Mobile energy storage configuration method for improving supply guarantee capability of power distribution network under influence of ice disaster

Ice disaster failure scenarios are generated through time series Monte Carlo simulation and K-mean clustering method, and combined with Big-M method to optimize mobile energy storage pre-layout and dynamic scheduling, the problem of maximizing the distribution network load loss under ice disaster is solved, and the problem of improving the load loss of the distribution network under ice disaster is improved. The resilience and disaster recovery capabilities of the distribution network.

CN118920529APending Publication Date: 2024-11-08NORTHEAST DIANLI UNIVERSITY +2
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411030552.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-30
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The existing technology is difficult to effectively coordinate the pre-layout strategy of mobile energy storage during the pre-disaster prevention stage in the ice disaster, resulting in the inability to minimize the load loss of the distribution network during the ice disaster, and the impact of dynamic scheduling after the disaster is not fully considered, so it cannot cope with it. Dynamic changes in grid failures.

Method used

The timing Monte Carlo simulation method is used to generate a set of fault scenarios for distribution network under ice disasters, and the number of scenes is reduced by combining the K-mean clustering method to establish a random optimization model for pre-disaster pre-layout of mobile energy storage that considers the dynamic evolution of fault scenarios. Through Big-M The method transforms nonlinear constraints into linear constraints, generates a mixed integer linear planning model, and optimizes the pre-disaster point distribution and dynamic scheduling scheme of mobile energy storage.

Benefits of technology

It significantly reduces the load loss cost of the distribution network during the ice disaster, improves the resilience level of the distribution network under the ice disaster, and achieves more accurate and rapid mobile energy storage scheduling and load recovery.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118920529A_ABST
    Figure CN118920529A_ABST
Patent Text Reader

Abstract

The invention discloses a mobile energy storage configuration method for improving the supply guarantee capability of a power distribution network under the influence of an ice disaster, and the method comprises the steps: generating a fault state of each line in each time period through a time sequence Monte Carlo simulation method according to an obtained line fault probability and considering the time-space transfer characteristic of the ice disaster, and completing the one-time complete sampling of a fault scene of the power distribution network under the ice disaster; repeating the sampling process until a plurality of scene sets are generated, and reducing the number of scenes by adopting a K-means clustering method to obtain S typical fault scenes; taking the minimum expected load loss cost of each node in S typical fault scenes in an ice disaster invasion process as a target, considering a pre-disaster layout position readjustment process of mobile energy storage in each fault scene in an ice disaster dynamic evolution process, and establishing a pre-disaster pre-layout random optimization model of the power distribution network mobile energy storage in consideration of fault scene dynamic evolution; and converting nonlinear constraints in the model into linear constraints based on a Big-M method, generating a mixed integer linear programming model for solving, and outputting a mobile energy storage optimal pre-disaster stationing position and a dynamic scheduling scheme in each fault scene during a disaster.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of power system resilience under extreme disasters, and in particular to a mobile energy storage configuration method for improving the power supply guarantee capability of a distribution network under the influence of ice disasters. Background Art

[0002] As the global climate continues to deteriorate, extreme weather such as ice disasters occur frequently, which poses a huge threat to the distribution network. Since the power lines are located in complex terrain, they are easily affected by ice disasters, which cause ice and snow on the power lines, resulting in large-scale power outages in the distribution network, causing serious economic losses and social impacts. [1-3] Therefore, the ability of distribution networks to cope with disasters has attracted widespread attention, and the concept of distribution network resilience has been introduced. [4] , that is, the ability of the distribution network to resist failures caused by external disasters and quickly recover to normal operation. In this context, how to coordinate and utilize multiple resilience enhancement measures at multiple stages of ice disasters to improve the distribution network's ability to ensure supply under the influence of ice disasters has become an urgent problem to be solved.

[0003] Among various types of flexibility resources, mobile energy storage systems can be moved between different load units by trucks, thereby providing a variety of services such as load transfer and voltage regulation. [5] At the same time, it has the characteristics of energy time shifting, which can provide energy support for important load loss nodes during ice disasters that attack the distribution network. [6] , which plays an important role in reducing users’ power outage losses and improving the resilience of distribution networks during disasters.

[0004] In recent years, the issue of improving the resilience of distribution networks under ice disasters has become a hot topic in the academic community. At present, the research on distribution network resilience is generally divided into the pre-disaster prevention stage, the disaster resistance and adaptation stage, and the post-disaster recovery stage. [7-8] Based on the advantages of mobile energy storage mentioned above, many scholars at home and abroad first consider optimizing the dynamic scheduling of mobile energy storage in the post-disaster load recovery phase. [9] Although the rapid recovery of critical loads can be achieved after a disaster, the role of mobile energy storage in the pre-disaster prevention stage is not considered. Therefore, a large number of scholars have begun to study the pre-disaster layout strategy of mobile energy storage and consider the dynamic scheduling of mobile energy storage after the disaster. By minimizing the load loss of the power grid in the first period of the disaster in the pre-disaster stage, mobile energy storage can be placed at nodes with large load loss.

[10] However, these studies did not consider the impact of post-disaster dynamic scheduling when formulating pre-disaster layout strategies for mobile energy storage, and could not guarantee the minimum grid load loss during the entire ice disaster. In order to give full play to the synergistic effect of mobile energy storage in decision-making at all stages of a disaster, a large number of studies have begun to focus on the impact of pre-disaster mobile energy storage plan formulation on the real-time dynamic scheduling of mobile energy storage after a disaster.

[11] , so that mobile energy storage can be dispatched more flexibly and quickly from pre-disaster deployment to each load loss node during the entire ice disaster, further improving the resilience of the distribution network. On this basis, many scholars have analyzed the impact of the uncertainty of distribution network failure scenarios under ice disasters on the pre-deployment and dispatch of mobile energy storage.

