is the system positive reserve capacity requirement in period t.

[0131] System Negative Reserve Capacity Constraint

[0132] The system negative reserve capacity constraint can be described as:

[0133]

[0134] in, is the minimum output of thermal power unit i in period t; is the energy storage charging power; k is the number of interconnection lines; T k t is the input power of tie line k at time t; is the system negative reserve capacity requirement for period t.

[0135] c) Output constraints of thermal power units

[0136]

[0137] In the formula, are the maximum and minimum output values ​​of the i-th thermal power unit respectively.

[0138] d) Thermal power unit climbing constraints

[0139]

[0140] In the formula, is the output of the i-th thermal power unit at time t and t-1; is the maximum climbing rate and maximum landslide rate of the i-th thermal power unit.

[0141] e) Wind power and photovoltaic output constraints

[0142]

[0143] In the formula, It is the maximum output of wind power and photovoltaic units.

[0144] f) Energy storage constraints

[0145] Charging power constraints

[0146]

[0147] Discharge power constraint

[0148]

[0149] Charge and discharge status limit

[0150]

[0151] Energy storage capacity constraints

[0152]

[0153] Energy storage cycle end power control

[0154] E s,t=0 =E s,t=T

[0155] Where:

[0156] is the energy storage charging and discharging power at time t;

[0157] The upper and lower limits of energy storage charging and discharging power;

[0158] The moment is the energy storage charging and discharging state;

[0159] E s,t 、E s,t=0 、E s,t=T They are the energy storage charge states at time t and the first and last moments respectively;

[0160] It is the energy storage charging and discharging efficiency;

[0161] Δt is the time interval in hours.

[0162] Embodiment 2:

[0163] This embodiment provides a source-load-storage low-carbon economic dispatching system based on virtual carbon emission intensity of power plants, including:

[0164] The electricity price calculation module, based on the electricity price, power, and virtual carbon emission intensity reported by the power generation entity, conducts electricity spot clearing with the power generation entity's composite electricity price and calculates the node electricity price;

[0165] The carbon emission cost calculation module uses the carbon flow algorithm to calculate the virtual carbon emission intensity of the node based on the network topology, the first clearing results and the virtual carbon emission intensity reported by the power generation entity, and obtains the virtual carbon emission cost per kilowatt-hour of the node;

[0166] The dispatch optimization module guides users to adjust their electricity consumption behavior based on node electricity prices and node kilowatt-hour virtual carbon emission costs. Within a day's dispatch cycle, the virtual carbon emission costs are considered, and the dispatch results are obtained with the minimum total cost of the power system as the objective function.

[0167] The result output module outputs the dispatching results of the unit combination, unit output, energy storage equipment combination and energy storage equipment charging and discharging curves.

[0168] Embodiment three:

[0169] This embodiment provides an electronic device having a computer program stored thereon, and when the computer program is executed by a processor, the source-load-storage low-carbon economic dispatch method based on the virtual carbon emission intensity of a power plant as described in any embodiment of the present invention is implemented.

[0170] Embodiment 4:

[0171] This embodiment provides a computer-readable medium for storing one or more programs. When the one or more programs are executed by the one or more processors, the one or more processors implement the source-load-storage low-carbon economic scheduling method based on the virtual carbon emission intensity of the power plant as described in any embodiment of the present invention.

[0172] In the embodiments of the present application, "at least one" refers to one or more, and "more than one" refers to two or more. "And / or" describes the association relationship of associated objects, indicating that three relationships may exist. For example, A and / or B can represent the existence of A alone, the existence of A and B at the same time, and the existence of B alone. Among them, A and B can be singular or plural. The character " / " generally indicates that the previous and next associated objects are in an "or" relationship. "At least one of the following" and similar expressions refer to any combination of these items, including any combination of single or plural items. For example, at least one of a, b and c can be represented by: a, b, c, a and b, a and c, b and c, or a and b and c, where a, b, c can be single or multiple.

[0173] Those of ordinary skill in the art will appreciate that the various units and algorithm steps described in the embodiments disclosed herein can be implemented in a combination of electronic hardware, computer software, and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.

[0174] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.

[0175] In several embodiments provided in the present application, if any function is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product, which is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (Read-Only Memory; hereinafter referred to as: ROM), random access memory (Random Access Memory; hereinafter referred to as: RAM), disk or optical disk, and other media that can store program codes.

[0176] The above descriptions are merely embodiments of the present invention and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. A source-load-storage low-carbon economic dispatch method based on virtual carbon emission intensity of power plants, characterized in that: The specific steps include: The composite electricity price of the power generation entity is calculated based on the electricity price, power, and virtual carbon emission intensity reported by the power generation entity. The power spot is cleared based on the composite electricity price of the power generation entity to calculate the node electricity price. Based on the network topology, the first clearing results and the virtual carbon emission intensity reported by the power generation entity, the carbon flow algorithm is applied to calculate the virtual carbon emission intensity of the node and obtain the virtual carbon emission cost per kilowatt-hour of the node; Since node electricity prices and node virtual carbon emission prices per kilowatt-hour fluctuate within the preset scheduling cycle, these two parameters are used to guide users to adjust their electricity usage behavior. Within the preset scheduling cycle, the virtual carbon emission cost is taken into consideration, and the second clearing is carried out with the minimum total cost of the power system as the objective function to obtain the scheduling results. The scheduling results include unit combination, unit output, energy storage equipment combination and energy storage power station charging and discharging curves.