[12] , the problem is modeled and solved based on robust methods, stochastic optimization methods and other methods, but it is assumed that the situation of line disconnection caused by ice disasters does not change with time. However, in fact, as the ice disaster moves, the power line fault changes dynamically. Therefore, the pre-disaster layout strategy of mobile energy storage developed in the above research cannot better realize the rapid scheduling of mobile energy storage under the dynamic evolution of faults during disasters.

[0005] References

[0006] [1] Liu Xinrui, Li Xin, Sun Qiuye, et al. Distribution network situation awareness and weak link identification method considering ice disaster environment[J]. Power System Technology, 2019, 43(7): 2243-2250.

[0007] [2] Shao Dejun, Yin Xianggen, Chen Qingqian, et al. Analysis of the impact of the 2008 ice and snow disaster on the power grid in southern my country [J]. Power System Technology, 2009, 33(5): 38-43.

[0008] [3] Songhai Fan,

[0009] [4] Chen Chaoyang, Zhou Yong, Chi Ming, et al. A review of research on large power grid vulnerability based on complex network theory[J]. Control and Decision, 2022, 37(4): 782-798.

[0010] [5] Wang Yushan, Deng Hui, Wang Xu, et al. Optimal configuration and operation strategy of mobile energy storage in distribution network considering the temporal and spatial evolution of typhoons[J]. Automation of Electric Power Systems, 2022, 46(9): 42-51.

[0011] [6] Lu Zhigang, Li Dan, Lü Xuejiao, et al. Multi-fault repair strategy for distribution network with distributed generation during ice disasters[J]. Transactions of the Chinese Society of Electrotechnical Engineering, 2018, 33(2): 423-432.

[0012] [7] Chong Wang, Yunhe Hou, Feng Qiu. et al. Resilience enhancement with sequentially proactive operation strategies[J]. IEEE Transactions on Power Systems, 2017, 32(4): 2847-2857. [8] Liu Yuling, Zhang Feng, Zhang Gang, et al. Coordinated resilience recovery decision of distribution network during and after disaster considering distributed generation[J]. Automation of Electric Power Systems, 2024, 48(2): 48-58.

[0013] [9] Yang Lijun, Zhao Yu, Zhao You, et al. Balanced restoration of active distribution network faults considering emergency power supply vehicle dispatching in traffic network[J]. Automation of Electric Power Systems, 2021, 45(21): 170-180.

[0014]

[10] Wang Yuehan, Liu Wenxia, ​​Yao Qi, et al. Mobile energy storage pre-layout and dynamic dispatch strategy for improving distribution network resilience[J]. Automation of Electric Power Systems, 2022, 46(15): 37-45.

[0015]

[11] Shunbo Lei,Jianhui Wang,Chen Cheng.et al.Mobile emergencygenerator pre-positioning and real-time allocation for resilient response to natural disasters[J].IEEE Transactions on Smart Grid,2018,9(3):2030-2041.

[0016]

[12] Chen Yunhan, Xu Yin, Wang Ying, et al. Pre-disaster deployment of mobile emergency resources in urban distribution networks considering potential restoration needs[J]. Automation of Electric Power Systems, 2023, 47(14): 105-113. Summary of the invention

[0017] The present invention provides a mobile energy storage configuration method for improving the power supply guarantee capability of a distribution network under the influence of an ice disaster. The present invention is based on the dynamic evolution characteristics of distribution line faults caused by ice disasters, and coordinates the mobile energy storage re-dispatching decision-making under various fault scenarios during the disaster to formulate an optimal pre-disaster mobile energy storage pre-layout strategy, which significantly reduces the load loss cost of the distribution network during the ice disaster and improves the resilience of the distribution network to cope with ice disasters. See the following description for details:

[0018] A mobile energy storage configuration method for improving the power supply capability of a distribution network under the influence of an ice disaster, the method comprising:

[0019] According to the obtained line failure probability, considering the spatiotemporal transfer characteristics of ice disasters, the temporal Monte Carlo simulation method is used to generate the fault status of each line in each period, completing a complete sampling of distribution network fault scenarios under ice disasters; the sampling process is repeated until several scenario sets are generated, and the K-means clustering method is used to reduce the number of scenarios to obtain S typical fault scenarios;

[0020] Taking the minimum expected loss cost of each node load under S typical fault scenarios during the ice disaster as the goal, considering the pre-disaster layout readjustment process of mobile energy storage under various fault scenarios during the dynamic evolution of the ice disaster, a random optimization model for the pre-disaster layout of mobile energy storage in the distribution network considering the dynamic evolution of fault scenarios is established.

[0021] Based on the Big-M method, the nonlinear constraints in the model are converted into linear constraints, and a mixed integer linear programming model is generated for solution, thereby outputting the optimal pre-disaster deployment location of mobile energy storage and the dynamic scheduling scheme for various fault scenarios during the disaster.

[0022] The repeated sampling process until a number of scene sets are generated is:

[0023]

[0024] Among them, α k,t-1,s is a Boolean variable representing the fault status of line k in period t-1 under scenario s, P k,t is the failure probability of the kth line.

[0025] The stochastic optimization model of the pre-disaster layout of mobile energy storage equipment is:

[0026] The objective function is to minimize the expected loss cost of each node load under all possible failure scenarios during the ice disaster:

[0027]

[0028] Where S is the number of fault scenarios; T is the number of time periods divided into the research period; N is the number of distribution network nodes; γ s is the probability of occurrence of failure scenario s; c j The unit load reduction cost for node j; is the load reduction of node j in time period t under scenario s; ΔT is the duration of each time period;

[0029] The constraints include: pre-disaster deployment constraints for mobile energy storage equipment, scheduling constraints for mobile energy storage equipment under all fault scenarios that occur during ice disasters, output constraints for distributed power sources, and safety constraints on distribution network operation trends.

[0030] The mobile energy storage device scheduling constraints include: mobile energy storage device deployment location switching constraints during a disaster, specifically:

[0031]

[0032]

[0033]

[0034]

[0035]

[0036]

[0037] In the formula, is the connection status between the mobile energy storage device e and the node j in time period t under scenario s; This is the period when the line starts to be disconnected due to the ice disaster in scenario s; is the moving speed of the mobile energy storage device e; D j,k represents the travel distance between node j and node k; It represents the minimum number of time periods required for the deployment location of mobile energy storage e to switch between node j and node k; is the rounding-up operator; the first formula indicates that before the line is disconnected in scenario s, the mobile energy storage device does not participate in the scheduling and is always connected to the pre-disaster deployment location; the second formula indicates that each node of the power grid can deploy at most one mobile energy storage device in each time period in scenario s; the third formula indicates the total number of mobile energy storage devices that can be deployed in the distribution network in time period t in scenario s; the fourth and fifth formulas indicate the minimum number of time periods required for the mobile energy storage device to be scheduled between two nodes and the deployment location of the mobile energy storage device e to switch between nodes j and k.

[0038] The distributed power generation output constraints include:

[0039]

[0040]

[0041] The voltage drop equation constraint taking into account the dynamic change of line fault is:

[0042]

[0043]

[0044] The branch current constraint taking into account the dynamic change of line fault is:

[0045] 0≤l ij,t,s ≤(1-α ij,t,s ) ij,max

[0046] Among them, l ij,t,s is the square of the current amplitude flowing through line ij in time period t under scenario s; r ij and x ij are the resistance and reactance of line ij respectively; P ij,t,s and Q ij,t,s are the active power and reactive power flowing through line ij in time period t under scenario s; u i,t,s and u j,t,s are the squares of the voltage amplitudes at nodes i and j in time period t under scenario s; Z ij is the impedance of line ij; H is a sufficiently large positive number; l ij,max is the square of the critical overload current amplitude of line ij.

[0047] Wherein, the mixed integer linear programming model is:

[0048]

[0049]

[0050]

[0051]

[0052] In the formula, λ e,j,t,s , μ e,j,t,s is a non-negative continuous variable; M is a large positive number.

[0053] The beneficial effects of the technical solution provided by the present invention are:

[0054] 1. The strategy proposed in this invention considers the impact of the spatiotemporal transfer characteristics of ice disasters on the probability of distribution line failures, and uses time-series Monte Carlo simulation to generate a dynamically evolving set of power grid failure scenarios, which can more accurately describe the uncertainty of power grid failures under ice disasters;

[0055] 2. The strategy proposed in the present invention combines the real-time dispatching strategy of mobile energy storage under various dynamic evolution scenarios to construct a random optimization model for pre-disaster pre-location of mobile energy storage. The resulting pre-disaster pre-location strategy can achieve on-demand optimal pre-deployment and optimal dispatching allocation of limited emergency resources under the spatiotemporal characteristics of line faults, and dispatch more important load-loss nodes more accurately and quickly to provide energy support for them, thereby greatly improving the speed of dynamic dispatching of mobile energy storage between connection points after a disaster occurs;

[0056] 3. The strategy proposed in the present invention is closer to the actual dynamic process of ice disasters invading the distribution network. Compared with the mobile energy storage pre-layout strategy formulated without considering the changes in line fault status over time, it can further improve the power supply capacity and resilience level of the distribution network under ice disasters. BRIEF DESCRIPTION OF THE DRAWINGS

[0057] Figure 1 A flow chart of the pre-disaster layout strategy of mobile energy storage for distribution networks considering the dynamic evolution of faults under ice disasters;

[0058] Figure 2 It is the improved IEEE 33-node distribution network topology diagram;

[0059] Figure 3 It is the load active power prediction curve;

[0060] Figure 4 This is a diagram of the process of ice disaster attacking 33-node distribution network. DETAILED DESCRIPTION

[0061] In order to make the objectives, technical solutions and advantages of the present invention more clear, the embodiments of the present invention are described in further detail below.

[0062] In view of the problems existing in the background technology, the embodiment of the present invention proposes a mobile energy storage configuration method for improving the supply guarantee capability of the distribution network under the influence of ice disasters. First, the embodiment of the present invention analyzes and finely models the accumulated ice thickness and ice wind load of the line during the process of ice disasters invading the distribution network based on measured meteorological data, distribution network parameters and other information, and then models and solves the probability of line failure under ice disasters. In view of the uncertainty characteristics of line failures under ice disasters, Monte Carlo simulation sampling is used to generate a scene set consisting of the fault states of each line that change with the increase of the duration of the ice disaster. Secondly, in view of the dynamic evolution characteristics of the line fault state under the spatiotemporal transfer characteristics of the ice disaster, a random optimization modeling technology for pre-disaster pre-layout of mobile energy storage in the distribution network considering the dynamic evolution of faults under ice disasters is proposed. By coordinating the mobile energy storage position readjustment strategy after the disaster occurs, and introducing the time-varying line fault state variable in the constraints, the pre-disaster mobile energy storage pre-layout strategy is optimized to achieve the purpose of minimizing the load loss cost of the distribution network during the ice disaster. Finally, in order to solve the problem that nonlinear constraints in the proposed stochastic optimization model are difficult to solve directly, a linearization solution technology based on the Big-M method is proposed to transform the model into an easy-to-solve mixed integer linear programming problem. The mobile energy storage pre-layout strategy optimized according to this strategy can realize the accurate and rapid dispatch of mobile energy storage after the disaster occurs, while taking into account the dynamic evolution characteristics of the fault, which has broad application prospects in the future research on the resilience of power systems under ice disasters.