2. The source-load-storage low-carbon economic dispatching method based on the virtual carbon emission intensity of power plants according to claim 1 is characterized by: The specific formula of the composite electricity price is as follows: P compond =P single +P carbon ×ρ carbon Where P compond represents the composite electricity price, P single represents the electricity price, P carbon represents the carbon price, ρ carbon Represents virtual carbon emission intensity.

3. The source-load-storage low-carbon economic dispatching method based on the virtual carbon emission intensity of power plants according to claim 1 is characterized by: The virtual carbon emission cost per kilowatt-hour of the node is shown in the following formula: C j =P carbon ×ρ j Among them C j represents the virtual carbon emission cost per kWh of electricity of the node, P carbon represents the carbon price, ρ j Represents the virtual carbon emission intensity of the jth node, calculated according to the carbon flow theory.

4. The source-load-storage low-carbon economic dispatching method based on the virtual carbon emission intensity of power plants according to claim 1 is characterized by: The total cost of the power system includes: charging and discharging costs of energy storage power stations, flexible load regulation costs, thermal power fuel costs, virtual carbon emission costs, wind power operation and maintenance costs, and photovoltaic operation and maintenance costs. The total cost of the power system during the dispatching period is expressed by the following formula: C u,t =C bes,t +C wind,t +C solar,t +C fuel,t +C a,t +C carbon,t Where t is the scheduling cycle time, C bes,t is the charge and discharge loss cost during period t, C wind,t is the operation and maintenance cost of the wind turbine in period t, C solar,t is the maintenance cost of the photovoltaic system in period t, C fuel,t is the operating cost of the thermal power unit during period t, C a,t is the adjustment cost caused by the user adjusting the electricity consumption strategy during period t, C carbon,t Virtual carbon emission cost in period t; The calculation formula with the minimum total cost as the optimization goal is:

5. The source-load-storage low-carbon economic dispatching method based on the virtual carbon emission intensity of power plants according to claim 4 is characterized by: The flexible load adjustment cost is specifically: C a,t =a t (ΔQ l,t ) 2 +b t ΔQ l,t Among them, C a,t represents the adjustment cost caused by the user adjusting the electricity consumption strategy during period t, a t and b t To adjust the coefficient of the cost function, ΔQ 1,t represents the amount of power adjustment of the user during time period t, which satisfies the following constraints: in, is the maximum load regulation.

6. A source-load-storage low-carbon economic dispatch system based on virtual carbon emission intensity of power plants, characterized in that: include: The electricity price calculation module, based on the electricity price, power, and virtual carbon emission intensity reported by the power generation entity, conducts electricity spot clearing with the power generation entity's composite electricity price and calculates the node electricity price; The carbon emission cost calculation module uses the carbon flow algorithm to calculate the node carbon emission intensity based on the network topology, the first clearing results and the virtual carbon emission intensity reported by the power generation entity, and obtains the virtual carbon emission cost per kilowatt-hour of the node; The dispatch optimization module guides users to adjust their electricity consumption behavior based on node electricity prices and node kilowatt-hour virtual carbon emission costs. Within a day's dispatch cycle, the virtual carbon emission costs are considered, and the dispatch results are obtained with the minimum total cost of the power system as the objective function. The result output module outputs the dispatching results of the unit combination, unit output, energy storage equipment combination and energy storage equipment charging and discharging curves.

7. The source-load-storage low-carbon economic dispatching system based on virtual carbon emission intensity of power plants according to claim 6 is characterized by: The carbon emission cost calculation module calculates the virtual carbon emission cost per kilowatt-hour of a node as shown in the following formula: C j =P carbon ×ρ j Among them C j represents the virtual carbon emission cost per kWh of electricity of the node, P carbon represents the carbon price, ρ j Represents the virtual carbon emission intensity of the j-th node.

8. The source-load-storage low-carbon economic dispatching system based on virtual carbon emission intensity of power plants according to claim 6 is characterized by: In the dispatch optimization module, the total cost of the power system during the dispatch period is expressed by the following formula: C u,t =C bes,t +C wind,t +C solar,t +C fuel,t +C a,t +C carbon,t Where t is the scheduling cycle time, C bes,t is the charge and discharge loss cost during period t, C wind,t is the operation and maintenance cost of the wind turbine in period t, C solar,t is the maintenance cost of the photovoltaic system in period t, C fuel,t is the operating cost of the thermal power unit during period t, C a,t is the adjustment cost caused by the user adjusting the electricity consumption strategy during period t, C carbon,t Virtual carbon emission cost in period t; The calculation formula with the minimum total cost as the optimization goal is:

9. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the program, the source-load-storage low-carbon economic scheduling method based on the virtual carbon emission intensity of the power plant as described in any one of claims 1 to 5 is implemented.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the source-load-storage low-carbon economic dispatch method based on the virtual carbon emission intensity of the power plant as described in any one of claims 1 to 5 is implemented.

Citation Information

Patent Citations

  • Conduction method based on carbon emission cost in power network

    CN115545498A

  • Economic dispatching method of wind-light-storage-containing virtual power plant considering stepped carbon price

    CN116187019A

  • Virtual power plant scheduling method, device and equipment based on carbon transaction mechanism

    CN116703085A

  • Power system regulation method based on deep reinforcement learning

    WO2024092954A1