[0063] Example 1

[0064] In view of the impact of ice disasters on the distribution network, the embodiment of the present invention takes into account the temporal and spatial transfer characteristics of ice disasters, and based on the energy time-shift characteristics of mobile energy storage, provides a mobile energy storage configuration method for improving the power supply guarantee capability of the distribution network under the influence of ice disasters, such as Figure 1 As shown, the method comprises the following steps:

[0065] 101: Obtain information such as distribution network equipment parameters and meteorological data provided by the meteorological center;

[0066] 102: Calculate the wind speed at the location of each line according to the meteorological data such as the maximum wind speed in the environment and the positional relationship between the line and the ice disaster center obtained in step 101;

[0067] 103: Calculate the accumulated ice thickness on the line in each period according to the wind speed at each line location;

[0068] 104: Calculate the ice wind load per unit length of the line based on the wind speed at each line location and the accumulated ice thickness at each time period;

[0069] 105: Calculate the failure probability of a unit length line according to the ice and wind load of the unit length distribution line in each period, and calculate the failure probability of a line with a length of l according to the definition of the series network;

[0070] 106: Based on the obtained line failure probability and considering the spatiotemporal transfer characteristics of ice disasters, the temporal Monte Carlo simulation method is used to generate the fault status of each line in each period, and a complete sampling of the distribution network fault scenario under the ice disaster is completed; the sampling process is repeated until a sufficient number of scenario sets are generated, and the K-means clustering method is used to reduce the number of scenarios to obtain S typical fault scenarios;

[0071] 107: Taking the minimum expected loss cost of each node load under S typical fault scenarios during the ice disaster as the goal, considering the impact of the pre-disaster deployment location of mobile energy storage on the readjustment of mobile energy storage in the dynamic evolution of each distribution network fault field under the ice disaster, a random optimization model for the pre-disaster deployment of mobile energy storage in the distribution network considering the dynamic evolution of fault scenarios is established;

[0072] 108: Based on the Big-M method, the nonlinear constraints in the model are converted into linear constraints, and then the model is converted into a mixed integer linear programming model for solution, and the optimal pre-disaster deployment location of mobile energy storage and the dynamic scheduling plan during the disaster are output to ensure that when the line starts to be disconnected due to an ice disaster, the mobile energy storage can be accurately and quickly dispatched from the pre-disaster deployment location to the important load-loss nodes to supply power to them.

[0073] In summary, the embodiment of the present invention outputs the optimal mobile energy storage pre-disaster deployment location and the dynamic scheduling plan during the disaster through the above steps 101 to 108, thereby achieving accurate and rapid scheduling of mobile energy storage and rapid recovery of important loads during the disaster.

[0074] Example 2

[0075] The embodiment of the present invention takes into account the dynamic evolution process of power grid faults under ice disasters, constructs a dynamic fault scenario model of the distribution network affected by ice disasters, comprehensively considers the demand for pre-disaster pre-layout of mobile energy storage equipment for load supply guarantee under various fault scenarios, and constructs a random optimization model for pre-disaster pre-layout of mobile energy storage in the distribution network considering the dynamic evolution of fault scenarios. The model construction includes the following steps:

[0076] 201: Constructing a probability model for distribution line failures under ice disasters;

[0077] like Figure 2 As shown in the figure, under extreme ice disaster weather, the ice-covered distribution lines exposed to the air are subjected to the horizontal wind load L w In addition to the vertical ice load L I As the ice thickness continues to increase, when the ice wind load L wI When the load limit is exceeded, a disconnection fault will occur. In order to quantify the impact of the temporal and spatial evolution of ice disasters on the probability of distribution line failure, the embodiment of the present invention first constructs a distribution line wind load and ice load model based on ice disaster meteorological data.

[0078] Wind speed v at the location of the distribution line at each time period t It can be expressed as follows:

[0079]

[0080] In the formula, v max is the maximum wind speed in the environment; r t and θ t is the polar diameter and polar angle of the distribution line to the center of the ice disaster during period t; k1 is the attenuation coefficient; r max and θ max is the polar diameter and angle from the maximum wind speed point to the center of the ice disaster; β t It is the angle between the distribution line and the wind direction during period t.

[0081] According to the wind speed at the location of the distribution line, the cumulative ice thickness R of the distribution line during period t is eq,t It can be expressed as:

[0082]

[0083] In the formula, ΔT is the duration of each period divided by the research cycle; r s is the rainfall rate; ρ I is the density of ice; ρ W is the density of water; W is the water content in the air v τ The wind speed at the location of the distribution line for each time period.

[0084] The ice load and wind load per unit length of the line can be expressed as formula (3) and formula (4):

[0085] L I,t =9.8×10 -3 ρ I π(D+R eq,t )R eq,t (3)

[0086]

[0087] Where, L I,t is the ice load per unit length of the line during period t; L W,t is the wind load per unit length of the line in period t; C is the constant factor; D is the line diameter; S is the line span coefficient.

[0088] According to the ice load L in the vertical direction of the ice-covered line I,t and horizontal wind load L W,t , we can get the ice-wind load L under the combined action of wind load and ice load WI,t :

[0089]

[0090] According to the ice and wind load of the distribution line per unit length in each period, the failure probability of the distribution line per unit length can be calculated, as shown in formula (6):

[0091]

[0092] In the formula, a wl and b wl are the ice and wind load thresholds corresponding to the normal operation and failure of the distribution line at 100% confidence level; P f,t is the failure probability of the line per unit length in period t.

[0093] A distribution line with a length of l can be regarded as a series connection of l unit length lines, so the failure probability of the line is:

[0094] P t =1-(1-P f,t ) l (7)

[0095] 202: Generate dynamic fault scenarios of distribution network under ice disaster;

[0096] In order to accurately describe the impact of ice disasters on the distribution network, the embodiment of the present invention takes into account the temporal and spatial transfer characteristics of the ice disaster invasion process, calculates the time-varying distribution line failure probability under the ice disaster, and uses the time series Monte Carlo sampling method to simulate the distribution network failure scenario under the ice disaster. The specific steps are as follows:

[0097] 1) The process of ice disaster attacking the distribution network is divided into T time periods. According to the ice disaster forecast information obtained in advance and the geographical location information of the distribution network, the temporal and spatial transfer characteristics of the ice disaster are considered, such as Figure 3 As shown in the figure, the cumulative ice thickness of the line in each period is calculated by formula (2), and then the line ice wind load is obtained according to formula (3)-formula (5). Finally, the failure probability of the distribution line in each period during the movement of the ice disaster is calculated by formula (6) and formula (7).

[0098] 2) According to the fault state transfer process of the distribution line under ice disaster shown in formula (8), the temporal Monte Carlo sampling method is used to determine the fault state of all lines in the distribution network at each moment, and complete a complete sampling of the distribution network fault scenario under ice disaster. k,t,s is a random number uniformly distributed between [0,1] drawn from line k in time period t under scenario s; k,t,s is a Boolean variable representing the fault status of line k in period t under scenario s (0 means normal, 1 means fault). In the process of line status sampling, considering that the line cannot be repaired in time during the ice disaster, if line k fails in period t-1, the fault status will remain unchanged in the subsequent period sampling of this scenario.

[0099]

[0100] Among them, α k,t-1,s is a Boolean variable representing the fault status of line k in period t-1 under scenario s (0 means normal, 1 means fault), P k,t is the failure probability of the kth line.

[0101] 3) Continue sampling using step 2) until the preset N s distribution network fault scenarios, and then use the K-means clustering method to reduce the fault scenarios and generate S typical fault scenarios under ice disasters.

[0102] 203: Construct a stochastic optimization model for pre-disaster layout of mobile energy storage equipment;

[0103] The objective function is to minimize the expected loss cost of each node load under all possible failure scenarios during the ice disaster. The specific expression is as follows:

[0104]

[0105] Where S is the number of fault scenarios; T is the number of time periods divided into the research period; N is the number of distribution network nodes; γ s is the probability of occurrence of failure scenario s; c j The unit load reduction cost for node j; is the load reduction of node j in time period t under scenario s; ΔT is the duration of each time period, which is 15 minutes in the embodiment of the present invention.

[0106] The constraints include: pre-disaster deployment constraints for mobile energy storage equipment, scheduling constraints for mobile energy storage equipment under all possible failure scenarios that may occur during an ice disaster, output constraints for distributed power sources, and safety constraints on distribution network operation trends.

[0107] 1) Pre-disaster deployment constraints:

[0108] Formula (10) indicates that before a disaster, each distribution network node can deploy at most one mobile energy storage device; Formula (11) indicates the total number of mobile energy storage devices that can be deployed before a disaster.

[0109]

[0110]

[0111] In the formula, is the connection status between the mobile energy storage device e and the node j before the disaster (1 means connected, otherwise 0); E is the total number of deployable mobile energy storage devices.

[0112] 2) Disaster Dispatch Constraints:

[0113] a) Disaster-prone mobile energy storage equipment deployment location switching constraints:

[0114] During the ice disaster, with the dynamic evolution of the distribution line disconnection fault, the mobile energy storage device needs to adjust its deployment position in the power grid in real time to meet the potential demand for load recovery, and its deployment position switching needs to meet the following constraints. Among them, formula (12) indicates that before the line disconnection fault occurs in scenario s, the mobile energy storage device does not participate in the dispatch and is always connected to the pre-disaster deployment position; formula (13) indicates that each node of the power grid can deploy at most one mobile energy storage device in each time period in scenario s; formula (14) indicates the total number of mobile energy storage devices that can be deployed in the distribution network in time period t in scenario s; formula (15)-formula (16) indicate the minimum number of time periods required for the deployment position of the mobile energy storage device e to switch between node j and node k.

[0115]

[0116]

[0117]

[0118]

[0119]

[0120] In the formula, is the connection status between the mobile energy storage device e and the node j in the time period t under the scenario s (1 means connected, otherwise 0); This is the period when the line starts to be disconnected due to the ice disaster in scenario s; is the moving speed of the mobile energy storage device e; D j,k represents the travel distance between node j and node k; It represents the minimum number of time periods required for the deployment location of mobile energy storage e to switch between node j and node k; is the ceiling operator.

[0121] b) Individual charging and discharging constraints of mobile energy storage equipment:

[0122] Formula (17) represents the charging and discharging state constraint of the mobile energy storage device, so that it can only charge or discharge when connected; Formula (18)-Formula (19) are the upper and lower limit constraints of the charging and discharging power of the mobile energy storage device; Formula (20) is the charge state constraint of the mobile energy storage; Formula (21) represents the time coupling constraint of the power of the mobile energy storage device.

[0123]

[0124]

[0125]

[0126]

[0127]

[0128] In the formula, is a Boolean variable for the discharge state of the mobile energy storage device e in time period t under scenario s (1 means discharge, otherwise 0); is a Boolean variable for the charging status of the mobile energy storage device e in time period t under scenario s (1 means charging, otherwise 0); are the discharge power and charging power of the mobile energy storage device e in time period t under scenario s, respectively; are the maximum limits of discharge and charging power of mobile energy storage device e, respectively; is the remaining power of mobile energy storage e in time period t under scenario s; are the upper and lower limits of the energy storage capacity of the mobile energy storage device e, respectively; are the charging efficiency and discharging efficiency of the mobile energy storage device e respectively.

[0129] 3) Distributed power output constraints:

[0130]

[0131]

[0132] In the formula, are respectively the active power and reactive power generated by distributed generation i in time period t under scenario s; are the maximum active power and reactive power allowed to be generated by distributed generation i respectively; They are the minimum values ​​of active power and reactive power allowed to be emitted respectively.

[0133] 4) Distribution network power flow safety constraints:

[0134] Formula (24)-Formula (25) is the power balance constraint; Formula (26)-Formula (27) is the voltage drop equation constraint taking into account the dynamic change of line fault; Formula (28) is the node voltage constraint; Formula (29) is the branch current constraint taking into account the dynamic change of line fault; Formula (30) is the line flow constraint in the form of second-order cone; Formula (31) is the node load shedding constraint;

[0135]

[0136]

[0137]

[0138]

[0139]

[0140] 0≤l ij,t,s ≤(1-α ij,t,s ) ij,max (29)

[0141]

[0142]

[0143] Where u(j) is the set of first nodes of all distribution lines with j as the last node; v(j) is the set of last nodes of all distribution lines with j as the first node; l ij,t,s is the square of the current amplitude flowing through line ij in time period t under scenario s; r ij and x ij are the resistance and reactance of line ij respectively; P ij,t,s and Q ij,t,s are respectively the active power and reactive power flowing through line ij in time period t under scenario s; P j,DG,t,sand Q j,DG,t,s They are respectively the active power and reactive power output by the distributed generation of node j in time period t under scenario s; and are the active and reactive loads of node j in time period t under scenario s, respectively; is the active power of the load removed by node j in time period t under scenario s; u i,t,s and u j,t,s are the squares of the voltage amplitudes at nodes i and j in time period t under scenario s; Z ij is the impedance of line ij; H is a sufficiently large positive number; U i,min and U i,max are the minimum and maximum values ​​of the voltage at node i, respectively; l ij,max is the square of the critical overload current amplitude of line ij, and L is the number of distribution lines.

[0144] 204: Constructing a mixed integer linear programming model:

[0145] For the pre-disaster layout optimization model of mobile energy storage equipment in the distribution network considering the dynamic evolution of faults under ice disasters established in this embodiment, since constraint formula (24) contains Therefore, the Big-M method is used to linearize it and convert equation (24) into the following form:

[0146]

[0147]

[0148]

[0149]

[0150] In the formula, λ e,j,t,s , μ e,j,t,s is a non-negative continuous variable; M is a large positive number.

[0151] After the above linearization processing, the original model can be converted into a mixed integer linear programming model. By calling the Gurobi solver, the pre-disaster pre-deployment strategy of mobile energy storage in the distribution network can be solved, and the pre-disaster pre-deployment point location of mobile energy storage considering the dynamic evolution process of faults under ice disasters can be obtained. Combined with the comparison scheme, the influence of the pre-deployment point location on the dynamic dispatch of mobile energy storage to the load-losing node during the disaster is analyzed.

[0152] Example 3

[0153] The following is a specific example. Figure 2 , Figure 3 , Figure 4Table 1, Table 2, Table 3, Table 4, Table 5, and Table 6 verify the feasibility of the solutions in Examples 1 and 2, as described below:

[0154] This embodiment adopts Figure 2 The improved IEEE 33-node distribution system example shown in the figure is simulated and analyzed. The distributed power generation parameters are shown in Table 1, the mobile energy storage equipment parameters are shown in Table 2, and the initial power of each mobile energy storage is 900kW·h. The active power prediction curves of important loads and non-important loads during the ice disaster are shown in Figure 3 , the unit load reduction cost of important load nodes is 10.70 yuan / (kW·h), and the unit load reduction cost of non-important load nodes is 2.85 yuan / (kW·h). It is assumed that the road network topology of the coupled distribution network is the same as the grid topology, and the travel distance between adjacent electrical nodes is 5km.

[0155] Table 1 Distributed power supply parameters

[0156]

[0157] Table 2 Parameters of mobile energy storage equipment

[0158]

[0159] The embodiment of the present invention assumes that the ice disaster occurs at 19:00 and ends at 19:00 the next day, and lasts for 24 hours. The ice disaster meteorological data uses typical ice disaster data in a certain area in 2008. The process of ice disaster attacking the distribution network is as follows: Figure 4 As shown in the figure, the initial position of the ice disaster center is (-30km, -20km), the ice disaster moves at a speed of 4km / h at an angle of 60° along the horizontal axis, the wire diameter is 26.6mm, and the maximum wind speed in the environment is 23m / s. At the same time, it is assumed that the distribution network is disconnected from the main grid after the ice disaster occurs, and only the distributed power supply of the distribution network, mobile energy storage and other resources are relied on to supply power to the load.

[0160] 301: Analysis of dynamic evolution scenarios of power grid faults under ice disasters;

[0161] The time-varying probability of distribution line failure was calculated based on the model during the spatiotemporal evolution of the ice disaster. From 19:00 to 6:00 the next day, although the ice thickness continued to increase, it gradually approached or slightly exceeded the threshold value for line failure, making the line failure probability low and growing slowly during this stage. After 6:00 the next day, as the ice thickness exceeded the lower limit of the failure threshold and continued to deteriorate, the line failure probability increased rapidly. As the line ice approached the upper limit of the threshold for random line failure, the growth rate of the line failure probability tended to be flat. When the ice and wind load on the line exceeded the limit that the line could withstand, the line would inevitably break.

[0162] According to the time-varying failure probability of distribution lines under ice disasters, 400 power grid fault scenarios were generated by time series Monte Carlo simulation, and 30 representative scenarios were obtained by scenario reduction using K-means clustering. Although the number of line breaks in each scenario in the same period is slightly different, the cumulative number of line breaks has the same monotonically changing trend with the ice disaster invasion time. Therefore, taking scenario 11 as an example, the dynamic evolution characteristics of the number of line breaks under each fault scenario are analyzed. The line break situation in this scenario is shown in Table 3.

[0163] Table 3. Temporal and spatial evolution of faults in scenario 11

[0164]

[0165] As shown in Table 3, at 11:00 the next day, due to the continuous impact of the ice disaster on lines 3-4 and 5-6, the accumulated ice thickness resulted in a high probability of line failure, and the state generated by MCS was a fault state. At this time, the number of disconnections in the distribution network was 2; considering that the faulty lines could not be repaired in time during the ice disaster, lines 3-4 and 5-6 were always in a disconnected state before the end of the ice disaster; as the ice disaster evolved in time and space, more lines were affected by the ice disaster. At 11:30 the next day, line 21-22 changed from a normal state to a faulty state, and the number of disconnections in the distribution network was 3; as the ice disaster continued to evolve, more lines would have an increased probability of failure due to the accumulation of ice thickness, and the number of disconnections in the distribution network would increase until the end of the ice disaster, thus showing the temporal dynamic evolution characteristics of faults under the ice disaster.

[0166] 302: Validation of the pre-disaster layout results of mobile energy storage equipment considering the dynamic evolution characteristics of faults under ice disasters;

[0167] In order to illustrate the effectiveness of the proposed pre-disaster energy storage equipment pre-layout strategy considering the temporal and spatial evolution of faults, the following two schemes are designed for comparative analysis according to whether the dynamic evolution process of power grid faults is considered.

[0168] Solution 1: The dynamic evolution of power grid failures under ice disasters is not considered in the pre-disaster layout model of mobile energy storage.

[0169] Solution 2: Consider the dynamic evolution of power grid failures under ice disasters in the pre-disaster layout model of mobile energy storage.

[0170] Table 1 shows the results of the pre-layout of mobile energy storage under the two schemes, where the expected load loss cost is calculated based on the model of this embodiment, fixing the pre-layout positions of the mobile energy storage equipment optimized by the two schemes respectively, and substituting them into the typical fault scenario set generated by this embodiment.

[0171] Table 4 Pre-disaster layout results of mobile energy storage under different schemes

[0172]

[0173] Analysis shows that Scheme 1 assumes that the line disconnection scenarios in each scenario and time period are instantly changed to the accumulated line disconnection scenarios at the end of the ice disaster, ignoring the gradual dynamic process of the development of power grid line disconnection faults. Therefore, in order to meet the power supply needs under this severe fault scenario, MESS1 and MESS2 are deployed at nodes 9 and 13 respectively before the disaster, and the corresponding expected load loss cost is 49,336 yuan.

[0174] Compared with Scheme 1, Scheme 2 takes into account the temporal and spatial evolution characteristics of the fault and can more accurately simulate the dynamic scheduling process of mobile energy storage equipment after the ice disaster. At this time, MESS1 and MESS2 are deployed at nodes 5 and 9 respectively before the disaster. After the disaster, MESS can follow the dynamic evolution of the fault under the ice disaster to provide power support for important loads more accurately and quickly, reducing the expected load loss cost of the distribution network from 49,336 yuan to 46,122 yuan, a reduction of about 6.5%.

[0175] In summary, considering the spatiotemporal evolution of power grid faults can improve the pertinence and effectiveness of the pre-disaster mobile energy storage equipment deployment plan, reduce the expected load loss cost after a disaster, and maximize the power supply needs of urban distribution networks.

[0176] 303: Verification of the effectiveness of the energy storage equipment scheduling strategy considering the dynamic evolution characteristics of faults under ice disasters.

[0177] In order to analyze the impact of the pre-disaster layout scheme of mobile energy storage equipment on its scheduling strategy in the fault scenario, this embodiment takes scenario 11 shown in Table 3 as an example (the line starts to be disconnected at 11:00 the next day, and no new disconnection occurs after 14:30, and the cumulative number of faulty lines is 12), and compares and analyzes the scheduling strategies of mobile energy storage equipment under the two pre-disaster layout schemes of mobile energy storage shown in Table 4. Tables 5 and 6 respectively give the dynamic scheduling strategies of mobile energy storage equipment in Scheme 1 and Scheme 2 in scenario 11.

[0178] Table 5 Charging and discharging of mobile energy storage during redispatch in Scheme 1

[0179]

[0180] Note: Positive numbers for charge and discharge capacity represent discharge capacity, and negative numbers represent charge capacity.

[0181] Table 6 Charging and discharging of mobile energy storage during redispatch in Scheme 2

[0182]

[0183]

[0184] Note: Positive numbers for charge and discharge capacity represent discharge capacity, and negative numbers represent charge capacity.

[0185] From the analysis, it can be seen that in scheme 1, MESS1 and MESS2 were deployed at nodes 9 and 13 before the disaster. Since the lines 3-4 and 5-6 were disconnected at 11:00, the important load of node 4 lost power, and the lines 9-10 and 6-26 were disconnected at 12:00, which caused more important loads of nodes 7 and 8 to lose power supply. In order to minimize the loss of load, MESS1 remained in the same position from 11:00 to 12:00, and supplied power to the important loads of nodes 7 and 8 from 12:00 to 12:30, and was dispatched to node 10 at 12:45 to charge until 13:30. MESS2 deployed at node 13 was far away from node 4. At the same time, in order to avoid greater load loss at nodes 7 and 8, MESS2 was dispatched from 11:30, and deployed at node 9 at 12:30 to replace MESS1 to supply power until 13:45, and then dispatched to node 10 at 14:00 to charge until 15:00. During the transfer charging period of MESS2, MESS1 was dispatched to node 9 at 13:45 to replace MESS2 to supply power until 15:15, and alternately supplied power with MESS2 at node 9 from 15:15 to 17:00. From 17:00 to 19:00, as the load demand of nodes 7 and 8 decreased, MESS2 was dispatched to node 11 at 17:30 for a short charge, and then dispatched to node 13 at 18:15 to supply power to nodes 14, 16, 17, and 18 until the ice disaster ended. It should be noted that in this fault scenario, since the important load nodes 21 and 29 had a small amount of load loss and were far away from the pre-layout nodes of the energy storage equipment, neither MESS1 nor MESS2 transferred power to these nodes.

[0186] In solution 2, MESS1 and MESS2 are deployed at nodes 5 and 9 respectively before the disaster. From 11:00 to 11:30, MESS1 deployed at node 5 can supply power to node 4, and then transfer to node 6 for charging from 11:45 to 12:00. From 12:00 to 12:45, MESS2 deployed at node 9 supplies power to nodes 7 and 8, and then is dispatched to node 12 for charging from 13:30 to 14:00. At the same time, MESS1 begins to transfer at 12:00, and is dispatched to node 9 at 12:45 to replace MESS2 to supply power until 14:45. Since MESS1 can meet the power supply needs of nodes 7 and 8 during the period of 14:00-14:45, in order to improve the utilization efficiency of mobile energy storage, MESS2 will continue to supply power to nodes 14, 16, 17, and 18 at node 12 after the failure of line 11-12 until 15:00 after being fully charged at 14:00, while MESS1 needs to be dispatched to node 10 for charging from 15:00 to 16:45, and dispatched back to node 9 at 17:00 to continue supplying power until the ice disaster ends. Since MESS2 has a low power level at 15:00 and line 12-13 fails, in order to reduce the load loss of nodes 14, 16, 17, and 18, MESS2 needs to be dispatched to node 11 at 15:15 to charge until 16:00, and then dispatched to node 13 at 16:30 to supply power until the ice disaster ends.

[0187] Among the two schemes, although Scheme 2 has a certain load loss from 15:00 to 17:00 due to the lack of energy storage equipment to power nodes 7 and 8, it can power important load-loss nodes 4, 14, 16, 17, and 18 earlier than Scheme 1, making the overall load loss cost of Scheme 2 smaller and having better supply guarantee capabilities in this scenario.

[0188] Those skilled in the art will appreciate that the accompanying drawing is only a schematic diagram of a preferred embodiment, and the serial numbers of the embodiments of the present invention are only for description and do not represent the advantages or disadvantages of the embodiments.

[0189] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A mobile energy storage configuration method for improving the power supply capability of a distribution network under the influence of ice disasters, characterized in that: The method comprises: According to the obtained line failure probability, considering the spatiotemporal transfer characteristics of ice disasters, the temporal Monte Carlo simulation method is used to generate the fault status of each line in each period, completing a complete sampling of distribution network fault scenarios under ice disasters; the sampling process is repeated until several scenario sets are generated, and the K-means clustering method is used to reduce the number of scenarios to obtain S typical fault scenarios; Taking the minimum expected loss cost of each node load under S typical fault scenarios during the ice disaster as the goal, considering the pre-disaster layout readjustment process of mobile energy storage under various fault scenarios during the dynamic evolution of the ice disaster, a random optimization model for the pre-disaster layout of mobile energy storage in the distribution network considering the dynamic evolution of fault scenarios is established. Based on the Big-M method, the nonlinear constraints in the model are converted into linear constraints, and a mixed integer linear programming model is generated for solution, thereby outputting the optimal pre-disaster deployment location of mobile energy storage and the dynamic scheduling scheme for various fault scenarios during the disaster.

2. A mobile energy storage configuration method for improving the power supply capability of a distribution network under the influence of an ice disaster according to claim 1, characterized in that: The repeated sampling process is performed until a number of scene sets are generated: Among them, α k,t-1,s is a Boolean variable representing the fault status of line k in period t-1 under scenario s, P k,t is the failure probability of the kth line.

3. A mobile energy storage configuration method for improving the power supply capability of a distribution network under the influence of an ice disaster according to claim 1, characterized in that: The stochastic optimization model of the pre-disaster layout of mobile energy storage equipment is: The objective function is to minimize the expected loss cost of each node load under all possible failure scenarios during the ice disaster: Where S is the number of fault scenarios; T is the number of time periods divided into the research period; N is the number of distribution network nodes; γ s is the probability of occurrence of failure scenario s; c j The unit load reduction cost for node j; is the load reduction of node j in period t under scenario s; ΔT is the duration of each period; The constraints include: pre-disaster deployment constraints for mobile energy storage equipment, scheduling constraints for mobile energy storage equipment under all fault scenarios that occur during ice disasters, output constraints for distributed power sources, and safety constraints on distribution network operation trends.

4. A mobile energy storage configuration method for improving the power supply capability of a distribution network under the influence of an ice disaster according to claim 3, characterized in that: The mobile energy storage device scheduling constraints include: mobile energy storage device deployment location switching constraints during disasters, specifically: In the formula, is the connection status between the mobile energy storage device e and the node j in the time period t under the scenario s; This is the period when the line starts to be disconnected due to the ice disaster in scenario s; is the moving speed of the mobile energy storage device e; D j,k represents the travel distance between node j and node k; It represents the minimum number of time periods required for the deployment location of mobile energy storage e to switch between node j and node k; is the rounding-up operator; the first formula indicates that before the line breaks in scenario s, the mobile energy storage device does not participate in the scheduling and is always connected to the pre-disaster deployment location; the second formula indicates that each node of the power grid can deploy at most one mobile energy storage device in each time period in scenario s; the third formula indicates the total number of mobile energy storage devices that can be deployed in the distribution network in time period t in scenario s; the fourth and fifth formulas indicate the minimum number of time periods required for the deployment location of the mobile energy storage device e to switch between node j and node k.

5. A mobile energy storage configuration method for improving the power supply capability of a distribution network under the influence of ice disasters according to claim 3, characterized in that: The distributed power generation output constraints include: The voltage drop equation constraint taking into account the dynamic change of line fault is: The branch current constraint taking into account the dynamic change of line fault is: 0≤l ij,t,s ≤(1-α ij,t,s )l ij,max Among them, l ij,t,s is the square of the current amplitude flowing through line ij in time period t under scenario s; r ij and x ij are the resistance and reactance of line ij respectively; P ij,t,s and Q ij,t,s are the active power and reactive power flowing through line ij in time period t under scenario s; u i,t,s and u j,t,s are the squares of the voltage amplitudes at nodes i and j in time period t under scenario s; Z ij is the impedance of line ij; H is a sufficiently large positive number; l ij,max is the square of the critical overload current amplitude of line ij.

6. A mobile energy storage configuration method for improving the power supply capability of a distribution network under the influence of an ice disaster according to claim 1, characterized in that: The mixed integer linear programming model is: In the formula, λ e,j,t,s , μ e,j,t,s is a non-negative continuous variable; M is a large positive number.

Citation Information

Cited By

  • Cellular automaton-based urban power distribution network fault defense method under flood disaster

    CN120317567A